Road inspection well periphery reinforcing construction method and reinforcing structure
By backfilling the cement-stabilized gravel and prefabricated shaft at the intersection of the inspection well chamber and the wellbore, combined with the reinforced pier structure, the problems of sinking of the inspection well and cracking of the road surface around the well in hilly areas have been solved, improving construction quality and safety, and reducing maintenance costs. cost.
Patent Information
- Application Number
- CN202411077819.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-10-01
AI Technical Summary
During the construction of high-grade roads in hilly areas, due to the difference in material properties and soil mass of the inspection wells and the difficulty in compacting the backfill material, the inspection wells have subsided and the road surface around the wells has cracked, causing vehicles to jump out and surface water to seep in, which in turn aggravates the settlement of the inspection wells. The surrounding road surface is cracked, and the concealed nature of the construction makes it difficult to control the quality, resulting in safety hazards and high maintenance costs.
The intersection of the inspection well chamber and the wellbore is backfilled with 5% cement-stabilized gravel and compacted by a hand-pushed small roller. Prefabricated wellbore is used to speed up construction. Reinforcement piers are set along the well circle to enhance the strength of the well circle, well seat and manhole cover. Stability, ensure the compaction of roadbed fill, and optimize the construction process to avoid settlement and leakage.
It effectively avoids the sinking of the inspection well and the cracking of the road surface around the well, improves the construction quality, reduces the maintenance cost, and ensures the safety and stability of the construction.
Smart Images

Figure CN118727833A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of road inspection well perimeter reinforcement, and in particular to a road inspection well perimeter reinforcement construction method and a reinforcement structure. Background Art
[0002] With the gradual improvement of the national road network, high-grade roads have gradually extended to hilly areas with more complex terrain. However, there are many sections of roads with high excavation and low filling in hilly areas, which brings many challenges to road construction. In particular, the quality of inspection wells is difficult to control in such sections with large elevation changes. Due to the significant difference between the performance of inspection well materials and the surrounding soil and road surface materials, and the difficulty in compacting the inspection well cushion and backfill materials, inspection wells often sink and crack around the wells under the repeated action of traffic loads, causing secondary diseases such as vehicle jumping and surface water infiltration, further aggravating the settlement of inspection wells and cracking of surrounding roads, and finally forming a vicious circle. Inspection well construction is a concealed project, which is difficult to manage during actual construction and difficult to detect quality problems in time. Once quality defects occur, it will bring great safety hazards, and later maintenance will be difficult and costly. Summary of the invention
[0003] The present invention aims to provide a road inspection well reinforcement construction method and reinforcement structure to solve the problem that existing road inspection wells sink under the repeated action of traffic loads and the road surface around the wells cracks, causing vehicles to jump out and surface water to seep in, aggravating the settlement of the inspection wells and the cracking of the surrounding road surfaces.
[0004] The present invention is achieved by adopting the following technical solutions:
[0005] The present invention provides a road inspection well perimeter reinforcement construction method, comprising the following steps:
[0006] S1: Excavation of inspection wells and foundation pits on the target road section;
[0007] S2: pouring the inspection well cushion at the bottom of the foundation pit;
[0008] S3: pouring the inspection well chamber on the inspection well cushion layer;
[0009] S4: Backfill and reinforce the inspection well chamber. Backfill 5% cement-stabilized gravel around the inspection well chamber and compact it;
[0010] S5: Install an inspection well shaft above the inspection well chamber; wherein the inspection well shaft adopts a prefabricated shaft;
[0011] S6: Backfill and reinforce the inspection well shaft. Backfill 5% cement-stabilized gravel around the lower part of the inspection well shaft and compact it;
[0012] S7: Multiple well ring reinforcement piers are arranged at intervals around the upper part of the inspection well shaft, the lower part of the well ring reinforcement piers is connected to the periphery of the inspection well shaft, and the upper part of the well ring reinforcement piers is connected to the top of the inspection well shaft, and then the roadbed filler is backfilled and compacted above the 5% cement stabilized gravel around the inspection well shaft and around the well ring reinforcement piers;
[0013] S8: Install a well seat on the upper part of the well ring reinforcement pier, and install a well cover on the well seat;
[0014] S9: Construct the pavement layer above the roadbed filling material and around the inspection well.
[0015] As the preferred technical solution:
[0016] In step S3, the inspection well chamber is a reinforced concrete well chamber.
[0017] As the preferred technical solution:
[0018] The 5% cement-stabilized crushed stone in step S4 and step S6 is compacted by a roller.
[0019] As the preferred technical solution:
[0020] The roller is a hand-push roller.
[0021] As the preferred technical solution:
[0022] In step S7, four well ring reinforcement piers are evenly and spaced apart around the inspection well shaft.
[0023] As the preferred technical solution:
[0024] In step S7, the well ring reinforcement pier adopts a concrete structure.
[0025] As the preferred technical solution:
[0026] In step S7, the compaction degree of the roadbed filler meets the road requirements.
[0027] As the preferred technical solution:
[0028] In step S8, a well seat is installed on the inner side of the upper part of a plurality of well ring reinforcement piers.
[0029] As the preferred technical solution:
[0030] In step S9, the road surface layer is flush with the manhole cover.
[0031] The present invention further provides a road inspection well perimeter reinforcement structure, comprising an inspection well cushion layer cast at the bottom of a foundation pit, an inspection well chamber cast on the inspection well cushion layer, the perimeter of the inspection well chamber backfilled with 5% cement-stabilized gravel, an inspection well shaft installed above the inspection well chamber, the inspection well shaft adopts a prefabricated shaft, the perimeter of the inspection well shaft is backfilled with 5% cement-stabilized gravel, a plurality of well ring reinforcement piers are arranged at intervals around the upper part of the inspection well shaft, the lower part of the well ring reinforcement piers is connected to the perimeter of the inspection well shaft, the upper part of the well ring reinforcement piers is connected to the upper part of the inspection well shaft, roadbed filling material is backfilled above the 5% cement-stabilized gravel around the inspection well shaft and around the well ring reinforcement piers, a well seat is installed on the upper part of the well ring reinforcement piers, a well cover is installed on the well seat, and a pavement layer is constructed above the roadbed filling material and around the inspection well.
[0032] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0033] The present invention adopts a variety of reinforcement measures to address the difficulties in the construction of inspection wells, so as to avoid the sinking of the inspection wells, cracking of the road surface around the wells, and the jumping of vehicles and the infiltration of surface water. The present invention first optimizes the backfill material, uses 5% cement stabilized crushed stone to backfill the inspection well chamber and the intersection with the inspection well shaft, and uses a hand-push small roller to roll it to ensure the compaction degree, so as to achieve the purpose of comprehensively reinforcing the periphery of the inspection well and avoiding leakage and settlement; secondly, the concrete cast-in-place shaft is adjusted to an assembled prefabricated shaft, so as to speed up the construction speed and save costs; finally, the position structure of the inspection well seat is optimized, and 4 well ring reinforcement piers are added around the well ring to achieve the purpose of strengthening the inspection well ring, well seat and well cover, so as to ensure the stability of the well ring, well seat and well cover. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 The present invention provides a flow chart of the road inspection well perimeter reinforcement construction method.
[0035] Figure 2 It is a schematic diagram of step S1 of the present invention.
[0036] Figure 3 It is a schematic diagram of step S2 of the present invention.
[0037] Figure 4 It is a schematic diagram of step S3 of the present invention.
[0038] Figure 5 It is a schematic diagram of step S4 of the present invention.
[0039] Figure 6 It is a schematic diagram of step S5 of the present invention.
[0040] Figure 7 It is a schematic diagram of step S6 of the present invention.
[0041] Figure 8 It is a schematic diagram of step S7 of the present invention.
[0042] Fig. 9 It is a schematic diagram of step S8 of the present invention.
[0043] Fig.10 It is a schematic diagram of step S9 of the present invention.
[0044] Icons: 1-foundation pit, 2-inspection well cushion layer, 3-inspection well chamber, 4-5% cement stabilized gravel, 5-inspection well shaft, 6-well ring reinforcement pier, 7-roadbed filling material, 8-well seat, 9-well cover, 10-pavement layer. DETAILED DESCRIPTION
[0045] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0046] Example 1
[0047] like Figure 1 As shown, this embodiment proposes a road inspection well perimeter reinforcement construction method, comprising the following steps:
[0048] S1: Excavation of inspection wells, excavation of foundation pit 1 in the target section, such as Figure 2 As shown;
[0049] S2: Pour the inspection well cushion layer 2 at the bottom of the foundation pit 1, such as Figure 3 As shown;
[0050] S3: pouring the inspection well chamber 3 on the inspection well cushion layer 2; wherein the inspection well chamber 3 is a reinforced concrete well chamber, such as Figure 4 As shown;
[0051] S4: Backfill and reinforce the inspection well chamber 3. Backfill 5% cement-stabilized gravel 4 around the inspection well chamber 3 and roll it with a hand-propelled small roller to ensure compaction. Figure 5 As shown;
[0052] S5: Install the inspection well shaft 5 above the inspection well chamber 3, such as Figure 6 As shown; wherein, the inspection well shaft 5 adopts a prefabricated shaft to speed up the construction speed and save costs;
[0053] S6: Backfill and reinforce the inspection well shaft 5. Backfill 5% cement-stabilized gravel 4 around the lower part of the inspection well shaft 5 and roll it with a hand-propelled small roller to ensure the compaction degree, such as Figure 7 As shown;
[0054] S7: Multiple well ring reinforcement piers 6 are arranged at intervals around the upper part of the inspection well shaft 5, the lower part of the well ring reinforcement piers 6 is located around the inspection well shaft 5, and the upper part of the well ring reinforcement piers 6 is located above the inspection well shaft 5, so as to strengthen the inspection well ring, well seat 8 and well cover 9, and then the roadbed filler 7 is backfilled above the 5% cement stabilized gravel 4 around the inspection well shaft 5 and around the well ring reinforcement piers 6 and compacted, and the compaction degree meets the road requirements, such as Figure 8 As shown;
[0055] S8: Install a well seat 8 on the inner side of the upper part of the plurality of well ring reinforcement piers 6, and install a well cover 9 on the well seat 8, such as Fig. 9 As shown;
[0056] S9: Construct a pavement layer 10 above the roadbed filler 7 and around the inspection well, such as Fig.10 shown.
[0057] In this embodiment, four well ring reinforcement piers 6 are evenly and spaced apart around the inspection well shaft 5 .
[0058] In this embodiment, 5% cement stabilized gravel 4 is a material made of gravel and cement mixed in proportion, wherein the proportion of cement accounts for 5% of the total volume, and is used to improve the stability and bearing capacity of the backfill around the well chamber, so as to achieve the purpose of comprehensively reinforcing the periphery of the inspection well and avoiding leakage and settlement.
[0059] In this embodiment, the well ring reinforcement pier 6 adopts a concrete structure, the lower part of the well ring reinforcement pier 6 is connected to the periphery of the inspection well shaft 5, and the upper part of the well ring reinforcement pier 6 is connected to the top of the inspection well shaft 5.
[0060] In this embodiment, the pavement structure layer includes a roadbed filler 7 and a pavement layer 10 .
[0061] Example 2
[0062] like Fig.10As shown, this embodiment provides a road inspection well surrounding reinforcement structure, including an inspection well cushion layer 2 cast at the bottom of a foundation pit 1, an inspection well chamber 3 cast on the inspection well cushion layer 3, the surrounding of the inspection well chamber 3 is backfilled with 5% cement stabilized gravel 4, an inspection well shaft 5 is installed above the inspection well chamber 3, the inspection well shaft 5 adopts a prefabricated shaft, the surrounding of the inspection well shaft 5 is backfilled with 5% cement stabilized gravel 4, and a plurality of well ring reinforcements are arranged at intervals around the upper part of the inspection well shaft 5. The lower part of the well ring reinforcement pier 6 is connected to the vicinity of the inspection well shaft 5, and the upper part of the well ring reinforcement pier 6 is connected to the top of the inspection well shaft 5. The roadbed filling material 7 is backfilled above the 5% cement stabilized gravel 4 around the inspection well shaft 5 and around the well ring reinforcement pier 6. A well seat 8 is installed on the upper part of the well ring reinforcement pier 6, and a well cover 9 is installed on the well seat 8. A pavement layer 10 is constructed above the roadbed filling material 7 and around the inspection well, and the top surface of the pavement layer 10 is flush with the top surface of the well cover 9.
[0063] Four well ring reinforcement piers 6 are evenly and spaced apart around the inspection well shaft 5, and the four well ring reinforcement piers 6 are spaced apart along the circumferential direction of the well ring.
[0064] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A road inspection well reinforcement construction method, characterized in that: The following steps are involved: S1: Excavation of inspection wells and foundation pits on the target road section; S2: pouring the inspection well cushion at the bottom of the foundation pit; S3: pouring the inspection well chamber on the inspection well cushion layer; S4: Backfill and reinforce the inspection well chamber. Backfill 5% cement-stabilized gravel around the inspection well chamber and compact it; S5: Install an inspection well shaft above the inspection well chamber; wherein the inspection well shaft adopts a prefabricated shaft; S6: Backfill and reinforce the inspection well shaft. Backfill 5% cement-stabilized gravel around the lower part of the inspection well shaft and compact it; S7: Multiple well ring reinforcement piers are arranged at intervals around the upper part of the inspection well shaft, the lower part of the well ring reinforcement piers is connected to the periphery of the inspection well shaft, and the upper part of the well ring reinforcement piers is connected to the top of the inspection well shaft, and then the roadbed filler is backfilled and compacted above the 5% cement stabilized gravel around the inspection well shaft and around the well ring reinforcement piers; S8: Install a well seat on the upper part of the well ring reinforcement pier, and install a well cover on the well seat; S9: Construct the pavement layer above the roadbed filling material and around the inspection well.
2. The method for reinforcing the perimeter of a road inspection well according to claim 1 is characterized in that: In step S3, the inspection well chamber is a reinforced concrete well chamber.
3. The method for reinforcing the perimeter of a road inspection well according to claim 1 is characterized in that: The 5% cement-stabilized crushed stone in step S4 and step S6 is compacted by a roller.
4. The method for reinforcing the perimeter of a road inspection well according to claim 3 is characterized in that: The roller is a hand-push roller.
5. The method for reinforcing the perimeter of a road inspection well according to claim 1 is characterized in that: In step S7, four well ring reinforcement piers are evenly and spaced apart around the inspection well shaft.
6. The method for reinforcing the perimeter of a road inspection well according to claim 1 is characterized in that: In step S7, the well ring reinforcement pier adopts a concrete structure.
7. The method for reinforcing the perimeter of a road inspection well according to claim 1 is characterized in that: In step S7, the compaction degree of the roadbed filler meets the road requirements.
8. The method for reinforcing the perimeter of a road inspection well according to claim 1 is characterized in that: In step S8, a well seat is installed on the inner side of the upper part of a plurality of well ring reinforcement piers.
9. The method for reinforcing the perimeter of a road inspection well according to claim 1 is characterized in that: In step S9, the road surface layer is flush with the manhole cover.
10. A road inspection well surrounding reinforcement structure, characterized in that: It includes an inspection well cushion layer cast at the bottom of the foundation pit, an inspection well chamber cast on the inspection well cushion layer, the inspection well chamber is backfilled with 5% cement-stabilized gravel, an inspection well shaft is installed above the inspection well chamber, the inspection well shaft adopts a prefabricated shaft, the lower part of the inspection well shaft is backfilled with 5% cement-stabilized gravel, a plurality of well ring reinforcement piers are arranged at intervals around the upper part of the inspection well shaft, the lower part of the well ring reinforcement pier is connected to the inspection well shaft, the upper part of the well ring reinforcement pier is connected to the top of the inspection well shaft, the 5% cement-stabilized gravel around the inspection well shaft and the well ring reinforcement pier are backfilled with roadbed filling material, a well seat is installed on the top of the well ring reinforcement pier, a well cover is installed on the well seat, and a pavement layer is constructed above the roadbed filling material and around the inspection well.