Material information updating method and device, storage medium and electronic equipment

By connecting the product management system, supplier system and test verification system, the server board material information update is automatically processed, which solves the problem of low material information update efficiency in the existing technology, realizes efficient and accurate material information management, and improves the factory and customer satisfaction.

CN118733364APending Publication Date: 2024-10-01INSPUR SUZHOU INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410865538.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In the existing technology, the server board material information update efficiency is low and relies on personal offline processing. There are execution deviations and scattered information, which makes it impossible to achieve effective information transmission and management, affecting factory efficiency and customer satisfaction.

Method used

Through the connection of the product management system, supplier system and test verification system, the update status on the board design tool is detected, the board test task is generated, the supplier system and test verification system are called to execute the test task, the test results are extracted and the material information is updated. , to realize the automated material information update process.

Benefits of technology

It improves the efficiency of material information update, reduces human participation, ensures the accuracy and timeliness of information transmission, reduces work costs, and improves customer satisfaction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118733364A_ABST
    Figure CN118733364A_ABST
Patent Text Reader

Abstract

The invention discloses a material information updating method and device, a storage medium and electronic equipment. The material information updating method comprises the steps of detecting a board card updating state on a board card design tool; when it is detected that the board card update state is used for indicating that a reference server board card designed on the board card design tool is updated, generating a board card test task corresponding to the reference server board card according to updated target material information on the reference server board card; calling a supplier system and a test verification system to execute a board card test task; the target test result is extracted from the test verification system, and the stored reference material information set of the reference server board card is updated according to the target test result, by adopting the technical scheme, the problems of relatively low updating efficiency of the material information and the like in related technologies are solved, and the updating efficiency of the material information is improved. And the technical effect of improving the updating efficiency of the material information is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present application relate to the computer field, and specifically, to a material information updating method and device, a storage medium, and an electronic device. Background Art

[0002] Current server configurations are facing challenges of increasing complexity, intelligence, and precision. Product development and maintenance have become more complex, and the demand for frequent iterations and upgrades and material verification and import is increasing. However, in product lifecycle management, the existing operating model has obvious deficiencies, especially in the material information changes of server boards and the proofing verification of material introduction. Many tasks rely on personal offline processing, there are execution deviations, timeliness cannot be guaranteed, and information cannot be effectively connected in series. Even if some links are supported by the system, the information is fragmented and effective information transmission and management cannot be achieved, which affects the factory's execution efficiency and test verification progress, and thus affects product delivery.

[0003] In addition, each change in material information verification requires evaluation by the R&D department, which not only wastes a lot of costs, but also may lead to deviations in evaluation results due to the different professional levels of evaluators. More seriously, due to the fragmented verification data information, different projects and personnel cannot obtain relevant information in a timely and effective manner, which may lead to duplication of work, waste of resources, and even failure to meet customer needs in a timely manner, ultimately affecting customer satisfaction.

[0004] With regard to the problems in related technologies such as low efficiency in updating material information, no effective solution has yet been proposed. Summary of the invention

[0005] The embodiments of the present application provide a material information updating method and device, a storage medium and an electronic device, so as to at least solve the problem of low material information updating efficiency in the related art.

[0006] According to an embodiment of the present application, a method for updating material information is provided, wherein a product management system, a supplier system, and a test verification system are interconnected, and the product management system is also connected to a board design tool, and the product management system stores a material information set of a server board designed on the board design tool. The method is applied to the product management system, and the method includes:

[0007] Detecting a board update status on the board design tool;

[0008] When it is detected that the board update status indicates that the reference server board designed on the board design tool has been updated, a board test task corresponding to the reference server board is generated according to the updated target material information on the reference server board, wherein the board test task is used to test whether the target material information meets the operating conditions of the reference server board;

[0009] Calling the supplier system and the test verification system to execute the board test task, wherein the supplier system is used to provide the test verification system with a sample server board required to execute the board test task, the sample server board being a server board having the same design as the updated reference server board, and the test verification system is used to execute the board test task on the sample server board to obtain a target test result;

[0010] The target test result is extracted from the test verification system, and the stored reference material information set of the reference server board is updated according to the target test result.

[0011] Optionally, generating a board test task corresponding to the reference server board according to the updated target material information on the reference server board includes:

[0012] Acquire material type information, material area information and material function information of the target board material indicated by the target material information, wherein the material type information is used to indicate the type of the target board material, the material area information is used to indicate the location area where the target board material is deployed on the reference server board, and the material function information is used to indicate the function of the target board material;

[0013] Generate a set of to-be-tested items corresponding to the target board material according to the material type information, the material area information and the material function information, wherein the set of to-be-tested items includes a plurality of to-be-tested items, each of the plurality of to-be-tested items is used to test whether the target material information meets the operating conditions of the reference server board in a corresponding aspect, and when each of the to-be-tested items in the set of to-be-tested items passes the test, it is determined that the target material information meets the operating conditions of the reference server board;

[0014] The board test task is constructed according to the set of items to be tested, wherein the board test task is used to instruct execution of all the items to be tested in the set of items to be tested.

[0015] Optionally, generating a set of items to be tested corresponding to the target board material according to the material type information, the material area information and the material function information includes:

[0016] Generate N hardware test items corresponding to the target board material according to the material type information, the material area information and the material function information, wherein N is an integer greater than or equal to 0, and the N hardware test items are used to test whether the target material information meets the operating conditions of the reference server board in terms of hardware parameters;

[0017] Generate M firmware test items corresponding to the target board material according to the material type information, the material area information and the material function information, wherein M is an integer greater than or equal to 0, and the M firmware test items are used to test whether the target material information meets the operating conditions of the reference server board in terms of firmware adaptation;

[0018] The N hardware test items and the M firmware test items are constructed as the set of items to be tested.

[0019] Optionally, generating N hardware test items corresponding to the target board material according to the material type information, the material area information and the material function information includes:

[0020] In a case where the material type information, the material area information, and the material function information are used to indicate that the operation of the reference server board depends on the target board material satisfying hardware parameter conditions on multiple hardware parameters, a plurality of test items for testing whether the target board material satisfies the hardware parameter conditions on multiple hardware parameters are determined as N hardware test items;

[0021] The generating M firmware test items corresponding to the target board material according to the material type information, the material area information and the material function information includes:

[0022] When the material type information, the material area information and the material function information are used to indicate that the operation of the reference server board depends on the target board material and multiple target solid states satisfying the target adaptation conditions, the multiple test items used to test whether the target board material and the multiple target solid states satisfy the target adaptation conditions are determined as M firmware test items.

[0023] Optionally, constructing the board test task according to the set of items to be tested includes:

[0024] Generate a sample board number for each of the items to be tested in the set of items to be tested, and obtain a plurality of sample board numbers, wherein the sample board number is the number of sample server boards required to execute the corresponding item to be tested;

[0025] Performing an addition operation on the numbers of the plurality of sample boards to obtain the total number of sample boards, wherein the total number of sample boards is the number of the sample server boards required to execute all the items to be tested in the set of items to be tested;

[0026] The board test task is constructed according to the set of items to be tested and the total number of the sample boards, wherein the board test task is used to instruct the sample server boards with the total number of sample boards to execute all the items to be tested in the set of items to be tested.

[0027] Optionally, calling the supplier system and the test verification system to perform the board test task includes:

[0028] The board test task is sent to the supplier system and the test verification system, wherein the board test task is used to instruct the use of the sample server boards of the total number of sample boards to execute all the items to be tested in the set of items to be tested, the total number of sample boards is the number of sample server boards required to execute all the items to be tested in the set of items to be tested, the set of items to be tested includes multiple items to be tested, each of the multiple items to be tested is used to test whether the target material information meets the operating conditions of the reference server board in a corresponding aspect, and when each of the items to be tested in the set of items to be tested passes the test, it is determined that the target material information meets the operating conditions of the reference server board, the supplier system is used to provide the sample server boards of the total number of sample boards to the test verification system, and the test verification system is used to use the sample server boards of the total number of sample boards to execute all the items to be tested in the set of items to be tested to obtain the target test results.

[0029] Optionally, updating the stored reference material information set of the reference server board according to the target test result includes:

[0030] When the target test result indicates that the target material information satisfies the operating condition of the reference server board, updating the stored reference material information set of the reference server board using the target material information;

[0031] When the target test result indicates that the target material information does not satisfy the operating conditions of the reference server board, it is prohibited to update the stored reference material information set of the reference server board using the target material information.

[0032] According to another embodiment of the embodiment of the present application, a material information updating device is also provided, wherein a product management system, a supplier system and a test verification system are interconnected, the product management system is also connected to a board design tool, the product management system stores a material information set of a server board designed on the board design tool, the device is applied to the product management system, and the device includes:

[0033] A detection module, used for detecting the board update status on the board design tool;

[0034] A generation module, configured to generate a board test task corresponding to the reference server board according to the updated target material information on the reference server board when detecting that the board update status indicates that the reference server board designed on the board design tool has been updated, wherein the board test task is used to test whether the target material information meets the operating conditions of the reference server board;

[0035] A calling module, used for calling the supplier system and the test verification system to execute the board test task, wherein the supplier system is used for providing the test verification system with a sample server board required for executing the board test task, the sample server board being a server board having the same design as the updated reference server board, and the test verification system is used for executing the board test task on the sample server board to obtain a target test result;

[0036] An updating module, configured to extract the target test result from the test verification system, and update the stored reference material information set of the reference server board according to the target test result;

[0037] According to another embodiment of the present application, a computer program product is provided, including a computer program, wherein the computer program is executed by a processor to perform the steps in any of the above method embodiments.

[0038] According to another embodiment of the present application, a computer-readable storage medium is provided, in which a computer program is stored, wherein the computer program is configured to execute the steps of any of the above method embodiments when run.

[0039] According to another embodiment of the present application, an electronic device is provided, including a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to execute the steps in any one of the above method embodiments.

[0040] In an embodiment of the present application, a material information updating method is proposed, wherein a product management system, a supplier system and a test verification system are interconnected, and the product management system is also connected to a board design tool, and a material information set of a server board designed on the board design tool is stored in the product management system. The method is applied to the product management system, and the product management system first detects the board update status on the board design tool; and when it is detected that the board update status indicates that the reference server board designed on the board design tool has been updated, a board test task corresponding to the reference server board is generated according to the updated target material information on the reference server board, wherein the board test task is used to test whether the target material information meets the operating conditions of the reference server board; and then directly calls The supplier system and the test verification system perform the board test task, wherein the supplier system is used to provide the test verification system with the sample server board required to perform the board test task, the sample server board is a server board with the same design as the updated reference server board, and the test verification system is used to perform the board test task on the sample server board to obtain the target test result; finally, the target test result is extracted from the test verification system, and the reference material information set of the stored reference server board is updated according to the target test result. By constructing the connection between the product management system, the supplier system and the test verification system in the above manner, the systems can cooperate with each other to quickly complete the testing and updating of the target material information without human participation, which greatly improves the updating efficiency of the material information. The above technical solution solves the problems of low updating efficiency of material information in the related technology, and achieves the technical effect of improving the updating efficiency of material information. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a hardware structure block diagram of a computer device of a material information updating method according to an embodiment of the present application;

[0042] Figure 2 is a flow chart of a method for updating material information according to an embodiment of the present application;

[0043] Figure 3 is a schematic diagram of the connection between a product management system, a supplier system and a test verification system according to an embodiment of the present application;

[0044] Figure 4 It is a schematic diagram of a review path node review deployment according to an embodiment of the present application;

[0045] Figure 5 is a schematic diagram of a review process according to an embodiment of the present application;

[0046] Figure 6 is a schematic diagram of a carrier processing factory and a production plan according to an embodiment of the present application;

[0047] Figure 7 is a schematic diagram of a proofing instruction template according to an embodiment of the present application;

[0048] Figure 8 is a structural block diagram of a device for updating material information according to an embodiment of the present application;

[0049] Fig. 9 is a schematic diagram of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0050] The embodiments of the present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0051] It should be noted that the terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence.

[0052] The method embodiments provided in the embodiments of the present application can be executed in a server device or a similar computing device. Taking running on a server device as an example, Figure 1 1 is a hardware structure block diagram of a computer device for a material information updating method according to an embodiment of the present application. Figure 1 As shown, the server device may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the server device may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the above server device. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.

[0053] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the material information update method in the embodiment of the present application. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, to implement the above method. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories may be connected to the server device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0054] The transmission device 106 is used to receive or send data via a network. The specific example of the above network may include a wireless network provided by a communication provider of the server device. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 can be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.

[0055] The nouns involved in the embodiments of the present application are explained as follows:

[0056] PLM: Product Lifecycle Management, product lifecycle management system;

[0057] GCP: Global Customers Product, global supplier assistance system;

[0058] ITMS: Test and Verification System;

[0059] SIV: Signal integrity validation, signal integrity validation;

[0060] SIT: System Integration Testing, system integration testing;

[0061] PIV: Power integrity validation, power integrity verification;

[0062] BMC: Baseboard Management Controller;

[0063] BIOS: Basic Input Output System;

[0064] CPLD: Complex Programmable Logic Device;

[0065] VR code: 3D code;

[0066] BOM: Bill of Materials;

[0067] Firmware: FW firmware for short;

[0068] Hardware: referred to as HD hardware;

[0069] In this embodiment, a method for updating material information is provided. Figure 2 is a flow chart of a method for updating material information according to an embodiment of the present application, such as Figure 2 As shown, the product management system, the supplier system and the test verification system are interconnected, and the product management system is also connected to the board design tool. The product management system stores a material information set of the server board designed on the board design tool. The method is applied to the product management system, and the method flow includes the following steps:

[0070] Step S12, detecting the board update status on the board design tool;

[0071] Step S14, when it is detected that the board update status indicates that the reference server board designed on the board design tool has been updated, a board test task corresponding to the reference server board is generated according to the updated target material information on the reference server board, wherein the board test task is used to test whether the target material information meets the operating conditions of the reference server board;

[0072] Step S16, calling the supplier system and the test verification system to execute the board test task, wherein the supplier system is used to provide the test verification system with a sample server board required to execute the board test task, the sample server board being a server board having the same design as the updated reference server board, and the test verification system is used to execute the board test task on the sample server board to obtain a target test result;

[0073] Step S18, extracting the target test result from the test verification system, and updating the stored reference material information set of the reference server board according to the target test result.

[0074] Optionally, in this embodiment, the product management system may be but is not limited to a product lifecycle management system (Product Lifecycle Management, hereinafter referred to as P system), the supplier system may be but is not limited to a global supplier assistance system (Global Customers Product, hereinafter referred to as G system), and the test verification system may be but is not limited to ITMS, hereinafter referred to as I system.

[0075] The solution proposed in this application is aimed at the material information change of server boards and the proofing verification of material introduction in the prior art. Many tasks rely on personal offline processing, resulting in low efficiency in updating material information. On the basis of the existing P system, G system and I system, the connection between the P system, G system and I system is established to achieve the management of the whole process recording and monitoring from demand triggering to implementation of import closure. Figure 3 is a schematic diagram of a connection between a product management system, a supplier system, and a test verification system according to an embodiment of the present application, such as Figure 3 As shown, in each system, a review module, a sample production module, a test verification module, an engineering change module, an import implementation module, and a monitoring management module are established from scratch. The monitoring management module is used to feed back the implementation information to the front end (which can be but is not limited to the board design tool), forming a complete closed loop.

[0076] Furthermore, each module also establishes an independent unit for intelligent management and analysis, which can minimize the errors and omissions caused by human subjective judgment, ensure the correctness and integrity of information transmission, and ensure accuracy without omissions. Figure 3 As shown, the P system establishes a review module, a sample production module, an engineering change module, and a monitoring and management module; the ITMS system establishes a test verification module; and the GCP system establishes an import and implementation module. Among them, the review module includes: an information input unit, a review plan identification unit, a review path unit, a carrier quantity calculation unit, and a review plan unit. The sample production module includes: a factory selection unit (deployed in the P system), an instruction issuing unit (deployed in the P system), and a return board feedback unit (deployed in the G system). The engineering change module includes: an engineering change review unit and an engineering change release unit. The monitoring and management module includes: a result collection unit and a data analysis unit. The test verification module includes: a test unit. The import and implementation module includes: an information receiving unit, an import and implementation unit, and an information feedback unit.

[0077] As an optional solution, generating a board test task corresponding to the reference server board according to the updated target material information on the reference server board includes:

[0078] S21, acquiring material type information, material area information and material function information of the target board material indicated by the target material information, wherein the material type information is used to indicate the type of the target board material, the material area information is used to indicate the location area where the target board material is deployed on the reference server board, and the material function information is used to indicate the function of the target board material;

[0079] S22, generating a set of to-be-tested items corresponding to the target board material according to the material type information, the material area information and the material function information, wherein the set of to-be-tested items includes a plurality of to-be-tested items, each of the plurality of to-be-tested items is used to test whether the target material information meets the operating conditions of the reference server board in a corresponding aspect, and when each of the to-be-tested items in the set of to-be-tested items passes the test, it is determined that the target material information meets the operating conditions of the reference server board;

[0080] S23, constructing the board test task according to the set of items to be tested, wherein the board test task is used to instruct execution of all the items to be tested in the set of items to be tested.

[0081] Optionally, in this embodiment, the material type information, material area information and material function information of the target board material indicated by the target material information may be obtained by, but is not limited to, Figure 3 The information input unit in is obtained. The usage of the information input unit is described as follows:

[0082] First of all, it should be noted that various electronic hardware are deployed on the server board. These electronic hardware are called board materials of the server board. There are many types of board materials, such as: resistors, capacitors, inductors, transistors, connectors, power supplies, switches, relays, heat sinks, integrated circuits and other types of components.

[0083] The components of electrical functions are divided into active key components and passive non-key components. For example, integrated circuits, power supplies, transistors and other devices are active key components, while resistors, capacitors, and inductors are generally passive non-key components. However, the above classification method is not absolute. For example, precision resistors are also key components; capacitors less than or equal to 1uF are generally not key components. Special cases such as capacitors used on crystal oscillators, although they are small capacitance capacitors of nF or pF, affect the base frequency of high-speed signals and are also key components.

[0084] Different types, deployment areas and functions of board materials require different test items. For example, key components need to undergo PIV and SIT tests, and high-speed signals need to undergo SIV tests. The following is an example of connectors and integrated circuits:

[0085] Connectors may have various types or functional uses, such as CONN_connector, CONN_button, CONN_battery, CONN_dimm, CONN_guide, CONN_plug, CONN_sas, CONN_usb, CONN_switch, CONN_sata, CONN_holder, CONN_pcie, etc. When updating the material information corresponding to the board material connector, it is necessary to perform test items in multiple fields such as signals, cables, and structures to verify whether the updated board material connector is compatible with the reference server board;

[0086] Integrated circuits have a wide range of types, functions and uses, such as IC_controller, IC_buffer, IC_clock, IC_cpu, IC_dram, IC_efuse, IC_eeprom, IC_logic, IC_monitor, IC_nand, IC_pol, IC_Ido, IC_memory, IC_sensor, etc. If the control chip involves basic function testing, such as power on and off, various network cards, graphics cards, various hard disk in-place status, etc., it is necessary to execute BMC, BIOS and other firmware adaptation test items.

[0087] The material type information, material area information and material function information mentioned above can all be input through the information input unit. The information input unit can set attribute information a1, a2, a3, a4, a5... to input material type information, material area information and material function information, thereby meeting the subsequent review requirements of various material verifications and change plans. The meaning of each attribute information is as follows:

[0088] a1: project name;

[0089] a2: carrier material number;

[0090] a3: Verify material number or hardware change plan;

[0091] a4: Verify basic material information, hardware change plan and domain;

[0092] a5: proofing requirements;

[0093] As an optional solution, generating a set of items to be tested corresponding to the target board material according to the material type information, the material area information and the material function information includes:

[0094] S31, generating N hardware test items corresponding to the target board material according to the material type information, the material area information and the material function information, wherein N is an integer greater than or equal to 0, and the N hardware test items are used to test whether the target material information meets the operating conditions of the reference server board in terms of hardware parameters;

[0095] S32, generating M firmware test items corresponding to the target board material according to the material type information, the material area information and the material function information, wherein M is an integer greater than or equal to 0, and the M firmware test items are used to test whether the target material information meets the operating conditions of the reference server board in terms of firmware adaptation;

[0096] S33, constructing the N hardware test items and the M firmware test items into the set of items to be tested.

[0097] Optionally, in this embodiment, the above steps S31 to S33 may be but are not limited to: Figure 3 The review scheme identification unit in the system is executed. The review scheme identification unit identifies the material type information, the material area information and the material function information to determine the set of test items that need to be executed on the target board material.

[0098] Hardware parameters may include but are not limited to: EE, DC, AC, SIV, SIT, PIV, EMC, cables, structures, software adaptation and other parameters; firmware may include but are not limited to: BMC, BIOS, CPLD, FPGA, FRU, MCU, Expander, Retimer, LAN, VR code, Raid, SAS firmware.

[0099] The specific hardware parameters and firmware adaptation conditions that need to be tested are determined by the review scheme identification unit. Based on the basic information of the verification material or the hardware change input by the information input unit, a unified review scheme management model is established, namely the review scheme identification unit, which is the core element of the review model.

[0100] The set of items to be tested can be but is not limited to using H x F y Indicates, H stands for hardware, F stands for firmware, H x Indicates N hardware test items, F y Represents M firmware test items.

[0101] About H x , where x=0,1,2,3,4,5,6,7,8,9,a,b,c……12,23,24…….

[0102] 0 means no testing is required, 1 means only board factory process and function testing is required, 2 means SIT testing is required, 3 means SIV testing is required, 4 means PIV testing is required..., a means structural adaptation testing is required...

[0103] Furthermore, numerical values ​​and symbols can be combined to indicate that multiple items need to be tested, for example:

[0104] 23 represents SIT and SIV tests.

[0105] 24 represents SIT and PIV tests.

[0106] 34 represents SIV and PIV testing.

[0107] 4a represents PIV test and structural fit test.

[0108] When x=1, the test belongs to X1; when x=2, the test belongs to X2; when x=3, the test belongs to X3; when x=a, the test belongs to X a …….

[0109] When x=4a, the test belongs to X4 and X a .

[0110] Similarly, y=0,1,2,3,4,5,6,7,8,9,a,b,c…12,23,24,1a,2b…

[0111] 0 means that no firmware adaptation test is required, 1 means that BMC adaptation test is required, 2 means that BIOS adaptation test is required, 3 means that CPLD adaptation test is required, 4 means that FPGA adaptation test is required...a means that VR adaptation test is required...

[0112] Furthermore, numerical values ​​and symbols can be combined to indicate that multiple items need to be tested, for example:

[0113] 12 means that BMC and BIOS tests need to be adapted.

[0114] 13 indicates that BMC and CPLD tests need to be adapted.

[0115] 23 means that BIOS and CPLD tests need to be adapted.

[0116] 1a means that BMC and VR tests need to be adapted.

[0117] When y=1, the test belongs to Y1; when y=2, the test belongs to Y2; when y=3, the test belongs to Y3; when y=a, the test belongs to Y a …….

[0118] When y=1a, the test belongs to Y1 and Y a .

[0119] The above values ​​and symbols can be combined to indicate that multiple items need to be tested. Furthermore, separators can be added between each symbol, for example: Y 1-23-24 It indicates that the test items corresponding to 1, 23, and 24 need to be executed. This can break through the limitations of the test items, achieve more flexible information representation, and improve information transmission efficiency.

[0120] As an optional solution, N hardware test items corresponding to the target board material are generated according to the material type information, the material area information and the material function information, including:

[0121] S41, when the material type information, the material area information, and the material function information are used to indicate that the operation of the reference server board depends on the target board material satisfying hardware parameter conditions on multiple hardware parameters, a plurality of test items for testing whether the target board material satisfies the hardware parameter conditions on multiple hardware parameters are determined as N hardware test items;

[0122] The generating M firmware test items corresponding to the target board material according to the material type information, the material area information and the material function information includes:

[0123] S42, when the material type information, the material area information and the material function information are used to indicate that the operation of the reference server board depends on the target board material and multiple target solids satisfying the target adaptation conditions, a plurality of test items for testing whether the target board material and multiple target solids satisfy the target adaptation conditions are determined as M firmware test items.

[0124] Optionally, in this embodiment, multiple hardware parameters may be but are not limited to multiple parameters in multiple fields such as EE, DC, AC, SIV, SIT, PIV, EMC, cables, structures, and software adaptation; the multiple target solids may be but are not limited to include: multiple firmware in BMC, BIOS, CPLD, FPGA, FRU, MCU, Expander, Retimer, LAN, VR code, Raid, and SAS.

[0125] As an optional solution, constructing the board test task according to the set of items to be tested includes:

[0126] S51, generating a sample board number for each of the items to be tested in the set of items to be tested, and obtaining a plurality of sample board numbers, wherein the sample board number is the number of sample server boards required to execute the corresponding items to be tested;

[0127] S52, performing an addition operation on the numbers of the plurality of sample boards to obtain a total number of sample boards, wherein the total number of sample boards is the number of the sample server boards required to execute all the items to be tested in the set of items to be tested;

[0128] S53, constructing the board test task according to the set of items to be tested and the total number of the sample boards, wherein the board test task is used to instruct the sample server boards with the total number of sample boards to execute all the items to be tested in the set of items to be tested.

[0129] Optionally, in this embodiment, although the aforementioned review scheme identification unit has determined the set of items to be tested, it is not clear how many sample server boards are specifically required for each item to be tested in the set of items to be tested, and this needs to be determined by the review path unit and the carrier quantity calculation unit.

[0130] The review path unit is used to determine which reviewers are needed to determine how many sample server boards are needed for the corresponding project to be tested. The review path unit needs to match the corresponding reviewers according to the field for each carrier (i.e., server board), that is, preset reviewers for each node on each review path of the review path unit. Figure 4 is a schematic diagram of a review path node review deployment according to an embodiment of the present application, such as Figure 4 As shown,

[0131] The reviewer for the EE item to be tested for project A a carrier is reviewer X1, the reviewer for the DC item to be tested is reviewer X2, the reviewer for the EMC item to be tested is reviewer X8...;

[0132] The EE reviewer for the project to be tested of the carrier a of project B is reviewer X1, the DC reviewer for the project to be tested is reviewer X2, the EMC reviewer for the project to be tested is reviewer X8…;

[0133] The EE reviewer for the project to be tested for carrier a of project C is reviewer X1, the DC reviewer for the project to be tested is reviewer X2, the EMC reviewer for the project to be tested is reviewer X8... and so on, so that every single point is fully covered.

[0134] Figure 5is a schematic diagram of a review process according to an embodiment of the present application, such as Figure 5 As shown, the verification material information or hardware change plan is input in the information input unit, and the carrier (server board) of the verification material or change plan is input, that is, all X1, X2, X3, X4, X5, etc. related to the boards that are affected or need to be verified. Once the verification material information or change plan and the carrier are input and confirmed, the review process is deemed to have received the information input, and the review plan identification unit is started according to the material type attribute information (that is, material type information), regional function (that is, material region information and the material function information), carrier and other information, and H is automatically calculated. x F y The x and y values ​​are used to generate the review plan. At the same time, the information carrier review module automatically identifies the product line to which the carrier belongs, and generates the review path in combination with the review plan.

[0135] Among them, there are A, B, C, D...N nodes on the generated review path. The review of node A requires a1 pcs (pcs, unit: block) carriers (sample server boards) for verification, the review of node B requires a2 pcs carriers for verification, the review of node C requires a3 pcs carriers for verification, the review of node D requires a4 pcs carriers for verification... The review of node N requires an pcs carrier for verification. After the review of each node is completed, the review result opinion library is generated and the total number of carrier requirements N (that is, the total number of sample boards) is output. The total number of sample boards can be calculated by the carrier quantity calculation unit according to the following formula:

[0136] ∑ai=a1+a2+...+an, where i=1 to n, represents the sum of a1+a2+...+an.

[0137] Finally, the review plan unit outputs Figure 3 The review results in (i.e., board test tasks).

[0138] As an optional solution, calling the supplier system and the test verification system to perform the board test task includes:

[0139] S61, sending the board test task to the supplier system and the test verification system, wherein the board test task is used to instruct the use of the sample server boards in the total number of sample boards to execute all the items to be tested in the set of items to be tested, the total number of sample boards is the number of sample server boards required to execute all the items to be tested in the set of items to be tested, the set of items to be tested includes multiple items to be tested, each of the multiple items to be tested is used to test whether the target material information meets the operating conditions of the reference server board in a corresponding aspect, and when each of the items to be tested in the set of items to be tested passes the test, it is determined that the target material information meets the operating conditions of the reference server board, the supplier system is used to provide the sample server boards in the total number of sample boards to the test verification system, and the test verification system is used to use the sample server boards in the total number of sample boards to execute all the items to be tested in the set of items to be tested to obtain the target test results.

[0140] Optionally, in this embodiment, the sample server cards of the total number of sample cards may be, but are not limited to, Figure 3 The sample production module in the production. The sample production module includes: factory selection unit (deployed in the P system), instruction issuing unit (deployed in the P system) and return board feedback unit (deployed in the G system). The functions of each unit are as follows:

[0141] The factory selection unit pre-deploys the production and processing factories of each carrier (server board), such as the production and processing factories of carrier a are A, B, C, the production and processing factories of carrier b are B, C, D, the production and processing factories of carrier c are C, E, F, G, etc. The factory selection unit also stores / establishes the production schedule of the carrier in each processing factory. Figure 6 is a schematic diagram of a carrier processing factory and a production plan according to an embodiment of the present application, such as Figure 6 As shown, the current date is set to T0, the production date of carrier a in production and processing factory A is T1, the production date in production and processing factory B is T2, the production date in production and processing factory C is T3... and the production date in production and processing factory N is Tn; the production date of carrier b in production and processing factory B is T1′, the production date in production and processing factory C is T2′, the production date in production and processing factory D is T3′... and the production date in production and processing factory N is Tn′; the production date of carrier c in production and processing factory C is T1″, the production date in production and processing factory E is T2″, the production date in production and processing factory F is T3″... and the production date in production and processing factory N is Tn″...

[0142] When the sample production module receives the information input from the review module (i.e., the board test task), it first enters the factory selection unit. The factory selection unit automatically identifies the processing factory of the carrier. For example, the production and processing factories of carrier a are A, B, and C, and the corresponding production dates are T1, T2, and T3, respectively. The system automatically calculates the difference between T1-T0, T2-T0, and T3-T0, and selects the factory with the smallest difference.

[0143] The instruction issuing unit establishes a proofing instruction template. Figure 7 is a schematic diagram of a proofing instruction template according to an embodiment of the present application, such as Figure 7 As shown, the factory selection unit completes the factory selection and inputs the information into the instruction issuing unit. The instruction issuing unit automatically verifies the integrity and accuracy of the information of a1′, a2′, a3′, a4′, a5′, a6′, etc. After the inspection is completed, the carrier version value needs to be added in this unit module. The system automatically identifies the latest version value in the attribute information of the carrier. The mass production version of the carrier is generally named A10, A20, A30, A40, A50, A60, A70, A80, A90, B10, B20, etc. The carrier template version automatically produces a new version based on the latest version. The version upgrade rules are as follows: the major version is not upgraded, and the last upgrade principle is adopted. For example, the latest mass production version of carrier a is A10, and the system automatically names the carrier a template version A15. The latest mass production version of carrier b is A80, and the system automatically names the carrier b template version A85, etc. After the carrier template version is assigned a value, it can automatically trigger the proofing instruction to be passed to the G system production and processing factory.

[0144] The following information fully complies with the requirements of the proofing instruction template:

[0145] a1′: project name;

[0146] a2′: carrier material number;

[0147] a3′: Verify material number or hardware change plan;

[0148] a4′: number of carriers (i.e., total number of sample boards);

[0149] a5′: requirement description;

[0150] a6′: proofing requirements;

[0151] The instruction issuing unit on the P system sends the proofing instruction to the return board feedback unit on the G system. The G system produces according to the proofing instruction received from the processing factory, completes the production of the carrier sample (sample server board) according to the proofing instruction requirements, and feeds back the carrier sample production information to the return board feedback unit in the proofing module. The feedback information a1", a2", a3", a4", a5"... is received and the information feedback unit provides data input for the test verification module.

[0152] a1″: carrier material number;

[0153] a2″: number of carriers (greater than or equal to the total number of sample boards);

[0154] a3″: carrier batch number or LOT number information;

[0155] a4″: return time;

[0156] a5″: return board address;

[0157] The review scheme of the entire review module and the sample production module information are output to the ITMS system of the test verification module. The test verification module, engineering change module, and import implementation module are auxiliary modules in this technology, and the technical solution will not be described in detail.

[0158] As an optional solution, updating the stored reference material information set of the reference server board according to the target test result includes:

[0159] S71, when the target test result indicates that the target material information satisfies the operating condition of the reference server board, using the target material information to update the stored reference material information set of the reference server board;

[0160] S72: When the target test result indicates that the target material information does not satisfy the operating conditions of the reference server board, it is prohibited to update the stored reference material information set of the reference server board using the target material information.

[0161] Optionally, in this embodiment, it is assumed that the target test result is used to indicate that the target material information meets the operating conditions of the reference server board, such as Figure 3As shown, the test verification module executes the PASS path and enters the subsequent engineering change module and import implementation module. The engineering change module and the import implementation module are responsible for using the target material information to update the reference material information set of the reference server board stored. Finally, the implementation information is fed back to the front end through the result collection unit and the data analysis unit in the monitoring management module to form a complete closed loop. The result collection unit collects the data of the import implementation module in the G system, and inputs the collected data into the data analysis unit. At the same time, the review items, review content, review positions, review opinion results and carrier verification quantity in the review module are also transmitted to this data analysis unit to establish a complete data management model. It can be queried and managed from multiple dimensions such as product line, project, carrier material number, verification material information, change plan information, etc., and all data that have passed the review, verification, and import can be concretely managed.

[0162] Assume that the target test result is used to indicate that the target material information does not meet the operating conditions of the reference server board, such as Figure 3 As shown, the test verification module executes the FALL path to clarify the problem. If the problem still exists, it is prohibited to use the target material information to update the stored reference material information set of the reference server board.

[0163] Optionally, in this embodiment, in order to better understand the above-mentioned material information updating method, the above-mentioned material information updating method is described below in combination with a complete optional embodiment, but it is not used to limit the technical solution of the embodiment of the present application.

[0164] First, attribute information a1, a2, a3, a4, a5, ... is input into the information input unit, where:

[0165] a1: project name X;

[0166] a2: Carrier material number XXXX-000XXX-001;

[0167] a3: Verify the material number (that is, there is updated target material information, as follows 5):

[0168] YYYY-000YY-001;

[0169] YYYY-000YY-002;

[0170] YYYY-000YY-003;

[0171] YYYY-000YY-004;

[0172] YYYY-000YY-005;

[0173] a4: Verify basic material information:

[0174] YYYY-000YY-001: BMC chip IC_controller;

[0175] YYYY-000YY-002: battery connector CONN_Battery;

[0176] YYYY-000YY-003: R_precision resistor;

[0177] YYYY-000YY-004: C_High-speed signal link;

[0178] YYYY-000YY-005: C_Filter;

[0179] a5: Proofing requirement Z;

[0180] The solution identification unit receives the information of verification materials YYYY-000YY-001, YYYY-000YY-002, YYYY-000YY-003, YYYY-000YY-004, and YYYY-00YY-005. The review process automatically identifies the verification items that need to be performed according to the review rules and automatically assigns them to the review positions according to the verification items. For example, the BMC chip needs to perform relevant communication function tests, such as I2C communication. Communication is performed according to the I2C protocol. Whether the sent signal complies with the I2C protocol, whether the initialization level is correct, and whether it is According to the instructions, high and low levels are sent normally, the voltage accuracy of the ADC voltage detection is tested to see if it meets the chip's accuracy range, and the voltage and current test is performed. This requires hardware, firmware and other positions to participate in the evaluation test; the battery connector CONN_Battery needs to undergo power integrity test, plug-in force test, contact impedance test, temperature rise test, life aging test, cable matching conduction impedance test, etc. This requires PIV, ME, and cable positions to participate in the evaluation test; precision resistors and high-speed signal link capacitors require system integration test, signal integrity test, etc. This requires SIV and SIT positions to participate in the evaluation test. The system automatically identifies and distributes the completed review information and generates the review model H. x F y ; Among them, H x F y Schematic description:

[0181] H stands for hardware, and F stands for firmware;

[0182] x=0,1,2,3,4,5,6,7,8,9,a,b,c……12,23,24……;

[0183] 0 means no test is required, 1 means only board factory process and function test, 2 means SIT test is required, 3 means SIV test is required, 4 means PIV test is required... a means structure adaptation test is required, b means cable adaptation test is required...;

[0184] 23 represents SIT and SIV tests;

[0185] 24 represents SIT and PIV testing;

[0186] 34 represents SIV and PIV testing;

[0187] 4a represents PIV test and structural fit test;

[0188] When x=1, the test belongs to X1; when x=2, the test belongs to X2; when x=3, the test belongs to X3; when x=a, the test belongs to X a ……;

[0189] When x=4a, the test belongs to X4 and X a ……;

[0190] In this case, x = 234ab, and the test belongs to X2, X3, X4, X a , X b ;

[0191] Similarly, y = 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, a, b, c ... 12, 23, 24, 1a, 2b ...;

[0192] 0 means no firmware adaptation test is required, 1 means BMC adaptation test is required, 2 means BIOS adaptation test is required, 3 means CPLD adaptation test is required, 4 means FPGA adaptation test is required...a means VR adaptation test is required...;

[0193] 12 means that BMC and BIOS tests need to be adapted;

[0194] 13 means that BMC and CPLD tests need to be adapted;

[0195] 23 means that BIOS and CPLD tests need to be adapted;

[0196] 1a means that BMC and VR testing need to be adapted;

[0197] When y=1, the test belongs to Y1; when y=2, the test belongs to Y2; when y=3, the test belongs to Y3; when y=a, the test belongs to Y a ……;

[0198] When y=1a, the test belongs to Y1 and Y a ;

[0199] In this case, y = 13, and the test belongs to Y1 and Y3;

[0200] The review path unit is established. It is necessary to match the corresponding reviewers according to the field for each carrier, that is, all the boards that need to be verified, that is, preset reviewers for each node on each review path of the review path unit, for example:

[0201] The EE reviewer for project A carrier a is reviewer X1, the DC reviewer is reviewer X2, the EMC reviewer is reviewer X8...;

[0202] The EE reviewer for project B a′ is reviewer X1′, the DC reviewer is reviewer X2′, the EMC reviewer is reviewer X8′…;

[0203] The EE reviewer for project C a″ is reviewer X1″, the DC reviewer is reviewer X2″, the EMC reviewer is reviewer X8″… and so on, to ensure that each single point is fully covered;

[0204] In this case, the reviewer for carrier XXXX-000XXX-001EE in project X is X1, the reviewer for BMC is X2, the reviewer for SIT is X3, the reviewer for SIV is X4, the reviewer for PIV is X5, the reviewer for ME is X6, the reviewer for cable is X7, etc.;

[0205] The review model automatically calculates H x F y The x and y values, in this case H 234ab F 13 . Test belongs to positions X2, X3, X4, X a , X b , Y1, Y3, combined with the carrier XXXX-000XXX-001EE reviewer is X1, the BMC reviewer is X2, the SIT reviewer is X3, the SIV reviewer is X4, the PIV reviewer is X5, the ME reviewer is X6, the cable reviewer is X7… and generate the review path.

[0206] There are N nodes A, B, C, D, etc. on the review path. Node A review requires a1 pcs (unit, block) carriers for verification, node B review requires a2 pcs carriers for verification, node C review requires a3 pcs carriers for verification, node D review requires a4 pcs carriers for verification... Node N review requires an pcs carrier for verification. After each node review is completed, a review opinion result library is generated and the total number of carrier requirements N is output. The total number is calculated according to the following formula:

[0207] ∑ai=a1+a2+...+an, where i=1 to n, represents the sum of a1+a2+...+an;

[0208] In this case, EE review test verification requires a1 = 3pcs, BMC review test verification requires a2 = 2pcs, SIT review test verification requires a3 = 3pcs, SIV review test verification requires a4 = 1pc, PIV review test verification requires a5 = 2pcs, ME review test verification requires a6 = 5pcs, and cable review test verification requires a7 = 2pcs;

[0209] ∑ai=a1+a2+...+an=a1+a2+a3+a4+a5+a6+a7=20pcs;

[0210] At this point, the review results and the total number of carrier requirements (20 pcs) are fully recorded in the review model and the information is transmitted to the carrier sample production module.

[0211] Afterwards, the steps are executed by the sample making module, which includes a factory selection unit, an instruction issuing unit, and a return board feedback unit.

[0212] The factory selection unit pre-deploys the production and processing factories of each carrier, such as the production and processing factories of carrier a are A, B, and C, the production and processing factories of carrier b are B, C, and D, the production and processing factories of carrier c are C, E, F, and G, and establishes a production schedule for the carrier in each processing factory, setting the current date to T0, the production date of carrier a in production and processing factory A to T1, the production date in production and processing factory B to T2, the production date in production and processing factory C to T3, and the production date in production and processing factory N to Tn; the production date of carrier b in production and processing factory B is T1′, the production date in production and processing factory C to T2′, the production date in production and processing factory D to T3′, and the production date in production and processing factory N to Tn′; the production date of carrier c in production and processing factory C is T1″, the production date in production and processing factory E to T2″, the production date in production and processing factory F to T3″, and the production date in production and processing factory N to Tn″;

[0213] When the sample making module receives the information input from the review module, it first enters the factory selection unit. The factory selection unit automatically identifies the processing factory of the carrier. For example, the production and processing factories of carrier a are A, B, and C, and the corresponding production dates are T1, T2, and T3, respectively. The system automatically calculates the difference between T1-T0, T2-T0, and T3-T0, and selects the factory with the smallest difference.

[0214] In this case, the carrier XXXX-000XXX-001 is produced and processed in factories A, B, and C. The current date is set to T0. The production dates of carrier XXXX-000XXX-001 corresponding to factories A, B, and C are T1, T2, and T3 respectively. The system automatically calculates T1-T0=62, T2-T0=23, and T3-T0=95. It is confirmed that factory B has the latest production time, so the system automatically selects factory B.

[0215] The factory selection unit completes the factory selection and inputs the information into the instruction issuing unit. The instruction issuing unit automatically verifies the integrity and accuracy of the information of a1′, a2′, a3′, a4′, a5′, a6′, etc., and adds the carrier version value in this unit module. The system automatically identifies the latest version value in the carrier's attribute information. The version upgrade rules are as follows: major versions are not upgraded, and the last-place upgrade principle is adopted. For example, the latest mass production version of carrier a is A10, and the system automatically names the sample version of carrier a A15. The latest mass production version of carrier XXXX-000XXX-001 is A50, and the system automatically names the sample version of carrier A55. After the carrier sample version is assigned a value, it can automatically trigger the proofing instruction to be passed to the B processing factory;

[0216] a1′: Project name: X;

[0217] a2′: Carrier material number: XXXX-000XXX-001;

[0218] a3′: Verify the material number;

[0219] YYYY-000YY-001;

[0220] YYYY-000YY-002;

[0221] YYYY-000YY-003;

[0222] YYYY-000YY-004;

[0223] YYYY-000YY-005;

[0224] a4′: Number of carriers: 20 PCS;

[0225] a5′: requirement description Y;

[0226] a6′: proofing requirement Z;

[0227] Processing factory B receives the proofing instruction, completes the carrier sample production according to the proofing instruction, feeds back the carrier sample production information to the return board feedback unit in the proofing module, receives feedback information a1″, a2″, a3″, a4″, a5″… and forms an information feedback unit to provide data input for the test verification module.

[0228] a1″: Carrier material number: XXXX-000XXX-001;

[0229] a2″: Number of carriers: 20PCS;

[0230] a3″: carrier batch number: MB0000X70001A55~MB0000X70020A55;

[0231] a4″: Return time: YYYY-MM-DD;

[0232] a5″: Return address: XX Park, XX District, XX City;

[0233] The review results of the review module and the information of the sample production module are output to the ITMS system of the test verification module. The test verification module, engineering change module, and import implementation module belong to the secondment module in this technology, and the technical solution is not described in detail in this technical invention.

[0234] Afterwards, the steps are executed by the monitoring management module, which includes the result collection unit and the data analysis unit. This module feeds back the implementation information to the front end to form a complete closed loop.

[0235] The result collection unit collects the data imported into the implementation module in the G system, and inputs the collected data into the data analysis unit. At the same time, the review items, review contents, review positions, review opinion results, and carrier verification quantity in the review module are also transmitted to this data analysis unit to establish a complete data analysis management model. It can query and manage from multiple dimensions such as project type, carrier material number, verification material information, and change plan information, and manage all data that have passed review, verification, and import concretely.

[0236] In this case, the evaluation module information input unit information a1, a2, a3, a4, a5... and the evaluation model H x F y The x and y values, that is, H in this case 234ab F 13 , input into the data analysis unit in the monitoring and management module; the production and processing factory B in the sample making model and the carrier quantity and carrier batch number information in the return board feedback unit are also input into the data analysis unit in the monitoring and management module to form a complete data management.

[0237] a1: project name X;

[0238] a2: Carrier material number XXXX-000XXX-001;

[0239] a3: Verify the material number (the updated target material information):

[0240] YYYY-000YY-001;

[0241] YYYY-000YY-002;

[0242] YYYY-000YY-003;

[0243] YYYY-000YY-004;

[0244] YYYY-000YY-005;

[0245] a4: Verify basic material information:

[0246] YYYY-000YY-001: BMC chip IC_controller;

[0247] YYYY-000YY-002: battery connector CONN_Battery;

[0248] YYYY-000YY-003: R_precision resistor;

[0249] YYYY-000YY-004: C_High-speed signal link;

[0250] YYYY-000YY-005: C_Filter;

[0251] a2″: Number of carriers: 20PCS;

[0252] a3″: carrier batch number: MB0000X70001A55~MB0000X70020A55;

[0253] The material information updating method proposed in this application proposes a management model for recording and monitoring the entire process from demand triggering to implementation of import closure, and establishes a review module, a sample production module, a test verification module, an engineering change module, and an import implementation module from scratch. At the same time, each module establishes an independent unit for intelligent analysis to minimize errors and omissions caused by human subjective judgment, and ensure the correctness and integrity of information transmission, so as to achieve accuracy without omissions.

[0254] This application also establishes a monitoring management module, which will implement information feedback to the front end to form a complete closed loop. The monitoring management module also has a special data analysis tool for data analysis and integration, which manages all data that have passed review, verification, and import. The data analysis of the monitoring management module is efficient and error-free, saving a lot of manpower and financial resources.

[0255] This application truly realizes the clarification of requirements, intelligent review, and automation of changes, and realizes the establishment of different modules on different system platforms to realize data transmission and management. It solves the problems of offline processing, insufficient evaluation accuracy, large execution deviation, scattered information without effective connection, and waste of work costs in the existing technology, and truly achieves data monitoring and management functions, and greatly improves accuracy and timeliness. It can effectively manage the entire product life cycle, meet production and customer needs, and prevent major impacts and losses caused by negligence and omissions.

[0256] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, computer, server, or network device, etc.) to execute the methods described in each embodiment of the present application.

[0257] In this embodiment, a material information updating device is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made are not repeated here. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0258] Figure 8 is a structural block diagram of a device for updating material information according to an embodiment of the present application; Figure 8 As shown, the product management system, the supplier system and the test verification system are interconnected, and the product management system is also connected to the board design tool. The product management system stores a material information set of the server board designed on the board design tool. The device is applied to the product management system, and the device includes:

[0259] A detection module 802 is used to detect the board update status on the board design tool;

[0260] A generating module 804 is used to generate a board test task corresponding to the reference server board according to the updated target material information on the reference server board when it is detected that the board update status indicates that the reference server board designed on the board design tool has been updated, wherein the board test task is used to test whether the target material information meets the operating conditions of the reference server board;

[0261] A calling module 806 is used to call the supplier system and the test verification system to execute the board test task, wherein the supplier system is used to provide the test verification system with a sample server board required to execute the board test task, the sample server board being a server board having the same design as the updated reference server board, and the test verification system is used to execute the board test task on the sample server board to obtain a target test result;

[0262] The updating module 808 is used to extract the target test result from the test verification system, and update the stored reference material information set of the reference server board according to the target test result.

[0263] In an exemplary embodiment, the generating module comprises:

[0264] an acquisition unit, configured to acquire material type information, material area information, and material function information of a target board material indicated by the target material information, wherein the material type information is used to indicate the type of the target board material, the material area information is used to indicate the location area where the target board material is deployed on the reference server board, and the material function information is used to indicate the function of the target board material;

[0265] A generating unit, configured to generate a set of to-be-tested items corresponding to the target board material according to the material type information, the material area information and the material function information, wherein the set of to-be-tested items includes a plurality of to-be-tested items, each of the plurality of to-be-tested items is used to test whether the target material information meets the operating conditions of the reference server board in a corresponding aspect, and when each of the to-be-tested items in the set of to-be-tested items passes the test, it is determined that the target material information meets the operating conditions of the reference server board;

[0266] A construction unit is used to construct the board test task according to the set of items to be tested, wherein the board test task is used to instruct the execution of all the items to be tested in the set of items to be tested.

[0267] In an exemplary embodiment, the generating unit is further configured to:

[0268] Generate N hardware test items corresponding to the target board material according to the material type information, the material area information and the material function information, wherein N is an integer greater than or equal to 0, and the N hardware test items are used to test whether the target material information meets the operating conditions of the reference server board in terms of hardware parameters;

[0269] Generate M firmware test items corresponding to the target board material according to the material type information, the material area information and the material function information, wherein M is an integer greater than or equal to 0, and the M firmware test items are used to test whether the target material information meets the operating conditions of the reference server board in terms of firmware adaptation;

[0270] The N hardware test items and the M firmware test items are constructed as the set of items to be tested.

[0271] In an exemplary embodiment, the generating unit is further configured to:

[0272] In a case where the material type information, the material area information, and the material function information are used to indicate that the operation of the reference server board depends on the target board material satisfying hardware parameter conditions on multiple hardware parameters, a plurality of test items for testing whether the target board material satisfies the hardware parameter conditions on multiple hardware parameters are determined as N hardware test items;

[0273] The generating unit is further used for:

[0274] When the material type information, the material area information and the material function information are used to indicate that the operation of the reference server board depends on the target board material and multiple target solid states satisfying the target adaptation conditions, the multiple test items used to test whether the target board material and the multiple target solid states satisfy the target adaptation conditions are determined as M firmware test items.

[0275] In an exemplary embodiment, the construction unit is further used for:

[0276] Generate a sample board number for each of the items to be tested in the set of items to be tested, and obtain a plurality of sample board numbers, wherein the sample board number is the number of sample server boards required to execute the corresponding item to be tested;

[0277] Performing an addition operation on the numbers of the plurality of sample boards to obtain the total number of sample boards, wherein the total number of sample boards is the number of the sample server boards required to execute all the items to be tested in the set of items to be tested;

[0278] The board test task is constructed according to the set of items to be tested and the total number of the sample boards, wherein the board test task is used to instruct the sample server boards with the total number of sample boards to execute all the items to be tested in the set of items to be tested.

[0279] In an exemplary embodiment, the calling module includes:

[0280] A sending unit is used to send the board test task to the supplier system and the test verification system, wherein the board test task is used to instruct the use of the sample server boards of the total number of sample boards to execute all the items to be tested in the set of items to be tested, the total number of sample boards is the number of sample server boards required to execute all the items to be tested in the set of items to be tested, the set of items to be tested includes multiple items to be tested, each of the multiple items to be tested is used to test whether the target material information meets the operating conditions of the reference server board in a corresponding aspect, and when each of the items to be tested in the set of items to be tested passes the test, it is determined that the target material information meets the operating conditions of the reference server board, the supplier system is used to provide the sample server boards of the total number of sample boards to the test verification system, and the test verification system is used to use the sample server boards of the total number of sample boards to execute all the items to be tested in the set of items to be tested to obtain the target test results.

[0281] In an exemplary embodiment, the update module includes:

[0282] an updating unit, configured to update the stored reference material information set of the reference server board using the target material information when the target test result indicates that the target material information satisfies the operating condition of the reference server board;

[0283] A prohibition unit is used to prohibit the use of the target material information to update the stored reference material information set of the reference server board when the target test result is used to indicate that the target material information does not meet the operating conditions of the reference server board.

[0284] It should be noted that the above modules can be implemented by software or hardware. For the latter, it can be implemented in the following ways, but not limited to: the above modules are all located in the same processor; or the above modules are located in different processors in any combination.

[0285] An embodiment of the present application also provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of the method described in each embodiment of the present application; the computer program product also includes a non-volatile computer-readable storage medium, which stores the computer program, and when executed by a processor, implements the steps of the method described in each embodiment of the present application.

[0286] An embodiment of the present application further provides a computer-readable storage medium, in which a computer program is stored, wherein the computer program is configured to execute the steps of any of the above method embodiments when running.

[0287] In an exemplary embodiment, the computer-readable storage medium may include, but is not limited to, various media that can store computer programs, such as a USB flash drive, a read-only memory (ROM), a random access memory (RAM), a mobile hard disk, a magnetic disk or an optical disk.

[0288] An embodiment of the present application further provides an electronic device, Fig. 9 is a schematic diagram of an electronic device according to an embodiment of the present application, such as Fig. 9 As shown, the electronic device includes a memory and a processor, the memory stores a computer program, and the processor is configured to run the computer program to execute the steps in any one of the above method embodiments.

[0289] In an exemplary embodiment, the electronic device may further include a transmission device and an input / output device, wherein the transmission device is connected to the processor, and the input / output device is connected to the processor.

[0290] For specific examples in this embodiment, reference may be made to the examples described in the above embodiments and exemplary implementation modes, and this embodiment will not be described in detail herein.

[0291] Obviously, those skilled in the art should understand that the above modules or steps of the present application can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order from that herein, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present application is not limited to any specific combination of hardware and software.

[0292] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the principles of the present application shall be included in the protection scope of the present application.

Claims

1. A method for updating material information, characterized in that: The product management system, the supplier system and the test verification system are interconnected, the product management system is also connected to the board design tool, the product management system stores a material information set of the server board designed by the board design tool, the method is applied to the product management system, and the method includes: Detecting a board update status on the board design tool; When it is detected that the board update status indicates that the reference server board designed on the board design tool has been updated, a board test task corresponding to the reference server board is generated according to the updated target material information on the reference server board, wherein the board test task is used to test whether the target material information meets the operating conditions of the reference server board; Calling the supplier system and the test verification system to execute the board test task, wherein the supplier system is used to provide the test verification system with a sample server board required to execute the board test task, the sample server board being a server board having the same design as the updated reference server board, and the test verification system is used to execute the board test task on the sample server board to obtain a target test result; The target test result is extracted from the test verification system, and the stored reference material information set of the reference server board is updated according to the target test result.

2. The method according to claim 1, characterized in that The generating a board test task corresponding to the reference server board according to the updated target material information on the reference server board includes: Acquire material type information, material area information and material function information of the target board material indicated by the target material information, wherein the material type information is used to indicate the type of the target board material, the material area information is used to indicate the location area where the target board material is deployed on the reference server board, and the material function information is used to indicate the function of the target board material; Generate a set of to-be-tested items corresponding to the target board material according to the material type information, the material area information and the material function information, wherein the set of to-be-tested items includes a plurality of to-be-tested items, each of the plurality of to-be-tested items is used to test whether the target material information meets the operating conditions of the reference server board in a corresponding aspect, and when each of the to-be-tested items in the set of to-be-tested items passes the test, it is determined that the target material information meets the operating conditions of the reference server board; The board test task is constructed according to the set of items to be tested, wherein the board test task is used to instruct execution of all the items to be tested in the set of items to be tested.

3. The method according to claim 2, characterized in that The step of generating a set of items to be tested corresponding to the target board material according to the material type information, the material area information and the material function information comprises: Generate N hardware test items corresponding to the target board material according to the material type information, the material area information and the material function information, wherein N is an integer greater than or equal to 0, and the N hardware test items are used to test whether the target material information meets the operating conditions of the reference server board in terms of hardware parameters; Generate M firmware test items corresponding to the target board material according to the material type information, the material area information and the material function information, wherein M is an integer greater than or equal to 0, and the M firmware test items are used to test whether the target material information meets the operating conditions of the reference server board in terms of firmware adaptation; The N hardware test items and the M firmware test items are constructed as the set of items to be tested.

4. The method according to claim 3, characterized in that The generating N hardware test items corresponding to the target board material according to the material type information, the material area information and the material function information includes: In a case where the material type information, the material area information, and the material function information are used to indicate that the operation of the reference server board depends on the target board material satisfying hardware parameter conditions on multiple hardware parameters, a plurality of test items for testing whether the target board material satisfies the hardware parameter conditions on multiple hardware parameters are determined as N hardware test items; The generating M firmware test items corresponding to the target board material according to the material type information, the material area information and the material function information includes: When the material type information, the material area information and the material function information are used to indicate that the operation of the reference server board depends on the target board material and multiple target solid states satisfying the target adaptation conditions, the multiple test items used to test whether the target board material and the multiple target solid states satisfy the target adaptation conditions are determined as M firmware test items.

5. The method according to claim 2, characterized in that: The step of constructing the board test task according to the set of items to be tested includes: Generate a sample board number for each of the items to be tested in the set of items to be tested, and obtain a plurality of sample board numbers, wherein the sample board number is the number of sample server boards required to execute the corresponding item to be tested; Performing an addition operation on the numbers of the plurality of sample boards to obtain the total number of sample boards, wherein the total number of sample boards is the number of the sample server boards required to execute all the items to be tested in the set of items to be tested; The board test task is constructed according to the set of items to be tested and the total number of the sample boards, wherein the board test task is used to instruct the sample server boards with the total number of sample boards to execute all the items to be tested in the set of items to be tested.

6. The method according to claim 1, characterized in that The calling of the supplier system and the test verification system to execute the board test task includes: The board test task is sent to the supplier system and the test verification system, wherein the board test task is used to instruct the use of the sample server boards of the total number of sample boards to execute all the items to be tested in the set of items to be tested, the total number of sample boards is the number of sample server boards required to execute all the items to be tested in the set of items to be tested, the set of items to be tested includes multiple items to be tested, each of the multiple items to be tested is used to test whether the target material information meets the operating conditions of the reference server board in a corresponding aspect, and when each of the items to be tested in the set of items to be tested passes the test, it is determined that the target material information meets the operating conditions of the reference server board, the supplier system is used to provide the sample server boards of the total number of sample boards to the test verification system, and the test verification system is used to use the sample server boards of the total number of sample boards to execute all the items to be tested in the set of items to be tested to obtain the target test results.

7. The method according to claim 1, characterized in that The updating of the stored reference material information set of the reference server board according to the target test result includes: When the target test result indicates that the target material information satisfies the operating condition of the reference server board, updating the stored reference material information set of the reference server board using the target material information; When the target test result indicates that the target material information does not satisfy the operating conditions of the reference server board, it is prohibited to update the stored reference material information set of the reference server board using the target material information.

8. A material information updating device, characterized in that: The product management system, the supplier system and the test verification system are interconnected, and the product management system is also connected to the board design tool. The product management system stores a material information set of the server board designed by the board design tool. The device is applied to the product management system, and the device includes: A detection module, used for detecting the board update status on the board design tool; A generation module, configured to generate a board test task corresponding to the reference server board according to the updated target material information on the reference server board when detecting that the board update status indicates that the reference server board designed on the board design tool has been updated, wherein the board test task is used to test whether the target material information meets the operating conditions of the reference server board; A calling module, used for calling the supplier system and the test verification system to execute the board test task, wherein the supplier system is used for providing the test verification system with a sample server board required for executing the board test task, the sample server board being a server board having the same design as the updated reference server board, and the test verification system is used for executing the board test task on the sample server board to obtain a target test result; An updating module is used to extract the target test result from the test verification system and update the stored reference material information set of the reference server board according to the target test result.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, wherein the computer program implements the steps of the method described in any one of claims 1 to 7 when executed by a processor.

10. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method described in any one of claims 1 to 7 are implemented.