A signal control operation system for engineering vehicles capable of operating across lines

By introducing the straight-line and intersection driving collision risk monitoring module and cloud database into the railway engineering vehicle management and control system, real-time analysis and optimization of the operation of railway engineering vehicles are solved, which solves the problems of slow collision risk warning and rigid speed regulation strategy in the existing technology, and improves improve the safety and operational efficiency of railway transportation.

CN118722797BInactive Publication Date: 2024-10-29北京市基础设施投资有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411204490.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-10-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing management and control model of railway engineering vehicles has the problems of slow early warning response, rigid adjustment objects and rigid speed regulation strategies in the analysis of collision risks of straight driving and intersection driving. It cannot effectively predict and optimize the dynamic relationship between railway engineering vehicles, resulting in the system being unable to Flexibly respond to collision risks in different scenarios.

Method used

A signal control operation system for engineering vehicles that can operate across lines is designed, including a task distribution module, a straight-line collision risk monitoring module, an intersection collision risk monitoring module, a cloud database, etc., through real-time monitoring and analysis of the movement of railway engineering vehicles Path, speed and task priority, calculating personalized adjustment parameters and signal feedback to optimize the operation of railway engineering vehicles.

Benefits of technology

It realizes instant collision risk determination and priority assessment of railway engineering vehicles, quickly adjusts speed and position, avoids potential collision risks, improves the safety and operating efficiency of railway transportation, and reduces energy consumption and time waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118722797B_ABST
    Figure CN118722797B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of railway engineering traffic management, and to a signal control operation system for engineering vehicles that can operate across lines. On the one hand, the present invention can timely discover the railway engineering vehicles that are operating on the straight section ahead, and judge whether there is a risk of straight-line collision between the two railway engineering vehicles, and display the adjustment priorities of the two railway engineering vehicles in a detailed digital manner, and calculate personalized straight-line adjustment parameters, including the best adjustment position and specific adjustment speed, and generate a straight-line adjustment signal to feed back to the railway engineering vehicle with priority adjustment in real time. On the other hand, it can sense two railway engineering vehicles that are expected to pass through the same intersection section within a set time period, analyze the adjustment priorities of the two railway engineering vehicles from the perspective of the mission location, calculate personalized intersection adjustment parameters, and generate an intersection adjustment signal to feed back to the railway engineering vehicle with priority adjustment, effectively avoiding the problems of slow warning response, rigid adjustment objects, and rigid speed regulation strategies in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of railway engineering traffic management, and in particular to a signal control operation system for an engineering vehicle capable of operating across lines. Background Art

[0002] With the rapid progress of railway construction, railway engineering vehicles play an increasingly critical role in the construction and maintenance of railways. However, in a complex railway network, how to ensure the safe and efficient operation of railway engineering vehicles while reducing the accident rate of railway engineering workshops has always been an important challenge faced by the railway engineering vehicle control center. In order to achieve effective control of railway engineering vehicles traveling on the railway, it is particularly important for the railway engineering vehicle control center to develop a signal control operation system for engineering vehicles that can operate across lines.

[0003] The existing railway engineering vehicle control mode has achieved real-time scheduling and adjustment by adopting advanced technology to track each railway engineering vehicle in the railway network in real time, thereby avoiding the inaccuracy and untimeliness of manual scheduling and on-site command. However, it still has certain limitations, which are specifically manifested in: the existing technology for the collision risk analysis of railway engineering vehicles in straight driving and intersecting driving has problems such as slow warning response, rigid adjustment objects and rigid speed regulation strategy.

[0004] First, the existing technology usually starts speed adjustment analysis when two railway engineering vehicles reach the straight-line warning distance or the intersection warning distance. It is unable to predict the risk of collision between the two railway engineering vehicles in advance, which may lead to a relatively late timing for adjusting the speed, or even cause the railway engineering vehicles to stop and wait, delaying the implementation of railway engineering tasks, and further leading to aggravated railway traffic congestion.

[0005] Secondly, the existing technology generally tends to adjust the speed of railway engineering vehicles at the rear without conducting a reasonable priority analysis, which may lead to an inflexible speed regulation strategy for the entire system and fail to minimize the risk of collision.

[0006] Finally, the existing technology only relies on simple position and speed adjustment rules, lacks the ability to calculate the optimal adjustment position and specific adjustment speed, and cannot fully consider the actual operating conditions and the dynamic relationship between engineering vehicles, which leads to the system's inability to flexibly respond to collision risks in different scenarios, which is not conducive to fully optimizing the operation of engineering vehicles. Summary of the invention

[0007] In order to overcome the shortcomings of the background technology, an embodiment of the present invention provides a signal control operation system for an engineering vehicle that can operate across lines, which can effectively solve the problems involved in the above-mentioned background technology.

[0008] The purpose of the present invention can be achieved by the following technical solutions: A signal control operation system for engineering vehicles capable of operating across lines, comprising: a task issuing module for issuing a specified task item to a railway engineering vehicle A, including a specified task location, a specified task type, a specified load weight and a specified driving path. After receiving the specified task item, the railway engineering vehicle A drives at a standard driving speed. Open to traffic.

[0009] The straight-line driving collision risk monitoring module is used to monitor the straight section in the specified driving path of railway engineering vehicle A in real time. When monitoring the presence of railway engineering vehicle B operating on the straight section ahead, it is determined whether there is a straight-line collision risk between railway engineering vehicle A and railway engineering vehicle B. If it is determined that there is a straight-line adjustment signal feedback module, the straight-line adjustment signal feedback module is executed, otherwise the railway engineering vehicle A continues to drive normally.

[0010] The straight line adjustment signal feedback module is used to analyze the adjustment priority of railway engineering vehicle A and railway engineering vehicle B, calculate the straight line adjustment parameters of the railway engineering vehicle with priority adjustment, and generate a straight line adjustment signal to feed back to the railway engineering vehicle with priority adjustment.

[0011] The intersection collision risk monitoring module is used to monitor the intersection section in the specified driving path of railway engineering vehicle A in real time. When monitoring railway engineering vehicle A and railway engineering vehicle C to pass through the same intersection section within a set time period, it is determined whether there is an intersection collision risk between railway engineering vehicle A and railway engineering vehicle C. If it is determined that there is a risk of intersection collision, the intersection adjustment signal feedback module is executed, otherwise the railway engineering vehicle A continues to pass normally.

[0012] The intersection adjustment signal feedback module is used to analyze the adjustment priority of railway engineering vehicle A and railway engineering vehicle C, calculate the intersection adjustment parameters of the railway engineering vehicle with priority adjustment, and generate an intersection adjustment signal to feed back to the railway engineering vehicle with priority adjustment.

[0013] The cloud database is used to store the safety distance threshold between two railway engineering workshops on a one-way track as stipulated by railway safety regulations, and to store the task level corresponding to each task type of railway engineering vehicles, the reference speed change distance, the lower limit of the reasonable range of driving speed, the upper limit of the reasonable range of operating speed, and the rated intersection time when passing through the intersection section.

[0014] Preferably, the step of determining whether there is a linear collision risk between railway engineering vehicle A and railway engineering vehicle B comprises: obtaining operation task information of railway engineering vehicle B, including operation task type, current operation speed, and operation task type. , Operating load weight and the remaining operation travel path.

[0015] According to the remaining designated driving path of the current railway engineering vehicle A and the remaining operating driving path of the railway engineering vehicle B, obtain the overlapping driving sections and their distances between the railway engineering vehicles A and B .

[0016] Get the current interval and distance between railway engineering vehicle A and railway engineering vehicle B , extract the safety distance threshold between two railway engineering workshops on a one-way track according to railway safety regulations from the cloud database , by the straight line collision determination model The existence of the linear collision risk between railway engineering vehicle A and railway engineering vehicle B is obtained, where It means that there is a risk of a straight-line collision between railway engineering vehicles A and B. It means that there is no risk of straight-line collision between railway engineering vehicles A and B.

[0017] Preferably, the analysis of the adjustment priority of railway engineering vehicle A and railway engineering vehicle B includes: extracting the specified task type in the specified task item of railway engineering vehicle A and the operation task type in the operation task information of railway engineering vehicle B respectively, and according to the task level corresponding to each task type of railway engineering vehicle stored in the cloud database, respectively obtaining the task level corresponding to railway engineering vehicle A and B and setting the task priority influence weight, which is recorded as .

[0018] Based on the railway engineering vehicle benchmark speed change distance stored in the cloud database , the current distance between railway engineering vehicle A and railway engineering vehicle B Determine whether railway engineering vehicle A has the speed change reference condition. , then it is determined that railway engineering vehicle A has the speed change reference condition, and the basic speed change compliance factor of railway engineering vehicle A is set to 1, otherwise it is set to 0, so as to obtain the basic speed change compliance factor of railway engineering vehicle A , .

[0019] The distance between the overlapping sections of railway engineering vehicle A and railway engineering vehicle B Determine whether railway engineering vehicle B has the speed change benchmark conditions and obtain the basic speed change compliance factor of railway engineering vehicle B , .

[0020] Get the historical speed change information of railway engineering vehicle A, including the speed change of each historical speed change , Braking control accuracy and response time ,in is the number of each speed change in history, , analyze the speed regulation capability evaluation coefficient of railway engineering vehicle A , and its calculation formula is: ,in are respectively the reasonable thresholds of the speed change, braking control accuracy and response time of a single speed change of a railway engineering vehicle. is the historical speed change times of railway engineering vehicle A, is a natural constant.

[0021] Obtain the historical speed change information of railway engineering vehicle B, and similarly analyze and obtain the speed regulation capability evaluation coefficient of railway engineering vehicle B .

[0022] Extract the specified load weight in the specified task item of railway engineering vehicle A respectively and the operating load weight in the railway engineering vehicle B operating task information , and thus calculate the adjustment priority evaluation coefficient of railway engineering vehicle A compared to railway engineering vehicle B , ,in They are respectively the weight proportions corresponding to the preset speed regulation capability ratio, task priority influence weight ratio, basic speed change compliance factor difference ratio, and load weight ratio.

[0023] like If it is greater than or equal to the preset value, railway engineering vehicle A will be adjusted as the railway engineering vehicle with priority, otherwise railway engineering vehicle B will be adjusted as the railway engineering vehicle with priority.

[0024] Preferably, the calculation of the linear adjustment parameters of the railway engineering vehicle with priority adjustment includes: if railway engineering vehicle A is the railway engineering vehicle with priority adjustment, the current position of railway engineering vehicle A is the distance before the end of the overlapping driving section. The road section between the positions is divided into the normal driving section, speed change driving section and speed reduction driving section of railway engineering vehicle A, and the driving time of each section is recorded as .

[0025] Create the following condition Determine the linear downward speed value of railway engineering vehicle A ,in is the lower limit of the reasonable range of railway engineering vehicle speed stored in the cloud database, and then determines the driving time of railway engineering vehicle A in the normal driving section The specific value of .

[0026] The optimal speed change position of railway engineering vehicle A is when railway engineering vehicle A travels at standard speed. Driving The distance between the current position of railway engineering vehicle A and the current position of railway engineering vehicle A is , .

[0027] Preferably, the calculation of the priority adjustment of the straight-line adjustment parameters of the railway engineering vehicle further includes: if the railway engineering vehicle B is the priority adjustment railway engineering vehicle, dividing the overlapping driving section of the railway engineering vehicle A and the railway engineering vehicle B into a normal operation section, a speed change operation section and an acceleration operation section of the railway engineering vehicle B, and recording the operation time of each section as .

[0028] Create the following condition Determine the straight-line upward speed value of railway engineering vehicle B ,in is the upper limit of the reasonable range of railway engineering vehicle operating speed stored in the cloud database, and then determines the driving time of railway engineering vehicle B in the normal operating section The specific value of .

[0029] The optimal speed change position of railway engineering vehicle B is Driving The distance between the current position of railway engineering vehicle B and the current position of railway engineering vehicle B is , .

[0030] Preferably, the specific monitoring process of the railway engineering vehicle A and the railway engineering vehicle C in preparing to pass through the same intersection section within a set time period is as follows: a corresponding intersection monitoring probe point is arranged at a preset distance before the entrance of each straight section adjacent to the intersection section; when the railway engineering vehicle A passes through the intersection monitoring probe point on its straight section, the probe point automatically obtains the intersection section number corresponding to the railway engineering vehicle A and records the current passing time point, and continuously obtains the pre-passage status of other vehicles on the intersection section with the number within a set time period after the time point; when the railway engineering vehicle C passes through the intersection monitoring probe point on its straight section within the set time period, its probe point compares the obtained intersection section number with the recorded intersection section number corresponding to the railway engineering vehicle A; if the numbers are the same, it is confirmed that the railway engineering vehicle A and the railway engineering vehicle C are preparing to pass through the same intersection section within the set time period.

[0031] Preferably, the determining whether there is a risk of intersection collision between railway engineering vehicle A and railway engineering vehicle C comprises: respectively obtaining the time points at which railway engineering vehicles A and C pass through their corresponding intersection detection probes, recorded as .

[0032] Extract the rated intersection time of railway engineering vehicles passing through the intersection section from the cloud database , determined by the intersection collision model The existence of the intersection collision risk between railway engineering vehicle A and railway engineering vehicle C is obtained, where It indicates that there is a risk of intersection and collision between railway engineering vehicles A and C. This indicates that there is no risk of intersection collision between railway engineering vehicles A and C.

[0033] Preferably, the analysis of the adjustment priority of railway engineering vehicle A and railway engineering vehicle C includes: obtaining the designated task locations of railway engineering vehicles A and C respectively, if the designated task location of railway engineering vehicle A is located before the designated task location of railway engineering vehicle C, then railway engineering vehicle A is used as the priority adjustment engineering vehicle, otherwise, railway engineering vehicle C is used as the priority adjustment engineering vehicle.

[0034] Preferably, the calculation of the intersection adjustment parameters of the railway engineering vehicle with priority adjustment includes: if the railway engineering vehicle A is the priority adjustment engineering vehicle, the preset distance between the intersection monitoring probe point and the intersection section is recorded as , according to the formula Get the intersection speed reduction value of railway engineering vehicle A The adjustment position point of railway engineering vehicle A is the position point where railway engineering vehicle C is located when it passes through the intersection monitoring probe point on its straight section.

[0035] If railway engineering vehicle C is the priority engineering vehicle, then the formula Get the reduced speed value of Railway Engineering Vehicle C The adjustment position of railway engineering vehicle C is the intersection monitoring probe point on its straight section.

[0036] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects: (1) When monitoring the presence of a railway engineering vehicle B operating on a straight section ahead of a railway engineering vehicle A, the present invention instantly determines whether there is a risk of a straight-line collision between railway engineering vehicle A and railway engineering vehicle B, fully considers the dynamic relationship between the traveling speed of railway engineering vehicle A and the operating speed of railway engineering vehicle B, and makes a quick judgment, thereby effectively avoiding potential collision risks and providing data support and a scientific basis for subsequent further analysis.

[0037] (2) The present invention comprehensively analyzes the adjustment priority evaluation coefficients of railway engineering vehicle A compared with railway engineering vehicle B from four aspects: speed regulation capability ratio, task priority influence weight ratio, basic speed change compliance factor difference ratio and load weight ratio, and displays the adjustment priorities of railway engineering vehicle A and railway engineering vehicle B in a digitized and detailed manner, thereby avoiding the rigid defects of adjustment objects in the prior art and adapting to different situations and conditions more flexibly, thereby bringing significant improvements to the operation and safety of railway engineering vehicles.

[0038] (3) The present invention calculates personalized straight-line adjustment parameters for different priority-adjustment railway engineering vehicles, including optimal adjustment positions and specific adjustment speeds, generates straight-line adjustment signals and feeds them back to the priority-adjustment railway engineering vehicles, thereby ensuring that the adjustment of each railway engineering vehicle is the most optimized result, helping to avoid unnecessary energy consumption and time waste, and improving the overall operating efficiency of the railway engineering vehicles.

[0039] (4) The present invention arranges corresponding intersection monitoring probe points at a preset distance before the intersection of the straight section, so as to predict in advance that railway engineering vehicles A and C will pass through the same intersection within a set time period, thereby timely determining whether there is a risk of intersection collision between railway engineering vehicles A and railway engineering vehicles C, helping to reasonably arrange the traffic flow of the intersection section, and hopefully improving the driving safety and operating efficiency of railway engineering vehicles on the intersection section.

[0040] (5) The present invention analyzes the adjustment priority of railway engineering vehicle A and railway engineering vehicle C from the perspective of the sequence of the designated task locations, fully considers the convenience of the subsequent driving sections, and then calculates the personalized intersection adjustment parameters of the railway engineering vehicles with different priority adjustments, generates an intersection adjustment signal and feeds it back to the railway engineering vehicles with priority adjustments, which has a positive impact on reducing intersection congestion and improving the overall efficiency of the railway transportation system. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.

[0042] Figure 1 It is a schematic diagram of module connection of the present invention.

[0043] Figure 2 This is a reference schematic diagram of the straight-line travel of the railway engineering vehicle A of the present invention.

[0044] Figure 3 It is a reference schematic diagram of the railway engineering vehicle A of the present invention for crossing and passing.

[0045] Figure numerals: 1. Railway engineering vehicle A; 2. Railway engineering vehicle B; 3. Railway engineering vehicle C. DETAILED DESCRIPTION

[0046] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0047] Reference Figure 1 As shown, the present invention provides a signal control operation system for engineering vehicles that can operate across lines, including: a task issuing module, a straight-line driving collision risk monitoring module, a straight-line adjustment signal feedback module, an intersection driving collision risk monitoring module, an intersection adjustment signal feedback module and a cloud database.

[0048] The task issuing module is respectively connected to the straight-line driving collision risk monitoring module and the intersection driving collision risk monitoring module, the straight-line driving collision risk monitoring module is connected to the straight-line adjustment signal feedback module, the intersection driving collision risk monitoring module is connected to the intersection adjustment signal feedback module, and the cloud database is respectively connected to the straight-line driving collision risk monitoring module, the straight-line adjustment signal feedback module, and the intersection driving collision risk monitoring module.

[0049] The task issuing module is used to issue a specified task item to the railway engineering vehicle A, including a specified task location, a specified task type, a specified load weight and a specified driving path. After receiving the specified task item, the railway engineering vehicle A drives at a standard speed. Open to traffic.

[0050] It should be noted that the above-mentioned standard driving speed refers to the initial driving speed value of each railway engineering vehicle, which is the calculated average of the upper and lower limits of the reasonable range of the railway engineering vehicle's driving speed, ensuring that each railway engineering vehicle has enough space to slow down or accelerate. In the scenario set by the present invention, each railway engineering vehicle will only change the standard driving speed when there is a need to change speed during driving, and maintain the standard driving speed in other traffic periods. Therefore, when the intersection collision risk between railway engineering vehicles A and C is subsequently analyzed, the driving speeds of railway engineering vehicles A and C are both set to the standard driving speed. .

[0051] The straight-line driving collision risk monitoring module is used to monitor the straight section in the specified driving path of railway engineering vehicle A in real time. When monitoring the presence of railway engineering vehicle B operating on the straight section ahead, it is determined whether there is a straight-line collision risk between railway engineering vehicle A and railway engineering vehicle B. If it is determined that there is a straight-line adjustment signal feedback module, the straight-line adjustment signal feedback module is executed, otherwise the railway engineering vehicle A continues to travel normally.

[0052] Please refer to Figure 2 Specifically, the determination of whether there is a linear collision risk between railway engineering vehicle A and railway engineering vehicle B includes: obtaining the operation task information of railway engineering vehicle B, including the operation task type, the current operation speed, , Operating load weight and the remaining operation travel path.

[0053] It should be noted that the operation task information of the above-mentioned railway engineering vehicle B and the historical speed change information of subsequent railway engineering vehicles A and B are extracted from the data sharing unit of the railway engineering vehicle control center.

[0054] According to the remaining designated driving path of the current railway engineering vehicle A and the remaining operating driving path of the railway engineering vehicle B, obtain the overlapping driving sections and their distances between the railway engineering vehicles A and B .

[0055] Get the current interval and distance between railway engineering vehicle A and railway engineering vehicle B , extract the safety distance threshold between two railway engineering workshops on a one-way track according to railway safety regulations from the cloud database , by the straight line collision determination model The existence of the linear collision risk between railway engineering vehicle A and railway engineering vehicle B is obtained, where It means that there is a risk of a straight-line collision between railway engineering vehicles A and B. It means that there is no risk of straight-line collision between railway engineering vehicles A and B.

[0056] It should be noted that the above is achieved by using the radar system built into railway engineering vehicle A to monitor the existence of railway engineering vehicle B operating on the straight section ahead and uploading it to the railway engineering vehicle control center. The radar detection distance is relatively long, so it can sense and predict in advance.

[0057] When monitoring the presence of railway engineering vehicle B operating on a straight section ahead of railway engineering vehicle A, the embodiment of the present invention instantly determines whether there is a risk of straight-line collision between railway engineering vehicle A and railway engineering vehicle B, fully considers the dynamic relationship between the traveling speed of railway engineering vehicle A and the operating speed of railway engineering vehicle B, and quickly makes a judgment, thereby effectively avoiding potential collision risks and providing data support and a scientific basis for subsequent further analysis.

[0058] The straight line adjustment signal feedback module is used to analyze the adjustment priority of railway engineering vehicle A and railway engineering vehicle B, calculate the straight line adjustment parameters of the railway engineering vehicle with priority adjustment, and generate a straight line adjustment signal to feed back to the railway engineering vehicle with priority adjustment.

[0059] Specifically, the analysis of the adjustment priority of railway engineering vehicle A and railway engineering vehicle B includes: extracting the specified task type in the specified task item of railway engineering vehicle A and the operation task type in the operation task information of railway engineering vehicle B respectively, and according to the task level corresponding to each task type of railway engineering vehicle stored in the cloud database, respectively obtaining the task level corresponding to railway engineering vehicle A and B and setting the task priority influence weight, which is recorded as .

[0060] It should be noted that the division of task levels corresponding to each task type of the above-mentioned railway engineering vehicles is usually determined based on the urgency, importance and impact of the task on the entire railway system. It is specifically divided into first-level tasks, second-level tasks and third-level tasks. First-level tasks include emergency fault repair tasks and emergency road clearing tasks, etc., second-level tasks include intersection management tasks and new line laying tasks, etc., and third-level tasks include routine maintenance tasks, etc. The task priority impact weights can be set as follows: first-level tasks: 0.5; second-level tasks: 0.3; third-level tasks: 0.2.

[0061] Based on the railway engineering vehicle benchmark speed change distance stored in the cloud database , the current distance between railway engineering vehicle A and railway engineering vehicle B Determine whether railway engineering vehicle A has the speed change reference condition. , then it is determined that railway engineering vehicle A has the speed change reference condition, and the basic speed change compliance factor of railway engineering vehicle A is set to 1, otherwise it is set to 0, so as to obtain the basic speed change compliance factor of railway engineering vehicle A , .

[0062] The distance between the overlapping sections of railway engineering vehicle A and railway engineering vehicle B Determine whether railway engineering vehicle B has the speed change reference condition. , then it is determined that railway engineering vehicle B has the speed change reference condition, and the basic speed change compliance factor of railway engineering vehicle B is set to 1, otherwise it is set to 0, and the basic speed change compliance factor of railway engineering vehicle B is obtained. , .

[0063] Get the historical speed change information of railway engineering vehicle A, including the speed change of each historical speed change , Braking control accuracy and response time ,in is the number of each speed change in history, , analyze the speed regulation capability evaluation coefficient of railway engineering vehicle A , and its calculation formula is: ,in are respectively the reasonable thresholds of the speed change, braking control accuracy and response time of a single speed change of a railway engineering vehicle. is the historical speed change times of railway engineering vehicle A, is a natural constant.

[0064] It should be noted that the above-mentioned speed change refers to acceleration or deceleration, and the speed change value here is an absolute value. The braking control accuracy refers to the railway engineering vehicle's ability to control the speed during the speed change process, including change balance control and change accuracy control. The response time refers to the time required for the railway engineering vehicle to complete the speed change action after the railway engineering vehicle control center sends a speed change signal to the railway engineering vehicle.

[0065] Obtain the historical speed change information of railway engineering vehicle B, and similarly analyze and obtain the speed regulation capability evaluation coefficient of railway engineering vehicle B .

[0066] Extract the specified load weight in the specified task item of railway engineering vehicle A respectively and the operating load weight in the railway engineering vehicle B operating task information , and thus calculate the adjustment priority evaluation coefficient of railway engineering vehicle A compared to railway engineering vehicle B , ,in They are respectively the weight proportions corresponding to the preset speed regulation capability ratio, task priority influence weight ratio, basic speed change compliance factor difference ratio, and load weight ratio.

[0067] like If it is greater than or equal to the preset value, railway engineering vehicle A will be adjusted as the railway engineering vehicle with priority, otherwise railway engineering vehicle B will be adjusted as the railway engineering vehicle with priority.

[0068] The embodiment of the present invention comprehensively analyzes the adjustment priority evaluation coefficient of railway engineering vehicle A compared with railway engineering vehicle B from four aspects: speed regulation capability ratio, task priority influence weight ratio, basic speed change compliance factor difference ratio and load weight ratio, and displays the adjustment priority of railway engineering vehicle A and railway engineering vehicle B in a digitized and detailed manner, thereby avoiding the rigid defects of adjustment objects in the prior art and adapting to different situations and conditions more flexibly, thereby bringing significant improvements to the operation and safety between railway engineering vehicles.

[0069] Specifically, the calculation of the priority adjustment of the straight-line adjustment parameters of the railway engineering vehicle includes: if the railway engineering vehicle A is the priority adjustment railway engineering vehicle, the current position of the railway engineering vehicle A and the distance before the end of the overlapping driving section are calculated. The road section between the positions is divided into the normal driving section, speed change driving section and speed reduction driving section of railway engineering vehicle A, and the driving time of each section is recorded as .

[0070] Create the following condition Determine the linear downward speed value of railway engineering vehicle A ,in is the lower limit of the reasonable range of railway engineering vehicle speed stored in the cloud database, and then determines the driving time of railway engineering vehicle A in the normal driving section The specific value of .

[0071] The optimal speed change position of railway engineering vehicle A is when railway engineering vehicle A travels at standard speed. Driving The distance between the current position of railway engineering vehicle A and the current position of railway engineering vehicle A is , .

[0072] It should be noted that railway engineering vehicle A starts to change speed at a certain position on the current distance section between it and railway engineering vehicle B. This position is the optimal speed change position of railway engineering vehicle A, which satisfies the requirement that when railway engineering vehicle B reaches the end position of the overlapping driving section, the distance between railway engineering vehicle A and railway engineering vehicle B is conditions.

[0073] Specifically, the calculation of the priority adjustment of the straight-line adjustment parameters of the railway engineering vehicle also includes: if the railway engineering vehicle B is the priority adjustment railway engineering vehicle, the overlapping driving section of the railway engineering vehicle A and the railway engineering vehicle B is divided into a normal operation section, a speed change operation section and an acceleration operation section of the railway engineering vehicle B, and the operation time of each section is recorded as .

[0074] Create the following condition Determine the straight-line upward speed value of railway engineering vehicle B ,in is the upper limit of the reasonable range of railway engineering vehicle operating speed stored in the cloud database, and then determines the driving time of railway engineering vehicle B in the normal operating section The specific value of .

[0075] The optimal speed change position of railway engineering vehicle B is Driving The distance between the current position of railway engineering vehicle B and the current position of railway engineering vehicle B is , .

[0076] It should be noted that the railway engineering vehicle B starts to change speed at a certain position on the overlapping driving section with the railway engineering vehicle A. This position is the optimal speed change position of the railway engineering vehicle B, which satisfies the requirement that when the railway engineering vehicle B travels to the end position of the overlapping driving section, the distance between the railway engineering vehicle A and the railway engineering vehicle B is conditions.

[0077] The embodiment of the present invention calculates personalized straight-line adjustment parameters for different priority-adjusted railway engineering vehicles, including optimal adjustment positions and specific adjustment speeds, generates straight-line adjustment signals and feeds them back to the priority-adjusted railway engineering vehicles, thereby ensuring that the adjustment of each railway engineering vehicle is the most optimized result, helping to avoid unnecessary energy consumption and time waste, and improving the overall operating efficiency of the railway engineering vehicles.

[0078] The intersection collision risk monitoring module is used to monitor the intersection section in the specified driving path of railway engineering vehicle A in real time. When monitoring railway engineering vehicle A and railway engineering vehicle C to pass through the same intersection section within a set time period, it is determined whether there is an intersection collision risk between railway engineering vehicle A and railway engineering vehicle C. If it is determined that there is a risk of intersection collision, the intersection adjustment signal feedback module is executed, otherwise the railway engineering vehicle A continues to pass normally.

[0079] See also Figure 3 As shown, specifically, the specific monitoring process of the railway engineering vehicle A and the railway engineering vehicle C in the pre-passing of the same intersection section within the set time period is: a corresponding intersection monitoring probe point is arranged at a preset distance before the intersection section entrance of each straight section; when the railway engineering vehicle A passes through the intersection monitoring probe point on its straight section, the probe point automatically obtains the intersection section number corresponding to the railway engineering vehicle A and records the current passing time point; after the time point, the pre-passing status of other vehicles on the intersection section with the number is continuously obtained within a set time period; when the railway engineering vehicle C passes through the intersection monitoring probe point on its straight section within the set time period, its probe point compares the obtained intersection section number with the recorded intersection section number corresponding to the railway engineering vehicle A; if the numbers are the same, it is confirmed that the railway engineering vehicle A and the railway engineering vehicle C are pre-passing the same intersection section within the set time period.

[0080] Specifically, the determination of whether there is a risk of intersection collision between railway engineering vehicle A and railway engineering vehicle C includes: obtaining the time points at which railway engineering vehicles A and C pass through their corresponding intersection detection probes, respectively, recorded as .

[0081] Extract the rated intersection time of railway engineering vehicles passing through the intersection section from the cloud database , determined by the intersection collision model The existence of the intersection collision risk between railway engineering vehicle A and railway engineering vehicle C is obtained, where It indicates that there is a risk of intersection and collision between railway engineering vehicles A and C. This indicates that there is no risk of intersection collision between railway engineering vehicles A and C.

[0082] The embodiment of the present invention arranges corresponding intersection monitoring probe points at a preset distance before the intersection of a straight section, so as to predict in advance that railway engineering vehicles A and C will pass through the same intersection within a set time period, thereby timely determining whether there is a risk of intersection collision between railway engineering vehicles A and railway engineering vehicles C, helping to reasonably arrange the traffic flow of the intersection section, and hopefully improving the driving safety and operating efficiency of railway engineering vehicles at the intersection section.

[0083] The intersection adjustment signal feedback module is used to analyze the adjustment priority of railway engineering vehicle A and railway engineering vehicle C, calculate the intersection adjustment parameters of the railway engineering vehicle with priority adjustment, and generate an intersection adjustment signal to feed back to the railway engineering vehicle with priority adjustment.

[0084] Specifically, the analysis of the adjustment priority of railway engineering vehicle A and railway engineering vehicle C includes: obtaining the designated task locations of railway engineering vehicles A and C respectively, and if the designated task location of railway engineering vehicle A is located before the designated task location of railway engineering vehicle C, railway engineering vehicle A is used as the priority adjustment engineering vehicle, otherwise, railway engineering vehicle C is used as the priority adjustment engineering vehicle.

[0085] Specifically, the calculation of the intersection adjustment parameters of the railway engineering vehicle with priority adjustment includes: if the railway engineering vehicle A is the priority adjustment engineering vehicle, the preset distance between the intersection monitoring probe point and the intersection section is recorded as , according to the formula Get the intersection speed reduction value of railway engineering vehicle A The adjustment position point of railway engineering vehicle A is the position point where railway engineering vehicle C is located when it passes through the intersection monitoring probe point on its straight section.

[0086] If railway engineering vehicle C is the priority engineering vehicle, then the formula Get the reduced speed value of Railway Engineering Vehicle C The adjustment position of railway engineering vehicle C is the intersection monitoring probe point on its straight section.

[0087] The embodiment of the present invention analyzes the adjustment priority of railway engineering vehicle A and railway engineering vehicle C from the perspective of the sequence of designated task locations, fully considers the convenience of subsequent driving sections, and then calculates personalized intersection adjustment parameters of railway engineering vehicles with different priority adjustments, generates an intersection adjustment signal and feeds it back to the railway engineering vehicles with priority adjustments, which has a positive impact on reducing intersection congestion and improving the overall efficiency of the railway transportation system.

[0088] The cloud database is used to store the safety spacing threshold between two railway engineering workshops on a one-way track as stipulated by railway safety regulations, and store the task level corresponding to each task type of the railway engineering vehicle, the reference speed change distance, the lower limit of the reasonable range of the driving speed, the upper limit of the reasonable range of the operating speed, and the rated intersection time through the intersection section.

[0089] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the present invention, they should all fall within the protection scope of the present invention.

Claims

1. A signal control operation system for engineering vehicles capable of operating across lines, characterized in that: The system includes: The task issuing module is used to issue the specified task items to the railway engineering vehicle A, including the specified task location, specified task type, specified load weight and specified driving path. After receiving the specified task items, the railway engineering vehicle A will drive at the standard speed. Open to traffic; The straight-line collision risk monitoring module is used to monitor the straight section in the specified driving path of railway engineering vehicle A in real time. When the railway engineering vehicle B is operating in the straight section ahead, it is determined whether there is a straight-line collision risk between railway engineering vehicle A and railway engineering vehicle B. If it is determined that there is a straight-line adjustment signal feedback module, the straight-line adjustment signal feedback module is executed, otherwise the railway engineering vehicle A continues to drive normally. A straight line adjustment signal feedback module is used to analyze the adjustment priority of railway engineering vehicle A and railway engineering vehicle B, calculate the straight line adjustment parameters of the railway engineering vehicle with priority adjustment, and generate a straight line adjustment signal to feed back to the railway engineering vehicle with priority adjustment; The intersection collision risk monitoring module is used to monitor the intersection section in the specified driving path of railway engineering vehicle A in real time. When monitoring railway engineering vehicle A and railway engineering vehicle C to pass through the same intersection section within a set time period, it is determined whether there is an intersection collision risk between railway engineering vehicle A and railway engineering vehicle C. If it is determined that there is a risk, the intersection adjustment signal feedback module is executed, otherwise the railway engineering vehicle A continues to pass normally; The intersection adjustment signal feedback module is used to analyze the adjustment priority of the railway engineering vehicle A and the railway engineering vehicle C, calculate the intersection adjustment parameters of the railway engineering vehicle with priority adjustment, and generate an intersection adjustment signal to feed back to the railway engineering vehicle with priority adjustment; The cloud database is used to store the safety distance threshold between two railway engineering workshops on a one-way track as stipulated by railway safety regulations, and store the task level corresponding to each task type of railway engineering vehicles, the reference speed change distance, the lower limit of the reasonable range of driving speed, the upper limit of the reasonable range of operating speed, and the rated intersection time of passing the intersection section; The analysis of the adjustment priority of railway engineering vehicle A and railway engineering vehicle B includes: extracting the specified task type in the specified task item of railway engineering vehicle A and the operation task type in the operation task information of railway engineering vehicle B respectively, and obtaining the task levels corresponding to railway engineering vehicles A and B respectively according to the task levels corresponding to each task type of railway engineering vehicles stored in the cloud database, and setting the task priority influence weight, which is recorded as ; Based on the railway engineering vehicle benchmark speed change distance stored in the cloud database , the current distance between railway engineering vehicle A and railway engineering vehicle B Determine whether railway engineering vehicle A has the speed change reference condition. , then it is determined that railway engineering vehicle A has the speed change reference condition, and the basic speed change compliance factor of railway engineering vehicle A is set to 1, otherwise it is set to 0, so as to obtain the basic speed change compliance factor of railway engineering vehicle A , ; The distance between the overlapping sections of railway engineering vehicle A and railway engineering vehicle B Determine whether railway engineering vehicle B has the speed change benchmark conditions and obtain the basic speed change compliance factor of railway engineering vehicle B , ; Get the historical speed change information of railway engineering vehicle A, including the speed change of each historical speed change , Braking control accuracy and response time ,in is the number of each speed change in history, , analyze the speed regulation capability evaluation coefficient of railway engineering vehicle A , and its calculation formula is: ,in are respectively the reasonable thresholds of the speed change, braking control accuracy and response time of a single speed change of a railway engineering vehicle. is the historical speed change times of railway engineering vehicle A, is a natural constant; Obtain the historical speed change information of railway engineering vehicle B, and similarly analyze and obtain the speed regulation capability evaluation coefficient of railway engineering vehicle B ; Extract the specified load weight in the specified task item of railway engineering vehicle A respectively and the operating load weight in the railway engineering vehicle B operating task information , and thus calculate the adjustment priority evaluation coefficient of railway engineering vehicle A compared to railway engineering vehicle B , ,in They are the weight proportions corresponding to the preset speed regulation capability ratio, task priority influence weight ratio, basic speed change compliance factor difference ratio, and load weight ratio; like If it is greater than or equal to the preset value, railway engineering vehicle A will be adjusted as the railway engineering vehicle with priority, otherwise railway engineering vehicle B will be adjusted as the railway engineering vehicle with priority.

2. According to claim 1, a signal control operation system for engineering vehicles capable of operating across lines is characterized by: The determination of whether there is a linear collision risk between railway engineering vehicle A and railway engineering vehicle B includes: obtaining operation task information of railway engineering vehicle B, including operation task type, current operation speed, , Operating load weight and the remaining operation travel path; According to the remaining designated driving path of the current railway engineering vehicle A and the remaining operating driving path of the railway engineering vehicle B, obtain the overlapping driving sections and their distances between the railway engineering vehicles A and B ; Get the current interval and distance between railway engineering vehicle A and railway engineering vehicle B , extract the safety distance threshold between two railway engineering workshops on a one-way track according to railway safety regulations from the cloud database , by the straight line collision determination model The existence of the linear collision risk between railway engineering vehicle A and railway engineering vehicle B is obtained, where It means that there is a risk of a straight-line collision between railway engineering vehicles A and B. It means that there is no risk of straight-line collision between railway engineering vehicles A and B.

3. The signal control operation system for engineering vehicles capable of operating across lines according to claim 1 is characterized in that: The calculation of the linear adjustment parameters of the railway engineering vehicle with priority adjustment includes: if the railway engineering vehicle A is the railway engineering vehicle with priority adjustment, the current position of the railway engineering vehicle A is the distance before the end of the overlapping driving section. The road section between the positions is divided into the normal driving section, speed change driving section and speed reduction driving section of railway engineering vehicle A, and the driving time of each section is recorded as ; Create the following condition Determine the linear downward speed value of railway engineering vehicle A ,in is the lower limit of the reasonable range of railway engineering vehicle speed stored in the cloud database, and then determines the driving time of railway engineering vehicle A in the normal driving section Specific value of The optimal speed change position of railway engineering vehicle A is when railway engineering vehicle A travels at standard speed. Driving The distance between the current position of railway engineering vehicle A and the current position of railway engineering vehicle A is , .

4. The signal control operation system for engineering vehicles capable of operating across lines according to claim 1 is characterized in that: The calculation of the linear adjustment parameters of the railway engineering vehicle with priority adjustment also includes: if the railway engineering vehicle B is the railway engineering vehicle with priority adjustment, the overlapping driving section of the railway engineering vehicle A and the railway engineering vehicle B is divided into a normal operation section, a speed change operation section and an acceleration operation section of the railway engineering vehicle B, and the operation time of each section is recorded as ; Create the following condition Determine the straight-line upward speed value of railway engineering vehicle B ,in is the upper limit of the reasonable range of railway engineering vehicle operating speed stored in the cloud database, and then determines the driving time of railway engineering vehicle B in the normal operating section Specific value of The optimal speed change position of railway engineering vehicle B is Driving The distance between the current position of railway engineering vehicle B and the current position of railway engineering vehicle B is , .

5. The signal control operation system for engineering vehicles capable of operating across lines according to claim 1 is characterized in that: The specific monitoring process of the railway engineering vehicle A and the railway engineering vehicle C in the pre-passage of the same intersection section within a set time period is as follows: a corresponding intersection monitoring probe point is arranged at a preset distance before the entrance of each straight section adjacent to the intersection section. When the railway engineering vehicle A passes through the intersection monitoring probe point on its straight section, the probe point automatically obtains the intersection section number corresponding to the railway engineering vehicle A and records the current passing time point. After the time point, the pre-passage status of other vehicles on the intersection section with the number is continuously obtained within a set time period. When the railway engineering vehicle C passes through the intersection monitoring probe point on its straight section within the set time period, its probe point compares the obtained intersection section number with the recorded intersection section number corresponding to the railway engineering vehicle A. If the numbers are the same, it is confirmed that the railway engineering vehicle A and the railway engineering vehicle C are in the pre-passage of the same intersection section within the set time period.

6. The signal control operation system for engineering vehicles capable of operating across lines according to claim 1 is characterized in that: The determination of whether there is a risk of intersection collision between railway engineering vehicle A and railway engineering vehicle C includes: obtaining the time points at which railway engineering vehicles A and C pass through their corresponding intersection detection probes, respectively, recorded as ; Extract the rated intersection time of railway engineering vehicles passing through the intersection section from the cloud database , determined by the intersection collision model The existence of the intersection collision risk between railway engineering vehicle A and railway engineering vehicle C is obtained, where It indicates that there is a risk of intersection and collision between railway engineering vehicles A and C. This indicates that there is no risk of intersection collision between railway engineering vehicles A and C.

7. The signal control operation system for engineering vehicles capable of operating across lines according to claim 6 is characterized by: The analysis of the adjustment priority of railway engineering vehicle A and railway engineering vehicle C includes: obtaining the designated task locations of railway engineering vehicles A and C respectively, and if the designated task location of railway engineering vehicle A is located before the designated task location of railway engineering vehicle C, railway engineering vehicle A is used as the priority adjustment engineering vehicle, otherwise, railway engineering vehicle C is used as the priority adjustment engineering vehicle.

8. The signal control operation system for engineering vehicles capable of operating across lines according to claim 7 is characterized in that: The calculation of the intersection adjustment parameters of the railway engineering vehicle with priority adjustment includes: if the railway engineering vehicle A is the priority adjustment engineering vehicle, the preset distance between the intersection monitoring probe point and the intersection section is recorded as , according to the formula Get the intersection speed reduction value of railway engineering vehicle A , the adjustment position point of the railway engineering vehicle A is the position point where the railway engineering vehicle C is located when it passes through the intersection monitoring probe point on its straight section; If railway engineering vehicle C is the priority engineering vehicle, then the formula Get the reduced speed value of Railway Engineering Vehicle C The adjustment position of railway engineering vehicle C is the intersection monitoring probe point on its straight section.

Citation Information

Patent Citations

  • Urban rail transit train operation control system oriented to different intelligent levels

    CN111923966A

  • Driving safety monitoring system for engineering vehicle in subway system

    CN113296487A