Production line intelligent circulation device and control method thereof
By using intelligent circulation devices on the production line, using label recognition and automatic matching technology, combined with transmission and return mechanisms, the problem of adaptation of different material processing processes is solved, the efficiency and flexibility of the production line are improved, manual intervention is reduced, and material waste is avoided clogged.
Patent Information
- Application Number
- CN202411064686.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-08-05
AI Technical Summary
Existing production lines cannot fully adapt to the processing processes of different types of materials, resulting in low processing efficiency and poor flexibility, and manual scheduling errors are prone to problems such as material blockage.
An intelligent flow device for the production line is designed, which uses label recognition equipment to automatically match the material frame and work station. The automatic flow of the material frame is realized through the transmission and return mechanism to ensure stability and reliability, and the material frame is transferred through the limit baffle and the material frame. The platform realizes automatic guidance and quality inspection of material frames.
It improves the efficiency and flexibility of the material frame flow in the production line, reduces manual intervention, avoids material blockage, realizes the adaptation of various processing flow sequences, and improves the stability and efficiency of the production line.
Smart Images

Figure CN118723474A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of intelligent production technology, and in particular to an intelligent circulation device for a production line and a control method thereof. Background Art
[0002] In order to improve production efficiency, existing production lines usually set up workstations for different processing processes in sequence according to the order of material processing processes. The workstations are connected by conveyor belts. The materials to be processed are loaded from one end of the conveyor belt and pass through the workstations of different processing processes in sequence. After completing each processing process, they are transferred to the workstation of the next processing process until all processing processes are completed.
[0003] However, due to the differences in the processing procedures for different materials, the production line in the prior art that sets up workstations according to the order of the processing procedures cannot fully adapt to the processing of different types of materials. When the processing procedure needs to be changed, the order of different workstations needs to be adjusted accordingly, resulting in a time-consuming and labor-intensive preparation process before processing. In addition, the flow of materials must be carried out in the order of the processing procedures. When an abnormality occurs in the previous processing procedure, all workstations in the subsequent processing procedures will be affected, thereby affecting the processing efficiency. At the same time, the material flow process in the prior art usually requires manual allocation and material delivery to the workstations of each process, and is highly dependent on manual labor. However, in a relatively busy production process, manual scheduling of the material production process is prone to errors. When errors occur in the material flow scheduling, problems such as material blockage may occur, resulting in low overall efficiency and poor flexibility of the production line. Summary of the invention
[0004] The purpose of this application is to provide an intelligent production line circulation device and a control method thereof to improve the efficiency and flexibility of the production line material frame circulation.
[0005] In the first aspect, the present application provides a production line intelligent circulation device adopting the following technical solution: A production line intelligent circulation device comprises a control mechanism, a feeding mechanism, a material discharging mechanism, a conveying mechanism and a reflux mechanism, wherein the feeding mechanism, the material discharging mechanism, the conveying mechanism and the reflux mechanism are electrically connected to the control mechanism respectively; The feeding mechanism is connected to the feeding end of the feeding mechanism, the feeding end of the feeding mechanism is connected to the feeding end of the conveying mechanism, the conveying mechanism includes a conveyor belt, the conveyor belt moves in a direction away from the feeding mechanism, and a plurality of workstations are arranged on both sides of the conveyor belt; The feeding mechanism stores a plurality of material frames with labels, the labels store corresponding material frame information, and the material delivery end of the delivery mechanism includes a first label recognition device; The reflux mechanism is located below the conveying mechanism, the unloading end of the reflux mechanism is connected to the reflux end of the feeding mechanism, and the reflux mechanism includes a reflux belt, which moves toward the direction close to the feeding mechanism.
[0006] By adopting the above technical solution, the present application sets a first label identification device on the material frame label to identify the material frame label, thereby reading the material frame information corresponding to the material frame label to be sent, automatically matching the corresponding material station according to the material frame information, and then transmitting the material frame to be sent to the corresponding material station for processing through the transmission mechanism. After the processing is completed, the material frame enters the return mechanism, and the return mechanism transmits the material frame back to the material frame mechanism, so that the next processing flow can re-send the material frame, thereby improving the stability and reliability of the material frame circulation of the production line. The present application automatically matches the material frame and the material station by reading the label. After the current process is completed, the material frame can be returned and continue to match the next material station according to the next process to circulate the material frame again. The material frame circulation is realized through the transmission mechanism and the return mechanism, so that the production line is no longer limited to a specific process sequence, and the problem of material blockage that may occur during the circulation process is effectively solved. It can be more suitable for the production of materials with different processing process sequences. The arrangement of the transmission mechanism and the return mechanism can also save space and improve the efficiency and flexibility of the material frame circulation of the production line.
[0007] Furthermore, the conveying mechanism further comprises a plurality of rotatable limit baffles, and the limit baffles are arranged on a side of each workstation close to the conveyor belt; A material frame placement platform is provided on the other side of the limit baffle, and the limit baffle is used to guide the material frame on the conveyor belt to flow to the material frame placement platform when it is opened.
[0008] By adopting the above technical solution, after the material frame of the present application is matched with the material waiting station, the limit baffle of the material waiting station is opened, and when the conveyor belt conveys the material frame to the material waiting station, the material frame is guided to flow to the material frame placement table of the station under the limiting effect of the limit baffle to process the material in the material frame. The present application realizes the automatic flow of the material frame through the limit baffle, ensuring the reliability of material delivery and the stability of flow.
[0009] Furthermore, a rotatable material frame flow table is provided under the material frame placement table, and the material frame placement table and the material frame flow table are connected by an inclined connecting table. The connecting table is used to guide the material frame on the material frame placement table to flow to the material frame flow table, and the material frame flow table is used to guide the material frame to flow to the reflux mechanism when rotating downward.
[0010] By adopting the above technical solution, the material frame of the present application is placed on the material frame placement table after being transferred to the material waiting station. After processing, it flows downward to the reflux mechanism through the material frame transfer table, and then flows back to the material delivery mechanism through the reflux mechanism, ensuring that each process of material processing can flow stably, thereby improving the efficiency and flexibility of the material frame flow of the production line.
[0011] Furthermore, the material dispensing mechanism comprises a material dispensing platform, one side of the material dispensing platform is connected to a feeding mechanism, and one end of the material dispensing platform is connected to a feeding end of a conveyor belt as a material dispensing end; The material delivery platform includes a first pulley assembly and a first roller assembly. The first pulley assembly moves toward or away from the feeding mechanism, and the first roller assembly moves toward or away from the conveyor belt.
[0012] By adopting the above-mentioned technical scheme, the present application drives the material frame after loading by the loading mechanism to move to the material delivery platform through the first pulley assembly, so that the first label recognition device can recognize the label of the material frame, thereby reading the material frame information to match the waiting station, and then drives the material frame that has matched the waiting station to move to the conveying mechanism through the first roller assembly, so that the material frame can move freely back and forth and left and right on the material delivery platform, thereby ensuring the stability of the material frame flow.
[0013] Furthermore, the material delivery mechanism further comprises a reflow platform, the reflow platform is located below the material delivery platform, one side of the reflow platform is connected to the loading mechanism, and one end of the reflow platform is connected to the unloading end of the reflow belt as a reflow end; The reflow station includes a second pulley assembly and a second roller assembly, the second pulley assembly moves toward or away from the feeding mechanism, and the second roller assembly moves toward or away from the conveyor belt.
[0014] By adopting the above-mentioned technical solution, the present application drives the material frame after reflow by the reflow mechanism to move to the material delivery platform through the second roller wheel assembly, and then drives the material frame that needs to be delivered for the next process to move to the loading mechanism through the second pulley assembly, so that the material frame can move freely back and forth and left and right on the reflow table, thereby ensuring the stability of the material frame flow.
[0015] Furthermore, the return end of the material delivery mechanism includes a second label identification device, and a quality inspection platform is connected to the side of the return platform away from the feeding mechanism.
[0016] By adopting the above-mentioned technical scheme, the present application performs label recognition on the reflowed material frame again through the second label recognition device to obtain the current label information of the material frame, so as to determine whether the reflowed material frame has completed all the processing processes. If all the processing processes have not been completed, the second pulley assembly drives the material frame to move toward the loading mechanism, so that the material frame enters the loading mechanism and waits for material delivery again. If all the processing processes have been completed, the second pulley assembly drives the material frame to move away from the loading mechanism, so that the material frame enters the quality inspection platform to carry out the quality inspection process after all the processing processes are completed, so that the material frame can automatically flow to the loading mechanism or the quality inspection platform according to the actual situation, without the need to manually select the material frame that has completed all the processing processes, thereby improving the efficiency of the material frame flow of the production line.
[0017] Furthermore, the feeding mechanism includes a material frame storage rack, a lifting device and a moving device, one end of the moving device is connected to the material delivery mechanism, the other side of the moving device is connected to the lifting mechanism, and one end of the lifting mechanism is connected to the material frame storage rack; The mobile device includes a third roller assembly connected to the material dispensing station and a fourth roller assembly connected to the reflow station. The third roller assembly moves toward or away from the material dispensing mechanism, and the fourth roller assembly moves toward or away from the material dispensing mechanism.
[0018] By adopting the above-mentioned technical scheme, the present application stores the material frames to be delivered on the material frame storage rack, moves the material frames on the material frame storage rack to the mobile device through the lifting mechanism, and then moves the material frames to the material delivery platform for delivery through the cooperation of the third roller assembly of the mobile device and the first pulley assembly of the delivery platform, thereby realizing the storage and automatic loading of the material frames. After the material frame returns to the reflow platform and it is determined that the next process needs to be carried out, the fourth roller assembly of the mobile device cooperates with the second pulley assembly of the reflow platform to move the material frame to the lifting device for re-loading, thereby realizing automatic reflow of the material frame, so that the present application does not require manual loading throughout the process, thereby improving the efficiency of the material frame flow of the production line and saving labor costs.
[0019] Furthermore, the material frame storage rack includes a support assembly and a plurality of material frame storage platforms supported by the support assembly, and the material frame storage platforms are inclined toward the lifting device; Rolling wheel assemblies are arranged on both sides of the material frame storage platform, and a moving wheel assembly is arranged at the bottom of the support assembly.
[0020] By adopting the above technical solution, the present application uses the inclined material frame storage table and the sliding wheel assemblies on both sides of the material frame storage table to enable the material frame to slide from the material frame storage table to the lifting equipment to achieve automatic loading and ensure the stability of the loading process.
[0021] Furthermore, the lifting device includes a lifting platform and a driving assembly, and the driving assembly is used to drive the lifting platform to move up and down; The lifting platform includes a third pulley assembly and a fifth roller assembly. The third pulley assembly moves toward or away from the moving equipment, and the fifth roller assembly moves toward or away from the material frame storage rack.
[0022] By adopting the above-mentioned technical solution, after the material frame of the present application slides from the material frame storage rack to the lifting device, it is moved to the lifting platform through the fifth roller assembly. The lifting platform can stop at any layer of the material frame storage rack to receive the material frame, and then the lifting platform is raised to a position parallel to the third roller assembly of the mobile equipment through the driving assembly, so that the third roller assembly can cooperate with the third pulley assembly to move the material frame to the material delivery mechanism, thereby further ensuring the stability of the material frame loading process.
[0023] In the second aspect, the present application provides a production line intelligent flow device control method using the following technical solutions: A production line intelligent circulation device control method, applied to the production line intelligent circulation device described in the first aspect, comprising: The control mechanism obtains the workstation information of each workstation and the material production information of the material to be produced currently; The control mechanism controls the feeding mechanism to transfer the frame to be dispatched to the dispatching mechanism; The control mechanism obtains the label of the material frame to be dispatched identified by the first label identification device; The control mechanism obtains the material frame information of the material frame to be sent according to the label; The control mechanism matches the material-waiting workstation according to the material frame information of the material frame to be sent and the workstation information of each workstation; The control mechanism controls the conveying mechanism to transfer the material frame to be sent to the material waiting station.
[0024] By adopting the above-mentioned technical scheme, the present application obtains the material frame information of the current material frame to be sent, and obtains the current process of the material frame to be sent according to the material frame information, and matches the process with the corresponding material waiting station and circulates the material frame. After the current process is completed, it can continue to match the next material waiting station according to the next process to circulate the material frame, so that the production line is no longer limited to a specific process sequence, and can be more adaptable to the production of materials with different processing flows, thereby improving the efficiency and flexibility of the material frame circulation of the production line.
[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. The present application sets a first label identification device on the material delivery mechanism to identify the material frame label, thereby reading the material frame information corresponding to the material frame label to be delivered, automatically matching the corresponding material waiting station according to the material frame information, and then delivering the material frame to be delivered to the corresponding material waiting station for processing through the conveying mechanism. After the processing is completed, the material frame enters the reflux mechanism, and the reflux mechanism delivers the material frame back to the material delivery mechanism, so that the next processing flow can re-deliver the material frame, thereby improving the stability and reliability of the material frame flow of the production line; 2. Apply to automatically match the material frame and the material waiting station by reading the tag. After the current process is completed, the material frame can be returned and continue to be matched with the next material waiting station according to the next process to circulate the material frame again, so that the production line is no longer limited to a specific process sequence, and can be more adaptable to the production of materials with different processing process sequences, thereby improving the efficiency and flexibility of the material frame flow of the production line; 3. The present application uses a second label recognition device to perform label recognition on the reflowed material frame again to obtain the current label information of the material frame, thereby judging whether the reflowed material frame has completed all processing procedures. If all processing procedures have not been completed, the second pulley assembly drives the material frame to move toward the feeding mechanism, so that the material frame enters the feeding mechanism and waits for material delivery again. If all processing procedures have been completed, the second pulley assembly drives the material frame to move away from the feeding mechanism, so that the material frame enters the quality inspection platform for the quality inspection procedure after all processing procedures are completed, so that the material frame can automatically flow to the feeding mechanism or the quality inspection platform according to the actual situation, without the need to manually select the material frame that has completed all processing procedures, thereby improving the efficiency of the material frame flow of the production line; 4. The present application stores material frames to be delivered on a material frame storage rack, moves the material frames on the material frame storage rack to a mobile device through a lifting mechanism, and then moves the material frames to the material delivery platform for delivery through the cooperation of the third roller assembly of the mobile device and the first pulley assembly of the delivery platform, thereby realizing the storage and automatic loading of the material frames. After the material frames return to the reflow platform and it is determined that the next process needs to be carried out, the fourth roller assembly of the mobile device cooperates with the second pulley assembly of the reflow platform to move the material frames to the lifting device for reloading, thereby realizing automatic reflow of the material frames, so that the present application does not require manual loading throughout the entire process, thereby improving the efficiency of the material frame flow of the production line and saving labor costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application; Figure 2 is a schematic diagram of the connection of the control mechanism of an embodiment of the present application; Figure 3 It is a schematic diagram of the structure of the lifting device, the moving device and the material delivery mechanism of the embodiment of the present application; Figure 4 This is a schematic diagram of the structure of the material frame storage table of an embodiment of the present application; Figure 5 It is a schematic diagram of the partial structure of the transmission mechanism and the reflux mechanism of the embodiment of the present application; Figure 6 It is a flow chart of the material frame material delivery method of the control method of the embodiment of the present application; Figure 7 is a flow chart of a material frame reflow method of a control method according to an embodiment of the present application; In the figure, 1, control mechanism; 2, feeding mechanism; 21, material frame storage rack; 211, support assembly; 212, material frame storage table; 213, rolling wheel assembly; 214, moving wheel assembly; 22, lifting device; 221, lifting platform; 2211, third pulley assembly; 2212, fifth roller assembly; 222, driving assembly; 23, moving device; 231, third roller assembly; 232, fourth roller assembly; 3, material delivery mechanism; 31. Material delivery platform; 311. First pulley assembly; 312. First roller assembly; 313. First label identification device; 32. Reflow platform; 321. Second pulley assembly; 322. Second roller assembly; 4. Conveying mechanism; 41. Conveyor belt; 42. Limit baffle; 43. Material frame placement platform; 44. Connecting platform; 45. Material frame transfer platform; 5. Reflow mechanism; 51. Reflow belt; 6. Lifting mechanism; 7. Work station; 8. Quality inspection platform. DETAILED DESCRIPTION
[0027] The following is combined with Figure 1 -Attached Figure 7 , further details of this application are given.
[0028] Since the processing procedures of different materials are different, the production line in the prior art that sets the workstations 7 according to the processing procedure sequence cannot fully adapt to the processing of different types of materials, and the flow of materials must be carried out in the order of the processing procedure. When an abnormality occurs in the previous processing procedure, all the workstations 7 of the subsequent processing procedure will be affected, which will affect the processing efficiency and cause the overall flexibility of the production line to be poor. Therefore, the embodiment of the present application provides an intelligent flow device for a production line, referring to Figure 1 and Figure 2, including a control mechanism 1, a feeding mechanism 2, a feeding mechanism 3, a conveying mechanism 4, a reflux mechanism 5 and a lifting mechanism 6, wherein the feeding mechanism 2, the feeding mechanism 3, the conveying mechanism 4, the reflux mechanism 5 and the lifting mechanism 6 are electrically connected to the control mechanism 1 respectively. The feeding mechanism 2 is connected to the feeding end of the feeding mechanism 3, the feeding end of the feeding mechanism 3 is connected to the feeding end of the conveying mechanism 4, the reflux mechanism 5 is located below the conveying mechanism 4, the unloading end of the reflux mechanism 5 is connected to the reflux end of the feeding mechanism 3, a plurality of workstations 7 are arranged on both sides of the conveying mechanism 4, the unloading end of the conveying mechanism 4 and the feeding end of the reflux mechanism 5 are connected to the lifting mechanism 6. The conveying mechanism 4 includes a conveyor belt 41, which moves in a direction away from the feeding mechanism 3. The reflux mechanism 5 includes a reflux belt 51, which moves in a direction close to the feeding mechanism 3. Among them, the loading mechanism 2 is used to store a number of material frames to be processed with labels and to load the material frames, the labels contain corresponding material frame information, the feeding mechanism 3 is used to receive the material frames to be fed by the loading mechanism 2, identify the labels of the material frames, and feed the material frames according to the material frame information, the conveying mechanism 4 is used to convey the material frames fed by the feeding mechanism 3 to the corresponding waiting stations, the reflux mechanism 5 is used to return the material frames after the current process is completed to the feeding mechanism 3 for re-feeding in the next process, and the lifting mechanism 6 is used to receive the material frames that failed to feed and transfer the material frames to the reflux mechanism 5.
[0029] The implementation principle of the embodiment of the present application is as follows: by reading the material frame information corresponding to the label of the material frame to be dispatched, automatically matching the corresponding material station to be dispatched according to the material frame information, and then transmitting the material frame to be dispatched to the corresponding material station to be dispatched for processing through the transmission mechanism 4, after the processing is completed, the material frame enters the reflux mechanism 5, and the reflux mechanism 5 transmits the material frame back to the dispatching mechanism 3, so that the next processing flow can re-dispatch the material frame, thereby improving the stability and reliability of the material frame circulation of the production line. By reading the label to automatically match the material frame and the material station to be dispatched, after the current process is completed, the material frame can be refluxed and continue to match the next material station to be dispatched according to the next process to circulate the material frame again, so that the production line is no longer limited to a specific process sequence, and can be more adaptable to the production of materials with different processing process sequences, thereby improving the efficiency and flexibility of the material frame circulation of the production line.
[0030] like Figure 3As shown, the material dispensing mechanism 3 includes a dispensing platform 31 and a reflow platform 32 located below the dispensing platform 31. One side of the dispensing platform 31 is connected to the feeding mechanism 2. One end of the dispensing platform 31 is connected to the feeding end of the conveyor belt 41 as the dispensing end. One side of the reflow platform 32 is connected to the feeding mechanism 2. One end of the reflow platform 32 is connected to the unloading end of the reflow belt 51 as the reflow end. The side of the reflow platform 32 away from the feeding mechanism 2 is connected to the quality inspection platform 8. The dispensing platform 31 includes a first pulley assembly 311 and a first roller assembly 312. The first pulley assembly 311 moves in a direction close to or away from the feeding mechanism 2, and the first roller assembly 312 moves in a direction close to or away from the conveyor belt 41. The reflow platform 32 includes a second pulley assembly 321 and a second roller assembly 322. The second pulley assembly 321 moves in a direction close to or away from the feeding mechanism 2, and the second roller assembly 322 moves in a direction close to or away from the conveyor belt 41. In the specific implementation process, the first pulley assembly 311 drives the material frame after loading by the loading mechanism 2 to move to the material delivery platform 31, and then the first roller assembly 312 drives the material frame that has matched the material waiting station to move to the conveying mechanism 4, so that the material frame can move freely forward and backward and left and right on the material delivery platform 31. The second roller assembly drives the material frame after reflow by the reflow mechanism 5 to move to the material delivery platform 31, and then the second pulley assembly 321 drives the material frame that needs to be delivered by the next process to move to the loading mechanism 2, so that the material frame can move freely forward and backward and left and right on the reflow platform 32.
[0031] The material delivery mechanism 3 also includes a first label recognition device 313 disposed on one side of the material delivery platform 31 and a second label recognition device disposed on one side of the reflow platform 32. The first label recognition device 313 and the second label recognition device are both connected to the control mechanism 1 for communication. In the specific implementation process, the first label recognition device 313 is used to recognize the label of the frame to be delivered on the material delivery platform 31 and upload it to the control mechanism 1, so that the control mechanism 1 reads the frame information according to the label of the frame to be delivered, matches the corresponding material delivery station according to the current processing flow, and thus controls the material delivery platform 31 and the conveying mechanism 4 to cooperate and deliver the material to the frame to be delivered. The second label identification device is used to identify the label of the reflow material frame that has returned to the reflow table 32 and upload it to the control mechanism 1, so that the control mechanism 1 reads the material frame information according to the label of the reflow material frame, and judges whether the material frame has completed all processing processes based on the comparison between the current processing flow and the entire processing flow in the reflow material frame information. If all processing flows have not been completed, the second pulley assembly 321 drives the material frame to move toward the feeding mechanism 2, so that the material frame enters the feeding mechanism 2 and waits for material delivery again. If all processing flows have been completed, the second pulley assembly 321 drives the material frame to move away from the feeding mechanism 2, so that the material frame enters the quality inspection platform 8 for the quality inspection flow after all processing flows are completed, so that the material frame can automatically flow to the feeding mechanism 2 or the quality inspection platform 8 according to the actual situation.
[0032] like Figure 3 and Figure 4 As shown, the feeding mechanism 2 includes a material frame storage rack 21, a lifting device 22 and a moving device 23. One end of the moving device 23 is connected to the material delivery mechanism 3, and the other side of the moving device 23 is connected to the lifting mechanism. One end of the lifting mechanism is connected to the material frame storage rack 21. The moving device 23 includes a third roller assembly 231 connected to the material delivery platform 31 and a fourth roller assembly 232 connected to the reflow platform 32. The third roller assembly 231 moves in a direction close to or away from the material delivery mechanism 3, and the fourth roller assembly 232 moves in a direction close to or away from the material delivery mechanism 3. The lifting device 22 includes a lifting platform 221 and a driving assembly 222. The driving assembly 222 is used to drive the lifting platform 221 to move up and down. The lifting platform 221 includes a third pulley assembly 2211 and a fifth roller assembly 2212. The third pulley assembly 2211 moves in a direction close to or away from the moving device 23, and the fifth roller assembly 2212 moves in a direction close to or away from the material frame storage rack 21.
[0033] In the specific implementation process, the driving assembly 222 includes a slider fixedly connected to the lifting platform 221 and a slide bar movably connected to the slider, and the lifting platform 221 is driven to move up and down along the slide bar by the slider. The driving assembly 222 also includes two gears fixed at the top and bottom of the lifting device 22 and a chain connecting the two gears, and the chain further drives the lifting platform 221 to move up and down through transmission.
[0034] like Figure 4 As shown, the material frame storage rack 21 includes a support assembly 211 and a plurality of material frame storage platforms 212 supported by the support assembly 211. The material frame storage platform 212 is inclined toward the lifting device 22. Rolling wheel assemblies 213 are provided on both sides of the material frame storage platform 212, and a moving wheel assembly 214 is provided at the bottom of the support assembly 211. The rolling wheel assembly 213 is used to enable the material frame to slide from the material frame storage platform 212 to the lifting device 22, and the moving wheel assembly 214 is used to move the material frame storage rack 21.
[0035] In the specific implementation process, after the material frame that needs to be loaded slides from the material frame storage rack 21 to the lifting device 22, it is moved to the lifting platform 221 through the fifth roller assembly 2212. The lifting platform 221 can stop at any layer of the material frame storage rack 21 to receive the material frame, and then the lifting platform 221 is raised to a position parallel to the third roller assembly 231 of the moving device 23 through the driving assembly 222, so that the third roller assembly 231 can move the material frame to the material delivery mechanism 3, and the material frame is moved by the third roller assembly 231 of the moving device 23 and the first pulley assembly 311 of the material delivery platform 31. The material is delivered to the material delivery table 31, thereby realizing the storage and automatic loading of the material frame. After the material frame flows back to the reflow table 32 and it is determined that the next process needs to be carried out, the fourth roller assembly 232 of the mobile equipment 23 cooperates with the second pulley assembly 321 of the reflow table 32 to move the material frame to the lifting platform 221. The lifting device 22 then moves the material frame upward to the material frame storage table 212 with a vacant space on the material frame storage rack 21, and then the fifth roller assembly 2212 moves the material frame to the material frame storage table 212 for storage, so that the material frame can be re-loaded later, thereby realizing automatic reflow of the material frame.
[0036] like Figure 5 As shown, the conveying mechanism 4 includes a conveyor belt 41 and a plurality of rotatable limit baffles 42. The limit baffle 42 is arranged on one side of each workstation 7 close to the conveyor belt 41. A material frame placement table 43 is provided on the other side of the limit baffle 42. One end of the limit baffle 42 is rotatably connected to the oblique rear side of the workstation 7 close to the conveyor belt 41. When opened, the limit baffle 42 guides the material frame on the conveyor belt 41 to flow to the material frame placement table 43 of the workstation 7.
[0037] During the specific implementation process, after the material frame and the waiting station are matched, the limit baffle 42 of the waiting station is opened. When the conveyor belt 41 transports the material frame to the waiting station, the material frame is guided to flow to the material frame placement table 43 of the station 7 under the limiting action of the limit baffle 42. At the same time, the display in front of the waiting station displays the corresponding processing flow to process the material in the material frame.
[0038] like Figure 5 As shown, a rotatable material frame flow table 45 is provided below the material frame placement table 43, and the material frame placement table 43 and the material frame flow table 45 are connected by an inclined connecting table 44. The connecting table 44 is used to guide the material frame on the material frame placement table 43 to flow to the material frame flow table 45, and the material frame flow table 45 is horizontally rotatably connected to a position below the workstation 7 close to the reflow mechanism 5. The material frame flow table 45 guides the material frame to flow to the reflow mechanism 5 when rotating downward.
[0039] During the specific implementation process, the material frame is transferred to the material waiting station and placed on the material frame placement table 43. The material frame being processed can be moved to the material frame transfer table 45. At this time, another material frame to be processed can be transferred to the material frame placement table 43 for storage. After the processing of the material frame is completed, it is transferred downward to the reflux mechanism 5 through the material frame transfer table 45, and then refluxed to the material sending mechanism 3 through the reflux mechanism 5.
[0040] In the best implementation of the present application, in order to further ensure the stability and accuracy of the material frame flow, sensing devices are provided at multiple locations of the loading mechanism 2, the dispensing mechanism 3, the conveying mechanism 4, the reflux mechanism 5 and the lifting mechanism 6. The sensing devices are connected to the control mechanism 1 for communication and are used to sense whether the material frame has been transferred to the desired position and upload the information to the control mechanism 1. Exemplarily, when the sensing device on the dispensing platform 31 senses that the material frame has been transferred to the dispensing platform 31, the information is uploaded to the control mechanism 1, and the control mechanism 1 controls the first label reading device to read the label of the material frame, thereby dispensing the material frame.
[0041] The embodiment of the present application also provides a production line intelligent flow device control method, which is applied to the production line intelligent flow device described in the first aspect, referring to Figure 6 The steps of the material frame material delivery method in the control method include: S1. The control mechanism 1 obtains the workstation information of each workstation 7 and the material production information of the material to be produced currently.
[0042] Specifically, usually a production line is provided with a plurality of workstations 7. Unlike the prior art in which workstations 7 are arranged in the order of the production process, the workstations 7 in the embodiment of the present application have no fixed order. Each workstation 7 corresponds to a workstation information. The workstation information includes the workstation 7 number corresponding to the workstation 7, the processing flow that can be performed, and the current working status. Among them, the processing flow that can be performed is the processing flow that the employee corresponding to the workstation 7 is good at, which is usually multiple. The current working status includes working, resting, and idle. If the current working status is working, it means that the workstation 7 is currently working. If the current working status is resting, it means that the workstation 7 is currently resting and cannot work. If the current working status is idle, it means that the workstation 7 is currently idle and can work, that is, the material waiting station can be matched. The production information for different types of materials is different. Therefore, before starting production, it is necessary to first obtain the material production information of the current material to be produced. The material production information includes the processing flow sequence and the standard time consumption of each process. The processing flow sequence is pre-set according to demand, and the standard time consumption of each processing flow is obtained according to previous experience records.
[0043] S2, the control mechanism 1 controls the feeding mechanism 2 to transfer the frame to be dispatched to the dispatching mechanism 3.
[0044] Specifically, the lifting platform 221 of the lifting mechanism moves to the material frame storage platform 212 where the material frame that needs to be loaded is located, and the material frame on the material frame storage rack 21 moves to the lifting platform 221 due to inertia. The lifting platform 221 moves the material frame to the horizontal surface of the mobile device 23 through the driving component 222, and then the third pulley component 2211 cooperates with the third roller component 231 of the mobile device 23 and the first pulley component 311 of the material delivery platform 31 to move the material frame to the material delivery platform 31.
[0045] S3. The control mechanism 1 obtains the label of the material frame to be dispatched identified by the first label identification device 313.
[0046] Specifically, a production line usually uses multiple material frames, which are used to place multiple materials to facilitate material flow. Each material frame corresponds to a material frame information, and the material frame information is stored in a label on the surface of the material frame to facilitate identification by a label identification device. The material frame information includes the material frame number and the current processing flow corresponding to the material frame. The current processing flow is the processing flow that the material frame needs to perform next. When the material frame information needs to be obtained, the first label identification device 313 performs non-contact data communication with the label of the material frame through radio frequency identification technology (RFID), thereby performing label identification.
[0047] S4. The control mechanism 1 obtains the material frame information of the material frame to be sent according to the tag.
[0048] Specifically, the first tag recognition device 313 uploads the recognized tag to the control mechanism 1 so that the control mechanism 1 reads the material frame information stored in the tag.
[0049] S5. The control mechanism 1 matches the material-waiting workstations according to the material frame information of the material-waiting frame and the workstation information of each workstation 7.
[0050] Specifically, according to the current processing flow in the material frame information, a workstation 7 that can perform the processing flow and is currently in an idle state is matched as a material-waiting workstation.
[0051] S6. The control mechanism 1 controls the conveying mechanism 4 to transfer the material frame to be sent to the material waiting station.
[0052] Specifically, after the matching of the material waiting station is completed, the limit baffle 42 on one side of the material waiting station is opened, and the first roller assembly 312 of the material delivery platform 31 moves the material frame to be delivered to the conveyor belt 41. When the conveyor belt 41 moves the material frame to be delivered to the material waiting station, the material frame enters the material frame placement table 43 corresponding to the material waiting station under the limiting action of the limit baffle 42.
[0053] The control method of the embodiment of the present application also includes a material frame reflow method, referring to Figure 7 , the specific steps include: S7 , the control mechanism 1 controls the reflux mechanism 5 to transfer the reflux material frame that has completed the current processing flow to the delivery mechanism 3 .
[0054] Specifically, the reflow belt 51 cooperates with the second roller assembly 322 of the material delivery platform 31 to move the material frame that has completed the current processing flow to the reflow platform 32 of the material delivery mechanism 3 .
[0055] S8. The control mechanism 1 obtains the label of the reflow material frame identified by the second label identification device.
[0056] Specifically, the second tag recognition device performs non-contact data communication with the tag of the material frame through radio frequency identification technology (RFID), thereby performing tag recognition.
[0057] S9, the control mechanism 1 controls the reflow station 32 to transfer the reflow material frame to the loading mechanism 2 or the quality inspection platform 8 according to the material frame information.
[0058] Specifically, based on the comparison between the current processing flow and all processing flows in the reflux material frame information, it is determined whether the material frame has completed all processing flows. If not all processing flows are completed, the second pulley assembly 321 drives the material frame to move toward the loading mechanism 2, so that the material frame enters the loading mechanism 2 and waits for material delivery again. If all processing flows have been completed, the second pulley assembly 321 drives the material frame to move away from the loading mechanism 2, so that the material frame enters the quality inspection platform 8 for the quality inspection flow after all processing flows are completed.
[0059] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A production line intelligent circulation device, It is characterized in that It comprises a control mechanism (1), a feeding mechanism (2), a feeding mechanism (3), a conveying mechanism (4) and a reflux mechanism (5), wherein the feeding mechanism (2), the feeding mechanism (3), the conveying mechanism (4) and the reflux mechanism (5) are electrically connected to the control mechanism (1) respectively; The feeding mechanism (2) is connected to the feeding end of the feeding mechanism (3), the feeding end of the feeding mechanism (3) is connected to the feeding end of the conveying mechanism (4), the conveying mechanism (4) comprises a conveyor belt (41), the conveyor belt (41) moves in a direction away from the feeding mechanism (3), and a plurality of workstations (7) are arranged on both sides of the conveyor belt (41); The feeding mechanism (2) stores a plurality of material frames with labels, the labels storing corresponding material frame information, and the material delivery end of the material delivery mechanism (3) includes a first label identification device (313); The reflux mechanism (5) is located below the conveying mechanism (4); the unloading end of the reflux mechanism (5) is connected to the reflux end of the feeding mechanism (3); the reflux mechanism (5) comprises a reflux belt (51); and the reflux belt (51) moves in a direction close to the feeding mechanism (3).
2. According to claim 1, a production line intelligent circulation device, It is characterized in that The conveying mechanism (4) further comprises a plurality of rotatable limit baffles (42), wherein the limit baffles (42) are arranged on a side of each work station (7) close to the conveyor belt (41); A material frame placement platform (43) is provided on the other side of the limiting baffle (42), and the limiting baffle (42) is used to guide the material frames on the conveyor belt (41) to flow to the material frame placement platform (43) when it is opened.
3. According to claim 2, a production line intelligent circulation device, It is characterized in that A rotatable material frame flow table (45) is provided below the material frame placement table (43); the material frame placement table (43) and the material frame flow table (45) are connected via an inclined connecting table (44); the connecting table (44) is used to guide the material frame on the material frame placement table (43) to flow to the material frame flow table (45); and the material frame flow table (45) is used to guide the material frame to flow to the reflux mechanism (5) when rotating downward.
4. According to claim 1, a production line intelligent circulation device, It is characterized in that The material dispensing mechanism (3) comprises a material dispensing platform (31), one side of the material dispensing platform (31) is connected to the feeding mechanism (2), and one end of the material dispensing platform (31) is connected to the feeding end of the conveyor belt (41) as a material dispensing end; The material delivery platform (31) comprises a first belt pulley assembly (311) and a first roller assembly (312); the first belt pulley assembly (311) moves in a direction approaching or away from the feeding mechanism (2); and the first roller assembly (312) moves in a direction approaching or away from the conveyor belt (41).
5. According to claim 4, a production line intelligent circulation device, It is characterized in that The material dispensing mechanism (3) further comprises a reflow platform (32), wherein the reflow platform (32) is located below the material dispensing platform (31), one side of the reflow platform (32) is connected to the material loading mechanism (2), and one end of the reflow platform (32) is connected to the unloading end of the reflow belt (51) as a reflow end; The reflow platform (32) comprises a second pulley assembly (321) and a second roller assembly (322), wherein the second pulley assembly (321) moves in a direction approaching or away from the feeding mechanism (2), and the second roller assembly (322) moves in a direction approaching or away from the conveyor belt (41).
6. The intelligent flow device for a production line according to claim 5, It is characterized in that The return end of the material delivery mechanism (3) includes a second label recognition device, and the side of the return platform (32) away from the material feeding mechanism (2) is connected to a quality inspection platform (8).
7. The intelligent flow device for a production line according to claim 5, It is characterized in that The feeding mechanism (2) comprises a material frame storage rack (21), a lifting device (22) and a moving device (23); one end of the moving device (23) is connected to the material dispensing mechanism (3); one side of the moving device (23) is connected to the lifting mechanism; and one end of the lifting mechanism is connected to the material frame storage rack (21); The mobile device (23) comprises a third roller assembly (231) connected to the material dispensing platform (31) and a fourth roller assembly (232) connected to the reflow platform (32); the third roller assembly (231) moves in a direction approaching or moving away from the material dispensing mechanism (3); and the fourth roller assembly (232) moves in a direction approaching or moving away from the material dispensing mechanism (3).
8. The intelligent flow device for a production line according to claim 7, It is characterized in that The material frame storage rack (21) comprises a support assembly (211) and a plurality of material frame storage platforms (212) supported by the support assembly (211), wherein the material frame storage platforms (212) are inclined toward the lifting device (22); Rolling wheel assemblies (213) are provided on both sides of the material frame storage platform (212), and a moving wheel assembly (214) is provided at the bottom of the support assembly (211).
9. The intelligent flow device for a production line according to claim 8, It is characterized in that The lifting device (22) comprises a lifting platform (221) and a driving component (222), wherein the driving component (222) is used to drive the lifting platform (221) to move up and down; The lifting platform (221) comprises a third pulley assembly (2211) and a fifth roller assembly (2212); the third pulley assembly (2211) moves toward or away from the moving equipment (23); and the fifth roller assembly (2212) moves toward or away from the material frame storage rack (21).
10. A production line intelligent circulation device control method, applied to a production line intelligent circulation device according to any one of claims 1 to 9, It is characterized in that include: The control mechanism (1) obtains the workstation information of each workstation (7) and the material production information of the material to be produced currently; The control mechanism (1) controls the feeding mechanism (2) to transfer the frame to be dispatched to the dispatching mechanism (3); The control mechanism (1) obtains the label of the material frame to be dispatched identified by the first label identification device (313); The control mechanism (1) obtains the material frame information of the material frame to be sent according to the tag; The control mechanism (1) matches the material-waiting workstation according to the material frame information of the material-waiting frame and the workstation information of each workstation (7); The control mechanism (1) controls the conveying mechanism (4) to transfer the material frame to be sent to the material waiting station.
Citation Information
Patent Citations
Resource allocation and integration system based on production line
CN110070150A
Double-layer circulating conveying device and control method thereof
CN110294280A
Intelligent assembly line
CN206307642U
Automatic change coating production line
CN206854018U
Transmission return line for blocking indoor and outdoor air convection
CN216071825U