Fixed-height variable-amplitude height compensation control method, controller, tower crane and medium
By obtaining the boom tip position and boom inclination angle of the tower crane in real time, a height compensation model is constructed, which solves the problem of poor real-time performance and accuracy in fixed height and variable amplitude technology, and achieves timely and accurate height compensation during operation.
Patent Information
- Application Number
- CN202410833934.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-10-01
AI Technical Summary
The existing fixed height and amplitude technology has problems of poor real-time performance and poor accuracy. The motion control model is complex and has many parameters. Some parameters have low measurement accuracy and large compensation control errors, making it impossible to achieve timely height compensation during operation. .
By obtaining the boom tip position and boom inclination angle of the tower crane in real time, a height compensation model is constructed, and the real-time height compensation amount is calculated using the change in the boom inclination angle before and after the fixed height amplitude, the wire rope height compensation amount and the rotation center position. , real-time control of the wire rope for height compensation.
It improves the accuracy and real-time performance of height compensation during the height-fixing and amplitude-changing process, reduces the number of parameters, improves measurement accuracy, and realizes timely height compensation during operation.
Smart Images

Figure CN118723809A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of engineering construction, and in particular to a height compensation control method for a fixed height and variable amplitude, a controller, a tower crane and a medium. Background Art
[0002] Tower cranes are indispensable construction equipment in the engineering construction industry, and boom tower cranes are the earliest type of tower cranes in history. In order to allow boom tower cranes to operate safely in environments with multiple obstacles, the research on fixed-height variable-luffing technology came into being. The basic principle of fixed-height variable-luffing technology is to keep the height of the mounted object from the ground stable during the luffing process of the boom tower crane, and compensate for the height difference caused by the wire rope that hoists the heavy object during the luffing process.
[0003] However, the current method of determining the height and amplitude of the technology has the following main defects: (1) The motion control model is complex, with many parameters, the measurement accuracy of some parameters is low, the compensation control error is large, and the accuracy is poor; (2) The real-time performance is poor. It is a post-compensation method and cannot achieve timely height compensation during the operation.
[0004] It can be seen that the existing fixed height and variable amplitude technology has technical problems of poor real-time performance and poor accuracy. Summary of the invention
[0005] The purpose of the embodiments of the present application is to provide a height compensation control method, controller, tower crane and medium for fixed height and variable amplitude, so as to solve the problems of poor real-time performance and poor accuracy in the existing fixed height and variable amplitude technology.
[0006] In order to achieve the above-mentioned objectives, the first aspect of the present application provides a height compensation control method for fixed-height amplitude variation, including: real-time acquisition of the arm tip position and boom inclination angle of the tower crane's lifting arm; constructing a height compensation model using a first change in the boom inclination angle before and after the fixed-height amplitude variation, a second change in the wire rope height compensation amount before and after the fixed-height amplitude variation, and the rotation center position; inputting the arm tip position before and after the fixed-height amplitude variation and the boom inclination angle before and after the fixed-height amplitude variation into the height compensation model to obtain a real-time height compensation amount; and controlling the wire rope for height compensation according to the real-time height compensation amount.
[0007] In an embodiment of the present application, a height compensation model is constructed using a first change in the boom inclination angle before and after the fixed height change, a second change in the wire rope height compensation before and after the fixed height change, and the position of the rotation center, including: determining a first correspondence between a first distance and a second change according to the position of the rotation center, wherein the first distance is the distance between the arm tip position after the fixed height change and the projection position of the boom before the fixed height change; determining a second correspondence between the first distance and the first change according to the position of the rotation center and trigonometric functions; and obtaining a height compensation model based on the first correspondence and the second correspondence.
[0008] In the embodiment of the present application, the arm tip position includes a first position of the arm tip in the first direction and a second position of the arm tip in the second direction, the rotation center position includes a third position of the rotation center in the first direction and a fourth position of the rotation center in the second direction, the first direction is perpendicular to the second direction, and the first corresponding relationship is expressed by a first formula, wherein the first formula includes:
[0009]
[0010] Wherein, Δh represents the second change; h represents the first distance; x A Indicates the first position after the height is set and the amplitude is changed; x B Indicates the first position before the fixed height change; y B Indicates the second position before the fixed height change; x O Indicates the third position, y O Indicates the fourth position.
[0011] In the embodiment of the present application, the second corresponding relationship is expressed by a second formula, wherein the second formula includes:
[0012]
[0013] In the formula, L represents the total length of the boom, Δθ represents the change in the boom elevation angle, y A Indicates the second position after the height is set and the amplitude is changed.
[0014] In the embodiment of the present application, the height compensation model is expressed by a third formula, wherein the third formula includes:
[0015]
[0016] In an embodiment of the present application, the compensation control method also includes: acquiring the hook position coordinates of the tower crane in real time; using the hook position coordinates to correct the real-time height compensation amount; controlling the wire rope for height compensation according to the real-time height compensation amount, including: controlling the wire rope for height compensation according to the corrected real-time height compensation amount.
[0017] A second aspect of the present application provides a controller configured to execute the height compensation control method of the fixed height and variable amplitude of the aforementioned embodiment.
[0018] According to a third aspect of the present application, there is provided a tower crane, comprising: a boom tip position sensor configured to acquire the boom tip position of the tower crane's lifting boom; a rotation center position sensor configured to acquire the rotation center position of the tower crane; an inclination sensor configured to acquire the boom inclination angle of the tower crane's lifting boom; a controller of the aforementioned embodiment; a wire rope configured to suspend a target object; and a lifting motor configured to control the movement of the wire rope.
[0019] In an embodiment of the present application, the tower crane of the aforementioned embodiment further includes: a hook position sensor configured to collect the hook position of the tower crane.
[0020] A fourth aspect of the present application provides a machine-readable storage medium having instructions stored thereon. When the instructions are executed by a processor, the processor is configured to execute the height compensation control method of the fixed height and variable amplitude of the aforementioned embodiment.
[0021] The height compensation control method, controller, tower crane and medium for fixed height and amplitude change provided in the embodiments of the present application obtain the arm tip position and boom inclination angle of the crane arm in real time. The change in the arm tip position of the crane arm reflects the height compensation amount of the wire rope. During the fixed height and amplitude change process, as the boom inclination angle of the crane arm changes, in addition to the change in the height of the target object mounted on the wire rope, the crane arm will also be deformed, affecting the height compensation amount of the wire rope. The embodiments of the present application only use the first change in the boom inclination angle before and after the fixed height and amplitude change, the second change in the height compensation amount of the wire rope before and after the fixed height and amplitude change, and the rotation center position to construct a height compensation model, which solves the problems of complex height compensation models, numerous parameters, low measurement accuracy of some parameters, large compensation control errors, and poor accuracy in the existing fixed height and amplitude change technology. By substituting the arm tip position and boom inclination angle before and after fixed height variation into the height compensation model, the real-time height compensation amount can be calculated. The arm tip position and boom inclination angle are both acquired in real time. During the fixed height variation process, the wire rope can be controlled in real time to perform height compensation according to the calculated real-time height compensation amount, which solves the problem that the existing fixed height variation technology cannot achieve timely height compensation during operation and has poor real-time performance.
[0022] Other features and advantages of the embodiments of the present application will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the following specific implementations, they are used to explain the embodiments of the present invention, but do not constitute a limitation on the embodiments of the present invention. In the accompanying drawings:
[0024] Figure 1 The flowchart of the fixed height and variable amplitude compensation control method 100 according to the embodiment of the present application is schematically shown;
[0025] Figure 2 The structure diagram of the tower crane 200 according to the embodiment of the present application is schematically shown; and
[0026] Figure 3 Schematically shows the embodiment of the present application Figure 1 Schematic diagram of step S102 in the compensation control method for fixed height and amplitude variation. DETAILED DESCRIPTION
[0027] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. It should be understood that the specific implementation methods described herein are only used to illustrate and explain the embodiments of the present application, and are not used to limit the embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0028] It should be noted that if the embodiments of the present application involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0029] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present application, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.
[0030] Reference Figure 1 , Figure 1 The following is a schematic diagram showing a flow chart of a height compensation control method for a fixed height and variable amplitude according to an embodiment of the present application. Figure 1 As shown, the height compensation control method 100 for fixed height and variable amplitude provided in the embodiment of the present application includes:
[0031] Step S110: acquiring the arm tip position and the arm inclination angle of the tower crane in real time.
[0032] It can be understood that the boom of the embodiment of the present application generally includes one end connected to the tower crane body and the other end away from the tower crane body, the arm tip position is the other end away from the tower crane body, the end of the boom connected to the tower crane body is located in a reference plane parallel to the ground, the boom has a projection on the reference plane, and the boom inclination angle is the angle between the boom and the projection. The arm tip position and the boom inclination angle will change based on the boom amplitude change, and the arm tip position and the boom inclination angle will also be different with the degree of boom amplitude change. The change of the arm tip position can directly reflect the height compensation amount. The boom will deform due to the hoisting target, and the deformation degree will be different with different boom inclination angles. The change of the boom inclination angle can reflect the deformation degree of the boom and indirectly reflect the height compensation amount. The arm tip position and the boom inclination angle of the tower crane boom are obtained in real time. Through the real-time acquisition of the arm tip position and the boom inclination angle, the height compensation amount in the boom amplitude change process can be more accurately reflected, and the accuracy of the fixed-amplitude variable-amplitude compensation control can be improved.
[0033] Step S120: construct a height compensation model using a first change in the boom inclination angle before and after the fixed height change, a second change in the wire rope height compensation amount before and after the fixed height change, and the rotation center position.
[0034] The height compensation model is used to characterize the correspondence between the first change in boom inclination before and after fixed height variation and the second change in wire rope compensation before and after fixed height variation. The slewing center position is the end where the boom is connected to the tower crane body.
[0035] In the embodiment of the present application, "after the fixed height change" does not mean the beginning and end of the fixed height change, but may refer to before and after a specific moment in the fixed height change process. The first change refers to the change in the boom inclination angle before and after a specific moment. During the fixed height change process, the height of the hoisted target object will change, and it is necessary to control the extension of the wire rope for height compensation. The amount of wire rope extension is the wire rope height compensation amount. The second change refers to the change in the wire rope height compensation amount before and after a specific moment in the fixed height change process. The constructed height compensation model only uses the first change, the second change and the rotation center position, with few parameters and a relatively simple model, which solves the problems of complex motion control models, numerous parameters, low measurement accuracy of some parameters, large compensation control errors and poor accuracy in the existing fixed height change technology.
[0036] Step S130: input the arm tip position before and after the fixed height change and the arm frame inclination angle before and after the fixed height change into the height compensation model to obtain the real-time height compensation amount.
[0037] Specifically, before and after the fixed-height variation does not indicate the beginning and end of the fixed-height variation, but refers to before and after a specific moment in the fixed-height variation process. The arm tip position indicates the arm tip coordinate position, which can be specifically expressed as the position at the center axis of the arm tip. The arm tip position and the boom inclination angle are acquired in real time. The arm tip position and the boom inclination angle are acquired at the moment when the fixed-height variation is in effect. By substituting the real-time acquired arm tip position and boom inclination angle into the height compensation model, the real-time height compensation amount can be obtained during the fixed-height variation process, which solves the problem that the existing fixed-height variation technology cannot realize timely height compensation during operation and the real-time performance is poor.
[0038] Step S140: Control the wire rope to perform height compensation according to the real-time height compensation amount.
[0039] Specifically, the extension and retraction of the wire rope will drive the movement of the mounted target, and the real-time height compensation represents the change in the extension and retraction of the wire rope. The real-time height compensation is obtained in real time, and the wire rope can be controlled in real time to compensate for the height according to the real-time height compensation, which solves the problem of poor real-time performance of existing fixed height and variable amplitude technologies.
[0040] In the embodiment of the present application, a height compensation model is constructed by using the first change in the boom inclination before and after the fixed height change, the second change in the wire rope height compensation amount before and after the fixed height change, and the rotation center position, including:
[0041] Step S121: determining a first corresponding relationship between a first distance and a second variation according to the rotation center position, wherein the first distance is the distance between the boom tip position after the fixed height variation and the boom projection position before the fixed height variation.
[0042] Step S122: Determine a second corresponding relationship between the first distance and the first variation according to the rotation center position and the trigonometric function.
[0043] Step S123: Obtaining a height compensation model according to the first corresponding relationship and the second corresponding relationship.
[0044] In an embodiment of the present application, a first distance, that is, a distance between the arm tip position after height-fixed amplitude change and the projection position of the boom before height-fixed amplitude change, is used as an intermediate variable to respectively determine a first correspondence between the first distance and the second change amount, and a second correspondence between the first distance and the first change amount, and then a height compensation model is obtained by using the first correspondence and the second correspondence.
[0045] The present application schematically provides an implementation form of a height compensation model, which will be described in detail below using the arm lifting process as an example.
[0046] The arm tip position includes the arm tip in the first direction ( Figure 2The first position of the boom forward inclination angle θ1 in the transverse direction indicated by the dotted line at the starting side of the boom and the first position of the boom tip in the second direction ( Figure 2 The rotation center position includes the third position of the rotation center in the first direction ( Figure 2 The horizontal coordinate x of the rotation center O o ) and the fourth position of the rotation center in the second direction ( Figure 2 The ordinate y of the rotation center O o ), the first direction is perpendicular to the second direction, which can be understood as establishing a rectangular coordinate system with the rotation center O as the origin.
[0047] For details, please refer to Figure 2 , Figure 2 The principle diagram of the compensation control method for fixed height and variable amplitude is shown schematically. Figure 2 The principle diagram of the compensation control method for fixed height and variable amplitude can be understood as a simplified diagram of the structure of the tower crane, including: the arm tip position coordinate sensor, the position point A after fixed height and variable amplitude, and its coordinates (x A ,y A ), the arm tip position coordinate sensor determines the position B point before the height change and its coordinates (x B ,y B ), the tower crane hook position coordinate sensor determines the position C point before the height change and its coordinates (x C ,y C ), the position O of the tower crane rotation center and its coordinates (x o ,y o ), boom length L, boom forward inclination angle θ1 for boom luffing, boom backward inclination angle θ2 for fixed height luffing, height compensation Δh, height difference h between point A after fixed height luffing and point A at the projection position A of the boom before fixed height luffing.
[0048] Optionally, the first corresponding relationship may be determined using a first formula, namely:
[0049]
[0050] Wherein, Δh represents the second change; h represents the first distance; x A Indicates the first position after the height is set and the amplitude is changed; x B Indicates the first position before the fixed height change; y B Indicates the second position before the fixed height change; x O Indicates the third position, y o Indicates the fourth position.
[0051] Specifically, according to the similar triangle theorem, combined with Figure 2 Show, By further transforming the formula, we can get the first formula.
[0052] It can be seen from the first formula that Δh in the first formula is mainly expressed by the ratio of the transverse coordinates of the arm tip position before and after the fixed height change. The longitudinal coordinate used is unique. The crane arm will produce a downward deformation due to the pulling force of the hoisted target. The transverse coordinate will not reflect the deformation of the crane arm. The deformation of the crane arm is reflected in the first distance h. Therefore, the first formula can more accurately reflect the height compensation amount through the first distance h, reduce the impact of different deformation amounts, including the elastic deformation of the crane arm during the change of height, and can perform height compensation more accurately.
[0053] Optionally, the second corresponding relationship may be determined by a second formula, namely:
[0054]
[0055] In the formula, L represents the total length of the boom, Δθ represents the change in the boom elevation angle, y A Indicates the second position after the height is set and the amplitude is changed.
[0056] Specifically, according to the cosine theorem of trigonometric functions, d represents the distance between the coordinate origin O and the projection point A, Substituting in, we get the second formula.
[0057] It can be seen from the second formula that the boom deforms downward due to the pulling force during the fixed height and luffing process. In the second formula, h is composed of the horizontal and vertical coordinates of the arm tip before the fixed height and luffing, the total length of the boom, the horizontal and vertical coordinates of the rotation center, and the change in the inclination angle of the boom. h only contains the horizontal coordinate position of the arm tip, but not the vertical coordinate position of the arm tip. It can be seen from the expression of L that L is a constant. It can be seen that the height compensation brought by the first distance is reflected by the first change, that is, the change in the inclination angle of the boom, which accurately reflects the deformation of the boom caused by different inclination positions during the fixed height and luffing process, and then reflects the real-time height compensation, which can perform height compensation more accurately.
[0058] According to the first corresponding relationship and the second corresponding relationship, a height compensation model is obtained. Optionally, the height compensation model is determined by a third formula, namely:
[0059]
[0060] Specifically, the real-time height compensation Δh in the third formula is reflected by the horizontal coordinate of the boom tip position before and after the fixed height change, the horizontal coordinate of the rotation center position, the vertical coordinate of the boom tip position before the fixed height change, and the change in the boom inclination angle. The deformation of the boom is caused by the hoisted target. With the different degrees of fixed height change, the change in the boom inclination angle is also different, and the deformation of the boom is different. Therefore, the change in the inclination angle can reflect the deformation of the boom during the entire change process, and can more accurately reflect the real-time height compensation in the fixed height change process, accurately perform height compensation, and solve the problem of low accuracy in the existing fixed height change technology.
[0061] In an embodiment of the present application, the compensation control method further includes:
[0062] Obtain the hook position coordinates of the tower crane in real time; use the hook position coordinates to correct the real-time height compensation;
[0063] According to the real-time height compensation amount, the wire rope is controlled to perform height compensation, including:
[0064] The steel wire rope is controlled to perform height compensation according to the corrected real-time height compensation amount.
[0065] Specifically, there is a device, i.e., a hook, below the other end of the boom away from the tower crane body that lifts the target object through a wire rope. When the hook is lifting the target object, the boom and the wire rope itself are elastic and will undergo structural deformation. The hook position coordinates are obtained in real time. The hook position coordinates can reflect the deformation of the wire rope during the fixed height and variable amplitude process. The real-time height compensation amount can be corrected through the hook position coordinates, and then the real-time height compensation amount can be used to make more accurate height compensation for the wire rope, solving the problem of low accuracy in existing fixed height and variable amplitude technologies.
[0066] Figure 3 The structure block diagram of a controller according to an embodiment of the present application is schematically shown. Figure 3 As shown, an embodiment of the present application provides a controller, which may include:
[0067] Memory 310, configured to store instructions; and
[0068] The processor 320 is configured to call instructions from the memory 310 and implement the above-mentioned fixed-height variable amplitude height compensation control method when executing the instructions.
[0069] The present application also provides a tower crane, which may include:
[0070] A boom tip position sensor is configured to collect the boom tip position of the tower crane;
[0071] A slewing center position sensor is configured to collect the slewing center position of the tower crane;
[0072] The inclination sensor is configured to collect the inclination angle of the boom of the tower crane;
[0073] The aforementioned controller;
[0074] a wire rope configured to suspend a target object;
[0075] The hoisting motor is configured to control the movement of the wire rope.
[0076] In an embodiment of the present application, the coordinates of the center of rotation position can be (0,0). During the fixed height and amplitude change process, the controller obtains the arm tip position and the boom inclination angle in real time through the inclination sensor and the arm tip position sensor, and substitutes the obtained arm tip position and boom inclination angle into the constructed height compensation model to calculate the real-time height compensation amount, and issues a control command to the lifting inverter according to the real-time height compensation amount, thereby driving the lifting motor to rotate, driving the wire rope to compensate and control the height of the hoisted target in real time.
[0077] Specifically, the arm tip position sensor can be set at the vertical central axis of the arm tip to obtain the position coordinates of the arm tip in real time. The inclination sensor can be located at the rotation center, for example, to obtain the boom inclination in real time. The arm tip position and the boom inclination are both obtained in real time, and the real-time arm tip position and boom inclination are substituted into the height compensation model. The control of the wire rope for supplementary control is also carried out in real time according to the real-time height compensation amount, which solves the problem of low real-time performance in the existing fixed height and variable amplitude technology.
[0078] The present application also provides a tower crane, which may also include:
[0079] The hook position sensor is configured to collect the hook position of the tower crane.
[0080] In the embodiment of the present application, the controller obtains the corresponding coordinates of the hook position in real time through the hook position sensor, and corrects the real-time height compensation amount according to the change of the hook position.
[0081] Specifically, the hook position sensor is located at the vertical center axis of the hook and is used to obtain the position coordinates of the hook in real time. The hook suspends the target object through a wire rope, and the wire rope has elastic deformation. The change in the hook position can reflect the elastic deformation of the wire rope and correct the real-time height compensation amount. This can solve the problem of low compensation control accuracy during the fixed height change process.
[0082] In the embodiment of the present application, the arm tip position sensor, the hook position sensor, and the rotation center position sensor 205 can be respectively located at the vertical central axis corresponding to the arm tip, the hook, and the rotation center of the tower crane.
[0083] The embodiment of the present application further provides a machine-readable storage medium, on which instructions are stored, and the instructions are used to enable a machine to execute the above-mentioned fixed-height variable amplitude height compensation control method.
[0084] In summary, the embodiments of the present invention can achieve some or all of the following advantages through the above technical solutions:
[0085] (1) A real-time height compensation model is constructed. The position coordinates of the rotation center, the arm tip and the hook and the arm inclination angle are respectively obtained in real time through the rotation center position sensor, the arm tip position sensor, the hook position sensor and the inclination angle sensor. The real-time height compensation model can be accurately constructed by determining the position coordinates of the arm tip and the hook and the change in the arm inclination angle before and after the height change. This solves the problem of numerous model parameters and low application accuracy in the existing technology.
[0086] (2) The slewing center position sensor, arm tip position sensor, hook position sensor and inclination sensor can obtain the position coordinate data and arm inclination data in real time and feed them back to the controller in real time. The controller can perform real-time and accurate height compensation through the real-time height compensation model, thus solving the problem of poor real-time performance in medium-height amplitude change in the existing technology.
[0087] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.
[0088] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0089] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0090] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0091] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0092] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0093] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0094] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0095] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.
Claims
1. A height compensation control method for fixed height variable amplitude, applied to tower crane, characterized in that: include: Acquire the arm tip position and arm inclination angle of the tower crane's lifting arm in real time; A height compensation model is constructed by using a first change in the boom inclination angle before and after the fixed height change, a second change in the wire rope height compensation amount before and after the fixed height change, and a rotation center position; Inputting the arm tip position before and after the fixed height change and the arm inclination angle before and after the fixed height change into the height compensation model to obtain a real-time height compensation amount; The steel wire rope is controlled to perform height compensation according to the real-time height compensation amount.
2. The method according to claim 1, characterized in that The height compensation model is constructed by using the first change of the boom inclination angle before and after the fixed height change, the second change of the wire rope height compensation amount before and after the fixed height change, and the rotation center position, including: Determine a first correspondence between a first distance and the second variation according to the rotation center position, wherein the first distance is a distance between the arm tip position after the fixed height change and the boom projection position before the fixed height change; Determine a second corresponding relationship between the first distance and the first change amount according to the rotation center position and the trigonometric function; The height compensation model is obtained according to the first corresponding relationship and the second corresponding relationship.
3. The method according to claim 2, characterized in that The arm tip position includes a first position of the arm tip in the first direction and a second position of the arm tip in the second direction, the rotation center position includes a third position of the rotation center in the first direction and a fourth position of the rotation center in the second direction, the first direction is perpendicular to the second direction, and the first corresponding relationship is expressed by a first formula, wherein the first formula includes: Wherein, Δh represents the second variation; h represents the first distance; x A represents the first position after the height is fixed and the amplitude is changed; x B represents the first position before the fixed height change; y B represents the second position before the fixed height change; x O represents the third position, y O Indicates the fourth position.
4. The method according to claim 3, characterized in that The second corresponding relationship is expressed by a second formula, wherein the second formula includes: In the formula, L represents the total length of the boom, Δθ represents the change in the boom elevation angle, y A It indicates the second position after the height is fixed and the amplitude is changed.
5. The method according to claim 4, characterized in that The height compensation model is expressed by a third formula, wherein the third formula includes:
6. The method according to claim 1, characterized in that The compensation control method further includes: Acquire the hook position coordinates of the tower crane in real time; Using the hook position coordinates to correct the real-time height compensation amount; The step of controlling the steel wire rope to perform height compensation according to the real-time height compensation amount comprises: The steel wire rope is controlled to perform height compensation according to the corrected real-time height compensation amount.
7. A controller, characterized in that: The method is configured to execute the height compensation control method of fixed height and variable amplitude according to any one of claims 1 to 6.
8. A tower crane, characterized in that: include: A boom tip position sensor is configured to collect the boom tip position of the tower crane; A rotation center position sensor is configured to collect the rotation center position of the tower crane; An inclination sensor is configured to collect an inclination angle of a boom of the tower crane; The controller according to claim 7; a wire rope configured to suspend a target object; The hoisting motor is configured to control the movement of the wire rope.
9. The tower crane according to claim 8, characterized in that: Also includes: The hook position sensor is configured to collect the hook position of the tower crane.
10. A machine-readable storage medium having instructions stored thereon, characterized in that: When the instruction is executed by a processor, the processor is configured to execute the height compensation control method of fixed height and variable amplitude according to any one of claims 1 to 6.
