Low-nitrogen combustion circulating fluidized bed boiler
By arranging inverted conical ventilation filter partitions and flat channels in the circulating fluidized bed boiler, combined with the surrounding heating chamber and spiral separator, the problems of nitrogen oxide generation and exhaust gas instability in the circulating fluidized bed boiler are solved, and the combustion efficiency is improved. efficiency and steam heating efficiency, reducing energy waste and environmental pollution.
Patent Information
- Application Number
- CN202411223082.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-10-01
AI Technical Summary
Existing circulating fluidized bed boilers produce high amounts of nitrogen oxides during the combustion process, leading to the formation of acid rain, unstable exhaust gas emissions, poor thermal efficiency, and unburned coal ash residues that cannot be effectively utilized, resulting in energy waste and environmental damage. pollute.
By connecting the inverted conical bottom of the main combustion chamber to the cinder pipe, a ventilation filter plate is installed, and a flat channel is set up at the bottom of the primary air intake pipe to increase the air flow velocity and reduce the nitrogen-oxygen reaction; at the same time, a water pipe is added to the surrounding heating chamber to Improve steam heating efficiency, and recirculate unburned coal ash residue through the spiral separator and ash return pipe to reduce residue in the exhaust gas.
It effectively reduces the nitrogen generated by the initial combustion of coal, increases the oxygen volume and air volume of the coal pile, ensures full combustion, improves heat and steam heating efficiency, reduces residues in the exhaust gas, improves the utilization rate of the centrifugal blower, and reduces Energy consumption is reduced, and clogging of the ash return pipe is avoided.
Smart Images

Figure CN118729261A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal-fired power generation, and in particular to a circulating fluidized bed boiler with low-nitrogen combustion. Background Art
[0002] Coal-fired power generation is the main thermal power generation method in my country. The main fuel for coal-fired power generation is coal. In order to further improve the efficiency of coal-fired power generation, circulating fluidized bed boilers have been developed based on bubbling bed boilers. However, coal combustion will produce many pollutants, such as sulfur dioxide, nitrogen oxides and smoke, among which nitrogen oxides are one of the main sources of acid rain formation. Therefore, it is particularly important to reduce the nitrogen content inside the circulating fluidized bed boiler.
[0003] Based on the above, the existing circulating fluidized bed boiler has the following shortcomings: In order to ensure sufficient combustion, a large air volume is usually used at the bottom of the circulating fluidized bed boiler to ensure combustion, which also increases the release of nitrogen and its combination with oxygen, resulting in a higher amount of nitrogen production. Side curtain heating is often used. Due to the unstable direction of exhaust gas emission, uneven heating and poor heating efficiency are prone to occur. In addition, the exhaust gas still contains unburned coal ash and waste residue. If it is not utilized, it will cause energy waste and environmental pollution. Summary of the invention
[0004] The disclosed embodiment relates to a circulating fluidized bed boiler with low-nitrogen combustion, which connects the inverted conical bottom of the main combustion chamber to the cinder pipe, and fixes a ventilation filter baffle in the cinder pipe. Then, with the cooperation of the primary air intake pipe connected to the right side of the bottom of the cinder pipe, it is ensured that sufficient air volume passes through the ventilation filter baffle and combines with the coal. The ventilation filter baffle has large openings to prevent clogging by coal ash, thereby ensuring the stability of the primary air supply. The bottom of the primary air intake pipe is flat, which can further increase the flow rate of the wind, so as to reduce the reaction of nitrogen and oxygen under extremely low oxygen content and reduce the nitrogen generated by the primary combustion of coal.
[0005] According to a first aspect of the present disclosure, a circulating fluidized bed boiler with low nitrogen combustion is provided, which specifically comprises: a main combustion chamber; a ventilation filter plate is fixedly installed on the inner side of the bottom of the main combustion chamber, a primary air intake duct is fixedly installed on the right side of the bottom of the main combustion chamber, a secondary air intake duct is fixedly connected to the middle of the top of the primary air intake duct, a centrifugal blower is fixedly connected to the right end of the primary air intake duct, a surround heating bin is fixedly installed on the inner side of the top of the main combustion chamber, a pressurized air injection duct is fixedly installed on the left side of the top of the main combustion chamber, a gas-slag separation bin is fixedly connected to the right side of the main combustion chamber, a spiral separator is rotatably connected in the gas-slag separation bin, and a conveying motor is fixedly connected to the right side of the bottom of the gas-slag separation bin.
[0006] Furthermore, the middle section of the main combustion chamber is in an inverted cone shape, and a cylindrical cinder pipe is fixedly connected to the bottom of the main combustion chamber. The bottom of the cinder pipe is fixedly connected to a sealing bottom plate by bolts, and a ventilation filter plate is fixedly installed at the connection between the top of the cinder pipe and the main combustion chamber. A primary air intake pipe is fixedly connected to the middle of the right side wall of the cinder pipe, and the top of the primary air intake pipe is closed. A flat channel is opened at the bottom of the primary air intake pipe, and a coal filling pipe is fixedly connected to the left side of the conical side wall of the main combustion chamber.
[0007] Furthermore, the surrounding heating chamber is fixedly installed on the upper side of the inner wall of the main combustion chamber, the middle part of the surrounding heating chamber is inverted cone shape, the interior of the surrounding heating chamber is hollow, a water filling pipe is fixedly connected to the left bottom of the surrounding heating chamber, the top of the water filling pipe is level with the top of the surrounding heating chamber, a steam outlet pipe is fixedly connected to the left side of the top of the surrounding heating chamber, and the steam outlet pipe is connected through the middle of the top of the left side wall of the main combustion chamber.
[0008] Furthermore, the pressurized air injection pipe is in a "Y" shape, and both ends of the left bottom side of the pressurized air injection pipe are inserted into the top of the left wall of the main combustion chamber, and both ends of the left bottom side of the pressurized air injection pipe face the opening in the middle of the top of the surrounding heating chamber. The right end of the pressurized air injection pipe is fixedly connected to a centrifugal blower, and the bottom of the centrifugal blower is fixedly connected to the top end face of the main combustion chamber.
[0009] Furthermore, a flat connecting pipe is provided on the top of the main combustion chamber and is connected to the top of the gas-slag separation bin. A waste gas discharge pipe is fixedly connected to the middle of the top of the gas-slag separation bin. The waste gas discharge pipe is in an "L" shape. The bottom of the waste gas discharge pipe extends to the inner bottom of the gas-slag separation bin. A spiral separator is slidably connected to the outer wall of the waste gas discharge pipe. The spiral outer wall of the spiral separator is in contact with the inner wall of the gas-slag separation bin, and a driven gear is fixedly connected to the top of the outer wall of the spiral separator.
[0010] Furthermore, a driving motor is fixedly installed on the right side of the top outer wall of the gas-slag separation bin, and a driving gear is fixedly connected to the bottom driving end of the driving motor. The left side of the driving gear is meshed and connected with the right side of the driven gear at the top of the spiral separator.
[0011] Furthermore, the bottom of the gas-slag separation bin is fixedly connected to an inclined ash return pipe, the left bottom of the ash return pipe is fixedly connected to the conical right wall of the middle section of the main combustion chamber, a conveying motor is fixedly installed on the right end of the ash return pipe, and a screw conveyor is fixedly connected to the left end driving shaft of the conveying motor, and the screw conveyor is rotatably connected to the ash return pipe.
[0012] Furthermore, the top of the primary air intake duct and the secondary air intake duct form a "T" shape, and the top of the secondary air intake duct is connected to an annular surrounding pipe, which is annularly arranged on the outside of the ash reflux pipe at the bottom of the gas-slag separation bin, and the top of the surrounding pipe is fixedly connected to an annular surrounding pipe, which is annularly arranged on the upper side of the conical wall of the middle section of the main combustion chamber, and six air intake pipe openings are arranged in an annular array in the inner wall of the surrounding pipe, and the six air intake pipe openings are all inclined downward toward the conical middle section of the main combustion chamber.
[0013] Furthermore, an inclined high-oxygen connecting pipe is fixedly connected to the top of the secondary air intake pipe and the top of the pipe between the surrounding pipe, and the high-oxygen connecting pipe is connected to the pure oxygen supply.
[0014] Furthermore, a protective filter is fixedly connected to the front air inlet end of the centrifugal blower by bolts.
[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. By connecting the inverted cone-shaped bottom of the main combustion chamber to the cinder pipe, and fixing the ventilation filter baffle in the cinder pipe, and then cooperating with the primary air intake pipe connected to the right side of the bottom of the cinder pipe, it is ensured that sufficient air volume passes through the ventilation filter baffle and combines with the coal. The larger opening of the ventilation filter baffle can prevent the clogging of coal ash, thereby ensuring the stability of the primary air supply. The bottom of the primary air intake pipe is flat, which can further increase the flow rate of the wind, so as to reduce the reaction of nitrogen and oxygen in the case of extremely low oxygen content, reduce the nitrogen generated by the initial combustion of coal, and reduce the initial The secondary air intake duct connected to the secondary air intake duct has a larger ventilation volume, and the top of the secondary air intake duct is connected to a high-oxygen connecting pipe. While the air is introduced synchronously with the primary air intake duct, sufficient oxygen is added to the surrounding pipe. In order to increase the oxygen and air volume on the top of the coal pile when it is blown to the coal pile through the air intake pipe mouth, ensure the full combustion of the top of the coal pile, greatly increase the heat of the coal pile, and reduce the residue in the exhaust gas. The primary air intake duct and the secondary air intake duct share an air intake duct to improve the utilization rate of the centrifugal blower and reduce unnecessary energy consumption.
[0016] 2. By installing a surround-type surround heating bin on the upper side of the inner wall of the main combustion chamber, and surrounding the top of the main combustion chamber with the surround heating bin, and the middle part of the interior of the surround heating bin is tapered, the side wall of the main combustion chamber and the high-temperature exhaust gas can be better contacted, so that the temperature of the exhaust gas can be better utilized for steam heating, which greatly improves the steam heating efficiency. The surround heating bin adopts the method of injecting water through the bottom water pipe and discharging steam through the top steam outlet pipe, which can better help the steam to be discharged and reduce the impact of adding cold water on the steam generation. The pressurized air injection pipe connected to the left side of the top of the main combustion chamber is used to blow air to the opening in the middle of the top of the surround heating bin, so that a negative pressure phenomenon is generated in the middle of the top of the surround heating bin, so as to accelerate the discharge speed of the exhaust gas inside the main combustion chamber and avoid the excessive temperature inside the main combustion chamber affecting the combustion.
[0017] 3. When the waste gas is blown into the gas-slag separation bin through the connecting pipe by the pressurized air injection pipe, the waste gas will pass through the spiral separator downward in the gas-slag separation bin and finally enter through the bottom of the waste gas discharge pipe and be discharged outward. When the waste gas passes through the spiral separator, the gas in the waste gas and the unburned coal ash residue will remain on the spiral blades of the spiral separator. By engaging the driving gear on the bottom driving end of the driving motor and the driven gear on the top of the spiral separator, the spiral separator can be driven to rotate so as to concentrate the unburned coal ash residue on the blades of the spiral separator to the bottom of the gas-slag separation bin and return to the main combustion chamber through the ash return pipe at the bottom of the gas-slag separation bin so as to participate in combustion again and reduce waste. In order to avoid blockage of the ash return pipe, the spiral conveyor is driven by the conveying motor to rotate, which can ensure the stable transportation of the coal ash residue to the main combustion chamber and avoid the accumulation and blockage of the coal ash residue in the ash return pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the drawings of the embodiment are briefly introduced below.
[0019] The drawings described below are only related to some embodiments of the present invention, but are not intended to limit the present invention.
[0020] In the attached picture: Figure 1 It is a schematic diagram of the right front axial structure of a circulating fluidized bed boiler according to an embodiment of the present invention.
[0021] Figure 2 It is a schematic diagram of the left front axial structure of a circulating fluidized bed boiler according to an embodiment of the present invention.
[0022] Figure 3 It is a schematic diagram of the overall disassembled front structure of a circulating fluidized bed boiler according to an embodiment of the present invention.
[0023] Figure 4It is a schematic diagram of the overall cross-sectional structure of a circulating fluidized bed boiler according to an embodiment of the present invention.
[0024] Figure 5 It is a schematic diagram of the overall cross-section structure of a circulating fluidized bed boiler in an embodiment of the present invention, viewed from the top.
[0025] Figure 6 It is a schematic diagram of the overall cutaway structure of a circulating fluidized bed boiler according to an embodiment of the present invention.
[0026] Figure 7 It is a schematic diagram of the longitudinal cross-section structure of the main combustion chamber of the circulating fluidized bed boiler according to an embodiment of the present invention.
[0027] Figure 8 It is a schematic diagram of the transverse cross-sectional structure of the main combustion chamber of a circulating fluidized bed boiler according to an embodiment of the present invention.
[0028] Reference numerals: 1. Main combustion chamber; 101. Cinder pipe; 102. Coal adding pipe; 103. Connecting pipe; 2. Ventilation filter baffle; 3. Primary air intake pipe; 4. Secondary air intake pipe; 401. Surrounding pipe; 402. Surrounding pipe; 403. Air intake pipe opening; 404. High oxygen connecting pipe; 5. Sealing bottom plate; 6. Surrounding heating chamber; 601. Water filling pipe; 602. Steam outlet pipe; 7. Pressurized air injection pipe; 8. Gas-slag separation chamber; 801. Waste gas discharge pipe; 802. Ash reflux pipe; 9. Driving motor; 901. Driving gear; 10. Spiral separator; 1001. Driven gear; 11. Conveying motor; 1101. Screw conveyor; 12. Centrifugal blower; 1201. Protective filter. DETAILED DESCRIPTION
[0029] In order to make the purpose, scheme and advantages of the technical solution of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described in conjunction with the drawings of the specific embodiments of the present invention. Unless otherwise specified, the terms used herein have the usual meanings in the art. The same reference numerals in the drawings represent the same components.
[0030] Example 1: Please refer to Figures 1 to 8 As shown: The present invention provides a circulating fluidized bed boiler with low nitrogen combustion, comprising a main combustion chamber 1; a ventilation filter plate 2 is fixedly installed on the inner side of the bottom of the main combustion chamber 1, a primary air intake pipe 3 is fixedly installed on the right side of the bottom of the main combustion chamber 1, a secondary air intake pipe 4 is fixedly connected to the middle of the top of the primary air intake pipe 3, a centrifugal blower 12 is fixedly connected to the right end of the primary air intake pipe 3, a surrounding heating bin 6 is fixedly installed on the inner side of the top of the main combustion chamber 1, a pressurized air injection pipe 7 is fixedly installed on the left side of the top of the main combustion chamber 1, a gas-slag separation bin 8 is fixedly connected to the right side of the main combustion chamber 1, a spiral separator 10 is rotatably connected in the gas-slag separation bin 8, and a conveying motor 11 is fixedly connected to the right side of the bottom of the gas-slag separation bin 8.
[0031] Among them, the middle section of the main combustion chamber 1 is in an inverted cone shape, and a cylindrical cinder pipe 101 is fixedly connected to the bottom of the main combustion chamber 1. The bottom of the cinder pipe 101 is fixedly connected to a sealing bottom plate 5 by bolts, and a ventilation filter plate 2 is fixedly installed at the connection between the top of the cinder pipe 101 and the main combustion chamber 1. A primary air intake pipe 3 is fixedly connected to the middle of the right side wall of the cinder pipe 101. The top of the primary air intake pipe 3 is closed, and a flat channel is opened at the bottom of the primary air intake pipe 3. A coal filling pipe 102 is fixedly connected to the left side of the conical side wall of the main combustion chamber 1.
[0032] Among them, the top of the primary air intake pipe 3 and the secondary air intake pipe 4 form a "T" shape, and the top of the secondary air intake pipe 4 is connected to a ring-shaped surrounding pipe 401, which is annularly arranged on the outside of the ash reflux pipe 802 at the bottom of the gas-slag separation bin 8, and the top of the surrounding pipe 401 is fixedly connected to a ring-shaped surrounding pipe 402, which is annularly arranged on the upper side of the conical wall of the middle section of the main combustion chamber 1, and six air intake pipe openings 403 are arranged in a ring array in the inner wall of the surrounding pipe 402, and the six air intake pipe openings 403 are all inclined downward toward the conical middle section of the main combustion chamber 1.
[0033] Among them, an inclined high-oxygen connecting pipe 404 is fixedly connected to the top of the secondary air intake pipe 4 between the top surrounding pipe 401 and the surrounding pipe 402, and the high-oxygen connecting pipe 404 is connected to the pure oxygen supply.
[0034] Among them, the front air inlet end of the centrifugal blower 12 is fixedly connected with a protective filter 1201 by bolts.
[0035] By adopting the above technical scheme, the bottom of the inverted cone of the main combustion chamber 1 is connected to the cinder pipe 101, and the ventilation filter baffle 2 is fixedly installed in the cinder pipe 101. Then, with the cooperation of the primary air intake pipe 3 connected to the right side of the bottom of the cinder pipe 101, it is ensured that sufficient air volume passes through the ventilation filter baffle 2 and combines with the coal. The ventilation filter baffle 2 has a large opening to prevent coal ash from clogging, thereby ensuring the stability of the primary air supply. The bottom of the primary air intake pipe 3 is flat, which can further increase the flow rate of the wind, so as to reduce the reaction of nitrogen and oxygen in the case of extremely low oxygen content, and reduce the nitrogen generated by the initial combustion of coal. The secondary air intake pipe 4 connected to the primary air intake pipe 3 has a large ventilation volume, and the secondary air intake pipe A high-oxygen connecting pipe 404 is connected to the top of the duct 4, which replenishes sufficient oxygen into the surrounding pipe 402 while synchronously introducing air with the primary air intake duct 3, so as to increase the amount of oxygen and air volume on the top of the coal pile when blowing to the coal pile through the air intake pipe port 403, thereby ensuring sufficient combustion on the top of the coal pile, greatly increasing the heat of the coal pile, and reducing residue in the exhaust gas. The primary air intake duct 3 and the secondary air intake duct 4 share an air intake duct, so as to improve the utilization rate of the centrifugal blower 12 and reduce unnecessary energy consumption. By fixing the protective filter 1201 at the front air intake end of the centrifugal blower 12, foreign matter can be prevented from entering the primary air intake duct 3 and the secondary air intake duct 4, thereby preventing unnecessary influence on the combustion of the coal pile.
[0036] Embodiment 2: Based on a low-nitrogen combustion circulating fluidized bed boiler provided in Example 1, the device connects the inverted conical bottom of the main combustion chamber 1 and the cinder pipe 101, and fixes a ventilation filter plate 2 in the cinder pipe 101, and then, with the cooperation of the primary air intake pipe 3 connected to the right side of the bottom of the cinder pipe 101, ensures that sufficient air volume passes through the ventilation filter plate 2 and combines with the coal. The ventilation filter plate 2 has a large opening to prevent clogging by coal ash, thereby ensuring the stability of the primary air supply. The low-nitrogen combustion circulating fluidized bed boiler also includes: a surrounding heating bin 6 is fixedly installed on the upper side of the inner wall of the main combustion chamber 1, the middle of the surrounding heating bin 6 is inverted conical, the interior of the surrounding heating bin 6 is hollow, and a filling water pipe 601 is fixedly connected to the bottom of the left side of the surrounding heating bin 6, the top of the filling water pipe 601 is flush with the top of the surrounding heating bin 6, and a steam outlet pipe 602 is fixedly connected to the left side of the top of the surrounding heating bin 6, and the steam outlet pipe 602 is connected through the middle of the top of the left side wall of the main combustion chamber 1.
[0037] Among them, the pressurized air injection pipe 7 is in a "Y" shape, and both ends of the left bottom of the pressurized air injection pipe 7 are inserted into the top of the left wall of the main combustion chamber 1, and both ends of the left bottom of the pressurized air injection pipe 7 face the opening in the middle of the top of the surrounding heating chamber 6. The right end of the pressurized air injection pipe 7 is fixedly connected to the centrifugal blower 12, and the bottom of the centrifugal blower 12 is fixedly connected to the top end face of the main combustion chamber 1.
[0038] By adopting the above-mentioned technical scheme, a surrounding surrounding heating chamber 6 is installed on the upper side of the inner wall of the main combustion chamber 1, and the surrounding heating chamber 6 surrounds the top of the main combustion chamber 1, and the middle part of the surrounding heating chamber 6 is tapered, which can better make the side wall of the main combustion chamber 1 and the high-temperature exhaust gas fully contact, so as to better utilize the temperature of the exhaust gas for steam heating, greatly improving the steam heating efficiency, and the surrounding heating chamber 6 adopts the method of injecting water through the bottom water filling pipe 601 and discharging steam through the top steam outlet pipe 602, which can better help the steam to be discharged and reduce the impact of adding cold water on the steam generation. The pressurized air injection pipe 7 connected to the left side of the top of the main combustion chamber 1 is used to blow air to the opening in the middle of the top of the surrounding heating chamber 6, so as to generate a negative pressure phenomenon in the middle of the top of the surrounding heating chamber 6, so as to accelerate the discharge speed of the exhaust gas inside the main combustion chamber 1 and avoid the internal temperature of the main combustion chamber 1 being too high to affect the combustion.
[0039] Embodiment three: Based on a low-nitrogen combustion circulating fluidized bed boiler provided in Example 1, the device connects the inverted conical bottom of the main combustion chamber 1 and the coal ash pipe 101, and fixes the ventilation filter baffle 2 in the coal ash pipe 101, and then cooperates with the primary air intake pipe 3 connected to the right side of the bottom of the coal ash pipe 101 to ensure that sufficient air volume passes through the ventilation filter baffle 2 and combines with the coal. The ventilation filter baffle 2 has a large opening to prevent coal ash from clogging, thereby ensuring the stability of the primary air supply. The low-nitrogen combustion circulating fluidized bed boiler also includes: a main combustion chamber 1 is provided with a flat connecting pipe 103 which is connected to the top of the gas-slag separation bin 8. A waste gas discharge pipe 801 is fixedly connected to the middle of the top of the gas-slag separation bin 8. The waste gas discharge pipe 801 is in an "L" shape. The bottom of the waste gas discharge pipe 801 extends to the inner bottom of the gas-slag separation bin 8. A spiral separator 10 is slidably connected to the outer wall of the waste gas discharge pipe 801. The spiral outer wall of the spiral separator 10 is in contact with the inner wall of the gas-slag separation bin 8. A driven gear 1001 is fixedly connected to the top of the outer wall of the spiral separator 10.
[0040] Among them, a driving motor 9 is fixedly installed on the right side of the top outer wall of the gas-slag separation bin 8, and a driving gear 901 is fixedly connected to the bottom driving end of the driving motor 9. The left side of the driving gear 901 is meshed and connected with the right side of the driven gear 1001 at the top of the spiral separator 10.
[0041] Among them, the bottom of the gas-slag separation bin 8 is fixedly connected to the inclined ash return pipe 802, the left bottom of the ash return pipe 802 is fixedly connected to the conical right wall of the middle section of the main combustion chamber 1, and the right end of the ash return pipe 802 is fixedly installed with a conveying motor 11, and the left end driving shaft of the conveying motor 11 is fixedly connected with a screw conveyor 1101, and the screw conveyor 1101 is rotatably connected in the ash return pipe 802.
[0042] By adopting the above technical solution, when the waste gas is blown into the gas-slag separation chamber 8 through the connecting pipe 103 by the pressurized air injection pipe 7, the waste gas passes downward through the spiral separator 10 in the gas-slag separation chamber 8 and finally enters through the bottom of the waste gas discharge pipe 801 and is discharged outward. When the waste gas passes through the spiral separator 10, the gas in the waste gas and the unburned coal ash residue will remain on the spiral blades of the spiral separator 10, and the driving gear 901 at the bottom driving end of the driving motor 9 and the driven gear 1001 at the top of the spiral separator 10 are meshed. When the spiral separator 10 is combined, it can drive the spiral separator 10 to rotate, so as to collect the unburned coal ash residue on the blades of the spiral separator 10 to the bottom of the gas-slag separation bin 8, and return it to the main combustion chamber 1 through the ash return pipe 802 at the bottom of the gas-slag separation bin 8, so as to participate in the combustion again and reduce waste. In order to avoid the blockage of the ash return pipe 802, the spiral conveyor 1101 is driven to rotate by the conveying motor 11, so as to ensure the stable transportation of the coal ash residue to the main combustion chamber 1, thereby avoiding the accumulation and blockage of the coal ash residue in the ash return pipe 802.
[0043] Specific usage and function of this embodiment: In the present invention, by connecting the inverted conical bottom of the main combustion chamber 1 and the cinder pipe 101, and fixing the ventilation filter baffle 2 in the cinder pipe 101, and then with the cooperation of the primary air intake pipe 3 connected to the right side of the bottom of the cinder pipe 101, it is ensured that sufficient air volume passes through the ventilation filter baffle 2 and combines with the coal. The ventilation filter baffle 2 has a large opening to prevent coal ash from clogging, thereby ensuring the stability of the primary air supply, and the bottom of the primary air intake pipe 3 is flat, which can further increase the flow rate of the wind, so as to reduce the reaction of nitrogen and oxygen in the case of extremely low oxygen content, and reduce the nitrogen generated by the initial combustion of coal. The secondary air intake pipe 4 connected to the primary air intake pipe 3 has a large ventilation volume, and the secondary air intake pipe A high-oxygen connecting pipe 404 is connected to the top of the duct 4, which replenishes sufficient oxygen into the surrounding pipe 402 while synchronously introducing air with the primary air intake duct 3, so as to increase the oxygen and air volume at the top of the coal pile when blowing to the coal pile through the air intake pipe port 403, ensure the full combustion of the top of the coal pile, greatly increase the heat of the coal pile, and reduce the residue in the exhaust gas, and the primary air intake duct 3 and the secondary air intake duct 4 share an air intake duct to improve the utilization rate of the centrifugal blower 12 and reduce unnecessary energy consumption. By installing a surrounding surrounding heating bin 6 on the upper side of the inner wall of the main combustion chamber 1, and surrounding the top of the main combustion chamber 1 by the surrounding heating bin 6, and the middle part of the surrounding heating bin 6 is tapered, the side wall of the main combustion chamber 1 and the high-temperature exhaust gas can be better connected. The temperature of the exhaust gas can be better utilized for steam heating, which greatly improves the steam heating efficiency. The surrounding heating bin 6 adopts the method of injecting water through the bottom water filling pipe 601 and discharging steam through the top steam outlet pipe 602, which can better help the steam to be discharged and reduce the impact of adding cold water on the steam generation. The pressurized air injection pipe 7 connected to the left side of the top of the main combustion chamber 1 is used to blow air to the opening in the middle of the top of the surrounding heating bin 6, so that a negative pressure phenomenon is generated in the middle of the top of the surrounding heating bin 6, so as to accelerate the exhaust speed of the exhaust gas inside the main combustion chamber 1 and avoid the excessive temperature inside the main combustion chamber 1 affecting the combustion. When the exhaust gas is blown to the gas-slag separation bin 8 through the connecting pipe 103 through the pressurized air injection pipe 7, the exhaust gas passes through the spiral separator in the gas-slag separation bin 8. 10 downward and finally enters through the bottom of the exhaust gas discharge pipe 801 and is discharged outward. When the exhaust gas passes through the spiral separator 10, the gas in the exhaust gas and the unburned coal ash residue will remain on the spiral blades of the spiral separator 10. The driving gear 901 on the bottom driving end of the driving motor 9 is engaged with the driven gear 1001 on the top of the spiral separator 10, so that the spiral separator 10 can be driven to rotate, so as to concentrate the unburned coal ash residue on the blades of the spiral separator 10 to the bottom of the gas-slag separation bin 8, and return to the main combustion chamber 1 through the ash return pipe 802 at the bottom of the gas-slag separation bin 8, so as to participate in the combustion again and reduce waste. In order to avoid the ash return pipe 802 from being blocked, the screw conveyor 1101 is driven to rotate by the conveying motor 11.This ensures that the coal ash residue is stably transported to the main combustion chamber 1, avoiding the accumulation and blockage of the coal ash residue in the ash return pipe 802.
[0044] The above description is merely an exemplary embodiment of the present invention and is not intended to limit the protection scope of the present invention. The protection scope of the present invention is determined by the appended claims.
Claims
1. A circulating fluidized bed boiler with low nitrogen combustion, characterized in that: The invention comprises a main combustion chamber (1); a ventilation filter plate (2) is fixedly installed on the inner side of the bottom of the main combustion chamber (1); a primary air intake duct (3) is fixedly installed on the right side of the bottom of the main combustion chamber (1); a secondary air intake duct (4) is fixedly connected to the middle of the top of the primary air intake duct (3); a centrifugal blower (12) is fixedly connected to the right end of the primary air intake duct (3); a surrounding heating chamber (6) is fixedly installed on the inner side of the top of the main combustion chamber (1); a pressurized air injection pipe (7) is fixedly installed on the left side of the top of the main combustion chamber (1); a gas-slag separation chamber (8) is fixedly connected to the right side of the main combustion chamber (1); a spiral separator (10) is rotatably connected in the gas-slag separation chamber (8); and a conveying motor (11) is fixedly connected to the right side of the bottom of the gas-slag separation chamber (8).
2. A low-nitrogen combustion circulating fluidized bed boiler as claimed in claim 1, characterized in that: The middle section of the main combustion chamber (1) is in an inverted cone shape, a cylindrical cinder pipe (101) is fixedly connected to the bottom of the main combustion chamber (1), a sealing bottom plate (5) is fixedly connected to the bottom of the cinder pipe (101) by bolts, a ventilation filter plate (2) is fixedly installed at the connection between the top of the cinder pipe (101) and the main combustion chamber (1), a primary air intake pipe (3) is fixedly connected to the middle of the right side wall of the cinder pipe (101), the top of the primary air intake pipe (3) is closed, and a flat channel is opened at the bottom of the primary air intake pipe (3), and a coal filling pipe (102) is fixedly connected to the left side of the conical side wall of the main combustion chamber (1).
3. A low-nitrogen combustion circulating fluidized bed boiler as claimed in claim 1, characterized in that: The surrounding heating chamber (6) is fixedly mounted on the upper side of the inner wall of the main combustion chamber (1); the middle of the surrounding heating chamber (6) is in an inverted cone shape; the interior of the surrounding heating chamber (6) is hollow; a water filling pipe (601) is fixedly connected to the bottom of the left side of the surrounding heating chamber (6); the top of the water filling pipe (601) is flush with the top of the surrounding heating chamber (6); a steam outlet pipe (602) is fixedly connected to the left side of the top of the surrounding heating chamber (6); the steam outlet pipe (602) passes through and is connected to the middle of the top of the left side wall of the main combustion chamber (1).
4. A low-nitrogen combustion circulating fluidized bed boiler as claimed in claim 1, characterized in that: The pressurized air injection pipe (7) is in a "Y" shape, and both ends of the left bottom of the pressurized air injection pipe (7) are plugged into the top of the left wall of the main combustion chamber (1), and both ends of the left bottom of the pressurized air injection pipe (7) face the opening at the middle of the top of the surrounding heating chamber (6). The right end of the pressurized air injection pipe (7) is fixedly connected to a centrifugal blower (12), and the bottom of the centrifugal blower (12) is fixedly connected to the top end surface of the main combustion chamber (1).
5. A low-nitrogen combustion circulating fluidized bed boiler as claimed in claim 1, characterized in that: A flat connecting pipe (103) is provided on the top of the main combustion chamber (1) and is connected to the top of the gas-slag separation chamber (8). A waste gas discharge pipe (801) is fixedly connected to the middle of the top of the gas-slag separation chamber (8). The waste gas discharge pipe (801) is in an "L" shape. The bottom of the waste gas discharge pipe (801) extends to the inner bottom of the gas-slag separation chamber (8). A spiral separator (10) is slidably connected to the outer wall of the waste gas discharge pipe (801). The spiral outer wall of the spiral separator (10) is in contact with the inner wall of the gas-slag separation chamber (8). A driven gear (1001) is fixedly connected to the top of the outer wall of the spiral separator (10).
6. A low-nitrogen combustion circulating fluidized bed boiler as claimed in claim 1, characterized in that: A driving motor (9) is fixedly mounted on the right side of the top outer wall of the gas-slag separation bin (8); a driving gear (901) is fixedly connected to the bottom driving end of the driving motor (9); and the left side of the driving gear (901) is meshingly connected to the right side of the driven gear (1001) at the top of the spiral separator (10).
7. A low-nitrogen combustion circulating fluidized bed boiler as claimed in claim 1, characterized in that: The bottom of the gas-slag separation bin (8) is fixedly connected to an inclined ash return pipe (802); the left bottom of the ash return pipe (802) is fixedly connected to the right conical wall of the middle section of the main combustion chamber (1); a conveying motor (11) is fixedly mounted on the right end of the ash return pipe (802); a screw conveyor (1101) is fixedly connected to the drive shaft at the left end of the conveying motor (11); and the screw conveyor (1101) is rotatably connected to the ash return pipe (802).
8. A low-nitrogen combustion circulating fluidized bed boiler as claimed in claim 1, characterized in that: The top of the primary air intake duct (3) and the secondary air intake duct (4) form a "T" shape. The top of the secondary air intake duct (4) is connected to an annular surrounding pipe (401). The surrounding pipe (401) is arranged in an annular manner on the outside of the ash return pipe (802) at the bottom of the gas-slag separation bin (8). The top of the surrounding pipe (401) is fixedly connected to an annular surrounding pipe (402). The surrounding pipe (402) is arranged in an annular manner on the upper side of the conical wall of the middle section of the main combustion chamber (1). Six air intake pipe openings (403) are arranged in an annular array in the inner side wall of the surrounding pipe (402). The six air intake pipe openings (403) are all inclined downward toward the conical middle section of the main combustion chamber (1).
9. A low-nitrogen combustion circulating fluidized bed boiler as claimed in claim 1, characterized in that: An inclined high-oxygen connecting pipe (404) is fixedly connected to the top of the secondary air intake pipe (4) between the top surrounding pipe (401) and the surrounding pipe (402), and the high-oxygen connecting pipe (404) is connected to the pure oxygen supply.
10. A low-nitrogen combustion circulating fluidized bed boiler as claimed in claim 1, characterized in that: The front air inlet end of the centrifugal blower (12) is fixedly connected to a protective filter screen (1201) via bolts.
Citation Information
Patent Citations
Boiler combustion system
CN107238074A
Low-nitrogen combustion circulating fluidized bed boiler and using method thereof
CN110500577A
Furfural vapor-residue treatment system
CN111076189A
Ash circulating system
CN114508749A
Circulating fluidized bed boiler
CN118031205A
