Winter maintenance device for small pre-support box girder

By using sealing components, water collection components and spray pipeline adjustments in the pre-supported box beam maintenance device, the problem of high water and electricity consumption in the maintenance of pre-supported box beams is solved, and the effect of reducing maintenance costs is achieved.

CN118721397AActive Publication Date: 2024-10-01ZHENJIANG RUNTONG TRAFFIC ENG MANAGER INVESTMENT CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410753845.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2024-10-01
Estimated Expiration
2044-06-12

AI Technical Summary

Technical Problem

The maintenance process of pre-supported box beams consumes a large amount of water and electricity, resulting in high maintenance costs.

Method used

A winter maintenance device for small pre-supported box beams is designed, including a curing cover, a steam generator, a spray pipeline, a water collection component and a water circulation component. The sealing component improves the sealing of the curing cover, and the water collection component collects and recycles condensed water. , the spray pipe adjusts the steam injection direction to evenly contact the box beam.

Benefits of technology

It reduces heat loss and water consumption, reduces the electricity and water consumption of box beam maintenance, and reduces the overall maintenance cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118721397A_ABST
    Figure CN118721397A_ABST
Patent Text Reader

Abstract

The invention relates to the field of prefabricated box girder maintenance technologies, in particular to a small prefabricated box girder winter maintenance device which comprises a maintenance cover, a steam generator, a spraying pipeline, a water collection assembly, a water circulation assembly and a sealing assembly. A curing cavity used for containing a box girder is formed in the curing cover, a steam inlet communicated with the steam generator is formed in one end of the curing cover, the sealing assembly is installed on the curing cover and used for sealing the steam inlet, and the spraying pipeline is installed at the bottom of the curing cover and communicated with the steam generator. The spraying pipeline is provided with a plurality of spraying openings used for spraying steam, the water collecting assembly is located at the top of the curing cover and used for collecting water drops generated after steam condensation, and the water circulating assembly is used for circulating water generated after steam condensation into the steam generator. Heat loss is reduced through the sealing assembly, water consumption is reduced through the water collection assembly and the water circulation assembly, the water amount and electric quantity consumed during box girder maintenance are reduced on the whole, and the maintenance cost of the box girder is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of prefabricated box girder maintenance technology, and in particular to a winter maintenance device for a small prefabricated box girder. Background Art

[0002] After the concrete is poured and before the formwork is removed, the pre-supported box girder is subjected to thermal insulation and moisture maintenance so that the design strength of the poured box girder reaches 40% to meet the conditions for removing the external formwork.

[0003] When maintaining the pre-supported box girder, comprehensive maintenance is usually carried out using equipment such as heaters, quilt covers, foam glue, and large steam generators. Steam is sprayed on the box girder, and the temperature of the box girder is regulated by a heater. Foam glue and cotton are used to keep the pre-supported box girder warm and moist, so as to set constant temperature and humidity conditions for the environment in which the box girder is located.

[0004] However, when the box girder is being maintained, the maintenance time is usually not less than 10 hours. During this period, the box girder needs to be heated and humidified every 1-2 hours to ensure the environmental conditions, which will consume a huge amount of water and electricity, resulting in the maintenance cost of the box girder remaining high. Summary of the invention

[0005] In order to reduce the amount of water and electricity consumed in box girder maintenance and reduce the maintenance cost of the box girder, the present application provides a small-scale pre-supported box girder winter maintenance device.

[0006] The present application provides a small-sized pre-supported box girder winter maintenance device adopts the following technical solution: A small-sized pre-supported box girder winter maintenance device comprises a maintenance cover, a steam generator, a spray pipeline, a water collection component, a water circulation component and a sealing component; A curing cavity for placing the box girder is provided in the curing hood, a steam inlet connected to the steam generator is provided at one end of the curing hood, the sealing assembly is installed on the curing hood and is used to seal the steam inlet, the spray pipeline is installed on the bottom of the curing hood and is connected to the steam generator, a plurality of injection ports for spraying steam are provided on the spray pipeline, the water collecting assembly is located at the top of the curing hood and is used to collect water droplets after condensation of steam, the water circulation assembly connects the water collecting assembly and the steam generator, and the water circulation assembly is used to circulate water after condensation of steam to the steam generator.

[0007] By adopting the above technical solution, the sealing performance of the entire curing cover is improved through the sealing component to reduce the loss of heat and save electricity. The steam droplets condensed on the top of the curing cover can be collected by the water collection component, and then moved to the steam generator for recycling through the water circulation component, thereby saving water, reducing the amount of water and electricity consumed in the maintenance of the box beam as a whole, and reducing the maintenance cost of the box beam.

[0008] Optionally, the sealing assembly includes a first sealing tube, a second sealing tube, a sealing block and a control member; The first sealing tube is installed on the steam hood and arranged coaxially with the steam inlet, the second sealing tube is installed at the outlet of the steam generator, the second sealing tube is coaxially slidably inserted into the first sealing tube, the inner peripheral wall of the first sealing tube is provided with a first sliding groove for radial movement of the sealing card, the outer peripheral wall of the second sealing tube is provided with a second sliding groove for radial insertion of the sealing card, and the control part is used to control the sliding direction of the sealing card.

[0009] By adopting the above technical solution, the gap between the steam generator and the curing cover can be reduced by plugging the first sealing tube and the second sealing tube, and the gap between the steam generator and the curing cover can be complicated, thereby reducing heat loss.

[0010] Optionally, the control part includes a control slide rod, a control handle and a control spring; a third slide groove is provided in the first sealing tube along its own axial direction for the control slide rod to slide, the third slide groove is vertically connected to the first slide groove, a fourth slide groove is provided on the outside of the first sealing tube for the control to slide along its own axial direction, the control handle is connected to the control slide rod, the control spring is located in the fourth slide groove and the two ends are respectively connected to the control handle and the first sealing tube, a control inclined surface is provided on the sealing block for slidingly abutting the control slide rod, and the control inclined surface is arranged obliquely toward the axial direction of the first sealing tube in the direction close to the maintenance cover.

[0011] By adopting the above technical solution, when the second sealing tube is inserted into the first sealing tube, the control handle is pushed in the direction away from the second sealing tube, the control spring contracts, and the sealing block is located in the first slide groove. When the second sealing tube is completely inserted into the first sealing tube, the control handle is released, the control spring retracts and drives the control slide rod to push the sealing block into the second slide groove, thereby achieving sealing between the steam generator and the curing cover.

[0012] Optionally, the water collection assembly includes a water collection strip and a water collection pool; the top of the maintenance cover is triangular, the water collection strip is installed on the top of the maintenance cover and multiple water collection strips are arranged at intervals from top to bottom, the top of the water collection strip is fixed to the inner top wall of the maintenance cover, the bottom of the water collection strip is inclined along the direction close to the side wall of the maintenance cover, the water collection pool is located below the water collection strip and installed on the side wall of the maintenance cover, and the opening of the water collection pool is arranged upward.

[0013] By adopting the above technical solution, the condensed water vapor can be collected faster through the water collecting strip, and the condensed water droplets move along the inclined direction of the water collecting strip to the water collecting pool for collection.

[0014] Optionally, the water collecting strips are L-shaped, and two adjacent water collecting strips are staggered on a vertical plane.

[0015] By adopting the above technical solution, the L-shaped water collection strip can guide the water droplets condensed on the top of the curing chamber to fall onto the water collection plate. At the same time, the staggered water collection plates can reduce the number of water droplets that do not flow into the water collection pool, thereby improving the water collection efficiency.

[0016] Optionally, the water circulation component includes a water circulation pipe, a water collecting tank and a return pipe; one end of the water circulation pipe is connected to the water collecting tank and the other end is connected to the water collecting tank, and one end of the return pipe is connected to the water collecting tank and the other end is connected to the steam generator.

[0017] By adopting the above technical solution, the recovered water can be concentrated and precipitated in the water collecting tank and then transported to the steam generator, so as to ensure the stability of the water supply at the steam generator.

[0018] Optionally, a plurality of the spray pipes are horizontally spaced apart, and a rotating assembly is connected between the plurality of spray pipes, and the rotating assembly is used to adjust the layout angle of the spray pipe.

[0019] By adopting the above technical solution, the layout angle of the spray pipeline is adjusted by rotating the component, thereby adjusting the spray direction of the steam to avoid spraying steam at one position for a long time, thereby improving the uniformity of contact between the steam and the box girder and improving the maintenance quality.

[0020] Optionally, the rotating assembly includes a rotating bracket, a rotating gear, a rotating rack and a driving cylinder; the rotating bracket is installed at the bottom of the maintenance chamber, the spray pipeline is rotatably installed on the rotating bracket along its own axial direction, the rotating gear is coaxially installed on the spray pipeline, the rotating rack is horizontally arranged and meshed with the rotating gear, the driving cylinder is installed on the maintenance cover and the output shaft is coaxially fixedly connected to the rotating rack.

[0021] By adopting the above technical solution, the rotation of the spray pipeline is supported by the rotating bracket, and the rotating rack drives the rotating gear to rotate, thereby driving the spray pipeline to rotate to adjust its own steam injection direction.

[0022] Optionally, a heating component is provided in the curing chamber, and the heating component includes a resistance wire installed on the inner wall of the curing cover. A protective cover is provided on the side of the resistance wire facing the curing chamber. The protective cover is installed on the wall of the curing chamber and is made of breathable and water-absorbent material.

[0023] By adopting the above technical scheme, the temperature inside the maintenance cover can be kept at a constant temperature through the resistance wire, and the resistance wire is located inside the maintenance cover, which can reduce heat loss. The protective cover can prevent the resistance wire from contacting with water vapor without affecting the heat dissipation of the resistance wire, thereby improving the safety performance of the resistance wire.

[0024] Optionally, the outer wall of the maintenance cover is wrapped with an insulation layer, and the insulation layer is composed of geotextile and a quilt.

[0025] By adopting the above technical solution, since the use of the resistance wire will increase the temperature of the peripheral wall of the maintenance cover, in order to reduce heat loss, an insulation layer is used to insulate the maintenance cover, thereby saving electricity.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. The sealing assembly improves the sealing of the entire curing cover to reduce the loss of heat and save electricity. The water condensed by steam can be recycled through the water collection assembly and water circulation assembly, thereby saving water and reducing the amount of water and electricity consumed in the maintenance of the box beam as a whole, thereby reducing the maintenance cost of the box beam; 2. When the second sealing tube is completely inserted into the first sealing tube, release the control handle, and the control spring retracts to drive the control slide rod to push the sealing block into the second slide groove, thereby achieving sealing between the steam generator and the curing cover; 3. The water collecting strip can speed up the collection of condensed water vapor, and the condensed water droplets move along the inclined direction of the water collecting strip to the water collecting pool for collection. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application; Figure 2 is a schematic cross-sectional structure diagram of an embodiment of the present application; Figure 3 yes Figure 2 A partial enlarged schematic diagram of part 6; Figure 4 It is a schematic diagram showing the cross-sectional structure of the maintenance cover; Figure 5 This is a schematic diagram showing the structure of the rotating components on the maintenance cover.

[0028] Description of reference numerals: 1. Curing cover; 11. Curing chamber; 12. Steam inlet; 2. Steam generator; 3. Spray pipeline; 31. Injection port; 4. Water collecting assembly; 41. Water collecting strip; 42. Water collecting pool; 5. Water circulation assembly; 51. Water circulation pipeline; 52. Water collecting tank; 53. Return pipe; 6. Sealing assembly; 61. First sealing pipe; 62. Second sealing pipe; 63. Sealing block; 64. Control member; 641. Control slide bar; 642. Control handle; 643. Control spring; 65. First slide slot; 66. Second slide slot; 67. Third slide slot; 68. Fourth slide slot; 69. Control slope; 7. Rotating assembly; 71. Rotating bracket; 72. Rotating gear; 73. Rotating rack; 74. Driving cylinder; 8. Heating assembly; 81. Resistance wire; 82. Protective cover; 9. Insulation layer. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1-Figure 5 This application is described in further detail.

[0030] It should be noted that, in the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicating orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0031] The embodiment of the present application discloses a winter maintenance device for a small pre-supported box girder.

[0032] Reference Figure 1 and Figure 2 The maintenance device includes a maintenance cover 1, a steam generator 2, a spray pipeline 3, a water collection component 4, a water circulation component 5, a sealing component 6 and a heating component 8.

[0033] Among them, a curing chamber 11 for placing the box girder is provided in the curing cover 1. A steam inlet 12 connected to the steam generator 2 is provided at one end of the curing cover 1. The sealing component 6 is installed on the curing cover 1 and is used to seal the steam inlet 12 to reduce heat loss. The spray pipeline 3 is installed at the bottom of the curing cover 1 and is connected to the steam generator 2. The spray pipeline 3 is provided with a plurality of injection ports 31 for spraying steam. The water collection component 4 is located at the top of the curing cover 1 and is used to collect water droplets after steam condensation. The water circulation component 5 connects the water collection component 4 and the steam generator 2. The water circulation component 5 is used to circulate the water after steam condensation to the steam generator 2, so that the water droplets after steam condensation can be recycled and used to save water.

[0034] In addition, the heating component 8 is installed on the vertically arranged cavity wall of the curing cavity 11. The heating component 8 includes a resistance wire 81 installed on the inner wall of the curing cover 1. A protective cover 82 is provided on the side of the resistance wire 81 facing the curing cavity 11. The protective cover 82 is installed on the cavity wall of the curing cavity 11 and is made of a breathable and water-absorbent material. The temperature inside the curing cavity 11 is heated and controlled by the resistance wire 81, and the heat consumed is low and high-power heating is not required at the beginning, saving electricity. The use of the protective cover 82 does not affect the heat transfer on the one hand, and can prevent steam from directly contacting the resistance wire 81 on the other hand.

[0035] Since the use of the resistance wire 81 will increase the temperature of the peripheral wall of the curing cover 1, in order to reduce the loss of heat, the peripheral wall of the curing cover 1 is wrapped with an insulation layer 9. The insulation layer 9 is composed of geotextile and quilt, so as to insulate the curing cover 1 and save electricity. By cooperating with the sealing component 6, the water collection component 4 and the water circulation component 5, the water and electricity consumed in the curing of the box beam are reduced as a whole, thereby reducing the maintenance cost of the box beam.

[0036] Reference Figure 1 and Figure 3 The sealing assembly 6 includes a first sealing tube 61 , a second sealing tube 62 , a sealing block 63 and a control member 64 .

[0037] The first sealing tube 61 is installed on the steam cover and arranged coaxially with the steam inlet 12, and the second sealing tube 62 is installed at the outlet of the steam generator 2. When the steam generator 2 and the curing cover 1 are connected, the second sealing tube 62 is coaxially slidably inserted into the first sealing tube 61. The inner peripheral wall of the first sealing tube 61 is provided with a first sliding groove 65 for the radial movement of the sealing block 63, and the outer peripheral wall of the second sealing tube 62 is provided with a second sliding groove 66 for the radial insertion of the sealing block 63; In addition, the control member 64 includes a control slide bar 641 , a control handle 642 and a control spring 643 .

[0038] A third slide groove 67 is provided inside the first sealing tube 61 along its own axial direction for the control slide bar 641 to slide, and the third slide groove 67 is vertically connected to the first slide groove 65. A control inclined surface 69 is provided on the sealing block 63 for slidingly contacting the control slide bar 641, and the control inclined surface 69 is arranged obliquely toward the axial direction of the first sealing tube 61 in the direction close to the maintenance cover 1. A fourth slide groove 68 is provided outside the first sealing tube 61 for controlling the sliding along its own axial direction, and the control handle 642 is connected to the control slide bar 641. The control spring 643 is located in the fourth slide groove 68 and its two ends are respectively connected to the control handle 642 and the first sealing tube 61.

[0039] When the second sealing tube 62 is inserted into the first sealing tube 61, the control handle 642 is pushed in a direction away from the second sealing tube 62, the control spring 643 is contracted, and the sealing block 63 is located in the first slide groove 65, so that the second sealing tube 62 can be smoothly inserted into the first sealing tube 61. When the second sealing tube 62 is completely inserted into the first sealing tube 61, the control handle 642 is released, the control spring 643 retracts and drives the control slide rod 641 to pass through the control inclined surface 69, thereby pushing the sealing block 63 into the second slide groove 66, so as to achieve a sealing effect between the steam generator 2 and the curing cover 1.

[0040] Reference Figure 2 and Figure 4 The water collection component 4 includes a water collection strip 41 and a water collection pool 42.

[0041] The top of the curing cover 1 is triangular in shape, and a plurality of water collecting strips 41 are installed on the inner top wall of the curing cover 1 and are arranged at intervals from top to bottom. The water collecting pool 42 is located below the water collecting strips 41 and is installed on the side wall of the curing cover 1. The water collecting pool 42 is opened upward. The condensed water drops flow along the inclined direction of the water collecting strips 41 to the water collecting pool 42 for collection.

[0042] In order to better collect condensed water droplets, the water collecting strip 41 is arranged in an L shape, the top of the water collecting strip 41 is fixed to the inner top wall of the curing cover 1, the bottom of the water collecting strip 41 is arranged obliquely in the direction close to the side wall of the curing cover 1, and two adjacent water collecting strips 41 are arranged alternately on the vertical plane. On the one hand, it is convenient to accelerate the condensation speed of water vapor, and on the other hand, the staggered water collecting strips 41 can reduce the number of water droplets that do not fall on the water collecting pool 42, thereby accelerating the water collection efficiency.

[0043] Reference Figure 2 The water circulation assembly 5 includes a water circulation pipe 51, a water collecting tank 52 and a water return pipe 53. One end of the water circulation pipe 51 is connected to the water collecting tank 42 and the other end is connected to the water collecting tank 52. One end of the water return pipe 53 is connected to the water collecting tank 52 and the other end is connected to the steam generator 2. The recovered water is concentrated and precipitated through the water collecting tank 52, and the water return pipe 53 is connected to the top of the water collecting tank 52, so that the condensed water after precipitation is transported to the steam generator 2 for recycling, while ensuring the stability of the water supply at the steam generator 2.

[0044] In order to avoid spraying water vapor at a single location of the box girder for a long time, refer to Figure 2 and Figure 5 A plurality of spray pipes 3 are arranged at horizontal intervals, and a rotating component 7 is connected between the plurality of spray pipes 3. The rotating component 7 is used to adjust the layout angle of the spray pipes 3 to adjust the ejection direction of the steam, thereby improving the uniformity of the contact between the steam and the box beam and improving the maintenance quality.

[0045] The rotating assembly 7 includes a rotating bracket 71, a rotating gear 72, a rotating rack 73 and a driving cylinder 74. The rotating bracket 71 is installed at the bottom of the curing chamber 11, and the spray pipeline 3 is installed on the rotating bracket 71 along its own axis, thereby supporting and guiding the rotation of the spray pipeline 3. The rotating gear 72 is coaxially installed on the spray pipeline 3. The rotating rack 73 is arranged horizontally and meshes with the rotating gear 72. The driving cylinder 74 is installed on the curing cover 1 and the output shaft is coaxially fixedly connected to the rotating rack 73. The rotating rack 73 drives the rotating gear 72 to rotate, thereby driving the spray pipeline 3 to rotate to adjust its own steam injection direction.

[0046] The implementation principle of a small pre-supported box girder winter maintenance device in the embodiment of the present application is as follows: when the box girder is maintained, the maintenance chamber 11 is heated by the resistance wire 81, and the heat loss is reduced by the insulation layer 9. The sealing assembly 6 improves the connection sealing between the steam generator 2 and the maintenance cover 1 to reduce heat loss and save electricity. The steam condensate can be transported to the steam generator 2 again for recycling through the water collection assembly 4 and the water circulation assembly 5, thereby saving water, and ultimately reducing the amount of water and electricity consumed in the maintenance of the box girder as a whole, thereby reducing the maintenance cost of the box girder.

[0047] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A small pre-supported box beam winter maintenance device, characterized in that: It comprises a maintenance cover (1), a steam generator (2), a spray pipeline (3), a water collection component (4), a water circulation component (5) and a sealing component (6); The curing cover (1) is provided with a curing cavity (11) for placing a box girder, one end of the curing cover (1) is provided with a steam inlet (12) connected to a steam generator (2), the sealing component (6) is installed on the curing cover (1) and is used to seal the steam inlet (12), the spray pipeline (3) is installed on the bottom of the curing cover (1) and is connected to the steam generator (2), the spray pipeline (3) is provided with a plurality of spray ports (31) for spraying steam, the water collection component (4) is located at the top of the curing cover (1) and is used to collect water droplets after steam condensation, the water circulation component (5) connects the water collection component (4) and the steam generator (2), and the water circulation component (5) is used to circulate water after steam condensation to the steam generator (2).

2. A small pre-supported box beam winter maintenance device according to claim 1, characterized in that: The sealing assembly (6) comprises a first sealing tube (61), a second sealing tube (62), a sealing block (63) and a control member (64); The first sealing tube (61) is installed on the steam hood and is coaxially arranged with the steam inlet (12); the second sealing tube (62) is installed at the outlet of the steam generator (2); the second sealing tube (62) is coaxially slidably inserted into the first sealing tube (61); the inner peripheral wall of the first sealing tube (61) is provided with a first sliding groove (65) for radial movement of the sealing block (63); the outer peripheral wall of the second sealing tube (62) is provided with a second sliding groove (66) for radial insertion of the sealing block (63); and the control member (64) is used to control the sliding direction of the sealing block (63).

3. A small pre-supported box beam winter maintenance device according to claim 2, characterized in that: The control member (64) comprises a control slide bar (641), a control handle (642) and a control spring (643); A third slide groove (67) is provided inside the first sealing tube (61) along its own axial direction for the control slide rod (641) to slide, and the third slide groove (67) is vertically connected to the first slide groove (65). A fourth slide groove (68) is provided outside the first sealing tube (61) for the control to slide along its own axial direction. The control handle (642) is connected to the control slide rod (641). The control spring (643) is located in the fourth slide groove (68) and its two ends are respectively connected to the control handle (642) and the first sealing tube (61). A control inclined surface (69) is provided on the sealing block (63) for slidingly abutting against the control slide rod (641). The control inclined surface (69) is arranged obliquely toward the axial direction of the first sealing tube (61) in the direction close to the maintenance cover (1).

4. A small-sized pre-supported box beam winter maintenance device according to claim 1, characterized in that: The water collection assembly (4) comprises a water collection strip (41) and a water collection pool (42); The top of the maintenance cover (1) is triangular in shape. The water collecting strips (41) are installed on the top of the maintenance cover (1) and are arranged in a plurality of intervals from top to bottom. The top of the water collecting strips (41) is fixed to the inner top wall of the maintenance cover (1). The bottom of the water collecting strips (41) is arranged obliquely in a direction close to the side wall of the maintenance cover (1). The water collecting pool (42) is located below the water collecting strips (41) and is installed on the side wall of the maintenance cover (1). The water collecting pool (42) is arranged with its opening facing upward.

5. A small-sized pre-supported box girder winter maintenance device according to claim 4, characterized in that: The water collecting strips (41) are L-shaped, and two adjacent water collecting strips (41) are arranged alternately on a vertical plane.

6. A small pre-supported box girder winter maintenance device according to claim 4, characterized in that: The water circulation assembly (5) comprises a water circulation pipeline (51), a water collecting tank (52) and a water return pipe (53); one end of the water circulation pipeline (51) is connected to the water collecting tank (42) and the other end is connected to the water collecting tank (52); one end of the water return pipe (53) is connected to the water collecting tank (52) and the other end is connected to the steam generator (2).

7. A small-sized pre-supported box girder winter maintenance device according to claim 1, characterized in that: A plurality of the spray pipelines (3) are arranged horizontally at intervals, and a rotating assembly (7) is connected between the plurality of the spray pipelines (3). The rotating assembly (7) is used to adjust the layout angle of the spray pipeline (3).

8. A small-sized pre-supported box beam winter maintenance device according to claim 7, characterized in that: The rotating assembly (7) comprises a rotating bracket (71), a rotating gear (72), a rotating rack (73) and a driving cylinder (74); the rotating bracket (71) is mounted on the bottom of the curing chamber (11); the spray pipeline (3) is rotatably mounted on the rotating bracket (71) along its own axial direction; the rotating gear (72) is coaxially mounted on the spray pipeline (3); the rotating rack (73) is horizontally arranged and meshes with the rotating gear (72); the driving cylinder (74) is mounted on the curing cover (1) and the output shaft is coaxially fixedly connected to the rotating rack (73).

9. A small-sized pre-supported box girder winter maintenance device according to claim 1, characterized in that: A heating component (8) is arranged in the curing chamber (11), the heating component (8) comprising a resistance wire (81) mounted on the inner wall of the curing cover (1), a protective cover (82) is arranged on the side of the resistance wire (81) facing the curing chamber (11), the protective cover (82) is mounted on the wall of the curing chamber (11) and is made of a breathable and water-absorbent material.

10. The winter maintenance device for a small pre-supported box beam according to claim 1, characterized in that: The outer peripheral wall of the maintenance cover (1) is wrapped with a thermal insulation layer (9), and the thermal insulation layer (9) is composed of geotextile and a quilt.

Citation Information

Patent Citations

  • Moisture-proof vehicle-mounted controller

    CN115315116A

  • Environment -friendly paint spraying booth

    CN207615089U

  • Precast concrete member heating maintenance device

    CN214871478U

  • Cement specimen curing box

    CN218195919U

  • Electric three-eccentric sealing butterfly valve

    CN219606063U