Deeply-buried anchor cable support pre-tightening force anti-attenuation device and construction method
By designing a pretightening force anti-attenuation device for deep-buried anchor cable support, the jacking cylinder and pressurized oil pipe are used to realize real-time prestress compensation of the anchor cable, which solves the problem of being unable to compensate for the prestress loss in the existing technology and ensures the anchorage design. Engineering safety and construction safety.
Patent Information
- Application Number
- CN202410885051.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing anchor cable cannot be compensated for prestress after it is put into use, resulting in the loss of preload force that cannot be compensated.
Design a deep-buried anchor cable support pretightening force anti-attenuation device, including a shell, a jacking cylinder, a pressure sensor, a first anchor cable anchorage and a second anchor cable anchorage, which is achieved through the jacking cylinder and pressurized oil pipe. Real-time compensation of anchor cables ensures multiple compensations for prestress losses.
It realizes real-time and multiple compensations for the prestress loss of the anchor cable during use, ensuring the safety of the anchor design project and the safety of the construction personnel, avoiding damage to the cast body or shotcrete layer, and the operation is simple and convenient.
Smart Images

Figure CN118727732A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of deep-buried anchor cable support, and in particular to a deep-buried anchor cable support preload force anti-attenuation device and a construction method. Background Art
[0002] In the existing technology of using anchor cables, the prestressing force of the anchor cables will decay over time. The compensation for the loss of prestressing force of the anchor cables can only be done before the anchor cables are put into use. The attenuation loss of the prestressing force of the anchor cables can be compensated by performing secondary tensioning. However, prestressing compensation cannot be performed during the process of the anchor cables being put into use. After the construction of the anchor cables is completed, the anchors and anchor cables are cast in the pile-sheet wall or thick concrete spraying layer, so that the anchor cables cannot be tensioned for a second time during use, resulting in the prestressing force lost during the use of the anchor cables cannot be compensated.
[0003] Before the existing anchor cables are put into use, the main construction process for compensating the prestress loss during the anchor cable tensioning stage includes: first, prestress the anchor cables to reach the design value, and after a period of time after the prestress is applied, when the prestress loss occurs, the anchor cables are clamped by tensioning equipment, and the anchor cables are tensioned again using special anchor cable tensioning equipment, thereby compensating for the prestress loss, and finally the anchor cables are anchored by the anchor, and then the anchor and the anchor cables are cast so that they are located in the pile board wall or thick concrete spraying layer. If the prestress loss occurs again after casting or spraying, the existing anchor cables cannot be tensioned to compensate for the prestress loss. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a deep-buried anchor cable support pre-tightening force anti-attenuation device and a construction method which can still be tensioned after the anchor and the anchor cable are cast.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solution: a deep buried anchor cable support preload force anti-attenuation device, comprising:
[0006] The housing comprises a first fixing portion, a receiving portion connected to the first fixing portion, and a second fixing portion connected to the receiving portion;
[0007] A lifting oil cylinder, which is arranged in the first fixing part and is connected with a pressurized oil pipe;
[0008] A pressure sensor is slidably disposed in the receiving portion and is connected to a pressure indicator gauge and can contact the telescopic end of the jacking cylinder;
[0009] A first anchor cable anchor, slidably disposed in the receiving portion and connected to the pressure sensor;
[0010] A second anchor cable anchor is disposed in the second fixing portion;
[0011] A spring is arranged in the receiving portion and located between the first anchor cable anchor and the second anchor cable anchor.
[0012] Furthermore, the first anchor cable anchor and the second anchor cable anchor have the same structure, both comprising an anchor pad and a fixed block, the anchor pad and the fixed block are provided with clearance holes for the anchor cable to pass through, and the fixed block has a plurality of pressure plates elastically provided on the inner wall of the clearance holes corresponding to the fixing block.
[0013] Furthermore, the first anchor cable anchor and the second anchor cable anchor also include a fixing assembly, which includes a sleeve arranged on the anchor pad, a driving block rotatably arranged on the sleeve, and a threaded tube located in the sleeve and connected to the driving block and threadedly connected to the fixing block. The fixing block and the anchor pad are slidably matched along the direction in which the anchor cable is passed, and the anchor cable is passed through the sleeve, the driving block and the threaded tube.
[0014] Furthermore, the first cable anchor and the second cable anchor also include an anti-slip assembly, which includes a ring slidably mounted on the outside of the sleeve and a limiting member, a side of the ring close to the driving block is provided with a circle of teeth, a side of the driving block close to the ring is provided with a circle of teeth that can be engaged with the teeth, and the limiting member can limit and fix the ring when the driving block is engaged with the ring.
[0015] Furthermore, the limiting member includes a fixed column arranged on the sleeve and two plugs elastically slidably penetrated through the fixed column respectively, the ring is provided with a sliding groove along its own sliding direction and an adjustment block is also elastically slidably provided on the ring along its own sliding direction, the fixed column is slidably matched with the sliding groove, and the two plugs can be inserted into the ring when the ring is engaged with the driving block, and the adjustment block can slide to adjust the plug to withdraw from the ring.
[0016] Furthermore, a plurality of abutment plates are elastically provided on the outer side of the first fixing portion.
[0017] Furthermore, a pipeline compensation component is also arranged in the first fixing portion and the receiving portion, and the pipeline compensation component includes at least three rollers arranged in high and low positions and rotatably set, and the roller located in the middle position can also be elastically lifted and lowered in the vertical direction.
[0018] Furthermore, a plurality of cable management buckles are disposed inside the first fixing portion, the receiving portion, and the second fixing portion.
[0019] Furthermore, a circle of flanges are provided at the connecting positions of the second fixing portion, the receiving portion and the first fixing portion, and the flange length of the second fixing portion is greater than the flange length of the receiving portion.
[0020] A construction method for preventing the preload force of a deep-buried anchor cable support from attenuating, which is applicable to the device for preventing the preload force of a deep-buried anchor cable support from attenuating, comprises the following steps:
[0021] Step 1: Drill holes in the rock wall around the anchor cable;
[0022] Step 2: Place the device shell in the borehole in sequence, install the jacking cylinder, pressure sensor, first anchor cable anchor, positioning spring and second anchor cable anchor in sequence in the shell, the anchor cable passes through the jacking cylinder, pressure sensor, first anchor cable anchor, positioning spring and second anchor cable anchor in sequence, and the second anchor cable anchor is located outside the rock wall, and the pressure indicator and the pressurized oil pipe interface are both located outside the shell;
[0023] Step 3: Grout the inside of the borehole and the outer edge of the shell, and keep the pressure indicator and the pressure oil pipe interface always outside the grouting layer;
[0024] Step 4: Observe the pressure indicator. When the indicator shows prestress loss, inject oil into the lifting cylinder through the pressurized oil pipe interface. The lifting cylinder lifts the first anchor cable and moves it outward, and the first anchor cable drives the anchor cable to stretch.
[0025] The beneficial effects of the present invention are embodied in:
[0026] 1. The whole device is arranged inside the casting structure or the spraying layer, and inside the casting or spraying layer. When the anchor cable loses prestress after casting or spraying, the construction design device can compensate for the prestress loss of the anchor cable in real time and multiple times, thereby solving the problem that the prestress loss cannot be compensated after the anchor cable is put into use in the prior art, ensuring the safety of the anchor cable anchoring design project, and enabling the anchor cable to be lifted multiple times and in real time to compensate for the prestress loss according to the specific prestress loss situation during the process of being put into use;
[0027] 2. The lifting cylinder is pressurized and filled with oil through the exposed pressurized oil pipe, so that the first anchor cable anchor moves outward under pressure, so that the first anchor cable anchor drives the anchor cable to stretch, and the prestress loss of the anchor cable is compensated, ensuring the safety of the construction personnel. The anchor cable itself is also in a safe state, and the cast body or shotcrete layer is not damaged. The oil filling and pressurization can be repeated many times, which is very simple and convenient to operate, and can compensate for the prestress loss of the anchor cable, ensuring the safety of the reinforcement design project;
[0028] 3. A pressure indicator is arranged between the first anchor cable anchor and the lifting cylinder, which can observe the anchor cable prestress compensation in real time, so that the numerical value of the prestress compensation can be accurately compensated, and the problem of accurate control of the prestress compensation is solved. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a side sectional view of the structure of the deep-buried anchor cable support pre-tightening force anti-attenuation device of the present invention;
[0030] Figure 2 The present invention Figure 1 A magnified view of part A;
[0031] Figure 3 The present invention Figure 1 A magnified view of part B;
[0032] Figure 4 The present invention Figure 3 A top view of the C section structure.
[0033] The components in the accompanying drawings are marked as follows: 1. housing; 101. first fixing part; 102. receiving part; 103. second fixing part; 104. abutment plate; 105. flange; 2. lifting cylinder; 201. pressurized oil pipe; 3. pressure sensor; 301. pressure indicator; 4. first anchor cable anchor; 401. anchor pad; 4011. clearance hole; 402. fixing block; 403. pressing plate; 404. fixing assembly; 4041. sleeve; 4042. driving block;
[0034] 4043, threaded pipe; 405, anti-slip assembly; 4051, collar; 4052, tooth groove; 4053, tooth; 4054, fixing column; 4055, plug; 4056, adjustment block; 4057, slide groove; 5, second anchor cable anchor; 6, spring; 7, roller; 8, cable tie buckle. DETAILED DESCRIPTION
[0035] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0036] See also Figure 1 .
[0037] The deep-buried anchor cable support preload force anti-attenuation device of the present invention comprises:
[0038] The housing 1 comprises a first fixing portion 101, a receiving portion 102 connected to the first fixing portion 101, and a second fixing portion 103 connected to the receiving portion 102;
[0039] A lifting cylinder 2, which is disposed in the first fixing portion 101 and is connected to a pressurized oil pipe 201;
[0040] A pressure sensor 3 is slidably disposed in the receiving portion 102 and is connected to a pressure indicator 301 and can be in contact with the telescopic end of the jacking cylinder 2;
[0041] A first anchor cable anchor 4, slidably disposed in the receiving portion 102 and connected to the pressure sensor 3;
[0042] A second anchor cable anchor 5, arranged in the second fixing portion 103;
[0043] The spring 6 is arranged in the receiving portion 102 and is located between the first anchor cable anchor 4 and the second anchor cable anchor 5. In this embodiment, the second anchor cable anchor 5 is an anchor cable anchor required for tensioning during normal construction, and the first anchor cable anchor 4 is an anchor cable anchor used for prestress compensation. The spring 6 is wound around the anchor cable to reserve a moving space for the anchor cable during the subsequent prestress compensation.
[0044] In one embodiment, see Figure 3 The first anchor cable anchor 4 and the second anchor cable anchor 5 have the same structure, both of which include an anchor pad 401 and a fixing block 402. The anchor pad 401 and the fixing block 402 are provided with a clearance hole 4011 for the anchor cable to pass through, and the fixing block 402 is elastically provided with a plurality of pressing plates 403 on the inner wall corresponding to the clearance hole 4011. In this design, the elastic setting of the pressing plate 403 can make the connection between the reinforcement anchor cable and the anchor pad 401 tighter.
[0045] In one embodiment, see Figure 3The first anchor cable anchor 4 and the second anchor cable anchor 5 further include a fixing assembly 404, the fixing assembly 404 includes a sleeve 4041 disposed on the anchor pad 401, a driving block 4042 rotatably disposed on the sleeve 4041, and a threaded tube 4043 located in the sleeve 4041 and connected to the driving block 4042 and threadedly connected to the fixing block 402. The fixing block 402 and the anchor pad 401 slide in cooperation along the direction of the anchor cable passing through, and the anchor cable passes through the sleeve 4041, the driving block 4042 and the threaded tube 4043. With this design, when the anchor cable is fixed to the anchor pad 401, the threaded tube 4043 can be driven to rotate by rotating the driving block 4042. The threaded tube 4043 is threadedly connected to the fixing block 402, but the fixing block 402 cannot rotate, so the fixing block 402 can only slide on the anchor pad 401 to achieve a close fit with the anchor cable.
[0046] In one embodiment, see Figure 3 and Figure 4 The first anchor cable anchor 4 and the second anchor cable anchor 5 also include an anti-slip assembly 405, the anti-slip assembly 405 includes a ring 4051 slidably sleeved on the outside of the sleeve 4041 and a stopper, the ring 4051 is provided with a circle of tooth grooves 4052 on one side close to the driving block 4042, the driving block 4042 is provided with a circle of teeth 4053 that can be engaged with the tooth grooves 4052 on one side close to the ring 4051, and the stopper can limit and fix the ring 4051 when the driving block 4042 is engaged with the ring 4051. With this design, the engagement of the teeth 4053 with the tooth grooves 4052 can effectively prevent the driving block 4042 from rotating automatically over time, causing the fixing block 402 to loosen, thereby ensuring the tightness of the connection between the anchor cable and the anchor.
[0047] In one embodiment, see Figure 4 The stopper comprises a fixed column 4054 provided on the sleeve 4041 and two plugs 4055 elastically slidably penetrated on the fixed column 4054, the collar 4051 is provided with a slide groove 4057 along its own sliding direction, and an adjustment block 4056 elastically slides along its own sliding direction on the collar 4051, the fixed column 4054 is slidably matched with the slide groove 4057, and the two plugs 4055 can be inserted into the collar 4051 when the collar 4051 is engaged with the driving block 4042, and the adjustment block 4056 can slide and adjust the plugs 4055 to exit the collar 4051. With this design, by fixing the fixed block 402 and the plugs 4055 in different directions, the fixing effect is good and the situation of one falling off and the whole falling off will not occur.
[0048] In one embodiment, see Figure 1 The outer side of the first fixing part 101 is also elastically provided with a plurality of abutment plates 104. With this design, the first fixing part 101 can be first fixed by the tension of the abutment plates 104 after drilling a hole in the rock wall, which facilitates the subsequent installation of other components.
[0049] In one embodiment, see Figure 1 and Figure 2 The first fixing part 101 and the receiving part 102 are also provided with a pipeline compensation component, which includes at least three rollers 7 arranged in high and low positions and rotatably arranged, and the roller 7 located in the middle position can also be elastically lifted and lowered in the vertical direction. With this design, the length of the pipeline is compensated through elastic lifting, and the pressure sensor 3 and the lifting cylinder 2 are prevented from being damaged by pulling the pipeline during use.
[0050] In one embodiment, see Figure 1 The first fixing portion 101, the receiving portion 102 and the second fixing portion 103 are also provided with a plurality of cable management buckles 8. This design facilitates the arrangement of the pipes of the pressure sensor 3 and the lifting cylinder 2.
[0051] In one embodiment, see Figure 1 A flange 105 is provided at the connection position of the second fixing part 103, the receiving part 102 and the first fixing part 101, and the flange 105 of the second fixing part 103 is longer than the flange 105 of the receiving part 102. This design facilitates the connection between the various parts, and the flange 105 of the second fixing part 103 is convenient for fixing it outside the rock wall.
[0052] A construction method for preventing the preload force of a deep-buried anchor cable support from attenuating, which is applicable to the device for preventing the preload force of a deep-buried anchor cable support from attenuating, comprises the following steps:
[0053] Step 1: Drill holes in the rock wall around the anchor cable;
[0054] Step 2: Place the device shell 1 in the borehole in sequence, install the jacking cylinder 2, the pressure sensor 3, the first anchor cable anchor 4, the positioning spring 6 and the second anchor cable anchor 5 in sequence in the shell 1, the anchor cable passes through the jacking cylinder 2, the pressure sensor 3, the first anchor cable anchor 4, the positioning spring 6 and the second anchor cable anchor 5 in sequence, and the second anchor cable anchor 5 is located outside the rock wall, and the pressure indicator 301 and the interface of the pressurized oil pipe 201 are both located outside the shell 1;
[0055] Step 3: Grouting is performed inside the borehole and on the outer edge of the housing 1, and the pressure indicator 301 and the interface of the pressurized oil pipe 201 are always located outside the grouting layer;
[0056] Step 4: Observe the indication of the pressure indicator 301. When the indication shows prestress loss, inject oil into the interface of the pressurized oil pipe 201 to the lifting cylinder 2. The lifting cylinder 2 lifts the first anchor cable anchor 4 and moves it outward. The first anchor cable anchor 4 drives the anchor cable to stretch.
[0057] In summary, the beneficial effects of the present invention are embodied in:
[0058] 1. The whole device is arranged inside the casting structure or the spraying layer, and inside the casting or spraying layer. When the anchor cable loses prestress after casting or spraying, the construction design device can compensate for the prestress loss of the anchor cable in real time and multiple times, thereby solving the problem that the prestress loss cannot be compensated after the anchor cable is put into use in the prior art, ensuring the safety of the anchor cable anchoring design project, and enabling the anchor cable to be lifted multiple times and in real time to compensate for the prestress loss according to the specific prestress loss situation during the process of being put into use;
[0059] 2. The jacking oil cylinder 2 is pressurized and filled with oil through the exposed pressurized oil pipe 201, so that the first anchor cable anchor 4 is pressed and moved outward, so that the first anchor cable anchor 4 drives the anchor cable to stretch, and the prestress loss of the anchor cable is compensated, which ensures the safety of the construction personnel, and the anchor cable itself is also in a safe state, and the cast body or the shotcrete layer is not damaged. The oil filling and pressurization can be repeated many times, and the operation is very simple and convenient, which can compensate for the prestress loss of the anchor cable and ensure the safety of the reinforcement design project;
[0060] 3. A pressure indicator 301 is arranged between the first anchor cable anchor 4 and the lifting cylinder 2, which can observe the anchor cable prestress compensation in real time, so that the numerical value of the prestress compensation can be accurately compensated, and the problem of accurate control of the prestress compensation is solved.
[0061] It should be understood that the examples and implementation modes described herein are for illustrative purposes only and are not intended to limit the present invention. Those skilled in the art may make various modifications or changes based on the examples and implementation modes. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
[0062] It should be noted that if the embodiments of the present invention involve directional indications such as up, down, left, right, front, back, etc., then the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture as shown in the accompanying drawings. If the specific posture changes, the directional indication will also change accordingly.
[0063] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or schemes that A and B meet at the same time. In addition, "multiple" refers to more than two. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in this field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
Claims
1. A device for preventing the preload force of a deep-buried anchor cable from attenuating, characterized in that: include: A housing (1) comprises a first fixing portion (101), a receiving portion (102) connected to the first fixing portion (101), and a second fixing portion (103) connected to the receiving portion (102); A lifting oil cylinder (2) is arranged in the first fixing part (101) and is connected to a pressurized oil pipe (201); A pressure sensor (3) is slidably disposed in the receiving portion (102), is connected to a pressure indicator (301), and can be in contact with the telescopic end of the lifting cylinder (2); A first anchor cable anchor (4) is slidably disposed in the receiving portion (102) and is connected to the pressure sensor (3); A second anchor cable anchor (5) is arranged in the second fixing portion (103); A spring (6) is arranged in the receiving portion (102) and is located between the first anchor cable anchor (4) and the second anchor cable anchor (5).
2. The deep-buried anchor cable support preload force anti-attenuation device according to claim 1 is characterized in that: The first anchor cable anchor (4) and the second anchor cable anchor (5) have the same structure, both comprising an anchor pad (401) and a fixing block (402), the anchor pad (401) and the fixing block (402) being provided with a clearance hole (4011) for the anchor cable to pass through, and the fixing block (402) being elastically provided with a plurality of pressure plates (403) on the inner wall corresponding to the clearance hole (4011).
3. The deep-buried anchor cable support preload force anti-attenuation device according to claim 2 is characterized in that: The first cable anchor (4) and the second cable anchor (5) further include a fixing assembly (404), the fixing assembly (404) including a sleeve (4041) arranged on the anchor pad (401), a driving block (4042) rotatably arranged on the sleeve (4041), and a threaded tube (4043) located in the sleeve (4041) and connected to the driving block (4042) and threadedly connected to the fixing block (402), the fixing block (402) and the anchor pad (401) slidingly cooperate along the direction of anchor cable insertion, and the anchor cable is inserted into the sleeve (4041), the driving block (4042) and the threaded tube (4043).
4. The deep-buried anchor cable support preload force anti-attenuation device according to claim 3 is characterized in that: The first cable anchor (4) and the second cable anchor (5) further include an anti-slip assembly (405), the anti-slip assembly (405) including a ring (4051) slidably mounted on the outside of the sleeve (4041) and a limiting member, the ring (4051) having a circle of tooth grooves (4052) on a side close to the driving block (4042), the driving block (4042) having a circle of teeth (4053) that can be snap-fitted with the tooth grooves (4052) on a side close to the ring (4051), and the limiting member can limit and fix the ring (4051) when the driving block (4042) is snap-fitted with the ring (4051).
5. The deep-buried anchor cable support preload force anti-attenuation device according to claim 4 is characterized in that: The limiting member comprises a fixing post (4054) arranged on the sleeve (4041) and two plugs (4055) elastically slidably penetrated through the fixing post (4054), the collar (4051) is provided with a sliding groove (4057) along its own sliding direction, and the collar (4051) is also provided with an adjusting block (4056) elastically slidably along its own sliding direction, the fixing post (4054) is slidably matched with the sliding groove (4057), and the two plugs (4055) can be inserted into the collar (4051) when the collar (4051) and the driving block (4042) are snap-fitted, and the adjusting block (4056) can slide and adjust the plug (4055) to withdraw from the collar (4051).
6. The deep-buried anchor cable support preload force anti-attenuation device according to claim 1 is characterized in that: A plurality of abutment plates (104) are elastically provided on the outer side of the first fixing portion (101).
7. The deep-buried anchor cable support preload force anti-attenuation device according to claim 1 is characterized in that: A pipeline compensation component is also arranged in the first fixing portion (101) and the receiving portion (102), and the pipeline compensation component comprises at least three rollers (7) arranged in high and low positions and rotatably disposed, and the roller (7) located in the middle position can also be elastically lifted and lowered in the vertical direction.
8. The deep-buried anchor cable support preload force anti-attenuation device according to claim 1 is characterized in that: A plurality of cable management buckles (8) are also arranged inside the first fixing portion (101), the receiving portion (102) and the second fixing portion (103).
9. The deep-buried anchor cable support preload force anti-attenuation device according to claim 1, characterized in that: A circle of flange (105) is provided at the connection position of the second fixing part (103), the receiving part (102) and the first fixing part (101), and the length of the flange (105) of the second fixing part (103) is greater than the length of the flange (105) of the receiving part (102).
10. A construction method for preventing the preload force of a deep-buried anchor cable support from attenuating, applicable to the device for preventing the preload force of a deep-buried anchor cable support from attenuating as claimed in any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1: Drill holes in the rock wall around the anchor cable; Step 2: placing the device housing (1) in the borehole in sequence, installing the lifting cylinder (2), the pressure sensor (3), the first anchor cable anchor (4), the positioning spring (6) and the second anchor cable anchor (5) in sequence in the housing (1), the anchor cable passing through the lifting cylinder (2), the pressure sensor (3), the first anchor cable anchor (4), the positioning spring (6) and the second anchor cable anchor (5) in sequence, and the second anchor cable anchor (5) is located outside the rock wall, and the pressure indicator (301) and the interface of the pressurized oil pipe (201) are both located outside the housing (1); Step 3: Grouting is performed inside the borehole and on the outer edge of the shell (1), and the interface of the pressure indicator (301) and the pressure oil pipe (201) are always located outside the grouting layer; Step 4: Observe the indication of the pressure indicator (301). When the indication shows that the prestress is lost, inject oil into the lifting cylinder (2) through the interface of the pressurized oil pipe (201). The lifting cylinder (2) lifts the first anchor cable anchor (4) and moves it outward. The first anchor cable anchor (4) drives the anchor cable to stretch.