Nuclear power project key equipment circular hole template supporting system and construction method thereof

By using portal steel frames and curved steel formwork support systems in nuclear power projects, the deficiencies of the traditional opening formwork support system in terms of flexibility, efficiency and quality control during construction are solved, achieving higher construction safety and structural stability. sex.

CN118728071AActive Publication Date: 2024-10-01CHINA NUCLEAR IND 22ND CONSTR

Patent Information

Application Number
CN202411170291.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-10-01
Estimated Expiration
2044-08-26

AI Technical Summary

Technical Problem

The traditional opening formwork support system has deficiencies in flexibility, efficiency and quality control during construction, especially when installing large equipment and processing special-shaped openings, resulting in affected construction progress, potential safety hazards and a decrease in concrete quality.

Method used

A circular opening formwork support system for key equipment in nuclear power projects is adopted, including side-by-side portal steel frames, arc-shaped steel formwork, steel pipes and high-strength tie rods. The formwork is fixed by welding and threaded connections, and circular ferrules and butterfly nuts are used. Adjust the tension of the tie rod to enhance the rigidity and stability of the formwork.

Benefits of technology

It improves construction safety and the stability of the formwork system, ensures the quality of the concrete structure, simplifies the construction process, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728071A_ABST
    Figure CN118728071A_ABST
Patent Text Reader

Abstract

The invention provides a nuclear power engineering key equipment circular opening formwork supporting system and a construction method thereof. The nuclear power engineering key equipment circular opening formwork supporting system comprises at least two portal steel frames arranged side by side, a plurality of steel pipes are evenly arranged on the inner surface of an arc-shaped steel formwork, the two ends of each steel pipe extend out of the two ends of the arc-shaped steel formwork, and the steel pipes are connected with the portal steel frames through a plurality of high-strength pull rods. The high-strength pull rod can be adjusted to be in a horizontal or vertical state according to needs. Due to the design, the other end of the pull rod can smoothly penetrate through the portal frame, and the butterfly nut and the steel bar anchoring block are used for anchoring, so that a load is effectively decomposed into horizontal force and vertical force, and the overall stability and reliability of a template system are greatly enhanced. According to the gate-type steel formwork supporting system, the safety in the construction process is improved, the stability of the formwork system and the overall quality of the structure are enhanced, and the gate-type steel formwork supporting system is a more efficient and reliable construction scheme.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of circular[1] opening formwork support, and in particular to a circular opening formwork support system for key equipment in nuclear power engineering and a construction method thereof. Background Art

[0002] The traditional opening formwork support system has some obvious limitations and shortcomings in construction, which can be summarized as follows: In some engineering projects, especially those involving the installation of large equipment, some key equipment needs to be hoisted into place at the early stage of structural construction. Once the equipment is in place, the space around it will be occupied, making it difficult to carry out the subsequent internal support formwork reinforcement work. This not only increases the complexity of construction organization, but may also affect the progress of structural construction.

[0003] In many cases, openings are not only part of the structure, but also important passages for transporting personnel and materials at the construction site. Using internal supports will occupy the space of these passages, affecting the passage of personnel and the transportation of materials, and may pose a threat to safe evacuation, especially in an emergency.

[0004] Traditional opening formwork, especially wooden formwork for circular or other irregular cross-section openings, often has gaps at the joints, which can cause leakage during concrete pouring. Leakage not only causes material waste, but also reduces the overall quality and safety of the concrete structure. In addition, for irregular openings, it is difficult for wooden formwork to accurately match the shape of the opening, further exacerbating the problem.

[0005] In summary, the traditional opening formwork support system has obvious shortcomings in adapting to the needs of modern engineering, especially in terms of flexibility, efficiency and quality control. These problems have prompted the industry to seek more advanced and efficient solutions, such as the application of new technologies such as the portal steel formwork support system. Summary of the invention

[0006] The main purpose of the present invention is to provide a circular opening formwork support system for key equipment in nuclear power projects and a construction method thereof, so as to solve the obvious shortcomings of traditional opening formwork support systems in adapting to modern engineering needs, especially in terms of flexibility, efficiency and quality control.

[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is: a circular opening formwork support system for key equipment in nuclear power projects, including at least two portal steel frames arranged side by side, a plurality of steel pipes are evenly arranged on the surface of the arc-shaped steel formwork, and both ends of the steel pipes extend out of both ends of the arc-shaped steel formwork, and the plurality of steel pipes are connected to the portal steel frames through a plurality of high-strength tie rods.

[0008] In the preferred embodiment, the portal steel frame is composed of two steel frames arranged side by side, with a gap between the two steel frames. One end of the high-strength tie rod is connected to the steel pipe and the other end passes through the gap on the portal steel frame and is connected to the butterfly nut.

[0009] In the preferred embodiment, a circular ring hoop is further provided, which is sleeved on the steel pipe and connected to at least one high-strength pull rod.

[0010] In the preferred embodiment, one or more limiting grooves are provided on the circular hoop, a rotating ring is rotatably connected inside the limiting groove, a connecting rod is provided on the rotating ring, and the connecting rod is connected to one end of the high-strength pull rod.

[0011] In the preferred embodiment, both ends of the high-strength tie rod are provided with threads, one end of the high-strength tie rod is threadedly connected to the connecting rod on the rotating ring, and a hexagonal rotating structure is also provided near the threaded end of the high-strength tie rod.

[0012] In the preferred embodiment, the other end of the high-strength tie rod passes through the gap of the portal steel frame and the steel pad to be threadedly connected with the butterfly nut.

[0013] In the preferred embodiment, when the circular hoop is connected to the two high-strength tie rods, the two high-strength tie rods respectively pass through the gaps at the top and sides of the portal steel frame and the steel pads to be threadedly connected to the butterfly nuts.

[0014] In the preferred embodiment, tensioning tubes are arranged side by side at the root positions on both sides of the bottom of the arc-shaped steel formwork, and both ends of the tensioning tubes extend out of the two ends of the arc-shaped steel formwork. One side of the two tensioning tubes is connected to the inner surface of the arc-shaped steel formwork, and the other side is against the tension plate. One end of the tie rod steel bar passes through between the two tensioning tubes and through the tension plate, and the other end of the tie rod steel bar passes through the portal steel frame and the steel pad. Steel bar anchor blocks are provided at both ends of the tie rod steel bar, and the steel bar anchor blocks are threadedly connected to the tie rod steel bar, and the two steel bar anchor blocks are respectively against the pull plate and the steel pad.

[0015] In a preferred embodiment, an arc-shaped groove matching the tensioning tube is provided on the inner surface of the tensioning plate.

[0016] The method includes: S1. When constructing the lower half of the opening, pre-embed the steel bracket on the wall and weld the portal steel frame to the steel bracket; S2. According to the center positioning of the hole, the arc-shaped steel template is temporarily fixed with sleepers, and the deformation of the arc-shaped steel template is controlled during the process; S3. Arrange the steel pipes at equal intervals on the arc-shaped steel formwork, and weld the arc-shaped steel formwork to the steel pipes, weld the tensioning tubes at the base of the arc-shaped steel formwork, and leave a distance between the tensioning tubes to facilitate the passage of the tie rod reinforcement; S4. A circular hoop is sleeved on the steel pipe, and a high-strength tie rod is welded or threaded on the rotating ring of the circular hoop. A high-strength tie rod is installed at the top of the arc-shaped steel formwork, and at least two high-strength tie rods are installed on each steel pipe at the side of the arc-shaped steel formwork; S5, vertical and horizontal high-strength tie rods pass through the top and side of the portal steel frame and are threadedly connected with butterfly nuts. The butterfly nuts adjust the tension of the high-strength tie rods; S6. After the curved steel formwork is fixed as a whole, the root of the curved steel formwork is tightened and fixed; S7. Install a pull plate on the tensioning tube. One end of the tie rod steel bar passes through the installation pull plate, and the other end passes through the portal steel frame and the steel pad. Install steel bar anchor blocks at both ends of the tie rod steel bar. The steel bar anchor blocks are threadedly connected to both ends of the tie rod steel bar. Turn the steel bar anchor block to tighten the root position of the arc steel formwork.

[0017] The present invention provides a circular opening template support system for key equipment of a nuclear power project and a construction method thereof, which improves the structural safety: when constructing the lower half of the opening, a steel bracket is pre-embedded on the wall, and a portal steel frame is welded to the steel bracket, which can effectively reduce the height of the frame, thereby improving the safety of the entire structure.

[0018] Enhance the rigidity of the formwork: Using curved steel formwork as the formwork, compared with the traditional wooden formwork, the steel formwork has greater rigidity and can better resist the deadweight of the concrete and the lateral pressure generated during the pouring process, thus ensuring the quality of the concrete structure.

[0019] Improve the stability of the formwork system: The high-strength tie rod is connected to the steel pipe through a circular hoop. The mobility and adjustability of the circular hoop allow the high-strength tie rod to be adjusted to a horizontal or vertical state as needed. This design allows the other end of the tie rod to pass smoothly through the portal steel frame and be anchored using butterfly nuts and steel anchor blocks, thereby effectively decomposing the load into horizontal and vertical forces, greatly enhancing the overall stability and reliability of the formwork system.

[0020] In summary, the portal steel formwork support system not only improves the safety during the construction process, but also enhances the stability of the formwork system and the overall quality of the structure. It is a more efficient and reliable construction solution. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 This is a main structural diagram of the portal steel frame of the present invention; Figure 2 This is the overall appearance structure diagram of the portal steel frame layout of the present invention; Figure 3 This is a structural diagram of a single tie rod at the top of the arc-shaped steel formwork of the present invention; Figure 4 It is a left-side structural diagram of the installation of two high-strength tie rods on the side of the arc-shaped steel formwork of the present invention; Figure 5 It is a right view structural diagram of the installation of two high-strength tie rods on the side of the arc-shaped steel formwork of the present invention; Figure 6 This is a disassembled structural diagram of the circular ring hoop of the present invention; Figure 7 This is a main structural diagram of the installation of the tensioning tube of the present invention; Figure 8 It is a side structural diagram of the tension tube installation of the present invention.

[0022] In the figure: steel corbel 1; portal steel frame 2; steel pipe 3; arc steel formwork 4; high-strength tie rod 5; steel bar anchor block 6; butterfly nut 7; tie rod steel bar 8; steel pad 9; circular ring hoop 10; rotating ring 1001; connecting rod 1002; limiting groove 1003; pull plate 11; tensioning tube 12. DETAILED DESCRIPTION

[0023] Example 1 like Figures 1 to 8 As shown, a circular opening formwork support system for key equipment in a nuclear power project includes at least two portal steel frames 2 arranged side by side, a plurality of steel pipes 3 are evenly arranged on the surface of an arc-shaped steel formwork 4, both ends of the steel pipes 3 extend out of both ends of the arc-shaped steel formwork 4, and the plurality of steel pipes 3 are connected to the portal steel frames 2 through a plurality of high-strength tie rods 5.

[0024] The system mainly includes at least two side-by-side portal steel frames 2, arc-shaped steel formworks 4, steel pipes 3, and high-strength tie rods 5. Multiple steel pipes 3 are evenly distributed inside the arc-shaped steel formwork 4, and the two ends of these steel pipes extend out of the two ends of the formwork. Multiple steel pipes 3 are connected to the portal steel frame 2 through multiple high-strength tie rods 5. The steel pipes 3 are arranged on the arc-shaped steel formwork 4 at equal intervals and fixed to the formwork by welding. This design enhances the rigidity and overall stability of the formwork.

[0025] The two high-strength tie rods 5 can be adjusted to horizontal and vertical states to facilitate the other end to pass through the portal steel frame 2 and be anchored by butterfly nuts 7 and steel bar anchor blocks 6, effectively decomposing the load into horizontal force and vertical force, significantly improving the overall stability and safety of the formwork system.

[0026] The inner surface is evenly arranged with multiple steel pipes 3, and the two ends of these steel pipes extend out of the two ends of the template. The steel pipes 3 are fixed to the arc-shaped steel template 4 by welding, which enhances the overall rigidity and stability of the template.

[0027] In the preferred embodiment, the portal steel frame 2 is composed of two steel frames arranged side by side, with a gap between the two steel frames, one end of the high-strength tie rod 5 is connected to the steel pipe 3, and the other end passes through the gap on the portal steel frame 2 and is connected to the butterfly nut 7. It is composed of two steel frames arranged side by side, with a certain gap between the two steel frames.

[0028] This design facilitates one end of the high-strength tie rod 5 to pass through the gap and connect with the butterfly nut 7, which is convenient for installation and adjustment.

[0029] The gap design between the portal steel frames 2 facilitates the installation of the high-strength tie rods 5, while the butterfly nuts 7 simplify the fastening process and improve the construction efficiency.

[0030] In the preferred embodiment, a circular hoop 10 is further provided, which is sleeved on the steel pipe 3 and connected to at least one high-strength tie rod 5. The circular hoop 10 is sleeved on the steel pipe 3 and connected to at least one high-strength tie rod 5.

[0031] Through the mobility and adjustability of the circular hoop 10 , the high-strength tie rod 5 can be adjusted to a horizontal or vertical state so that the other end passes through the portal steel frame 2 and is anchored with the butterfly nut 7 and the steel bar anchor block 6 .

[0032] In the preferred embodiment, one or more limiting grooves 1003 are provided on the circular hoop 10, and a rotating ring 1001 is rotatably connected inside the limiting groove 1003. The rotating ring 1001 is provided with a connecting rod 1002, and the connecting rod 1002 is connected to one end of the high-strength pull rod 5.

[0033] One or more limiting grooves 1003 are provided on the circular ring hoop 10, and these limiting grooves are used to accommodate and fix the position of the rotating ring 1001 to ensure that it can rotate freely within a specific range without falling off.

[0034] The rotating ring 1001 is located inside the limiting groove 1003 and can rotate freely in the groove. The design of the rotating ring 1001 allows the high-strength tie rod 5 to be adjusted to a horizontal or vertical state as required, so that the other end can pass through the portal steel frame 2 for installation and fixing.

[0035] One end of the connecting rod 1002 is connected to the rotating ring 1001, and the other end is connected to one end of the high-strength tie rod 5. The function of the connecting rod 1002 is to connect the rotating ring 1001 with the high-strength tie rod 5 to achieve the linkage between the two.

[0036] The design of the limiting groove 1003 and the rotating ring 1001 of the circular hoop 10 enables the high-strength tie rod 5 to be adjusted to different positions according to actual needs, thereby enhancing the adaptability and adjustment capability of the system.

[0037] The rotating ring 1001 is connected to the high-strength tie rod 5 through the connecting rod 1002, so that the high-strength tie rod 5 can pass through the portal steel frame 2 more conveniently, simplifying the installation process.

[0038] In the preferred embodiment, both ends of the high-strength tie rod 5 are provided with threads, one end of the high-strength tie rod 5 is threadedly connected to the connecting rod 1002 on the rotating ring 1001, and a hexagonal rotating structure is also provided near the threaded end of the high-strength tie rod 5. The threaded connection method facilitates the rapid disassembly and assembly between the high-strength tie rod 5 and the connecting rod 1002, thereby improving the construction efficiency.

[0039] A hexagonal rotating structure is also provided near the threaded end of the high-strength tie rod 5. This design facilitates the use of tools such as wrenches to rotate the high-strength tie rod 5, thereby achieving the tightening or loosening of the threaded connection.

[0040] By means of threaded connection, the high-strength tie rod 5 can be quickly assembled or disassembled with the connecting rod 1002, simplifying the installation process. The hexagonal rotating structure design allows the high-strength tie rod 5 to be easily rotated by tools such as wrenches, making it convenient to adjust the position and tightening degree of the high-strength tie rod 5, thereby improving the flexibility of construction.

[0041] In the preferred embodiment, the other end of the high-strength tie rod 5 passes through the gap of the portal steel frame 2 and the steel backing plate 9 and is threadedly connected to the butterfly nut 7.

[0042] After the other end of the high-strength tie rod 5 passes through the gap of the portal steel frame 2, it also needs to pass through the steel pad 9. The function of the steel pad 9 is to increase the contact area, disperse the pressure of the high-strength tie rod 5 on the portal steel frame 2, and prevent excessive local stress from causing structural damage.

[0043] The butterfly nut 7 rests on the steel backing plate 9. By rotating the butterfly nut 7, the tension of the high-strength tie rod 5 can be adjusted to ensure the stability of the formwork system.

[0044] The steel pad 9 increases the contact area, disperses the pressure of the high-strength tie rod 5 on the portal steel frame 2, and improves the stability of the overall structure. The use of the butterfly nut 7 can accurately adjust the tension of the high-strength tie rod 5 to ensure the stability and safety of the formwork system during the concrete pouring process.

[0045] In the preferred embodiment, when the annular hoop 10 is connected to the two high-strength tie rods 5, the two high-strength tie rods 5 pass through the gaps on the top and sides of the portal steel frame 2 and the steel pad 9 and are threadedly connected to the butterfly nut 7.

[0046] like Figure 2 , 4As shown in Figure 5, the two high-strength tie rods 5 can be adjusted to the horizontal and vertical states, so that the other end can pass through the portal steel frame 2 and be anchored by the butterfly nut 7 and the steel anchor block 6. Through the connection between the two high-strength tie rods 5 and the portal steel frame 2, the load is effectively decomposed into horizontal force and vertical force, which significantly improves the overall stability and safety of the formwork system.

[0047] The two high-strength tie rods 5 can be adjusted to different positions according to actual needs, which enhances the adaptability and adjustment ability of the system. The gap design on the top and side of the portal steel frame 2 facilitates the installation of the high-strength tie rods 5, while the butterfly nuts 7 simplify the fastening process and improve the construction efficiency.

[0048] In the preferred embodiment, tensioning tubes 12 are arranged side by side at the root positions on both sides of the bottom of the arc-shaped steel formwork 4, and both ends of the tensioning tubes 12 extend out of the two ends of the arc-shaped steel formwork 4. One side of the two tensioning tubes 12 is connected to the inner surface of the arc-shaped steel formwork 4, and the other side is against the tension plate 11. One end of the tie rod steel bar 8 passes through between the two tensioning tubes 12 and through the tension plate 11, and the other end of the tie rod steel bar 8 passes through the portal steel frame 2 and the steel pad 9. Steel bar anchor blocks 6 are provided at both ends of the tie rod steel bar 8, and the steel bar anchor blocks 6 are threadedly connected to the tie rod steel bar 8, and the two steel bar anchor blocks 6 are respectively against the tension plate 11 and the steel pad 9.

[0049] By using the tension tube 12, the tension plate 11, the tie rod steel bar 8 and the steel bar anchor block 6, the root position of the arc steel formwork 4 can be effectively tightened to ensure the stability of the formwork. The design of the tension tube 12 and the tie rod steel bar 8 enhances the overall rigidity of the formwork, enabling the formwork to withstand greater concrete deadweight and lateral pressure generated during the pouring process. The gap design on the top and side of the portal steel frame 2 facilitates the installation of high-strength tie rods 5 and tie rod steel bars 8, while the steel bar anchor block 6 simplifies the tightening process and improves construction efficiency. By rotating the steel bar anchor block 6 to adjust the tension of the tie rod steel bar 8, the adaptability and adjustment ability of the system are enhanced.

[0050] In the preferred embodiment, the inner surface of the pull plate 11 is provided with an arc groove matching the tension tube 12. The inner surface of the pull plate 11 is provided with an arc groove matching the tension tube 12. This design enables the pull plate 11 to better fit the tension tube 12 and enhance the stability of the connection.

[0051] Example 2 Further illustrate with reference to Example 1, Figure 1-8 The structure shown in FIG. 1 includes: S1. When constructing the lower half of the opening, a steel bracket 1 is embedded in the wall, and a portal steel frame 2 is welded to the steel bracket 1; S2. According to the center positioning of the hole, the arc-shaped steel template 4 is temporarily fixed with sleepers, and the deformation of the arc-shaped steel template 4 is controlled during the process; S3, arranging the steel pipes 3 on the arc-shaped steel formwork 4 at equal intervals, and welding the arc-shaped steel formwork 4 to the steel pipes 3, welding the tensioning tubes 12 at the base of the arc-shaped steel formwork 4, and leaving a distance between the tensioning tubes 12 to facilitate the passage of the tie rod steel bars 8; S4, a circular hoop 10 is sleeved on the steel pipe 3, a high-strength tie rod 5 is welded or threaded on the rotating ring 1001 of the circular hoop 10, a high-strength tie rod 5 is installed at the top position of the arc-shaped steel template 4, and at least two high-strength tie rods 5 are installed on each steel pipe 3 at the side position of the arc-shaped steel template 4; S5, vertical and horizontal high-strength tie rods 5 pass through the top and side of the portal steel frame 2 and are threadedly connected with butterfly nuts 7, and butterfly nuts 7 adjust the tension of the high-strength tie rods 5; S6. After the arc-shaped steel formwork 4 is fixed as a whole, the root of the arc-shaped steel formwork 4 is tightened and fixed; S7, a pull plate 11 is installed on the tensioning tube 12, one end of the tie rod steel bar 8 passes through the installation pull plate 11, and the other end passes through the portal steel frame 2 and the steel pad 9, and steel bar anchor blocks 6 are respectively installed at both ends of the tie rod steel bar 8. The steel bar anchor blocks 6 are threadedly connected to both ends of the tie rod steel bar 8, and the steel bar anchor blocks 6 are rotated to tighten the root position of the arc-shaped steel formwork 4.

[0052] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A circular opening formwork support system for key equipment in nuclear power engineering, characterized by: It comprises at least two portal steel frames (2) arranged side by side, a plurality of steel pipes (3) are evenly arranged on the surface of an arc-shaped steel template (4), two ends of the steel pipes (3) extend out of two ends of the arc-shaped steel template (4), and the plurality of steel pipes (3) are connected to the portal steel frames (2) via a plurality of high-strength tie rods (5).

2. According to claim 1, a circular opening formwork support system for key equipment in nuclear power engineering is characterized by: The portal steel frame (2) is composed of two steel frames arranged side by side, with a gap between the two steel frames. One end of the high-strength tie rod (5) is connected to the steel pipe (3) and the other end passes through the gap on the portal steel frame (2) and is connected to the butterfly nut (7).

3. According to claim 1, a circular opening formwork support system for key equipment in nuclear power engineering is characterized by: A circular hoop (10) is also provided, which is sleeved on the steel pipe (3) and connected to at least one high-strength tie rod (5).

4. According to claim 3, a circular opening formwork support system for key equipment in nuclear power engineering is characterized by: One or more limiting grooves (1003) are provided on the circular hoop (10), a rotating ring (1001) is rotatably connected inside the limiting groove (1003), a connecting rod (1002) is provided on the rotating ring (1001), and the connecting rod (1002) is connected to one end of the high-strength pull rod (5).

5. According to claim 3, a circular opening formwork support system for key equipment in nuclear power engineering is characterized by: Both ends of the high-strength tie rod (5) are provided with threads, one end of the high-strength tie rod (5) is threadedly connected to the connecting rod (1002) on the rotating ring (1001), and a hexagonal rotating structure is also provided near the threaded end of the high-strength tie rod (5).

6. According to claim 3, a circular opening formwork support system for key equipment in nuclear power engineering is characterized by: The other end of the high-strength tie rod (5) passes through the gap of the portal steel frame (2) and the steel pad (9) and is threadedly connected to the butterfly nut (7).

7. According to claim 6, a circular opening formwork support system for key equipment in nuclear power engineering, characterized in that: When the circular hoop (10) is connected to the two high-strength tie rods (5), the two high-strength tie rods (5) respectively pass through the gaps at the top and side of the portal steel frame (2) and the steel pad (9) and are threadedly connected to the butterfly nut (7).

8. According to claim 1, a circular opening formwork support system for key equipment in nuclear power engineering, characterized in that: Tension tubes (12) are arranged side by side at the base positions on both sides of the bottom of the arc-shaped steel formwork (4). Both ends of the tension tubes (12) extend out of the two ends of the arc-shaped steel formwork (4). One side of the two tension tubes (12) is connected to the inner surface of the arc-shaped steel formwork (4), and the other side abuts against the tension plate (11). One end of the tie rod steel bar (8) passes through between the two tension tubes (12) and through the tension plate (11), and the other end of the tie rod steel bar (8) passes through the portal steel frame (2) and the steel pad (9). Both ends of the tie rod steel bar (8) are provided with steel bar anchor blocks (6), and the steel bar anchor blocks (6) are threadedly connected to the tie rod steel bar (8). The two steel bar anchor blocks (6) abut against the tension plate (11) and the steel pad (9) respectively.

9. According to claim 1, a circular opening formwork support system for key equipment in nuclear power engineering, characterized in that: The inner surface of the pulling plate (11) is provided with an arc-shaped groove matching the tensioning tube (12).

10. A method for cleaning a circular opening template support system for key equipment in a nuclear power project according to any one of claims 1 to 9, characterized in that: The method includes: S1. When constructing the lower half of the opening, a steel bracket (1) is embedded in the wall, and a portal steel frame (2) is welded to the steel bracket (1); S2. According to the center positioning of the hole, the arc-shaped steel template (4) is temporarily fixed with sleepers, and during the process, the deformation of the arc-shaped steel template (4) is controlled; S3, arranging the steel pipes (3) at equal intervals on the arc-shaped steel formwork (4), and welding the arc-shaped steel formwork (4) and the steel pipes (3) to fix them, welding the tensioning tubes (12) at the base of the arc-shaped steel formwork (4), and leaving a distance between the tensioning tubes (12) to facilitate the passage of the tie rod steel bars (8); S4, a circular hoop (10) is sleeved on the steel pipe (3), a high-strength tie rod (5) is welded or threaded on the rotating ring (1001) of the circular hoop (10), a high-strength tie rod (5) is installed at the top position of the arc-shaped steel formwork (4), and at least two high-strength tie rods (5) are installed on each steel pipe (3) at the side position of the arc-shaped steel formwork (4); S5, vertical and horizontal high-strength tie rods (5) pass through the top and side of the portal steel frame (2) and are threadedly connected to butterfly nuts (7), and the butterfly nuts (7) adjust the tension of the high-strength tie rods (5); S6. After the curved steel formwork (4) is fixed as a whole, the base of the curved steel formwork (4) is tightened and fixed; S7, a tension plate (11) is installed on the tension tube (12), one end of the tension rod steel bar (8) passes through the installation tension plate (11), and the other end passes through the portal steel frame (2) and the steel pad (9), and steel bar anchor blocks (6) are respectively installed at both ends of the tension rod steel bar (8), and the steel bar anchor blocks (6) are threadedly connected to both ends of the tension rod steel bar (8), and the steel bar anchor blocks (6) are rotated to tighten the root position of the arc steel formwork (4).

Citation Information

Patent Citations

  • Arc-shaped formwork bottom support system

    CN103790375A

  • Formwork support system with towering asymmetric concrete cantilever structure

    CN203113226U

  • Hoisting pipe clamp

    CN209146505U

  • Stainless steel pipeline elevator

    CN217208104U

  • Fixing device for template at chamfering position

    CN217517310U

Cited By

  • Stability detection device for portal steel frame supporting system