A method and system for estimating soil loss in production and construction projects
Through the RUSLE model and soil and water conservation score, combined with the comprehensive evaluation and prediction model, the problem of soil erosion estimation due to the impact of construction companies on the importance and implementation capacity of soil and water conservation measures is solved, and a more accurate soil erosion prediction is achieved.
Patent Information
- Application Number
- CN202411186468.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-08-28
AI Technical Summary
The existing technology cannot accurately estimate the soil loss of production and construction projects, especially because the degree of importance and implementation capacity of construction companies to pay attention to soil and water conservation measures is difficult to calculate, resulting in a large gap between the calculation results and the actual soil loss.
The RUSLE model is used to combine soil and water conservation scores and comprehensive evaluation prediction models. By obtaining soil parameters and the completion rate of soil and water conservation measures of construction enterprises, the comprehensive evaluation of soil and water conservation measures of construction enterprises is calculated, and the soil loss is predicted based on this.
The accuracy of soil erosion estimation is improved, and the changes in the importance and implementation capabilities of construction companies to pay attention to soil and water conservation measures are taken into account, which reduces the gap between the estimation results and the actual situation.
Smart Images

Figure CN118709922B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of soil loss estimation, and more specifically, to a method and system for estimating soil loss in a production and construction project. Background Art
[0002] Before a production and construction project is put into construction, in order to avoid causing serious damage to the local ecological environment and to avoid large-scale soil loss that may lead to reduced safety of the production and construction project and increased production costs, it is necessary to estimate the amount of soil loss after the production and construction project is completed based on the original local soil loss situation and the construction company's own information. For a specific production and construction project, since the type and scale have been determined before construction, it is difficult to predict the amount of soil loss caused by the target company during the construction process.
[0003] During the construction of production and construction projects by target construction companies, the target companies' emphasis on and ability to implement soil and water conservation measures are the main factors affecting the large differences in soil loss. The common soil loss calculation method cannot calculate the target companies' emphasis on and ability to implement soil and water conservation measures, so the calculation results are often different from the actual soil loss in construction. Summary of the invention
[0004] The present invention provides a method and system for estimating soil loss in a production and construction project, which solves the technical problems in the above-mentioned background technology.
[0005] The present invention provides a method for estimating soil loss in a production and construction project, comprising the following steps:
[0006] Step S101, obtaining initial soil parameters of the target construction enterprise's previous construction areas, and calculating the initial soil loss according to the RUSLE model;
[0007] Soil parameters include: rainfall erosivity factor, soil erosivity factor, slope factor, slope length factor, cover vegetation factor and soil management factor;
[0008] Step S102, obtaining the soil loss amount of the target construction enterprise according to the previous construction standards;
[0009] Step S103, calculating the soil and water conservation scores of the target construction enterprise in all previous constructions, and calculating the target construction enterprise's execution capability and degree of attention to soil and water conservation measures based on the soil and water conservation scores and the completion rate of each soil and water conservation measure in each step, and calculating a comprehensive evaluation of soil and water conservation measures;
[0010] Step S104, constructing a comprehensive evaluation prediction model, inputting the comprehensive evaluation of soil and water conservation measures of the target construction enterprise for j times of construction into the comprehensive evaluation prediction model in sequence, and outputting the predicted comprehensive evaluation of soil and water conservation measures of the target construction enterprise when constructing the production and construction project;
[0011] j is a custom parameter;
[0012] Step S105, calculating the predicted soil loss amount of the target construction enterprise during the construction phase of the production and construction project based on the comprehensive evaluation of the predicted soil and water conservation measures when the target construction enterprise is constructing the production and construction project.
[0013] Furthermore, the method for obtaining soil parameters specifically includes:
[0014] Obtain the average monthly and annual rainfall at the construction sites of the target construction company, and then calculate the rainfall erosivity factor. The calculation formula is as follows:
[0015]
[0016] In the formula, R represents the rainfall erosivity factor; p represents the average annual rainfall; p i represents the average monthly rainfall in the ith month;
[0017] Obtain soil samples from the target construction company's previous construction sites, analyze the sand content, silt content, clay content and organic carbon content of the soil samples, and then calculate the soil erosivity factor using the epic model. The calculation formula of the epic model is as follows:
[0018]
[0019] Where, K represents the soil erosibility factor output by the epic model; Sd represents the sand content of the soil; Si represents the silt content of the soil; Cl represents the clay content of the soil; C represents the organic carbon content of the soil; exp represents the exponential function;
[0020] The slope information of the target construction company's previous construction sites is obtained through field measurement, and then the slope factor is calculated. The calculation formula is as follows:
[0021]
[0022] In the formula, S represents the slope factor; θ represents the actual slope; sin represents the sine function;
[0023] The slope length factor is calculated by actually measuring the slope length of the target construction company's previous construction sites and then combining the slope. The calculation formula is as follows:
[0024]
[0025] Where, L represents the slope length factor of the target construction enterprise's previous construction sites; λ represents the soil type parameter; m represents the empirical index; λ and m are both custom parameters; tan represents the tangent function;
[0026] Obtain the vegetation coverage rate of the target construction company's previous construction sites, and then calculate the vegetation coverage factor. The calculation formula is as follows:
[0027]
[0028] In the formula, C represents the vegetation cover factor; C v Indicates vegetation coverage;
[0029] The corresponding soil management factors are obtained through the land management measures of the target construction company at previous construction sites.
[0030] Furthermore, the calculation formula of the RUSLE model is as follows:
[0031] A = R × K × S × L × C × P;
[0032] Where A represents soil loss; P represents soil management factor.
[0033] Furthermore, the steps to calculate the soil and water conservation score of the target construction enterprise during construction are as follows:
[0034] Step S201, obtaining the average soil parameters of the target construction enterprise during the construction process, and calculating the soil loss during the construction process according to the RUSLE model;
[0035] Step S202, calculating the ratio between the soil loss amount of the target construction enterprise during the construction process and the standard soil loss amount, and the calculation result is the soil and water conservation score.
[0036] Further, the steps of soil and water conservation measures include: formulating soil and water conservation plans and implementing soil and water conservation plans;
[0037] Among them, the soil and water conservation measures in the soil and water conservation plan include: bare soil covering, drainage treatment and vegetation protection.
[0038] Furthermore, the completion rate of each soil and water conservation measure includes: bare soil coverage, drainage treatment parameters, and vegetation protection rate;
[0039] Among them, the bare soil coverage rate is calculated by calculating the ratio of the bare soil area covered in the construction site to the total idle area; the drainage treatment rate is calculated by calculating the drainage speed of the construction site after rain; and the vegetation protection rate is calculated by the ratio of the number of trees retained in the construction site to the original total amount.
[0040] Furthermore, the calculation formula for calculating the target construction enterprise's execution capability and attention to soil and water conservation measures includes:
[0041] The calculation formula for the target construction enterprise's ability to implement soil and water conservation measures is as follows:
[0042]
[0043] Where ECI represents the target construction enterprise's ability to implement soil and water conservation measures; t1, p1 and z1 represent the bare soil coverage rate, drainage treatment parameters and vegetation protection rate of the target construction enterprise during construction; t2, p2 and z2 represent the bare soil coverage rate, drainage treatment parameters and vegetation protection rate in the soil protection plan; W a , W b and W c Respectively represent the first, second and third weight parameters of the execution capability of soil and water conservation measures; W a , W b and W c All are custom parameters;
[0044] The calculation formula for the target construction companies’ emphasis on soil and water conservation measures is as follows:
[0045] SDI = W d ×t2+W e ×p2+W f ×z2;
[0046] Where W d , W e and W f The first, second and third weight parameters respectively represent the importance of soil and water conservation measures; W d , W e and W f All are custom parameters;
[0047] The calculation formula for the comprehensive evaluation of soil and water conservation measures by the target construction enterprise is as follows:
[0048] TAV=α×SDI+β×ECI-γ×SLS;
[0049] Where TAV represents the comprehensive evaluation of soil and water conservation measures by the target construction enterprise; SLS represents the soil and water conservation score of the target construction enterprise; α, β and γ represent the first, second and third adjustment coefficients corresponding to the comprehensive evaluation of soil and water conservation measures by the target construction enterprise, respectively; α, β and γ are all custom parameters.
[0050] Furthermore, the training samples used to train the comprehensive evaluation prediction model include:
[0051] Obtain the comprehensive evaluation of soil and water conservation measures of n construction companies in the past y constructions, and set a sliding window in it. The length of the sliding window is j and the step length is k. Each time the sliding window slides, a sample data for training the comprehensive evaluation prediction model is generated;
[0052] The comprehensive evaluation of the soil and water conservation measures of the construction enterprise in the next construction corresponding to each sample data is used as the sample label for training the comprehensive evaluation prediction model;
[0053] n, k and y are all custom parameters, 1≤j≤y.
[0054] Furthermore, the calculation formula for the predicted soil loss amount of the target construction enterprise during the construction phase of the production and construction project is as follows:
[0055] A actual =A c +T y (A c -A1);
[0056] In the formula, A actual A represents the predicted soil loss during the construction phase of the target construction enterprise's production and construction project; c It indicates the initial soil loss in the area where the production and construction project is located; T y It represents the comprehensive evaluation of the predicted soil and water conservation measures of the target construction enterprise during the construction of the production and construction project; A1 represents the amount of soil loss of the production and construction project under standard construction conditions.
[0057] The present invention also provides a system for estimating soil loss in a production and construction project, comprising:
[0058] Comprehensive evaluation module for target construction enterprises, which is used to obtain comprehensive evaluation of soil and water conservation measures of target construction enterprises in previous constructions;
[0059] Among them, the comprehensive evaluation module of the target construction enterprise includes a soil information acquisition unit, a soil loss calculation unit and a comprehensive evaluation calculation unit; the soil information acquisition unit is used to obtain the initial soil parameters of the target construction enterprise's previous construction areas; the soil loss calculation unit is built based on the RUSLE model to calculate the initial soil loss of the target construction enterprise's previous construction areas; the comprehensive evaluation calculation unit is used to calculate the comprehensive evaluation of the soil and water conservation measures of the target construction enterprise's previous constructions
[0060] A comprehensive evaluation prediction module is used to calculate the comprehensive evaluation of soil and water conservation measures when the target construction enterprise constructs the production and construction project according to the comprehensive evaluation of soil and water conservation measures of the target construction enterprise j times;
[0061] The soil loss prediction module is used to calculate the predicted soil loss of the target construction enterprise during the construction phase of the production and construction project.
[0062] The beneficial effect of the present invention is that by analyzing the degree of attention and execution ability of the target construction enterprise to soil and water conservation measures in previous construction processes, the degree of attention parameters and execution ability parameters of the soil and water conservation measures in previous construction processes are obtained. Compared with the general soil loss calculation method, the influence of the degree of attention and execution ability of the target construction enterprise to soil and water conservation measures on the amount of soil loss is taken into account. At the same time, the changes in the attitude and execution ability of the management of the target construction enterprise towards soil and water conservation measures are taken into account, so that the estimation of the amount of soil loss generated by the target construction enterprise during the construction process is more accurate. BRIEF DESCRIPTION OF THE DRAWINGS
[0063] Figure 1 is an overall flow chart of the first embodiment of the present invention;
[0064] Figure 2 It is a flowchart of calculating the soil and water conservation score of the target construction enterprise during construction according to the present invention;
[0065] Figure 3 It is an overall flow chart of the second embodiment of the present invention.
[0066] In the figure: 30, comprehensive evaluation module of target construction enterprises; 40, comprehensive evaluation prediction module; 50, soil loss prediction module;
[0067] 301. Soil information acquisition unit; 302. Soil loss calculation unit; 303. Comprehensive evaluation calculation unit. DETAILED DESCRIPTION
[0068] The subject matter described herein will now be discussed with reference to example embodiments. It should be understood that the discussion of these embodiments is only to enable those skilled in the art to better understand and implement the subject matter described herein, and the functions and arrangements of the elements discussed may be changed without departing from the scope of protection of the contents of this specification. Each example may omit, replace or add various processes or components as needed. In addition, the features described relative to some examples may also be combined in other examples.
[0069] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in one or more embodiments of the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in one or more embodiments of the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0070] The purpose of the first embodiment of the present invention is that when a production and construction project is put on the market for bidding, its scale and type have been determined. Therefore, during the construction process of the target construction enterprise, the amount of soil loss caused by its construction is difficult to estimate. Generally, the amount of soil loss caused by the construction of the target construction enterprise is predicted based on the amount of soil loss in previous constructions. However, this method is not accurate and does not take into account the changes in the target construction enterprise's emphasis on soil and water conservation measures and its execution ability. Such changes often lead to huge differences in soil loss in one construction. Therefore, a method for estimating the amount of soil loss in a production and construction project is proposed. Figure 1-Figure 2 As shown, the following steps are included:
[0071] Step S101, obtaining initial soil parameters of the target construction enterprise's previous construction areas, and calculating the initial soil loss according to the RUSLE model;
[0072] Soil parameters include: rainfall erosivity factor, soil erosivity factor, slope factor, slope length factor, cover vegetation factor and soil management factor;
[0073] Among them, the rainfall erosivity factor reflects the potential of rainfall on soil erosion, including the impact force of raindrops and the ability to generate runoff; the soil erosivity factor indicates the ability of soil to resist erosion, which is affected by factors such as soil texture, structure, and organic matter content; the slope factor reflects the impact of slope on erosion; the slope length factor reflects the promoting effect of slope length on erosion; the vegetation cover factor describes the role of vegetation cover in reducing soil erosion; and the soil management factor reflects the effect of different land management measures on reducing soil erosion.
[0074] The methods for obtaining soil parameters specifically include:
[0075] Obtain the average monthly and annual rainfall at the construction sites of the target construction company, and then calculate the rainfall erosivity factor. The calculation formula is as follows:
[0076]
[0077] In the formula, R represents the rainfall erosivity factor; p represents the average annual rainfall; p i represents the average monthly rainfall in the ith month;
[0078] Obtain soil samples from the target construction company's previous construction sites, analyze the sand content, silt content, clay content and organic carbon content of the soil samples, and then calculate the soil erosivity factor using the epic model. The calculation formula of the epic model is as follows:
[0079]
[0080] In the formula, K represents the soil erosivity factor output by the epic model; Sd represents the sand content of the soil; Si represents the silt content of the soil; Cl represents the clay content of the soil; C represents the organic carbon content of the soil; exp represents the exponential function; the epic model belongs to the existing technology and will not be described here;
[0081] The slope information of the target construction company's previous construction sites is obtained through field measurement, and then the slope factor is calculated. The calculation formula is as follows:
[0082]
[0083] Wherein, S represents the slope factor; θ represents the actual slope; sin represents the sine function; θ can be obtained by testing with testing equipment such as a level, an inclinometer, and a laser slope meter, and the above-mentioned level, inclinometer, and laser slope meter are all prior arts and will not be described in detail here;
[0084] The slope length factor is calculated by actually measuring the slope length of the target construction company's previous construction sites and then combining the slope. The calculation formula is as follows:
[0085]
[0086] Where, L represents the slope length factor of the target construction enterprise's previous construction sites; λ represents the soil type parameter; m represents the empirical index; λ and m are both custom parameters; tan represents the tangent function;
[0087] Obtain the vegetation coverage rate of the target construction company's previous construction sites, and then calculate the vegetation coverage factor. The calculation formula is as follows:
[0088]
[0089] In the formula, C represents the vegetation cover factor; C v Indicates vegetation coverage;
[0090] The corresponding soil management factors are obtained through the land management measures of the target construction company at previous construction sites.
[0091] The initial soil loss at the construction site and the soil loss after construction can be calculated using the RUSLE model. The calculation formula of the RUSLE model is as follows:
[0092] A = R × K × S × L × C × P;
[0093] In the formula, A represents soil loss; P represents soil management factor. By calculating the initial soil loss and soil loss in each period in the construction area through the RUSLE model, a more accurate total soil loss can be obtained.
[0094] In addition, before the construction of a production and construction project, it is necessary to fully consider the soil conditions in the area where it is located and formulate a construction plan accordingly, which includes the amount of soil that needs to be excavated. In addition, different production and construction projects will cause different changes to the terrain in the area where they are located. For example, the construction of dams and residential buildings will cause different slopes and slope lengths in the area where the production and construction project is located. Therefore, step S102 obtains the amount of soil loss for the target construction company's previous construction standards.
[0095] From the above content, it can be seen that the standard amount of soil loss required for a production and construction project is directly selected from the amount of soil that needs to be excavated in the construction plan.
[0096] In addition, when a construction company carries out construction, it generally formulates a soil and water conservation plan first, and then implements the soil and water conservation plan during the construction process. After the construction is completed, the soil and water conservation results, that is, the amount of soil loss, can be calculated. Different construction companies have different levels of attention and execution capabilities for soil and water conservation, so even if a good plan is proposed, a large amount of soil loss will still occur during the execution process. Therefore, it is necessary to evaluate the construction company's attention and execution capabilities for soil and water conservation. Therefore, step S103 calculates the soil and water conservation scores of the target construction company in previous constructions, and calculates the execution capabilities, attention levels, and comprehensive evaluation of soil and water conservation measures of the target construction company based on the soil and water conservation scores and the completion rate of each soil and water conservation measure in each step;
[0097] The steps to calculate the soil and water conservation score of the target construction company during construction are as follows:
[0098] Step S201, obtaining the average soil parameters of the target construction enterprise during the construction process, and calculating the soil loss during the construction process according to the RUSLE model;
[0099] Step S202, calculating the ratio between the soil loss amount of the target construction enterprise during the construction process and the standard soil loss amount, and the calculation result is the soil and water conservation score.
[0100] Since the soil protection plan can reflect the target construction company's execution ability and attention to soil and water conservation measures to varying degrees when it is formulated and implemented, it is necessary to comprehensively consider these two items. Therefore, the steps of soil and water conservation measures include: formulating soil and water conservation plans and implementing soil and water conservation plans;
[0101] Among them, the soil and water conservation measures in the soil and water conservation plan include: bare soil covering, drainage treatment and vegetation protection.
[0102] The completion rate of each soil and water conservation measure includes: bare soil coverage rate, drainage treatment parameters and vegetation protection rate;
[0103] Among them, the bare soil coverage rate is calculated by calculating the ratio of the bare soil area covered in the construction site to the total idle area; the drainage treatment rate is calculated by calculating the drainage speed of the construction site after rain; the vegetation protection rate is calculated by the ratio of the number of trees retained in the construction site to the original total number;
[0104] According to the soil and water conservation plan, the bare soil coverage rate, drainage treatment rate and vegetation protection rate of the target construction enterprises in each link are calculated. The above parameters can reflect the degree of attention and execution ability of the target construction enterprises to soil and water conservation measures to a certain extent;
[0105] The calculation formulas for calculating the target construction enterprise’s execution capability and attention to soil and water conservation measures include:
[0106] The calculation formula for the target construction enterprise's ability to implement soil and water conservation measures is as follows:
[0107]
[0108] Where ECI represents the target construction enterprise's ability to implement soil and water conservation measures; t1, p1 and z1 represent the bare soil coverage rate, drainage treatment parameters and vegetation protection rate of the target construction enterprise during construction; t2, p2 and z2 represent the bare soil coverage rate, drainage treatment parameters and vegetation protection rate in the soil protection plan; W a , W b and W c Respectively represent the first, second and third weight parameters of the execution capability of soil and water conservation measures; W a , W b and W c All are custom parameters;
[0109] The calculation formula for the target construction companies’ emphasis on soil and water conservation measures is as follows:
[0110] SDI = W d ×t2+W e ×p2+W f ×z2;
[0111] Where W d , W e and W f The first, second and third weight parameters respectively represent the importance of soil and water conservation measures; W d , W e and W f All are custom parameters; W d +W e +W f =1;
[0112] The calculation formula for the comprehensive evaluation of soil and water conservation measures by the target construction enterprise is as follows:
[0113] TAV=α×SDI+β×ECI-γ×SLS;
[0114] Where TAV represents the comprehensive evaluation of soil and water conservation measures by the target construction enterprise; SLS represents the soil and water conservation score of the target construction enterprise; α, β and γ represent the first, second and third adjustment coefficients corresponding to the comprehensive evaluation of soil and water conservation measures by the target construction enterprise, respectively; α, β and γ are all custom parameters.
[0115] After obtaining the comprehensive evaluation of the soil and water conservation measures of the target construction enterprise in previous constructions, it is necessary to consider the changes in each comprehensive evaluation. Therefore, in step S104, a comprehensive evaluation prediction model is constructed, and the comprehensive evaluation of the soil and water conservation measures of the target construction enterprise in j constructions is sequentially input into the comprehensive evaluation prediction model, and the predicted comprehensive evaluation of the soil and water conservation measures of the target construction enterprise when constructing the production and construction project is output. The value range of the predicted comprehensive evaluation of the soil and water conservation measures of the target construction enterprise when constructing the production and construction project is {0, 1};
[0116] j is a custom parameter, preferably, j is set to 10;
[0117] In order to improve the prediction accuracy of the comprehensive evaluation prediction model, it is necessary to train it before use. Therefore, the training samples used to train the comprehensive evaluation prediction model include:
[0118] Obtain the comprehensive evaluation of soil and water conservation measures of n construction companies in the past y constructions, and set a sliding window in it. The length of the sliding window is j and the step length is k. Each time the sliding window slides, a sample data for training the comprehensive evaluation prediction model is generated;
[0119] The comprehensive evaluation of the construction enterprise corresponding to each sample data in the next construction is used as the sample label for training the comprehensive evaluation prediction model;
[0120] n, k and y are all custom parameters, 1≤j≤y. When less information about construction companies is available, more sample data can be obtained by reducing the step size of the sliding window to ensure the amount of sample data, thereby improving the prediction accuracy of the comprehensive evaluation prediction model.
[0121] Step S105, calculating the predicted soil loss amount of the target construction enterprise during the construction phase of the production and construction project based on the comprehensive evaluation of the predicted soil and water conservation measures when the target construction enterprise is constructing the production and construction project.
[0122] The calculation formula for the predicted soil loss amount of the target construction enterprise during the construction phase of the production and construction project is as follows:
[0123] A actual =A c +T y (A c -A1);
[0124] In the formula, A actual A represents the predicted soil loss during the construction phase of the target construction enterprise's production and construction project; c It indicates the initial soil loss in the area where the production and construction project is located; T y It represents the comprehensive evaluation of the predicted soil and water conservation measures of the target construction enterprise during the construction of the production and construction project; A1 represents the amount of soil loss of the production and construction project under the standard construction conditions; A c Calculated using the RUSLE model.
[0125] The second embodiment of the present invention aims to: Figure 3 As shown, a system for estimating soil loss in a production and construction project is provided, comprising:
[0126] A comprehensive evaluation module 30 for target construction enterprises, which is used to obtain a comprehensive evaluation of the soil and water conservation measures of the target construction enterprises in previous constructions;
[0127] Among them, the comprehensive evaluation module 30 of the target construction enterprise includes a soil information acquisition unit 301, a soil loss calculation unit 302 and a comprehensive evaluation calculation unit 303; the soil information acquisition unit 301 is used to obtain the initial soil parameters of the target construction enterprise's previous construction areas; the soil loss calculation unit 302 is constructed based on the RUSLE model to calculate the initial soil loss of the target construction enterprise's previous construction areas; the comprehensive evaluation calculation unit 303 is used to calculate the comprehensive evaluation of the soil and water conservation measures of the target construction enterprise's previous constructions
[0128] A comprehensive evaluation prediction module 40 is used to calculate the comprehensive evaluation of soil and water conservation measures when the target construction enterprise constructs the production and construction project according to the comprehensive evaluation of soil and water conservation measures of the target construction enterprise j times of construction;
[0129] The soil loss prediction module 50 is used to calculate the predicted soil loss during the construction phase of a production and construction project of a target construction enterprise.
[0130] The above describes an embodiment of the present embodiment, but the present embodiment is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present embodiment, ordinary technicians in this field can also make many forms, all of which are within the protection of the present embodiment.
Claims
1. A method for estimating soil loss in a production and construction project, characterized in that: The steps include: Step S101, obtaining initial soil parameters of the target construction enterprise's previous construction areas, and calculating the initial soil loss according to the RUSLE model; Soil parameters include: rainfall erosivity factor, soil erosivity factor, slope factor, slope length factor, cover vegetation factor and soil management factor; Step S102, obtaining the soil loss amount of the target construction enterprise according to the previous construction standards; Step S103, calculating the soil and water conservation scores of the target construction enterprise in all previous constructions, and calculating the target construction enterprise's execution capability and degree of attention to soil and water conservation measures based on the soil and water conservation scores and the completion rate of each soil and water conservation measure in each step, and calculating a comprehensive evaluation of soil and water conservation measures; The steps to calculate the soil and water conservation score of the target construction company during construction are as follows: Step S201, obtaining the average soil parameters of the target construction enterprise during the construction process, and calculating the soil loss during the construction process according to the RUSLE model; Step S202, calculating the ratio between the soil loss amount of the target construction enterprise during the construction process and the standard soil loss amount, and the calculation result is the soil and water conservation score; The steps of soil and water conservation measures include: formulating soil and water conservation plans and implementing soil and water conservation plans; Among them, the soil and water conservation measures in the soil and water conservation plan include: bare soil covering, drainage treatment and vegetation protection; The completion rate of each soil and water conservation measure includes: bare soil coverage rate, drainage treatment parameters and vegetation protection rate; Among them, the bare soil coverage rate is calculated by calculating the ratio of the bare soil area covered in the construction site to the total idle area; the drainage treatment rate is calculated by calculating the drainage speed of the construction site after rain; the vegetation protection rate is calculated by the ratio of the number of trees retained in the construction site to the original total number; The calculation formulas for calculating the target construction enterprise’s execution capability and attention to soil and water conservation measures include: The calculation formula for the target construction enterprise's ability to implement soil and water conservation measures is as follows: ; In the formula, Indicates the target construction company's ability to implement soil and water conservation measures; , and They represent the bare soil coverage rate, drainage treatment parameters and vegetation protection rate of the target construction enterprise during construction; , and They represent the bare soil coverage, drainage treatment parameters and vegetation protection rate in the soil protection scheme respectively; , and represent the first, second and third weight parameters regarding the implementation capacity of soil and water conservation measures; , and All are custom parameters; The calculation formula for the target construction companies’ emphasis on soil and water conservation measures is as follows: ; In the formula, , and The first, second and third weight parameters respectively represent the importance attached to soil and water conservation measures; , and All are custom parameters; The calculation formula for the comprehensive evaluation of soil and water conservation measures by the target construction enterprise is as follows: ; In the formula, It indicates the comprehensive evaluation of soil and water conservation measures by the target construction enterprises; It indicates the soil and water conservation score of the target construction enterprise; , and They represent the first, second and third adjustment coefficients corresponding to the comprehensive evaluation of soil and water conservation measures by the target construction enterprise; , and All are custom parameters; Step S104, constructing a comprehensive evaluation prediction model, inputting the comprehensive evaluation of soil and water conservation measures of the target construction enterprise for j times of construction into the comprehensive evaluation prediction model in sequence, and outputting the predicted comprehensive evaluation of soil and water conservation measures of the target construction enterprise when constructing the production and construction project; j is a custom parameter; Step S105, calculating the predicted soil loss amount of the target construction enterprise during the construction phase of the production and construction project based on the comprehensive evaluation of the predicted soil and water conservation measures when the target construction enterprise is constructing the production and construction project.
2. A method for estimating soil loss in a production and construction project according to claim 1, characterized in that: The methods for obtaining soil parameters specifically include: Obtain the average monthly and annual rainfall at the construction sites of the target construction company, and then calculate the rainfall erosivity factor. The calculation formula is as follows: ; In the formula, represents the rainfall erosivity factor; represents the average annual rainfall; represents the average monthly rainfall in the ith month; Obtain soil samples from the target construction company's previous construction sites, analyze the sand content, silt content, clay content and organic carbon content of the soil samples, and then calculate the soil erosivity factor using the epic model. The calculation formula of the epic model is as follows: ; In the formula, It represents the soil erosivity factor output by the epic model; Indicates the sand content of the soil; Indicates the silt content of the soil; Indicates the clay content of the soil; Indicates the organic carbon content of soil; represents the exponential function; The slope information of the target construction company's previous construction sites is obtained through field measurement, and then the slope factor is calculated. The calculation formula is as follows: ; In the formula, represents the slope factor; Indicates the actual slope; represents the sine function; The slope length factor is calculated by actually measuring the slope length of the target construction company's previous construction sites and then combining the slope. The calculation formula is as follows: ; In the formula, Indicates the slope length factor of the target construction enterprise's previous construction sites; Indicates soil type parameters; represents the experience index; and All are custom parameters; represents the tangent function; Obtain the vegetation coverage rate of the target construction company's previous construction sites, and then calculate the vegetation coverage factor. The calculation formula is as follows: ; In the formula, Indicates the vegetation cover factor; Indicates vegetation coverage; The corresponding soil management factors are obtained through the land management measures of the target construction company at previous construction sites.
3. A method for estimating soil loss in a production and construction project according to claim 2, characterized in that: The calculation formula of the RUSLE model is as follows: ; In the formula, Indicates the amount of soil loss; Represents soil management factor.
4. A method for estimating soil loss in a production and construction project according to claim 1, characterized in that: The training samples used to train the comprehensive evaluation prediction model include: Obtain the comprehensive evaluation of soil and water conservation measures of n construction companies in the past y constructions, and set a sliding window in it. The length of the sliding window is j and the step length is k. Each time the sliding window slides, a sample data for training the comprehensive evaluation prediction model is generated; The comprehensive evaluation of the soil and water conservation measures of the construction enterprise in the next construction corresponding to each sample data is used as the sample label for training the comprehensive evaluation prediction model; n, k and y are all custom parameters, 1≤j≤y.
5. The method for estimating soil loss in a production and construction project according to claim 1, characterized in that: The calculation formula for the predicted soil loss amount of the target construction enterprise during the construction phase of the production and construction project is as follows: ; In the formula, It indicates the predicted soil loss amount during the construction phase of the production and construction project of the target construction enterprise; It indicates the initial soil loss in the area where the production and construction project is located; It indicates the comprehensive evaluation of the predicted soil and water conservation measures of the target construction enterprise during the construction of the production and construction project; It indicates the amount of soil loss in a production and construction project under standard construction conditions.
6. A system for estimating soil loss in a production and construction project, characterized in that: A method for estimating soil loss in a production and construction project according to any one of claims 1 to 5, comprising: A comprehensive evaluation module (30) for target construction enterprises, which is used to obtain a comprehensive evaluation of the soil and water conservation measures of the target construction enterprises in previous constructions; The target construction enterprise comprehensive evaluation module (30) includes a soil information acquisition unit (301), a soil loss amount calculation unit (302) and a comprehensive evaluation calculation unit (303); the soil information acquisition unit (301) is used to obtain the initial soil parameters of the target construction enterprise's previous construction areas; the soil loss amount calculation unit (302) is constructed based on the RUSLE model to calculate the initial soil loss amount of the target construction enterprise's previous construction areas; the comprehensive evaluation calculation unit (303) is used to calculate the comprehensive evaluation of the soil and water conservation measures of the target construction enterprise's previous constructions; A comprehensive evaluation prediction module (40) is used to calculate the predicted comprehensive evaluation of soil and water conservation measures when the target construction enterprise constructs the production and construction project according to the comprehensive evaluation of soil and water conservation measures of the target construction enterprise j times of construction; The soil loss amount prediction module (50) is used to calculate the predicted soil loss amount of a target construction enterprise during the construction phase of a production and construction project.
Citation Information
Patent Citations
Method for measuring soil loss amount through military map
CN105866386A
Drainage basin soil conservation function evaluation method based on RUSLE and SDR model
CN115146922A