Grouting seam plugging device of prefabricated assembly plate

By designing a prefabricated panel grouting joint sealing device for the abutment, sealing platform and guide platform, the traveling mechanism and various rods are used to achieve efficient pouring, sealing and recycling of mortar, thus solving the problems of mortar spillage and cost increase. , improving grouting efficiency and board surface flatness.

CN118728087AInactive Publication Date: 2024-10-01MCC COMM CONSTR GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411103002.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-12
Publication Date
2024-10-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing grouting joint sealing device for prefabricated panels has problems of mortar spillage and increased costs during the mortar pouring process, and the flatness of the board surface is affected after mortar pouring.

Method used

A grouting joint sealing device including a base, sealing platform and guide platform is designed. It uses a traveling mechanism, an electric roller, a pneumatic telescopic rod, a hydraulic telescopic rod and recovery parts to achieve efficient pouring, sealing and sealing of mortar. Recycling to avoid mortar backflow and waste.

Benefits of technology

It effectively avoids mortar backflow and waste, improves grouting efficiency and board surface flatness, reduces mortar pouring costs, and improves the installation effect of prefabricated walls.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728087A_ABST
    Figure CN118728087A_ABST
Patent Text Reader

Abstract

The invention discloses a grouting seam plugging device for a prefabricated assembly plate, and the grouting seam plugging device comprises a base table, a plugging table and a flow guide table. In the using process, an extrusion block and a plugging head are pushed out from a through hole through an arranged hydraulic telescopic rod; the hydraulic telescopic rod can tightly insert the plugging head on one side of the extrusion block into the grouting hole in the surface of the prefabricated assembly wall, so that the grouting hole in the surface of the prefabricated assembly wall is plugged, mortar in the grouting hole in the surface of the prefabricated assembly wall is effectively prevented from flowing back and being discharged, and it is guaranteed that the mortar in the prefabricated assembly wall is smoothly fixed; a reciprocating frame can be driven by an arranged vertical lifting guide rail to vertically move in a reciprocating mode, and a lateral scraping plate can scrape off mortar attached to the surface of the prefabricated wall body when attached to the surface of the prefabricated wall body, so that the mortar quickly flows to the surface of an inclined flow guide groove from the prefabricated wall body, and the mortar recycling efficiency is improved conveniently; and meanwhile, the smoothness of the surface of the prefabricated wall body is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of prefabricated plate grouting, in particular to a grouting seam sealing device for a prefabricated assembly plate. Background Art

[0002] Prefabricated panels are a construction method in which building components are prefabricated in a factory or prefabrication yard and then installed on the construction site. This method aims to improve construction efficiency, reduce on-site labor intensity, and save construction time. Prefabricated panels mainly include two types: hollow prefabricated panels and reinforced concrete floor slabs.

[0003] Hollow precast panels: This type of precast panel was invented in the past to save construction time and labor intensity on site because concrete mixing equipment was relatively backward. They are placed on the load-bearing wall. Some of them cast the prestressed tendons on the panel on the ring beam, while others directly put the hollow precast panel on the load-bearing wall. Houses with this type of precast panel basically have no earthquake resistance and may collapse instantly during an earthquake.

[0004] Reinforced concrete floor slab: This is a reinforced concrete floor slab prefabricated outside the component prefabrication factory or construction site. Compared with hollow prefabricated slabs, reinforced concrete floor slabs have higher structural strength and safety, and can better meet the needs of modern buildings.

[0005] The advantages of prefabricated panels include improving construction efficiency, saving manpower and materials, and compared with traditional construction methods, prefabricated buildings can be faster and more convenient. This method has been widely used in Europe, the United States and Japan and is considered to be an industrialized and industrialized construction method. The widespread use of prefabricated panels reflects a trend in the construction industry towards a more efficient and environmentally friendly direction.

[0006] In the prior art, a grouting joint plugging device for a prefabricated assembled structure is disclosed in the publication number "CN110409637B", the prefabricated assembled structure includes a prefabricated assembly plate, a grouting joint is opened on the top of the prefabricated assembly plate, and the device includes: a plugging seat, which is arranged on the top of the prefabricated assembly plate, a feeding cavity and a pair of fixed grooves are arranged at the bottom of the plugging seat, and a feeding hole is arranged at the bottom of the feeding cavity; a pair of first baffles, which are slidably connected to the two sides of the inner wall of the feeding hole and can cover the feeding hole; a pair of control columns, each control column is slidably connected in a fixed groove; a pair of first screw rods, each of the two ends of the first screw rod is respectively connected to the first baffle and the control column; a connecting plate, which is arranged between the pair of control columns, and a feeding pipe connected to the feeding hole and the grouting joint is arranged on the top of the connecting plate; a pair of connecting grooves are arranged on the side walls of the feeding pipe; a pair of second baffles, each second baffle is slidably connected in a connecting groove; a control mechanism, which is connected to the connecting plate, and is used to control the pair of second baffles to move toward each other to plug the feeding pipe.

[0007] However, the existing technology still has major deficiencies, such as:

[0008] In the above-mentioned device and the prior art, when the prefabricated assembly wall panel is loaded onto the prefabricated assembly wall base plate, the vertical positioning steel bars on the prefabricated assembly wall base plate will be inserted into the loading hole at the bottom of the prefabricated assembly wall panel. In order to ensure the stability between the prefabricated assembly wall panel and the prefabricated assembly wall base plate, mortar is usually poured into the vertical positioning steel bar area to fix it. When pouring mortar, the discharge flow rate of the mortar is faster than the filling rate of the loading hole by the mortar, which will cause mortar overflow. If the mortar cannot be recovered, the mortar pouring cost will increase. At the same time, the scattered mortar adheres to the surface of the prefabricated assembly wall panel, which will affect the surface flatness of the prefabricated assembly wall panel. Summary of the invention

[0009] The purpose of the present invention is to provide a grouting joint sealing device for a prefabricated assembly panel to solve the problems raised in the above-mentioned background technology.

[0010] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a grouting joint plugging device for a prefabricated assembly plate, comprising a base, a plugging platform and a guide platform, the base area is provided with a walking mechanism, the plugging platform is provided at the top area of ​​the base, the plugging platforms are symmetrically arranged in two groups, the guide platform is provided between adjacent plugging platforms, and a collecting trough is provided on the surface of the plugging platform;

[0011] A prefabricated wall panel surface hole grouting unit, which is arranged inside the collecting tank and is used to pour mortar into the surface holes of the prefabricated wall after the prefabricated wall is assembled in place, and fix the prefabricated wall after the mortar is formed;

[0012] A prefabricated wall panel surface hole plugging unit, which is also arranged inside the collecting tank and is used to plug the holes of the mortar after the mortar is poured into the holes on the surface of the prefabricated wall panel, so as to prevent the mortar from flowing back and out due to the heating of the prefabricated wall panel;

[0013] The precast board surface mortar recovery and caulking unit is arranged in the guide platform area and is used for recycling the mortar spilled in the grouting hole area during the mortar pouring process.

[0014] Preferably, the prefabricated wall panel surface hole grouting unit includes a first-level electric roller, which is installed inside the collecting trough, and a rotating sleeve is installed on the rotating end of the first-level electric roller, and two groups of fixing frames are fixedly installed on the rotating sleeve, and a mortar tank is installed inside one group of the fixing frames, and a pneumatic telescopic rod is also installed on the fixing frame, and a through hole is opened on the surface of the fixing frame, and a grouting bin is installed on the output end of the pneumatic telescopic rod, and a grouting insert is installed at one end of the grouting bin, the mortar tank is connected to the grouting bin, and the grouting insert slides out of the through hole.

[0015] Preferably, the prefabricated wall panel surface hole sealing unit includes a hydraulic telescopic rod, which is installed inside the group of fixed frames, an extrusion block is installed on the output end of the hydraulic telescopic rod, a sealing head is installed at the bottom of the extrusion block, and the output end of the hydraulic telescopic rod slides out of the through hole.

[0016] Preferably, the prefabricated board surface mortar recovery and caulking unit includes a primary recovery part, and the primary recovery part includes a vertical lifting guide rail, and the vertical lifting guide rail is embedded in both sides of the sealing platform, and a reciprocating frame is installed on the movable end of the adjacent vertical lifting guide rail, and a lateral scraper is installed on the outer side of the reciprocating frame.

[0017] Preferably, the prefabricated board surface mortar recovery and caulking unit also includes a secondary recovery part, the secondary recovery part includes an inclined movable guide rail, the guide table surface is provided with an inclined guide groove, the inclined movable guide rail is installed on both sides of the guide table surface, an inclined scraper is installed in the inclined guide groove, and secondary electric rollers are installed at both ends of the inclined scraper, and the rotating end of the secondary electric roller is fixed to the movable end of the inclined movable guide rail.

[0018] Preferably, a feeding hole is provided in the bottom area of ​​the inclined guide groove.

[0019] Preferably, the walking mechanism comprises a walking wheel, a through groove is provided on the surface of the base, an electric-driven roller is installed in the through groove, and the walking wheel is installed on the rotating end of the electric-driven roller.

[0020] Preferably, a first fixing seat is installed on one side of the base, a second fixing seat is installed on one side of the blocking platform, a hydraulic lifting rod is installed on the top of the second fixing seat, and a movable end of the hydraulic lifting rod is fixed to one side of the first fixing seat.

[0021] Preferably, a reciprocating groove is provided on the surface of the blocking platform, a guide slide rod is installed in the reciprocating groove, the guide slide rod is arranged into several groups, a guide rail is installed on the inner bottom of the reciprocating groove, a traction arm is slidably installed on the surface of the guide slide rod, and one side of the traction arm is fixed to one side of the moving end of the guide rail.

[0022] Preferably, a pulling arm is installed at the bottom of the traction arm, and a hydraulic hook is installed on the pulling arm.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] 1. When in use, the hydraulic hook installed at the bottom of the tension arm is used to hook the lifting column at the top of the prefabricated panel wall, and then the guide rail is driven again to lift the prefabricated panel assembly wall through the tension arm, and the prefabricated panel assembly wall is moved to the top area of ​​the prefabricated assembly bottom plate through the walking wheel, so that the loading hole at the bottom of the prefabricated panel assembly wall and the vertical steel bar column at the top of the prefabricated assembly bottom plate are kept in a vertical filling state, thereby completing the vertical installation of the prefabricated assembly wall, avoiding the bending of the vertical steel bar column during the installation process, and ensuring the installation effect of the prefabricated assembly wall;

[0025] 2. When in use, the grouting plug is pushed out of the through hole through the pneumatic telescopic rod on the fixed frame, and the pneumatic telescopic rod inserts the grouting plug into the grouting hole on the surface of the prefabricated wall, and mortar is poured into the grouting plug through the grouting chamber. Since the grouting plug is inserted deeper, the mortar waste can be reduced during the grouting process, thereby improving the grouting efficiency inside the prefabricated wall;

[0026] 3. When in use, the extrusion block and the plugging head are pushed out of the through hole by the hydraulic telescopic rod, and the hydraulic telescopic rod will tightly insert the plugging head on one side of the extrusion block into the grouting hole on the surface of the prefabricated assembly wall, thereby plugging the grouting hole on the surface of the prefabricated assembly wall, thereby effectively preventing the mortar from flowing back and out of the grouting hole on the surface of the prefabricated assembly wall, and ensuring that the mortar inside the prefabricated assembly wall is smoothly fixed;

[0027] 4. When in use, the reciprocating frame can be driven to move vertically back and forth through the vertical lifting guide rail. The lateral scraper will scrape off the mortar attached to the surface of the prefabricated wall when it is attached to the surface of the prefabricated wall, so that the mortar can quickly flow from the prefabricated wall to the surface of the oblique guide groove, which is convenient for improving the recovery efficiency of the mortar and ensuring the smoothness of the surface of the prefabricated wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is an overall schematic diagram of the device of the present invention;

[0029] Figure 2 It is a partial schematic diagram of the second fixing seat and the first fixing seat in the present invention;

[0030] Figure 3 It is a schematic diagram of the hydraulic hook part of the present invention;

[0031] Figure 4 It is a partial schematic diagram of the collecting tank in the present invention;

[0032] Figure 5It is a schematic diagram of the rotating sleeve part in the present invention;

[0033] Figure 6 It is a schematic diagram of the plugging head part in the present invention;

[0034] Figure 7 It is a partial schematic diagram of the guide platform in the present invention;

[0035] Figure 8 It is a schematic diagram of the reciprocating groove part in the present invention;

[0036] Fig. 9 It is a partial schematic diagram of the traction arm and the pulling arm in the present invention.

[0037] In the figure: 1, base; 11, second fixed seat; 12, hydraulic lifting rod; 13, first fixed seat; 14, through slot; 15, walking wheel; 16, electric drive roller; 2, blocking platform; 21, collecting slot; 211, first-level electric roller; 212, rotating sleeve; 213, fixed frame; 214, through hole; 22, reciprocating slot; 221, guide rail; 23, guide slide; 24, traction arm; 241, pulling arm ; 242, hydraulic hook; 25, vertical lifting guide rail; 26, reciprocating frame; 27, lateral scraper; 28, mortar tank; 281, pneumatic telescopic rod; 282, grouting bin; 283, grouting plug; 29, hydraulic telescopic rod; 291, extrusion block; 292, plugging head; 3, guide table; 31, oblique guide groove; 32, discharge hole; 33, oblique scraper; 34, secondary electric roller; 35, oblique moving guide rail. DETAILED DESCRIPTION

[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] See also Figure 1-9 , the present invention provides a technical solution:

[0040] Embodiment 1: A grouting joint plugging device for a prefabricated assembly plate: comprising a base 1, a plugging platform 2 and a guide platform 3, wherein a walking mechanism is arranged in the base 1 area, the plugging platform 2 is arranged in the top area of ​​the base 1, the plugging platforms 2 are symmetrically arranged in two groups, the guide platform 3 is arranged between adjacent plugging platforms 2, and a collecting trough 21 is arranged on the surface of the plugging platform 2;

[0041] A reciprocating groove 22 is provided on the surface of the blocking platform 2, and a guide slide bar 23 is installed in the reciprocating groove 22. The guide slide bar 23 is arranged in several groups, and a guide rail 221 is installed on the inner bottom of the reciprocating groove 22. A traction arm 24 is slidably installed on the surface of the guide slide bar 23, and one side of the traction arm 24 is fixed to the moving end side of the guide rail 221.

[0042] A pulling arm 241 is installed at the bottom of the traction arm 24 , and a hydraulic hook 242 is installed on the pulling arm 241 .

[0043] In this embodiment, the prefabricated panel assembly wall is moved to the top area of ​​the prefabricated assembly base plate by the walking wheels 15, so that the loading holes at the bottom of the prefabricated panel assembly wall and the vertical steel bars at the top of the prefabricated assembly base plate maintain a vertical filling state, thereby completing the vertical installation of the prefabricated assembly wall, avoiding the bending of the vertical steel bars during the installation process, and ensuring the installation effect of the prefabricated assembly wall.

[0044] The prefabricated wall panel surface hole grouting unit is arranged inside the collecting tank 21 and is used to pour mortar into the surface holes of the prefabricated wall panel after the prefabricated wall panel is assembled in place, and fix the prefabricated wall panel after the mortar is formed;

[0045] The prefabricated wall panel surface hole grouting unit includes a first-level electric roller 211, which is installed inside the collecting tank 21. A rotating sleeve 212 is installed on the rotating end of the first-level electric roller 211. Two groups of fixing frames 213 are fixedly installed on the rotating sleeve 212. A mortar tank 28 is installed inside one group of fixing frames 213. A pneumatic telescopic rod 281 is also installed on the fixing frame 213. A through hole 214 is opened on the surface of the fixing frame 213. A grouting bin 282 is installed on the output end of the pneumatic telescopic rod 281. A grouting insert 283 is installed at one end of the grouting bin 282. The mortar tank 28 is connected to the grouting bin 282, and the grouting insert 283 slides out of the through hole 214.

[0046] The walking mechanism includes a walking wheel 15 . A through groove 14 is provided on the surface of the base 1 . An electric drive roller 16 is installed in the through groove 14 . The walking wheel 15 is installed on the rotating end of the electric drive roller 16 .

[0047] A first fixing seat 13 is installed on one side of the base 1 , a second fixing seat 11 is installed on one side of the blocking platform 2 , a hydraulic lifting rod 12 is installed on the top of the second fixing seat 11 , and a movable end of the hydraulic lifting rod 12 is fixed to one side of the first fixing seat 13 .

[0048] In this embodiment, the first-level electric roller 211 is driven to rotate. When the first-level electric roller 211 rotates in the forward direction, the fixed frame 213 in the grouting bin 282 area will be turned to the side of the prefabricated assembly wall. Then, the grouting plug 283 will be pushed out of the through hole 214 through the pneumatic telescopic rod 281 on the fixed frame 213. The pneumatic telescopic rod 281 will insert the grouting plug 283 into the grouting hole on the surface of the prefabricated assembly wall, and mortar will be poured into the grouting plug 283 through the grouting bin 282. Since the grouting plug 283 is inserted into a deeper position, the mortar waste can be reduced during the grouting process, thereby improving the grouting efficiency inside the prefabricated assembly wall.

[0049] The prefabricated board wall plate surface hole plugging unit is also arranged inside the collecting tank 21, and is used to plug the holes of the mortar after the mortar is poured into the holes on the surface of the prefabricated board wall, so as to prevent the mortar from flowing back and out due to the heating of the prefabricated board wall;

[0050] The surface hole sealing unit of the prefabricated wall panel includes a hydraulic telescopic rod 29, which is installed inside a set of fixed frames 213. An extrusion block 291 is installed on the output end of the hydraulic telescopic rod 29, and a sealing head 292 is installed at the bottom of the extrusion block 291. The output end of the hydraulic telescopic rod 29 slides out of the through hole 214.

[0051] In this embodiment, after grouting is completed, the grouting tube 283 is removed and reset through the pneumatic telescopic rod 281, and then the fixing frame 213 located on one side of the extrusion block 291 is rotated in the opposite direction again through the first-level electric roller 211 toward the surface of the prefabricated assembly wall, and then the extrusion block 291 and the plugging head 292 are pushed out of the through hole 214 through the set hydraulic telescopic rod 29. The hydraulic telescopic rod 29 will tightly insert the plugging head 292 on one side of the extrusion block 291 into the grouting hole on the surface of the prefabricated assembly wall, thereby blocking the grouting hole on the surface of the prefabricated assembly wall, thereby effectively avoiding the backflow and discharge of mortar in the grouting holes on the surface of the prefabricated assembly wall, and ensuring that the mortar inside the prefabricated assembly wall is smoothly fixed.

[0052] The precast board surface mortar recovery and caulking unit is arranged in the guide platform 3 area, and is used to recycle the mortar spilled in the grouting hole area during the mortar pouring process.

[0053] The precast board surface mortar recovery and caulking unit includes a primary recovery part, which includes a vertical lifting guide rail 25, which is embedded in both sides of the sealing platform 2, and a reciprocating frame 26 is installed on the moving end of the adjacent vertical lifting guide rails 25, and a lateral scraper 27 is installed on the outer side of the reciprocating frame 26.

[0054] In this embodiment, in order to reduce the residual mortar on the surface of the prefabricated assembly wall, the reciprocating frame 26 can be driven to move vertically back and forth by the vertical lifting guide rail 25, and the lateral scraper 27 will scrape off the mortar attached to the surface of the prefabricated assembly wall when it is in contact with the surface of the prefabricated assembly wall, so that the mortar can quickly flow from the prefabricated assembly wall to the surface of the inclined guide groove 31, thereby improving the mortar recovery efficiency and ensuring the smoothness of the surface of the prefabricated assembly wall.

[0055] Embodiment 2:

[0056] Based on the first embodiment, the second embodiment takes into account that when the recovered mortar falls on the surface of the oblique guide groove 31, the mortar can flow downward along the surface of the oblique guide groove 31, but when the amount of mortar increases, the viscosity increases, which affects the flow rate of the mortar on the oblique guide groove 31. Therefore, a secondary recovery part is provided in this embodiment, which can avoid the above-mentioned problem.

[0057] The precast board surface mortar recovery and caulking unit also includes a secondary recovery part, which includes an oblique movable guide rail 35. An oblique guide groove 31 is provided on the surface of the guide platform 3. The oblique movable guide rail 35 is installed on both sides of the surface of the guide platform 3. An oblique scraper 33 is installed in the oblique guide groove 31. Secondary electric rollers 34 are installed at both ends of the oblique scraper 33. The rotating end of the secondary electric roller 34 is fixed to the moving end of the oblique movable guide rail 35.

[0058] A feeding hole 32 is provided at the bottom area of ​​the inclined guide groove 31 .

[0059] In the present embodiment, when the recovered mortar falls into the surface of the inclined guide groove 31, in order to accelerate the flow rate of the mortar on the surface of the inclined guide groove 31, an oblique movable guide rail 35 installed on the surface of the guide platform 3 can be used to drive the oblique scraper 33 to scrape the mortar along the surface of the inclined guide groove 31. When the oblique movable guide rail 35 drives the oblique scraper 33 to reset, in order to avoid the oblique scraper 33 from scraping the mortar to the top of the oblique guide groove 31 when resetting, the oblique scraper 33 can be rotated to a state parallel to the oblique guide groove 31 by the secondary electric roller 34 to avoid scraping the mortar upward during the resetting process of the oblique scraper 33. The scraped mortar is discharged to the gap area between the prefabricated assembly wall and the prefabricated assembly bottom plate through the discharge hole 32, thereby accelerating the mortar recovery efficiency.

[0060] Working principle: During the use of the device, the electric drive roller 16 is operated so that the walking wheel 15 drives the base 1 to move to the prefabricated panel wall area placed on the operating plane, and then the guide rail 221 is operated to drive the traction arm 24 and the tension arm 241 to move downward. When the tension arm 241 is inserted into the lifting position at the top of the prefabricated panel wall, the hydraulic hook 242 installed at the bottom of the tension arm 241 hooks the lifting column at the top of the prefabricated panel wall, and then the guide rail 221 is driven again to lift the prefabricated panel assembly wall through the tension arm 241, and the prefabricated panel assembly wall is moved to the top area of ​​the prefabricated assembly bottom plate through the walking wheel 15, so that the loading hole at the bottom of the prefabricated panel assembly wall and the vertical steel bar column at the top of the prefabricated assembly bottom plate maintain a vertical filling state, thereby completing the vertical installation of the prefabricated assembly wall, which can avoid the bending of the vertical steel bar column during the installation process and ensure the installation effect of the prefabricated assembly wall;

[0061] After the prefabricated assembly wall is installed in place, the hydraulic hook 242 is removed, and the tension arm 241 is reset through the guide rail 221, and then the mortar is poured into the loading hole area in the prefabricated panel assembly wall through the grouting holes on the surface of the prefabricated assembly wall, and the first-level electric roller 211 is driven to rotate. When the first-level electric roller 211 rotates forward, the fixed frame 213 in the grouting bin 282 area will be turned to the side of the prefabricated assembly wall, and then the grouting plug 283 is pushed out of the through hole 214 through the pneumatic telescopic rod 281 on the group of fixed frames 213. The pneumatic telescopic rod 281 will insert the grouting plug 283 into the grouting hole on the surface of the prefabricated assembly wall, and mortar is poured into the grouting plug 283 through the grouting bin 282. Since the grouting plug 283 is inserted into a deeper position, the mortar waste can be reduced during the grouting process, thereby improving the grouting efficiency inside the prefabricated assembly wall.

[0062] When grouting is completed, the grouting insert 283 is taken out and reset through the pneumatic telescopic rod 281, and then the fixing frame 213 on one side of the extrusion block 291 is rotated toward the surface of the prefabricated assembly wall by the reverse rotation of the first-level electric roller 211 again, and then the extrusion block 291 and the plugging head 292 are pushed out of the through hole 214 through the provided hydraulic telescopic rod 29, and the hydraulic telescopic rod 29 will tightly insert the plugging head 292 on one side of the extrusion block 291 into the grouting hole on the surface of the prefabricated assembly wall, thereby plugging the grouting hole on the surface of the prefabricated assembly wall, thereby effectively preventing the mortar from flowing back and out of the grouting hole on the surface of the prefabricated assembly wall, and ensuring that the mortar inside the prefabricated assembly wall is fixed smoothly;

[0063] During the grouting process, the leaked mortar will flow downward along the surface of the prefabricated assembly wall, and part of the mortar will fall on the oblique guide groove 31 on the surface of the guide platform 3, and flow along the surface of the oblique guide groove 31 to the gap area between the prefabricated assembly wall and the prefabricated assembly bottom plate. In order to reduce the residual mortar on the surface of the prefabricated assembly wall, the reciprocating frame 26 can be driven to move vertically by the vertical lifting guide rail 25, and the side scraper 27 will scrape off the mortar attached to the surface of the prefabricated assembly wall when it is attached to the surface of the prefabricated assembly wall, so that the mortar quickly flows from the prefabricated assembly wall to the surface of the oblique guide groove 31, which is convenient for improving the recovery efficiency of the mortar and ensuring the smoothness of the surface of the prefabricated assembly wall.

[0064] When the recovered mortar falls into the surface of the inclined guide groove 31, in order to accelerate the flow rate of the mortar on the surface of the inclined guide groove 31, the inclined movable guide rail 35 installed on the surface of the guide platform 3 can be used to drive the inclined scraper 33 to scrape the mortar along the surface of the inclined guide groove 31. When the inclined movable guide rail 35 drives the inclined scraper 33 to reset, in order to avoid the mortar being scraped to the top of the inclined guide groove 31 when the inclined scraper 33 is reset, the inclined scraper 33 can be rotated to a state parallel to the inclined guide groove 31 by the secondary electric roller 34 to avoid scraping the mortar upward during the reset process of the inclined scraper 33. The scraped mortar is discharged to the gap area between the prefabricated assembly wall and the prefabricated assembly bottom plate through the discharge hole 32, thereby accelerating the mortar recovery efficiency.

[0065] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A grouting joint sealing device for a prefabricated assembly panel, Features: The invention comprises a base (1), a blocking platform (2) and a guide platform (3), wherein a walking mechanism is arranged in the area of ​​the base (1), the blocking platform (2) is arranged in the top area of ​​the base (1), the blocking platforms (2) are symmetrically arranged in two groups, the guide platform (3) is arranged between adjacent blocking platforms (2), and a collecting groove (21) is arranged on the surface of the blocking platform (2); A prefabricated wall panel surface hole grouting unit, the prefabricated wall panel surface hole grouting unit is arranged inside the collecting tank (21), and is used to pour mortar into the holes on the surface of the prefabricated wall after the prefabricated wall is assembled in place, and fix the prefabricated wall after the mortar is formed; A prefabricated board wall surface hole plugging unit, the prefabricated board wall surface hole plugging unit is also arranged inside the collecting tank (21), and is used to plug the holes for pouring mortar after the mortar is poured into the holes on the surface of the prefabricated board wall, so as to prevent the prefabricated board wall from being heated and causing the mortar to flow back and be discharged; A mortar recovery and caulking unit on the surface of a precast board, wherein the mortar recovery and caulking unit on the surface of the precast board is arranged in the area of ​​the guide platform (3) and is used for recovering and utilizing the mortar spilled from the grouting hole area during the mortar pouring process.

2. A grouting joint sealing device for a prefabricated assembly panel according to claim 1, Features: The prefabricated board wall plate surface hole grouting unit comprises a primary electric roller (211), the primary electric roller (211) being mounted inside the collecting tank (21), a rotating sleeve (212) being mounted on the rotating end of the primary electric roller (211), two groups of fixing frames (213) being fixedly mounted on the rotating sleeve (212), a mortar tank (28) being mounted inside one group of the fixing frames (213), a pneumatic telescopic rod (281) being further mounted on the fixing frames (213), a through hole (214) being provided on the surface of the fixing frames (213), a grouting bin (282) being mounted on the output end of the pneumatic telescopic rod (281), a grouting insert (283) being mounted on one end of the grouting bin (282), the mortar tank (28) being connected to the grouting bin (282), and the grouting insert (283) slidingly passing through the through hole (214).

3. A grouting joint sealing device for a prefabricated assembly panel according to claim 2, Features: The prefabricated panel wall panel surface hole blocking unit comprises a hydraulic telescopic rod (29), the hydraulic telescopic rod (29) is installed inside the set of fixed frames (213), an extrusion block (291) is installed on the output end of the hydraulic telescopic rod (29), a blocking head (292) is installed at the bottom of the extrusion block (291), and the output end of the hydraulic telescopic rod (29) slides out of the through hole (214).

4. A grouting joint sealing device for a prefabricated assembly panel according to claim 1, Features: The precast panel surface mortar recovery and caulking unit comprises a primary recovery part, and the primary recovery part comprises a vertical lifting guide rail (25). The vertical lifting guide rail (25) is embedded and installed on both sides of the blocking platform (2). A reciprocating frame (26) is installed on the movable end adjacent to the vertical lifting guide rail (25), and a lateral scraper (27) is installed on the outer side of the reciprocating frame (26).

5. A grouting joint sealing device for a prefabricated assembly panel according to claim 4, Features: The precast panel surface mortar recovery and caulking unit further comprises a secondary recovery section, the secondary recovery section comprising an oblique movable guide rail (35), the surface of the guide platform (3) is provided with an oblique guide groove (31), the oblique movable guide rail (35) is installed on both sides of the surface of the guide platform (3), an oblique scraper (33) is installed in the oblique guide groove (31), and secondary electric rollers (34) are installed at both ends of the oblique scraper (33), and the rotating end of the secondary electric roller (34) is fixed to the movable end of the oblique movable guide rail (35).

6. A grouting joint sealing device for a prefabricated assembly panel according to claim 5, Features: A material discharge hole (32) is provided in the bottom area of ​​the oblique guide groove (31).

7. A grouting joint sealing device for a prefabricated assembly panel according to claim 1, Features: The walking mechanism comprises a walking wheel (15), a through groove (14) is provided on the surface of the base (1), an electric drive roller (16) is installed in the through groove (14), and the walking wheel (15) is installed on the rotating end of the electric drive roller (16).

8. A grouting joint sealing device for a prefabricated assembly panel according to claim 1, Features: A first fixed seat (13) is installed on one side of the base (1), a second fixed seat (11) is installed on one side of the blocking platform (2), a hydraulic lifting rod (12) is installed on the top of the second fixed seat (11), and a movable end of the hydraulic lifting rod (12) is fixed to one side of the first fixed seat (13).

9. A grouting joint sealing device for a prefabricated assembly panel according to claim 1, Features: The surface of the blocking platform (2) is provided with a reciprocating groove (22), a guide slide bar (23) is installed in the reciprocating groove (22), and the guide slide bar (23) is arranged in a plurality of groups. A guide rail (221) is installed at the inner bottom of the reciprocating groove (22), and a traction arm (24) is slidably installed on the surface of the guide slide bar (23), and one side of the traction arm (24) is fixed to one side of the moving end of the guide rail (221).

10. A grouting joint sealing device for a prefabricated assembly panel according to claim 9, Features: A pulling arm (241) is installed at the bottom of the traction arm (24), and a hydraulic hook (242) is installed on the pulling arm (241).