Piling device with loose joint mechanism and piling construction method

By designing a movable connection mechanism in the piling equipment and utilizing the hinged structure of the movable arm, the piling pipe and the pile body, the problem in the existing technology that the connecting mechanism is complex and cannot be automatically separated is solved, and the pile body and piling pipe can be easily hoisted and installed. Automatic separation improves piling efficiency.

CN118727735APending Publication Date: 2024-10-01SHENZHEN JULIAN BOLT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410878363.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-04-28
Filing Date
2024-06-28
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The connecting mechanism of existing piling equipment is complex in design and cannot be automatically separated, which causes inconvenience in use and affects piling efficiency.

Method used

A piling device with a flexible joint mechanism is designed, including a pile body, a piling pipe and a movable arm. The movable arm can be hinged with the piling pipe and automatically separate after the top of the pile body comes into contact, realizing the automatic movement of the pile body and piling pipe. Connection and separation.

Benefits of technology

Through the combined structure of the support arm and the movable arm, the pile body and the piling pipe can be easily hoisted and automatically separated, which improves the piling efficiency and simplifies the operation process of the piling equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727735A_ABST
    Figure CN118727735A_ABST
Patent Text Reader

Abstract

The piling device with the loose joint mechanism comprises a pile body with a top and a side wall, and the side wall is provided with a connecting part; the piling pipe and the pile body are coaxially arranged, and the piling pipe is used for hoisting or transmitting force to the pile body; the movable arm is used for detachably connecting the pile body and the pile driving pipe, one end of the movable arm is hinged to the pile driving pipe, the other end of the movable arm is a free end, and the free end is used for being connected with the connecting part of the pile body; when the piling pipe and the movable arm move downwards relative to the pile body, the upper portion of the pile body abuts against the movable arm, so that the free end of the movable arm is completely separated from the connecting part of the pile body. The piling machine has the advantages that the movable connecting mechanism is arranged between the piling pipe and the pile body, the pile body and the piling pipe which are connected together can be integrally hoisted by the piling machine before piling, the movable connecting mechanism can be automatically separated during piling, and the piling pipe is used for piling the pile body, so that the piling efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of civil engineering, and in particular to a movable joint mechanism of a piling device and a piling construction method. Background Art

[0002] In the process of civil engineering construction and general structural construction, in order to further increase the firmness of the foundation or improve the stability of the structure, it is necessary to drive piles into the ground. Pile driving equipment is an important facility for driving piles into the ground. Before piling, the pile driving equipment must be equipped with a connecting mechanism between the pile body and the pile driving pipe so that the two can be hoisted as a whole and the piling point can be positioned and installed. During piling, the connecting mechanism between the pile driving pipe and the pile body must be easily disengaged so as to carry out the piling operation. However, the connecting mechanism of the piling equipment in the prior art is complex in design and cannot be automatically separated. Therefore, it is necessary to improve the connecting mechanism of the piling equipment. Summary of the invention

[0003] In order to solve the above technical problems, the present invention provides a piling device with a flexible connection mechanism to solve the problems of the connection mechanism between the pile body and the piling pipe of the existing piling equipment being complex in structure, inconvenient to use and unable to be automatically separated.

[0004] The technical solution of the present invention is achieved in this way:

[0005] The invention discloses a piling device with a movable joint mechanism, comprising: a pile body, which has a top and a side wall, wherein the side wall is provided with a connecting portion; a piling pipe, which is coaxially arranged with the pile body and is used for hoisting or transmitting force to the pile body; a movable arm, which is used for detachable connection between the pile body and the piling pipe, wherein one end of the movable arm is hinged to the piling pipe, and the other end is a free end, which is used for connecting with the connecting portion of the pile body; when the piling pipe and the movable arm move downward relative to the pile body, the upper part of the pile body presses against the movable arm, so that the free end of the movable arm is disengaged from the connecting portion of the pile body.

[0006] Preferably, a support arm is provided between the piling pipe and the movable arm, one end of the support arm is fixedly connected to the side of the piling pipe, and the other end of the support arm extends outward and is hinged to the movable arm.

[0007] Preferably, there are two support arms, which are arranged on two sides of the piling pipe opposite to each other and are perpendicular to the axis of the piling pipe.

[0008] Preferably, the connecting portion of the pile body is a support, which includes: a load-bearing cross bar fixedly connected to the side wall of the pile body; or a load-bearing cross bar fixedly connected to the side wall of the pile body, and the distal end of the load-bearing cross bar also has a downwardly bent limiting vertical bar.

[0009] Preferably, the movable arm is a frame-shaped hanger, which includes: a hook bolt, which is used to be hinged with the support arm; two hook rods, which are arranged parallel to each other in its plane, and one end of the two hook rods are respectively connected to the two ends of the hook bolt; a hook head, which is used to connect the support and is in a U shape, and the two ends of the U shape are respectively connected to the other ends of the two hook rods.

[0010] Preferably, the distance from the side of the piling pipe to the hinge axis of the support arm and the hook bolt of the frame-shaped hanger is a, the distance from the side of the piling pipe to the inner side of the limiting vertical rod is b, and b>a.

[0011] Preferably, the length of the limit vertical rod of the hanging is d, the distance between the hinge axis of the support arm and the hook bolt of the frame-shaped hanger and the top of the pile body is H2, and d <H2。

[0012] Preferably, the distance between the hinge axis of the support arm and the hook bolt of the frame-shaped hanger and the top of the pile body is H2, the distance from the bottom end of the piling pipe to the bottom of the center hole of the pile body is H1, and H2>H1.

[0013] Preferably, the movable arm is a hook, which includes: a short rod for being hinged to the support arm; a curved hook for being connected to the supporting part of the pile body; and a long rod, one end of which is connected to the end of the short rod and the other end is connected to the curved hook.

[0014] Preferably, the connecting portion of the pile body is an opening, and there are two openings which are arranged oppositely on the side walls of the pile body.

[0015] Preferably, the movable arm is a frame-shaped hook, comprising: a rotating shaft for being hinged with the support arm; two connecting rods, which are arranged parallel to each other in its plane, and one end of the two connecting rods are respectively connected to the two ends of the rotating shaft; a T-shaped hook, whose two ends are respectively connected to the other ends of the two connecting rods, for cooperating with the opening of the pile body.

[0016] Preferably, the T-hook comprises: two annular connecting blocks, the outer circle of each annular connecting block is connected to the connecting rod, the inner circles of the two annular connecting blocks are respectively connected to the two ends of the support rod, and a tail hook is connected to the middle of the support rod perpendicular to the axis of the support rod, and the tail hook forms an angle less than or equal to 90 degrees with the plane where the frame-shaped hook is located.

[0017] Preferably, it further comprises a steel cage, the lower end of which is fixedly connected to the pile body, and the upper end of which is inserted into the piling pipe from the lower end of the piling pipe.

[0018] Preferably, the connection portion between the movable arm and the pile body constitutes a connection assembly, which is used to connect the pile driving pipe and the pile body together to facilitate the lifting of the pile body.

[0019] A piling construction method, using the above-mentioned piling device with a movable joint mechanism, comprises the following steps:

[0020] Step 1, connect the free end of the movable arm to the connecting portion on the side wall of the pile body, so that the piling pipe and the pile body are fixedly connected together;

[0021] Step 2: Hoisting: connect the upper end of the piling pipe to the piling machine. Under the hoisting of the piling machine, the piling pipe and the pile body fixedly connected together are moved to the top of the piling hole;

[0022] Step 3, separation of the piling pipe and the pile body. The pile driver moves the piling pipe and the pile body that are fixedly connected together downward to make the pile body reach the piling point on the ground. The piling pipe moves toward the pile body relative to the pile body, and the movable arm is pushed against by the pile body to rotate around the hinge point with the piling pipe. The free end of the movable arm moves downward and outward relative to the connecting part of the pile body and disengages from the connecting part of the pile body.

[0023] The piling device with a movable joint mechanism and the piling construction method of the present invention have the following beneficial technical effects:

[0024] The piling device with a movable joint mechanism of the present invention adopts a movable connection assembly composed of a support arm, a movable arm and a connecting part on the outer wall of the pile body, so as to connect the pile body and the piling pipe into a whole, so as to facilitate lifting. Before the pile driver starts piling, the pile driver can lift the pile body by hanging it on the piling pipe, so as to position and install the piling hole of the pile body. When piling is being carried out, the movable connection mechanism of the pile body and the piling pipe can be automatically separated, thereby improving the piling efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0026] Figure 1 It is one of the structural schematic diagrams of the pile driving device with a movable joint mechanism of the present invention;

[0027] Figure 2 This is the second structural schematic diagram of the piling device with a movable joint mechanism of the present invention;

[0028] Figure 3 It is the third structural schematic diagram of the piling device with a movable joint mechanism of the present invention;

[0029] Figure 4 It is a partial structural schematic diagram of embodiment 1 of the present invention;

[0030] Figure 51 is a diagram showing a disengaged state of the pile body 1 and the piling pipe 2 according to Embodiment 1 of the present invention;

[0031] Figure 6 It is a schematic diagram of the structure of the pile body and the support in Example 1 of the present invention;

[0032] Figure 7 is a schematic diagram of the structure of a frame-shaped hanger and a support arm according to Embodiment 1 of the present invention;

[0033] Figure 8 is a schematic structural diagram of a frame-shaped hanger according to Embodiment 1 of the present invention;

[0034] Fig. 9 is a schematic structural diagram of a movable arm of Embodiment 2 of the present invention as a hook;

[0035] Fig.10 A schematic structural diagram of Embodiment 3 of the present invention;

[0036] Fig.11 is a schematic structural diagram of a frame-shaped hook according to Embodiment 3 of the present invention;

[0037] Fig.12 is a partial structural schematic diagram of a pile body according to Embodiment 3 of the present invention;

[0038] Fig.13 is a schematic structural diagram of a piling device according to Embodiment 4 of the present invention;

[0039] Fig.14 is a schematic structural diagram of a piling device according to Embodiment 5 of the present invention;

[0040] Fig.15 Schematic diagram of the connection state between the piling pipe and the pile body of the piling device structure of Example 7 of the present invention;

[0041] Fig.16 Schematic diagram of the piling device of Embodiment 7 of the present invention in the state of being hoisted by a pile driver;

[0042] Fig.17 Schematic diagram of the pile driving device of embodiment 7 of the present invention above the pile point;

[0043] Fig.18 is a schematic diagram of a pile driving device according to Embodiment 7 of the present invention when the pile driving device is driven into a pile hole;

[0044] Fig.19 Schematic diagram of the pile driving pipe and pile body of the pile driving device of embodiment 7 of the present invention in a separated state;

[0045] Fig. 20 It is a schematic diagram of the pile body of the pile driving device according to embodiment 7 of the present invention being located in the pile hole.

[0046] Reference numerals:

[0047] Pile body 1 Middle hole 11 Connection part 12

[0048] Hanging 121 Load-bearing cross bar 121a Limiting vertical bar 121b

[0049] Opening 122 Pile shoe 13 Bearing surface 14

[0050] Piling pipe 2 Connector 21 Adaptation surface 22

[0051] Movable arm 3 Frame hanger 31 Hook bolt 311

[0052] Hook rod 312 Hook head 313 Hook 32

[0053] Short rod 321 Hook 322 Long rod 323

[0054] Stop bar 324 Frame hook 33 Rotating shaft 331

[0055] Connecting rod 332 T-shaped hook 333 Ring-shaped connecting block 333a

[0056] Support rod 333b tail hook 333c support arm 4

[0057] Steel cage 5 Pile hole 6 Active connection assembly 100 DETAILED DESCRIPTION

[0058] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] See also Figure 1 and Figure 2 The piling device with a movable joint mechanism of the present invention comprises: a pile body 1, a piling pipe 2 and a movable arm 3. The pile body 1 comprises: a middle hole 11 arranged along the axis of the pile body 1 and a connecting portion 12 arranged on the upper part of the side wall of the pile body 1, the upper end of the middle hole 11 is an open structure, and the bottom of the middle hole 11 is a bearing surface 14, which is used to bear the piling force of the piling pipe 2 and transmit it to the pile body 1, and a pile shoe 13 is also arranged at the lower end of the pile body 1, and the large end of the pile shoe 13 is fixed to the lower end of the pile body 1.

[0060] The piling pipe 2 is a tubular structure. The lower part of the piling pipe 2 can be inserted into the middle hole 11 of the pile body 1. The bottom end of the piling pipe 2 is an adapting surface 22. When piling, the adapting surface 22 of the piling pipe 2 abuts against the bearing surface 14 at the bottom of the middle hole 11 of the pile body 1. The upper part of the piling pipe 2 is located above the middle hole 11 of the pile body 1. The upper end of the piling pipe 2 is provided with a connector 21, which is used for fixed connection between the piling pipe 2 and an external pile driver. A support arm 4 is provided extending outward from the middle part of the piling pipe 2. There are two support arms 4, which are relatively arranged on both sides of the piling pipe 2. The two support arms 4 are located on the same horizontal line, and the axes of the two support arms 4 are perpendicular to the central axis of the piling pipe 2.

[0061] The movable arm 3 is used for detachable connection between the pile body 1 and the piling pipe 2. One end of the movable arm 3 is hinged to the supporting arm 4. When the supporting arm 4 is not provided, one end of the movable arm 3 can also be directly hinged to the piling pipe 2. Preferably, one end of the movable arm 3 is hinged to the supporting arm 4, and the other end of the movable arm 3 is a free end, which is detachably connected to the connecting portion 12 on the side wall of the pile body 1.

[0062] like Figure 2 As shown, the support arm 4 arranged on the piling pipe 2, the connecting part 12 arranged on the side wall of the pile body 1, the support arm 4 and the movable arm 3 constitute a movable connection assembly 100. The movable connection assembly 100 is divided into two groups and is symmetrically arranged with the piling pipe 2 as the axis. The movable connection assembly 100 is used to connect the piling pipe 2 and the pile body 1 together for easy lifting. After the lifting is completed, the movable connection assembly 100 can be disengaged, and the piling pipe 2 can perform piling operations on the pile body 1.

[0063] like Figure 1 As shown, during the hoisting, one end of the matching surface 22 of the piling pipe 2 is inserted from the upper end opening of the middle hole 11 of the pile body 1, and the pile body 1 and the piling pipe 2 are connected together through the movable connection assembly 100. The upper end of the piling pipe 2 is connected to the pile driver (not shown) through the connecting head 21, that is, the pile driver clamps the connecting head 21 of the piling pipe 2 and hoists the piling pipe 2 and the pile body 1 upward, so that the pile shoe 13 of the pile body 1 is downward and aligned with the piling point position in the vertical direction, as shown in FIG. Figure 3 As shown in FIG. 1 , the distance between the adapting surface 22 at the bottom of the pile pipe 2 and the bearing surface 14 at the bottom of the middle hole 11 of the pile body 1 is H1. Figure 2As shown, the pile driver moves the pile pipe 2 downward, and when the adapting surface 22 at the bottom of the pile pipe 2 abuts against the bearing surface 14 at the bottom of the middle hole 11 of the pile body 1, the support arm 4 on the side wall of the pile pipe 2 is synchronously brought close to the top of the pile body 1, and the top edge of the pile body 1 abuts against the middle position of the lower side of the support arm 4, driving the free end of the movable arm 3 to move downward and outward relative to the connecting portion 12 of the pile body 1, so that the free end of the movable arm 3 is completely separated from the connecting portion 12 on the side wall of the pile body 1, that is, the free end of the movable arm 3 in the movable connection assembly 100 is automatically disengaged from the connecting portion 12 on the side wall of the pile body 1, and the lifting of the pile body 1 is completed. After the lifting of the pile body 1 is completed, when the pile pipe 2 moves relatively in the middle hole 11 of the pile body 1, it is no longer restricted by the movable connection assembly 100, so as to facilitate the pile driving operation of the pile pipe 2 on the pile body 1.

[0064] like Figure 3 As shown, there are two support arms 4, which are arranged on both sides of the pile driving pipe 2. Specifically, the two support arms 4 are arranged on the two side walls of the pile driving pipe 2, one end of the support arm 4 is fixedly connected to the side wall of the pile driving pipe 2, and the other end of the support arm 4 is hinged to the movable arm 3. The distance between the hinge connecting the support arm 4 and the movable arm 3 and the side wall of the pile driving pipe 2 is a, and the distance between the distal end of the connecting portion 12 on the upper part of the outer wall of the pile body 1 and the side wall of the pile body 1 is b, and b>a, and the size of b is larger than the size of a. When piling, the upper edge of the pile body 1 can push the movable arm 3 and the free end of the movable arm 3 to the outside of the pile body 1. The distance from the lower end of the support arm 4 to the upper end surface of the pile body 1 is H2, and the distance from the bottom end surface of the pile driving pipe 2 to the bottom of the middle hole 11 of the pile body 1 is H1, and H2>H1. The adapting surface 22 at the bottom of the piling pipe 2 can abut against the bearing surface 14 at the bottom of the middle hole 11 of the pile body 1 , so that the free end of the movable arm 3 is completely separated from the connecting portion 12 on the side wall of the pile body 1 .

[0065] Figure 1 to Figure 6The first embodiment of the piling device with a movable connection mechanism of the present invention is illustrated. The piling device with a movable connection mechanism comprises: a pile body 1, a piling pipe 2 and a movable arm 3. The pile body 1 comprises: a middle hole 11 arranged along the axis of the pile body 1 and a connecting portion 12 arranged on the upper part of the side wall of the pile body 1, the upper end of the middle hole 11 is an open structure, the bottom of the middle hole 11 is a bearing surface 14, the bearing surface 14 is used to bear the piling force of the piling pipe 2 and transmit it to the pile body 1, and a pile shoe 13 is also arranged at the lower end of the pile body 1, and the large end of the pile shoe 13 is fixed to the lower end of the pile body 1. The piling pipe 2 is a tubular structure. The lower part of the piling pipe 2 is located in the middle hole 11 of the pile body 1. The bottom of the piling pipe 2 is an adapting surface 22. When piling, the adapting surface 22 abuts against the bearing surface 14 at the bottom of the middle hole 11 of the pile body 1. The upper part of the piling pipe 2 is located outside the middle hole 11 of the pile body 1. The upper end of the piling pipe 2 is provided with a connector 21. The connector 21 is used for the fixed connection between the piling pipe 2 and an external pile driver. A support arm 4 is provided extending outward from the middle of the piling pipe 2. There are two support arms 4, which are relatively arranged on both sides of the piling pipe 2. The two support arms 4 are located on the same axis, and the axes of the two support arms 4 are perpendicular to the central axis of the piling pipe 2. The movable arm 3 is used for the detachable connection between the pile body 1 and the piling pipe 2. One end of the movable arm 3 is hinged with the support arm 4, and the other end of the movable arm 3 is a free end, which is connected to the connecting portion 12 on the side wall of the pile body 1.

[0066] The connecting portion 12 of the pile body 1 is a hanging 121, which includes a load-bearing cross bar 121a, which extends outward from the upper part of the side wall of the pile body 1 and is arranged parallel to the support arm 4. Preferably, a limiting vertical bar 121b is bent downward at the distal end of the load-bearing cross bar 121a, and the limiting vertical bar 121b is connected to the distal end of the load-bearing cross bar 121a, extends downward and is basically parallel to the axis of the pile body 1, and the limiting vertical bar 121b is used to prevent the free end of the movable arm 3 from slipping off the load-bearing cross bar 121a.

[0067] In this embodiment, Figure 7 and Figure 8As shown, the movable arm 3 uses a frame-shaped hanger 31, which includes: two hook rods 312, a hook bolt 311 and a hook head 313. In the plane of the frame-shaped hanger 31, the two hook rods 312 are parallel to each other; the two ends of the hook bolt 311 are respectively connected to the opposite ends of the two hook rods 312, and the hook bolt 311 is inserted into the hole of the support arm 4, so that the frame-shaped hanger 31 can rotate relative to the support arm 4; the hook head 313 is a U-shaped hook 313a, and the two ends of the U-shaped hook 313a are respectively connected to the opposite ends of the two hook rods 312, and the U-shaped part of the U-shaped hook 313a protrudes outward. The function of the U-shaped hook 313a is to connect the frame-shaped hanger 31 with the bearing 121 on the side wall of the pile body 1. The two hook rods 312 , the hook bolt 311 and the hook head 313 are sequentially connected to form a frame structure, which is conducive to the frame-shaped hanger 31 being firmly hung on the bearing 121 on the side wall of the pile body 1 , and has good safety.

[0068] Fig. 9 The second embodiment of the piling device with a movable joint mechanism of the present invention is shown. Fig. 9 The main difference between the piling device of the second embodiment and the piling device of the first embodiment is that the movable arm 3 adopts a hook 32, which includes a short rod 321, a curved hook 322 and a long rod 323, wherein the short rod 321 is used to be hinged with the support arm 4 so that the hook 32 can rotate relative to the support arm 4; the curved hook 322 is hook-shaped and is used to connect with the bearing 121 on the side wall of the pile body 1; the long rod 323, one end of which is connected to the end of the short rod 321 and the other end of which is connected to the end of the curved hook 322. At the other end of the short rod 321 connected to the long rod 323, a blocking rod 324 is formed by a 90-degree bend, and the blocking rod 324 prevents the short rod 321 of the hook 32 from slipping out of the through hole of the support arm 4. The hook 32 is an open structure, which is conducive to the connection and separation of the movable arm 3 and the bearing 121 on the side wall of the pile body 1.

[0069] Fig.10 , Fig.11 and Fig.12 The third embodiment of the piling device with a movable joint mechanism of the present invention is shown. Fig.10 , Fig.11 and Fig.12The main difference between the piling device of the third embodiment and the piling device of the first embodiment is that the movable arm 3 adopts a frame-shaped hook 33, which is composed of a rotating shaft 331, two connecting rods 332 and a T-shaped hook 333, wherein the rotating shaft 331 is penetrated through the through hole of the support arm 4, one end of the two connecting rods 332 is respectively connected to the two ends of the rotating shaft 331, and the other end of the two connecting rods 332 is respectively connected to the two ends of the T-shaped hook 333, and the specific structure of the T-shaped hook 333 is composed of two annular connecting blocks 333a, a support rod 333b and a tail hook 333c, the outer circle of each annular connecting block 333a is respectively connected to the two connecting rods 332, the inner circles of the two annular connecting blocks 333a are respectively connected to the two ends of the support rod 333b, and the middle of the support rod 333b is connected with a tail hook 333c perpendicular to the axis of the support rod 333b, and the tail hook 333c forms an angle less than or equal to 90 degrees with the plane where the frame-shaped hook 33 is located. The upper connecting portion 12 on the side wall of the pile body 1 is an opening 122. There are two openings 122, which are respectively provided on the two side walls of the pile body 1. The openings 122 extend radially inwardly along the pile body 1 and are used to adapt and connect with the tail hook 333c of the T-shaped hook 333. The tail hook 333c is a round rod, which cooperates with the opening 122 of the pile body 1, making it easy to connect or separate the movable arm 3 and the pile body 1.

[0070] Fig.13 The fourth embodiment of the piling device with a movable joint mechanism of the present invention is shown. Fig.13 The main difference between the piling device of the fourth embodiment and the piling device of the first embodiment is that one end of the movable arm 3 is hinged to the piling pipe 2, and the other end of the movable arm 3 is connected to the connecting part 12 arranged on the upper part of the side wall of the pile body 1, and the connecting part 12 is a bearing 121.

[0071] Fig.14 The fifth embodiment of the piling device with a movable joint mechanism of the present invention is shown. Fig.14 The main difference between the piling device with a movable joint mechanism of the fifth embodiment and the piling device with a movable joint mechanism of the first embodiment is that the load-bearing surface 14 of the pile body 1 is arranged at the top of the pile body 1, and the load-bearing surface 14 at the top of the pile body 1 cooperates with the adapting surface 22 at the bottom of the piling pipe 2 for transmitting the piling force. Two support arms 4 are relatively arranged at the lower part of the two side walls of the piling pipe 2. When the piling pipe 2 moves relative to the pile body 1, the support arms 4 on the side walls of the piling pipe 2 are synchronously driven to approach the top of the pile body 1, and the movable arm 3 is subjected to the upward force of the upper edge of the pile body 1, so that the movable arm 3 rotates around one end of the support arm 4, and the free end of the movable arm 3 moves downward and outward relative to the connecting portion 12 of the pile body 1, and the free end of the movable arm 3 is disengaged from the connecting portion 12 of the pile body 1.

[0072] It should be noted that the fifth embodiment is different from the other embodiments in that the adapting surface 22 of the piling pipe 2 abuts against the load-bearing surface 14 at the top of the pile body 1 for piling.

[0073] In a sixth embodiment, the present invention further provides a piling construction method, using the piling device with a movable joint mechanism, comprising the following steps:

[0074] Step 1, insert the lower end of the piling pipe from the upper opening of the middle hole of the pile body, and connect the free end of the movable arm with the bearing on the side wall of the pile body, so that the piling pipe and the pile body are fixedly connected together;

[0075] Step 2: Connect the upper end of the piling pipe to the piling machine. Under the action of the piling machine, the piling pipe and the pile body fixedly connected together are moved to the top of the piling hole;

[0076] Step 3: Separation of the piling pipe and the pile body. The piling machine moves the piling pipe and the pile body fixedly connected together downward, so that the pile body reaches the piling point on the ground. The piling pipe moves toward the pile body relative to the pile body, and the movable arm is pushed against by the pile body, so that the movable arm rotates around the hinge point with the piling pipe, and the free end of the movable arm moves downward and outward relative to the connecting part of the pile body, and is disengaged from the connecting part of the pile body.

[0077] Step 4: The pile driver applies force to the bottom of the middle hole of the pile body through the pile driving pipe, so that the pile body is driven into the formation to the designed depth;

[0078] Step 5: The piling pipe is moved out from the middle hole of the pile body under the action of the pile driver.

[0079] Fig.15 , Fig.16 , Fig.17 , Fig.18 , Fig.19 and Fig. 20 The seventh embodiment of the piling device with a movable joint mechanism of the present invention is shown. Fig.15 The main difference between the piling device with a movable joint mechanism of the seventh embodiment and the piling device with a movable joint mechanism of the first embodiment is that the piling device of this embodiment includes a steel cage 5, the lower end of the steel cage 5 is fixedly connected to the load-bearing surface 14 of the pile body 1, and an annular surface is provided between the circumference of the lower end of the steel cage 5 and the inner wall of the middle hole 11 of the pile body 1. The adapting surface 22 at the lower end of the piling pipe 2 applies a piling force to the load-bearing surface 14 of the pile body 1, and the connecting head 21 at the upper end of the piling pipe 2 is used for fixed connection with the pile driver. When the piling pipe 2 is connected to the pile body 1 through the movable arm 3, the piling pipe 2 is sleeved on the steel cage 5 of the pile body 1.

[0080] In this embodiment, the piling construction includes the following steps:

[0081] Step 1, constructing a casing pile assembly: passing the upper end of the steel cage 5 of the pile body 1 through the piling pipe 2, matching the load-bearing surface 14 of the pile body 1 with the matching surface 22 of the piling pipe 2, and movably connecting the pile body 1 and the piling pipe 2 through the movable arm 3 for hoisting by a pile driver;

[0082] Step 2, hoisting the casing pile assembly: connect the connector 21 at the upper end of the pile pipe 2 to the pile driver, and under the hoisting of the pile driver, the pile pipe 2 and the pile body 1 connected to the pile pipe 2 are moved above the pile point, and the pile driver controls the assembly to move downward, so that the small end of the pile shoe 13 of the pile body 1 reaches the ground pile point;

[0083] Step 3, the movable arm 3 of the movable connection between the pile body 1 and the piling pipe 2 is disconnected: the pile shoe 13 arrives at the pile point on the ground, and the movable connection between the pile body 1 and the piling pipe is disconnected;

[0084] Step 4, driving the casing pile assembly into the stratum: the pile driver controls the pile driving pipe 2 to move downward so that the lower end of the pile driving pipe 2 presses against the bearing surface 14 of the pile body 1, and the pile driver applies force to the pile shoe 13 of the pile body 1 through the pile driving pipe 2, drives the pile shoe 13 of the pile body 1 into the stratum, pushes it downward in the stratum, squeezes the soil to form a pile hole 6, and the pile shoe 13 simultaneously brings the steel cage 5 of the pile body 1 into the pile hole 6;

[0085] Step 5: The pile driver pulls the pile driving pipe 2 out of the pile hole 6, and the pile body 1 remains in the pile hole 6, and concrete is poured into the pile hole 6; or, concrete is poured into the pile hole 6 through the pile driving pipe 2, and the pile driving pipe 2 is pulled out, and the pile body 1 remains in the pile hole 6.

[0086] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A piling device with a movable joint mechanism, characterized in that: include: A pile body having a top and a side wall, wherein the side wall is provided with a connecting portion; A piling pipe is coaxially arranged with the pile body and is used for hoisting or transmitting force to the pile body; A movable arm is used for detachably connecting the pile body and the piling pipe, one end of the movable arm is hinged to the piling pipe, and the other end is a free end, which is used to be connected to the connecting part of the pile body; When the pile driving pipe and the movable arm move downward relative to the pile body, the upper part of the pile body presses against the movable arm, so that the free end of the movable arm is disengaged from the connecting part of the pile body.

2. The piling device according to claim 1, characterized in that: A support arm is provided between the piling pipe and the movable arm, one end of the support arm is fixedly connected to the side surface of the piling pipe, and the other end of the support arm extends outward and is hinged to the movable arm.

3. The piling device according to claim 2, characterized in that: The connecting part of the pile body is a bearing and the bearing comprises: A load-bearing cross bar fixedly connected to the side wall of the pile body; or, a load-bearing cross bar fixedly connected to the side wall of the pile body, wherein the distal end of the load-bearing cross bar is also provided with a downwardly bent limiting vertical bar.

4. The piling device according to claim 3, characterized in that: The movable arm is a frame-shaped hanger, and the frame-shaped hanger includes: A hook bolt, used for being hinged to the support arm; Two hook rods are arranged parallel to each other in the plane thereof, and one end of the two hook rods is connected to the two ends of the hook bolt respectively; The hook head is used to connect the bearing and is in a U shape, and the two ends of the U shape are respectively connected to the other ends of the two hook rods.

5. The piling device according to claim 4, characterized in that: The distance from the side of the piling pipe to the hinge axis of the support arm and the hook bolt of the frame-shaped hanger is a, the distance from the side of the piling pipe to the inner side of the limiting vertical rod is b, and b>a.

6. The piling device according to claim 5, characterized in that: The length of the limit vertical rod of the hanging is d, the distance between the hinge axis of the support arm and the hook bolt of the frame-shaped hanging device and the top of the pile body is H2, and d <H2。 7. The piling device according to claim 6, characterized in that: The distance between the hinge axis of the support arm and the hook bolt of the frame-shaped hanger and the top of the pile body is H2, the distance between the bottom end of the pile driving pipe and the bottom of the middle hole of the pile body is H1, and H2>H1.

8. The piling device according to claim 3, characterized in that: The movable arm is a hook, and the hook comprises: A short rod, used for being hinged to the supporting arm; The hook is used to connect with the bearing and hanging part of the pile body; A long rod has one end connected to the end of the short rod and the other end connected to a curved hook.

9. The piling device according to claim 2, characterized in that: The connecting part of the pile body is an opening, and there are two openings which are arranged oppositely on the side wall of the pile body.

10. The piling device according to claim 9, characterized in that: The movable arm is a frame-shaped hook, comprising: A rotating shaft, used for being hinged to the supporting arm; Two connecting rods are arranged parallel to each other in the plane, and one end of the two connecting rods is connected to the two ends of the rotating shaft respectively; The two ends of the T-hook are respectively connected to the other ends of the two connecting rods and are used for matching connection with the openings of the pile body.

11. The piling device according to claim 10, characterized in that: T-hook includes: Two annular connecting blocks, the outer ring of each annular connecting block is connected to the connecting rod, the inner rings of the two annular connecting blocks are respectively connected to the two ends of the support rod, and a tail hook is connected in the middle of the support rod perpendicular to the axis of the support rod, and the tail hook and the plane where the frame-shaped hook is located form an angle less than or equal to 90 degrees.

12. The piling device according to claim 1, characterized in that: It also includes a steel cage, the lower end of which is fixedly connected to the pile body, and the upper end of which penetrates into the piling pipe from the lower end of the piling pipe.

13. The piling device according to claim 1, characterized in that: The connecting part of the movable arm and the pile body constitutes a connecting assembly, which is used to connect the pile driving pipe and the pile body together.

14. A piling construction method, applied to the piling device with a movable joint mechanism according to any one of claims 1 to 13, characterized in that: The steps include: Step 1, connect the free end of the movable arm to the connecting portion on the side wall of the pile body, so that the piling pipe and the pile body are fixedly connected together; Step 2: Hoisting: connect the upper end of the piling pipe to the piling machine. Under the hoisting of the piling machine, the piling pipe and the pile body fixedly connected together are moved to the top of the piling hole; Step 3, separation of the piling pipe and the pile body. The pile driver moves the piling pipe and the pile body that are fixedly connected together downward to make the pile body reach the piling point on the ground. The piling pipe moves toward the pile body relative to the pile body, and the movable arm is pushed against by the pile body to rotate around the hinge point with the piling pipe. The free end of the movable arm moves downward and outward relative to the connecting part of the pile body and disengages from the connecting part of the pile body.