Open cut tunnel mechanical method continuous construction method
Through the combination of the biting cutterhead boring machine and the shield body and shield tail retaining structure, open-cut tunnel construction without foundation pit enclosure structure is realized, which solves the problems of high construction investment and space occupation, improves the construction speed and scope of application, and Form a stable supporting structure.
Patent Information
- Application Number
- CN202411030748.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-10-01
AI Technical Summary
The existing cut-and-cover tunnel construction method requires a foundation pit enclosure structure, which results in high project investment and occupied underground space. The construction speed is slow and the scope of application is limited.
An interlocking cutterhead boring machine is used to excavate the surrounding strata along the contour of the tunnel. The shield retaining structure and shield tail retaining structure follow closely in sequence to form a temporary retaining structure to avoid permanent foundation pit enclosure structures and use prefabricated assembled structures and horizontal supports. frame to improve construction efficiency and stability.
It realizes tunnel construction without foundation pit enclosure structure, saves project investment, reduces underground space occupation, improves construction speed and scope of application, and forms a stable retaining structure suitable for the excavation needs of different strata.
Smart Images

Figure CN118727831A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel engineering, and in particular to a mechanical continuous construction method for an open-cut tunnel. Background Art
[0002] Open cut method is a commonly used construction method in tunnel construction. Generally, the foundation pit retaining structure is constructed along the outer side of the tunnel contour first, and then the soil in the foundation pit is excavated layer by layer. Finally, the main structure of the tunnel is constructed, and backfill is carried out above the buried tunnel section. In order to ensure the overall stability of the foundation pit, the retaining structure generally needs to be inserted to a certain depth below the bottom of the foundation pit. The construction speed of the open cut tunnel is relatively fast, and the construction technology is relatively mature. Among them, the foundation pit retaining structure is generally only used as a temporary retaining structure during the foundation pit construction. After the foundation pit construction is completed, it generally has no clear function, but it requires a large amount of engineering investment and permanently occupies the underground space below the main structure. Summary of the invention
[0003] The purpose of the present invention is to provide an open-cut tunnel mechanical continuous construction method, which does not require the construction of foundation pit retaining structures, can save project investment, reduce underground space occupation, and has a wide range of applications.
[0004] To achieve the above object, the technical solution of the present invention is a mechanical continuous construction method of an open-cut tunnel, comprising the following steps:
[0005] S1, push the interlocking cutter head boring machine into the starting end;
[0006] S2. The interlocking cutterhead of the tunnel boring machine excavates the surrounding strata along the excavation contour, and the shield body retaining structure and the shield tail retaining structure follow the interlocking cutterhead in sequence;
[0007] S3, dig out the soil in the pit inside the shield retaining structure;
[0008] S4. Construct the main structure of the tunnel within the shield tail retaining structure;
[0009] S5. After the main structure of the tunnel reaches the bearing capacity requirement, the interlocking cutterhead boring machine is pushed forward to make the main structure of the tunnel escape from the shield tail retaining structure;
[0010] S6. Carry out construction according to S2-S5 cycle until the construction of all the main structures of the tunnel is completed;
[0011] S7. Receive the interlocking cutterhead tunnel boring machine at the receiving end.
[0012] As one of the implementation methods, before step S1, a starting working shaft and a receiving working shaft or a construction working end face are constructed, and the interlocking cutterhead, shield body retaining structure and shield tail retaining structure of the interlocking cutterhead tunnel boring machine are configured according to the stratum distribution.
[0013] As one of the implementation methods, in step S2, the surrounding strata of the bottom surface contour of the foundation pit are excavated by using an interlocking cutter disc; the surrounding strata of the side wall contour of the foundation pit are excavated by using an interlocking cutter disc or a combination of an interlocking cutter disc and a bayonet. When an interlocking cutter disc and a bayonet are used in combination, the hard strata at the bottom are excavated by using the interlocking cutter disc, and the soft soil strata at the top are directly penetrated by a bayonet.
[0014] As one of the implementation modes, the interlocking cutter disc includes a plurality of circular cutter discs that overlap and interlock with each other along the excavation contour, and adjacent circular cutter discs are staggered front and back.
[0015] As one of the implementation modes, the shield protection structure is a U-shaped structure, adopts a double-layer steel shell structure, and a reinforcement structure is arranged between the inner and outer steel shells.
[0016] As one of the implementation modes, the shield tail protection structure is a U-shaped structure, and adopts a single-layer steel shell structure.
[0017] As one of the implementation modes, in step S3, when the side walls of the shield body retaining structure and the shield tail retaining structure are relatively high and subjected to relatively large forces, a horizontal support frame is provided in the shield body retaining structure and the shield tail retaining structure.
[0018] As one of the implementation modes, in step S4, the main structure of the tunnel adopts a prefabricated assembly structure.
[0019] As one of the implementation modes, in step S4, when the main structure of the tunnel is a large-span open-cut structure, the bottom plate adopts an inverted arch with a certain curvature, and the junction between the side wall and the bottom plate adopts a corner structure with a certain radius.
[0020] As one of the implementation methods, in step S5, after the main structure of the tunnel reaches the bearing capacity requirement, the other end of the jack fixed on the shield retaining structure is supported on the assembled main structure of the tunnel to enable the interlocking cutterhead tunnel boring machine to move forward.
[0021] Compared with the prior art, the present invention has the following beneficial effects:
[0022] (1) Compared with the existing open-cut construction method, the present invention uses an interlocking cutterhead as a retaining structure for tunnel excavation, and does not require the construction of a foundation pit retaining structure, which can save project investment and reduce underground space occupation;
[0023] (2) Compared with the existing open-cut construction method, a closed double-layer steel shell "U"-shaped retaining structure is formed along the tunnel excavation contour. The structure has high rigidity and can form a stable retaining structure. It can also be combined with a horizontal support frame to increase the depth of the foundation pit applicable to this method.
[0024] (3) The present invention uses an interlocking cutter disc to cut the strata, and can also be used in combination with a plunge cutter, which can meet the excavation requirements of various strata from soil layers to bedrock and has a wide range of applications. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0026] Figure 1 It is a schematic diagram of the excavation section arrangement of the interlocking cutter disc according to an embodiment of the present invention;
[0027] Figure 2 It is a schematic diagram of the cross-sectional arrangement of the interlocking cutterhead and the insert cutter combination excavation according to an embodiment of the present invention;
[0028] Figure 3 It is a schematic diagram of the arrangement of the interlocking cutter disc according to an embodiment of the present invention;
[0029] Figure 4 It is a schematic diagram of the longitudinal section arrangement of the interlocking cutterhead roadheader according to an embodiment of the present invention;
[0030] Figure 5 A schematic diagram of a longitudinal section of rock layer distribution according to an embodiment of the present invention;
[0031] Figure 6 A schematic diagram of a shield protection structure according to an embodiment of the present invention using a double-layer curved arch steel shell structure;
[0032] Figure 7 A schematic diagram of a shield protection structure according to an embodiment of the present invention using a flat box-shaped steel structure;
[0033] Figure 8 A schematic diagram of a shield protection structure according to an embodiment of the present invention;
[0034] Fig. 9 A schematic diagram of a shield protection structure according to an embodiment of the present invention;
[0035] Fig.10 A schematic diagram of a main structure of a tunnel under construction in a shield tail retaining structure according to an embodiment of the present invention;
[0036] In the figure: 1. Ground; 2. Main structure of the tunnel; 3. Surrounding strata; 4. Soil in the pit; 5. Interlocking cutterhead; 6. Inserting cutter; 7. Shield body retaining structure; 8. Shield tail retaining structure; 9. Horizontal support frame; 10. Top surface line of hard strata. DETAILED DESCRIPTION
[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0038] In the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0039] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features; in the description of the present invention, unless otherwise specified, "plurality" means two or more.
[0040] This embodiment provides a mechanical continuous construction method for an open-cut tunnel, comprising the following steps:
[0041] S1, push the interlocking cutter head boring machine into the starting end;
[0042] S2, the interlocking cutterhead 5 of the interlocking cutterhead excavates the surrounding stratum 3 along the excavation contour, and the shield body retaining structure 7 and the shield tail retaining structure 8 follow the interlocking cutterhead 5 in sequence;
[0043] S3, digging out the soil 4 in the pit in the shield retaining structure 7;
[0044] S4, constructing the tunnel main structure 2 in the shield tail retaining structure 8;
[0045] S5. After the main tunnel structure 2 reaches the bearing capacity requirement, the interlocking cutterhead boring machine is pushed forward to make the main tunnel structure 2 escape from the shield tail retaining structure 8;
[0046] S6. Carry out construction according to S2-S5 in a cycle until the construction of all the tunnel main structures 2 is completed;
[0047] S7. Receive the interlocking cutterhead tunnel boring machine at the receiving end.
[0048] This embodiment uses an interlocking cutterhead tunnel boring machine to excavate the excavation contour of the open-cut tunnel foundation pit, which can meet the excavation needs of various soil layers from soft soil to bedrock and has a wide range of applications; the shield body retaining structure 7 and the shield tail retaining structure 8 follow the interlocking cutterhead 5 in sequence and serve as a temporary retaining structure for the foundation pit. The excavation of the soil 4 in the pit and the construction of the main tunnel structure 2 are carried out in the stable, water-free open environment formed by the shield body retaining structure 7, and there is no need to construct a permanent foundation pit retaining structure, which saves project investment and reduces underground space occupancy.
[0049] In this embodiment, according to the excavation sequence of the strata within the tunnel range, it is divided into the surrounding strata 3 to be excavated first and the pit soil 4 to be excavated later; the surrounding strata 3 is the rock and soil along the excavation contour, and is excavated by a bite cutter head tunneling machine; the pit soil 4 is the rock and soil within the shield retaining structure 7, and during excavation, it must be excavated in an orderly manner under the condition of the support of the retaining structures on both sides, that is, the excavation surface of the pit soil 4 should be within the range of the retaining structure and have a certain distance from the end; the excavation method of the pit soil 4 can adopt the relay backhoe method under the support of the retaining structure, or it can adopt the method of mechanical excavation in the pit and continuous slag discharge by belt conveyor. The excavation surface of the surrounding strata 3 is ahead of the excavation surface of the pit soil 4, and the leading distance is selected according to the stratum conditions. The shield retaining structure 7 and the shield tail retaining structure 8 are any continuous structures whose form is not larger than the excavation contour.
[0050] Furthermore, before step S1, construction preparation is carried out, a starting working shaft and a receiving working shaft or a working end face, a starting reaction frame and other facilities are constructed, and the interlocking cutterhead 5, the insert cutter 6 and the corresponding shield body retaining structure 7 and the shield tail retaining structure 8 of the interlocking cutterhead tunnel boring machine are configured according to the stratum distribution.
[0051] like Figure 1 As shown, in one of the embodiments, in step S2, the bottom surface of the foundation pit and the surrounding bottom layer of the two side wall contours are excavated using an interlocking cutter disc 5, which can adapt to various strata and effectively reduce the resistance of the overall propulsion of the machine. It is more suitable for foundation pit excavation with a longer circumference than the existing propulsion without a cutter disc.
[0052] like Figure 2 As shown, in another embodiment, in step S2, the surrounding strata 3 of the bottom surface contour of the foundation pit are excavated by the interlocking cutterhead 5; the surrounding strata 3 of the side wall contour of the foundation pit are excavated by the interlocking cutterhead 5 in combination with the plunger 6, the lower hard strata are excavated by the interlocking cutterhead 5, and the upper soft soil strata are directly penetrated by the plunger 6. The surrounding strata 3 of the side wall contour of the foundation pit can be excavated by the interlocking cutterhead 5 in combination with the plunger 6 in combination with the stratum penetration characteristics, and the vertical setting range of the interlocking cutterhead 5 is determined according to the position of the top surface line 10 of the hard stratum within the tunnel range, such as Figure 2 and Figure 5As shown, the total height h of the interlocking cutter disc 5 should be greater than the maximum height h' of the hard rock layer within the excavation range. The soft soil part of the shallow surface layer is above the interlocking cutter disc 5, which is easy to penetrate. The inserting cutter 6 with a sharp blade at the front is used to directly squeeze into the formation, which can reduce the number of interlocking cutter discs 5 and save engineering investment.
[0053] Furthermore, the interlocking cutter disc 5 comprises a plurality of circular cutter discs that overlap and interlock with each other along the excavation contour, and adjacent circular cutter discs are staggered front and back. Figure 1-Figure 4 As shown in the figure, the circular cutterheads are continuously distributed along the excavation contour and are retreated from top to bottom. Different types of cutters such as roller cutters and tooth cutters can be installed on the circular cutterhead to meet the excavation needs of various strata from soft soil to rock.
[0054] In this embodiment, the shield protection structure 7 is a U-shaped structure, adopting a double-layer steel shell structure, which has greater rigidity and can better resist the pressure from the surrounding soil or rocks. Figure 6-Figure 7 As shown, the double-layer steel shell structure can specifically adopt a double-layer curved arch steel shell structure similar to the excavation profile, or a flat box-shaped steel structure smaller than the excavation profile. When the upper soft soil layer is squeezed into the layer by the insert 6, considering the characteristics of small upper soil pressure and small stress on the retaining structure, the thickness of the shield retaining structure 7 of this part can be appropriately reduced.
[0055] Optimally, a reinforcement structure is provided between the inner and outer steel shells of the double-layer steel shell structure. The reinforcement structure may specifically adopt structures such as columns, longitudinal partitions or ribs to increase the integrity and protection capacity of the double-layer steel shell structure, so as to meet the overall force requirements of the double-layer steel shell structure.
[0056] When the interlocking cutter disc 5 adopts a 2m circular cutter disc, the shield protection structure 7 can adopt a double-layer steel shell structure with a thickness of 1.2m to 1.3m, which can meet the rigidity requirement of foundation pit support at a depth of about 20m.
[0057] In order to reduce the gap between the structure and the excavation contour and reduce the backfill, especially the bottom backfill and grouting volume, the thickness of the tail retaining structure can be appropriately reduced. In this embodiment, the shield tail retaining structure 8 is a U-shaped structure, using a single-layer steel shell structure, so that the gap between the tunnel main structure 2 and the excavation contour is smaller, and the filling volume outside the prefabricated assembled tunnel main structure 2 is smaller during the advancement process. Fig.10 As shown. Optimally, the outer wall of the shield tail retaining structure 8 is flush with the outer wall of the shield body retaining structure 7, and can also be arched outward to form an arched structure. A temporary water-stopping device such as a wire brush is arranged at the rear of the shield tail retaining structure 8.
[0058] This embodiment uses steel shell as the retaining structure for the main structure of the foundation pit. According to different locations or different working conditions, double-layer or single-layer steel shell can be selected as the retaining structure. A brief analysis is conducted on the feasibility of the retaining structure. For a 20m wide and 20m deep foundation pit constructed in soft soil, the internal force and deformation of the retaining structure are:
[0059]
[0060] From the calculation results, the single-layer steel shell structure is relatively unfavorable, but the vertical displacement and stress of the bottom plate can be controlled by setting an arch structure at the bottom. The calculation does not take into account the prefabricated assembled tunnel main structure 2 of the shield tail, and the calculation results are relatively conservative. Therefore, it is feasible to use a single-layer steel shell structure for the shield tail retaining structure 8.
[0061] Furthermore, in step S3, when the side walls of the shield body protection structure 7 and the shield tail protection structure 8 are relatively high and subjected to relatively large forces, a horizontal support frame 9 can be provided in the shield body protection structure 7 and the shield tail protection structure 8 according to the overall force requirements of the components. The two ends of the horizontal support frame 9 are respectively connected to the two side walls of the shield body protection structure 7 or the shield tail protection structure 8, thereby improving the force on the side walls and improving the stability of the shield body protection structure 7 and the shield tail protection structure 8, such as Figure 8-Figure 9 The horizontal support frame 9 can be a steel structure and move together with the shield body retaining structure 7 and the shield tail retaining structure 8; the size, spacing and other parameters of the horizontal support frame 9 are determined according to the stress conditions of the side wall.
[0062] In this embodiment, in step S4, the main tunnel structure 2 adopts a prefabricated assembly structure, and the main tunnel structure 2 is hoisted or assembled in the U-shaped space formed by the shield tail retaining structure 8. During the excavation of the interlocking cutter head tunnel boring machine, the assembled main tunnel structure 2 is pushed out of the shield tail retaining structure 8 to achieve the goal of continuous advancement and assembly.
[0063] Optimally, in step S4, when the main tunnel structure 2 is a large-span open-cut structure, the bottom plate adopts an inverted arch with a certain curvature, and the junction of the side wall and the bottom plate adopts a corner structure with a certain radius, which can effectively reduce the structural stress of the bottom plate and the corner.
[0064] Furthermore, in step S5, after the main tunnel structure 2 reaches the bearing capacity requirement, the other end of the jack fixed on the shield retaining structure 7 is supported on the assembled main tunnel structure 2 to enable the interlocking cutterhead tunnel boring machine to move forward.
[0065] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A mechanical continuous construction method for an open-cut tunnel, characterized in that: The steps include: S1, push the interlocking cutter head boring machine into the starting end; S2. The interlocking cutterhead of the tunnel boring machine excavates the surrounding strata along the excavation contour, and the shield body retaining structure and the shield tail retaining structure follow the interlocking cutterhead in sequence; S3, dig out the soil in the pit inside the shield retaining structure; S4. Construct the main structure of the tunnel within the shield tail retaining structure; S5. After the main structure of the tunnel reaches the bearing capacity requirement, the interlocking cutterhead boring machine is pushed forward to make the main structure of the tunnel escape from the shield tail retaining structure; S6. Carry out construction according to S2-S5 cycle until the construction of all the main structures of the tunnel is completed; S7. Receive the interlocking cutterhead tunnel boring machine at the receiving end.
2. The mechanical continuous construction method of open-cut tunnel according to claim 1, characterized in that: Before step S1, a starting working shaft and a receiving working shaft or a construction working end face are constructed, and the interlocking cutterhead, the shield body retaining structure and the shield tail retaining structure of the interlocking cutterhead tunnel boring machine are configured according to the stratum distribution.
3. The mechanical continuous construction method of open-cut tunnel according to claim 1, characterized in that: In step S2, the surrounding strata of the bottom surface contour of the foundation pit are excavated by using an interlocking cutter disc; the surrounding strata of the side wall contour of the foundation pit are excavated by using an interlocking cutter disc or a combination of an interlocking cutter disc and a bayonet. When the interlocking cutter disc and the bayonet are used for excavation, the hard strata at the bottom are excavated by using an interlocking cutter disc, and the soft soil strata at the top are directly penetrated by a bayonet.
4. The mechanical continuous construction method of open-cut tunnel according to claim 3, characterized in that: The interlocking cutter disc comprises a plurality of circular cutter discs which overlap and interlock with each other along the excavation contour, and adjacent circular cutter discs are staggered front and back.
5. The mechanical continuous construction method of open-cut tunnel according to claim 1, characterized in that: The shield protection structure is a U-shaped structure, adopts a double-layer steel shell structure, and a reinforcement structure is arranged between the inner and outer steel shells.
6. The mechanical continuous construction method of open-cut tunnel according to claim 1, characterized in that: The shield tail protection structure is a U-shaped structure and adopts a single-layer steel shell structure.
7. The mechanical continuous construction method of open-cut tunnel according to claim 1, characterized in that: In step S3, when the side walls of the shield body retaining structure and the shield tail retaining structure are high and subjected to greater force, a horizontal support frame is arranged in the shield body retaining structure and the shield tail retaining structure.
8. The mechanical continuous construction method of open-cut tunnel according to claim 1, characterized in that: In step S4, the main structure of the tunnel adopts a prefabricated assembly structure.
9. The mechanical continuous construction method of open-cut tunnel according to claim 1, characterized in that: In step S4, when the main structure of the tunnel is a large-span open-cut structure, the bottom plate adopts an inverted arch with a certain curvature, and the junction between the side wall and the bottom plate adopts a corner structure with a certain radius.
10. The mechanical continuous construction method of open-cut tunnel according to claim 1, characterized in that: In step S5, after the main structure of the tunnel reaches the bearing capacity requirement, the other end of the jack fixed on the shield retaining structure is supported on the assembled main structure of the tunnel to enable the interlocking cutterhead tunnel boring machine to move forward.