Nitrogen injection method for insulating layer of LNG (Liquefied Natural Gas) ship
By performing inertization and dry airification in the cargo hold of the LNG ship, and simultaneously controlling the pressure difference between the primary and secondary insulation layers, the problems of cumbersome and wasteful operations in the traditional method are solved, and a more economical and safe nitrogen injection process for the insulation layer is achieved. , improving production efficiency and safety.
Patent Information
- Application Number
- CN202410809902.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-21
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-21
AI Technical Summary
The traditional nitrogen injection method for the insulation layer of LNG ships is cumbersome, resulting in a waste of manpower and material resources, increased production costs and operational risks, and can easily lead to substandard oxygen content and waste of nitrogen.
By injecting the vaporized nitrogen into the cargo tank for inerting, and after pre-dry airification and reducing the pressure, the pressure difference between the primary and secondary insulation layers is gradually controlled to achieve the synchronization of inerting and nitrogen injection to ensure the stable operation of the gasifier , Reduce valve adjustment frequency and nitrogen waste.
It reduces production costs, shortens test time, increases production capacity, improves the economy and safety of operations, and ensures sufficient nitridation of the insulation layer and stable operation of the gasifier.
Smart Images

Figure CN118729152A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of liquefied natural gas ships, and in particular to a nitrogen injection method for an insulation layer of an LNG ship. Background Art
[0002] Before the gas trial, the primary and secondary insulation layers must be deoxygenated and nitrogen injected for nitridation. This critical task requires experienced personnel. Improper operation, resulting in the inhalation of air, increases the number of pumping and injection cycles, resulting in a waste of manpower and material resources. Therefore, a cost-effective and safe method is needed to meet the requirements of the trial operation.
[0003] In the current LNG ship insulation layer nitrogen injection method, such as Figure 1 As shown, the operation process is relatively complicated, which is a test for the operator's physical strength and energy. In order to ensure the smooth operation of the vaporizer, the opening of the valve V3 needs to be continuously adjusted during the nitrogen injection process of the insulation layer. Once a problem occurs in the liquid supply, the operator fails to discover it in time, causing the insulation layer with a large negative pressure to suck air back from the valve V3. This will cause the oxygen content in the space of the insulation layer to fail to meet the standard after two injections, thereby increasing the number of injections. In addition, the valve V3 is always kept at a certain opening, which also causes a certain amount of nitrogen waste, thereby increasing production costs and operational risks.
[0004] Therefore, the inventors provide a method for injecting nitrogen into the insulation layer of an LNG ship. Summary of the Invention
[0005] (1) Technical problems to be solved
[0006] The embodiment of the present invention provides a method for injecting nitrogen into the insulation layer of an LNG ship, which solves the technical problem that the conventional method for injecting nitrogen into the insulation layer of an LNG ship has a complicated operation process.
[0007] (2) Technical solution
[0008] The present invention provides a method for injecting nitrogen into an insulation layer of an LNG ship, comprising the following steps:
[0009] Inject part of the vaporized nitrogen into the cargo hold of the LNG carrier for inerting;
[0010] Then, the secondary insulation layer of the cargo hold is vacuumed, and when the pressure difference between the secondary insulation layer and the primary insulation layer is greater than a first set value, the primary insulation layer is vacuumed;
[0011] When the primary insulating layer and the secondary insulating layer are evacuated to the corresponding first target value and second target value, the vacuum pump is stopped and the corresponding valves are closed;
[0012] When the oxygen content at the top of the cargo hold is lower than a second set value, another portion of the vaporized nitrogen begins to be injected into the primary insulation layer; when the pressure difference between the primary insulation layer and the secondary insulation layer is greater than a third set value, the secondary insulation layer is injected with nitrogen;
[0013] The primary insulation layer and the secondary insulation layer always maintain a set pressure difference until the primary insulation layer and the secondary insulation layer return to normal pressure, and the nitrogen injection of the primary insulation layer, the secondary insulation layer and the cargo hold is completed.
[0014] Furthermore, before injecting a portion of the vaporized nitrogen into the cargo hold of the LNG ship for inerting, the method further includes: pre-inerting the cargo hold with dry air to reduce the dew point of the cargo hold to at least -25°C.
[0015] Furthermore, after the pre-drying of the cargo hold, the method further includes: reducing the pressure of the cargo hold to below 4.5 kPa.
[0016] Furthermore, the first set value is 150 mbar.
[0017] Furthermore, the difference between the first target value and the second target value is 20-50 mbar.
[0018] Furthermore, the first target value is -750 mbar.
[0019] Furthermore, the pressure difference between the main insulation layer and the cargo hold is -800 mbar.
[0020] Furthermore, the second target value is -780 mbar.
[0021] Furthermore, the second set value is 3% vol.
[0022] Furthermore, the top of the cargo hold is the upper 1 / 3 of the space in the height direction.
[0023] (3) Beneficial effects
[0024] In summary, this invention pre-nitrides the cargo hold roof, using it as a buffer tank, allowing for simultaneous cargo hold nitridation and insulation layer nitrogen injection. This not only fully utilizes liquid nitrogen but also allows nitrogen injection into the insulation layer while ensuring stable vaporizer operation. This reduces production costs, achieves a cost-effective and profitable outcome, shortens testing time, and increases production capacity. This method is both economical and safe. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments of the present invention. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.
[0026] Figure 1 This is a schematic diagram of the flow direction of nitrogen injection into the insulation layer of a conventional LNG ship;
[0027] Figure 2 This is a schematic flow chart of a method for injecting nitrogen into an insulation layer of an LNG ship provided by an embodiment of the present invention;
[0028] Figure 3 This is a schematic diagram of the flow direction of nitrogen injection into the insulation layer of an LNG ship provided by an embodiment of the present invention.
[0029] In the picture:
[0030] 1-Cargo hold; 2-Primary insulation layer; 3-Secondary insulation layer. DETAILED DESCRIPTION
[0031] The following detailed description of the embodiments of the present invention is provided in conjunction with the accompanying drawings and examples. The detailed description of the following embodiments and the accompanying drawings are intended to illustrate the principles of the present invention and are not intended to limit the scope of the present invention. That is, the present invention is not limited to the described embodiments and covers any modifications, replacements, and improvements to the parts, components, and connection methods without departing from the spirit of the present invention.
[0032] It should be noted that, in the absence of conflict, the embodiments and features of the embodiments in this application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0033] Figure 2 The present invention provides a flow chart of a method for injecting nitrogen into an insulation layer of an LNG ship, which may include the following steps:
[0034] S100: inject a portion of the vaporized nitrogen into the cargo hold of the LNG carrier for inerting.
[0035] Specifically, according to design requirements, the dew point of all cargo holds is measured to confirm compliance with design requirements. Based on test requirements, the cargo hold pressure is reduced. A specific cargo hold is selected for inerting. The number of inerting tanks selected for replacement can be one or two, depending on the liquid nitrogen supply rate and volume. Because the insulation layer requires two pumping cycles each, four cargo holds cannot be replaced simultaneously to accommodate the two nitrogen injections.
[0036] S200. Then, the secondary insulation layer of the cargo hold is vacuumed. When the pressure difference between the secondary insulation layer and the primary insulation layer is greater than a first set value, the primary insulation layer is vacuumed.
[0037] Specifically, when initially evacuating the secondary insulation layer, the pressure differential with the primary insulation layer can be increased, perhaps to 150 mbar (the first set value). The primary insulation layer is then placed on top and vacuumed. Throughout the vacuuming process, the openings of the relevant valves must be controlled to gradually reduce the pressure differential between the primary and secondary insulation layers until the vacuum is fully achieved, reaching a pressure differential between 20 and 50 mbar.
[0038] S300: When the primary insulating layer and the secondary insulating layer are evacuated to the corresponding first target value and second target value, the vacuum pump is stopped and the corresponding valves are closed.
[0039] Specifically, the first target value is -750 mbar, and the second target value is -780 mbar.
[0040] S400. When the oxygen content at the top of the cargo hold is lower than the second set value, another part of the vaporized nitrogen begins to be injected into the main insulation layer; when the pressure difference between the main insulation layer and the secondary insulation layer is greater than the third set value, nitrogen is injected into the secondary insulation layer.
[0041] Specifically, the second set value is 3% vol. When the insulation layer is vacuumed, it is necessary to pay attention to the pressure in the cargo hold not being greater than 4.5 kPa. At the same time, the inerting rate must be controlled. The optimal rate is when the insulation layer is vacuumed to the right position, such as Figure 3 As shown, the cargo hold 1 is inerted to ensure that the oxygen content at the top reaches the target (i.e., the second set value). Nitrogen injection into the insulation layer then begins. First, valve V1 is opened to inject nitrogen into the primary insulation layer 2. When a certain pressure differential exists between the primary insulation layer 2 and the secondary insulation layer 3, the secondary insulation layer 3 is brought together and valve V2 is opened to inject nitrogen into it. It should be noted that the top of the cargo hold generally refers to the upper 1 / 3 of the space in the cargo hold's height.
[0042] S500, the main insulation layer and the secondary insulation layer always maintain the set pressure difference until the main insulation layer and the secondary insulation layer return to normal pressure, and the nitrogen injection of the main insulation layer, the secondary insulation layer and the cargo hold is completed.
[0043] Specifically, during the nitrogen injection process, ensure that the cargo hold pressure does not drop, which means that the nitrogen from the vaporizer is being injected into the insulation layer. However, even if the cargo hold pressure drops, there is no need to worry about the insulation layer sucking back air, because at this time it sucks back the gas that has been nitrided at the top of the cargo hold, which will not cause the oxygen content of the insulation layer to exceed the standard. Figure 3As shown, valve V3 only needs to be adjusted down to ensure that the cargo hold pressure remains stable or rises slightly. This will reduce the amount of gas discharged from the cargo hold and allow nitrogen injection into the insulation layer to continue. At the same time, the cargo hold inerting must be completed before nitrogen injection into the insulation layer is completed. If this is the case, nitrogen will inevitably flow directly into the atmosphere to continue nitrogen injection, resulting in waste.
[0044] As an optional embodiment, before injecting a portion of the vaporized nitrogen into the cargo hold of the LNG carrier for inerting in step S100, the method further includes pre-inerting the cargo hold with dry air to reduce the dew point to at least -25°C. Of course, the drier the dry air used to replace the cargo hold, the better, as the subsequent drying effect after nitrogen inerting will also be.
[0045] As an optional implementation, after pre-drying the cargo hold, the process also includes reducing the cargo hold pressure to below 4.5 kPa. This ensures that the pressure differential between the main insulation layer and the cargo hold remains within -800 mbar when the main insulation layer is subsequently evacuated to a negative pressure of -750 mbar, ensuring the safety of the insulation layer.
[0046] It should be noted that the various embodiments in this specification are described in a progressive manner. References to the same or similar parts between the various embodiments are sufficient. Each embodiment focuses on the differences from the other embodiments. The present invention is not limited to the specific steps and structures described above and shown in the figures. Furthermore, for the sake of brevity, detailed descriptions of known methods and technologies are omitted here.
[0047] The above are merely embodiments of the present application and are not intended to limit the present application. Various modifications and variations are possible for those skilled in the art without departing from the scope of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included within the scope of the claims of the present application.
Claims
1. A method for injecting nitrogen into the insulation layer of an LNG ship, characterized in that: The method comprises the following steps: Inject part of the vaporized nitrogen into the cargo hold of the LNG carrier for inerting; Then, the secondary insulation layer of the cargo hold is evacuated, and when the pressure difference between the secondary insulation layer and the main insulation layer is greater than a first set value, the main insulation layer is evacuated; When the main insulating layer and the secondary insulating layer are evacuated to the corresponding first target value and second target value, the vacuum pump is stopped and the corresponding valve is closed; When the oxygen content at the top of the cargo hold is lower than a second set value, another part of the vaporized nitrogen begins to be injected into the main insulation layer; when the pressure difference between the main insulation layer and the secondary insulation layer is greater than a third set value, the secondary insulation layer is injected with nitrogen; The main insulation layer and the secondary insulation layer always maintain a set pressure difference until the main insulation layer and the secondary insulation layer return to normal pressure, and the nitrogen injection of the main insulation layer, the secondary insulation layer and the cargo hold is completed.
2. The nitrogen injection method for the insulation layer of an LNG ship according to claim 1, characterized in that: Before injecting part of the vaporized nitrogen into the cargo hold of the LNG ship for inerting, the method further includes: pre-inerting the cargo hold with dry air to reduce the dew point of the cargo hold to at least -25°C.
3. The nitrogen injection method for the insulation layer of an LNG ship according to claim 2, characterized in that: After the pre-drying of the cargo hold, the method further includes: reducing the pressure of the cargo hold to below 4.5 kPa.
4. The nitrogen injection method for the insulation layer of an LNG ship according to claim 1, characterized in that: The first set value is 150 mbar.
5. The nitrogen injection method for the insulation layer of an LNG ship according to claim 1, characterized in that: The difference between the first target value and the second target value is 20-50 mbar.
6. The method for injecting nitrogen into the insulation layer of an LNG ship according to claim 5, characterized in that: The first target value is -750 mbar.
7. The nitrogen injection method for the insulation layer of an LNG ship according to claim 6, characterized in that: The pressure difference between the main insulation layer and the cargo hold is -800 mbar.
8. The method for injecting nitrogen into the insulation layer of an LNG ship according to claim 5, characterized in that: The second target value is -780 mbar.
9. The method for injecting nitrogen into the insulation layer of an LNG ship according to claim 1, characterized in that: The second set value is 3% vol.
10. The method for injecting nitrogen into the insulation layer of an LNG ship according to claim 1, characterized in that: The top of the cargo hold is the upper 1 / 3 of the space in its height direction.
Citation Information
Patent Citations
Method and system for inerting a wall of a liquefied fuel gas-storage tank
CN106068418A
Device for operating a pumping device connected to a thermally insulating barrier of a tank used for storing liquefied gas
CN107850260A
Method for determining optimal value of at least one parameter for implementing method for cooling watertight and thermally insulating tank
CN111344515A
Device for inerting liquefied gas storage tank for ship for transporting this gas
CN111356873A
Method for detecting a leak in a sealed and thermally insulating tank
CN113227638A
Cited By
Layer-by-layer safety monitoring method and early warning platform based on LNG ship cold insulation system
CN121469815A
