A catastrophic fault testing method and related device for distribution automation system

By building a catastrophic topology model of the distribution network and simulating the fault scenarios, evaluating the catastrophic fault handling capabilities of the distribution automation system, the problem of lag in the distribution network fault handling in extreme disaster situations is solved, and the rapid recovery of power supply is achieved and the power supply is improved. Reliability and user satisfaction.

CN118731591BActive Publication Date: 2024-12-03POWER RES INST OF STATE GRID SHAANXI ELECTRIC POWER CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411219878.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-12-03
Estimated Expiration
2044-09-02

AI Technical Summary

Technical Problem

In extreme natural disasters, catastrophic failures of the distribution network cannot be previewed in advance, resulting in the failure being unable to be dealt with in time when the failure occurs, and the power supply time is long, which affects the order of social production and living.

Method used

The catastrophic topology model of the distribution network based on variable structure dissipation network theory is used to construct a hierarchical structure, set up the fault scenario and test the distribution automation main station through secondary signal injection, evaluate its catastrophic fault handling capabilities, and generate the expected operation sequence to Quickly handle faults.

Benefits of technology

It improves the rapid processing capacity of the distribution network when catastrophic failure occurs, reduces power outage time, improves power supply reliability and user power satisfaction, and reduces economic losses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118731591B_ABST
    Figure CN118731591B_ABST
Patent Text Reader

Abstract

The present application relates to a fault testing method. Aiming at the technical problems that catastrophic faults cannot be rehearsed in advance, cannot be handled in time when they occur, and the power supply restoration time is long, a catastrophic fault testing method and related devices for a distribution automation system are provided. A hierarchical distribution network catastrophic topology model is constructed, and then a fault is set on the bus or at the upper end of the bus in the distribution network catastrophic topology model. Then, a fault scenario is generated in real time at the lower end of the bus in the distribution network catastrophic topology model. A signal triggering mechanism of the fault occurrence scenario is simulated and transmitted to the tested distribution automation master station through a secondary signal injection method. The specific operation given by the tested distribution automation master station at the time of the simulated catastrophic fault is observed to determine whether the tested distribution automation master station has the catastrophic fault handling function of the distribution automation system, and can quickly handle the fault at the time of the fault and speed up the power supply restoration.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to a fault testing method, and specifically to a catastrophic fault testing method and related devices for a distribution automation system. Background Art

[0002] With the frequent occurrence of extreme natural disasters (such as ice and fire, snow and fire, earthquakes, etc.), external force damage causing the collapse of transmission line towers or transmission line fault maintenance, the possibility of large-scale power outages in the distribution network environment has further increased, and sometimes it will cause one or more 10kV busbars to lose pressure and other large-scale faults. When a small disturbance such as a feeder failure occurs in the distribution network, it can be handled by using conventional distribution network fault isolation and power supply restoration functions. However, in extreme cases, the pressure-losing busbar cannot be restored in time, causing a catastrophic failure of the distribution network to cause a large-scale and long-term power outage. Once this catastrophic failure occurs, it has a wide impact and is extremely harmful.

[0003] At present, catastrophic failures mainly rely on manual fault analysis in advance and the preparation of fault plans. However, there is a lack of analysis of the specific load conditions of the distribution network at the time of catastrophic failures, especially with the continuous growth of distribution network loads and the increasing number of new energy equipment in recent years, the situation has become more complicated. At the same time, since catastrophic failures are sudden failures and cannot be rehearsed in advance, they often cannot be handled in time when they occur, and the power supply restoration time is long, affecting social production and living order. Summary of the invention

[0004] The present application aims to solve the technical problems that catastrophic failures cannot be rehearsed in advance, cannot be handled in time when they occur, and take a long time to restore power supply, and provides a catastrophic failure testing method and related devices for a distribution automation system.

[0005] In order to achieve the above objectives, this application adopts the following technical solutions:

[0006] In a first aspect, the present application proposes a catastrophic fault testing method for a distribution automation system, comprising:

[0007] Based on the theory of variable structure dissipative network, a hierarchical distribution network catastrophic topology model is constructed; the distribution network catastrophic topology model includes a distribution network equipment model and a distribution network busbar topology model;

[0008] Setting a fault on a bus or on an upper end of the bus in the catastrophic topology model of the distribution network;

[0009] According to the set fault, a fault scenario is generated in real time at the lower end of the busbar in the catastrophic topology model of the distribution network;

[0010] The generated fault scenario is transmitted to the tested distribution automation master station by means of secondary signal injection;

[0011] Collect the operations performed by the tested distribution automation master station to handle the fault scenario and record them as reaction operations;

[0012] The reaction operation is compared with the expected operation to determine whether the tested distribution automation master station has the ability to handle catastrophic faults of the distribution automation system.

[0013] Furthermore, the distribution network busbar topology model adopts a hierarchical structure, the root node is the substation busbar, and the child nodes include feeder switches and distribution transformer loads.

[0014] Furthermore, the distribution network bus topology model is:

[0015]

[0016] in, Representation Node The type is an integer ranging from 0 to 5. , Indicates the total number of nodes; Representation Node For busbar nodes, represents a constant; for the source point in the child node, Indicates the bus number connected to the source point, and the remaining represents a constant; for the remaining child nodes, Indicates the sequence number of the node adjacent to this node.

[0017] Further, setting a fault on a bus or at an upper end of the bus in the catastrophic topology model of the distribution network includes: causing the voltage of any bus and the current of all power supply points connected to the bus to drop from an operating value to 0±preset deviation;

[0018] Alternatively, the voltage of any bus is reduced from the operating value to 0±preset deviation, and the current of a preset number of power points connected to the bus or the voltage and current of the first-stage switch on the corresponding feeder are reduced from the operating value to 0±preset deviation.

[0019] Furthermore, the real-time corresponding generation of fault scenarios includes:

[0020] The electrical quantity changes of the switch voltage, current, protection signal and trip information corresponding to the lines and transformers in the catastrophic topology model of the distribution network, as well as the reduction of all switch voltage and current values ​​in the bus power supply area.

[0021] Furthermore, the method for obtaining the expected operation includes:

[0022] It is obtained by integrating the direct load transfer strategy, the indirect load transfer strategy to maximize the power supply capacity of the distribution network, and the load transfer strategy after removing the necessary load.

[0023] Furthermore, the method for obtaining the expected operation includes:

[0024] The set of disconnecting switches is taken as candidate solutions, and virtual disconnecting nodes are defined at the terminal nodes and next to the power nodes of the catastrophic topology model of the distribution network. The location of each disconnecting switch is moved upstream or downstream as a neighborhood search strategy.

[0025] Taking the position of the disconnect switch as the taboo object, and taking the least switch operation and the most load power supply as the goal, and taking the electrical limit, voltage qualified range and network topology requirements as constraints, an operation sequence combination consisting of a fault isolation operation sequence, a load direct transfer operation sequence, an indirect load transfer operation sequence and a load transfer operation sequence after load shedding is obtained as the expected operation.

[0026] In a second aspect, the present application proposes a catastrophic fault testing system for a distribution automation system, comprising:

[0027] A model module is used to construct a hierarchical distribution network catastrophic topology model based on variable structure dissipative network theory; the distribution network catastrophic topology model includes a distribution network equipment model and a distribution network busbar topology model;

[0028] A fault setting module, used for setting a fault on a bus or on an upper end of the bus in the catastrophic topology model of the distribution network;

[0029] A scenario generation module, used to generate a fault scenario in real time at the lower end of the bus in the catastrophic topology model of the distribution network according to the set fault;

[0030] The input module is used to input the generated fault scenario into the tested distribution automation master station by means of secondary signal injection;

[0031] A collection module is used to collect the operations performed by the tested distribution automation master station in handling fault scenarios and record them as response operations;

[0032] The judgment module is used to compare the reaction operation with the expected operation to judge whether the tested distribution automation master station has the ability to handle catastrophic faults of the distribution automation system.

[0033] In a third aspect, the present application provides an electronic device, comprising:

[0034] Memory for storing computer programs;

[0035] A processor is used to implement the steps of the above-mentioned distribution automation system catastrophic failure testing method when executing the computer program.

[0036] In a fourth aspect, the present application proposes a computer-readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned distribution automation system catastrophic failure testing method are implemented.

[0037] Compared with the prior art, this application has the following beneficial effects:

[0038] The present application proposes a method for testing catastrophic faults in a distribution automation system, which constructs a hierarchical distribution network catastrophic topology model, then sets a fault on the bus or at the upper end of the bus in the distribution network catastrophic topology model, and then generates a fault scenario in real time at the lower end of the bus in the distribution network catastrophic topology model, simulating the signal triggering mechanism of the fault scenario, and transmitting the signal to the tested distribution automation master station through secondary signal injection, observing the specific operation given by the tested distribution automation master station at the time of the simulated catastrophic fault, and judging whether the tested distribution automation master station has the catastrophic fault handling function of the distribution automation system. The test method of the present application is helpful to evaluate the rationality of the distribution network structure, and can test various forms of catastrophic faults with high flexibility. It can quickly handle the fault at the time of the fault, speed up the power supply restoration, and thus improve the power supply reliability, improve the power supply quality and user satisfaction with electricity, and effectively reduce the economic losses caused by power outages.

[0039] The present application also proposes a distribution automation system catastrophic fault testing system, electronic equipment and computer storage medium, which have all the advantages of the above-mentioned distribution automation system catastrophic fault testing method. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0041] Figure 1 As shown, it is a first flow chart of a method for testing catastrophic failures of a distribution automation system according to the present application;

[0042] Figure 2 This is a schematic diagram of the expected operation process for catastrophic failures in an embodiment of the present application;

[0043] Figure 3 This is a schematic diagram of the actual operation mode of the east city distribution network flow diagram in the embodiment of this application;

[0044] Figure 4A schematic diagram of a catastrophic topology model of a distribution network constructed in Example 1 of the present application;

[0045] Figure 5 This is a schematic diagram of the fault scenario formed in Example 1 of this application;

[0046] Figure 6 This is a schematic diagram of the operation mode of substation A after voltage loss recovery in Example 1 of this application;

[0047] Figure 7 This is a schematic diagram of the fault scenario formed in Example 2 of this application;

[0048] Figure 8 This is a schematic diagram of the operation mode of substation A after voltage loss recovery in Example 2 of this application;

[0049] Fig. 9 A schematic diagram of a catastrophic fault testing system for a distribution automation system according to the present application. DETAILED DESCRIPTION

[0050] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.

[0051] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0052] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0053] In the description of the embodiments of the present application, it should be noted that if the terms "upper", "lower", "horizontal", "inner", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the invented product is usually placed when used. It is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0054] In addition, if the term "horizontal" appears, it does not mean that the component must be absolutely horizontal, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", which does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0055] In the description of the embodiments of the present application, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0056] Catastrophic failures usually refer to sudden and huge serious failures that may cause the system, equipment or business to be completely paralyzed, and may cause a large-scale and long-term power outage in the distribution network. There are many reasons for this catastrophic failure, such as natural disasters and equipment failures. By conducting manual fault analysis in advance and writing detailed fault plans, the impact of catastrophic failures on systems, equipment or businesses can be effectively reduced. However, with the increase in load and the continuous increase in new energy equipment, the situation of the distribution network has become more and more complicated. In addition, catastrophic failures are often sudden failures. If they cannot be rehearsed in advance, it will be difficult to handle the failures accurately and in a timely manner, which will affect the restoration of power supply.

[0057] Based on the above situation, the present application proposes a catastrophic fault testing method and related devices for a distribution automation system. The present application is described in detail below in conjunction with embodiments and drawings.

[0058] like Figure 1 As shown, it is a first flow chart of a catastrophic fault testing method for a distribution automation system of the present application, which may include:

[0059] S101, based on the variable structure dissipative network theory, construct a hierarchical distribution network catastrophic topology model; the distribution network catastrophic topology model includes a distribution network equipment model and a distribution network bus topology model.

[0060] It should be noted that the variable structure dissipative network theory is a theoretical framework for describing and analyzing the dynamic behavior of distribution networks. The distribution network is regarded as a system with variable structure and dissipative characteristics. By considering the topological changes, energy flow and dissipation process of the network, the stability, optimal operation and fault handling of the distribution network can be studied. Among them, variable structure means that during the operation of the distribution network, the topological structure may change due to switch operations, equipment failures and other reasons. Dissipative characteristics refer to the phenomenon that the internal energy of the system gradually decreases in the process of exchanging matter and energy with the external environment. In the distribution network, energy flows from the power supply to the load and generates losses through components such as resistors and inductors, forming a dissipative process. In addition, the use of a hierarchical structure can construct the model structure more accurately and clearly, which is convenient for subsequent model applications.

[0061] In practical applications, the catastrophic topology model of the distribution network includes the distribution network equipment model and the distribution network busbar topology model. Among them, the distribution network equipment model mainly describes the physical and electrical characteristics of various equipment in the distribution network, such as the switch model that describes the parameters such as the opening and closing state, operation time, and failure probability of the switch; the transformer model that describes the characteristics such as the transformer ratio, loss, and capacity; the line model that describes the impedance, admittance, length, and other parameters of the line. The equipment model usually describes the electrical behavior of the equipment through detailed parameter settings and physical equations, so as to accurately reflect the actual working conditions of the equipment in simulation and analysis. The distribution network busbar topology model focuses on describing the connection relationship between the buses in the distribution network.

[0062] The distribution network equipment model and the distribution network bus topology model support and complement each other to form a catastrophic topology model of the distribution network, which can simulate and analyze the behavior of the distribution network under catastrophic conditions and provide strong support for the safe operation and fault recovery of the distribution network.

[0063] S102, setting a fault on a bus or at an upper end of the bus in the catastrophic topology model of the distribution network.

[0064] Setting a fault on the bus or at the upper end of the bus will directly affect all equipment and feeders connected to the bus, potentially causing a large-scale power outage.

[0065] S103, according to the set fault, generating a fault scenario in real time at the lower end of the bus in the catastrophic topology model of the distribution network.

[0066] In practical applications, after setting the fault, the tested distribution automation master station can be isolated from the distribution network system, and then the fault scenario can be generated in real time at the lower end of the busbar in the catastrophic topology model of the distribution network. In practical applications, the fault scenario can include network status information before and after the fault occurs, such as switch status, voltage and current data, load changes, etc. In practical applications, the current status of each node and edge can also be shown in a visual way in the catastrophic topology model of the distribution network.

[0067] S104, transmitting the generated fault scenario to the tested distribution automation master station by means of secondary signal injection.

[0068] It should be noted that the information in the fault scenario can be converted into secondary signals, electrical quantities (such as voltage, current, etc.) can be converted into analog signals, and switch status, fault information, etc. can be converted into digital signals. The signals are encoded and packaged according to the communication protocol and data format requirements of the tested distribution automation master station.

[0069] S105, collecting operations performed by the tested distribution automation master station in processing the fault scenario and recording them as reaction operations.

[0070] In actual applications, the tested distribution automation master station receives and analyzes the injected secondary signal, extracts the fault information and network status information, and starts the fault identification algorithm based on the received information to determine the fault type and location. According to the fault situation, the tested distribution automation master station triggers the corresponding protection and control strategies, such as isolating the fault area, adjusting load distribution, and restoring power supply.

[0071] S106, comparing the reaction operation with the expected operation, and determining whether the tested distribution automation master station has the ability to handle catastrophic faults of the distribution automation system.

[0072] This application constructs a catastrophic topology model of the distribution network, simulates the fault scenario at the time of a catastrophic accident, transmits it to the tested distribution automation master station through secondary signal injection, observes the specific operations given by the tested distribution automation master station at the time of the simulated catastrophic accident, and determines whether the tested distribution automation master station has the ability to handle catastrophic faults of the distribution automation system. This is helpful to evaluate the rationality of the distribution network structure, facilitate rapid fault handling at the time of the fault, speed up the recovery of power supply, and improve power supply reliability.

[0073] Another specific embodiment of a catastrophic fault testing method for a distribution automation system of the present application is as follows, which may include:

[0074] S201, based on the variable structure dissipative network theory, using the hierarchical structure, construct a catastrophic topology model of the distribution network, wherein the catastrophic topology model of the distribution network includes a distribution network equipment model and a distribution network busbar topology model.

[0075] For the catastrophic topology model of the distribution network, based on the original variable structure dissipative network theory, the distribution network bus topology model is introduced, and the root node is changed from the substation outlet circuit breaker to the substation bus. The hierarchical structure is used to simulate the actual operation of the substation bus, distribution lines, outgoing line switches, feeder switches, distribution transformer loads and other equipment in real time. A distribution network bus topology model is established with the bus as the root node, feeder switches and distribution transformer loads as child nodes, and hierarchical level by level. The catastrophic topology model of the distribution network can simulate the situation where the main transformer exits operation due to faults or non-faults, resulting in bus voltage loss. In practical applications, a distribution network bus topology model can be established based on the data structure of the adjacency table to define The adjacency table DT in rows 5 and columns reflects the grid structure of the distribution network busbar topology model, namely:

[0076]

[0077] in, Representation Node The type is an integer ranging from 0 to 5. , Indicates the total number of nodes; Representation Node For busbar nodes, represents a constant; for the source point in the child node, Indicates the bus number connected to the source point, and the remaining represents a constant; for the remaining child nodes, Indicates the sequence number of the node adjacent to this node.

[0078] It should be noted that for , when the value is 0, it means the node The type is a normal node. When the value is 1, it indicates a node The type is a T-connected node. When the value is 2, it means the node The type is a source node. When the value is 3, it indicates a node The type is the terminal node. When the value is 4, it means the node The type is the main variable node. When the value is 5, it means the node The type is busbar node.

[0079] When the value is 1, it means the node The closed and open states are locked and cannot be changed. When the value is 2, it means the node Perform load shedding operation.

[0080] For busbar nodes, The elements in are meaningless and can be filled with -1; for the source point in the child node, The bus number connected to the source point is fixed in the field; for other nodes, Describes the serial number of the nodes adjacent to each node, for example, the node Respectively and nodes , , Adjacent, then , , In addition, in the adjacency table DT, the idle elements can be filled with -1.

[0081] S202, simulating a fault scenario at the time of a catastrophic accident, and transmitting the fault scenario to the tested distribution automation master station through a secondary signal injection method.

[0082] In practical applications, the present application can simulate many fault scenarios. For example, it can simulate that when the main transformer of the 10kV upper-level substation fails, the voltage of the 10kV busbar of the substation drops sharply, and the voltage and current values ​​of the 10kV outgoing line and the switch equipment on the line in the bus power supply area decrease accordingly. It can also simulate a series of actions such as protection signals and tripping of the 10kV busbar, 10kV outgoing line and switch equipment on the line of the substation when the main transformer of the 10kV upper-level substation fails. In short, the present application can simulate a series of changes in electrical quantities such as specific switch voltage, current, protection signals, tripping information, etc. when the line and distribution transformer fail at the time of the fault. After the busbar fails, when the busbar voltage of the substation drops sharply, the scenario of the voltage and current values ​​of all outgoing switches in the bus power supply area are simulated to decrease. In addition, all outgoing switch nodes in the bus power supply area can also be configured with undervoltage protection to simulate the scenario of the outgoing switch tripping after the fault occurs.

[0083] In practical applications, when injecting secondary signals, a large number of secondary signals can be simulated and injected simultaneously for testing, as long as the secondary signals do not interfere with each other.

[0084] The normal time of the fault is not set. The sampling information of each node in the catastrophic topology model of the distribution network is normal, the current and voltage show the normal operating values, and the fault signal defaults to 0. The "three remote" information of each node can be defined, including sampling point information (such as phase current, voltage, active power, reactive power, etc.), switch status and protection information. When a catastrophic fault occurs, the fault signal of the connection point (switch) around the node with the nature of the busbar changes to 1. At the same time, the current and voltage of the switch sampling point information drop from the normal operating value to approximately 0, simulating the occurrence of a fault scenario. At the same time, the switch state changes from closed to open, simulating the tripping scenario after the accident.

[0085] When simulating a fault scenario, you can implement it in the following way:

[0086] There are many criteria for judging busbar pressure loss, such as:

[0087] (1) Within the agreed data collection time (e.g. 5 to 10 seconds), if the voltage of a bus and the current of all power points connected to the bus drop from the normal operating value to approximately 0, it can be determined that the bus is de-voltaged.

[0088] (2) Considering the influence of data acquisition devices or transformers, it is possible that the current of individual power points is not zero when the bus loses voltage. Therefore, the judgment condition of bus loss voltage can be modified as follows: if the voltage of a bus drops from the normal operating value to approximately 0, and the currents of the n power points connected to the bus or the voltage and current of the first-stage switch on the corresponding feeder drop from the normal operating value to approximately 0, then the bus can be judged to have lost voltage. In practical applications, n can generally be 2 to 5.

[0089] S203, collecting specific operations performed by the tested distribution automation master station at the time of the simulated catastrophic accident.

[0090] S204, determining whether the tested distribution automation master station has a catastrophic fault handling function for the distribution automation system.

[0091] In practical applications, when making judgments, expected operations can be pre-set, and expected operations can be divided into isolation and recovery as a whole. After a catastrophic fault occurs, the pressure-depleted bus area is isolated through the switch opening and closing operations, and the load in the recovery area can be subsequently transferred to the opposite bus. At the same time, considering the bus load capacity, load shedding operations can be performed when necessary. When performing recovery operations, catastrophic accident recovery can simulate the situation where the main transformer exits operation due to faults or non-faults, resulting in bus pressure loss, and transfer the load exceeding the rated capacity to other buses. The action strategy given by the tested distribution automation master station should also take into account the importance of the load, the large-scale load transfer control algorithm of the number of switch operations, and the corresponding functions that should be implemented. Specifically, it can include the generation of direct load transfer strategies, the generation of indirect load transfer strategies to maximize the power supply capacity of the distribution network through load balancing, and the generation of load transfer strategies after the necessary load is removed. The three strategies are combined to obtain the expected operation.

[0092] like Figure 2 As shown in the figure, it is a schematic diagram of the expected operation process flow of catastrophic faults. In practical applications, catastrophic fault recovery processing realizes the safe operation step sorting algorithm and the functions realized for large-scale load transfer. The power supply of loads with large power outage losses can be restored first, and the principle of not generating closed loops and overloads can be followed to exclude repeated operations. After proper pairing and sorting, the principle of sorting in the power outage area first and then the energized area is followed. In the case where there are multiple switches to be disconnected in the power outage area (or energized area), they are sorted in order from small to large according to the power outage loss of the load being removed. Finally, the switch operation sequence table in the power supply restoration process when the disaster occurs and the process of returning to normal after the fault is repaired is obtained.

[0093] The specific implementation method can adopt the catastrophic failure strategy algorithm, and realize the distribution network reconstruction with the goal of minimizing load shedding under emergency conditions based on the taboo search algorithm: take the set of disconnect switches as candidate solutions, and define virtual disconnect nodes at the terminal points and next to the power supply points, and move the positions of each disconnect switch upstream or downstream as the neighborhood search strategy, take the position of the disconnect switch as the taboo object, and operate the switch as little as possible to meet the power supply of as many loads as possible as the network reconstruction goal, and use electrical limits, voltage qualified ranges, and network topology requirements as constraints. This method can achieve the maximum restoration of power supply to the affected healthy area with fewer switch operations.

[0094] The final load batch transfer operation sequence can be generated in the order of fault isolation operation sequence, direct load transfer operation sequence, indirect load transfer operation sequence and load transfer operation sequence after load shedding. First, the repeated operations (i.e., the closing and opening operations of the same switch appear in pairs) can be deleted, and then a safe (non-overload) transition step can be formed. The source point that is already in the open state can be deleted in the fault isolation operation sequence, and the direct load transfer operation sequence does not need to be processed. For the indirect load transfer operation sequence, the switches to be operated can be paired, and the principle of opening before closing can be followed: first disconnect any switch to be disconnected, and then find a switch paired with it among all the switches to be closed in the connected system. This switch should meet the requirements of not forming a closed loop after closing and not causing any source point or transformer node to be overloaded. If the non-powered line connected to the disconnected switch can be energized after closing, it can also be given priority. Repeating this process can find all the switches to be closed corresponding to the switches to be disconnected, and the adjusted operation sequence is also generated. At this time, the remaining switch to be closed is the last switch to be operated in the connected system.

[0095] In actual applications, all outgoing switches and feeder primary switch nodes in the busbar power supply area can be flexibly set to perform remote control operations to meet the fault isolation and fault recovery operations under the distribution automation master station processing strategy under the on-site test. The above expected operations mainly improve the data reception and optimization mechanism of the fault isolation strategy, the non-sound area isolation strategy, and the sound area recovery strategy, and can realize the optimized execution strategy of the switch remote control command.

[0096] Two examples of a catastrophic fault testing method for a distribution automation system of the present application are shown below:

[0097] against Figure 3 , Figure 5-Figure 8 , A, B, C, D, and E represent five substations respectively. The corresponding I and II lines represent the busbar I and busbar II of the corresponding substations. The rectangular boxes in the figure all represent switches. The hollow rectangular box indicates that the switch is in the closed state, and the rectangular box with a hatched line indicates that the switch is in the open state. The rectangular boxes with vertical lines on both sides represent tie switches. For tie switches, the hollow one indicates that it is in the closed state, and the hatched one indicates that it is in the open state. The dotted line indicates that there is no current flowing and it is in the power-off state. The letter + number string above each switch indicates the switch name, such as "DIP2S2", "DIIP1S33", etc. "Ia: number" below each switch, Ia represents the current of phase A, and the number after the colon represents the current value.

[0098] Example 1:

[0099] like Figure 3As shown, it is a schematic diagram of the actual operation mode of the power flow diagram of the eastern distribution network in a certain city, including 5 substations, 9 10kV busbars, 18 power supply points, 58 feeder switches, and 110 feeder segments.

[0100] First, input the distribution network flow chart and relevant data, correctly establish the distribution network model, and then test the corresponding functions. The distribution network model can simulate various possible busbar pressure loss phenomena and test the functions and performance.

[0101] Based on the input distribution network flow chart, the corresponding catastrophic topology model of the distribution network is constructed. That is, the switches, 10kV busbars and main transformers of each main substation are regarded as nodes, and the lines and distribution transformers are regarded as edges. In order to improve the catastrophic topology model of the distribution network, a busbar topology model of the distribution network at the time of catastrophic faults is constructed. And based on the data structure of the adjacency table, a catastrophic topology model of the distribution network is established with the busbar as the root node, the feeder switch and the distribution transformer load as child nodes, and a hierarchical distribution network topology model. Figure 4 As shown in Figure 1, it is a schematic diagram of the constructed catastrophic topology model of the distribution network. Figure 4 Based on the simulation, an accident occurred in substation A, resulting in a voltage loss failure in bus section I and bus section II, and the corresponding fault scenario was injected into the tested distribution automation master station. Figure 5 The figure shows a schematic diagram of the fault scenario formed in Example 1.

[0102] After receiving the information related to the fault scenario, the tested distribution automation master station gives a processing solution for the current fault scenario. The operation strategy given by the tested distribution automation master station after the power outage of substation A can be received through the test computer:

[0103] Split [AII-P1 feeder AIIP1S1] Combine [AII-P1 feeder AIIP1S4]

[0104] Points [AI-P1 feeder AIP1S1]

[0105] Points [AI-P1 feeder AIP1S2]

[0106] [AI-P1 feeder AIP1S3]

[0107] Split [AII-P2 feeder AIP2S1] Combine [AII-P2 feeder AIP2S3]

[0108] After executing the above strategy, the operation mode of substation A after voltage loss recovery is as follows: Figure 6 shown.

[0109] From the above example 1, we can see that:

[0110] After the bus section II and bus section I of substation A lose voltage, the outgoing load of bus section II AII-P1 is restored by the outgoing line BII-P2 of substation, the outgoing load of bus section II AII-P2 is restored by the bus BII-P3 of substation BII section, and part of the outgoing load of bus section I AI-P1 is restored by bus CIP2 of substation CI section. The load from switch AIP1S2 to the terminal is thrown off due to the overload of CIP2 and cannot be restored.

[0111] Example 2:

[0112] exist Figure 3 Based on the distribution automation system operation diagram shown in the figure, a catastrophic accident occurs in substation B, resulting in a voltage loss scenario for bus section I and bus section II of substation B. The simulated fault scenario is injected into the tested distribution automation master station, and the corresponding catastrophic scenario is as follows: Figure 7 As shown, the operation strategies given by the distribution automation master station are collected and analyzed.

[0113] After the bus section I and bus section II of substation B lose voltage, the outgoing load of bus section I BI-P1 is restored by the outgoing line DI-P2 of the substation, the outgoing load of bus section I BI-P2 is restored by the outgoing line DI-P2 of the substation, the outgoing load of bus section II BII-P1 is restored by the D switch DIP2 of the substation, part of the outgoing load of bus section II BII-P2 is restored by the bus AIIP1 of section AII of the substation, part of the load is restored by the D switch DIP2 of the substation, part of the outgoing load of bus section II BIIP3 is restored by the D switch DIIP1 of the substation, the area composed of switches BIIP3S4, BIIP3S1, and BIIP3S3, and part of the load from switch BIIP3S4 to the end cannot be restored due to excessive load, and becomes an unrecoverable area, and the outgoing load of bus section II BII_P4 feeder BIIP4 is restored by the D switch DIIP1 of the substation.

[0114] The operation mode of substation B after voltage loss recovery is as follows Figure 8 shown.

[0115] From the above two examples, we can see that setting the voltage loss of busbar section I and busbar section II of substation B can correctly analyze the network analysis situation after the power loss of substation B, correctly analyze the operation steps of isolating the fault and restoring the recoverable area after the voltage loss of substation B. It can correctly display the voltage loss of substation B and the load of the power supply area of ​​the substation is transferred to other substations.

[0116] Based on the above-mentioned catastrophic fault testing method of distribution automation system, Fig. 9 As shown, the present application also proposes a catastrophic fault testing system for a distribution automation system, which may include:

[0117] A model module is used to construct a hierarchical distribution network catastrophic topology model based on variable structure dissipative network theory; the distribution network catastrophic topology model includes a distribution network equipment model and a distribution network busbar topology model;

[0118] A fault setting module, used for setting a fault on a bus or on an upper end of the bus in the catastrophic topology model of the distribution network;

[0119] A scenario generation module, used to generate a fault scenario in real time at the lower end of the bus in the catastrophic topology model of the distribution network according to the set fault;

[0120] The input module is used to input the generated fault scenario into the tested distribution automation master station by means of secondary signal injection;

[0121] A collection module is used to collect the operations performed by the tested distribution automation master station in handling fault scenarios and record them as response operations;

[0122] The judgment module is used to compare the reaction operation with the expected operation to judge whether the tested distribution automation master station has the ability to handle catastrophic faults of the distribution automation system.

[0123] It should be noted that in the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of each module is only a logical function division. There may be other division methods in actual implementation. For example, multiple modules can be combined or integrated into another device, or some features can be ignored or not executed. The module described as a separate component may or may not be physically separated. The component displayed as a module may be a physical unit or multiple physical units, that is, it may be located in one place, or it may be distributed in multiple different places. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment.

[0124] In addition, each module in each embodiment of the present invention may be integrated into a processing unit, each module may exist physically separately, or two or more modules may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of a software functional unit.

[0125] An electronic device provided in an embodiment of the present application includes a memory and a processor. The memory stores a computer program. When the processor executes the computer program, the steps of the catastrophic fault testing method for a distribution automation system described in any of the above embodiments are implemented.

[0126] Another electronic device provided in the embodiment of the present application may also include: an input port connected to the processor, used to transmit multimodal data collected by an external acquisition device to the processor; and a display unit connected to the processor, used to display the processing results of the processor to the outside world; a communication module connected to the processor, used to realize the communication between the electronic device and the outside world. The display unit can be a display panel, a laser scanning display, etc.; the communication mode adopted by the communication module includes but is not limited to mobile high-definition link technology (HML), universal serial bus (USB), high-definition multimedia interface (HDMI), wireless connection (including wireless fidelity technology (WiFi), Bluetooth communication technology, low-power Bluetooth communication technology, and communication technology based on IEEE802.11s).

[0127] An embodiment of the present application provides a computer-readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, the steps of the catastrophic fault testing method for a distribution automation system described in any of the above embodiments are implemented.

[0128] The computer-readable storage medium involved in the present application includes random access memory (RAM), internal memory, read-only memory (ROM), electrically programmable ROM, electrically erasable programmable ROM, registers, hard disks, removable disks, CD-ROMs, or any other form of storage medium known in the technical field.

[0129] For the description of the relevant parts of the catastrophic fault test system for the distribution automation system, the electronic device, and the computer-readable storage medium provided in the embodiments of the present application, please refer to the detailed description of the corresponding parts in the catastrophic fault test method for the distribution automation system provided in the embodiments of the present application, which will not be repeated here. In addition, the parts of the above-mentioned technical solutions provided in the embodiments of the present application that are consistent with the implementation principles of the corresponding technical solutions in the prior art are not described in detail to avoid excessive elaboration.

[0130] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A catastrophic fault testing method for a distribution automation system, characterized in that: include: Based on the theory of variable structure dissipative network, a hierarchical distribution network catastrophic topology model is constructed; the distribution network catastrophic topology model includes a distribution network equipment model and a distribution network bus topology model; the distribution network bus topology model adopts a hierarchical structure, the root node is the substation bus, and the child nodes include feeder switches and distribution transformer loads; the distribution network bus topology model is: in, Representation Node The type is an integer ranging from 0 to 5. , Indicates the total number of nodes; Representation Node For busbar nodes, represents a constant; for the source point in the child node, Indicates the bus number connected to the source point, and the remaining represents a constant; for the remaining child nodes, Indicates the sequence number of the node adjacent to this node; A fault is set on a busbar or on the upper end of the busbar in the catastrophic topology model of the distribution network: Make the voltage of any bus and the current of all power supply points connected to the bus drop from the operating value to 0±preset deviation; Alternatively, the voltage of any busbar is reduced from the operating value to 0±preset deviation, and the current of a preset number of power supply points connected to the busbar or the voltage and current of the first-stage switch on the corresponding feeder are reduced from the operating value to 0±preset deviation; According to the set fault, a fault scenario is generated in real time at the lower end of the busbar in the catastrophic topology model of the distribution network: The electrical quantity changes of the switch voltage, current, protection signal and trip information corresponding to the lines and transformers in the catastrophic topology model of the distribution network, and the reduction of all switch voltage and current values ​​in the bus power supply area; The generated fault scenario is transmitted to the tested distribution automation master station by means of secondary signal injection; Collect the operations performed by the tested distribution automation master station to handle the fault scenario and record them as reaction operations; Comparing the reaction operation with the expected operation, determining whether the tested distribution automation master station has the ability to handle catastrophic faults of the distribution automation system; The method for obtaining the expected operation includes: taking a set of disconnect switches as candidate solutions, and additionally defining virtual disconnect nodes at the terminal nodes and next to the power supply nodes of the catastrophic topology model of the distribution network, and moving the position of each disconnect switch upstream or downstream as a neighborhood search strategy; taking the position of the disconnect switch as a taboo object, and taking the least switch operation and the most load power supply as the goal, and taking electrical limits, voltage qualified ranges and network topology requirements as constraints, to obtain an operation sequence combination consisting of a fault isolation operation sequence, a load direct transfer operation sequence, a load indirect transfer operation sequence and a load transfer operation sequence after load shedding as the expected operation.

2. A catastrophic fault testing system for a distribution automation system, characterized in that: include: The model module is used to construct a hierarchical distribution network catastrophic topology model based on the variable structure dissipative network theory; the distribution network catastrophic topology model includes a distribution network equipment model and a distribution network bus topology model; the distribution network bus topology model adopts a hierarchical structure, the root node is the substation bus, and the child nodes include feeder switches and distribution transformer loads; the distribution network bus topology model is: in, Representation Node The type is an integer ranging from 0 to 5. , Indicates the total number of nodes; Representation Node For busbar nodes, represents a constant; for the source point in the child node, Indicates the bus number connected to the source point, and the remaining represents a constant; for the remaining child nodes, Indicates the sequence number of the node adjacent to this node; A fault setting module is used to set a fault on a bus or on the upper end of the bus in the catastrophic topology model of the distribution network: Make the voltage of any bus and the current of all power supply points connected to the bus drop from the operating value to 0±preset deviation; Alternatively, the voltage of any busbar is reduced from the operating value to 0±preset deviation, and the current of a preset number of power supply points connected to the busbar or the voltage and current of the first-stage switch on the corresponding feeder are reduced from the operating value to 0±preset deviation; A scenario generation module is used to generate a fault scenario in real time at the lower end of the bus in the catastrophic topology model of the distribution network according to the set fault: The electrical quantity changes of the switch voltage, current, protection signal and trip information corresponding to the lines and transformers in the catastrophic topology model of the distribution network, and the reduction of all switch voltage and current values ​​in the bus power supply area; The input module is used to input the generated fault scenario into the tested distribution automation master station by means of secondary signal injection; A collection module is used to collect the operations performed by the tested distribution automation master station in handling fault scenarios and record them as reaction operations; A judgment module, used for comparing the reaction operation with the expected operation, and judging whether the tested distribution automation master station has the ability to handle catastrophic faults of the distribution automation system; The method for obtaining the expected operation includes: taking a set of disconnect switches as candidate solutions, and additionally defining virtual disconnect nodes at the terminal nodes and next to the power supply nodes of the catastrophic topology model of the distribution network, and moving the position of each disconnect switch upstream or downstream as a neighborhood search strategy; taking the position of the disconnect switch as a taboo object, and taking the least switch operation and the most load power supply as the goal, and taking electrical limits, voltage qualified ranges and network topology requirements as constraints, to obtain an operation sequence combination consisting of a fault isolation operation sequence, a load direct transfer operation sequence, a load indirect transfer operation sequence and a load transfer operation sequence after load shedding as the expected operation.

3. An electronic device, characterized in that: include: Memory for storing computer programs; A processor is used to implement the steps of the catastrophic fault testing method for a distribution automation system as claimed in claim 1 when executing the computer program.

4. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the catastrophic fault testing method for a distribution automation system as claimed in claim 1 are implemented.