Paint configuration reliability confirmation method
By conducting paint reliability verification before ship construction, we solve the coating quality problems caused by the difference between the paint configuration in the laboratory and the actual environment, achieve the reliability confirmation of the paint configuration, avoid rework and waste of resources, and improve the efficiency of construction. quality.
Patent Information
- Application Number
- CN202410720100.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-05
- Publication Date
- 2024-10-01
AI Technical Summary
In the existing technology, the difference in paint configuration between the laboratory environment and the actual ship construction environment results in poor coating adhesion, resulting in substandard coating quality, waste of resources in rework, and impact on ship delivery.
By compiling a list of paint reliability verification items, including confirmation implementation plans for the pretreatment, spraying and brushing processes, conducting test panels, simulating the ship construction environment, evaluating the reliability of the paint configuration, and ensuring the applicability of the paint configuration in actual construction .
It effectively avoids rework and resource waste caused by unreasonable paint configuration, improves the quality of ship painting construction, and ensures the reliability of paint configuration and the traceability of construction.
Smart Images

Figure CN118731049A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ship and marine engineering construction, and in particular to a method for confirming the reliability of paint configuration. Background Art
[0002] At present, paint manufacturers determine the paint configuration used for ship painting work based on the regional division and paint type in the shipyard's paint order specification, and through laboratory tests, the shipyard paints the ship according to the paint configuration recommended by the paint manufacturer.
[0003] At present, the paint configuration confirmation method used in ship painting only conducts laboratory tests to test the compatibility and adhesion of paints. Since the laboratory environment is relatively ideal and quite different from the actual ship painting construction environment, when the paint configuration recommended by the paint manufacturer has a test environment that is different from the shipyard's construction environment, the coating adhesion problem is likely to occur after painting due to incompatible paint configuration, resulting in substandard coating quality. At the same time, due to the large construction area and tight construction period of ship painting, coating rework will not only waste a lot of materials and energy, but also a lot of labor and time, and in severe cases may even affect the normal delivery of ships.
[0004] Therefore, it is urgent to propose a paint configuration reliability confirmation method to ensure the reliability of paint configuration, avoid unqualified paint film quality control caused by configuration, and effectively improve the construction quality of ship painting. Summary of the invention
[0005] The purpose of the present invention is to address the deficiencies of the above-mentioned prior art and to provide a method for confirming the reliability of paint configuration, thereby achieving accurate evaluation of the reliability of paint configuration, solving the problem of inapplicable paint configuration caused by the difference between the laboratory environment and the shipyard construction environment, avoiding rework and waste of resources caused by unqualified paint film quality control, and providing a basis for improving the construction quality of ship painting.
[0006] To achieve the above object, the present invention adopts the following technical solution:
[0007] A method for confirming the reliability of paint configuration comprises the following steps:
[0008] Step 1: According to the ship coating construction process and the process required for the paint test panel test, a list of paint reliability verification items is compiled for the paint configuration and construction reliability verification process;
[0009] Step 2: Prepare the coating process confirmation criteria according to the contents and requirements of each guiding process in the paint configuration reliability verification process;
[0010] Step 3: Prepare a pretreatment process confirmation implementation plan based on the content and requirements of the pretreatment process;
[0011] Step 4, prepare the spray coating process confirmation implementation plan and the brush coating process confirmation implementation plan according to the content and requirements of the spray coating construction process and the brush coating construction process;
[0012] Step 5, according to the pretreatment process confirmation implementation plan, the spray coating process confirmation implementation plan and the brush coating process confirmation implementation plan, the test plate test data of the paint configuration to be confirmed is obtained by performing a test plate test on the paint configuration to be confirmed;
[0013] Step 6, based on the test data of the test panel of the paint configuration to be confirmed, combined with the evaluation standards in the pretreatment process confirmation implementation plan, the spray coating process confirmation implementation plan and the brush coating process confirmation implementation plan, the reliability of the paint configuration to be confirmed is evaluated.
[0014] Preferably, in step 1, the guiding processes involved in the paint configuration and construction reliability verification process include pretreatment construction, paint spraying construction, and paint brushing construction;
[0015] According to the guiding processes involved in the paint configuration and construction reliability verification process, a list of paint reliability verification items is compiled, including painting process confirmation criteria, pretreatment process confirmation implementation plan, spray painting process confirmation implementation plan, and brush painting process confirmation implementation plan.
[0016] Preferably, in step 2, the coating process confirmation criteria include confirmation of coating process tests, confirmation of coating processes, confirmation of qualifications of coating process operators, confirmation of equipment or instruments used in the coating process, and process confirmation approval.
[0017] Preferably, in step 3, the test plate specifications, process requirements, construction personnel requirements, equipment requirements, construction environment requirements, inspection items and assessment standards of the pretreatment process are clarified, and a pretreatment process confirmation implementation plan is prepared in combination with the test records and report requirements of the pretreatment test.
[0018] Preferably, in step 4, the test plate specifications, process requirements, construction personnel requirements, equipment requirements, construction environment requirements, inspection items and evaluation standards of the spraying construction process are clarified, and the spraying coating process confirmation implementation plan is prepared in combination with the test records and report requirements of the spraying construction process;
[0019] Clarify the test plate specifications, process requirements, construction personnel requirements, equipment requirements, construction environment requirements, inspection items and assessment standards of the brush painting construction process; formulate a confirmation implementation plan for the brush painting process in combination with the test records and report requirements of the brush painting construction process.
[0020] Preferably, in step 5, a test plate test is performed on the paint configuration to be confirmed, simulating the pretreatment process, spray coating process and brush coating process of the paint configuration to be confirmed on the ship, and obtaining the test plate test data of the paint configuration to be confirmed;
[0021] The test panel test includes a pretreatment test panel test, a spray coating test panel test and a brush coating test panel test, and correspondingly obtains pretreatment test panel test data, spray coating test panel test data and brush coating test panel test data of the paint configuration to be confirmed.
[0022] Preferably, in step 6, the reliability of the paint configuration to be confirmed is evaluated according to the test plate appearance inspection, paint curing state inspection, paint film thickness detection, tensile test detection and antifouling paint adhesion test detection. If the reliability evaluation result of the paint configuration to be confirmed is qualified, the paint configuration is applied to ship construction, otherwise, it is checked whether the test plate test operation complies with the regulations; if the test plate test operation complies with the regulations, the paint configuration is replaced and the reliability of the new paint configuration is re-evaluated, otherwise, the test plate test is re-performed.
[0023] Preferably, the test plate appearance inspection satisfies that the sample coating is uniform and free of coating defects, the paint curing state inspection satisfies that the paint reaches a predetermined curing state within a specified time, the paint film thickness detection satisfies that the dry film thickness at 85% of the measuring points is not less than a preset specified film thickness and the dry film thickness at the remaining measuring points is greater than 85% of the preset specified film thickness, the tensile test detection satisfies that the adhesion of the PSPC area is greater than 3.5 MPa and the adhesion of the remaining areas is not less than 3 MPa, and the antifouling paint adhesion test detection satisfies that the X-notch adhesion test result is not less than 3A level, then the reliability evaluation result of the paint configuration to be confirmed is qualified, otherwise, the reliability evaluation result of the paint configuration to be confirmed is unqualified.
[0024] Preferably, when the paint configuration to be confirmed is applied to the painting of dedicated seawater ballast tanks and fresh water tanks, the paint film thickness detection evaluation standard is to meet the requirement that the dry film thickness of 90% of the measuring points is not less than the preset prescribed film thickness and the dry film thickness of the remaining measuring points is greater than 90% of the preset prescribed film thickness.
[0025] Beneficial technical effects brought by the present invention:
[0026] (1) The present invention proposes a method for confirming the reliability of paint configuration, which solves the problem that the paint configuration is not applicable due to the difference between the laboratory environment and the shipyard construction environment, and effectively avoids rework and waste of resources caused by unqualified paint film quality control. At the same time, the method of the present invention can also discover in advance the environmental factors, construction methods and other influencing factors that may affect the coating quality during the actual ship construction process through the test plate test, which is conducive to guiding the actual ship construction and effectively improving the construction quality of paint coating.
[0027] (2) The method of the present invention realizes the test plate verification of the paint configuration and construction method before the actual construction of the ship, which has low implementation cost, short time consumption and simple operation.
[0028] (3) The test plate test records obtained by the method of the present invention can be retained for many years. When quality problems occur during construction and in the later stage of the paint surface, they can be checked and verified by retrieving the test plate test records, thereby ensuring the traceability of the paint configuration reliability confirmation method. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 Schematic diagram of the pre-treated test panel.
[0030] Figure 2 Schematic diagram of the test panel for the spraying construction process and the brushing construction process. DETAILED DESCRIPTION
[0031] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.
[0032] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0033] In the present invention, the directions or positional relationships indicated by terms such as "upper", "lower", "bottom", "top", etc. are based on the directions or positional relationships shown in the accompanying drawings. They are relational words determined only for the convenience of describing the structural relationships of the various parts or elements of the present invention. They do not specifically refer to any part or element in the present invention and cannot be understood as limitations on the present invention.
[0034] In the present invention, terms such as "connected" and "connection" should be understood in a broad sense, indicating that the connection can be fixed, integral or detachable; it can be directly connected or indirectly connected through an intermediate medium. Relevant scientific research or technical personnel in this field can determine the specific meaning of the above terms in the present invention according to specific circumstances, and they should not be understood as limiting the present invention.
[0035] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0036] This embodiment discloses a method for confirming the reliability of paint configuration, including the following steps:
[0037] Step 1. According to the ship painting construction process and the guiding process involved in the test plate test, determine the verification process of paint configuration reliability in pretreatment construction, paint spraying construction and paint brushing construction, and prepare a list of paint reliability verification items, including painting process confirmation criteria, pretreatment process confirmation implementation plan, spray painting process confirmation implementation plan, and brush painting process confirmation implementation plan.
[0038] Step 2: According to the contents and requirements of each guiding process in the paint configuration reliability verification process, the coating process confirmation criteria are compiled. The coating process confirmation criteria include confirmation of coating process test, confirmation of coating process, confirmation of coating process operator qualifications, confirmation of equipment or instruments used in the coating process, and process confirmation approval, which specifically include the following contents:
[0039] a. Coating process test confirmation;
[0040] Based on the test / assessment results of the pretreatment process, spray coating process and brush coating process, confirm whether the coating process test is qualified.
[0041] b. Confirmation of coating process;
[0042] Based on the test / assessment results of the pretreatment process, spray coating process and brush coating process, confirm the corresponding coating process and compile the coating process documents to guide the coating process.
[0043] c. Confirmation of qualifications of operators during the painting process;
[0044] Painting construction workers need to undergo training and pass the assessment before they can take up their posts. Painting construction workers are strictly prohibited from working beyond the prescribed scope of work. Painting construction workers must strictly carry out painting construction in accordance with the confirmed painting process and confirm their qualifications in accordance with regulations.
[0045] d. Confirmation of equipment or instruments used in the coating process;
[0046] Adjust the sprayers, air compressors and other equipment used for coating construction to the specified state, and issue an equipment integrity mark; steel plate thermometers, hand-cranked thermometers and hygrometers, dry film thickness gauges and other measuring equipment must be calibrated in accordance with regulations to meet measurement requirements.
[0047] e. Process confirmation and approval;
[0048] After completing the coating process test confirmation, coating process confirmation, coating process operator qualification confirmation and coating process equipment or instrument confirmation, it is confirmed that the test panel test can be carried out on the paint configuration to be confirmed.
[0049] Step 3: According to the content and requirements involved in the pretreatment process, clarify the test plate specifications, process requirements, construction personnel requirements, equipment requirements, construction environment requirements, inspection items and evaluation standards of the pretreatment process, and prepare the pretreatment process confirmation implementation plan in combination with the test records and report requirements of the pretreatment test, which specifically includes the following contents:
[0050] a. Clarify the test plate specifications for the pretreatment process;
[0051] The pretreatment test plate test is used to simulate the pretreatment process. The pretreatment test plate used in the pretreatment test plate test has a size of 12000×2000 mm and is made of Class A marine steel plate. Figure 1 shown.
[0052] b. Clarify the process requirements of the pretreatment process;
[0053] According to the shop primer brand actually used on ships, the construction film thickness of the shop primer is determined to be 15 to 21 μm, and the paint quota of the shop primer and thinner is set.
[0054] c. Clarify the requirements for construction personnel during the pretreatment process;
[0055] Construction workers in the pretreatment process need to undergo training and pass the assessment before they can take up their posts.
[0056] d. Clarify the equipment requirements during the pretreatment process, including construction equipment and measurement equipment;
[0057] The construction equipment such as sprayers used in the pretreatment process needs to be adjusted to the specified state and the equipment needs to be marked as intact. Measuring equipment such as steel plate thermometers, hand-cranked thermometers and hygrometers, and dry film thickness gauges need to be calibrated in accordance with regulations to meet measurement requirements. Before construction, a comprehensive inspection of the equipment used should be carried out. If there are any abnormalities, the equipment cannot be put into use. After construction, the equipment should be cleaned up in time. Airless spraying is prone to static electricity and needs to be properly grounded before painting. The dry film thickness gauge must be calibrated before use.
[0058] e. Clarify the construction environment requirements of the pretreatment process;
[0059] The pretreatment process should be carried out when the relative humidity does not exceed 85% and the construction surface temperature is at least 3°C higher than the dew point. Pretreatment is not allowed on a wet surface. The substrate temperature range of the pretreatment process is 10-60°C. During the pretreatment construction work and before the coating dries, the construction surface should be protected from contamination by surrounding dust or water droplets. There should be sufficient light during the pretreatment construction work. Lighting equipment should be equipped for indoor painting and night painting to provide sufficient light.
[0060] f. Clarify the inspection items and assessment standards;
[0061] During the pretreatment test, the appearance and inspection of the test plate shall be carried out in accordance with the "CB / T 3513 Technical Requirements for Acceptance of Ship Coating Quality". The coating of the test plate shall be uniform, without coating defects such as missing coating, pores, cracks, etc. The coating thickness test shall be carried out in accordance with the "GB / T6747 Marine Workshop Primer", and the average dry film thickness shall be within the specified range.
[0062] g. Test record and report requirements for pretreatment tests;
[0063] Record the relevant parameters and test results of the pretreatment test panel test process in the "Coating Process Confirmation Record Form".
[0064] Step 4: According to the contents and requirements of the spraying construction process and the brushing construction process, determine the test plate specifications, process requirements, construction personnel requirements, equipment requirements, construction environment requirements, inspection items and evaluation standards of the spraying construction process. Combined with the test records and report requirements of the spraying construction process, prepare the spraying coating process confirmation implementation plan and the brushing coating process confirmation implementation plan, which specifically include the following contents:
[0065] a. Clarify the test plate specifications for the spraying construction process and the brushing construction process;
[0066] The spray coating test panel test is used to simulate the spray coating construction process, and the brush coating test panel test is used to simulate the brush coating construction process. The test panel specifications used in the spray coating test panel test and the brush coating test panel test are 500×500mm, and the test panel material is Class A marine steel plate, such as Figure 2 shown.
[0067] b. Clarify the process requirements of spraying and brushing;
[0068] According to the paint configuration in different areas of the actual ship painting process, the requirements such as surface treatment level, paint brand, film thickness, etc. are clarified, and the paint quota of paint and thinner is determined.
[0069] c. Clarify the requirements for construction personnel during the spraying and brushing construction processes;
[0070] During the spraying construction process and the brushing construction process, construction personnel should clarify the process requirements of each process during the spraying construction process and the brushing construction process before construction. Construction personnel during the spraying construction process and the brushing construction process need to be trained and can only take up their posts after passing the assessment.
[0071] d. Specify the equipment requirements for the spraying and brushing construction processes, including construction equipment and measuring equipment;
[0072] The sprayers, air compressors and other construction equipment used in the spraying and brushing construction processes need to be adjusted to the specified state and issued with equipment integrity marks; steel plate thermometers, hand-cranked thermometers and hygrometers, dry film thickness gauges and other measuring equipment need to be calibrated in accordance with regulations to meet measurement requirements. Before construction, the equipment used should be fully inspected. If there are any abnormalities, the equipment cannot be put into use; clean the equipment in time after the construction is completed. Airless spraying is prone to static electricity, so it should be properly grounded before painting; the dry film thickness gauge must be calibrated before use.
[0073] e. Clarify the construction environment requirements for the spraying and brushing construction processes;
[0074] The spraying and brushing construction processes should be carried out in good weather conditions as much as possible. Outdoor painting operations cannot be carried out on rainy, snowy, or foggy days. The spraying / brushing construction process should be carried out when the relative humidity does not exceed 85% and the construction surface temperature is at least higher than 3°C. Painting operations are not allowed on any wet surface. The paint temperature used in the spray coating test panel test and the brush coating test panel test should comply with the provisions of the product manual; during spraying / brushing construction and before the coating dries, the construction surface should be prevented from being contaminated by surrounding dust or water droplets; during spraying / brushing construction, there should be sufficient light, and indoor painting and night painting should be equipped with sufficient lighting. Necessary ventilation measures should be taken during each stage of painting construction.
[0075] f. Clarify the inspection items and assessment standards;
[0076] The appearance inspection of the test plate in the coating test and brush coating test shall be carried out in accordance with the "CB / T 3513 Technical Requirements for Acceptance of Marine Coating Quality". The coating of the sample shall be uniform, without coating defects such as missing coating, pores, cracks, etc. The paint curing state inspection shall be carried out in accordance with the paint product manual. The paint at different temperatures shall reach the curing state specified in the product manual. The coating film thickness test shall be carried out in accordance with the "CB / T 3718 Ship Coating Film Thickness Test Requirements". The paint film thickness shall meet the process requirements. The dry film thickness at 85% of the measuring points shall not be less than the specified film thickness and the dry film thickness at the remaining measuring points shall be greater than 85% of the specified film thickness. However, the paint film inspection (90:10) for special seawater ballast tanks and fresh water tanks is carried out, that is, the dry film thickness at 90% of the measuring points shall not be less than the specified film thickness and the dry film thickness at the remaining measuring points shall be greater than 90% of the specified film thickness. The tensile test shall be carried out in accordance with the "GB / T 6822 Hull Antifouling and Antirust Paint System”, the adhesion requirement of PSPC in ballast water tank is greater than 3.5MPa, and the adhesion of other areas is required to be no less than 3Mpa without tensile test of antifouling paint; the adhesion test of antifouling paint shall be carried out in accordance with “ASTM 3359-09 Test Method Standard for Determination of Adhesion by Tape Test”, and the X-notch adhesion test result shall be no less than 3A grade.
[0077] g. Test record and report requirements;
[0078] Record the relevant parameters and test results during the spraying and brushing construction processes in the "Coating Process Confirmation Record Form".
[0079] Step 5, according to the pretreatment process confirmation implementation plan, the spray coating process confirmation implementation plan and the brush coating process confirmation implementation plan, by performing pretreatment test panel tests, spray coating test panel tests and brush coating test panel tests on the paint configuration to be confirmed, obtain the pretreatment test panel test data, spray coating test panel test data and brush coating test panel test data of the paint configuration to be confirmed.
[0080] In this embodiment, the qualifications of the construction personnel are confirmed according to the requirements in steps 2 to 4, and the "Process Operation Personnel Qualification Confirmation Form" shown in Table 1 is filled out.
[0081] Table 1 ____ Process operator qualification confirmation table
[0082] Work No. Name Job Category Working scope Qualification Certificate Number Issuing unit Validity period of certificate Current position years
[0083] Confirm the equipment status of the construction personnel according to the requirements in steps 2 to 4, and fill in the "Process Equipment Approval Record Form" as shown in Table 2.
[0084] Table 2 ____ Process Equipment Approval Record
[0085]
[0086] After the construction personnel and equipment conditions are confirmed to be correct, the paint configuration to be confirmed shall be subjected to pretreatment test panel test, spray coating test panel test and brush coating test panel test, and the test results of the pretreatment test panel test, spray coating test panel test and brush coating test panel test shall be recorded in the "Coating Process Confirmation Record Sheet" as shown in Table 3.
[0087] Table 3 Coating process confirmation record
[0088]
[0089] Step 6, based on the test data of the test panel of the paint configuration to be confirmed, combined with the evaluation standards in the pretreatment process confirmation implementation plan, the spray coating process confirmation implementation plan and the brush coating process confirmation implementation plan, the reliability of the paint configuration to be confirmed is evaluated.
[0090] In this embodiment, after the test results are recorded, fill in the "Process Confirmation and Approval Form" as shown in Table 4 to confirm the test results, coating process, construction personnel qualifications, equipment conditions, etc.
[0091] Table 4 Process Confirmation Approval Form
[0092]
[0093] In this embodiment, the reliability of the paint configuration to be confirmed is evaluated according to the test plate appearance inspection, paint curing state inspection, paint film thickness detection, tensile test detection and antifouling paint adhesion test detection. The evaluation criteria are shown in Table 3. If the reliability evaluation result of the paint configuration to be confirmed is qualified, the paint configuration is applied to ship construction. Otherwise, it is necessary to first check whether the test plate test operation complies with the regulations; if the test plate test operation complies with the regulations, the paint manufacturer should be contacted to replace the paint configuration and re-evaluate the reliability of the new paint configuration. Otherwise, the test plate test is re-performed.
[0094] It can be seen that the method of the present invention prepares a list of paint reliability verification items before the test plate test, clarifies the process documents required for the test plate test, and prepares the coating process confirmation criteria in conjunction with the process steps of the coating process. Then, according to the paint configuration and product instructions recommended by the paint manufacturer, a pretreatment process confirmation implementation plan, a spray coating process confirmation implementation plan and a brush coating process confirmation implementation plan are prepared to guide the test plate test of the paint configuration to be evaluated. Before the actual ship construction, the test plate test is used to simulate the pretreatment process, the spray construction process and the brush construction process to verify the feasibility of the paint configuration construction on the test plate. After the construction is completed, the appearance, curing state, tension, adhesion, etc. of the paint film are tested to verify the reliability of the paint configuration, thereby achieving an accurate evaluation of the reliability of the paint configuration, avoiding rework and waste of ship construction caused by unreasonable paint configuration, and facilitating the quality control of the paint film.
[0095] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not a limitation of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the protection scope of the present invention.
Claims
1. A method for confirming the reliability of paint configuration, characterized in that: The following steps are involved: Step 1: According to the ship coating construction process and the process required for the paint test panel test, a list of paint reliability verification items is compiled for the paint configuration and construction reliability verification process; Step 2: Prepare the coating process confirmation criteria according to the contents and requirements of each guiding process in the paint configuration reliability verification process; Step 3: Prepare a pretreatment process confirmation implementation plan based on the content and requirements of the pretreatment process; Step 4, prepare the spray coating process confirmation implementation plan and the brush coating process confirmation implementation plan according to the content and requirements of the spray coating construction process and the brush coating construction process; Step 5, according to the pretreatment process confirmation implementation plan, the spray coating process confirmation implementation plan and the brush coating process confirmation implementation plan, the test plate test data of the paint configuration to be confirmed is obtained by performing a test plate test on the paint configuration to be confirmed; Step 6, based on the test data of the test panel of the paint configuration to be confirmed, combined with the evaluation standards in the pretreatment process confirmation implementation plan, the spray coating process confirmation implementation plan and the brush coating process confirmation implementation plan, the reliability of the paint configuration to be confirmed is evaluated.
2. The method for confirming the reliability of paint configuration according to claim 1, characterized in that: In the step 1, the guiding processes involved in the paint configuration and construction reliability verification process include pretreatment construction, paint spraying construction, and paint brushing construction; According to the guiding processes involved in the paint configuration and construction reliability verification process, a list of paint reliability verification items is compiled, including painting process confirmation criteria, pretreatment process confirmation implementation plan, spray painting process confirmation implementation plan, and brush painting process confirmation implementation plan.
3. The paint configuration reliability confirmation method according to claim 1, characterized in that: In step 2, the coating process confirmation criteria include confirmation of coating process tests, confirmation of coating processes, confirmation of qualifications of coating process operators, confirmation of equipment or instruments used in the coating process, and process confirmation approval.
4. The paint configuration reliability confirmation method according to claim 1, characterized in that: In step 3, the test plate specifications, process requirements, construction personnel requirements, equipment requirements, construction environment requirements, inspection items and assessment standards of the pretreatment process are clarified, and the pretreatment process confirmation implementation plan is prepared in combination with the test records and report requirements of the pretreatment test.
5. The method for confirming the reliability of paint configuration according to claim 1, characterized in that: In step 4, the test plate specifications, process requirements, construction personnel requirements, equipment requirements, construction environment requirements, inspection items and evaluation standards of the spraying construction process are clarified, and the spraying coating process confirmation implementation plan is prepared in combination with the test records and report requirements of the spraying construction process; Clarify the test plate specifications, process requirements, construction personnel requirements, equipment requirements, construction environment requirements, inspection items and assessment standards of the brush painting construction process; formulate a confirmation implementation plan for the brush painting process in combination with the test records and report requirements of the brush painting construction process.
6. The method for confirming the reliability of paint configuration according to claim 1, characterized in that: In the step 5, a test plate test is performed on the paint configuration to be confirmed, simulating the pretreatment process, spray coating process and brush coating process of the paint configuration to be confirmed on the ship, and obtaining the test plate test data of the paint configuration to be confirmed; The test panel test includes a pretreatment test panel test, a spray coating test panel test and a brush coating test panel test, and correspondingly obtains pretreatment test panel test data, spray coating test panel test data and brush coating test panel test data of the paint configuration to be confirmed.
7. The method for confirming the reliability of paint configuration according to claim 1, characterized in that: In the step 6, the reliability of the paint configuration to be confirmed is evaluated according to the test plate appearance inspection, paint curing state inspection, paint film thickness detection, tensile test detection and antifouling paint adhesion test detection. If the reliability evaluation result of the paint configuration to be confirmed is qualified, the paint configuration is applied to ship construction, otherwise, it is checked whether the test plate test operation complies with the regulations; if the test plate test operation complies with the regulations, the paint configuration is replaced and the reliability of the new paint configuration is re-evaluated, otherwise, the test plate test is re-performed.
8. The method for confirming the reliability of paint configuration according to claim 7, characterized in that: If the test panel appearance inspection satisfies that the sample coating is uniform and has no coating defects, the paint curing state inspection satisfies that the paint reaches a predetermined curing state within a specified time, the paint film thickness detection satisfies that the dry film thickness at 85% of the measuring points is not less than the preset specified film thickness and the dry film thickness at the remaining measuring points is greater than 85% of the preset specified film thickness, the tensile test detection satisfies that the adhesion of the PSPC area is greater than 3.5MPa and the adhesion of the remaining areas is not less than 3MPa, and the anti-fouling paint adhesion test detection satisfies that the X-notch adhesion test result is not less than 3A level, then the reliability evaluation result of the paint configuration to be confirmed is qualified, otherwise, the reliability evaluation result of the paint configuration to be confirmed is unqualified.
9. The method for confirming the reliability of paint configuration according to claim 8, characterized in that: When the paint configuration to be confirmed is applied to the painting of special seawater ballast tanks and fresh water tanks, the paint film thickness detection evaluation standard is to meet the dry film thickness of 90% of the measuring points is not less than the preset specified film thickness and the dry film thickness of the remaining measuring points is greater than 90% of the preset specified film thickness.