Urban rail transit engineering vertical and horizontal directional combination comprehensive geological survey method

By combining vertical drilling and horizontal directional drilling in urban rail transit projects, together with in-hole geophysical prospecting, the problem of surveying geological blank areas in complex environments has been solved, detailed geological data has been provided, and subway construction risks and investment costs have been reduced.

CN118728359APending Publication Date: 2024-10-01CHINA RAILWAY LIUYUAN GRP CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410745960.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In urban rail transit projects, conventional survey methods cannot effectively identify the geological conditions of the site in complex environments, resulting in the formation of geological blank areas and increasing safety hazards and costs in subway design and construction.

Method used

The comprehensive geological survey method of vertical and horizontal directional combination of urban rail transit engineering is adopted, and through the combination of vertical drilling and horizontal directional drilling, combined with in-hole geophysical prospecting, the geological conditions within the tunnel range are identified in detail and detailed geological data are provided.

Benefits of technology

This method effectively reduces geological risks, improves survey accuracy and efficiency, provides reliable geological basis for subway design, and reduces investment and construction risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118728359A_ABST
    Figure CN118728359A_ABST
Patent Text Reader

Abstract

The invention discloses a vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering, which comprises the following steps of: 1, surveying an environment along a planned subway tunnel, and determining a drilling position; 2, vertical drilling is constructed, in-situ testing and wave velocity testing are carried out in holes, sampling is carried out, indoor soil tests are carried out, and vertical drilling exploration result data are formed; 3, designing trajectory parameters of horizontal directional drilling according to a horizontal directional drilling implementation site; fourthly, horizontal directional drilling and real-time deviation correction are carried out, established track drilling, full-hole-section continuous coring and sampling are achieved, indoor soil tests are carried out, horizontal directional drilling comprehensive logging tests are carried out after hole forming, and horizontal drilling exploration result data are formed; 5, performing in-hole cross-hole CT test, measuring geological conditions among the horizontal drill holes, and forming geophysical prospecting result data; and 6, according to geophysical prospecting result data, carrying out grading correction on the comprehensive surrounding rock of the tunnel, forming comprehensive prospecting result data, and providing a geological basis for subway design.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of urban rail transit survey, and in particular relates to a vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering. Background Art

[0002] At present, my country's urban rail transit is developing rapidly, and the network is gradually increasing. In particular, major cities are planning multiple networks, which provides great convenience for residents' daily travel. Urban rail transit lines are mostly located in the built-up areas of the city, and the surface is mainly manifested as existing streets, buildings, and complex areas of underground pipelines. Due to site conditions, conventional survey methods cannot identify the geological conditions of the site, thus forming a geological blank area, which brings great safety hazards to subway design and construction. As the engineering problems caused by the uncertainty of geological conditions are becoming increasingly prominent, there is an urgent need to innovate and enrich survey methods to further identify the geological conditions of the site under complex environments, provide detailed geological data for subway design, and escort subsequent construction.

[0003] At present, conventional survey methods are mainly based on vertical drilling, supplemented by ground or in-hole geophysical exploration. Due to the complex external environmental conditions, there are often a large number of sections that cannot be surveyed. In addition, due to the limitations of the drilling itself, the geological conditions revealed are only a view of one hole, and the geological conditions between the boreholes are artificially speculated, and there are often certain geological deviations, which further restricts the optimization space and cost control of the subway design plan. In view of the complex environmental conditions in urban areas, when vertical drilling and geophysical exploration cannot be carried out from the ground, this patent proposes a vertical and horizontal directional combined comprehensive geological exploration method for urban rail transit projects, which can effectively identify the geological conditions within the tunnel range, reduce the geological risks caused by the inability to implement vertical drilling and ground geophysical exploration, provide a geological basis for the design of the scheme, and greatly reduce the investment and construction risks of urban rail transit projects. Summary of the invention

[0004] The purpose of the present invention is to provide a vertical and horizontal directional combined comprehensive geological survey method for urban rail transit projects. In view of the complex environmental conditions in urban areas, when vertical drilling and geophysical exploration cannot be carried out from the ground, a horizontal directional exploration method with strong site adaptability and continuous coring drilling along the direction of the tunnel is provided. At the same time, in-hole geophysical exploration is carried out in horizontal holes, which can detailedly identify the geological conditions within the tunnel range and provide a detailed geological basis for the scheme design.

[0005] The present invention achieves this object through the following technical solutions:

[0006] A vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering, comprising the following steps:

[0007] Step 1: Collect and study the geological data of the area where the subway shield tunnel is to be built, conduct a survey of the surrounding environment along the line, and determine the vertical drilling location and the horizontal directional drilling ground implementation site location;

[0008] Step 2: construct vertical drilling according to the selected vertical drilling position, conduct in-situ testing and wave velocity testing in the hole, and take samples for indoor geotechnical testing to form vertical drilling survey results data;

[0009] Step 3: At one end of the tunnel, according to the selected horizontal directional drilling implementation site, design trajectory parameters for horizontal directional drilling along the tunnel direction after continuous inclination from the ground to the target depth, and arrange 6 horizontal directional boreholes in the same direction as the tunnel on the periphery of the tunnel structure;

[0010] Step 4: According to the established trajectory parameters, horizontal directional drilling is carried out, and the drilling parameter recorder is turned on to record the drilling trajectory, and the deviation is corrected in real time to achieve the established trajectory drilling, continuous coring of the entire hole section, sampling for indoor geotechnical testing, and comprehensive logging testing of horizontal directional drilling after the hole is formed. The preliminary classification of the comprehensive surrounding rock level of the tunnel is carried out to form horizontal drilling exploration results data;

[0011] Step 5: After all horizontal drillings are completed, a cross-hole CT test is conducted to determine the geological conditions between the horizontal drillings and form geophysical exploration results data;

[0012] Step six, according to the distribution range and size of the geophysical anomaly areas in the geophysical exploration results data, refine the comprehensive surrounding rock classification of the tunnel, correct the comprehensive surrounding rock classification of the tunnel, and form comprehensive survey results data to provide a geological basis for subway design.

[0013] Furthermore, in step one, the vertical drilling position is determined specifically as follows: in a complex urban environment, a geological blank section where vertical drilling cannot be implemented is divided out, and the geological blank area refers to a section where the tunnel length exceeds 150m and geological data is missing; according to the ground conditions of the geological blank area, feasible vertical drilling holes are arranged above the tunnel or near the tunnel on both sides of the geological blank area.

[0014] Furthermore, a suitable site is selected on one side of the tunnel to arrange horizontal directional drilling. The size of the site should be at least 15m×20m. The horizontal directional drilling holes are located outside the left and right tunnels, with 3 holes on each side, which are arranged 3m above the top of the tunnel structure, 3m below the bottom and on the center line of the tunnel structure height.

[0015] Furthermore, in step three, the spatial trajectory line of horizontal directional drilling is set according to the selected directional drilling implementation site, target depth, and the deflection strength of the drill bit and casing, and a spatial coordinate system is established, with the x-axis being the north-south direction, the y-axis being the east-west direction, and the z-axis being the vertical direction, so as to calculate the spatial coordinates of each point on the trajectory line.

[0016] Furthermore, the coordinates of any point A on the trajectory (X A , Y A , Z A )The calculation process is as follows: X A =X 0 +L A ·sinθcosα;Y A =Y 0 +L A ·sinθcosα; Z A =Z 0 +L A ·cosθ; horizontal distance from point A = L A sinθ; where (X 0 , Y 0 , Z 0 ) is the coordinate of the hole center point O on the ground, in meters; θ is the angle between the line connecting the two points OA and the Z axis, α is the angle between the projection of the line connecting the two points OA on the XY plane and the X axis, in degrees; L A It is the straight-line distance between points A and O, in meters.

[0017] Further, the bending strength of the drilling trajectory is calculated as follows: When the drilling trajectory only changes in the angle θ, the vertex bending strength i θ express: When the drilling trajectory only changes in the angle α, the azimuthal bending strength i α express: When the drilling trajectory angle θ and the angle α change simultaneously, the full bending strength i is used to express: cosγ=cosθ A cosθ B +sinθ A sinθ B cos(α B -α A ), where θ A is the angle between the line connecting the two points OA and the Z axis, θ B α is the angle between the line connecting the two points OB and the Z axis, in degrees; A is the angle between the projection of the line connecting the two points OA on the XY plane and the X axis, α B L is the angle between the projection of the line connecting the two points OB on the XY plane and the X-axis, in degrees; A is the straight-line distance between points A and O, L B is the straight-line distance between points B and O, in meters.

[0018] Furthermore, in step four, during the actual drilling process, the bending strength of the drilling trajectory is corrected every 1 m to achieve pipe-following drilling according to the established trajectory.

[0019] Furthermore, in step 4, coring is performed throughout the entire hole during the drilling process, and rock samples are taken every 5 m to obtain the saturated uniaxial compressive strength of the rock and the wave velocity of the rock block; after the hole is drilled, a comprehensive logging test is carried out in the hole, and the comprehensive logging probe is transported to the bottom of the hole by water pressure to test the shear wave and longitudinal wave values ​​of the rock and soil body, and the test interval is 1 m.

[0020] Furthermore, in step five, after the first horizontal directional drilling is completed, the remaining multiple holes utilize the common main hole section before the first horizontal directional drilling to build inclination, and then continuously build inclination to the predetermined horizontal directional drilling trajectory.

[0021] Furthermore, in step five, after all the drilling construction is completed, the cross-hole CT test is carried out, and the transmitting probe and the receiving probe are respectively transported to the bottom of the transmitting hole and the receiving hole by hydraulic pressure, and one hole is used to excite multiple holes and receive simultaneously.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] 1. Through the combined means of "conventional vertical drilling + horizontal directional drilling + in-hole geophysical exploration", the geological blank areas are finely surveyed and the exploration results are mutually verified, which has the advantages of intuitive effect, high work efficiency, high detection accuracy and reliable exploration results;

[0024] 2. It provides a means and method of geological survey under complex environmental conditions along the urban rail transit line, and identifies the engineering geological conditions within the shield tunnel in detail, providing a detailed geological basis for subway design, and greatly reducing the construction risks caused by unknown geology;

[0025] 3. The vertical drilling, horizontal directional drilling and geophysical comprehensive survey arrangement adopted by the present invention can verify each other's exploration results. The geophysical exploration results can further correct the comprehensive surrounding rock classification of the tunnel, provide a basis for the optimization of the design scheme, and reduce the investment waste caused by over-design.

[0026] 4. The horizontal directional drilling of the present invention has good adaptability to the site, is particularly suitable for complex urban environments, and can solve the problem of geological blank area exploration.

[0027] To sum up, the present invention provides a vertical and horizontal directional combined comprehensive geological survey method for urban rail transit projects, which is suitable for the survey and design of subway tunnels in complex urban environments. It adopts a combination of "vertical drilling + horizontal directional drilling + in-hole geophysical exploration" to conduct detailed surveys of geological blank areas. The detection results are mutually verified to provide detailed geological data for subway design, which greatly reduces the construction risks caused by unknown geology and also reduces the investment waste caused by over-design. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.

[0029] Figure 1 It is a schematic diagram of the arrangement of horizontal directional drilling and vertical drilling of the present invention;

[0030] Figure 2 It is a cross-sectional view of the arrangement of the horizontal directional drilling holes of the present invention;

[0031] Figure 3 It is a longitudinal cross-hole CT scan of the horizontal section of the horizontal directional drilling of the present invention;

[0032] Figure 4 It is a schematic diagram of the horizontal cross-hole CT observation system of horizontal directional drilling of the present invention;

[0033] Figure 5 It is a spatial schematic diagram of the drilling trajectory of the horizontal directional drilling of the present invention;

[0034] Figure 6 A schematic diagram of the coordinate calculation of the drilling trajectory points of the horizontal directional drilling of the present invention;

[0035] Figure 7 It is a schematic diagram of the full bending angle of the drilling trajectory of the horizontal directional drilling of the present invention. DETAILED DESCRIPTION

[0036] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to be able to fully convey the scope of the present invention to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

[0037] The invention discloses a method for vertical and horizontal directional combined comprehensive geological survey of urban rail transit engineering, including: collecting and studying the geological data of the area where the subway shield tunnel is to be built, surveying the surrounding environment along the line, and forming a comprehensive survey implementation plan combining vertical drilling, horizontal directional drilling and in-hole geophysical prospecting; constructing vertical drilling according to the survey implementation plan, conducting in-situ testing and wave velocity testing in the hole, and taking samples for indoor geotechnical testing to form vertical drilling survey results data; arranging the horizontal directional drilling implementation site according to the survey implementation plan, and reasonably setting a track for horizontal directional drilling along the direction of the tunnel after continuously building a slope from the ground to the target depth. Track parameters; according to the established trajectory parameters, horizontal directional drilling is carried out, and the drilling parameter recorder is turned on to record the drilling trajectory, and the deviation is corrected in real time to achieve the established trajectory drilling, continuous coring of the entire hole section, sampling for indoor geotechnical testing, and comprehensive logging test of horizontal directional drilling after the hole is completed, and preliminary classification of the comprehensive surrounding rock grade of the tunnel is carried out to form horizontal drilling exploration results data; after all horizontal drilling holes are implemented, cross-hole CT tests are carried out in the hole to determine the geological conditions between the horizontal drilling holes and form geophysical exploration results data; based on the geophysical exploration results data, the comprehensive surrounding rock classification of the tunnel is corrected, and comprehensive exploration results data are formed to provide detailed geological basis for subway design. In view of the complex environmental conditions in urban areas, when vertical drilling and geophysical exploration cannot be carried out from the ground, the present invention provides a horizontal directional exploration method with strong site adaptability and capable of continuous coring drilling along the direction of the tunnel. At the same time, in-hole geophysical exploration is carried out in the horizontal hole. Through the combination of "vertical drilling + horizontal directional drilling + in-hole geophysical exploration", detailed exploration of geological blank areas is carried out, providing detailed geological basis for subway design and greatly reducing the construction risks caused by unknown geology.

[0038] The specific steps of the vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering of the present invention are as follows:

[0039] Step 1: Collect and study the geological data of the areas along the urban rail transit lines, conduct field surveys on the surrounding environment, understand the surface environment and geological conditions along the lines, and form an engineering geological background report and comprehensive survey implementation plan for the detection area.

[0040] Specifically, in complex urban environments, geological blank sections caused by the inability to implement vertical drilling are demarcated. The geological blank area here refers to the section where the tunnel length exceeds 150m and the geological data is missing.

[0041] According to the ground conditions of this geological blank area, vertical drilling holes are arranged above the tunnels on both sides as much as possible. If it is not possible to arrange vertical drilling holes above the tunnels, they are arranged and implemented at the location closest to the tunnels.

[0042] A suitable site is selected on one side of the tunnel to arrange horizontal directional drilling. The size of the site is at least 15m×20m. There are 6 horizontal directional drilling holes, which are arranged in the same direction as the tunnel and around the tunnel structure. There are 3 holes on the outside of the left and right tunnels. The 3 horizontal directional drilling holes on each side are arranged vertically in a row, and are arranged at 3m above the top of the outside of the tunnel structure, 3m below the bottom, and on the middle horizontal line of the tunnel structure height. The drilling position selection range on the middle horizontal line of the tunnel structure height is from the outermost structural overlap position of the left and right tunnels to 5m outside the tunnel structure. In this embodiment, the outermost structural overlap position of the left and right tunnels is selected.

[0043] Select the in-hole geophysical exploration method that is suitable for the geological conditions of the survey area and has strong anti-interference ability; finally form a comprehensive survey implementation plan of "vertical drilling + horizontal directional drilling + in-hole geophysical exploration", such as Figure 1 , 2 shown.

[0044] Step 2: Carry out vertical drilling according to the survey implementation plan, conduct in-situ testing and wave velocity testing, and take samples for indoor geotechnical testing to generate vertical drilling survey results data.

[0045] Step three, arrange the horizontal directional drilling implementation site according to the survey implementation plan, and reasonably set the trajectory parameters for horizontal directional drilling along the tunnel direction after continuous inclination from the ground to the target depth.

[0046] Specifically, the spatial trajectory of horizontal directional drilling is set according to the selected directional drilling implementation site, target depth, drilling tools and the deflection strength of carbon high-strength fiber casing, and a spatial coordinate system is established. The x-axis is the north-south direction, the y-axis is the east-west direction, the z-axis is the vertical direction, and OABC is the spatial trajectory of the borehole, so as to calculate the spatial coordinates of each point on the trajectory.

[0047] 1) The coordinates of any point A on the trajectory (X A , Y A , Z A )The calculation process is as follows: X A =X 0 +L A ·sinθcosα;Y A =Y 0 +L A ·sinθcosα; Z A =Z 0 +L A ·cosθ; horizontal distance from point A = L A sinθ; where (X 0 , Y 0 , Z 0) is the coordinate of the hole center point O on the ground, in meters; θ is the vertex angle, that is, the angle between the line connecting the two points OA and the Z axis; α is the direction angle, that is, the angle between the projection OA' of the line connecting the two points OA on the XY plane and the X axis, in degrees; L A is the straight-line distance between points A and O, in meters; Figure 5 , 6 shown.

[0048] 2) Calculation of bending strength of drilling trajectory:

[0049] When only the vertex angle θ changes in the drilling trajectory, the vertex bending strength i θ express:

[0050] When the drilling trajectory only changes in the direction angle α, the azimuthal bending strength i α express:

[0051] When the top angle θ and the direction angle α of the drilling trajectory change simultaneously, the full bending strength i is used to express: cosγ=cosθ A cosθ B +sinθ A sinθ B cos(α B -α A );

[0052] Where γ is the actual deflection angle of the drilling axis, that is, the total bending angle, in degrees; θ A is the vertex angle of point A, that is, the angle between the line connecting the two points OA and the Z axis, θ B is the vertex angle of point B, that is, the angle between the line connecting the two points OB and the Z axis, in degrees; α A is the direction angle of point A, that is, the angle between the projection OA' of the line connecting the two points OA on the XY plane and the X axis, α B L is the direction angle of point B, that is, the angle between the projection OB' of the line connecting the two points OB on the XY plane and the X axis, in degrees; A is the straight-line distance between points A and O, L B is the straight-line distance between points B and O, in meters; plane I is the trajectory plane when only the vertex angle θ changes, plane II is the trajectory plane when only the direction angle α changes, plane III is the horizontal plane, plane IV is the plane where the vertex angle θ and the direction angle α change simultaneously, and D is the intersection of the extended line AB on plane I and plane III, such as Figure 5 , 6 , as shown in 7.

[0053] Step 4: According to the established trajectory parameters, horizontal directional drilling is carried out. At the same time, the drilling parameter recorder is turned on to record the drilling trajectory, and real-time deviation correction is carried out to achieve drilling on the established trajectory. Continuous coring is carried out in the entire hole section, and samples are taken for indoor geotechnical testing. After the hole is formed, comprehensive logging tests for horizontal directional drilling are carried out, and a preliminary classification of the comprehensive surrounding rock grade of the tunnel is carried out to form horizontal drilling exploration results data.

[0054] Specifically, in the actual drilling process, the straight main hole section is first drilled at a certain angle, and then continuous inclination is carried out to reach the horizontal directional drilling position, and then horizontal drilling is carried out. During this process, the borehole azimuth and top angle are corrected every 1m to achieve follow-up drilling according to the established trajectory. The role of the follow-up pipe is to prevent the hole wall from collapsing. The follow-up pipe is made of high-strength carbon fiber casing. During the drilling process, coring is carried out in the entire hole section, and rock samples are taken every 5m to obtain the saturated uniaxial compressive strength of the rock and the wave velocity of the rock block. After the hole is drilled, a comprehensive logging test is carried out in the hole. The comprehensive logging probe reaches the bottom of the hole through water pressure transportation to test the shear wave and longitudinal wave values ​​of the rock and soil. The test interval is 1m, and a preliminary division of the comprehensive surrounding rock level of the tunnel is carried out to form horizontal drilling results data.

[0055] Step 5: After all horizontal drilling is completed, conduct cross-hole CT testing to determine the geological conditions between the horizontal drilling holes and generate geophysical exploration results data.

[0056] Specifically, after the first horizontal directional drilling is completed, the remaining five holes can use the straight common main hole section before the first horizontal hole is inclined, and then continuously incline to the predetermined drilling trajectory, which can improve work efficiency and reduce construction drilling costs; after all drilling holes are completed, a cross-hole CT test is carried out in the hole. The transmitting probe and the receiving probe are respectively transported to the bottom of the transmitting hole and the receiving hole by water pressure. The transmitting source adopts the German SWG1005 electric spark, and the seismic signal is received by the German AQ-2000 seismic detector. The method of 1 hole exciting 3 holes at the same time can be adopted to improve the detection efficiency. Transmitters are placed in 3 horizontal boreholes on one side, and signal receivers are placed in 3 horizontal boreholes on the other side. The signal receivers receive signals from transmitters in different horizontal boreholes respectively; geophysical abnormal areas are delineated according to the detection results, such as geophysical abnormalities such as karst caves and joint fissure development, and a comprehensive geophysical results report is formed, such as Figure 3 , 4 shown.

[0057] Step six: Based on the geophysical exploration results, conduct comprehensive tunnel surrounding rock classification correction and form comprehensive survey results data to provide detailed geological basis for subway design.

[0058] Specifically, based on the distribution range and size of the geophysical anomaly areas, the comprehensive surrounding rock classification of the tunnel is refined to determine more realistic and comprehensive geological results, providing a geological basis for tunnel design and scheme optimization, and ensuring the smooth construction of the tunnel. At the same time, it reduces the investment waste caused by over-design due to unclear geology.

[0059] The invention discloses a method for comprehensive geological survey of urban rail transit projects in combination of vertical and horizontal directional exploration. The method adopts a combination of "vertical drilling + horizontal directional drilling + in-hole geophysical exploration" to conduct detailed exploration of geological blank areas, and the exploration results are mutually verified. The method has the advantages of intuitive effect, high work efficiency, high detection accuracy, and reliable exploration results. The method adopts comprehensive exploration technology to clarify the engineering geological conditions within the scope of the shield tunnel in detail, and provides a detailed geological basis for subway design, which greatly reduces the construction risks caused by unknown geology. The invention adopts a comprehensive exploration arrangement method combining drilling and geophysical exploration, and the exploration results are mutually verified. The geophysical exploration results can further correct the comprehensive surrounding rock grade classification of the tunnel, provide a basis for the optimization of the design scheme, and reduce the investment waste caused by over-design. The horizontal directional drilling of the invention has good adaptability to the site, is particularly suitable for complex urban environments, and can solve the problem of geological blank area exploration.

[0060] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0061] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

Claims

1. A vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering, characterized in that: The following steps are involved: Step 1: Collect and study the geological data of the area where the subway shield tunnel is to be built, conduct a survey of the surrounding environment along the line, and determine the vertical drilling location and the horizontal directional drilling ground implementation site location; Step 2: construct vertical drilling according to the selected vertical drilling position, conduct in-situ testing and wave velocity testing in the hole, and take samples for indoor geotechnical testing to form vertical drilling survey results data; Step 3: At one end of the tunnel, according to the selected horizontal directional drilling implementation site, design trajectory parameters for horizontal directional drilling along the tunnel direction after continuous inclination from the ground to the target depth, and arrange 6 horizontal directional boreholes in the same direction as the tunnel on the periphery of the tunnel structure; Step 4: According to the established trajectory parameters, horizontal directional drilling is carried out, and the drilling parameter recorder is turned on to record the drilling trajectory, and the deviation is corrected in real time to achieve the established trajectory drilling, continuous coring of the entire hole section, sampling for indoor geotechnical testing, and comprehensive logging testing of horizontal directional drilling after the hole is formed. The preliminary classification of the comprehensive surrounding rock level of the tunnel is carried out to form horizontal drilling exploration results data; Step 5: After all horizontal drillings are completed, a cross-hole CT test is conducted to determine the geological conditions between the horizontal drillings and form geophysical exploration results data; Step six, according to the distribution range and size of the geophysical anomaly areas in the geophysical exploration results data, refine the comprehensive surrounding rock classification of the tunnel, correct the comprehensive surrounding rock classification of the tunnel, and form comprehensive survey results data to provide a geological basis for subway design.

2. A vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering according to claim 1, characterized in that: In step one, the vertical drilling position is determined as follows: in a complex urban environment, a geological blank section where vertical drilling cannot be implemented is divided out, and the geological blank area refers to a section where the tunnel length exceeds 150m and geological data is missing; according to the ground conditions of the geological blank area, feasible vertical drilling holes are arranged above the tunnel or close to the tunnel on both sides of the geological blank area.

3. The vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering according to claim 1 is characterized in that: A suitable site is selected on one side of the tunnel for horizontal directional drilling. The site should be at least 15m×20m in size. The horizontal directional drilling holes are located outside the left and right tunnels, with three holes on each side, which are arranged 3m above the top of the tunnel structure, 3m below the bottom and on the center line of the tunnel structure height.

4. The vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering according to claim 1 is characterized in that: In step three, the spatial trajectory of horizontal directional drilling is set according to the selected directional drilling implementation site, target depth, drilling tools and casing deflection strength, and a spatial coordinate system is established, with the x-axis as the north-south direction, the y-axis as the east-west direction, and the z-axis as the vertical direction, so as to calculate the spatial coordinates of each point on the trajectory.

5. A vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering according to claim 4, characterized in that: The coordinates of any point A on the trajectory (X A , Y A , Z A )The calculation process is as follows: X A =X0+L A ·sinθcosα;Y A =Y0+L A ·sinθcosα;Z A =Z0+L A ·cosθ;A point's horizontal distance=L A sinθ; Where, (X0, Y0, Z0) is the coordinate of the hole center point O on the ground, in meters; θ is the angle between the line connecting the two points OA and the Z axis, and α is the angle between the projection of the line connecting the two points OA on the XY plane and the X axis, in degrees; L A It is the straight-line distance between points A and O, in meters.

6. A vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering according to claim 5, characterized in that: Calculation of the bending strength of the drilling trajectory: When the drilling trajectory only changes in the angle θ, the vertex bending strength i θ express: When the drilling trajectory only changes in the angle α, the azimuthal bending strength i α express: When the drilling trajectory angle θ and the angle α change simultaneously, the full bending strength i is used to express: cosγ=cosθ A cosθ B +sinθ A sinθ B cos(α B -α A ), where θ A is the angle between the line connecting the two points OA and the Z axis, θ B α is the angle between the line connecting the two points OB and the Z axis, in degrees; A is the angle between the projection of the line connecting the two points OA on the XY plane and the X axis, α B L is the angle between the projection of the line connecting the two points OB on the XY plane and the X-axis, in degrees; A is the straight-line distance between points A and O, L B is the straight-line distance between points B and O, in meters.

7. A vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering according to claim 6, characterized in that: In step 4, during the actual drilling process, the bending strength of the drilling trajectory is corrected every 1 m to achieve pipe-following drilling according to the established trajectory.

8. The vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering according to claim 1 is characterized in that: In step 4, coring is performed throughout the entire hole during the drilling process, and rock samples are taken every 5 m to obtain the saturated uniaxial compressive strength of the rock and the wave velocity of the rock block; after the hole is drilled, a comprehensive logging test is carried out in the hole, and the comprehensive logging probe is transported to the bottom of the hole by water pressure to test the shear wave and longitudinal wave values ​​of the rock and soil body, with a test interval of 1 m.

9. The vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering according to claim 1 is characterized in that: In step five, after the first horizontal directional drilling is completed, the remaining multiple holes use the common main hole section before the first horizontal directional drilling to build inclination, and then continuously build inclination to the predetermined horizontal directional drilling trajectory.

10. A vertical and horizontal directional combined comprehensive geological survey method for urban rail transit engineering according to claim 1, characterized in that: In step five, after all drilling holes are completed, a cross-hole CT test is performed. The transmitting probe and the receiving probe are respectively transported by hydraulic pressure to the bottom of the transmitting hole and the receiving hole, and one hole is used to excite multiple holes and receive simultaneously.

Citation Information

Cited By

  • Unfavorable geological exploration method based on inclined drilling

    CN119247460A

  • Construction method for judging bending feasibility of karst cavity tubular column

    CN119321282A