Concentric ring grid structure and construction method thereof
Through the concentric ring grid structure and its construction method, the interference between the grid and the structural columns, supports, and lifting frames during the lifting process is avoided, which solves the cumbersome construction and structural strength problems, and achieves the effects of simplifying construction and improving structural strength. .
Patent Information
- Application Number
- CN202411042944.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-10-01
AI Technical Summary
During the construction of a long-span grid structure, some of the grid members need to be temporarily disconnected to avoid interference with the lifting frame or structural columns, which results in a cumbersome construction process, affects the structural strength and increases safety risks.
Adopting a concentric ring grid structure and its construction method, by setting up annular ring beams and grids, it avoids interference with structural columns, supports, and lifting frames during the lifting process, achieving lifting without disconnecting or embedding rods, and simplifying construction. process and improve structural strength.
It simplifies the construction process, improves the strength of the grid structure, reduces high-altitude operations and construction costs, reduces construction risks, and improves construction safety and efficiency.
Smart Images

Figure CN118727931A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a concentric ring grid structure and a construction method thereof. Background Art
[0002] Spatial steel structure refers to a steel structure building with a large spatial span. In the construction field, the main structural forms include grid, lattice shell, truss, cable structure and the combination of the above structures. It is mainly used in large public buildings such as factories, railway station buildings, stadiums, airport terminals and ancillary projects, convention and exhibition centers, etc.
[0003] In the related art, when constructing a large-span grid structure, the grid needs to be lifted with the help of a lifting frame. However, some rods of the grid at the lifting frame or the structural column need to be temporarily disconnected to avoid structural interference and form a lifting space. Therefore, the grid needs to be equipped with force conversion rods at the disconnected rods to ensure the safety of the lifting process. After the lifting is completed, the conversion rods are cut off and the temporarily disconnected rods are replaced. The above process is cumbersome and increases a large amount of high-altitude operations, reduces construction efficiency, increases safety hazards, and the temporary breaking of rods and the setting of replacement rods weaken the force system of the original structure and affect the strength of the grid structure. Summary of the invention
[0004] In view of this, the present invention provides a concentric ring grid structure and a construction method thereof to solve the problem that during the grid lifting construction, some rods need to be temporarily disconnected to avoid interference with the lifting frame or structural columns, resulting in a cumbersome construction process and affecting the strength of the grid structure.
[0005] In the first aspect, the present invention provides a concentric ring grid structure and a construction method thereof, comprising: a structural column; a ring beam, coaxially arranged with the structural column; the inner diameter of the ring beam is larger than the diameter of the structural column; a grid, comprising a web, a chord and a ball node, the web being connected to the ring beam; a support, fixed to the top of the structural column, the maximum spacing between the edges of the support in a plane perpendicular to the axial direction being smaller than the inner diameter of the ring beam; a second beam support, detachably connected to the periphery of the support, the ring beam being overlapped at the second beam support; a lifting frame, detachably connected to the support, the lifting frame having a lifting state for lifting the ring beam to raise the grid; when the lifting frame is in the lifting state, the ring beam and the grid rise, the structural column and the support pass through the ring beam in sequence, and the structural column, the support and the lifting frame pass through the grid in sequence.
[0006] Beneficial effect: By setting an annular ring beam and a grid coordinated with the ring beam, the ring beam is arranged around the periphery of the structural column or the support, and the grid is arranged around the periphery of the structural column, the support or part of the lifting frame, and the grid maintains its original structure from the beginning of the rise of the grid to the process of the grid rising to the designed height. There is no need to break the grid rods, set conversion rods and other patching work, thereby achieving the purpose of simplifying the construction process and improving the strength of the grid structure. There is no need to dismantle and modify the main rods of the grid, patch and install the broken rods in the lifting holes, reduce high-altitude installation operations, and reduce construction costs and construction risks. There is no need to strengthen the original structure, such as welding temporary reinforcement rods, increasing the cross-section of the grid rods for reinforcement, reducing construction costs, and ensuring safe and efficient construction. It is easy to operate, reduces costs and increases efficiency, and has significant economic benefits and promotion value.
[0007] Beneficial effects: The grid is a frame structure arranged around the axis of the structural column, and the ring beam is a ring structure arranged around the axis of the structural column. Reasonable structural design avoids base structures such as structural columns and supports, ensuring that there is no patching operation during the lifting of the grid nodes, and there is no interference with base structures such as structural columns and supports, as well as functional structures such as lifting frames. The construction is safe and efficient, the operation is convenient, and the practical effect is leaps and bounds.
[0008] In an optional embodiment, the support includes a first column and a plurality of first beam supports arranged around the first column; the lifting frame includes a second column, the second column is detachably connected to the end of the first column and abuts against the first beam support, and the first beam support auxiliary supports the second column; the second column is coaxially arranged with the structural column, and the diameter of the second column is smaller than the inner diameter of the ring beam.
[0009] In an optional embodiment, the lifting frame also includes: a cantilever, which is arranged at one end of the second column away from the first column; a lifting cable, one end of which is connected to the cantilever and the other end of which is detachably connected to the ring beam; when the lifting frame is in a lifting state, the lifting cable contracts to drive the ring beam to move toward the cantilever.
[0010] In an optional embodiment, the second beam support is connected to a side of the first beam support facing away from the first column, and is suitable for providing support for the ring beam.
[0011] In an optional embodiment, the ring beam is provided with a lifting point on one side close to the grid, one end of the lifting cable is connected to the lifting point, and the other end is connected to the cantilever; when the lifting frame is in a lifting state, the grid rises, the second column and the lifting cable pass through the grid, and the web rod and the lifting cable are spaced apart so that the grid and the lifting frame do not interfere with each other.
[0012] In an optional embodiment, it also includes a support tube, which is arranged between the support and the structural column and is suitable for auxiliary supporting the first beam support; one end of the support tube is detachably connected to the first beam support, and the other end is detachably connected to the structural column.
[0013] In an optional embodiment, a plurality of wing plates are provided on a peripheral portion of one side of the support tube close to the support seat; an embedded part is provided on an end portion of one side of the support tube close to the structural column, and the embedded part is embedded in the top end of the structural column.
[0014] In an optional embodiment, the grid has a plurality of chord rods, the ball nodes are provided at the connecting positions of the chord rods, and the plurality of ball nodes are arranged at intervals; and a plurality of web rods are respectively connected to the ball nodes to form the grid.
[0015] In an optional embodiment, at least two cantilevers are respectively arranged opposite to each other at the second column, and at least two lifting cables are respectively connected to the at least two cantilevers.
[0016] In the second aspect, the present invention also provides a concentric ring grid structure construction method, which is applicable to the concentric ring grid structure as described in any of the above items, including: the ring beam and the grid are sleeved on the periphery of the structural column and arranged close to the top of the structural column; the support is installed to the top of the structural column, the lifting frame is installed on the side of the support away from the structural column, and the support pipe is installed between the first beam support of the support and the structural column; the lifting cable of the lifting frame is detachably connected to the lifting point at the ring beam; the lifting frame lifts the ring beam and the grid with the help of the lifting cable, and when the ring beam and the grid rise, the structural column and the support are sequentially passed through the ring beam, and the structural column, the support, and the lifting frame are sequentially passed through the grid; the grid is lifted to the standard position, and the second beam support is installed on the outside of the first beam support of the support, and the ring beam abuts at the second beam support; the support pipe, the lifting frame and the lifting point are removed. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0018] Figure 1 It is a schematic diagram of the concentric ring grid structure of the present invention;
[0019] Figure 2 This is a schematic diagram of the concentric ring grid structure of the present invention before lifting construction;
[0020] Figure 3It is a schematic diagram of the concentric ring grid structure of the present invention during lifting construction;
[0021] Figure 4 It is a schematic diagram of the grid structure of the present invention being lifted to a standard position;
[0022] Figure 5 It is a schematic diagram of installing the second beam support at the support of the present invention;
[0023] Figure 6 is a schematic diagram of the support of the present invention;
[0024] Figure 7 Schematic diagram of the support tube of the present invention.
[0025] Description of reference numerals:
[0026] 1. Structural column; 2. Ring beam; 21. Lifting point; 3. Grid; 31. Web member; 32. Chord; 33. Ball node; 4. Support; 41. First column; 42. First beam support; 43. Second beam support; 5. Lifting frame; 51. Lifting rope; 52. Second column; 53. Cantilever; 6. Support pipe; 61. Wing plate; 62. Embedded parts. DETAILED DESCRIPTION
[0027] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0028] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0029] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0031] Combine the following Figures 1 to 7 , describing an embodiment of the present invention.
[0032] According to an embodiment of the present invention, on the one hand, a concentric ring grid structure is provided, comprising: a structural column 1; a ring beam 2, which is coaxially arranged with the structural column 1; the inner diameter of the ring beam 2 is larger than the diameter of the structural column 1, and when the ring beam 2 is lifted, it surrounds the structural column 1; a grid 3, comprising a web member 31, a chord member 32 and a ball node 33, wherein the web member 31 is connected to the ring beam 2; a support 4, which is fixed to the top of the structural column 1, and the maximum spacing between the edges of the support 4 in a plane perpendicular to the axial direction is less than the maximum spacing between the edges of the support 4 and the plane perpendicular to the axial direction. The inner diameter of the ring beam 2 is such that when the ring beam 2 passes through the support 4 during the lifting process of the grid 3, the ring beam 2 is arranged around the periphery of the support 4 so that the ring beam 2 does not interfere with the support 4; the second beam support 43 is detachably connected to the periphery of the support 4, and the ring beam 2 is overlapped at the second beam support 43, which is used to install the second beam support 43 on the periphery of the support 4 after the grid 3 is lifted to the designed height, so as to provide support for the ring beam 2; the lifting frame 5 is detachably connected to the support 4, and the lifting frame 5 has the function of lifting the ring beam 2. The beam 2 is in a lifting state to make the grid 3 rise; when the lifting frame 5 is in the lifting state, the ring beam 2 and the grid 3 rise, the structural column 1 and the support 4 pass through the ring beam 2 in sequence, the structural column 1, the support 4, and the lifting frame 5 pass through the grid 3 in sequence, wherein the frame of the structural column 1, the support 4 and the lifting frame 5 are static mechanisms, the grid 3 and the ring beam 2 are rising mechanisms, and during the rising process of the grid 3 and the ring beam 2, the relative positions of the static mechanism and the rising mechanism do not interfere with each other; the grid As the ring beam changes its position during the rise, the ring beam 2 surrounds the periphery of the structural column 1 or the support 4, and the grid frame 3 surrounds the periphery of the structural column 1, the support 4 or the lifting frame 5. From the time the grid frame 3 starts to rise to the process of the grid frame 3 rising to the designed height, the grid frame 3 maintains the original structure, and there is no need to break the grid frame 3 rods, set conversion rods, or perform other patching work, thereby simplifying the construction process and improving the structural strength of the grid frame 3, greatly reducing high-altitude installation operations, reducing construction difficulty, cost and risk, and having strong practicality.
[0033] The construction process of the concentric ring grid structure is as follows: the ring beam 2 and grid 3 fixed together are arranged around the periphery of the structural column 1 and are arranged close to the top of the structural column 1; the support 4 is installed to the top of the structural column 1, and the lifting frame 5 is installed on the side of the support 4 away from the structural column 1, and the lifting frame 5 is provided with a hydraulic lift; the first beam support 42 is provided on the periphery of the support 4, and the lifting frame 5 abuts against the first beam support 42, and the first beam support 42 plays a role in auxiliary support of the lifting frame 5; a support pipe 6 is installed between the first beam support 42 of the support 4 and the structural column 1, and the support pipe 6 plays a role in auxiliary support of the first beam support 42; a lifting point 21 is set on the side of the ring beam 2 close to the grid 3, and the lifting rope 51 at the lifting frame 5 is detachably connected to the lifting point 21; the lifting The frame 5 lifts the ring beam 2 and the grid 3 with the help of the lifting rope 51. When the ring beam 2 and the grid 3 are raised, the structural column 1 and the support 4 are sequentially passed through the ring beam 2, and the structural column 1, the support 4 and the lifting frame 5 are sequentially passed through the grid 3. When the ring beam 2 and the grid 3 are raised, they do not interfere with the structural column 1, the support 4 and the lifting frame 5; the grid 3 is lifted to the standard position, and the second beam support 43 is installed on the outside of the first beam support 42 of the support 4. The ring beam 2 abuts against the second beam support 43. The entire grid node is supported on the support 4. After it is in place, the support pipe 6, the lifting frame 5 and the lifting point 21 are removed; the concentric ring grid structure can maintain the original structure of the grid 3 during construction. There is no need to break the grid 3 rods, set conversion rods or reinforcement rods during the lifting process, which reduces high-altitude construction work and improves the structural strength at the node.
[0034] In this embodiment, by providing an annular ring beam 2 and a grid 3 arranged in cooperation with the ring beam 2, the ring beam 2 is arranged around the periphery of the structural column 1 or the support 4, and the grid 3 is arranged around the periphery of the structural column 1, the support 4 or a part of the lifting frame 5 as the position changes during the rise. From the time the grid 3 starts to rise to the process of the grid 3 rising to the designed height, the grid 3 maintains the original structure, and there is no need to break the grid 3 rods, set conversion rods and other patching work, thereby achieving the purpose of simplifying the construction process and improving the structural strength of the grid 3. There is no need to dismantle and modify the main rods of the grid 3, patch and install the broken rods in the lifting holes, reduce high-altitude installation operations, and reduce construction costs and construction risks; there is no need to strengthen the original structure, such as welding temporary reinforcement rods, increasing the cross-section of the grid 3 rods for reinforcement, reducing construction costs, and achieving safe and efficient construction. It is easy to operate, reduces costs and increases efficiency, and has significant economic benefits and promotion value.
[0035] Optionally, the first beam support 42 and the second beam support 43 are respectively composed of at least two transverse plates and ribs sandwiched and fixed between the two transverse plates, so as to play a supporting role; the second beam support 43 is correspondingly installed at the first beam support 42 .
[0036] In some embodiments, in combination Figure 2 As shown, the support 4 includes a first column 41 and a plurality of first beam supports 42 arranged around the first column 41; the lifting frame 5 includes a second column 52, the second column 52 is detachably connected to the end of the first column 41 and abuts against the first beam support 42, the first beam support 42 auxiliary supports the second column 52 to improve the stability of the installation of the lifting frame 5; the second column 52 is coaxially arranged with the structural column 1, and the diameter of the second column 52 is smaller than the inner diameter of the ring beam 2 to ensure that the ring beam 2 is stable and can be lifted without hindrance.
[0037] In some embodiments, in combination Figure 2 As shown, the lifting frame 5 also includes: a cantilever 53, which is arranged at one end of the second column 52 away from the first column 41, at least two cantilevers 53 are arranged opposite to each other, and at least two lifting cables 51 are respectively connected to at least two cantilevers 53 to ensure balanced lifting; a lifting cable 51, one end of which is connected to the cantilever 53, and the other end is detachably connected to the ring beam 2; when the lifting frame 5 is in a lifting state, the lifting cable 51 contracts to drive the ring beam 2 to move toward the direction close to the cantilever 53, and the lifting frame 5 uses the lifting cable 51 to stably lift the ring beam 2 and the grid 3.
[0038] In some embodiments, in combination Figure 1 As shown, the second beam support 43 is connected to the side of the first beam support 42 away from the first column 41, and the plate body of the second beam support 43 is correspondingly connected to the plate body at the first beam support 42, so that the beam support around the bracket becomes longer to provide support for the ring beam 2.
[0039] In some embodiments, in combination Figure 2 As shown, the ring beam 2 is provided with a lifting point 21 on one side close to the grid 3, one end of the lifting cable 51 is connected to the lifting point 21, and the other end is connected to the cantilever 53; when the lifting frame 5 is in a lifting state, the grid 3 rises, and the range occupied by the edge of the lifting frame 5 in the plane perpendicular to the axial direction of the second column 52 is smaller than the range occupied by the grid 3, the second column 52 and the lifting cable 51 are smoothly passed through the grid 3, and the web rod 31 is spaced apart from the lifting cable 51, so that the grid 3 does not interfere with the lifting frame 5, avoiding the breaking of the grid 3 rods, setting conversion rods and other patching work.
[0040] In some embodiments, in combination Figure 2 and Figure 7As shown, the concentric ring grid structure also includes a support tube 6, which is arranged between the support 4 and the structural column 1, and is used to assist in supporting the first beam support 42; one end of the support tube 6 is detachably connected to the first beam support 42, and the other end is detachably connected to the structural column 1; a plurality of wing plates 61 are provided on the periphery of one side where the support tube 6 is connected to the support 4 to improve the structural strength of the support tube 6; an embedded part 62 is provided on the end portion of one side where the support tube 6 is connected to the structural column 1, and the embedded part 62 is embedded in the top of the structural column 1 to improve the connection stability between the support tube 6 and the structural column 1, thereby improving the stability of the grid node lifting construction.
[0041] In some embodiments, in combination Figure 1 As shown, the grid 3 is composed of multiple rods, and ball nodes 33 are provided at the connecting positions of the rods, and multiple ball nodes 33 are arranged at intervals; multiple webs 31 are respectively connected to the ball nodes 33 to form the grid 3, and the grid 3 is a frame structure arranged around the axis of the structural column 1, and the ring beam 2 is an annular structure arranged around the axis of the structural column 1. With reasonable structural design, the base structures such as the structural column 1 and the support 4 are avoided to ensure that there is no embedding operation during the lifting process of the grid node, and there is no interference with the base structures such as the structural column 1 and the support 4, as well as the functional structures such as the lifting frame 5. The construction is safe and efficient, the operation is convenient, and the practical effect is leaps forward.
[0042] According to an embodiment of the present invention, on the other hand, a concentric ring grid structure construction method is also provided, which is applicable to the concentric ring grid structure as described in any of the above items, comprising: surrounding and arranging the ring beam 2 and grid 3 fixed together around the periphery of the structural column 1, and arranging them close to the top of the structural column 1; installing the support 4 to the top of the structural column 1, and installing a lifting frame 5 on the side of the support 4 away from the structural column 1, and a hydraulic lift is provided at the lifting frame 5; a first beam support 42 is provided at the periphery of the support 4, and the lifting frame 5 abuts against the first beam support 42, and the first beam support 42 plays a role of auxiliary support for the lifting frame 5; a support pipe 6 is installed between the first beam support 42 of the support 4 and the structural column 1, and the support pipe 6 plays a role of auxiliary support for the first beam support 42; a lifting point 21 is set on the side of the ring beam 2 close to the grid 3, and the lifting rope 21 at the lifting frame 5 is lifted. 51 is detachably connected with the lifting point 21; the lifting frame 5 lifts the ring beam 2 and the grid 3 with the help of the lifting rope 51. When the ring beam 2 and the grid 3 are lifted, the structural column 1 and the support 4 are sequentially passed through the ring beam 2, and the structural column 1, the support 4 and the lifting frame 5 are sequentially passed through the grid 3. When the ring beam 2 and the grid 3 are lifted, they do not interfere with the structural column 1, the support 4 and the lifting frame 5; the grid 3 is lifted to the standard position, and the second beam support 43 is installed on the outer side of the first beam support 42 of the support 4. The ring beam 2 abuts against the second beam support 43, and the entire grid node is supported on the support 4. After it is in place, the support pipe 6, the lifting frame 5 and the lifting point 21 are removed; the concentric ring grid structure can maintain the original structure of the grid 3 during construction. There is no need to break the grid 3 rods, set conversion rods or reinforcement rods during the lifting process, which reduces high-altitude construction work and improves the structural strength at the node.
[0043] Obviously, the above embodiments are only examples for clear explanation, and are not intended to limit the implementation methods. Although the embodiments of the present invention are described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations all fall within the scope defined by the present invention.
Claims
1. A concentric ring grid structure, characterized in that: include: Structural column (1); A ring beam (2) is coaxially arranged with the structural column (1); the inner diameter of the ring beam (2) is greater than the diameter of the structural column (1); The grid (3) comprises a web member (31), a chord member (32) and a ball node (33), wherein the web member (31) is connected to the ring beam (2); A support (4) is fixed to the top of the structural column (1), and the maximum spacing between the edges of the support (4) in a plane perpendicular to the axial direction is smaller than the inner diameter of the ring beam (2); A second beam support (43) is detachably connected to the periphery of the support (4), and the ring beam (2) is overlapped at the second beam support (43); A lifting frame (5) is detachably connected to the support (4), and the lifting frame (5) has a lifting state for lifting the ring beam (2) to make the grid frame (3) rise; When the lifting frame (5) is in a lifting state, the ring beam (2) and the grid frame (3) rise, the structural column (1) and the support (4) pass through the ring beam (2) in sequence, and the structural column (1), the support (4) and the lifting frame (5) pass through the grid frame (3) in sequence.
2. The concentric ring grid structure according to claim 1, characterized in that: The support (4) comprises a first column (41) and a plurality of first beam supports (42) arranged on the periphery of the first column (41); The lifting frame (5) comprises a second column (52), the second column (52) is detachably connected to the end of the first column (41) and abuts against the first beam support (42), and the first beam support (42) auxiliary supports the second column (52); The second column (52) is coaxially arranged with the structural column (1), and the diameter of the second column (52) is smaller than the inner diameter of the ring beam (2).
3. The concentric ring grid structure according to claim 2, characterized in that: The lifting frame (5) further comprises: a cantilever (53), the cantilever (53) being arranged at an end of the second column (52) away from the first column (41); A lifting rope (51) has one end connected to the cantilever (53) and the other end detachably connected to the ring beam (2); when the lifting frame (5) is in a lifting state, the lifting rope (51) contracts to drive the ring beam (2) to move in a direction close to the cantilever (53).
4. The concentric ring grid structure according to claim 2, characterized in that: The second beam support (43) is connected to a side of the first beam support (42) away from the first column (41), and is suitable for providing support for the ring beam (2).
5. The concentric ring grid structure according to claim 3, characterized in that: The ring beam (2) is provided with a lifting point (21) on one side close to the grid (3); one end of the lifting rope (51) is connected to the lifting point (21), and the other end is connected to the cantilever (53); When the lifting frame (5) is in a lifting state, the grid frame (3) rises, the second column (52) and the lifting rope (51) are passed through the grid frame (3), and the web bar (31) and the lifting rope (51) are spaced apart so that the grid frame (3) and the lifting frame (5) do not interfere with each other.
6. The concentric ring grid structure according to claim 5, characterized in that: It also includes a support tube (6), which is arranged between the support (4) and the structural column (1) and is suitable for auxiliary supporting the first beam support (42); One end of the support tube (6) is detachably connected to the first beam support (42), and the other end is detachably connected to the structural column (1).
7. The concentric ring grid structure according to claim 6, characterized in that: A plurality of wing plates (61) are provided on a peripheral portion of one side of the support tube (6) close to the support seat (4); An embedded part (62) is provided at one end of the support tube (6) close to the structural column (1), and the embedded part (62) is embedded in the top end of the structural column (1).
8. The concentric ring grid structure according to claim 7, characterized in that: The grid (3) has a plurality of chord rods (32), and the ball nodes (33) are arranged at the connecting positions of the chord rods (32), and the plurality of ball nodes (33) are arranged at intervals; The plurality of web members (31) are respectively connected to the ball nodes (33) to form the grid frame (3).
9. The concentric ring grid structure according to claim 3, characterized in that: At least two cantilevers (53) are respectively arranged opposite to each other at the second upright column (52), and at least two lifting cables (51) are respectively connected to the at least two cantilevers (53).
10. A method for constructing a concentric ring grid structure, applicable to the concentric ring grid structure as claimed in any one of claims 1 to 9, characterized in that: include: The ring beam (2) and the grid (3) are sleeved around the periphery of the structural column (1) and are arranged close to the top of the structural column (1); Installing the support (4) to the top of the structural column (1), installing a lifting frame (5) on the side of the support (4) away from the structural column (1), and installing a support pipe (6) between the first beam support (42) of the support (4) and the structural column (1); The lifting rope (51) of the lifting frame (5) is detachably connected to the lifting point (21) at the ring beam (2); The lifting frame (5) lifts the ring beam (2) and the grid frame (3) with the help of the lifting rope (51); when the ring beam (2) and the grid frame (3) are lifted, the structural column (1) and the support (4) are sequentially passed through the ring beam (2) and arranged, and the structural column (1), the support (4) and the lifting frame (5) are sequentially passed through the grid frame (3) and arranged; The grid (3) is lifted to a standard position, and a second beam support (43) is installed outside the first beam support (42) of the support (4), and the ring beam (2) abuts against the second beam support (43); The support pipe (6), the lifting frame (5) and the lifting point (21) are removed.