A method and system for automatically correcting the path of an industrial robot

By analyzing obstacle data on the robot path, calculating the difficulty value of the dysfunction and the estimated time of the path, generating a correction signal to control the driving speed, solving the problem of unstable walking speed of industrial robots, and improving the stability and completion time of the path walking speed Controllability.

CN118707960BActive Publication Date: 2024-12-06SHENZHEN ZHIKU INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411198801.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-06
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

Existing industrial robots have poor speed stability during walking and lack effective preset walking speed correction methods, resulting in unstable speed during path walking.

Method used

By obtaining obstacle data on the robot path, analyzing obstacle difficulty values, generating obstacle impact signals, determining the path impact obstacles, and estimating the time of the computer robot's path. If the preset standard time is exceeded, a correction signal will be generated to obtain the correction speed and control the driving speed.

Benefits of technology

It realizes accurate correction of the walking speed of industrial robots, improves the speed stability during path walking, and ensures that the robot can complete the driving of the path within a specified time under different obstacles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118707960B_ABST
    Figure CN118707960B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of industrial robots, and in particular to a method and system for automatically correcting the path of an industrial robot, comprising the following steps: obtaining obstacle data of the robot path; analyzing to obtain the obstacle difficulty value of each obstacle on the path to be traveled; generating a large obstacle impact signal if the obstacle difficulty value is greater than or equal to an obstacle difficulty threshold; determining the path-impacting obstacle based on the generated large obstacle impact signal, and then analyzing to obtain the robot's estimated path time according to a data model, and generating a correction signal if the robot's estimated path time is greater than a preset path standard time; obtaining the robot's correction speed based on the correction signal, and then controlling the robot's path travel speed; the present invention ensures that the industrial robot can complete the path travel work within a specified time, so that before the robot walks, its preset walking speed is accurately corrected to improve the speed stability of the robot during subsequent path walking.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of industrial robots, and in particular to a method and system for automatically correcting the path of an industrial robot. Background Art

[0002] In order to improve the degree of automation in the handling of goods and other items, especially in the warehousing field, the application of walking robots is becoming more and more common.

[0003] In the prior art, industrial robots usually make automatic corrections in the following ways: in the real-time walking process, the robot judges the obstacles ahead and analyzes whether to make corrections to the preset route. However, at present, the walking time correction of industrial robots is relatively lacking. In the walking process, the robot frequently corrects the walking speed according to roadblocks and other conditions to ensure that the walking time is correct. This will lead to the problem of poor speed stability of the robot during the path walking process. Therefore, how to accurately correct the preset walking speed of the robot before it walks to improve the speed stability of the robot during the subsequent path walking process. Summary of the invention

[0004] The purpose of the present invention is to provide a method and system for automatically correcting the path of an industrial robot. The technical problem solved by the present invention is: how to accurately correct the preset walking speed of the robot before it walks, so as to improve the speed stability of the robot during subsequent path walking.

[0005] The purpose of the present invention can be achieved by the following technical solutions:

[0006] A method for automatically correcting an industrial robot path comprises the following steps:

[0007] Step 1: Obtain obstacle data of the robot path;

[0008] Step 2: Based on the obstacle data, the obstacle difficulty value of each obstacle on the path to be driven is analyzed;

[0009] Step 3: If the obstacle difficulty value is greater than or equal to the obstacle difficulty threshold, a large obstacle impact signal is generated;

[0010] Step 4: Based on the generation of the obstacle impact signal, the path impact obstacle is determined, and then the robot's estimated movement time is analyzed according to the data model. If the robot's estimated movement time is greater than the preset movement standard time, a correction signal is generated;

[0011] Step 5: Based on the correction signal, the correction speed of the robot is obtained, and then the path driving speed of the robot is controlled.

[0012] As a further solution of the present invention: in step 1, the number of obstacles on the path to be driven by the industrial robot is collected, and then obstacle data of each obstacle is obtained; wherein the obstacle data includes an obstacle peak value and an obstacle peak distance;

[0013] The process of obtaining the obstacle peak is as follows: obtaining the height of each wave peak and marking it as the obstacle peak;

[0014] The process of obtaining the obstacle peak distance is as follows: obtaining the distance between adjacent wave peaks and marking it as the obstacle peak distance.

[0015] As a further solution of the present invention: in step 2, the obstacle peak value of each obstacle on the path to be traveled is obtained, the first obstacle coefficient and the second obstacle coefficient are calculated, the first obstacle coefficient and the second obstacle coefficient are summed to obtain the obstruction coefficient of each obstacle, and the obstruction coefficient is multiplied with the average obstacle peak distance to obtain the walking obstacle value ZZ;

[0016] Then obtain the first wave crest and the last wave crest of each obstacle, and calculate the climbing obstacle value ZP and the descending obstacle value ZX;

[0017] The climbing obstacle value ZP, the walking obstacle value ZZ and the descending obstacle value ZX are summed up to obtain the obstacle difficulty value of each obstacle.

[0018] As a further solution of the present invention: the calculation process of the first obstacle coefficient is:

[0019] For each obstacle, obtain all obstacle peaks in each obstacle, calculate the average of all obstacle peaks, and obtain the average obstacle peak;

[0020] Then calculate the standard deviation of all obstacle peak values ​​and the obstacle average peak value to obtain the first obstacle coefficient.

[0021] As a further solution of the present invention: the calculation process of the second obstacle coefficient is:

[0022] For each obstacle, take all the obstacle peak distances in each obstacle, calculate the average of all the obstacle peak distances, and obtain the average obstacle peak distance;

[0023] Then calculate the standard deviation of all obstacle peak distances and the obstacle average peak distance to obtain the second obstacle coefficient.

[0024] As a further solution of the present invention: the calculation process of the climbing obstacle value ZP is:

[0025] Then connect the first wave crest with the starting point of the obstacle to obtain the climbing segment, obtain the angle A1 between the climbing segment and the horizontal plane, and obtain the length L1 of the climbing segment. , calculate the climbing obstacle value ZP;

[0026] The calculation process of the descending barrier value ZX is:

[0027] Connect the last wave crest with the end point of the obstacle to obtain the descending line segment, obtain the angle A2 between the descending line segment and the horizontal plane, and obtain the length L2 of the descending line segment. , calculate the descending barrier value ZX.

[0028] As a further solution of the present invention: in step 4, when a large obstacle impact signal is obtained, the obstacle corresponding to the large obstacle impact signal is marked as a path impact obstacle;

[0029] Substitute the obstacle difficulty value of the path-affecting obstacle into the two-dimensional model of travel time and obstacle difficulty value, and output the time required for the robot to pass the path-affecting obstacle, which is recorded as the estimated obstacle passing time;

[0030] The estimated time for overcoming all obstacles on the path to be driven is summed up to obtain the total estimated time for overcoming obstacles;

[0031] Then obtain the length of the robot's path to be driven in the non-path-affecting obstacles and the robot's preset average speed, calculate the ratio of the length to the average speed, and obtain the total estimated obstacle-free time;

[0032] The estimated total time of overcoming obstacles and the estimated total time of not having obstacles are calculated and the estimated time of robot movement is obtained;

[0033] If the robot's estimated movement time is greater than the preset movement standard time, a correction signal is generated.

[0034] As a further solution of the present invention: in step 5, when the correction signal is obtained, the robot's estimated movement time and the preset movement standard time are obtained, and the difference between the robot's estimated movement time and the preset movement standard time is calculated to obtain the movement control time;

[0035] Then, the length of the path to be driven by the robot at the non-path affecting obstacles is obtained, and the ratio of the length to the travel control time is calculated to obtain the corrected speed of the robot.

[0036] As a further solution of the present invention: the corrected speed of the robot is summed with the preset average speed of the robot to obtain the actual path travel speed of the robot.

[0037] A system for automatically correcting the path of an industrial robot, the system comprising:

[0038] Acquisition module: obtains obstacle data of the robot path;

[0039] Analysis module: Based on the obstacle data, the obstacle difficulty value of each obstacle on the path to be driven is analyzed;

[0040] The first generation module: if the obstacle difficulty value is greater than or equal to the obstacle difficulty threshold, a large obstacle impact signal is generated;

[0041] The second generation module: based on the generation of the obstacle impact signal, the path impact obstacle is determined, and then the robot's estimated movement time is analyzed according to the data model. If the robot's estimated movement time is greater than the preset movement standard time, a correction signal is generated;

[0042] Correction module: Based on the correction signal, the correction speed of the robot is obtained, and then the path driving speed of the robot is controlled.

[0043] Beneficial effects of the present invention:

[0044] The present invention obtains obstacle data of the robot path; based on the obstacle data, analyzes and obtains the obstacle difficulty value of each obstacle on the path to be driven; compares the obstacle difficulty value of each obstacle with the corresponding threshold value to generate an obstacle impact magnitude signal; the present invention analyzes the obstacles that the industrial robot path is to pass through from multiple dimensions such as up and down slopes, the height of the peak points and the dispersion degree of the spacing, and the distance between the peak points, and judges the impact on the robot in the actual movement process based on this, and can more accurately correct the industrial robot path according to the analyzed impact degree;

[0045] The present invention is based on generating a large obstacle impact signal, determining the path impact obstacles, and then analyzing the robot's estimated movement time according to the data model, and then generating the robot working signal by comparing it with the preset movement standard time; based on the correction signal, the robot's correction speed is obtained, and then the robot's path driving speed is controlled; based on the obstacle conditions on the path, the present invention determines the impact on the robot's subsequent driving time on the path, whether it will arrive within the specified time, and then corrects the robot's speed on the flat road section under the condition of delay, thereby ensuring that the industrial robot can complete the speed correction in advance on the paths affected by different obstacles, ensuring that the industrial robot can complete the path driving work within the specified time, so that before the robot walks, its preset walking speed is accurately corrected to improve the speed stability of the robot during the subsequent path walking process. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] The present invention will be further described below in conjunction with the accompanying drawings.

[0047] Figure 1 is a flowchart of Embodiment 1 of the present invention;

[0048] Figure 2is a flowchart of Embodiment 2 of the present invention;

[0049] Figure 3 It is a system block diagram of embodiment 3 of the present invention. DETAILED DESCRIPTION

[0050] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0051] Example 1

[0052] See also Figure 1 As shown, the present invention is a method and system for automatically correcting the path of an industrial robot, comprising the following steps:

[0053] Step 1: Obtain obstacle data of the robot path;

[0054] In some implementation schemes, the number of obstacles on the path to be driven by the industrial robot is collected, and then obstacle data of each obstacle is obtained; wherein the obstacle data includes an obstacle peak value and an obstacle peak distance;

[0055] Specifically, the number of obstacles on the driving path is: if there is no connection point in the projection area of ​​the adjacent obstacles, the number of the adjacent obstacles is two; if there is a connection point in the projection area of ​​the adjacent obstacles, the adjacent obstacle is a whole and the number is one;

[0056] The process of obtaining the obstacle peak is as follows: perform side projection on the obstacle to obtain the obstacle side projection image, extract each peak in the image, obtain the height of each peak, and mark it as the obstacle peak;

[0057] The process of obtaining the obstacle peak distance is as follows: obtaining the distance between adjacent wave peaks and marking it as the obstacle peak distance;

[0058] Step 2: Based on the obstacle data, the obstacle difficulty value of each obstacle on the path to be driven is analyzed;

[0059] In some implementation schemes, the obstacle peak value of each obstacle on the path to be traveled is obtained, the first obstacle coefficient and the second obstacle coefficient are calculated, the first obstacle coefficient and the second obstacle coefficient are summed to obtain the obstruction coefficient of each obstacle, and the obstruction coefficient is multiplied with the average obstacle peak distance to obtain the walking obstacle value ZZ;

[0060] Then obtain the first wave crest and the last wave crest of each obstacle, and calculate the climbing obstacle value ZP and the descending obstacle value ZX;

[0061] The climbing obstacle value ZP, the walking obstacle value ZZ and the descending obstacle value ZX are summed up to obtain the obstacle difficulty value of each obstacle;

[0062] First, specifically, the calculation process of the first barrier coefficient is:

[0063] For each obstacle, obtain all obstacle peaks in each obstacle, calculate the average of all obstacle peaks, and obtain the average obstacle peak;

[0064] Then calculate the standard deviation of all obstacle peaks and the obstacle average peak value to obtain the first obstacle coefficient;

[0065] The calculation process of the second barrier coefficient is:

[0066] For each obstacle, take all the obstacle peak distances in each obstacle, calculate the average of all the obstacle peak distances, and obtain the average obstacle peak distance;

[0067] Then calculate the standard deviation of all obstacle peak distances and the obstacle average peak distance to obtain the second obstacle coefficient;

[0068] Second, specifically, the calculation process of the climbing obstacle value ZP is:

[0069] Then connect the first wave crest with the starting point of the obstacle to obtain the climbing segment, obtain the angle A1 between the climbing segment and the horizontal plane, and obtain the length L1 of the climbing segment. , calculate the climbing obstacle value ZP;

[0070] The calculation process of the descending barrier value ZX is:

[0071] Connect the last wave crest with the end point of the obstacle to obtain the descending line segment, obtain the angle A2 between the descending line segment and the horizontal plane, and obtain the length L2 of the descending line segment. , calculate the descending barrier value ZX;

[0072] It should be explained that the obstacle difficulty value reflects the difficulty of the obstacle as a whole from the up and down slopes, the height and spacing dispersion of the peak points, and the distance between the peak points. The larger the obstacle difficulty value, the more difficult it is to pass the obstacle, and the smaller the obstacle difficulty value, the easier it is to pass the obstacle.

[0073] Step 3: Compare the difficulty value of each obstacle with the corresponding threshold to generate an obstacle impact signal;

[0074] In some embodiments, obtaining an obstacle difficulty value for each obstacle, and comparing the obstacle difficulty value for each obstacle with an obstacle difficulty threshold;

[0075] If the obstacle difficulty value is greater than or equal to the obstacle difficulty threshold, it means that the obstacle difficulty coefficient is large, it is difficult for the industrial robot to pass through the obstacle, and it has a great impact on the normal behavior of the industrial robot, and a large obstacle impact signal is generated;

[0076] If the obstacle difficulty value is less than the obstacle difficulty threshold, it means that the obstacle difficulty coefficient is small, the industrial robot can pass through the obstacle relatively smoothly, and the impact on the normal behavior of the industrial robot is small, then a small obstacle impact signal is generated;

[0077] The technical solution of the embodiment of the present invention is as follows: obtaining obstacle data of the robot path; analyzing and obtaining the obstacle difficulty value of each obstacle on the path to be driven based on the obstacle data; comparing the obstacle difficulty value of each obstacle with the corresponding threshold value to generate an obstacle impact magnitude signal; the present invention analyzes the obstacles that the industrial robot path is to pass through from multiple dimensions such as up and down slopes, the height of the peak points and the degree of dispersion of the spacing, and the distance between the peak points, and judges the impact on the robot during the actual movement process based on this, and can more accurately correct the industrial robot path based on the analyzed impact degree.

[0078] Example 2

[0079] See also Figure 2 As shown, the present invention is a method and system for automatically correcting the path of an industrial robot, which also includes the following steps:

[0080] Step 4: Based on the generated obstacle impact signal, determine the path impact obstacles, and then analyze the robot's estimated movement time according to the data model, and then compare it with the preset movement standard time to generate the robot work signal;

[0081] Among them, the robot working signal includes correction signal and operation signal;

[0082] In some embodiments, when a large obstacle impact signal is obtained, the obstacle corresponding to the large obstacle impact signal is marked as a path impact obstacle;

[0083] Substitute the obstacle difficulty value of the path-affected obstacle into the two-dimensional model of the travel time and obstacle difficulty value, and output the time required for the robot to pass the path-affected obstacle, which is recorded as the estimated obstacle-passing time; wherein, the construction of the two-dimensional model of the travel time and obstacle difficulty value: collect the experimental data of the corresponding travel time and obstacle difficulty value, construct a two-dimensional coordinate system with the obstacle difficulty value as the X-axis and the travel time as the Y-axis, substitute the travel time and obstacle difficulty value into the coordinate system, draw a curve for the obtained coordinate points, and obtain the obstacle travel time curve;

[0084] The estimated time for overcoming all obstacles on the path to be driven is summed up to obtain the total estimated time for overcoming obstacles;

[0085] Then obtain the length of the robot's path to be driven in the non-path-affecting obstacles and the robot's preset average speed, calculate the ratio of the length to the average speed, and obtain the total estimated obstacle-free time;

[0086] The estimated total time of overcoming obstacles and the estimated total time of not having obstacles are calculated and the estimated time of robot movement is obtained;

[0087] Compare the robot's estimated movement time with the preset movement standard time;

[0088] If the robot's estimated movement time is greater than the preset movement standard time, a correction signal is generated;

[0089] If the robot's estimated travel time is less than or equal to the preset travel standard time, a running signal is generated; when the running signal is obtained, the robot can be controlled to run on the path to be driven at a preset average speed;

[0090] Step 5: Based on the correction signal, the correction speed of the robot is obtained, and then the path driving speed of the robot is controlled;

[0091] In some implementation schemes, when a correction signal is obtained, the robot's estimated movement time and a preset movement standard time are obtained, and the difference between the robot's estimated movement time and the preset movement standard time is calculated to obtain the movement control time;

[0092] Then, the length of the path to be driven by the robot at the non-path-affecting obstacle is obtained, and the ratio of the length to the path control time is calculated to obtain the corrected speed of the robot;

[0093] The robot's corrected speed is added to the robot's preset average speed to obtain the actual robot's path travel speed;

[0094] The technical solution of the embodiment of the present invention is as follows: based on generating a large obstacle impact signal, determining the path impact obstacles, and then analyzing the estimated robot movement time according to the data model, and then generating the robot working signal by comparing it with the preset movement standard time; based on the correction signal, obtaining the robot's correction speed, and then controlling the robot's path driving speed; the present invention determines the impact on the robot's subsequent driving time on the path based on the obstacle conditions on the path, whether it will arrive within the specified time, and then corrects the robot's speed on the flat road section under the condition of delay, thereby ensuring that the industrial robot can complete the speed correction in advance on the path affected by different obstacles, ensuring that the industrial robot can complete the path driving work within the specified time, so that before the robot walks, its preset walking speed is accurately corrected to improve the speed stability of the robot during subsequent path walking.

[0095] Example 3

[0096] See also Figure 3 As shown, the present invention is a system for automatically correcting the path of an industrial robot, the system comprising:

[0097] Acquisition module: obtains obstacle data of the robot path;

[0098] Analysis module: Based on the obstacle data, the obstacle difficulty value of each obstacle on the path to be driven is analyzed;

[0099] The first generation module: if the obstacle difficulty value is greater than or equal to the obstacle difficulty threshold, a large obstacle impact signal is generated;

[0100] The second generation module: based on the generation of the obstacle impact signal, the path impact obstacle is determined, and then the robot's estimated movement time is analyzed according to the data model. If the robot's estimated movement time is greater than the preset movement standard time, a correction signal is generated;

[0101] Correction module: Based on the correction signal, the correction speed of the robot is obtained, and then the path driving speed of the robot is controlled.

[0102] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.

[0103] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A method for automatically correcting the path of an industrial robot, characterized in that: The following steps are involved: Step 1: Obtain obstacle data of the robot path; Step 2: Based on the obstacle data, the obstacle difficulty value of each obstacle on the path to be driven is analyzed; Step 3: If the obstacle difficulty value is greater than or equal to the obstacle difficulty threshold, a large obstacle impact signal is generated; Step 4: Based on the generation of the obstacle impact signal, the path impact obstacle is determined, and then the robot's estimated movement time is analyzed according to the data model. If the robot's estimated movement time is greater than the preset movement standard time, a correction signal is generated; Step 5: Based on the correction signal, the correction speed of the robot is obtained, and then the path driving speed of the robot is controlled; In step 1, the number of obstacles on the path to be driven by the industrial robot is collected, and then obstacle data of each obstacle is obtained; wherein the obstacle data includes obstacle peak value and obstacle peak distance; The process of obtaining the obstacle peak is as follows: obtaining the height of each wave peak and marking it as the obstacle peak; The process of obtaining the obstacle peak distance is as follows: obtaining the distance between adjacent wave peaks and marking it as the obstacle peak distance.

2. A method for automatic path correction of an industrial robot according to claim 1, characterized in that: In step 2, the obstacle peak value of each obstacle on the path to be traveled is obtained, the first obstacle coefficient and the second obstacle coefficient are calculated, the first obstacle coefficient and the second obstacle coefficient are summed to obtain the obstruction coefficient of each obstacle, and the obstruction coefficient is multiplied with the average obstacle peak distance to obtain the walking obstacle value ZZ; Then obtain the first wave crest and the last wave crest of each obstacle, and calculate the climbing obstacle value ZP and the descending obstacle value ZX; The climbing obstacle value ZP, the walking obstacle value ZZ and the descending obstacle value ZX are summed up to obtain the obstacle difficulty value of each obstacle.

3. A method for automatic path correction of an industrial robot according to claim 2, characterized in that: The calculation process of the first obstacle coefficient is: For each obstacle, obtain all obstacle peaks in each obstacle, calculate the average of all obstacle peaks, and obtain the average obstacle peak; Then calculate the standard deviation of all obstacle peak values ​​and the obstacle average peak value to obtain the first obstacle coefficient.

4. The method for automatic path correction of an industrial robot according to claim 3, characterized in that: The calculation process of the second barrier coefficient is: For each obstacle, take all the obstacle peak distances in each obstacle, calculate the average of all the obstacle peak distances, and obtain the average obstacle peak distance; Then calculate the standard deviation of all obstacle peak distances and the obstacle average peak distance to obtain the second obstacle coefficient.

5. The method for automatic path correction of an industrial robot according to claim 4, characterized in that: The calculation process of the climbing obstacle value ZP is: Then connect the first wave crest with the starting point of the obstacle to obtain the climbing segment, obtain the angle A1 between the climbing segment and the horizontal plane, and obtain the length L1 of the climbing segment. , calculate the climbing obstacle value ZP; The calculation process of the descending barrier value ZX is: Connect the last wave crest with the end point of the obstacle to obtain the descending line segment, obtain the angle A2 between the descending line segment and the horizontal plane, and obtain the length L2 of the descending line segment. , calculate the descending barrier value ZX.

6. The method for automatic path correction of an industrial robot according to claim 1, characterized in that: In step 4, when a large obstacle impact signal is obtained, the obstacle corresponding to the large obstacle impact signal is marked as a path impact obstacle; Substitute the obstacle difficulty value of the path-affecting obstacle into the two-dimensional model of travel time and obstacle difficulty value, and output the time required for the robot to pass the path-affecting obstacle, which is recorded as the estimated obstacle passing time; Sum up all the estimated obstacle-passing times on the path to be driven to obtain the total estimated obstacle-passing time; Then obtain the length of the robot's path to be driven in the non-path-affecting obstacles and the robot's preset average speed, calculate the ratio of the length to the average speed, and obtain the total estimated obstacle-free time; The estimated total time of overcoming obstacles and the estimated total time of not having obstacles are calculated and the estimated time of robot movement is obtained; If the robot's estimated movement time is greater than the preset movement standard time, a correction signal is generated.

7. The method for automatic path correction of an industrial robot according to claim 1, characterized in that: In step 5, when the correction signal is obtained, the robot's estimated movement time and the preset movement standard time are obtained, and the difference between the robot's estimated movement time and the preset movement standard time is calculated to obtain the movement control time; Then, the length of the path to be driven by the robot at the non-path affecting obstacles is obtained, and the ratio of the length to the travel control time is calculated to obtain the corrected speed of the robot.

8. The method for automatic path correction of an industrial robot according to claim 7, characterized in that: The robot's corrected speed is added to the robot's preset average speed to obtain the actual robot's path travel speed.

9. A system for automatically correcting the path of an industrial robot, characterized in that: The system is used to execute the method described in any one of claims 1 to 8, and the system comprises: Acquisition module: obtains obstacle data of the robot path; Analysis module: Based on the obstacle data, the obstacle difficulty value of each obstacle on the path to be driven is analyzed; The first generation module: if the obstacle difficulty value is greater than or equal to the obstacle difficulty threshold, a large obstacle impact signal is generated; The second generation module: based on the generation of the obstacle impact signal, the path impact obstacle is determined, and then the robot's estimated movement time is analyzed according to the data model. If the robot's estimated movement time is greater than the preset movement standard time, a correction signal is generated; Correction module: Based on the correction signal, the correction speed of the robot is obtained, and then the path driving speed of the robot is controlled.