Single-foundation construction elevator foundation and construction method

Through the single-foundation method of constructing the elevator foundation, combined with the integrated pouring of the independent foundation and foundation short columns, the problems of complex construction, high cost, long construction period and high safety risks have been solved, and the stability and safety of the construction elevator foundation have been improved. .

CN118727818APending Publication Date: 2024-10-01CHINA CONSTR THIRD ENG BUREAU GRP (ZHEJIANG) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411050131.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the construction of elevator foundation, the existing technology has the problems of complex construction, high cost, long construction period and high safety risks. Especially when the strength of the backfill soil does not meet the requirements, multiple processes are required to avoid settlement and other safety hazards. .

Method used

The single-foundation elevator foundation method is used to excavate the foundation pit at the designated location to the bearing layer, and then combine the independent foundation and foundation short columns for integrated pouring. Appropriate size and reinforcement design are used to simplify the construction process and directly transmit the force. to the bearing layer to improve stability and safety, and adapt to different foundation pit depths through the design of support cages and connectors.

Benefits of technology

It simplifies multiple processes in traditional construction methods, reduces construction difficulty and cost, improves the stability and safety of the foundation, achieves simple and efficient construction, and reduces safety risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727818A_ABST
    Figure CN118727818A_ABST
Patent Text Reader

Abstract

The invention relates to a single-foundation type construction elevator foundation and a construction method, a foundation pit is formed in a designated position of the ground, the foundation pit is excavated to a bearing stratum along with a main body foundation, and the single-foundation type construction elevator foundation comprises a bottom plate, a foundation short column and a supporting assembly, the bottom plate comprises a base and an independent foundation, and the base is fixed to the bottom of the foundation pit; the independent foundation is fixed on one side of the base away from the foundation pit bottom; the foundation short column comprises a supporting cage and a plurality of second formworks, the supporting cage is arranged in the depth direction of the foundation pit and connected with the independent foundation, the second formworks, the supporting cage and the second formworks define a foundation mold cavity convenient to pour, the supporting assembly comprises a cushion layer and a supporting plate, and the cushion layer is fixed to the end, away from the bottom of the foundation pit, of the supporting cage. The supporting plate is fixed to the side, away from the supporting cage, of the cushion layer, and the construction elevator embedded part is embedded in the supporting plate. The method has the effect of solving the problems of complex construction, high cost, long construction period, high safety risk and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of elevator construction technology, and more particularly to a single-base construction elevator foundation and a construction method. Background Art

[0002] During the construction of the construction elevator foundation, it is often encountered that the construction elevator foundation needs to be based on backfill soil. When the strength of the backfill soil does not meet the requirements, it needs to be processed through multiple processes to meet the foundation requirements and avoid safety hazards such as settlement of the construction elevator.

[0003] For most of the existing independent foundation forms, when setting up construction elevators, the surface backfill soil is generally removed to the bearing layer, and then backfill and compaction are carried out to finally achieve the bearing capacity of the construction elevator foundation that meets the requirements of the elevator instruction manual. The construction elevator foundation is generally set up in the form of an enlarged foundation plate or a manual bored pile foundation. The construction elevator foundation in the form of an enlarged foundation plate is set on the backfill soil, and the construction is quick and convenient. However, in order to meet the stress and stability, the foundation needs to be expanded. The manual bored pile foundation is used to construct the backfill soil. The stress layer is the foundation bearing layer, and the stress condition is better.

[0004] Regarding the above-mentioned related technologies, although the methods of increasing the foundation plate or manually excavating bored pile foundations can achieve the bearing capacity requirements of the foundation, they all have problems such as complex construction, high cost, long construction period and high safety risks. Therefore, there is an urgent need for a construction method that is both simple and efficient and can ensure the safety and stability of the foundation to solve the above problems. Summary of the invention

[0005] In order to overcome the above problems, the present application provides a single-base construction elevator foundation and a construction method.

[0006] The present application provides a single-base construction elevator foundation and construction method using the following technical solutions: A single-base construction elevator foundation, a foundation pit is opened at a designated position on the ground, excavated together with the main foundation to the bearing layer, including a bottom plate, a foundation short column and a support assembly, the bottom plate is located in the foundation pit, the bottom plate includes a base and an independent foundation, the base is fixed to the bottom of the foundation pit, the setting direction of the base is perpendicular to the depth direction of the foundation pit, and the independent foundation is fixed to the side of the base away from the bottom of the foundation pit; The foundation short column includes a support cage and a plurality of second formworks. The support cage is arranged along the depth direction of the foundation pit. The support cage is connected to the independent foundation. A plurality of second formworks are connected to the support cage. The plurality of second formworks form a basic mold cavity that is convenient for pouring. The support assembly includes a cushion layer and a support plate. The cushion layer is fixed to the end of the support cage away from the bottom of the foundation pit. The cushion layer is arranged parallel to the base. The support plate is fixed to the side of the cushion layer away from the support cage. The embedded parts of the construction elevator are buried in the support plate. The independent foundation, the foundation short column, the cushion layer and the support plate are selected with appropriate specific sizes and reinforcement.

[0007] By adopting the above technical scheme, when it is necessary to build the foundation of the construction elevator, first, according to the construction requirements, a foundation pit is excavated at a designated position on the ground, and it is ensured that it is excavated to the bearing layer together with the main foundation, so as to obtain a stable foundation support surface, and the bottom of the foundation pit is leveled and hardened, and a base is cast at the bottom of the foundation pit as required, and then the steel bars of the independent foundation are tied and supported by the formwork, and then a suitable support cage is selected, and the support cage is moved into the foundation pit by a lifting device, and the support cage is placed along the depth direction of the foundation pit, and one end of the support cage is fixed to the steel bars of the independent foundation, and then a plurality of second templates are taken out, and the second templates and the support cage are connected, and a foundation mold cavity convenient for casting is formed by the plurality of second templates, and the foundation short column and the independent foundation are cast integrally to the specified height by concrete, and then the concrete is solidified and cured, and after the curing is completed, the foundation pit is compacted layer by layer by backfill soil to ensure the density of the backfill soil; The cushion layer and the support plate are reinforced and formwork is carried out, and then the cushion layer and the support plate are poured. During the pouring process, the embedded parts of the construction elevator are buried in specific positions of the support plates, and then concrete curing is carried out. After the foundation strength of the construction elevator reaches the design strength requirement, the construction elevator can be installed and constructed. Compared with the related technology, the present application casts the independent foundation and the foundation short columns as one body. The structural form of the independent foundation and the foundation short columns enables the foundation force of the construction elevator to be directly transmitted to the bearing layer, thereby improving the stability and safety of the foundation. By reasonably designing the specific dimensions and reinforcement of the independent foundation, the foundation short columns and the construction elevator foundation, it can be flexibly adjusted according to the bearing capacity requirements of different construction elevators, simplifying multiple processes in the traditional construction method, reducing the construction difficulty and cost, achieving simple and efficient results while ensuring the safety and stability of the foundation, which is conducive to improving problems such as complex construction, high cost, long construction period and high safety risks.

[0008] Optionally, the support cage includes a plurality of steel cages, the steel cages are arranged along the depth of the foundation pit, and the plurality of steel cages are distributed along the depth of the foundation pit; The basic short column also includes a plurality of connecting pieces, one of the connecting pieces is connected between two adjacent steel cages, and the connecting piece connects the plurality of steel cages into the support cage.

[0009] By adopting the above technical solution, when it is necessary to install a support cage, the appropriate number of steel cages is selected according to the depth of the foundation pit, the selected steel cages are connected into a support cage through connectors, and then the support cage is installed. By setting up multiple steel cages, it is beneficial to adapt to different foundation pit depths, and the length of the support cage can be adjusted according to different foundation pit depths, which is beneficial to the stability and safety of the elevator foundation and has a wide range of applicability.

[0010] Optionally, the connecting member includes two connecting frames and multiple plug rods, each of the two connecting frames corresponds to one of the steel cages, the connecting frame is fixed inside the steel cage, the connecting frame and the steel cage are coaxially arranged, the outer wall of the connecting frame is in contact with the side wall of the steel cage, the two connecting frames are close to each other, the multiple plug rods are located between the two connecting frames, the multiple plug rods are fixed to one of the connecting frames, the plug rods are arranged from one connecting frame to the other, the multiple plug rods are evenly distributed along the circumference of the connecting frames, one end of the plug rod is fixed to one of the connecting frames, and the other connecting frame is provided with a slot for inserting the plug rod close to the side of the plug rod, and the two connecting frames are spliced ​​into a steel frame.

[0011] By adopting the above technical solution, when it is necessary to splice two adjacent steel cages, the connecting frame is placed in the steel cage so that the connecting frame and the steel cage are coaxially arranged, and the connecting frame and the steel cage are fixed in advance. Subsequently, the plug rod on the connecting frame in one of the steel cages is moved close to the slot on the connecting frame in the other steel cage, and the two steel cages are moved close to each other. At this time, the two connecting frames are close to each other, and the plug rod can be inserted into the slot, so that the two steel cages can be plugged in and fixed. According to the above steps, the selected steel cage can be fixed. By setting the plug rod and the slot, it is convenient to fix two adjacent steel cages, which is convenient for personnel to operate.

[0012] Optionally, the connecting member also includes multiple magnets, one of the plug rods and one of the slots each corresponds to a magnet, the magnet corresponding to the plug rod is fixed to the end of the plug rod where the connecting frame is not fixed, and the magnet corresponding to the slot is fixed to the bottom of the slot, and when the plug rod is inserted into the slot, the two connecting frames fit together, and the magnet on the plug rod and the magnet in the slot are magnetically attracted to each other.

[0013] By adopting the above technical solution, when two adjacent steel cages are close to each other, the insertion rod on the connecting frame in one steel cage is close to the slot on the connecting frame in the other steel cage, and the insertion rod is inserted into the slot. At this time, the magnet on the insertion rod and the magnet in the slot are mutually magnetized, which can enhance the firmness of the connection between the two connecting frames, thereby increasing the connection stability of the two adjacent steel cages.

[0014] Optionally, a plurality of reinforcing ribs are fixed inside the connecting frame, and the ribs are arranged perpendicular to the depth direction of the connecting frame. The plurality of reinforcing ribs are divided into two groups, and the two groups of reinforcing ribs are arranged along the depth direction of the connecting frame. The reinforcing ribs in each group are vertically distributed in a rectangular grid, and the reinforcing ribs are perpendicular to the inner wall of the connecting frame to which they are connected.

[0015] By adopting the above technical solution and arranging reinforcing ribs, the stress at the connection between two adjacent steel cages can be distributed, thereby facilitating the stability of the connection between the two adjacent steel cages.

[0016] Optionally, the basic short column also includes a plurality of fasteners, and the plurality of fasteners are all located in the steel frame, and the plurality of fasteners are evenly distributed along the circumference of the steel frame. The fasteners include two fastening plates and a fastening bolt, and the fastening plates correspond to the connecting frames one by one, and the fastening plates are fixed to the connecting frames. When the two connecting frames are fitted together, the two fastening plates are fitted together, and the fastening bolts are threadedly connected to the two fastening plates in sequence, and the fastening bolts fix the two fastening plates.

[0017] By adopting the above technical solution, when the rod is inserted into the slot, the two connecting frames fit together. Then, the personnel take out the fastening bolts and fix the two fastening plates by fastening the bolts, which can strengthen the connection stability of the two connecting frames, thereby further facilitating the connection stability of the two adjacent steel cages.

[0018] Optionally, it also includes a positioning assembly, which includes a connecting rod, two screws and two articulated seats, the connecting rod is arranged obliquely upward from the bottom of the foundation pit to one side of the steel cage, both ends of the connecting rod are hollow, one screw corresponds to one end of the connecting rod, the screw is inserted into one end of the connecting rod, the screw is threadedly connected to the connecting rod, the screw can move along the length direction of the connecting rod, the connecting rod and the two screws form a telescopic rod, one screw corresponds to one articulated seat, the screw is rotatably connected to the articulated seat away from one end of the connecting rod, the articulated seat close to the bottom of the foundation pit is connected to the bottom of the foundation pit, and the articulated seat close to the steel cage is connected to the second template.

[0019] By adopting the above technical solution, when the independent foundation formwork is completed, it is necessary to support the foundation short columns. First, according to the depth of the foundation pit, a suitable number of steel cages are selected, and the selected steel cages are spliced ​​into a support cage, and the steel bars in the support cage and the independent foundation are fixed. Subsequently, multiple second templates are taken out, and the multiple second templates are fixed to the support cage. The multiple second templates form a foundation mold cavity. Afterwards, according to the construction conditions, the connecting rod is screwed to change the length of the telescopic rod, and the hinged seat on the telescopic rod is respectively fixed to the second template and the foundation pit, so that the second template can be fixed to prevent the second template from tilting or overturning after the mold assembly is completed.

[0020] Optionally, a construction method for a single-base elevator foundation comprises the following steps: S1: Construction elevator positioning: excavate the foundation pit on the ground and excavate it together with the main foundation to the bearing layer; S2: Casting of bottom plate and foundation short columns: forming the independent foundation on the bearing layer, the independent foundation including predetermined dimensions and reinforcement, casting concrete on the independent foundation, tying steel bars and supporting formwork for the foundation short columns on the independent foundation, and completing the casting of concrete, wherein the foundation short columns have predetermined dimensions and reinforcement; S3: Backfill: backfill the soil and compact it; S4: Installation of embedded parts for construction elevator: tying the reinforcement bars of the cushion layer and the support plate, supporting the formwork, embedding the embedded parts of the construction elevator foundation, and completing the concrete pouring on the compacted backfill soil; S5: Construction elevator construction: After the foundation strength of the construction elevator reaches the design strength requirement, the installation of the construction elevator can be carried out.

[0021] By adopting the above technical scheme, first, the construction elevator is positioned, a foundation pit is excavated at a suitable position on the ground, and the pit is excavated together with the main foundation to the bearing layer. Subsequently, the bottom plate and the foundation short columns are reinforced and formworked. The bottom plate and the foundation short columns are selected according to the construction requirements. Appropriate sizes and reinforcements are selected to meet the bearing capacity requirements of different construction elevators. Concrete is poured on the bottom plate and the foundation short columns to a specific position, and the concrete is cured after solidification. After that, backfill construction is carried out and compacted layer by layer to ensure the density of the backfill soil. The reinforcement of the cushion layer and the support plate is tied and formworked, and concrete is poured. The embedded parts of the construction elevator are embedded, and the concrete is cured after solidification. After the foundation strength of the construction elevator reaches the design strength, the construction elevator can be installed. This simplifies multiple processes in traditional construction methods, reduces construction difficulty and cost, and improves work efficiency.

[0022] Optionally, in step S2, the foundation short column formwork selects a suitable number of the steel cages according to the depth of the foundation pit, connects the steel cages into the support cage through the connecting parts and the fasteners, fixes the support cage, surrounds a plurality of the second templates to form a basic mold cavity, takes out the positioning assembly, adjusts the length of the telescopic rod with the four positioning parts, and then connects the telescopic rods and the second templates to the bottom of the foundation pit respectively, so as to position the support cage.

[0023] By adopting the above technical scheme, the selected steel cages are spliced ​​into a support cage, and then the support cage is fixed to the steel bars in the independent foundation, and multiple second templates are fixed to the support cage. The multiple second templates form a foundation mold cavity, and then the positioning parts are taken out, and the length of the telescopic rod is adjusted. The telescopic rods are then respectively connected to the second templates and the bottom of the foundation pit, which can fix the second templates, thereby positioning the support cage, facilitating the pouring of the foundation short columns, and after the concrete solidifies, it is cured and the positioning parts are removed.

[0024] Optionally, the concrete pouring of the independent foundation and the foundation short columns adopts a one-time casting method.

[0025] By adopting the above technical solution and one-time casting, it is beneficial to increase the connection stability between the independent foundation and the foundation short column, and improve the stability and safety of the construction elevator foundation.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. Compared with the related art, the present application integrally casts the independent foundation and the foundation short column. The structural form of the independent foundation and the foundation short column enables the foundation force of the construction elevator to be directly transmitted to the bearing layer, thereby improving the stability and safety of the foundation. By reasonably designing the specific dimensions and reinforcement of the independent foundation, the foundation short column and the construction elevator foundation, it can be flexibly adjusted according to the bearing capacity requirements of different construction elevators, simplifying multiple processes in the traditional construction method, reducing the construction difficulty and cost, achieving simple and efficient construction while ensuring the safety and stability of the foundation, and helping to improve the problems of complex construction, high cost, long construction period and high safety risks; 2. By setting up multiple steel cages, it is beneficial to adapt to different foundation pit depths. The length of the support cage can be adjusted according to different foundation pit depths, which is beneficial to the stability and safety of the elevator foundation and has wide applicability; 3. By setting the positioning component, the second template can be fixed to prevent the second template from tilting or overturning after the second template is assembled, which is convenient for pouring the foundation short column. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 Schematic diagram of the overall structure of the first viewing angle in this embodiment; Figure 2 Schematic diagram of the structure of the base plate and the basic short column in this embodiment; Figure 3 is a cross-sectional view of the steel cage in this embodiment; Figure 4 yes Figure 3 A magnified view of middle; Figure 5 Schematic diagram of the structure of the basic short column and the positioning assembly in this embodiment; Figure 6 Schematic diagram of the overall structure of the second viewing angle in this embodiment.

[0028] Explanation of the accompanying drawings: 1. Base plate; 11. Base; 12. Independent foundation; 121. Transverse reinforcement; 122. Longitudinal reinforcement; 123. First formwork; 2. Foundation short column; 21. Support cage; 211. Rebar cage; 22. Connector; 221. Connecting frame; 2211. Reinforcement rib; 2212. Slot; 222. Insert rod; 223. Magnet; 23. Fastener; 231. Fastening plate; 232. Fastening bolt; 24. Second formwork; 241. Connecting plate; 3. Positioning assembly; 31. Positioning assembly; 311. Connecting rod; 312. Screw; 313. Articulated seat; 4. Support assembly; 41. Pad; 42. Support plate. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1-6 This application is described in further detail.

[0030] The embodiments of the present application disclose a single-base construction elevator foundation and a construction method.

[0031] In a first aspect, an embodiment of the present application discloses a single-base construction elevator foundation.

[0032] Reference Figure 1 A single-base construction elevator foundation includes a base plate 1, a foundation short column 2, a positioning assembly 3 and a support assembly 4, the foundation short column 2 is arranged on the base plate 1, the positioning assembly 3 is arranged on the foundation short column 2, and the support assembly 4 is arranged above the foundation short column 2.

[0033] Reference Figure 1 and Figure 2A foundation pit is excavated at a designated position on the ground according to construction requirements. A bottom plate 1 is located in the foundation pit. The bottom plate 1 includes a base 11 and an independent foundation 12. The base 11 is located at the bottom of the leveled and hardened foundation pit, and the base 11 is horizontally arranged. The base 11 is fixedly connected to the bottom of the foundation pit by anchor bolts. The base 11 is formed by pouring concrete. The independent foundation 12 is located at a side of the base 11 away from the bottom of the foundation pit. The independent foundation 12 includes a plurality of transverse steel bars 121, a plurality of longitudinal steel bars 122 and a plurality of first templates 123. The plurality of transverse steel bars 121 and the plurality of longitudinal steel bars 122 are all water-tight. The plurality of transverse steel bars 121 are arranged in parallel, the plurality of longitudinal steel bars 122 are arranged in parallel, and the transverse steel bars 121 and the longitudinal steel bars 122 are arranged vertically, the transverse steel bars 121 and the longitudinal steel bars 122 are fixedly connected by binding, the plurality of transverse steel bars 121 and the plurality of longitudinal steel bars 122 are in a grid shape, the transverse steel bars 121 and the longitudinal steel bars 122 are fixedly connected to the base 11 by bolts, the plurality of first templates 123 are located on the side of the transverse steel bars 121 and the longitudinal steel bars 122 away from the base 11, and the plurality of first templates 123 form a casting cavity.

[0034] Reference Figure 1 and Figure 2 On the one hand, the independent foundation 12 can be poured first, and the personnel pour concrete into the pouring mold cavity. After the concrete solidifies, it is maintained; the independent foundation 12 is divided into a rectangular seat and a conical seat. The rectangular seat is fixed to the top of the base 11. In this embodiment, the conical seat is a prism, and the conical seat is located on the side of the rectangular seat away from the base 11. The larger end of the conical seat is integrated with the rectangular seat. In this embodiment, the size of the independent foundation 12 is 2400*2400*400*200, and it is reinforced with C14@130 double-layer and bidirectional steel bars. The specific size and reinforcement need to be designed and calculated according to the bearing capacity requirements of different construction elevators.

[0035] Reference Figure 1 , Figure 2 and Figure 3 The foundation short column 2 includes a support cage 21, a plurality of connecting members 22, a plurality of fasteners 23 and a plurality of second templates 24. The support cage 21 includes a plurality of steel cages 211. The plurality of steel cages 211 are all located in the foundation pit. The steel cage 211 may be one, two or more. The specific number of the steel cages 211 depends on the depth of the foundation pit. In the present embodiment, there are two steel cages 211. The two steel cages 211 are both vertically arranged and distributed along the depth direction of the foundation pit. The top of the support cage 21 is flush with the top of the foundation pit.

[0036] Reference Figure 2 , Figure 3 and Figure 4A connecting piece 22 is provided between two adjacent steel cages 211. The connecting piece 22 may be one, two or more. In this embodiment, the number of the connecting piece 22 is one. The connecting piece 22 is located between the two steel cages 211. The connecting piece 22 includes two connecting frames 221, a plurality of insert rods 222 and a plurality of magnets 223. The two connecting frames 221 each correspond to a steel cage 211. The connecting frame 221 is located inside the steel cage 211, and the connecting frame 221 is coaxially arranged with the steel cage 211. The outer wall of the connecting frame 221 is connected to the steel cage 211. 11 inner wall is fitted, the connection frame 221 and the steel cage 211 are fixed by bolts, and the two connection frames 221 are close to each other; a plurality of reinforcing ribs 2211 are arranged inside the connection frame 221, and the reinforcing ribs 2211 are arranged perpendicular to the depth direction of the connection frame 221. In this embodiment, the number of the reinforcing ribs 2211 is eight, and the eight reinforcing ribs 2211 are divided into two groups. The two groups of reinforcing ribs 2211 are arranged along the depth direction of the connection frame 221, and each group of reinforcing ribs 2211 is vertically distributed in a rectangular grid shape, and the two ends of the reinforcing ribs 2211 are welded to the inner wall of the connection frame 221 , and the reinforcing rib 2211 is perpendicular to the inner wall of the connecting frame 221 to which it is connected; multiple plug rods 222 are located between the two connecting frames 221, and multiple plug rods 222 are located in one of the connecting frames 221, and the plug rods 222 are arranged from one connecting frame 221 to another connecting frame 221, and multiple plug rods 222 are evenly distributed along the circumference of the connecting frame 221, and one end of the plug rod 222 is welded to one of the connecting frames 221, and the other connecting frame 221 is close to the side of the plug rod 222 to open a slot 2212 for inserting the plug rod 222, and one plug rod 222 and One magnet 223 corresponds to one slot 2212, and the magnet 223 corresponding to the plug rod 222 is fixedly connected to the end of the plug rod 222 where the connecting frame 221 is not fixed by screws, and the magnet 223 corresponding to the plug rod 222 is fixed to the bottom of the slot 2212 by screws. When the plug rod 222 is inserted into the slot 2212, the two connecting frames 221 fit each other, and the magnet 223 on the plug rod 222 and the magnet 223 in the slot 2212 are magnetically attracted to each other to fix the two connecting frames 221, and the two connecting frames 221 are spliced ​​into a steel frame.

[0037] Reference Figure 1 , Figure 2 and Figure 3In this embodiment, there are two fasteners 23, both of which are located in the steel frame, and the two fasteners 23 are located on both sides of the steel frame. The fasteners 23 include two fastening plates 231 and a fastening bolt 232. One fastening plate 231 corresponds to one connecting frame 221, and the fastening plate 231 is welded to the connecting frame 221. When the two connecting frames 221 are fitted together, the two fastening plates 231 are fitted together, and the fastening bolts 232 pass through the two fastening plates 231 in turn. The fastening bolts 232 are threadedly connected to the two fastening plates 231 in turn, and the fastening bolts 232 fix the two fastening plates 231; multiple second templates 24 are laid along the outer side of the support cage 21, and the multiple second templates 24 form a basic mold cavity, and concrete is poured into the basic mold cavity.

[0038] Reference Figure 5 On the other hand, the concrete pouring of the independent foundation 12 and the foundation short column 2 can be cast in a one-time casting method. Specifically, after completing the steel bar binding and formwork work of the independent foundation 12 and the foundation short column 2, the concrete is poured to the designed height in one time. This method can simplify the construction process and reduce construction joints, thereby improving the integrity and crack resistance of the structure. However, it should be noted that the one-time casting method requires strict control of the concrete casting quality and maintenance conditions to ensure the strength and durability of the structure.

[0039] Reference Figure 5 The positioning assembly 3 includes four positioning members 31, one positioning member 31 corresponds to a side wall of the steel cage 211, the positioning member 31 includes a connecting rod 311, two screw rods 312 and two hinge seats 313, the connecting rod 311 is tilted, the connecting rod 311 is tilted upward from the bottom of the foundation pit to one side of the steel cage 211, and both ends of the connecting rod 311 are hollow, a screw rod 312 corresponds to one end of the connecting rod 311, the screw 312 is inserted into one end of the connecting rod 311, the screw 312 is threadedly connected to the connecting rod 311, and the screw 312 can move along the length direction of the connecting rod 311. Two screw rods 312 and one The connecting rod 311 forms a telescopic rod, and a screw rod 312 corresponds to an articulated seat 313. The screw rod 312 is rotatably connected to the articulated seat 313 at one end away from the connecting rod 311. A placement seat is fixedly connected to the circumference of the steel cage 211 at the bottom of the foundation pit by anchor bolts. The articulated seat 313 close to the bottom of the foundation pit is fixedly connected to the placement seat by screws. A connecting plate 241 is detachably connected to the second template 24. The articulated seat 313 close to the steel cage 211 is fixedly connected to the connecting plate 241 by screws. According to actual construction conditions, the connecting rod 311 is rotated to lock it to prevent the second template 24 from tilting or overturning after the mold assembly is completed.

[0040] Reference Figure 5 and Figure 6The support assembly 4 includes a cushion layer 41 and a support plate 42. After the support cage 21 is cast, backfill construction is carried out by backfilling soil. The cushion layer 41 is located at the end of the support cage 21 away from the bottom of the foundation pit. The cushion layer 41 is horizontally arranged. The cushion layer 41 is cast by concrete. The cushion layer 41 and the support cage 21 are fixed by reinforcing bolts. The support plate 42 is located at the side of the cushion layer 41 away from the support cage 21. The support plate 42 is cast by concrete, and the cushion layer 41 and the support plate 42 are cast integrally by concrete. The embedded parts of the construction elevator are buried in the support plate 42, which is convenient for the installation and construction of the construction elevator; the specific dimensions and reinforcement of the cushion layer 41 and the support plate 42 need to be designed and calculated according to the bearing capacity requirements of different construction elevators, which can effectively ensure the stability and safety of the construction elevator during use.

[0041] The implementation principle of a single-base construction elevator foundation in the embodiment of the present application is as follows: when it is necessary to build a construction elevator foundation, a foundation pit is excavated at a designated position on the ground according to the construction requirements, and a formwork is supported, steel bars are tied and poured at the bottom of the leveled and hardened foundation pit to form a bottom plate 1, and the number of appropriate steel cages 211 is selected according to the depth of the foundation pit, and the selected steel cages 211 are spliced ​​into a support cage 21, and then the second template 24 is taken out for formwork, and then the positioning component 3 is taken out, and the length of the telescopic rod is adjusted according to the construction conditions, and then the telescopic rod and the second template 24 are respectively connected to the bottom of the foundation pit, so that the support cage 21 can be positioned, and then concrete is poured, and after the concrete is cured and solidified, backfill construction is carried out and compacted, and then the cushion layer 41 and the support plate 42 are poured, and the embedded parts of the construction elevator are buried in the support plate 42, and concrete curing is carried out. After the strength of the construction elevator foundation reaches the design strength, the construction elevator can be installed.

[0042] In a second aspect, the present application discloses a construction method of a single-base elevator foundation, comprising the following steps: S1: Construction elevator positioning: After determining the construction location, excavate the foundation pit on the ground and ensure that it is excavated together with the main foundation to the bearing layer, so as to obtain a stable foundation support surface and level and harden the bottom of the foundation pit; S2: Casting of base plate 1 and foundation short column 2: On the one hand, the deterioration of the bottom plate 1 and the short foundation column 2 can be poured in two times. S21: Formwork for the bottom plate 1: Cast the base 11 in advance, and then fix the base 11 to the bottom of the foundation pit with anchor bolts, then take out the transverse steel bars 121 and the longitudinal steel bars 122 and fix them to the base 11 respectively, so that the transverse steel bars 121 and the longitudinal steel bars 122 are in a grid shape, and then surround a plurality of first templates 123 to form a casting mold cavity, and form an independent foundation 12 on the bearing layer according to the predetermined size and reinforcement requirements. Specifically, the size of the independent foundation 12 can be set to 2400*2400*400*200, and it is reinforced with C14@130 double-layer and bidirectional steel bars. The specific size and reinforcement need to be designed and calculated according to the bearing capacity requirements of different construction elevators; after the formwork for the bottom plate 1 is completed, pour concrete into the casting mold cavity, cure and solidify the concrete, and remove the first template 123; Formwork for foundation short column 2: First, according to the depth of the foundation pit, select the appropriate number of steel cages 211, connect the steel cages 211 into support cages 21 through connectors 22 and fasteners 23, then use a hoisting device to move the support cages 21 to a suitable position, connect the support cages 21 and the bottom plate 1, and then surround a plurality of second templates 24 to form a foundation mold cavity; Casting of foundation short column 2: After multiple second templates 24 are installed, take out the positioning assembly 3, adjust the length of the telescopic rod with four positioning members 31 according to the construction conditions, and then connect the telescopic rods with the second template 24 and the bottom of the foundation pit respectively, so as to position the support cage 21, and then pour concrete into the foundation mold cavity, cure and solidify the concrete, and remove the second template 24; On the other hand, the base plate 1 and the foundation short column 2 can be poured at one time. S21: Formwork for the bottom plate 1 and the foundation short column 2: Cast the base 11 in advance, then fix the base 11 to the bottom of the foundation pit with anchor bolts, then take out the transverse steel bars 121 and the longitudinal steel bars 122 and fix them to the base 11 respectively, so that the transverse steel bars 121 and the longitudinal steel bars 122 are in a grid shape, then surround a plurality of first templates 123 to form a casting mold cavity, then select a suitable number of steel cages 211 according to the depth of the foundation pit, connect the steel cages 211 to form a support cage 21 through a connecting assembly, then use a hoisting device to move the support cage 21 to a suitable position, connect the support cage 21 and the bottom plate 1, and then surround a plurality of second templates 24 to form a foundation mold cavity; Formwork for the bottom plate 1 and the foundation short column 2: pour concrete into the pouring mold cavity and the foundation mold cavity, pour the concrete to the designed height at one time, and form the independent foundation 12 and the foundation short column 2 after the concrete is cured and solidified; S3: Backfill: backfill the soil and compact it; S4: Installation of embedded parts of the construction elevator: Cast the cushion layer 41 and the support plate 42, bury the embedded parts of the construction elevator in the support plate 42, and perform concrete curing. After the foundation strength of the construction elevator reaches the design strength, the installation of the construction elevator can be carried out.

[0043] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A single-base construction elevator foundation, with a foundation pit opened at a designated position on the ground, excavated together with the main foundation to the bearing layer, characterized by: The invention comprises a bottom plate (1), a basic short column (2) and a supporting assembly (4), wherein the bottom plate (1) is located in a foundation pit, the bottom plate (1) comprises a base (11) and an independent foundation (12), the base (11) is fixed to the bottom of the foundation pit, the setting direction of the base (11) is perpendicular to the depth direction of the foundation pit, and the independent foundation (12) is fixed to a side of the base (11) away from the bottom of the foundation pit; The foundation short column (2) comprises a support cage (21) and a plurality of second templates (24); the support cage (21) is arranged along the depth direction of the foundation pit; the support cage (21) is connected to the independent foundation (12); the plurality of second templates (24) and the support cage (21); the plurality of second templates (24) surround a foundation mold cavity that is convenient for pouring; the support assembly (4) comprises a cushion layer (41) and a support plate (42); the cushion layer (41) is fixed to one end of the support cage (21) away from the bottom of the foundation pit; the cushion layer (41) is arranged parallel to the base (11); the support plate (42) is fixed to one side of the cushion layer (41) away from the support cage (21); the construction elevator embedded parts are embedded in the support plate (42); the independent foundation (12), the foundation short column (2), the cushion layer (41) and the support plate (42) are selected with appropriate specific sizes and reinforcement.

2. A single-base construction elevator foundation according to claim 1, characterized in that: The support cage (21) comprises a plurality of steel cages (211), wherein the steel cages (211) are arranged along the depth of the foundation pit, and the plurality of steel cages (211) are distributed along the depth of the foundation pit; The basic short column (2) further comprises a plurality of connecting pieces (22), one connecting piece (22) being connected between two adjacent steel cages (211), and the connecting piece (22) connecting the plurality of steel cages (211) into the supporting cage (21).

3. A single-base construction elevator foundation according to claim 2, characterized in that: The connecting member (22) comprises two connecting frames (221) and a plurality of inserting rods (222), the two connecting frames (221) each corresponding to a steel cage (211), the connecting frame (221) being fixed inside the steel cage (211), the connecting frame (221) being coaxially arranged with the steel cage (211), the outer wall of the connecting frame (221) being in contact with the side wall of the steel cage (211), the two connecting frames (221) being close to each other, the plurality of inserting rods (222) being located between the two connecting frames (221), and the plurality of The insertion rods (222) are all fixed to one of the connecting frames (221), and the insertion rods (222) are arranged from one connecting frame (221) to another connecting frame (221). A plurality of the insertion rods (222) are evenly distributed along the circumference of the connecting frame (221). One end of the insertion rod (222) is fixed to one of the connecting frames (221), and a slot (2212) for inserting the insertion rod (222) is provided on a side of the other connecting frame (221) close to the insertion rod (222). The two connecting frames (221) are spliced ​​into a steel frame.

4. The single-base construction elevator foundation according to claim 3 is characterized by: The connecting member (22) further comprises a plurality of magnets (223); one of the insertion rods (222) and one of the slots (2212) each corresponds to one of the magnets (223); the magnet (223) corresponding to the insertion rod (222) is fixed to the end of the insertion rod (222) to which the connecting frame (221) is not fixed; the magnet (223) corresponding to the slot (2212) is fixed to the bottom of the slot (2212); when the insertion rod (222) is inserted into the slot (2212), the two connecting frames (221) fit together, and the magnet (223) on the insertion rod (222) and the magnet (223) in the slot (2212) are magnetically attracted to each other.

5. The single-base construction elevator foundation according to claim 3 is characterized by: A plurality of reinforcing ribs (2211) are fixed inside the connection frame (221), and the reinforcing ribs (2211) are arranged perpendicularly to the depth direction of the connection frame (221). The plurality of reinforcing ribs (2211) are divided into two groups, and the two groups of reinforcing ribs (2211) are arranged along the depth direction of the connection frame (221). Each group of reinforcing ribs (2211) is vertically distributed in a rectangular grid shape, and the reinforcing ribs (2211) are perpendicular to the inner wall of the connection frame (221) to which they are connected.

6. The single-base construction elevator foundation according to claim 3 is characterized by: The basic short column (2) also includes a plurality of fasteners (23), and the plurality of fasteners (23) are all located in the steel frame. The plurality of fasteners (23) are evenly distributed along the circumference of the steel frame. The fasteners (23) include two fastening plates (231) and a fastening bolt (232). The fastening plates (231) correspond to the connecting frames (221) one by one. The fastening plates (231) are fixed to the connecting frames (221). When the two connecting frames (221) are fitted together, the two fastening plates (231) are fitted together. The fastening bolts (232) are threadedly connected to the two fastening plates (231) in sequence, and the fastening bolts (232) fix the two fastening plates (231).

7. The single-base construction elevator foundation according to claim 2, characterized in that: The invention also comprises a positioning assembly (3), wherein the positioning assembly (3) comprises a connecting rod (311), two screw rods (312) and two hinged seats (313), wherein the connecting rod (311) is arranged obliquely upward from the bottom of the foundation pit to one side of the steel cage (211), and both ends of the connecting rod (311) are hollow, and one screw rod (312) corresponds to one end of the connecting rod (311), and the screw rod (312) is inserted into one end of the connecting rod (311), and the screw rod (312) is threadedly connected to the connecting rod (311). The screw rod (312) can move along the length direction of the connecting rod (311), and the connecting rod (311) and the two screw rods (312) form a telescopic rod. One screw rod (312) corresponds to one hinge seat (313), and one end of the screw rod (312) away from the connecting rod (311) is rotatably connected to the hinge seat (313). The hinge seat (313) close to the bottom of the foundation pit is connected to the bottom of the foundation pit, and the hinge seat (313) close to the steel cage (211) is connected to the second template (24).

8. A construction method for a single-base elevator foundation, characterized in that: The single-base construction of an elevator foundation according to any one of claims 1 to 7 comprises the following steps: S1: Construction elevator positioning: excavate the foundation pit on the ground and excavate it together with the main foundation to the bearing layer; S2: pouring the bottom plate (1) and the foundation short column (2): forming the independent foundation (12) on the bearing layer, the independent foundation (12) including predetermined dimensions and reinforcement, pouring concrete on the independent foundation (12), tying the steel bars and supporting the formwork of the foundation short column (2) on the independent foundation (12), and completing the concrete pouring, wherein the foundation short column (2) has predetermined dimensions and reinforcement; S3: Backfill: Carry out backfill construction and compaction; S4: Installation of pre-embedded parts for the construction elevator: tying the reinforcement bars of the cushion layer (41) and the support plate (42) and supporting the formwork on the compacted backfill soil, embedding the pre-embedded parts for the construction elevator foundation, and completing the concrete pouring; S5: Construction elevator construction: After the foundation strength of the construction elevator reaches the design strength requirement, the installation of the construction elevator can be carried out.

9. The construction method of a single-base construction elevator foundation according to claim 8, characterized in that: In step S2, the foundation short column (2) is supported by a formwork, and according to the depth of the foundation pit, a suitable number of the steel cages (211) are selected, and the steel cages (211) are connected to form the support cage (21) through the connecting pieces (22) and the fasteners (23), and the support cage (21) is fixed, and a plurality of the second templates (24) are surrounded to form a basic mold cavity, and the positioning assembly (3) is taken out, and the four positioning pieces (31) are adjusted to the length of the telescopic rod, and then the telescopic rods are respectively connected to the second templates (24) and the bottom of the foundation pit, so that the support cage (21) can be positioned.

10. The construction method of a single-base construction elevator foundation according to claim 8, characterized in that: The concrete pouring of the independent foundation (12) and the foundation short column (2) adopts a one-time pouring and molding method.