Prefabricated shear wall with steel structure support and construction method thereof

By using adjustable steel structure support and fixing mechanism in prefabricated shear walls, the problem of thickness adjustment difficulties in the prior art is solved, and the flexibility, stability and load resistance of the shear walls are improved to ensure building safety sex.

CN118727967BActive Publication Date: 2024-12-27GUANGZHOU WU YANG STEEL CONSTR CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411002416.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-12-27
Estimated Expiration
2044-07-25

AI Technical Summary

Technical Problem

The existing prefabricated shear walls are not convenient to adjust the construction thickness according to building needs and load conditions during use, resulting in poor flexibility, insufficient stability and strength.

Method used

Using a prefabricated shear wall design with steel structure support, including first and second steel structure support, transverse and vertical fixing mechanism, and wrapping reinforcement mechanism, the adjustability of the support is achieved through adjustment rods and limit nut sleeves. , and improve structural stability and compressive resistance through hollow steel plates and thermal insulation blocks.

Benefits of technology

It realizes on-site customization of thicknesses according to different building needs and load conditions, improves the strength and stiffness of the shear wall, enhances the stability of the structure and earthquake resistance and wind resistance, and ensures building safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727967B_ABST
    Figure CN118727967B_ABST
Patent Text Reader

Abstract

The present invention discloses a prefabricated shear wall with a steel structure support and a construction method thereof, which comprises a first steel structure support, wherein the first steel structure support comprises a plurality of hollow steel plates, the front and rear sides of the hollow steel plates are fixedly connected with a connection frame, the plurality of hollow steel plates are fixedly connected to each other through the connection frame, the top and bottom of the front and rear sides of the hollow steel plates are fixedly connected with a socket, a multi-sided plug is fixedly connected inside the socket, and an adjustment tube is fixedly connected to one end of the multi-sided plug. The technical problem to be solved by the present invention is that the existing prefabricated shear wall is not convenient to adjust the construction thickness of the shear wall according to the building needs and load conditions during use, which reduces the flexibility of the use of the prefabricated shear wall, and it is difficult to form a stable frame structure, which reduces the stability and strength of the shear wall after forming.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, in particular to a prefabricated shear wall with a steel structure support and a construction method thereof. Background Art

[0002] Precast shear walls are a product of modern building industrialization and are part of prefabricated building technology. They are concrete wall components that are prefabricated in factories and are designed to withstand and resist horizontal loads, such as wind and seismic forces, as well as vertical loads, such as the weight of the structure itself. The main advantage of precast shear walls is that they can significantly speed up construction progress, reduce on-site construction time and labor requirements, while also reducing noise and environmental pollution on construction sites. Precast shear walls are connected to the columns, beams and foundations of the building through reserved steel bars or special connectors. Precast shear walls include precast composite shear walls, which are partially prefabricated in the factory and the rest are poured with concrete filling at the construction site to form a complete shear wall.

[0003] The frame-shear wall building structure with Chinese patent application number 202023244643.0 belongs to a three-dimensional frame structure in the building structure, including a first shear wall, a second shear wall, a third shear wall and a prefabricated base. The first shear wall, the second shear wall and the third shear wall are provided with rectangular openings and connecting openings at both ends thereof. The connecting openings are connected to the rectangular openings and extend to the edge of the shear wall. The prefabricated base includes an edge prefabricated base and an intermediate prefabricated base. A pouring opening is provided in the middle of the edge prefabricated base and the intermediate prefabricated base, so that the prefabricated base can be conveniently set at a specified position, thereby facilitating the positioning and setting of each shear wall, and is clamped by a connecting piece composed of a plug rod, a connecting rod and a clamping plate, so that during pouring, the connectivity between the shear wall and the base can be ensured to be better, so that it can meet the requirements of building indicators.

[0004] During the use of existing prefabricated shear walls, it is not convenient to adjust the construction thickness of the shear walls according to building needs and load conditions, which reduces the flexibility of the use of prefabricated shear walls. It is also difficult to form a stable frame structure, which reduces the stability and strength of the formed shear walls. Summary of the invention

[0005] The technical problem to be solved by the present invention is that during the use of the existing prefabricated shear wall, it is not convenient to adjust the construction thickness of the shear wall according to the building needs and load conditions, which reduces the flexibility of the use of the prefabricated shear wall, and it is difficult to form a stable frame structure, which reduces the stability and strength of the formed shear wall.

[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: a prefabricated shear wall with a steel structure support, comprising:

[0007] A first steel structure support, the first steel structure support comprises a plurality of hollow steel plates, the front and rear sides of the hollow steel plates are fixedly connected with connection frames, the plurality of hollow steel plates are fixedly connected to each other through the connection frames, the top and bottom of the front and rear sides of the hollow steel plates are fixedly connected with sockets, a multi-sided plug is fixedly connected inside the socket, and an adjustment tube is fixedly connected to one end of the multi-sided plug;

[0008] A second steel structure support, wherein the number of the second steel structure support is several and the second steel structure support is installed on the front and rear sides of the first steel structure support, and the second steel structure support comprises two mounting seats, and a vertical rod is fixedly connected to the opposite side of the two mounting seats, and a plurality of connection components are fixedly sleeved on the surface of the vertical rod;

[0009] A transverse fixing mechanism, the transverse fixing mechanism is fixedly installed on the upper and lower sides of the first steel structure support member and the second steel structure support member, and the transverse fixing mechanism includes a transverse plate;

[0010] A vertical fixing mechanism, the vertical fixing mechanism is fixedly installed on the left and right sides of the first steel structure support member, the vertical fixing mechanism comprises a vertical plate, and a T-shaped plate is fixedly connected to one side of the vertical plate;

[0011] A wrapping reinforcement mechanism is fixedly installed twice in front and behind the vertical fixing mechanism and connected to the surface of the second steel structure support member. The wrapping reinforcement mechanism includes a surrounding steel belt.

[0012] Preferably, a reinforcing plate is fixedly connected to the inner wall of the hollow steel plate, a plurality of mounting holes are formed on the reinforcing plate, and the mounting holes are filled with insulation blocks, wherein the insulation blocks are made of polyurethane foam.

[0013] Preferably, a first reinforcement frame is fixedly connected to the middle end of the front and rear sides of the hollow steel plate, and a second reinforcement frame is fixedly connected to the top and bottom of the front and rear sides of the hollow steel plate, and the first reinforcement frame and the second reinforcement frame are fixedly connected to the surface of the socket.

[0014] Preferably, there are several vertical rods, which are distributed around the opposite sides of the two mounting seats. The connecting assembly includes an annular rod fixedly sleeved on the surface of the vertical rod, one side of the annular rod is fixedly connected to a fixing plate, one side of the fixing plate is fixedly connected to an adjusting rod, and the adjusting rod extends to the inner cavity of the adjusting tube and is movably connected to its inner wall.

[0015] Preferably, a mounting screw is fixedly connected to opposite sides of the two mounting seats, a sliding groove is opened on the horizontal plate, the mounting screw passes through the sliding groove and a limiting nut sleeve is threadedly provided, and the limiting nut sleeve contacts with the surface of the horizontal plate to limit the mounting screw.

[0016] Preferably, a plurality of first reserved connecting members are fixedly connected to one side of the transverse plate, and the transverse plate is fixedly connected to the connecting frame by bolts.

[0017] Preferably, the vertical plate is fixedly connected to the connecting frame by bolts, a clamping block is fixedly connected to the bottom of the horizontal plate, the clamping block is clamped on the opposite side of the vertical plate and the T-plate, and a plurality of second reserved connecting parts are fixedly connected to one side of the T-plate.

[0018] Preferably, support seats are installed on both the left and right sides of the surrounding steel belt, and the support seats are fixedly connected to the surface of the T-shaped plate.

[0019] Preferably, a plurality of second limiting holes are provided on both sides of the surrounding steel belt, a first limiting hole is provided on the support seat, and the first limiting hole and the second limiting hole are fixedly connected by bolts.

[0020] A construction method of a prefabricated shear wall with a steel structure support comprises the following steps:

[0021] S1. Confirm that the construction site is leveled and ready for construction. Prepare all necessary steel structures, connectors and tools according to the design drawings. Check whether all components are intact and whether the size and quantity meet the design requirements.

[0022] S2. Install the first steel structure support member. Use a crane or other lifting equipment to lift the pre-installed first steel structure support member to the designated location. According to the foundation elevation and the building axis, accurately locate the position of each hollow steel plate. Through the cooperation between the connection frames, connect the hollow steel plates to each other to form a preliminary skeleton structure.

[0023] S3, fix the second steel structure support, install the second steel structure support on both sides of the front and rear of the first steel structure support, insert the adjustment rod into the adjustment tube, ensure that the second steel structure support is firmly connected to the first steel structure support, adjust the position of the connection assembly, and form a stable support network;

[0024] S4. Install the transverse fixing mechanism, install the transverse plate on the top and bottom of the first steel structure support, and fix it to the connection frame, and use the limit nut sleeve and the installation screw to fix the second steel structure support on the transverse plate;

[0025] S5. Strengthen the vertical fixing mechanism, install the vertical plates on the left and right sides of the first steel structure support, fix them with the connection frame by bolts, and connect the horizontal plates with the vertical plates and the T-shaped plates by the clamping blocks to form a closed frame structure;

[0026] S6. Install the wrapping reinforcement mechanism, install the wrapping steel belt on the front and rear sides of the vertical fixing mechanism and the second steel structure support, and use bolts to pass through the first limiting hole and the second limiting hole to fasten the wrapping steel belt on the support seat to ensure the integrity of the entire structure;

[0027] S7, the transverse plate is connected to the main body of the building through the first reserved connection piece, and the T-shaped plate is connected to the main body of the building through the second reserved connection piece. After the connection is completed, a casting module is installed around the prefabricated shear wall, and then concrete casting material is poured into the casting module. The concrete casting material is combined with the prefabricated shear wall to form a complete shear wall with a concrete structure;

[0028] S8. When pouring the concrete casting material, adopt a layered pouring method, with each layer thickness not exceeding meters, to ensure that the concrete can be fully vibrated, eliminate bubbles, and improve density. The pouring height of the first layer is cm, and the pouring height each time thereafter does not exceed m to ensure that the concrete can evenly fill the space in the formwork. During the pouring process, use a vibrating rod or a flat vibrator to vibrate the poured concrete to eliminate bubbles and improve the density of the concrete;

[0029] S9. After pouring, the concrete is cured, which includes moisture retention and heat preservation to promote the hardening process of the concrete and ensure that the designed strength is reached. After the concrete reaches a certain strength, the casting module is disassembled. The disassembly sequence starts from the non-load-bearing part and gradually moves to the load-bearing part.

[0030] Beneficial effects of the present invention:

[0031] 1. The present invention can customize shear walls of different thicknesses on site according to different building requirements and load conditions by adjusting the distance between the second steel structure support and the first steel structure support, which not only ensures the strength and rigidity of the wall, but also increases the flexibility of the design. When making adjustments, an adjusting rod is slid on the inner wall of the adjusting tube, and the adjusting rod drives the vertical rod to move through the fixing plate and the annular rod. The vertical rod drives the mounting seat to slide on the opposite side of the horizontal plate, and the mounting seat drives the mounting screw to slide inside the slide groove. When the second steel structure support is adjusted to the set position, the limiting nut sleeve is screwed onto the mounting screw, and the limiting nut sleeve is pressed against the horizontal plate to fix the mounting seat, thereby achieving the effect of fixing the second steel structure support as a whole.

[0032] 2. The present invention uses a three-dimensional frame composed of a first steel structure support, a second steel structure support and a transverse fixing mechanism, which is fixed by a transverse fixing mechanism and a vertical fixing mechanism. This not only enhances the stability of the overall structure, but also improves the ability of the shear wall to resist transverse forces, such as earthquakes and strong winds, thereby ensuring the safety of the building. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 is the main axonometric view of the present invention;

[0034] Figure 2 It is a bottom-up axonometric view of the present invention;

[0035] Figure 3 It is a schematic diagram of the pouring state of the present invention;

[0036] Figure 4 It is a main axonometric view of the first steel structure support member of the present invention;

[0037] Figure 5 It is a front and cross-sectional isometric view of the first steel structure support member of the present invention;

[0038] Figure 6 This is a main axonometric view of the reinforcement plate of the present invention;

[0039] Figure 7 This is a main axonometric view of the second steel structure support member of the present invention;

[0040] Figure 8 For the present invention Figure 7 A magnified view of middle;

[0041] Fig. 9 It is a main axonometric view of the connection assembly of the present invention;

[0042] Fig.10 It is a front axonometric view of the transverse fixing mechanism of the present invention;

[0043] Fig.11 This is a bottom-up axonometric view of the transverse fixing mechanism of the present invention;

[0044] Fig.12 It is a main axonometric view of the vertical fixing mechanism of the present invention;

[0045] Fig.13 This is a front axonometric view of the enveloping reinforcement mechanism of the present invention.

[0046] In the figure: 100, first steel structure support; 101, hollow steel plate; 102, connection frame; 103, socket; 104, multilateral plug; 105, adjustment tube; 106, first reinforcement frame; 107, second reinforcement frame; 108, reinforcement plate; 109, insulation block; 110, mounting hole; 200, second steel structure support; 201, mounting seat; 202, vertical rod; 203, connection assembly; 2031, annular rod; 2032, fixing plate; 2033, adjustment rod; 20 4. Limit nut sleeve; 205. Mounting screw; 300. Horizontal fixing mechanism; 301. Horizontal plate; 302. First reserved connection piece; 303. Slide groove; 304. Block; 400. Vertical fixing mechanism; 401. Vertical plate; 402. T-plate; 403. Second reserved connection piece; 500. Wrapping reinforcement mechanism; 501. Surrounding steel belt; 502. Second limiting hole; 503. Support seat; 504. First limiting hole; 600. Casting module; 700. Concrete casting material. DETAILED DESCRIPTION

[0047] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0048] Embodiment 1, as Figure 1-13 As shown, the present embodiment provides a prefabricated shear wall with a steel structure support, including a first steel structure support 100, the first steel structure support 100 includes a plurality of hollow steel plates 101, the front and rear sides of the hollow steel plates 101 are fixedly connected with a connection frame 102, the plurality of hollow steel plates 101 are fixedly connected to each other through the connection frame 102, the top and bottom of the front and rear sides of the hollow steel plates 101 are fixedly connected with a socket 103, a multilateral plug 104 is fixedly connected inside the socket 103, and an adjustment tube 105 is fixedly connected to one end of the multilateral plug 104.

[0049] A reinforcing plate 108 is fixedly connected to the inner wall of the hollow steel plate 101 . A plurality of mounting holes 110 are formed on the reinforcing plate 108 . The mounting holes 110 are filled with heat-insulating blocks 109 . The heat-insulating blocks 109 are made of polyurethane foam.

[0050] A first reinforcement frame 106 is fixedly connected to the middle end of the front and rear sides of the hollow steel plate 101, and a second reinforcement frame 107 is fixedly connected to the top and bottom of the front and rear sides of the hollow steel plate 101. The first reinforcement frame 106 and the second reinforcement frame 107 are fixedly connected to the surface of the socket 103.

[0051] The hollow steel plate 101 is connected to the second steel structure support 200 through the socket 103, the multilateral plug 104 and the adjusting tube 105, ensuring a firm connection and avoiding structural safety hazards caused by poor connection. The first reinforcement frame 106 and the second reinforcement frame 107 support and reinforce the socket 103 to prevent it from separating from the hollow steel plate 101, and at the same time strengthen the front and rear sides of the hollow steel plate 101.

[0052] A reinforcing plate 108 is arranged inside the hollow steel plate 101. The presence of the reinforcing plate 108 increases the internal rigidity of the hollow steel plate 101, avoids local deformation or instability of the hollow steel plate 101 when subjected to external force, and improves the structural stability of the entire shear wall. The hollow design of the hollow steel plate 101 and the application of the insulation block 109 reduce the dead weight of the first steel structure support 100, which is particularly important for high-rise buildings because it can reduce the load-bearing requirements of the lower structure, while also reducing energy consumption and costs during transportation and hoisting. The material of the insulation block 109 is polyurethane foam. As a high-performance thermal insulation and sound insulation material, polyurethane foam is filled in the mounting hole 110 of the reinforcing plate 108, which can significantly improve the thermal performance and sound insulation effect of the shear wall, creating a more comfortable living and working environment inside the building. Moreover, after flame retardant treatment, the polyurethane foam can provide certain fire protection, delay the spread of fire, buy time for personnel evacuation, and improve the safety of the building.

[0053] It also includes a second steel structure support member 200, which is in multiple numbers and is installed on the front and rear sides of the first steel structure support member 100. The second steel structure support member 200 includes two mounting seats 201, and the two mounting seats 201 are fixedly connected to vertical rods 202 on opposite sides. The surface of the vertical rods 202 is fixedly sleeved with multiple connecting components 203.

[0054] There are several vertical rods 202, which are distributed around the opposite sides of the two mounting seats 201. The connecting component 203 includes an annular rod 2031 fixedly sleeved on the surface of the vertical rod 202. One side of the annular rod 2031 is fixedly connected to a fixing plate 2032, and one side of the fixing plate 2032 is fixedly connected to an adjusting rod 2033. The adjusting rod 2033 extends to the inner cavity of the adjusting tube 105 and is movably connected to its inner wall.

[0055] The two mounting seats 201 are fixedly connected with mounting screws 205 on opposite sides. A slide groove 303 is provided on the cross plate 301. The mounting screw 205 passes through the slide groove 303 and is threadedly sleeved with a limiting nut sleeve 204. The limiting nut sleeve 204 contacts the surface of the cross plate 301 to limit the mounting screw 205.

[0056] The first steel structure support member 100 serves as the core support of the shear wall and cooperates with a plurality of second steel structure support members 200 to ensure the high strength of the wall and optimize the stiffness of the wall through the arrangement of the second steel structure support members 200, thereby forming a more reasonable stress distribution and improving the bearing capacity and seismic performance of the shear wall.

[0057] The first steel structure support 100 is composed of a plurality of hollow steel plates 101 and a connection frame 102. This splicing method and the adjustable design of the second steel structure support 200 are conducive to the modular and standardized production of components, facilitate mass production and rapid on-site assembly, and further improve construction efficiency and quality control.

[0058] By adjusting the distance between the second steel structure support 200 and the first steel structure support 100, shear walls of different thicknesses can be customized on site according to different building requirements and load conditions, which not only ensures the strength and rigidity of the wall, but also increases the flexibility of the design. When making adjustments, the adjusting rod 2033 is slid on the inner wall of the adjusting tube 105, and the adjusting rod 2033 drives the vertical rod 202 to move through the fixing plate 2032 and the annular rod 2031. The vertical rod 202 drives the mounting seat 201 to slide on the opposite side of the horizontal plate 301, and the mounting seat 201 drives the mounting screw 205 to slide inside the slide groove 303. When the second steel structure support 200 is adjusted to the set position, the limiting nut sleeve 204 is screwed on the mounting screw 205, and the limiting nut sleeve 204 is pressed against the horizontal plate 301 to fix the mounting seat 201, thereby achieving the effect of fixing the second steel structure support 200 as a whole.

[0059] The combination of the vertical rod 202 and the connecting assembly 203 provides additional vertical support, and enhances the ability of the shear wall to resist vertical loads, especially when encountering sudden loads such as earthquakes, and can effectively disperse and absorb energy.

[0060] It also includes a transverse fixing mechanism 300 , which is fixedly installed on the upper and lower sides of the first steel structure support member 100 and the second steel structure support member 200 , and the transverse fixing mechanism 300 includes a transverse plate 301 .

[0061] A plurality of first reserved connecting members 302 are fixedly connected to one side of the transverse plate 301 , and the transverse plate 301 is fixedly connected to the connecting frame 102 by bolts.

[0062] The upper and lower sides of the first steel structure support member 100 and the second steel structure support member 200 are fixed by a transverse fixing mechanism 300, which simplifies the on-site installation process, ensures accurate docking between the components, and also facilitates subsequent maintenance and inspection work.

[0063] It also includes a vertical fixing mechanism 400 , which is fixedly installed on the left and right sides of the first steel structure support 100 . The vertical fixing mechanism 400 includes a vertical plate 401 , and a T-shaped plate 402 is fixedly connected to one side of the vertical plate 401 .

[0064] The vertical plate 401 is fixedly connected to the connection frame 102 by bolts. A clamping block 304 is fixedly connected to the bottom of the horizontal plate 301. The clamping block 304 is clamped on the opposite side of the vertical plate 401 and the T-shaped plate 402. A plurality of second reserved connecting members 403 are fixedly connected to one side of the T-shaped plate 402.

[0065] The horizontal plate 301 and the vertical plate 401 together form a closed frame structure, which significantly improves the ability of the shear wall to resist lateral forces and enhances the overall stability and rigidity of the structure.

[0066] It also includes a wrapping reinforcement mechanism 500 , which is fixedly installed twice in front and behind the vertical fixing mechanism 400 and connected to the surface of the second steel structure support 200 . The wrapping reinforcement mechanism 500 includes a surrounding steel belt 501 .

[0067] Support seats 503 are installed on both the left and right sides of the surrounding steel belt 501 , and the support seats 503 are fixedly connected to the surface of the T-shaped plate 402 .

[0068] A plurality of second limiting holes 502 are provided on both sides of the surrounding steel belt 501 , and a first limiting hole 504 is provided on the support seat 503 . The first limiting hole 504 and the second limiting hole 502 are fixedly connected by bolts.

[0069] The surrounding steel belt 501 forms a tight peripheral support system by connecting with the T-plate 402 and the vertical plate 401, which not only increases the lateral stability of the shear wall, but also improves the ability of the shear wall to resist impact and deformation through the high rigidity and toughness of its metal material.

[0070] The three-dimensional frame formed by the first steel structure support 100, the second steel structure support 200 and the transverse fixing mechanism 300 is fixed by the transverse fixing mechanism 300 and the vertical fixing mechanism 400, which not only enhances the stability of the overall structure, but also improves the ability of the shear wall to resist lateral forces, such as earthquakes and strong winds, thereby ensuring the safety of the building.

[0071] During on-site construction, the prefabricated steel structure parts are transported to the site, and then the formwork is installed and the concrete is poured. Compared with traditional cast-in-place shear walls, this reduces on-site wet operations, speeds up the construction progress, and reduces the construction difficulty and cost.

[0072] Through the mutual coordination of all the above structural components, the entire shear wall system can demonstrate excellent stability and strength in the face of complex loads and environmental conditions. Since prefabricated shear walls have high strength and high stiffness characteristics, this shear wall design is particularly suitable for high-rise buildings and buildings in earthquake-prone areas, and can effectively improve the overall stability and safety of the building.

[0073] Embodiment 2, as Figure 1-13 As shown, as a second embodiment of the present invention, this embodiment provides a construction method of a prefabricated shear wall with a steel structure support, comprising the following steps:

[0074] S1. Confirm that the construction site is leveled and ready for construction. Prepare all necessary steel structures, connectors and tools according to the design drawings. Check whether all components are intact and whether the size and quantity meet the design requirements.

[0075] S2, installing the first steel structure support 100, using a crane or other lifting equipment to lift the pre-installed first steel structure support 100 to the designated location, accurately locating the position of each hollow steel plate 101 according to the foundation elevation and the building axis, and connecting the hollow steel plates 101 to each other through the cooperation between the connection frames 102 to form a preliminary skeleton structure;

[0076] S3, fix the second steel structure support 200, install the second steel structure support 200 on the front and rear sides of the first steel structure support 100, insert the adjustment rod 2033 into the adjustment tube 105, ensure that the second steel structure support 200 is firmly connected to the first steel structure support 100, adjust the position of the connection assembly 203, and form a stable support network;

[0077] S4, install the transverse fixing mechanism 300, install the transverse plate 301 on the top and bottom of the first steel structure support 100, and fix it with the connecting frame 102, and use the limiting nut sleeve 204 and the installation screw 205 to fix the second steel structure support 200 on the transverse plate 301;

[0078] S5, reinforce the vertical fixing mechanism 400, install the vertical plate 401 on the left and right sides of the first steel structure support 100, fix it with the connecting frame 102 by bolts, and connect the horizontal plate 301 with the vertical plate 401 and the T-shaped plate 402 by the clamping block 304 to form a closed frame structure;

[0079] S6. Install the wrapping reinforcement mechanism 500, install the surrounding steel belt 501 on the vertical fixing mechanism 400 and the front and rear sides of the second steel structure support 200, and use bolts to pass through the first limiting hole 504 and the second limiting hole 502 to fasten the surrounding steel belt 501 to the support seat 503 to ensure the integrity of the entire structure;

[0080] S7, the horizontal plate 301 is connected to the main body of the building through the first reserved connection piece 302, and the T-shaped plate 402 is connected to the main body of the building through the second reserved connection piece 403. After the connection is completed, the casting module 600 is installed around the prefabricated shear wall, and then the concrete casting material 700 is cast into the casting module 600. The concrete casting material 700 is combined with the prefabricated shear wall to form a complete shear wall with a concrete structure;

[0081] S8. When pouring the concrete pouring material 700, a layered pouring method is adopted, and the thickness of each layer does not exceed 1 meter to ensure that the concrete can be fully vibrated, eliminate bubbles, and improve the density. The pouring height of the first layer is 50cm, and the pouring height of each layer thereafter does not exceed 1m to ensure that the concrete can evenly fill the space in the formwork. During the pouring process, a vibrating rod or a flat vibrator is used to vibrate the poured concrete to eliminate bubbles and improve the density of the concrete;

[0082] S9. After pouring, the concrete is cured, which includes moisture retention and heat preservation to promote the hardening process of the concrete and ensure that the designed strength is reached. After the concrete reaches a certain strength, the pouring module 600 is disassembled. The disassembly sequence starts from the non-load-bearing part and gradually moves to the load-bearing part.

Claims

1. A prefabricated shear wall with steel structure support, characterized in that: include, A first steel structure support member (100), the first steel structure support member (100) comprising a plurality of hollow steel plates (101), the front and rear sides of the hollow steel plates (101) being fixedly connected to connection frames (102), the plurality of hollow steel plates (101) being fixedly connected to each other via the connection frames (102), the top and bottom of the front and rear sides of the hollow steel plates (101) being fixedly connected to sockets (103), the sockets (103) being fixedly connected internally to a multilateral plug (104), one end of the multilateral plug (104) being fixedly connected to an adjustment tube (105); A second steel structure support member (200), wherein the second steel structure support members (200) are in plurality and are mounted on the front and rear sides of the first steel structure support member (100), wherein the second steel structure support member (200) comprises two mounting seats (201), and vertical rods (202) are fixedly connected to opposite sides of the two mounting seats (201), and a plurality of connection components (203) are fixedly sleeved on the surface of the vertical rods (202); A transverse fixing mechanism (300), the transverse fixing mechanism (300) being fixedly mounted on upper and lower sides of the first steel structure support member (100) and the second steel structure support member (200), the transverse fixing mechanism (300) comprising a transverse plate (301); A vertical fixing mechanism (400), the vertical fixing mechanism (400) being fixedly installed on the left and right sides of the first steel structure support member (100), the vertical fixing mechanism (400) comprising a vertical plate (401), one side of the vertical plate (401) being fixedly connected to a T-shaped plate (402); A wrapping reinforcement mechanism (500), the wrapping reinforcement mechanism (500) being fixedly mounted twice on the front and rear of the vertical fixing mechanism (400) and connected to the surface of the second steel structure support member (200), the wrapping reinforcement mechanism (500) comprising a wrapping steel belt (501); A reinforcing plate (108) is fixedly connected to the inner wall of the hollow steel plate (101), a plurality of mounting holes (110) are formed on the reinforcing plate (108), and the interior of the mounting holes (110) is filled with a heat-insulating block (109), wherein the heat-insulating block (109) is made of polyurethane foam; A first reinforcing frame (106) is fixedly connected to the middle ends of the front and rear sides of the hollow steel plate (101), and a second reinforcing frame (107) is fixedly connected to the top and bottom of the front and rear sides of the hollow steel plate (101), and the first reinforcing frame (106) and the second reinforcing frame (107) are fixedly connected to the surface of the socket (103); The number of the vertical rods (202) is several and they are distributed around opposite sides of the two mounting seats (201); the connecting assembly (203) comprises an annular rod (2031) fixedly sleeved on the surface of the vertical rod (202); one side of the annular rod (2031) is fixedly connected to a fixing plate (2032); one side of the fixing plate (2032) is fixedly connected to an adjusting rod (2033); the adjusting rod (2033) extends to the inner cavity of the adjusting tube (105) and is movably connected to the inner wall thereof; A mounting screw (205) is fixedly connected to opposite sides of the two mounting seats (201); a slide groove (303) is provided on the transverse plate (301); the mounting screw (205) passes through the slide groove (303) and is threadedly sleeved with a limiting nut sleeve (204); the limiting nut sleeve (204) contacts the surface of the transverse plate (301) to limit the mounting screw (205); Support seats (503) are installed on both the left and right sides of the surrounding steel belt (501), and the support seats (503) are fixedly connected to the surface of the T-shaped plate (402); A plurality of second limiting holes (502) are provided on both left and right sides of the surrounding steel belt (501), a first limiting hole (504) is provided on the support seat (503), and the first limiting hole (504) and the second limiting hole (502) are fixedly connected by bolts.

2. The prefabricated shear wall with steel structure support members according to claim 1, characterized in that: A plurality of first reserved connection members (302) are fixedly connected to one side of the transverse plate (301), and the transverse plate (301) is fixedly connected to the connection frame (102) via bolts.

3. The prefabricated shear wall with steel structure support members according to claim 1, characterized in that: The vertical plate (401) is fixedly connected to the connection frame (102) by means of bolts, a clamping block (304) is fixedly connected to the bottom of the horizontal plate (301), the clamping block (304) is clamped to the vertical plate (401) and the opposite side of the T-shaped plate (402), and a plurality of second reserved connection pieces (403) are fixedly connected to one side of the T-shaped plate (402).

4. A construction method of a prefabricated shear wall with a steel structure support, applicable to the prefabricated shear wall with a steel structure support as claimed in any one of claims 1 to 3, characterized in that: The following steps are included: S1. Confirm that the construction site is leveled and ready for construction. Prepare all necessary steel structures, connectors and tools according to the design drawings. Check whether all components are intact and whether the size and quantity meet the design requirements. S2, installing the first steel structure support member (100), using a crane or other lifting equipment to lift the pre-installed first steel structure support member (100) to a designated location, accurately locating the position of each hollow steel plate (101) according to the foundation elevation and the building axis, and connecting the hollow steel plates (101) to each other through the cooperation between the connection frames (102) to form a preliminary skeleton structure; S3, fixing the second steel structure support member (200), installing the second steel structure support member (200) on both sides of the front and rear of the first steel structure support member (100), inserting the adjustment rod (2033) into the adjustment tube (105), ensuring that the second steel structure support member (200) is firmly connected to the first steel structure support member (100), and adjusting the position of the connection assembly (203) to form a stable support network; S4, installing the transverse fixing mechanism (300), installing the transverse plate (301) on the top and bottom of the first steel structure support member (100), and fixing it to the connection frame (102), and using the limit nut sleeve (204) and the installation screw (205) to fix the second steel structure support member (200) on the transverse plate (301); S5, reinforcing the vertical fixing mechanism (400), installing the vertical plate (401) on the left and right sides of the first steel structure support (100), fixing them to the connection frame (102) by bolts, and connecting the horizontal plate (301) with the vertical plate (401) and the T-shaped plate (402) by a clamping block (304) to form a closed frame structure; S6. Install the wrapping reinforcement mechanism (500), install the wrapping steel belt (501) on the front and rear sides of the vertical fixing mechanism (400) and the second steel structure support member (200), and use bolts to pass through the first limiting hole (504) and the second limiting hole (502) to fasten the wrapping steel belt (501) to the support seat (503) to ensure the integrity of the entire structure; S7, the horizontal plate (301) is connected to the main body of the building through the first reserved connection piece (302), and the T-shaped plate (402) is connected to the main body of the building through the second reserved connection piece (403). After the connection is completed, a casting module (600) is installed around the prefabricated shear wall, and then concrete casting material (700) is cast into the casting module (600). The concrete casting material (700) is combined with the prefabricated shear wall to form a complete shear wall with a concrete structure; S8. When pouring the concrete pouring material (700), adopt a layered pouring method, with each layer thickness not exceeding 1 meter, to ensure that the concrete can be fully vibrated, eliminate bubbles, and improve density. The first layer pouring height is 50cm, and the subsequent pouring height does not exceed 1m to ensure that the concrete can evenly fill the space in the formwork. During the pouring process, use a vibrating rod or a flat vibrator to vibrate the poured concrete to eliminate bubbles and improve the density of the concrete. S9. After pouring, the concrete is cured, which includes moisture retention and heat preservation to promote the hardening process of the concrete and ensure that the designed strength is reached. After the concrete reaches a certain strength, the pouring module (600) is disassembled. The disassembly sequence starts from the non-load-bearing part and gradually moves to the load-bearing part.

Citation Information

Patent Citations

  • Frame-shear wall building structure

    CN215106007U

  • Fabricated concrete shear wall and vertical steel structure ductile connecting method thereof

    CN112376733A

  • Prefabricated room module, building module combined structure, building and construction method thereof

    CN117145066A