Inspection channel for marine low-temperature liquid tank

By adopting a detachable folding inspection channel and a hinge-connected segmented main channel design on the gas carrier, the problem of space limitations in the cryogenic liquid tank inspection channel is solved, safe and efficient hoisting and inspection operations are achieved, and the crew's safety is ensured. Security and convenience.

CN118722962APending Publication Date: 2024-10-01RES INST 708 OF CHINA STATE SHIPBUILDING CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411063478.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The existing cryogenic liquid tank inspection channel design of gas carriers has space limitations, which makes it easy to crash the inspection platform and damage the insulation during hoisting. It is also inconvenient to operate and difficult to meet the needs of safety and convenience.

Method used

Adopt a detachable folding inspection channel design, including segmented inspection main roads, partial flipping types and fully flipping main roads. They are connected through hinges and bolts and can be flipped to leave space during hoisting. After the hoisting is completed, The restoration, combined with a round steel sliding bar and a portable aluminum straight ladder, ensures safe inspection by the crew.

Benefits of technology

It improves the safety and construction efficiency when lifting liquid tanks, reduces installation steps, ensures the safety and convenience of crew members, reduces construction costs, and meets the needs for comprehensive inspection of the external insulation of liquid tanks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118722962A_ABST
    Figure CN118722962A_ABST
Patent Text Reader

Abstract

The invention relates to an inspection channel for a marine low-temperature liquid tank, which relates to the technical field of large gas ships, and comprises an inspection trunk road arranged along the periphery of the outer side structure of the low-temperature liquid tank, and the inspection trunk road is arranged in a sectional manner; comprising a local overturning type inspection main road arranged in the length direction of a ship and a full overturning type inspection main road arranged in the width direction of the ship, and the local overturning type inspection main road and the full overturning type inspection main road can overturn the overturning part when a liquid tank needs to be hoisted so as to reserve a hoisting space; and after hoisting is completed, the turnover part can be restored and fixed. Through reasonable layout, the technical problem that a mounting platform in the space outside the low-temperature liquid tank is relatively tense is mainly solved, insulation around the low-temperature liquid tank can be inspected in all directions, the requirements of the structure, shipyard process and the like are reasonably configured, sailors can work conveniently, and the safety and comfort of work are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of large ships, and in particular to an inspection channel for a ship-based cryogenic liquid tank. Background Art

[0002] At present, in order to ensure that the gas carrier can conveniently inspect the external insulation of the cryogenic liquid tank during maintenance, it is necessary to set up an inspection channel outside the liquid tank. In the existing gas carrier inspection channel layout, due to space limitations, most of them adopt a fixed inspection channel design. This type of inspection channel brings great inconvenience to shipyard construction and crew inspection. When the shipyard hoists the liquid tank, the inspection platform may be damaged from time to time, and the external insulation of the liquid tank may also be damaged. How to make the inspection channel meet the safety requirements, facilitate the crew's operation, and facilitate the shipyard construction, etc., is the focus of the current inspection channel design. Summary of the invention

[0003] In view of the above problems, an inspection channel for ship-borne cryogenic liquid tanks is provided. In order to meet the demand for more cargo on the hull, the space between the cryogenic liquid tank and the hull structure is small. The ordinary channel layout cannot meet the reserved space requirements for lifting the liquid tank in the shipyard. The detachable folding channel layout is adopted, which can not only meet the space requirements for lifting the liquid tank, but also reduce the installation steps and improve the safety efficiency during construction; a suitable structure is set between the top ballast tank and the liquid tank so that personnel can safely check the upper space; and sufficient space is left between the bottom ballast tank and the liquid tank so that the crew can climb smoothly to check the insulation of the lower outer side of the liquid tank.

[0004] In order to achieve the above-mentioned purpose, the technical solution of the present invention provides an inspection channel for a ship's cryogenic liquid tank, including an inspection main road arranged around the outer structure of the cryogenic liquid tank. The inspection main road is arranged in sections, including a partial flip-type inspection main road arranged along the length of the ship and a full flip-type inspection main road arranged along the width of the ship. The partial flip-type inspection main road and the full flip-type inspection main road can flip the flippable part when the liquid tank needs to be lifted to leave lifting space. After the lifting is completed, the flippable part can be restored and fixed.

[0005] Preferably, the inspection trunk road is arranged at a middle position of the height of the cryogenic liquid tank.

[0006] Preferably, the partially flip-type inspection trunk road consists of a fixed part and a flip-type part. The width of the fixed part is not less than 300 mm, which can support the crew standing on the fixed trunk road to operate the flip-type trunk road. The width of the flip-type part is about 200 mm. The total width of the partially flip-type inspection trunk road is 500-600 mm.

[0007] Preferably, when the fully flip inspection trunk road is installed in the liquid tank and the outer structure space is relatively tight, the width of the trunk road is 350 to 500 mm.

[0008] Preferably, the fixed inspection trunk road is used when the liquid tank and the outer structure have sufficient space, and the width of the trunk road is 600-650 mm.

[0009] Preferably, the fixed part and the flippable part of the partial flip inspection trunk road are connected by bolts, nuts and a rotating hinge.

[0010] Preferably, no railings are required on the partially flip-type inspection trunk road and the fully flip-type inspection trunk road. After these two trunk roads are laid flat, the insulation distance from the outside of the liquid tank is ∼100mm, and this distance can ensure the safety of crew inspections without the need for railings.

[0011] Preferably, it also includes:

[0012] The upper round steel slide bar is located on the structure below the upper deck and is used to fix the safety ropes and rope ladders on the crew;

[0013] The rope ladder can slide along the upper round steel slide bar, which is convenient for crew members to operate and inspect;

[0014] The lower round steel slide bar, located above the bottom ballast tank, is used to fix the bottom portable aluminum vertical ladder;

[0015] The portable aluminum vertical ladder is located above the bottom ballast tank, which is convenient for the crew to conduct detailed inspection of the insulation on the outside of the liquid tank at the bottom.

[0016] Preferably, the rope ladder can be used for insulation inspection between the upper ballast tank and the liquid tank, and this inspection method can cover the entire upper insulation of the liquid tank.

[0017] Preferably, the portable aluminum ladder can be used for insulation inspection between the bottom ballast tank and the liquid tank, and the crew can fasten a rope to the ladder and move the portable aluminum ladder along the lower round steel slide bar by pulling the rope in front.

[0018] Compared with the prior art, the above technology has the following positive effects:

[0019] 1. Choose the appropriate inspection trunk road according to the distance between the liquid tank and the hull structure, so that there is enough space for operation when the liquid tank is hoisted, ensuring the safety during hoisting; the three forms of inspection trunk road design also provide a larger platform space for the crew when inspecting the insulation in the middle of the liquid tank, ensuring the safety and convenience of the crew's inspection.

[0020] 2. The partially flip inspection trunk road adopts an innovative design, using a hinge bolt connection structure to connect the fixed inspection trunk road and the flip trunk road. A lifting lug is set at the end of the platform. When the liquid tank is hoisted, the lifting lugs of each platform can be connected in series with a wire rope, and then the wire rope is hung with a crane hook to flip the platform completely. After the hoisting is completed, the crane can also be used to restore the flipped trunk road, without the crew having to manually flip each platform. This form of design reduces the platform installation operation steps and construction time.

[0021] 3. All flip inspection trunk roads are rationally arranged, using bolts, nuts, rotating hinges and fixed angle steels. When lifting liquid tanks, the trunk road can be erected and fixed on a portable hook to leave enough space for lifting the liquid tanks. Fixed angle steels are set under the trunk road. When the lifting is completed, the crew can lay the trunk road flat above the liquid tank through a rope ladder, so that the trunk road falls directly on the fixed angle steel to achieve a passable state. This type of trunk road design does not require scaffolding during operation, which can save installation process steps and facilitate crew operation.

[0022] 4. An upper round steel slide bar and a rope ladder are arranged at the top ballast tank structure. The combined use method of the round steel slide bar and the rope ladder not only improves the convenience and safety of the crew's operation, but also enables the crew to conduct a more detailed inspection of the insulation when inspecting the upper insulation of the liquid tank.

[0023] 5. Arrange round steel slide bars and straight ladders between the bottom ballast tank and the liquid tank so that the straight ladder can move longitudinally along the round steel slide bars along the liquid tank. This method can reduce the number of straight ladders, reduce weight, and save construction costs. It can also facilitate the crew to reach all areas below the outside of the liquid tank and inspect the insulation below the outside of the liquid tank. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 A top view of a patrol main road of a patrol channel for a marine cryogenic liquid tank according to the present invention;

[0025] Figure 2 It is a cross-sectional view of an inspection channel for a marine cryogenic liquid tank according to the present invention;

[0026] Figure 3 It is a cross-sectional view of a normal state of a partially flip-over inspection trunk channel of an inspection channel for a marine cryogenic liquid tank according to the present invention;

[0027] Figure 4 A cross-sectional view of a partially flip-over inspection trunk road of an inspection channel for a marine cryogenic liquid tank according to the present invention in a flip-over state

[0028] Figure 5This is a cross-sectional view of a normal state of a full-turn inspection trunk channel of an inspection channel for a marine cryogenic liquid tank according to the present invention;

[0029] Figure 6 It is a cross-sectional view of a fully flip-over inspection trunk channel of an inspection channel for a marine cryogenic liquid tank of the present invention in a flip-over state;

[0030] Figure 7 It is a cross-sectional view of a fixed inspection trunk road of an inspection channel for a marine cryogenic liquid tank according to the present invention;

[0031] Figure 8 It is a cross-sectional view of a normal state of a hingeless partially flip inspection trunk road of an inspection channel for a marine cryogenic liquid tank of the present invention;

[0032] Fig. 9 It is a cross-sectional view of a hingeless partial flip inspection trunk road of an inspection channel for a marine cryogenic liquid tank of the present invention in a flipped state;

[0033] Fig.10 A schematic diagram of the lower insulation inspection method for a patrol channel of a marine cryogenic liquid tank according to the present invention Figure 1 ;

[0034] Fig.11 A schematic diagram of the lower insulation inspection method for a patrol channel of a marine cryogenic liquid tank according to the present invention Figure 2 ;

[0035] Fig.12 Schematic diagram of the partial flip inspection trunk road flipping implementation of the inspection channel for a marine cryogenic liquid tank of the present invention Figure 1 ;

[0036] Fig.13 Schematic diagram of the partial flip inspection trunk road flipping implementation of the inspection channel for a marine cryogenic liquid tank of the present invention Figure 1 .

[0037] Figure numerals: 1. Partially flip-type inspection trunk road; 2. Fully flip-type inspection trunk road; 3. Fixed inspection trunk road; 4. Upper round steel slide bar; 5. Rope ladder; 6. Protective rope; 7. Portable aluminum ladder; 8. Lower round steel slide bar; 9. Inverted ladder; 10. T-profile; 11. Insulation on the outside of the liquid tank; 12. Main road support; 13. Bolts and nuts; 14. Connecting angle steel structure; 15. Rotating hinge; 16. Low-temperature steel web; 17. Fireproof grille; 18. Flippable main road; 19. Platform support; 20. Railing crossbar; 21. Railing handrail; 22. Fixed hook; 23. Fixed railing; 24. Round connecting panel; 25. Fixed support angle steel; 26. Rubber gasket; 27. Lifting ear. DETAILED DESCRIPTION

[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] The embodiment of the present invention discloses an inspection channel for a marine cryogenic liquid tank, which comprises:

[0040] Inspection trunk road: The inspection trunk road is arranged along the structure around the liquid tank, leaving a certain safety distance from the liquid tank. It is usually located in the middle of the height of the liquid tank. It adopts a segmented design and is arranged in sections along the structure.

[0041] The inspection trunk road can be in four forms. One is a partial flip inspection trunk road 1 composed of a grille, a platform, a support, a hinge, bolts and nuts 13, and a lifting lug 27, which is suitable for when the space between the liquid tank and the structure is relatively tight. The trunk road is composed of a fixed and flip platform. When the liquid tank is hoisted, the flip platform needs to be flipped and folded to leave enough space for the liquid tank to be hoisted. The specific operation is to set a lifting lug 27 at a certain distance outside the flip trunk road. When the platform needs to be flipped, the lifting lug 27 can be connected in series by a wire rope. Then the crane hangs the wire rope to flip it, which reduces the manual operation steps of the crew, and can flip multiple platforms at one time, saving workload. When the liquid tank is hoisted and enters the normal working state, the crane also hangs the lifting lug 27 to restore the platform, and then the personnel can stand on the fixed platform to connect the flip platform and the fixed platform by bolts. The structural design of the inspection trunk road can maximize the expansion of the inspection trunk road and meet the space requirements of the shipyard during hoisting.

[0042] The second is a partial flip inspection trunk road 1 composed of a grille, a platform, a support, bolts and nuts 13, etc. Compared with the first partial flip trunk road, this type of trunk road has no hinge connection between the fixed trunk road and the flip trunk road. During the lifting operation, the crew can only manually dismantle the flip part of the platform and place it on the fixed trunk road. After the lifting is completed, the crew manually connects the fixed trunk road and the flip trunk road. Compared with the first partial flip trunk road, this type of trunk road has a simple structure, but the installation steps are complicated. The two partial flip trunk roads have similar functions, and the shipyard can choose which type of partial flip trunk road to use.

[0043] The third is a fully flip inspection trunk road 2 composed of grilles, platforms, supports, hinges, bolts, etc., which is suitable for when the space between the liquid tank and the structure is very tight; the trunk road support 12 and the railings are both detachable. Since the space between the liquid tank and the peripheral structure is relatively tight, when a partial flip inspection trunk road 1 is used, the fixed platform part has a small space and personnel cannot stand on it for construction. Under the limitation of this space condition, it is meaningless to use a partial flip inspection trunk road 1. In view of this situation, a fully flip inspection trunk road 2 is designed. When the liquid tank is hoisted, this form of inspection trunk road can be manually flipped up by the crew and fixed by a hook fixed on the structure to leave space for the liquid tank to be hoisted. After the hoisting is completed, the crew can level the trunk road above the liquid tank through a rope ladder 5 so that the trunk road falls directly on the fixed angle steel to reach a passable state.

[0044] Fourth, there is a fixed inspection trunk road 3 composed of grilles, platforms, supports, railings, etc., which is suitable for when there is sufficient space between the liquid tank and the structure; the fixed inspection trunk road 3 is simple in form, easy to install, and has a large space, which can save a lot of shipyard construction time and ensure the safety of crew inspections.

[0045] The upper round steel slide bar 4 is located on the structural rib plate under the upper deck, so that when the crew inspects the liquid tank, the protective rope 6 is tied to the round steel slide bar to protect the safety of the crew.

[0046] A protection rope 6, one end of which is tied to the upper round steel slide bar 4, and the other end is tied to the crew.

[0047] The rope ladder 5 is used by the crew in the upper ballast tank passage. When the crew is carrying out maintenance, they can climb down along the rope ladder 5 to protect the safety of the crew.

[0048] A portable aluminum ladder 7 and a lower round steel slide bar 8. The ends of the portable aluminum ladder 7 are specially treated. The upper and lower ends of the ladder are fixed on the lower round steel slide bar 8. The contact between the ladder and the round steel slide bar is made of a rubber gasket 26, which is convenient for the crew to move the ladder and move it along the lower round steel slide bar 8 in the direction of the ship's length. It is used for the crew to pass through the lower ballast tank to inspect various positions of the insulation below the outer side. The lower round steel slide bar 8 is located above and below the top of the lower ballast tank and is arranged along the direction of the ship's length. When the crew inspects the insulation below the liquid tank, the movable portable sliding ladder can be hung on the round steel slide bar, and the ladder can be moved to inspect various positions below the liquid tank, so as to achieve full coverage of the inspection.

[0049] The grille is made of fire-resistant material and is used on the main inspection road. It can meet the crew's passage requirements in the event of a ship fire, and it can also reduce the weight of the platform.

[0050] The flip structure is used on all flip inspection trunk roads 2. When flipping is required, the trunk road can be quickly erected to leave space for liquid tank hoisting.

[0051] A fixed hook 22 is fixed on the structure above the entire flip-type inspection trunk road 2. When the entire flip-type inspection trunk road 2 is in a flipped state, the hook is used to fix it.

[0052] High railing, high railing includes top rail, middle rail and baluster.

[0053] Low railing, low railing includes top crossbar and baluster.

[0054] Top cross bar, the top cross bar is a water gas pipe or round steel or marine pipeline.

[0055] The middle cross bar is round steel.

[0056] Guardrails are mainly installed on the outside of the fixed inspection trunk road 3 to protect the safety of crew inspections.

[0057] Ordinary railing posts, the standard spacing of the ordinary railing posts does not exceed 1.5m.

[0058] Specifically, the present invention includes:

[0059] The inspection trunk road is arranged around the middle of the height of the cryogenic liquid tank and around the outer structure of the cryogenic liquid tank. The inspection trunk road adopts a segmented design. The length of each section of the trunk road is determined according to the structure of the T-profile 10 on the outer side of the cryogenic liquid tank, and the length is kept the same as much as possible to reduce the construction workload in the shipyard. The inspection trunk road includes a partial flip inspection trunk road 1, a full flip inspection trunk road 2, and a fixed inspection trunk road 3. There is no need to arrange railings on the partial flip inspection trunk road 1 and the full flip inspection trunk road 2. After these two trunk roads are laid flat, the distance from the insulation 11 to the outer side of the liquid tank is ~100mm. This distance does not require railings to ensure the safety of crew inspections.

[0060] The partially flip inspection trunk 1 is evenly arranged around the liquid tank along the length of the ship, and is composed of a fixed inspection trunk 3 and a flip inspection trunk connected by bolts and nuts 13 and hinges. During the lifting operation of the liquid tank, the flippable part can be flipped by a crane to leave enough lifting space; after the lifting is completed, the flipped part platform can be restored at one time by a crane, and the crew can subsequently install and fix it by tightening the bolts and nuts 13.

[0061] The partially flip inspection trunk road 1 is composed of a fixed inspection trunk road 3 and a flip inspection trunk road connected by bolts and nuts 13. This type of trunk road is simple in form, but the operation needs to be completed manually by the crew. When the liquid tank is hoisted, the crew can stand on the fixed platform to flip the flip part to leave space for hoisting; after the hoisting is completed, the crew can restore the flipped inspection trunk road by building a scaffolding below, and then tighten the bolts and nuts 13 to fix it.

[0062] The fully flip inspection trunk road 2 is arranged around the liquid tank along the ship width direction. The reserved space of the structure in this direction is small. In order to ensure sufficient lifting space, during lifting, the main road can be completely erected to connect the platform top buckle with the fixed hook 22; after the lifting is completed, the operator goes down to a certain position on the top of the liquid tank through the rope ladder 5, and then lays the main road flat. The platform can be fixed by fixing the angle steel and bolts and nuts 13 to achieve a passable state.

[0063] The upper round steel slide bar 4 is located on the structure below the upper deck and is used to fix the safety rope and rope ladder 5 on the crew.

[0064] The rope ladder 5 can slide along the upper round steel slide bar 4, which is convenient for the crew to operate and inspect.

[0065] The lower round steel slide bar 8 is located above the bottom ballast tank and is used to fix the bottom portable aluminum vertical ladder 7.

[0066] A portable aluminum vertical ladder 7 is located above the bottom ballast tank to facilitate the crew to conduct detailed inspection of the insulation 11 on the outside of the bottom liquid tank.

[0067] The partially flip inspection trunk road 1 consists of a fixed part and a flip part, which are connected by bolts and nuts 13 and a rotating hinge 15. The width of the fixed part is not less than 300 mm, which can support the crew standing on the fixed trunk road to operate the flip part of the trunk road. The width of the flip part is about 200 mm. The total width of the partially flip inspection trunk road 1 is 500-600 mm.

[0068] When the full flip inspection trunk road 2 is installed in the liquid tank and the outer structure space is relatively tight, the width of the trunk road is 350-500mm.

[0069] The fixed inspection trunk road 3 is used when the liquid tank and the outer structure space are sufficient, and the width of the trunk road is 600-650mm.

[0070] It also includes a rope ladder 5, which is used for insulation inspection between the upper ballast tank and the liquid tank. This inspection method can cover the insulation of the entire upper part of the liquid tank.

[0071] The portable aluminum ladder 7 is used for insulation inspection between the bottom ballast tank and the liquid tank. The crew can fasten a rope to the ladder and pull the rope in front to move the portable aluminum ladder 7 along the lower round steel slide bar 8. This inspection method can cover the entire insulation below the outer side of the liquid tank.

[0072] The grille on the inspection trunk road is a fire-resistant material, and the railing includes a railing crosspiece 20 and a T-shaped material 10. The railing crosspiece 20 includes a top crosspiece and other crosspieces, the top crosspiece is a water gas pipe or round steel, and the other crosspieces are round steel. The top crosspiece at some positions is also made of a small-sized pipe in a marine pipeline.

[0073] See also Figures 1 to 8 As shown, in a preferred embodiment, an inspection channel for a marine cryogenic liquid tank is shown, characterized in that it includes:

[0074] The partially flip inspection trunk road 1 is mainly composed of a trunk road support 12, bolts and nuts 13, a connecting angle steel structure 14, a rotating hinge 15, a low-temperature steel web 16, a fireproof grille 17, a flippable trunk road 18, a platform support 19, a railing crosspiece 20, a railing handrail 21, and a lifting lug 27.

[0075] The entire flip inspection trunk road 2 is mainly composed of a trunk road support 12, bolts and nuts 13, a low-temperature steel web 16, a fireproof grille 17, a fixed hook 22, a circular connecting panel 24, and a fixed support angle steel 25.

[0076] The fixed inspection trunk road 3 is mainly composed of a trunk road support 12 , a low-temperature steel web 16 , a fireproof grille 17 , a platform support 19 , and a fixed railing 23 .

[0077] The partially flip inspection trunk road 1 needs to be installed on the T-profile 10 structure in advance during the production and construction stage. However, since the entire cryogenic liquid tank hoisting requires a certain amount of reserved space, the partially flip inspection trunk road 1 is designed to be partially flippable and foldable. Specifically, the flippable trunk road 18 is connected to the fixed part of the inspection trunk road through bolts and nuts 13, connecting angle steel structure 14 and rotating hinge 15. When the partially flip inspection trunk road 1 is installed on the T-profile 10 structure in advance, the flippable trunk road 18 can be flipped up by a crane, such as Figure 8 As shown, about 300 mm of lifting space can be reserved for the cryogenic liquid tank; after the cryogenic liquid tank is lifted, the crane can also restore the flip platform, and then the crew can fix it by tightening the bolts and nuts 13, so that the local flip inspection trunk road 1 is completely laid out, so that there is enough passage space for people to walk.

[0078] The fully flip-type inspection trunk road 2 is suitable for the transverse channel layout. Since the ship needs sufficient liquid tank volume to ensure the loading capacity, the transverse channel space will be relatively tight. In this space layout, the fully flip-type inspection trunk road 2 can be selected. On the basis of ensuring convenient inspection, the liquid tank lifting space can be guaranteed.

[0079] The fixed inspection trunk road 3 of the multifunctional portable inspection platform is suitable for when the space between the liquid tank and the peripheral structure is relatively sufficient. The fixed inspection trunk road 3 has a simple structure and a large passable space. While reducing the construction workload of the shipyard, it can also ensure the safety of the crew during the inspection.

[0080] The upper round steel slide bar 4 and the inverted vertical ladder 9 are installed on the structure below the main deck. The crew enters the upper space of the liquid tank through the inverted vertical ladder 9 from the main deck to inspect the upper insulation.

[0081] The rope ladder 5 and the protective rope 6 are used to protect the crew members while inspecting the insulation of the upper buffer area. The rope ladder 5 is lighter than the straight ladder, which saves weight and construction steps in the shipyard and is convenient for the crew members to operate. Specifically, when inspecting, the crew members tie one end of the protective rope 6 to the upper round steel slide bar 4 and the other end to the crew members, and slowly climb down along the rope ladder 5, which protects the safety of the crew members while enabling the crew members to inspect the insulation 11 on the outside of the liquid tank more carefully.

[0082] The lower round steel slide bar 8 is fixed at the top of the lower ballast tank and arranged longitudinally along the direction of the shipyard.

[0083] The portable aluminum ladder 7 is fixed on the lower round steel slide bar 8 when in use, and the contact part is made of rubber gasket 26 material, which is convenient for the crew to move the ladder, so that the ladder can move along the lower round steel slide bar 8 in the direction of the ship length, which is convenient for the crew to check the bottom insulation. Compared with the method of arranging ordinary steel ladders at the bottom, this bottom channel scheme reduces the construction workload of the shipyard, can check various positions of the bottom insulation, and ensure the safety of the crew's operation.

[0084] The above description is only a preferred embodiment of the present invention, and does not limit the implementation mode and protection scope of the present invention.

[0085] Furthermore, in a preferred embodiment, a railing handrail 21 and a railing crossbar 20 are arranged on the structural T-profile 10 near the partial flip inspection trunk road 1, which can facilitate the crew to hold the railing handrail 21 when inspecting the partial flip inspection trunk road 1, thereby ensuring the safety of the crew.

[0086] Furthermore, in a preferred embodiment, due to space limitation requirements, the fully flip-type inspection trunk road 2 adopts a connection form different from that of the partially flip-type inspection trunk road 1, and the connection panel 24 is changed to a circular shape, thereby saving installation space. When the fully flip-type inspection trunk road 2 is in a flipped state, a larger liquid tank lifting space can be reserved.

[0087] Furthermore, in a preferred embodiment, the inspection is performed by entering the top of the cryogenic liquid tank from the inverted vertical ladder 9 .

[0088] Furthermore, in a preferred embodiment, the upper round steel slide bar 4, the protection rope 6 and the rope ladder 5 arranged along the passage are used in combination to ensure the safety of the crew inspection while expanding the inspection area.

[0089] Furthermore, a fixed railing 23 is arranged outside the fixed inspection trunk road 3 to ensure the safety of the crew's inspection.

[0090] The above are only preferred embodiments of the present invention, and are not intended to limit the implementation methods and protection scope of the present invention. Those skilled in the art should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the description and illustrations of the present invention should be included in the protection scope of the present invention.

Claims

1. An inspection channel for a marine cryogenic liquid tank, characterized in that: The invention comprises an inspection trunk road arranged around the outer structure of a cryogenic liquid tank. The inspection trunk road is arranged in sections, including a partial flip inspection trunk road (1) arranged along the length of the ship and a full flip inspection trunk road (2) arranged along the width of the ship. When the liquid tank needs to be hoisted, the flippable part of the partial flip inspection trunk road (1) and the full flip inspection trunk road (2) can be flipped to leave a hoisting space. After the hoisting is completed, the flippable part can be restored and fixed.

2. The inspection channel for a marine cryogenic liquid tank according to claim 1, characterized in that: The inspection trunk road is arranged at the middle position of the height of the cryogenic liquid tank.

3. The inspection channel for a marine cryogenic liquid tank according to claim 2, characterized in that: The partially flip inspection trunk road (1) is composed of a fixed part and a flip part. The width of the fixed part is not less than 300 mm, which can support a crew member standing on the fixed trunk road to operate the flip part of the trunk road. The width of the flip part is about 200 mm. The total width of the partially flip inspection trunk road (1) is 500-600 mm.

4. The inspection channel for a marine cryogenic liquid tank according to claim 3, characterized in that: When the fully flip inspection trunk road (2) is installed in the liquid tank and the outer structure space is relatively tight, the width of the trunk road is 350-500 mm.

5. The inspection channel for a marine cryogenic liquid tank according to claim 4, characterized in that: The fixed inspection trunk road (3) is used when the liquid tank and the outer structure have sufficient space, and the width of the trunk road is 600-650 mm.

6. The inspection channel for a marine cryogenic liquid tank according to claim 5, characterized in that: The fixed part and the flippable part of the partial flip inspection trunk road (1) are connected via bolts and nuts (13) and a rotating hinge (15).

7. The inspection channel for a marine cryogenic liquid tank according to claim 6, characterized in that: There is no need to arrange railings on the partial flip inspection trunk road (1) and the full flip inspection trunk road (2). After these two trunk roads are laid flat, the distance between them and the insulation (11) on the outside of the liquid tank is 100 mm. This distance does not require railings to ensure the safety of crew inspections.

8. An inspection channel for a marine cryogenic liquid tank according to any one of claims 1 to 7, characterized in that: Also includes: An upper round steel slide bar (4), located on the structure below the upper deck, for fixing the safety rope and rope ladder (5) on the crew; The rope ladder (5) can slide along the upper round steel slide bar (4), which is convenient for crew members to operate and inspect; A lower round steel slide bar (8) located above the bottom ballast tank and used to fix the bottom portable aluminum vertical ladder (7); The portable aluminum ladder (7) is located above the bottom ballast tank, which is convenient for the crew to conduct a detailed inspection of the insulation (11) on the outside of the liquid tank at the bottom.

9. The inspection channel for a marine cryogenic liquid tank according to claim 8, characterized in that: The rope ladder (5) can be used for insulation inspection between the upper ballast tank and the liquid tank, and this inspection method can cover the insulation of the entire upper part of the liquid tank.

10. The inspection channel for a marine cryogenic liquid tank according to claim 9, characterized in that: The portable aluminum ladder (7) can be used for insulation inspection between the bottom ballast tank and the liquid tank. The crew can fasten a rope to the ladder and pull the rope in front to move the portable aluminum ladder (7) along the lower round steel slide bar (8).