Shaftway type construction hoist combined with building machine steel platform

By combining the steel platform of the building machine in the shaft-type construction elevator, and using guide rails and hydraulic jacking devices, the problem that conventional shaft elevators cannot reach high-rise buildings is solved, efficient and safe steel platform construction material transportation is achieved, and construction efficiency and Security.

CN118723747APending Publication Date: 2024-10-01CHINA CONSTR THIRD ENG BUREAU GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411006708.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the construction of super high-rise buildings, conventional shaft construction elevators cannot reach the curing layer and steel bar binding layer, causing difficulties in material transportation, affecting construction efficiency and increasing safety risks.

Method used

Design a shaft-type construction elevator combined with the steel platform of the building machine. Through the guide rail bracket, guide rail, speed limiter, buffer and other components, the installation of the elevator system and the use of the hydraulic jacking device are realized to ensure that the elevator climbs with the steel platform. And climb, automatically promote to the top.

Benefits of technology

This device achieves efficient transportation of steel platforms without manual operation, improves construction safety and efficiency, and reduces the occurrence of safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118723747A_ABST
    Figure CN118723747A_ABST
Patent Text Reader

Abstract

The invention discloses a hoistway type construction elevator combined with a building machine steel platform, which comprises an elevator system, the elevator system at least comprises a guide rail support, a guide rail, a fixing plate, a speed limiter, a cage frame vertical beam, a limit switch, a limit switch, a speed reduction switch, an upper limit collision bow, a lower limit collision bow, a short collision bow assembly, an upper guide shoe, a lower guide shoe, a positioning auxiliary guide shoe, safety tongs, a lifting linkage mechanism, a buffer, a buffer base, a steel structure machine room, a bearing beam, an electric control cabinet, a connector assembly, a traction machine and a steel bottom support. The standard knot and the suspension cage are used for building construction of a high-rise building structure needing to build a steel platform, the height can be increased along with gradual rising of the building machine steel platform, the building machine steel structure platform is connected with an existing construction elevator in series for use, and convenient conditions are provided for construction personnel and material transportation of a maintenance layer and a steel bar binding layer in the building machine steel structure platform. The construction efficiency is ensured and safety accidents are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of elevators, and in particular to a shaft type construction elevator combined with a steel platform of a building construction machine. Background Art

[0002] With the improvement of building construction technology, super high-rise buildings have gradually occupied the main market of urban construction in my country. During the construction of super high-rise structures, as the main structure rises, material transportation becomes a huge problem. Conventional hoistway construction elevators can only reach the area below the maintenance layer, and cannot reach the maintenance layer and the steel bar binding layer, so improvements are needed. Summary of the invention

[0003] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, one purpose of the present invention is to provide a shaft-type construction elevator combined with a steel platform of a building construction machine, which is used for high-rise construction that requires the construction of a steel platform building structure, and can be raised in height as the steel platform of the building construction machine gradually rises, and can be used in series with the existing construction elevator, providing convenient conditions for the transportation of personnel and materials for the construction of the maintenance layer and steel bar binding layer inside the steel structure platform of the building construction machine, ensuring construction efficiency and reducing safety accidents.

[0004] The technical solution of the present invention is as follows: A hoistway type construction elevator combined with a steel platform of a building construction machine, characterized in that it includes an elevator system;

[0005] The elevator system at least includes a guide rail bracket, a guide rail, a fixing plate, a speed limiter, a cage frame beam, a limit switch, a limit switch, a deceleration switch, an upper limit striker, a lower limit striker, a short striker assembly, upper and lower guide shoes, a positioning auxiliary guide shoe, a safety clamp, a lifting linkage mechanism, a buffer, a buffer base, a steel structure machine room, a load-bearing beam, an electric control cabinet, a connector, a traction machine, a steel bottom bracket, a standard section, and a cage;

[0006] The installation method of the elevator system is as follows:

[0007] Use expansion bolts to install the guide rail bracket on the shaft wall of the hoistway, install the guide rail on the guide rail bracket, and the guide rail bracket is located so that it does not interfere with the guide rail. The fixing plate is installed on the guide rail bracket and is 30cm away from the lower surface of the elevator top beam. The speed limiter is installed on the fixing plate. The diameter of the wire rope wheel of the speed limiter is 200mm, and the center of the pitch circle of the wire rope wheel edge is 150mm away from the center of the solid guide rail and 35mm away from the top surface of the guide rail. The connection hole at the bottom of the speed limiter is connected with M8x25 bolts, and the fasteners are not tightened for the time being;

[0008] Install the limit switch, limit switch and deceleration switch on the vertical beam of the cage frame, install the upper limit impact bow and the lower limit impact bow on the guide rail, and set a set of short impact bow components at the upper and lower travel ends of the elevator; after the cage frame is installed, install the upper and lower guide shoes, positioning auxiliary guide shoes, safety clamps, and lifting linkage mechanism on the vertical beam of the cage frame. The safety clamp is divided into left and right parts, and its lifting wedge block is located on the same side of the guide surface of the guide rail. The swing rod of the lifting linkage mechanism is connected to the lifting wedge block of the safety clamp through a connecting piece, and then the master and slave lifting arm assemblies of the lifting linkage mechanism are connected through a screw; adjust the gap between the upper and lower guide shoes, the positioning auxiliary guide shoe and the working surface of the guide rail, and use a feeler gauge to check that the gap deviation on both sides and the top surface is not more than 0.2mm, and then tighten the connecting bolts;

[0009] By adjusting the reset spring and the basket bolt on the lifting linkage mechanism of the safety clamp, the master and slave lifting arms of the lifting linkage mechanism are adjusted to a certain swing angle, generally 12°±0.5°, at which time the gap between the fixed wedge of the safety clamp and the working surface of the guide rail side is 2.5±0.5mm; the distance between the center of the lifting wedge pin and the center of the guide rail is 32mm, at which time the gap between the moving wedge and the guide rail surface is generally 3.0±0.5mm; at this time, the lifting mechanism of the safety clamp should rotate flexibly and reliably, with good synchronization of action, and the lifting force should meet the requirements;

[0010] The position of the buffer and the buffer base is determined according to the civil engineering layout. The buffer base is a telescopic adjustable base. The height of the buffer base is adjusted according to the installation size. The adjustment height range of this universal buffer base is 530mm~870mm. Then it is fixed to the bottom pit of the shaft with M12*100 expansion bolts; the buffer uses a hydraulic buffer. After the buffer is installed, a plumb line should be hung from any two mutually perpendicular positions in the front, back, left and right to measure its verticality. The plumbness of the plunger on the buffer shall not exceed 0.5%; the installation deviation between the center of the buffer and the center of the buffer collision plate shall not exceed 20mm, and the horizontal deviation of the top surfaces of the two buffers shall not exceed 2mm; the buffer type is divided into energy storage type and energy consumption type. The free travel of the energy consumption type buffer is reserved for 150~400mm, and the free travel of the energy storage type buffer is reserved for 200~350mm;

[0011] The top formwork ladder of the elevator adopts a steel structure machine room, which is sealed with aluminum-plastic panels around and on the top. Color steel plates with a width of more than 1m are laid around the steel structure of the machine room, and rainproof cloth is laid on the top of the cage. During the initial installation, the steel structure, load-bearing beams, electric control cabinets, connectors, traction machines and other components of the machine room are hoisted to the Bailey platform of the top formwork. The middle lifting beam is placed in the reserved hole of the top formwork hanger layer on the upper three layers of the current ordinary elevator arrival layer. The middle lifting beam also takes into account the movable wall attachment, and an electric hoist is hung on the middle lifting beam for secondary lifting of the steel bottom support. The lifting beam is erected on the upper part of the top steel structure machine room and fastened with screws to prevent tipping. The lifting beam is mainly used for hoisting components such as load-bearing sky beams, traction machines, and standard sections.

[0012] After the steel bottom bracket is hoisted as a whole, the foundation of the basic standard section is set at the bottom. The basic section is welded and fixed to the steel bottom pit. After every 3 sections of the standard section are assembled, they are hoisted as a whole by an electric winch. For the later addition of standard sections, the hoist cage is used to add sections to the platform one by one; the guide groove surface of the standard section is adjacent to the guide rail bracket slide groove, which is used for the reinforcement of the movable wall; the middle lifting beam is placed in the reserved holes of the lower three layers of the top mold hanger, which also serves as the platform support beam) and the movable wall support beam; the connection between the movable wall and the standard section on the lifting beam is checked, so that the standard section can be extended and retracted up and down along the guide of the roller;

[0013] Fix the accompanying cable hanger at the bottom of the cage frame near the door. The hanger clamps the lock plate and the beam to the adjustment beam or the support beam of the beam through the M16x300 stud bolts. The roller at the other end can slide on the beam to adjust the free hanging arc angle of the accompanying cable. After the position is determined, add an M10x35 bolt and nut inside the roller to lock it, and install a 6*46 split pin at the end of the beam;

[0014] The materials are transported by the shaft-type construction elevator to the end layer of the main construction, and then transferred to the steel structure platform construction elevator in the same plane. They can be directly transported to each plane layer and the top layer in the steel structure platform. As the main structure continues to rise, the hydraulic jacking device pushes the steel structure platform attached to the wall to drive the steel structure platform structure frame to climb in height, so that the steel platform construction elevator can complete the lifting without any operation.

[0015] Compared with the prior art, the present invention has the following beneficial effects:

[0016] This device can be combined with the steel platform of the building construction machine to form an integral whole. It will rise along with the steel platform during its climbing process. There is no need to perform any operation on the construction elevator. Compared with ordinary construction elevators, it has the advantages of safe operation, high efficiency, and energy saving.

[0017] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative work:

[0019] Figure 1 It is a schematic diagram of the internal structure of a shaft type construction elevator combined with a steel platform of a building construction machine according to the present invention;

[0020] Figure 2 It is a schematic diagram of the main structure of a shaft type construction elevator combined with a steel platform of a building construction machine according to the present invention;

[0021] Figure 3 It is a schematic diagram of the main structure of a construction elevator combined with a steel platform of a building construction machine and a steel structure platform of the present invention;

[0022] Figure 4 The utility model discloses an example of a top formwork protection shed of a hoistway type construction elevator combined with a steel platform of a building construction machine according to the present invention.

[0023] The reference numerals are as follows:

[0024] 1. Speed ​​limiter; 2. Upper limit impact bow; 3. Safety clamp; 4. Lower limit impact bow; 5. Buffer; 6. Steel structure; 7. Floor door corridor; 8. Movable attached wall; 9. Support rod; 10. Support beam; 11. Hanging rack; 12. Bailey platform; 13. Steel structure platform construction elevator; 14. Steel structure platform structure frame; 15. Steel structure platform attached wall; 16. Shaft type construction elevator; 17. Hydraulic jacking device; 18. Elevator protection. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. In the description of the present invention, it should be understood that the orientations or positional relationships indicated by the terms "upper", "lower", "front", "rear", "left", "right", "inner", "outer", "vertical", "circumferential", etc. are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0027] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0028] like Figure 1-Figure 3 A hoistway type construction elevator combined with a steel platform of a building construction machine is shown, comprising an elevator system;

[0029] The elevator system at least includes a guide rail bracket, a guide rail, a fixing plate, a speed limiter 1, a cage frame beam, a limit switch, a limit switch, a deceleration switch, an upper limit striker 2, a lower limit striker 4, a short striker assembly, upper and lower guide shoes, a positioning auxiliary guide shoe, a safety clamp 3, a lifting linkage mechanism, a buffer 5, a buffer 5 base, a steel structure machine room, a load-bearing beam, an electric control cabinet, a connector, a traction machine, a steel bottom bracket, a standard section, and a cage;

[0030] The installation method of the elevator system is as follows:

[0031] Use expansion bolts to install the guide rail bracket on the shaft wall of the hoistway, install the guide rail on the guide rail bracket, and the position of the guide rail bracket does not interfere with the guide rail. The fixing plate is installed on the guide rail bracket and is 30cm away from the lower surface of the elevator top beam. The speed limiter 1 is installed on the fixing plate, wherein the diameter of the wire rope pulley of the speed limiter 1 is 200mm, the center of the pitch circle of the wire rope pulley edge is 150mm away from the center of the solid guide rail and 35mm away from the top surface of the guide rail. The connecting holes at the bottom of the speed limiter 1 are connected with M8x25 bolts, and the fasteners are not tightened for the time being.

[0032] To facilitate on-site floor-raising installation, the limit switch, limit switch and deceleration switch are installed on the vertical beam of the cage frame, the upper limit impact bow 2 and the lower limit impact bow 4 are installed on the guide rail, and a set of short impact bow assemblies are set at the upper and lower ends of the elevator's upper and lower strokes; after the cage frame is installed, the upper and lower guide shoes, positioning auxiliary guide shoes, safety clamp 3, and lifting linkage mechanism are installed on the vertical beam of the cage frame. The safety clamp 3 is divided into left and right parts, and its lifting wedge block is located on the same side of the guide surface of the guide rail. The rocker arm of the lifting linkage mechanism is connected to the lifting wedge block of the safety clamp 3 through a connecting piece, and then the master and slave lifting arm assemblies of the lifting linkage mechanism are connected through a screw; adjust the gap between the upper and lower guide shoes, the positioning auxiliary guide shoe and the working surface of the guide rail, and use a feeler gauge to check that the gap deviation on both sides and the top surface is not more than 0.2mm, and then tighten the connecting bolts. Figure 1-Figure 3 A hoistway type construction elevator combined with a steel platform of a building construction machine is shown, comprising an elevator system;

[0033] The elevator system at least includes a guide rail bracket, a guide rail, a fixing plate, a speed limiter 1, a cage frame beam, a limit switch, a limit switch, a deceleration switch, an upper limit striker 2, a lower limit striker 4, a short striker assembly, upper and lower guide shoes, a positioning auxiliary guide shoe, a safety clamp 3, a lifting linkage mechanism, a buffer 5, a buffer 5 base, a steel structure machine room, a load-bearing beam, an electric control cabinet, a connector, a traction machine, a steel bottom bracket, a standard section, and a cage;

[0034] The installation method of the elevator system is as follows:

[0035] Use expansion bolts to install the guide rail bracket on the shaft wall of the hoistway, install the guide rail on the guide rail bracket, and the position of the guide rail bracket does not interfere with the guide rail. The fixing plate is installed on the guide rail bracket and is 30cm away from the lower surface of the elevator top beam. The speed limiter 1 is installed on the fixing plate, wherein the diameter of the wire rope pulley of the speed limiter 1 is 200mm, the center of the pitch circle of the wire rope pulley edge is 150mm away from the center of the solid guide rail and 35mm away from the top surface of the guide rail. The connecting holes at the bottom of the speed limiter 1 are connected with M8x25 bolts, and the fasteners are not tightened for the time being.

[0036] To facilitate on-site floor-raising installation, limit switches, limit switches and deceleration switches are installed on the vertical beams of the cage frame, upper limit impact bows 2 and lower limit impact bows 4 are installed on the guide rails, and a set of short impact bow assemblies are set at the ends of the upper and lower strokes of the elevator; after the cage frame is installed, the upper and lower guide shoes, positioning auxiliary guide shoes, safety clamps 3, and lifting linkage mechanism are installed on the vertical beams of the cage frame. The safety clamp 3 is divided into left and right parts, and its lifting wedge block is located on the same side of the guide surface of the guide rail. The rocker arm of the lifting linkage mechanism is connected to the lifting wedge block of the safety clamp 3 through a connecting piece, and then the master and slave lifting arm assemblies of the lifting linkage mechanism are connected through a screw; adjust the gap between the upper and lower guide shoes, the positioning auxiliary guide shoe and the working surface of the guide rail, and use a feeler gauge to check that the gap deviation on both sides and the top surface is not more than 0.2mm, and then tighten the connecting bolts.

[0037] By adjusting the reset spring and the basket bolt on the lifting linkage mechanism of the safety clamp 3, the master and slave lifting arms of the lifting linkage mechanism are adjusted to a certain swing angle, generally 12°±0.5°, at which time the gap between the fixed wedge of the safety clamp 3 and the working surface of the guide rail side is 2.5±0.5mm; the distance between the center of the lifting wedge pin and the center of the guide rail is 32mm, at which time the gap between the moving wedge and the guide rail surface is generally 3.0±0.5mm; at this time, the lifting mechanism of the safety clamp 3 should rotate flexibly and reliably, with good synchronization of action, and the lifting force meets the requirements. Note that after the installation is completed, the safety clamp 3 is actuated at the inspection speed to verify the synchronization of the action of the lifting linkage mechanism of the safety clamp 3.

[0038] According to the civil engineering layout, the position of buffer 5 and the base of buffer 5 are determined. The base of buffer 5 is a telescopic adjustable base. The height of buffer 5 base is adjusted according to the installation size. The adjustment height range of this universal buffer 5 base is 530mm~870mm. Then it is fixed on the ground of the pit with M12*100 expansion bolts; the height of buffer 5 base is calculated as: pit depth-550-buffer 5 reserved free stroke-buffer 5 height. If the calculated result is lower than 530mm, the base of buffer 5 is not equipped. Buffer 5 uses hydraulic buffer 5. After the buffer 5 is installed, the plumb line should be hung from any two mutually perpendicular positions in the front, back, left and right to measure its verticality. The plumbness of the plunger on the buffer 5 is not more than 0.5%; the installation deviation between the center of buffer 5 and the center of buffer 5 collision plate is not more than 20mm, and the horizontal deviation of the top surface of the two buffers 5 does not exceed 2mm; the types of buffer 5 are divided into energy storage type and energy consumption type. The free stroke of energy consumption type buffer 5 is reserved for 150~400mm, and the free stroke of energy storage type buffer 5 is reserved for 200~350mm.

[0039] The top formwork ladder of the elevator adopts a steel structure machine room at the top, and the machine room is sealed with aluminum-plastic panels around and on the top. Color steel plates with a width of more than 1m are laid around the steel structure of the machine room, and rainproof cloth is laid on the top of the cage. During the initial installation, the steel structure, load-bearing beams, electric control cabinets, connectors, traction machines and other components of the machine room are hoisted to the top formwork Bailey platform 12 by a tower crane for later assembly on the top formwork platform. The middle lifting beam is placed in the reserved hole of the top formwork hanger 11 layers on the upper three layers of the current ordinary ladder's arrival layer. The middle lifting beam also takes into account the movable wall 8, and an electric hoist is hung on the middle lifting beam for secondary lifting of the steel bottom support. The lifting beam is erected on the upper part of the top steel structure machine room and fastened with screws to prevent tipping. The lifting beam is mainly used for the hoisting of load-bearing sky beams, traction machines, standard sections and other components. To ensure its strength, it is advisable to use I-beams above 22#.

[0040] After the steel base support is hoisted as a whole, the foundation of the basic standard section is set at the bottom, and the basic section is welded and fixed to the steel bottom pit. After every 3 sections of the standard section are assembled, the whole is hoisted by an electric winch. For the additional sections of the standard section in the later stage, the hoisting cage is used to add sections to the platform one by one; the guide groove surface of the standard section is adjacent to the guide rail bracket slide groove, which is used to reinforce the movable wall 8; the middle lifting beam is placed in the reserved hole of the lower three layers of the top mold hanger 11, which also serves as the platform support beam 10) and the movable wall 8 support beam 10; the connection between the movable wall 8 and the standard section on the lifting beam is checked, so that the standard section can be extended and retracted up and down along the guide of the roller.

[0041] Fix the accompanying cable hanger 11 at the bottom of the cage frame near the door side. The hanger 11 clamps the locking plate and the beam to the adjustment beam or the supporting beam 10 of the beam through the M16x300 stud bolts. The rolling ring at the other end can slide on the beam to adjust the free hanging arc angle of the accompanying cable. After the position is determined, add an M10x35 bolt and nut inside the rolling ring to lock it, and install a 6*46 cotter pin at the end of the beam.

[0042] When in use, the materials are transported by the shaft type construction elevator 16 to the main construction end layer, transferred to the steel structure platform construction elevator 13 in the same plane, and can be directly transported to each plane layer and the top layer in the steel structure platform.

[0043] As the main structure continues to rise, the hydraulic jacking device 17 pushes the steel structure platform wall 15 to drive the steel structure platform structure frame 14 to climb in height, thereby achieving the lifting of the steel platform construction elevator without any operation.

[0044] By adjusting the reset spring and the basket bolt on the lifting linkage mechanism of the safety clamp 3, the master and slave lifting arms of the lifting linkage mechanism are adjusted to a certain swing angle, generally 12°±0.5°, at which time the gap between the fixed wedge of the safety clamp 3 and the working surface of the guide rail side is 2.5±0.5mm; the distance between the center of the lifting wedge pin and the center of the guide rail is 32mm, at which time the gap between the moving wedge and the guide rail surface is generally 3.0±0.5mm; at this time, the lifting mechanism of the safety clamp 3 should rotate flexibly and reliably, with good synchronization of action, and the lifting force meets the requirements. Note that after the installation is completed, the safety clamp 3 is actuated at the inspection speed to verify the synchronization of the action of the lifting linkage mechanism of the safety clamp 3.

[0045] According to the civil engineering layout, the position of buffer 5 and the base of buffer 5 are determined. The base of buffer 5 is a telescopic adjustable base. The height of buffer 5 base is adjusted according to the installation size. The adjustment height range of this universal buffer 5 base is 530mm~870mm. Then it is fixed on the ground of the pit with M12*100 expansion bolts; the height of buffer 5 base is calculated as: pit depth-550-buffer 5 reserved free stroke-buffer 5 height. If the calculated result is lower than 530mm, the base of buffer 5 is not equipped. Buffer 5 uses hydraulic buffer 5. After the buffer 5 is installed, the plumb line should be hung from any two mutually perpendicular positions in the front, back, left and right to measure its verticality. The plumbness of the plunger on the buffer 5 is not more than 0.5%; the installation deviation between the center of buffer 5 and the center of buffer 5 collision plate is not more than 20mm, and the horizontal deviation of the top surface of the two buffers 5 does not exceed 2mm; the types of buffer 5 are divided into energy storage type and energy consumption type. The free stroke of energy consumption type buffer 5 is reserved for 150~400mm, and the free stroke of energy storage type buffer 5 is reserved for 200~350mm.

[0046] The top formwork ladder of the elevator adopts a steel structure machine room at the top, and the machine room is sealed with aluminum-plastic panels around and on the top. Color steel plates with a width of more than 1m are laid around the steel structure of the machine room, and rainproof cloth is laid on the top of the cage. During the initial installation, the steel structure 6, load-bearing beams, electric control cabinets, connectors, traction machines and other components of the machine room are hoisted to the top formwork Bailey platform 12 by a tower crane for later assembly on the top formwork platform. The middle lifting beam is placed in the reserved hole of the top formwork hanger 11 layers on the upper three layers of the current ordinary ladder's arrival layer. The middle lifting beam also takes into account the movable wall 8, and an electric hoist is hung on the middle lifting beam for secondary lifting of the steel bottom support. The lifting beam is erected on the upper part of the top steel structure machine room and fastened with screws to prevent tipping. The lifting beam is mainly used for the hoisting of load-bearing sky beams, traction machines, standard sections and other components. To ensure its strength, it is advisable to use I-beams above 22#.

[0047] After the steel base support is hoisted as a whole, the foundation of the basic standard section is set at the bottom, and the basic section is welded and fixed to the steel bottom pit. After every 3 sections of the standard section are assembled, the whole is hoisted by an electric winch. For the additional sections of the standard section in the later stage, the hoisting cage is used to add sections to the platform one by one; the guide groove surface of the standard section is adjacent to the guide rail bracket slide groove, which is used to reinforce the movable wall 8; the middle lifting beam is placed in the reserved hole of the lower three layers of the top mold hanger 11, which also serves as the platform support beam 10) and the movable wall 8 support beam 10; the connection between the movable wall 8 and the standard section on the lifting beam is checked, so that the standard section can be extended and retracted up and down along the guide of the roller.

[0048] Fix the accompanying cable hanger 11 at the bottom of the cage frame near the door side. The hanger 11 clamps the locking plate and the beam to the adjustment beam or the supporting beam 10 of the beam through the M16x300 stud bolts. The rolling ring at the other end can slide on the beam to adjust the free hanging arc angle of the accompanying cable. After the position is determined, add an M10x35 bolt and nut inside the rolling ring to lock it, and install a 6*46 cotter pin at the end of the beam.

[0049] When in use, the materials are transported by the shaft type construction elevator 16 to the main construction end layer, transferred to the steel structure platform construction elevator 13 in the same plane, and can be directly transported to each plane layer and the top layer in the steel structure platform.

[0050] As the main structure continues to rise, the hydraulic jacking device 17 pushes the steel structure platform wall 15 to drive the steel structure platform structure frame 14 to climb in height, thereby achieving the lifting of the steel platform construction elevator without any operation.

[0051] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A hoistway type construction elevator combined with a steel platform of a building construction machine, characterized in that: Including elevator systems; The elevator system at least includes a guide rail bracket, a guide rail, a fixing plate, a speed limiter, a cage frame beam, a limit switch, a limit switch, a deceleration switch, an upper limit striker, a lower limit striker, a short striker assembly, upper and lower guide shoes, a positioning auxiliary guide shoe, a safety clamp, a lifting linkage mechanism, a buffer, a buffer base, a steel structure machine room, a load-bearing beam, an electric control cabinet, a connector, a traction machine, a steel bottom bracket, a standard section, and a cage; The installation method of the elevator system is as follows: Use expansion bolts to install the guide rail bracket on the shaft wall of the hoistway, install the guide rail on the guide rail bracket, and the guide rail bracket is located so that it does not interfere with the guide rail. The fixing plate is installed on the guide rail bracket and is 30cm away from the lower surface of the elevator top beam. The speed limiter is installed on the fixing plate. The diameter of the wire rope wheel of the speed limiter is 200mm, and the center of the pitch circle of the wire rope wheel edge is 150mm away from the center of the solid guide rail and 35mm away from the top surface of the guide rail. The connection hole at the bottom of the speed limiter is connected with M8x25 bolts, and the fasteners are not tightened for the time being; Install the limit switch, limit switch and deceleration switch on the vertical beam of the cage frame, install the upper limit impact bow and the lower limit impact bow on the guide rail, and set a set of short impact bow components at the upper and lower travel ends of the elevator; after the cage frame is installed, install the upper and lower guide shoes, positioning auxiliary guide shoes, safety clamps, and lifting linkage mechanism on the vertical beam of the cage frame. The safety clamp is divided into left and right parts, and its lifting wedge block is located on the same side of the guide surface of the guide rail. The swing rod of the lifting linkage mechanism is connected to the lifting wedge block of the safety clamp through a connecting piece, and then the master and slave lifting arm assemblies of the lifting linkage mechanism are connected through a screw; adjust the gap between the upper and lower guide shoes, the positioning auxiliary guide shoe and the working surface of the guide rail, and use a feeler gauge to check that the gap deviation on both sides and the top surface is not more than 0.2mm, and then tighten the connecting bolts; By adjusting the reset spring and the basket bolt on the lifting linkage mechanism of the safety clamp, the master and slave lifting arms of the lifting linkage mechanism are adjusted to a certain swing angle, generally 12°±0.5°, at which time the gap between the fixed wedge of the safety clamp and the working surface of the guide rail side is 2.5±0.5mm; the distance between the center of the lifting wedge pin and the center of the guide rail is 32mm, at which time the gap between the moving wedge and the guide rail surface is generally 3.0±0.5mm; at this time, the lifting mechanism of the safety clamp should rotate flexibly and reliably, with good synchronization of action, and the lifting force should meet the requirements; The position of the buffer and the buffer base is determined according to the civil engineering layout. The buffer base is a telescopic adjustable base. The height of the buffer base is adjusted according to the installation size. The adjustment height range of this universal buffer base is 530mm~870mm. Then it is fixed to the bottom pit of the shaft with M12*100 expansion bolts; the buffer uses a hydraulic buffer. After the buffer is installed, a plumb line should be hung from any two mutually perpendicular positions in the front, back, left and right to measure its verticality. The plumbness of the plunger on the buffer shall not exceed 0.5%; the installation deviation between the center of the buffer and the center of the buffer collision plate shall not exceed 20mm, and the horizontal deviation of the top surfaces of the two buffers shall not exceed 2mm; the buffer type is divided into energy storage type and energy consumption type. The free travel of the energy consumption type buffer is reserved for 150~400mm, and the free travel of the energy storage type buffer is reserved for 200~350mm; The top formwork ladder of the elevator adopts a steel structure machine room, which is sealed with aluminum-plastic panels around and on the top. Color steel plates with a width of more than 1m are laid around the steel structure of the machine room, and rainproof cloth is laid on the top of the cage. During the initial installation, the steel structure, load-bearing beams, electric control cabinets, connectors, traction machines and other components of the machine room are hoisted to the Bailey platform of the top formwork. The middle lifting beam is placed in the reserved hole of the top formwork hanger layer on the upper three layers of the current ordinary elevator arrival layer. The middle lifting beam also takes into account the movable wall attachment, and an electric hoist is hung on the middle lifting beam for secondary lifting of the steel bottom support. The lifting beam is erected on the upper part of the top steel structure machine room and fastened with screws to prevent tipping. The lifting beam is mainly used for hoisting components such as load-bearing sky beams, traction machines, and standard sections. After the steel bottom bracket is hoisted as a whole, the foundation of the basic standard section is set at the bottom. The basic section is welded and fixed to the steel bottom pit. After every 3 sections of the standard section are assembled, they are hoisted as a whole by an electric winch. For the later addition of standard sections, the hoist cage is used to add sections to the platform one by one; the guide groove surface of the standard section is adjacent to the guide rail bracket slide groove, which is used for the reinforcement of the movable wall; the middle lifting beam is placed in the reserved holes of the lower three layers of the top mold hanger, which also serves as the platform support beam) and the movable wall support beam; the connection between the movable wall and the standard section on the lifting beam is checked, so that the standard section can be extended and retracted up and down along the guide of the roller; Fix the accompanying cable hanger at the bottom of the cage frame near the door. The hanger clamps the lock plate and the beam to the adjustment beam or the support beam of the beam through the M16x300 stud bolts. The roller at the other end can slide on the beam to adjust the free hanging arc angle of the accompanying cable. After the position is determined, add an M10x35 bolt and nut inside the roller to lock it, and install a 6*46 split pin at the end of the beam; The materials are transported by the shaft-type construction elevator to the end layer of the main construction, and then transferred to the steel structure platform construction elevator in the same plane. They can be directly transported to each plane layer and the top layer in the steel structure platform. As the main structure continues to rise, the hydraulic jacking device pushes the steel structure platform attached to the wall to drive the steel structure platform structure frame to climb in height, so that the steel platform construction elevator can complete the lifting without any operation.

2. The hoistway type construction elevator combined with the steel platform of the building construction machine according to claim 1 is characterized in that: After installation, activate the safety clamp at the inspection speed to verify the synchronization of the safety clamp lifting linkage mechanism.

3. The hoistway type construction elevator combined with the steel platform of the building construction machine according to claim 1, characterized in that: The buffer base height is calculated as: pit depth - 550 - buffer reserved free travel - buffer height. If the calculated result is less than 530mm, the buffer base is not required.

4. The hoistway type construction elevator combined with the steel platform of the building construction machine according to claim 1, characterized in that: The lifting beam should be made of 22# or above I-beam.