A polyethylene gas pipeline detection equipment

By designing a multifunctional polyethylene gas pipeline detection equipment, using ultrasonic, ray and sandblasting technology, the problem of low detection efficiency of existing equipment is solved, and efficient performance evaluation of pipeline bending and environmental conditions is achieved, improving Test efficiency and safety.

CN118730758BActive Publication Date: 2024-11-22CHENGDU CHUANLU PLASTIC GRP CO LTD
View PDF 12 Cites 0 Cited by

Patent Information

Application Number
CN202411201211.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-22
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

The existing polyethylene gas pipeline inspection equipment needs to replace the pipeline after testing a specific bending degree, which leads to a cumbersome and time-consuming inspection process, and it is impossible to efficiently evaluate the performance of the pipeline under different bending degrees.

Method used

A detection device including a chassis, mounting plate, fixing plate, electric slide rail, rotating shaft, power unit, bearing plate, press plate and protective cover is designed to check cracks and layering of the bent parts of the pipeline through ultrasonic or ray detection technology. , and simulate high temperature and strong wind environments, and use sand blasting mechanism to simulate sand and gravel scraping to achieve multiple inspections of pipeline performance without the need to replace pipelines.

Benefits of technology

Improves the detection efficiency of polyethylene gas pipelines, and can evaluate the performance of pipelines under various bending and environmental conditions without frequent pipe replacement, reduces inspection costs and time, and enhances monitoring of leakage and performance degradation risks ability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118730758B_ABST
    Figure CN118730758B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of polyethylene gas pipelines, and in particular to a polyethylene gas pipeline detection device, including a base frame, a mounting plate and a fixing plate, etc.; two mounting plates are connected to the base frame; the facing parts of the two mounting plates are respectively fixed with a fixing plate, and both fixing plates are provided with through holes. The present invention detects the bent part of the polyethylene gas pipeline by using ultrasonic detection equipment or ray detection equipment after the polyethylene gas pipeline is bent for a predetermined time, and detects whether cracks and delamination occur in the polyethylene gas pipeline. If so, it indicates that the performance of the polyethylene gas pipeline is unqualified after bending and deformation, which will affect its normal use and there is a risk of leakage, etc.; after each section is detected, it is advanced forward by a section, and the performance of the polyethylene gas pipeline under various curvatures can be detected by using one polyethylene gas pipeline, and the polyethylene gas pipeline does not need to be frequently replaced, thereby improving the detection efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of polyethylene gas pipelines, and in particular to a polyethylene gas pipeline detection device. Background Art

[0002] A significant advantage of polyethylene gas pipelines is their flexibility and bendability, which allows PE pipelines to be laid in a winding shape and bend along the terrain without the need for additional pipe fittings such as elbows. Polyethylene gas pipelines will deform at the bends, and bending deformation may cause cracks inside the polyethylene gas pipeline material, thereby increasing the risk of leakage. Therefore, it is necessary to test the bending resistance of polyethylene gas pipelines. After current testing equipment tests the performance of polyethylene gas pipelines after a specific degree of bending, it is often necessary to replace new polyethylene gas pipelines for the next round of testing. This process is cumbersome and time-consuming. Summary of the Invention

[0003] In order to overcome the shortcomings of current testing equipment that often requires replacing a new polyethylene gas pipeline for the next round of testing after testing the performance of the polyethylene gas pipeline after a specific curvature, and this process is cumbersome and time-consuming, the present invention provides a polyethylene gas pipeline testing device.

[0004] The technical solution is: a polyethylene gas pipeline detection equipment, including a base frame, a mounting plate and a fixed plate; two mounting plates are connected to the base frame; the facing parts of the two mounting plates are respectively fixed with a fixed plate, and both fixed plates are provided with through holes; it also includes an electric slide rail I, a rotating shaft, a power unit I, a receiving plate, a pressure plate and a protective cover, the protective cover is made of high-temperature resistant material, and the protective cover is arranged to be a telescopic structure; a rotating shaft is fixed to the middle of the base frame; the left mounting plate is rotatably connected to the rotating shaft; an arc track is provided on the left part of the base frame, and the electric slide rail I is slidably connected in the arc track; the rotating shaft is located at the center of the arc track; the electric slide rail I is fixed to the left mounting plate; the right mounting plate is connected with the power unit I; the power unit I is connected with the receiving plate, and the power unit I is used to drive the receiving plate to move left and right; the receiving plate is detachably connected with a pressure plate; a protective cover is fixed between the two mounting plates, and two gas pipes are passed through the protective cover.

[0005] Furthermore, the through holes of the two fixing plates are both beveled on one side facing the receiving plate.

[0006] Furthermore, a rubber sealing ring is included; a rubber sealing ring is fixedly connected to the facing parts of the two mounting plates.

[0007] Furthermore, it also includes a power unit II, a connecting rod II and a positioning ring; the power unit II is connected to the side of the right fixing plate away from the protective cover; the power unit II is connected to a number of connecting rods II, and the power unit II is used to drive the connecting rod II to move left and right; the ends of the two connecting rods II are jointly fixed with a positioning ring.

[0008] Furthermore, the left portion of the aligning ring is beveled.

[0009] Furthermore, it also includes a cooling ring, a water inlet pipe and a water outlet pipe; the cooling ring is fixed in the right fixed plate; the upper part of the cooling ring is connected to the water inlet pipe; the lower part of the cooling ring is connected to the water outlet pipe; the water inlet pipe and the water outlet pipe both pass through the right fixed plate.

[0010] Furthermore, the fitting portion on the inner side of the cooling ring is provided with an elastic material.

[0011] Furthermore, it also includes a sandblasting tube and a flexible collection frame; a plurality of sandblasting tubes pass through the front side of the protective cover; and a flexible collection frame is fixedly connected to the lower part of the protective cover.

[0012] Furthermore, a plurality of high-temperature resistant bristles are fixedly connected to the inner left portion and the inner right portion of the protective cover respectively.

[0013] Furthermore, it also includes a cylinder I; a cylinder I is fixed to the lower side of each of the two mounting plates; and the telescopic ends of the two cylinders I are both located directly below the flexible collection frame.

[0014] The beneficial effects are as follows: 1. The present invention uses ultrasonic detection equipment or radiographic detection equipment to detect the bent portion of the polyethylene gas pipeline after the polyethylene gas pipeline is bent and maintained for a predetermined period of time, and detects whether cracks and stratification occur in the polyethylene gas pipeline. If so, it indicates that the performance of the polyethylene gas pipeline is unqualified after bending and deformation, which will affect its normal use and may cause leakage. After each section is inspected, the pipeline is advanced a section. By using one polyethylene gas pipeline, the performance of the polyethylene gas pipeline under various curvatures can be detected, and there is no need to frequently replace the polyethylene gas pipeline, thereby improving the detection efficiency.

[0015] 2. During the test, high-temperature gas is introduced into the protective cover through the gas pipe. The rubber sealing ring is in close contact with the outer wall of the polyethylene gas pipe to prevent the high-temperature gas from overflowing. The introduced high-temperature gas is in contact with the curved part of the polyethylene gas pipe, thereby heating the polyethylene gas pipe and simulating the high-temperature environment that the pipe may encounter in actual operation.

[0016] 3. The present invention controls the sandblasting mechanism to spray sand and gravel through the sandblasting tube toward the curved and outwardly protruding part, simulating the situation of being scratched by sand and gravel in strong wind weather. The fallen sand and gravel are discharged into the collection box below through the flexible collection frame for collection, and then tested to check whether the performance of the polyethylene gas pipeline is affected by the sand and gravel. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a schematic diagram of the three-dimensional structure of the polyethylene gas pipeline detection equipment of the present invention;

[0018] Figure 2 This is a schematic diagram of the three-dimensional structure of the receiving plate and the pressing plate of the polyethylene gas pipeline detection equipment of the present invention;

[0019] Figure 3 This is a sectional view of the three-dimensional structure of the fixing plate and protective cover of the polyethylene gas pipeline detection equipment of the present invention;

[0020] Figure 4 This is a schematic diagram of the three-dimensional structure of the electric slide rail III, electric slider II, connecting rod II and righting ring of the polyethylene gas pipeline detection equipment of the present invention;

[0021] Figure 5 This is a schematic diagram of the three-dimensional structure of the cooling ring, water inlet pipe and water outlet pipe of the polyethylene gas pipeline detection equipment of the present invention;

[0022] Figure 6 This is a schematic diagram of the three-dimensional structure of the sandblasting tube, flexible collection frame and cylinder I of the polyethylene gas pipeline inspection equipment of the present invention from a first viewing angle;

[0023] Figure 7 This is a schematic diagram of the three-dimensional structure of the sandblasting tube, flexible collection frame and cylinder I of the polyethylene gas pipeline detection equipment of the present invention from a second viewing angle.

[0024] The names and serial numbers of the parts in the figure are: 1-base, 2-mounting plate, 3-fixed plate, 4-electric slide rail I, 5-rotating shaft, 6-electric slide rail II, 7-electric slider I, 8-supporting plate, 9-pressure plate, 10-protective cover, 11-rubber sealing ring, 21-electric slide rail III, 22-electric slider II, 23-connecting rod II, 24-aligning ring, 31-cooling ring, 3101-fitting part, 32-water inlet pipe, 33-water outlet pipe, 41-sandblasting pipe, 42-flexible collection frame, 43-cylinder I. DETAILED DESCRIPTION

[0025] The preferred technical solutions of the present invention will be described in detail below with reference to the accompanying drawings.

[0026] Example 1:

[0027] A polyethylene gas pipeline detection device, such as Figure 1-7 As shown, it includes a base frame 1, a mounting plate 2 and a fixing plate 3; two mounting plates 2 are connected to the base frame 1; a fixing plate 3 is welded to the facing parts of the two mounting plates 2, and both fixing plates 3 have through holes;

[0028] It also includes an electric slide rail Ⅰ4, a rotating shaft 5, a power unit Ⅰ, a receiving plate 8, a pressure plate 9 and a protective cover 10. The protective cover 10 is made of high-temperature resistant material and is arranged as a telescopic structure; a rotating shaft 5 is fixedly connected to the middle of the base frame 1; the left mounting plate 2 is rotatably connected to the rotating shaft 5; an arc track is provided on the left part of the base frame 1, and the electric slide rail Ⅰ4 is slidably connected to the circular arc track; the rotating shaft 5 is located at the center of the circular arc track; the electric slide rail Ⅰ4 is fixedly connected to the left mounting plate 2; the right mounting plate 2 is connected to the power unit Ⅰ; the power unit Ⅰ is connected to the receiving plate 8; the pressure plate 9 is detachably connected to the receiving plate 8; a protective cover 10 is fixedly connected between the two mounting plates 2, and two air pipes pass through the protective cover 10.

[0029] Furthermore, the power unit I includes an electric slide rail II 6 and an electric slider I 7; the electric slide rail II 6 is bolted to the right mounting plate 2; the electric slider I 7 is slidably connected to the electric slide rail II 6; and the electric slider I 7 is fixed to the receiving plate 8.

[0030] Furthermore, in order to facilitate the insertion of the polyethylene gas pipe, the right sides of the through holes of the two fixing plates 3 are both beveled.

[0031] Furthermore, a rubber sealing ring 11 is included; a rubber sealing ring 11 is fixedly connected to the facing parts of the two mounting plates 2 .

[0032] The first step: manually pass the left end of the polyethylene gas pipeline through the through holes on the two fixing plates 3. The inner diameter of the through holes on the fixing plates 3 is slightly larger than the outer diameter of the polyethylene gas pipeline. The right end of the polyethylene gas pipeline is placed on the receiving plate 8. Then, the pressure plate 9 is manually covered on the receiving plate 8. The pressure plate 9 and the receiving plate 8 are fixed with bolts, that is, the pressure plate 9 covers the receiving plate 8 to clamp the right end of the polyethylene gas pipeline.

[0033] Step 2: Control the electric slide rail I4 to drive the left mounting plate 2 and its connected components to slide backward in the arc track on the left part of the mounting plate 2. Taking the top-down view as the basis, the left mounting plate 2 rotates clockwise around the rotating shaft 5, and the left fixed plate 3 and the left part of the protective cover 10 move with the left mounting plate 2. When the left fixed plate 3 moves, it will bend the polyethylene gas pipeline, causing the polyethylene gas pipeline to bend at the part between the two mounting plates 2 and the protective cover 10. The moving distance of the electric slide rail I4 can be controlled to control the bending amplitude of the polyethylene gas pipeline. The more the electric slide rail I4 moves, the greater the bending amplitude.

[0034] Step 3: After the polyethylene gas pipeline is bent and maintained for a predetermined time, the electric slide rail Ⅰ4 is controlled to drive the left mounting plate 2 and its connected components to slide forward and reset in the arc track on the left side of the mounting plate 2, and the polyethylene gas pipeline is straightened again. Then, the electric slide rail Ⅱ6 is controlled to drive the electric slider Ⅰ7, the receiving plate 8, the pressure plate 9 and the polyethylene gas pipeline to move to the left, so that the inspected part of the polyethylene gas pipeline is moved to the left of the left fixed plate 3. Then, ultrasonic detection equipment or X-ray detection equipment is used to detect the bent part of the polyethylene gas pipeline to detect whether the polyethylene gas pipeline has cracks and delamination. If so, it means that the performance of the polyethylene gas pipeline is unqualified after bending and deformation. , which will affect its normal use and pose risks such as leakage; at this time, the part of the polyethylene gas pipeline located in the two fixed plates 3 brackets is the part that has not been tested, and then repeat the second step to detect whether the performance of the polyethylene gas pipeline decreases after different bending degrees; in this way, the performance of the polyethylene gas pipeline under various bending degrees can be detected using one polyethylene gas pipeline, and there is no need to frequently replace the polyethylene gas pipeline, thereby improving the detection efficiency; when the entire polyethylene gas pipeline is used up, control the electric slide rail II 6 to drive the electric slider I 7, the connecting plate 8, the pressure plate 9 and the polyethylene gas pipeline to move to the right and reset, and then remove the pressure plate 9 from the connecting plate 8, and finally remove the polyethylene gas pipeline.

[0035] Step 4: During the test, high-temperature gas can be introduced into the protective cover 10 through the air pipe. The rubber sealing ring 11 is in close contact with the outer wall of the polyethylene gas pipe to prevent the high-temperature gas from overflowing. The introduced high-temperature gas is in contact with the bent part of the polyethylene gas pipe, thereby heating the polyethylene gas pipe and simulating the high-temperature environment that the pipe may encounter in actual operation, such as the increase in ground temperature in summer. In this way, it is evaluated whether the performance of the polyethylene gas pipe will decrease after being bent and encountering high temperatures.

[0036] Example 2:

[0037] On the basis of Example 1, Figure 3-Figure 5 As shown, it also includes a power unit II, a connecting rod II 23 and a positioning ring 24; the right fixing plate 3 is connected to the side away from the protective cover 10 with the power unit II; the power unit II is connected to two connecting rods II 23; the left parts of the two connecting rods II 23 are welded with a positioning ring 24.

[0038] Furthermore, the power unit II includes an electric slide rail III 21 and an electric slider II 22; two electric slide rails III 21 are fixedly connected to the right side of the right fixed plate 3; an electric slider II 22 is slidably connected to each of the two electric slide rails III 21; and each of the two electric sliders II 22 is fixedly connected to a connecting rod II 23.

[0039] Furthermore, in order to facilitate the alignment of the polyethylene gas pipeline, the left portion of the alignment ring 24 is beveled.

[0040] Furthermore, it also includes a cooling ring 31, a water inlet pipe 32 and a water outlet pipe 33; the cooling ring 31 is fixedly connected to the right fixed plate 3; the upper part of the cooling ring 31 is connected to the water inlet pipe 32; the lower part of the cooling ring 31 is connected to the water outlet pipe 33; the water inlet pipe 32 and the water outlet pipe 33 both pass through the right fixed plate 3.

[0041] Furthermore, in order to better fit the polyethylene gas pipeline, the fitting portion 3101 on the inner side of the cooling ring 31 is set to an elastic material.

[0042] In the fourth step of Example 1: the electric slide rail I4 is controlled to drive the left mounting plate 2 and its connected components to slide forward and reset in the arc track on the left part of the mounting plate 2, so that when the polyethylene gas pipe is straightened again, if the polyethylene gas pipe is heated, its elastic restoring ability decreases, or if it is bent and causes its elastic restoring ability to decrease, it will be difficult to straighten it, resulting in it being difficult to pass through the through hole of the left fixed plate 3 when the polyethylene gas pipe is moved to the left, and there is a jamming situation; at this time, the electric slide rail III 21 is controlled to drive the electric slider II 22, the connecting rod II 23 and the positioning ring 24 to move to the left, so that the positioning ring 24 slides on the outer surface of the polyethylene gas pipe, and the inner diameter of the positioning ring 24 is the same as the outer diameter of the polyethylene gas pipe. In this way, the polyethylene gas pipe is straightened and positioned. After positioning, the electric slide rail III 21 is controlled to drive the electric slider II 22, the connecting rod II 23 and the positioning ring 24 to move to the right and reset, and then the polyethylene gas pipe can smoothly pass through the through hole of the left fixed plate 3.

[0043] In the third step of Example 1: high-temperature gas is introduced into the protective cover 10 through the air pipe, and the introduced high-temperature gas contacts the curved part of the polyethylene gas pipe. When the polyethylene gas pipe is heated in this way, the heat will be transferred to the part of the polyethylene gas pipe located on the right side of the fixed plate 3, causing the part of the polyethylene gas pipe located on the right side of the fixed plate 3 to be heated, thereby interfering with subsequent detection; therefore, a cooling ring 31 is provided in the fixed plate 3, and the water inlet pipe 32 and the water outlet pipe 33 are connected to an external cold water circulation system. Cooling water is injected into the cooling ring 31 through the water inlet pipe 32, and the polyethylene gas pipe on the inside of the cooling ring 31 is cooled by the cooling water to prevent heat from being transferred to the part of the polyethylene gas pipe located on the right side of the fixed plate 3, thereby avoiding interference with subsequent detection; the fitting part 3101 on the inside of the cooling ring 31 is set to an elastic material. After the cooling water is introduced, the cooling water forces the fitting part 3101 to deform inward and fit tightly against the outer wall of the polyethylene gas pipe to enhance the cooling effect.

[0044] Example 3:

[0045] On the basis of Example 2, Figure 6-Figure 7As shown, it also includes a sandblasting tube 41 and a flexible collection frame 42; four sandblasting tubes 41 pass through the front side of the protective cover 10; and the flexible collection frame 42 is fixedly connected to the lower part of the protective cover 10.

[0046] Furthermore, in order to remove the sand and gravel remaining on the upper part of the polyethylene gas pipeline, a plurality of high-temperature resistant bristles are fixed to the inner left and inner right parts of the protective cover 10 respectively.

[0047] Furthermore, it also includes a cylinder I 43; a cylinder I 43 is fixed to the lower side of each of the two mounting plates 2; and the telescopic ends of the two cylinders I 43 are both located directly below the flexible collection frame 42.

[0048] In polyethylene gas pipelines installed in open areas outdoors, the parts that are bent and protruding outward are often the most vulnerable parts of the structure. When encountering strong winds, the pipelines will be hit and scratched by sand and gravel, which may pose a threat to the integrity of the pipeline. Therefore, it is necessary to conduct scratch resistance testing on the parts of the polyethylene gas pipelines that are bent and protruding outward to evaluate whether their performance is affected after being scratched by sand and gravel. The sandblasting tube 41 is connected to the external sandblasting mechanism in advance, the cover at the bottom of the flexible collection frame 42 is opened, and a collection box is placed underneath it. In the second step, after the polyethylene gas pipeline is bent, the flexible collection frame 42 bends along with the protective cover 10, and then the sandblasting mechanism is controlled to spray sand and gravel through the sandblasting tube 41 to the parts that are bent and protruding outward, simulating the situation of being scratched by sand and gravel when encountering strong winds. The fallen sand and gravel are discharged into the collection box below through the flexible collection frame 42 for collection, and then tested to detect whether the performance of the polyethylene gas pipeline is affected by sand and gravel.

[0049] After the sandblasting test is completed, some sand and gravel will remain on the upper part of the polyethylene gas pipe, which will affect the movement of the polyethylene gas pipe through the rubber sealing ring 11. The sand and gravel will scratch the rubber sealing ring 11, causing the rubber sealing ring 11 to be damaged, affecting the sealing of the high-temperature gas; therefore, a number of high-temperature resistant bristles are fixed to the inner left and inner right parts of the protective cover 10 respectively. When the polyethylene gas pipe moves through the rubber sealing ring 11, the high-temperature resistant bristles will brush off the sand and gravel remaining on the upper part of the polyethylene gas pipe to avoid scratching the rubber sealing ring 11, causing the rubber sealing ring 11 to be damaged, affecting the sealing of the high-temperature gas.

[0050] After the extension end of cylinder Ⅰ 43 is retracted and reset, it no longer contacts the flexible collection frame 42. Due to the elasticity of the protective cover 10, the protective cover 10 is deformed and restored, so that the protective cover 10 is deformed back and forth and shakes, and the sand and gravel remaining in the fold of the protective cover 10 is shaken off, thereby avoiding damage to the protective cover 10.

[0051] The technical principles of the embodiments of the present invention have been described above in conjunction with specific embodiments. These descriptions are intended solely to explain the principles of the embodiments of the present invention and should not be construed in any way as limiting the scope of protection of the embodiments of the present invention. Based on the explanations herein, those skilled in the art will be able to conceive of other specific implementations of the embodiments of the present invention without inventive effort, and such implementations will fall within the scope of protection of the embodiments of the present invention.

Claims

1. A polyethylene gas pipeline detection device, comprising a base frame (1), a mounting plate (2) and a fixing plate (3); the base frame (1) is connected to two mounting plates (2); a fixing plate (3) is fixedly connected to the facing parts of the two mounting plates (2), and the two fixing plates (3) are each provided with a through hole; the device is characterized in that: It also includes an electric slide rail I (4), a rotating shaft (5), a power unit I, a receiving plate (8), a pressure plate (9) and a protective cover (10), wherein the protective cover (10) is made of a high temperature resistant material and is arranged as a telescopic structure; a rotating shaft (5) is fixedly connected to the middle of the base frame (1); the left mounting plate (2) is rotatably connected to the rotating shaft (5); an arc track is arranged on the left upper portion of the base frame (1), and the electric slide rail I (4) is slidably connected in the arc track; the rotating shaft (5) is located at the center of the arc track; the electric slide rail I (4) is fixedly connected to the left mounting plate (2); the right mounting plate (2) is connected to the power unit I; the power unit I is connected to the receiving plate (8), and the power unit I is used to drive the receiving plate (8) to move left and right; the pressure plate (9) is detachably connected to the receiving plate (8); a protective cover (10) is fixedly connected between the two mounting plates (2), and two air pipes are passed through the protective cover (10); The power unit I comprises an electric slide rail II (6) and an electric slider I (7); the electric slide rail II (6) is bolted to the right mounting plate (2); the electric slider I (7) is slidably connected to the electric slide rail II (6); the electric slider I (7) is fixedly connected to the receiving plate (8); The right end of the polyethylene gas pipeline is clamped by a pressing plate (9) covering the receiving plate (8); The electric slide rail II (6) is controlled to drive the electric slide block I (7), the receiving plate (8), the pressure plate (9) and the polyethylene gas pipeline to move to the left, so that the detected part of the polyethylene gas pipeline moves to the left of the left fixed plate (3).

2. A polyethylene gas pipeline detection device according to claim 1, characterized in that: The through holes of the two fixing plates (3) are both beveled on one side facing the receiving plate (8).

3. A polyethylene gas pipeline detection device according to claim 1, characterized in that: It also includes a rubber sealing ring (11); the two mounting plates (2) are each fixedly connected to a rubber sealing ring (11) at the facing parts; the rubber sealing ring (11) is in close contact with the outer wall of the polyethylene gas pipeline to prevent high-temperature gas from overflowing.

4. A polyethylene gas pipeline detection device according to claim 3, characterized in that: It also includes a power unit II, a connecting rod II (23) and a positioning ring (24); the power unit II is connected to the side of the right fixing plate (3) away from the protective cover (10); the power unit II is connected to a plurality of connecting rods II (23), and the power unit II is used to drive the connecting rods II (23) to move left and right; the ends of the two connecting rods II (23) are fixedly connected to the positioning ring (24).

5. A polyethylene gas pipeline detection device according to claim 4, characterized in that: The left portion of the aligning ring (24) is provided with an oblique angle.

6. A polyethylene gas pipeline detection device according to claim 4, characterized in that: It also includes a cooling ring (31), a water inlet pipe (32) and a water outlet pipe (33); the cooling ring (31) is fixedly connected to the inside of the right fixed plate (3); the upper part of the cooling ring (31) is connected to the water inlet pipe (32); the lower part of the cooling ring (31) is connected to the water outlet pipe (33); the water inlet pipe (32) and the water outlet pipe (33) both pass through the right fixed plate (3).

7. A polyethylene gas pipeline detection device according to claim 6, characterized in that: The fitting portion (3101) on the inner side of the cooling ring (31) is configured to be made of elastic material.

8. A polyethylene gas pipeline detection device according to claim 6, characterized in that: It also includes a sandblasting tube (41) and a flexible collection frame (42); a plurality of sandblasting tubes (41) penetrate the upper front side of the protective cover (10); and a flexible collection frame (42) is fixedly connected to the lower part of the protective cover (10).

9. A polyethylene gas pipeline detection device according to claim 8, characterized in that: A plurality of high temperature resistant bristles are fixedly connected to the inner left portion and the inner right portion of the protective cover (10) respectively.

10. A polyethylene gas pipeline detection device according to claim 9, characterized in that: It also includes a cylinder I (43); a cylinder I (43) is fixedly connected to the lower side of each of the two mounting plates (2); and the telescopic ends of the two cylinders I (43) are both located directly below the flexible collection frame (42).

Citation Information

Patent Citations

  • Device for measuring flexural rigidity and torsional rigidity of hose

    CN104101545A

  • Rubber hose component bending test device

    CN109540696A

  • Pipeline protection device capable of intelligently monitoring and preventing gas pipeline leakage

    CN115523422A

  • Equipment for testing bending performance of whole PVC (Polyvinyl Chloride) pipe

    CN116519494A

  • Bending resistance testing device for polyethylene corrugated pipe production

    CN117309570A