Construction method and application of equipment state prediction model and energy storage system

By building an equipment status prediction model, using historical data to analyze equipment status in extreme environments, predicting future equipment status and adjusting operating parameters, the maintenance difficulty and failure risk of energy storage systems in extreme environments are solved, and more timely and effective solutions are achieved. response.

CN118734572APending Publication Date: 2024-10-01CONTEMPORARY NEBULA TECH ENERGY CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410814649.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Energy storage systems face risks such as accelerated wear of hardware components, software crashes, and loss of key data in extreme environments, especially in remote areas where maintenance is difficult.

Method used

Construct an equipment status prediction model by obtaining environmental parameters and performance data from historical data, establishing mapping relationships and using statistical methods to analyze quantitative relationships, establishing mathematical models, predicting equipment status, and adjusting operating parameters based on future environmental parameters.

Benefits of technology

It realizes the prediction of equipment status and faults in extreme environments in advance, improves the timeliness and effectiveness of response, and ensures the stable operation and safety of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118734572A_ABST
    Figure CN118734572A_ABST
Patent Text Reader

Abstract

The invention discloses an equipment state prediction model construction method, which comprises the following steps: acquiring historical data of system operation, the historical data comprising environmental parameters and performance data; establishing a mapping relationship between the environmental parameters and the performance data in the historical data; analyzing a quantitative relationship between the environmental parameters and the performance data in the historical data through a statistical method, and establishing a mathematical model according to an analysis structure to obtain an equipment state prediction model; according to the method, the environment parameters and the operation performance data of the equipment in the extreme environment are acquired to analyze and construct the mathematical model for predicting the equipment state, and the equipment state can be predicted according to the input environment parameters, so that a worker can threshold the working state of the equipment in advance according to the future environment parameters, and the working efficiency is improved. Therefore, timely and effective response can be made.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of equipment state prediction, and in particular to a method for constructing an equipment state prediction model, its application, and an energy storage system. Background Art

[0002] With the widespread adoption of energy storage technology, energy storage systems are gradually penetrating extreme natural environments such as high and low temperatures and deserts. In this context, energy storage control systems must not only address the accelerated wear and even failure of hardware components due to extreme environmental stresses, but also prevent software system crashes caused by unforeseen environmental factors. They must also address numerous risks and challenges, such as the loss of critical data caused by harsh conditions. It should be noted that energy storage facilities deployed in these extreme environments are often located in remote areas with limited access, greatly increasing the difficulty for maintenance teams to quickly reach the site and troubleshoot.

[0003] Therefore, it is particularly necessary to predict the status of equipment in energy storage systems. This can help staff predict the working status and possible failure of equipment in advance, allowing staff to provide more timely responses. Summary of the Invention

[0004] The technical problem to be solved by the present invention is to provide a method for constructing an equipment status prediction model, its application and energy storage system, which can predict the working status and possible failure of the equipment in advance.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0006] A method for constructing an equipment status prediction model comprises the following steps:

[0007] S1. Obtain historical data of system operation, including environmental parameters and performance data;

[0008] S2. Establishing a mapping relationship between environmental parameters and performance data in historical data;

[0009] S3. Analyze the quantitative relationship between the environmental parameters and the performance data in the historical data by statistical methods, and establish a mathematical model based on the analysis structure to obtain an equipment status prediction model.

[0010] In order to solve the above technical problems, another technical solution adopted by the present invention is:

[0011] An application of a device state prediction model includes the following steps:

[0012] S1. Obtain environmental parameters at a future time, input them into the equipment status prediction model, and obtain equipment performance prediction data;

[0013] The device state prediction model is constructed using the above-mentioned method for constructing a device state prediction model;

[0014] S2. Adjusting the operating parameters of the equipment according to the performance prediction data.

[0015] In order to solve the above technical problems, another technical solution adopted by the present invention is:

[0016] An energy storage system includes a controller, the controller including a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps in the application of the above-mentioned device state prediction model when executing the computer program.

[0017] The beneficial effects of the present invention are as follows: a method for constructing a device status prediction model, its application and energy storage system of the present invention obtain environmental parameters and operating performance data of the device in extreme environments to analyze and construct a mathematical model for device status prediction, which can predict the device status based on the input environmental parameters, so that the staff can predict the working status of the threshold device in advance based on future environmental parameters, thereby making more timely and effective responses. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a flowchart illustrating a method for constructing a device state prediction model according to an embodiment of the invention;

[0019] Figure 2 This is an example flow chart of an application of a device status prediction model according to an embodiment of the invention;

[0020] Figure 3 This is an example diagram of a hardware redundancy architecture of an energy storage system according to an embodiment of the invention;

[0021] Figure 4 This is an example diagram of a software redundancy architecture of an energy storage system according to an embodiment of the invention. DETAILED DESCRIPTION

[0022] To illustrate the technical content, achieved objectives and effects of the present invention in detail, the following description is given in conjunction with the embodiments and accompanying drawings.

[0023] Please refer to Figure 1 , a method for constructing a device state prediction model, comprising the steps of:

[0024] S1. Obtain historical data of system operation, including environmental parameters and performance data;

[0025] S2. Establishing a mapping relationship between environmental parameters and performance data in historical data;

[0026] S3. Analyze the quantitative relationship between the environmental parameters and the performance data in the historical data by statistical methods, and establish a mathematical model based on the analysis structure to obtain an equipment status prediction model.

[0027] From the above description, it can be seen that the beneficial effects of the present invention are: a method for constructing an equipment status prediction model of the present invention obtains environmental parameters and operating performance data of the equipment in extreme environments to analyze and construct a mathematical model for equipment status prediction, and can predict the equipment status based on the input environmental parameters, so that the staff can predict the working status of the threshold equipment in advance based on future environmental parameters, thereby making more timely and effective responses.

[0028] Furthermore, step S1 further includes the steps of:

[0029] S11. Preprocess the historical data, remove abnormal data, retain trend information of environmental parameters, and supplement missing data.

[0030] From the above description, it can be seen that historical data is preprocessed to identify and eliminate data points that are beyond a reasonable range, obviously erroneous, or inconsistent with physical laws, retain trend information of environmental parameters, and ensure the validity of the data.

[0031] Furthermore, step S1 further includes the steps of:

[0032] For each piece of historical data, the same environmental parameters collected in different ways are fused, and a continuous environmental field distribution map is generated based on the historical data.

[0033] From the above description, it can be seen that by integrating the data of the same environmental parameter obtained by different sensors or different measurement methods, more accurate and reliable comprehensive data can be generated through data fusion algorithms, and the environmental field distribution map can be used to verify the predictive ability of the model.

[0034] Furthermore, the environmental parameters include geographical parameters and meteorological parameters;

[0035] Step S1 further includes the steps of:

[0036] The basic statistics of meteorological parameters are calculated, and the periodicity, trend and seasonal characteristics of meteorological parameters are identified. In combination with the geographical parameters, the environmental parameters are mapped into a spatial feature map.

[0037] As can be seen from the above description, basic statistics of environmental parameters, such as mean, standard deviation, maximum, minimum, peak-to-valley values, skewness, and kurtosis, are calculated to reflect the central tendency, dispersion, and distribution of the data. Periodicity, trends, and seasonal patterns in the data are identified to extract multi-scale features. The effects of factors such as geographic location, altitude, and topography on environmental parameters are considered, and the environmental parameters are mapped onto spatial feature maps, effectively demonstrating the joint characteristics of environmental parameters over time and space. Spatial feature maps can be used to verify the predictive capabilities of the model.

[0038] Furthermore, the method further comprises the steps of:

[0039] S4. Use a cross-validation method to verify the generalization ability of the device state prediction model and adjust the parameters of the device state prediction model.

[0040] From the above description, we can see that the cross-validation method is used to verify the generalization ability of the model, adjust the model parameters or optimize the model structure according to the actual application effect, and ensure the accuracy and reliability of the mapping relationship.

[0041] An application of a device state prediction model includes the following steps:

[0042] S1. Obtain environmental parameters at a future time, input them into the equipment status prediction model, and obtain equipment performance prediction data;

[0043] The device state prediction model is constructed using the above-mentioned method for constructing a device state prediction model;

[0044] S2. Adjusting the operating parameters of the equipment according to the performance prediction data.

[0045] From the above description, it can be seen that the beneficial effects of the present invention are: the application of an equipment status prediction model of the present invention obtains the environmental parameters and operating performance data of the equipment in extreme environments to analyze and construct a mathematical model for equipment status prediction, and can predict the equipment status based on the input environmental parameters, so that the staff can predict the working status of the threshold equipment in advance based on future environmental parameters, thereby making more timely and effective responses.

[0046] Furthermore, the performance prediction data includes the operating efficiency or safety risk of the equipment;

[0047] Step S2 includes the steps of:

[0048] S21. Determine whether the operating efficiency of the device has decreased to a preset efficiency threshold, or whether the safety risk has increased to a preset risk threshold. If so, adjust the cooling strategy and energy management strategy of the device.

[0049] As can be seen from the above description, if changes in environmental conditions cause equipment operating efficiency to decrease or safety risks to increase, the system adjusts equipment operating parameters, such as reducing energy storage output, changing cooling strategies, and optimizing energy management, to adapt to the new environmental conditions, maintain equipment performance, and protect the equipment from damage.

[0050] An energy storage system includes a controller, the controller including a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps in the application of the above-mentioned device state prediction model when executing the computer program.

[0051] As can be seen from the above description, the beneficial effects of the present invention are: an energy storage system of the present invention obtains environmental parameters and operating performance data of equipment in extreme environments to analyze and construct a mathematical model for equipment status prediction. It can predict the equipment status based on the input environmental parameters, so that personnel can predict the operating status of the threshold equipment in advance based on future environmental parameters, thereby making more timely and effective responses.

[0052] Furthermore, there are two controllers, namely a main controller and a backup controller;

[0053] The main controller and the standby controller further implement the following steps:

[0054] S1. The main controller regularly sends heartbeat signals to the standby controller;

[0055] S2. The standby controller verifies the heartbeat signal and determines whether the main controller is faulty. If so, the standby controller steps down the main controller to operate.

[0056] As can be seen from the above description, when the main controller encounters a failure or performance degradation, the backup controller can seamlessly switch and take over the control tasks to ensure the continuity of system operation.

[0057] The present invention provides a method for constructing a device state prediction model, its application, and an energy storage system, which are suitable for predicting the state of energy storage equipment when the environment changes, and are particularly suitable for predicting the state of energy storage equipment in extreme environments.

[0058] Please refer to Figure 1 , embodiment 1 of the present invention is:

[0059] A method for constructing an equipment status prediction model comprises the following steps:

[0060] S1. Obtain historical data of system operation, which includes environmental parameters and performance data.

[0061] In this embodiment, the system is equipped with a variety of sensors to monitor environmental parameters in real time, such as temperature, humidity, wind speed, light intensity, air pressure, dust concentration, etc. These sensors are placed in key locations of the energy storage system to ensure the accuracy and representativeness of the data.

[0062] Key locations refer to those locations that have a significant impact on the performance, safety, and life of the energy storage system, or the locations that are most directly and sensitive to changes in environmental conditions. In this embodiment, key locations include the following aspects:

[0063] a. Battery pack and its surrounding environment, including battery cells, battery modules / clusters;

[0064] b.Battery management system;

[0065] c.Battery compartment / cabinet;

[0066] d. Energy storage converter and cooling system;

[0067] e. Outdoor environment: Install wind speed, wind direction, rainfall, and dust concentration sensors at the outdoor installation location of the energy storage system, such as on top of containers and around outdoor brackets, to monitor the impact of extreme weather conditions on the energy storage system, such as wind load, rainwater penetration, and dust erosion.

[0068] In this embodiment, the monitored environmental data is analyzed in real time by a high-speed data processing unit. This processing unit uses advanced algorithms and models to clean, filter, fuse, and extract features from the environmental data to eliminate noise, improve data quality, and extract feature information useful for the energy storage control system.

[0069] Step S1 further includes the steps of:

[0070] S11. Preprocess the historical data, remove abnormal data, retain trend information of environmental parameters, and supplement missing data.

[0071] In this example, data points that are outside a reasonable range, are obviously erroneous, or do not conform to physical laws are identified and eliminated, retaining trend information of environmental parameters. Missing data are processed using methods such as interpolation, mean filling, and neighbor point replacement to ensure data integrity.

[0072] For each piece of historical data, the same environmental parameters collected in different ways are fused, and a continuous environmental field distribution map is generated based on the historical data.

[0073] In this embodiment, data of the same environmental parameter obtained by different sensors or different measurement methods are integrated, and more accurate and reliable comprehensive data are generated through a data fusion algorithm, and a continuous environmental field distribution map is generated.

[0074] The environmental parameters include geographical parameters and meteorological parameters;

[0075] The basic statistics of meteorological parameters are calculated, and the periodicity, trend and seasonal characteristics of meteorological parameters are identified. In combination with the geographical parameters, the environmental parameters are mapped into a spatial feature map.

[0076] In this embodiment, basic statistics of environmental parameters, such as mean, standard deviation, maximum, minimum, peak-to-valley values, skewness, and kurtosis, are calculated to reflect the central tendency, dispersion, and distribution of the data. Periodicity, trend, and seasonal patterns in the data are identified, and multi-scale features are extracted.

[0077] In this embodiment, environmental parameters include geographic parameters and meteorological parameters. In other equivalent embodiments, geographic parameters are obtained through other additional means. In this embodiment, based on geographic and meteorological parameters, the environmental parameters are mapped to a spatial feature map, taking into account the influence of geographic location, altitude, topography, and other factors on the environmental parameters. This maps the environmental parameters to the spatial feature map, taking into account the joint characteristics of the environmental parameters that vary over time and space.

[0078] S2. Establish a mapping relationship between environmental parameters and performance data in historical data.

[0079] In this embodiment, based on the above-mentioned processed features and combined with long-term historical data, statistical models are used for modeling and analysis.

[0080] Through long-term environmental monitoring and data accumulation, the system can establish a mapping relationship between environmental parameters and equipment performance. Statistical methods are used to analyze historical data to reveal the quantitative relationship between environmental parameter changes and equipment performance indicators.

[0081] S3. Analyze the quantitative relationship between the environmental parameters and the performance data in the historical data by statistical methods, and establish a mathematical model based on the analysis structure to obtain an equipment status prediction model.

[0082] In this embodiment, based on the above analysis results, a mathematical model or rule set is established, and the environmental parameters are used as input and the equipment performance or failure probability is used as output to obtain an equipment status prediction model.

[0083] Please refer to Figure 2 , the second embodiment of the present invention is:

[0084] An application of a device state prediction model includes the following steps:

[0085] S1. Obtain environmental parameters at a future time, input them into the equipment status prediction model, and obtain equipment performance prediction data;

[0086] The device state prediction model is constructed using the above-mentioned method for constructing a device state prediction model.

[0087] In this embodiment, based on the established equipment status prediction model, the system can predict the occurrence of potential failures and perform preventive maintenance in advance. For example, the system may detect a performance degradation trend of equipment under specific environmental conditions, thereby replacing wearing parts or adjusting operating parameters in advance to avoid failures.

[0088] S2. Adjusting the operating parameters of the equipment according to the performance prediction data.

[0089] In this embodiment, based on the performance prediction data predicted by the equipment status prediction model, the following maintenance decisions can be made:

[0090] a. Replacement of wearing parts: When a predicted performance degradation trend is clearly related to the wear or aging of specific wearing parts, the system will replace these wearing parts in advance to prevent their failure from causing equipment malfunction.

[0091] b. Operating parameter adjustment: If changes in environmental conditions lead to reduced equipment operating efficiency or increased safety risks, the system adjusts equipment operating parameters, such as reducing energy storage output, changing cooling strategies, and optimizing energy management, to adapt to the new environmental conditions, maintain equipment performance, and protect the equipment from damage.

[0092] In this embodiment, maintenance effect evaluation and feedback are also included:

[0093] After implementing preventive maintenance, the system tracks equipment performance recovery and evaluates maintenance effectiveness. If equipment performance does not improve as expected or the risk of failure persists after maintenance, it may be necessary to review the effectiveness of the mapping model or further optimize the maintenance strategy.

[0094] Please refer to Figure 3 and Figure 4 , the third embodiment of the present invention is:

[0095] An energy storage system includes a controller, the controller including a processor, a memory, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps in the application of a device state prediction model described in the second embodiment above when executing the computer program.

[0096] That is, in this embodiment, an adaptive control algorithm is designed for the energy storage system:

[0097] The system incorporates advanced adaptive control algorithms that analyze environmental parameters such as temperature, humidity, and vibration in real time and dynamically adjust control strategies accordingly. This adaptive capability enables the system to maintain optimal performance in diverse and extreme environments, reducing the risk of failure and extending equipment life.

[0098] In addition, in this embodiment, the energy storage system is designed with hardware redundancy and software redundancy, and is also scalable.

[0099] There are two controllers, namely a main controller and a backup controller;

[0100] The main controller and the standby controller further implement the following steps:

[0101] S1. The main controller regularly sends heartbeat signals to the standby controller;

[0102] S2. The standby controller verifies the heartbeat signal and determines whether the main controller is faulty. If so, the standby controller steps down the main controller to operate.

[0103] In this embodiment, the system core is designed with a primary controller and a backup controller. The primary controller is responsible for data processing and control tasks during normal operation, while the backup controller maintains real-time synchronization with the primary controller. If the primary controller fails or performance degrades, the backup controller can seamlessly take over control tasks, ensuring continuous system operation.

[0104] Please refer to Figure 3 The hardware redundancy architecture that enables seamless switchover between the primary and backup controllers typically includes the following key components:

[0105] a. Heartbeat detection unit:

[0106] A communication mechanism (such as serial or Ethernet) is established between the primary and backup controllers to periodically send heartbeat signals to confirm each other's operating status. The primary controller continuously sends heartbeat packets, which the backup controller receives and verifies. If a valid heartbeat signal from the primary controller is not received within a preset time window, the backup controller will assume that the primary controller may have failed.

[0107] b. Status monitoring and fault determination unit:

[0108] In addition to heartbeat-based monitoring, redundant systems may also include dedicated status monitoring modules or self-test functions integrated into the controller to detect hardware faults (such as power failure, CPU failure, memory errors, etc.), software anomalies (such as program crashes, deadlocks, etc.), and environmental factors (such as overheating and vibration) on the primary controller. This monitoring information is then analyzed to determine whether the primary controller is unavailable.

[0109] c. Redundant bus and synchronization unit:

[0110] Active and standby controllers are typically connected via a redundant bus (such as redundant Ethernet, dedicated redundant communication interfaces, or synchronous fiber-optic ring networks) to ensure that critical information, including real-time data, system status, and control instructions, from the active controller is transmitted to the standby controller in real time and integrity during normal operation. Synchronization mechanisms (such as time synchronization, data synchronization, and state synchronization) ensure that the standby controller always maintains the same system state as the active controller, allowing it to immediately take over control tasks when needed without reinitialization or reconfiguration.

[0111] d. Switching logic and control unit:

[0112] A redundant system includes an independent switching logic unit or controller monitoring module, which makes decisions based on heartbeat detection and status monitoring. If the primary controller is determined to be faulty, the unit triggers a switchover command, notifying the backup controller to take over and simultaneously severing control of the primary controller from the system.

[0113] e. Switch confirmation and fault recovery unit:

[0114] After the switch is complete, the system will perform a series of self-checks and confirmations to ensure that the backup controller has successfully taken over and the system is operating normally. At the same time, the failed primary controller may be restarted or put into maintenance mode so that it can rejoin the redundant system and serve as the new backup controller after repair.

[0115] Furthermore, this embodiment employs a modular hardware design for the system: key hardware units, such as the controller and electrical management system, utilize modular construction principles. Each module possesses independent and complete functionality, and a matching backup module is pre-installed. The core advantage of this modular design is that if a primary module fails, the system can instantly switch to the backup module, ensuring the continuity and stability of the overall system performance. Furthermore, this modular hardware redundancy system is highly flexible and scalable. When application scenarios place higher demands on system reliability, simply adding an additional set of modular hardware units can effectively improve system reliability.

[0116] Please refer to Figure 4 ,Realizing the scalability of modular hardware structure mainly involves the following aspects, and the corresponding circuit structure characteristics:

[0117] a. Standardized interface:

[0118] Modular hardware units must feature standardized physical interfaces and communication protocols to facilitate interconnection, replacement, and addition / subtraction of different modules. For example, using common electrical interfaces (such as PCI Express, USB, CAN bus, RS-485, etc.) or customized high-speed backplane interfaces ensures that newly added modules can seamlessly connect to the system bus and exchange data with the main controller or other modules. Standardized interfaces ensure compatibility and interoperability between modules, allowing system expansion without requiring significant modifications to existing circuitry.

[0119] b. Inter-module communication network:

[0120] To achieve efficient communication and data sharing between modules, systems typically employ distributed network architectures, such as daisy-chain, star, ring, bus, or hybrid topologies. For example, Ethernet, fieldbuses (such as PROFINET, EtherCAT, Modbus TCP), or customized high-speed data exchange buses can be used to build flexible communication networks. This network architecture supports plug-and-play, allowing new modules to be automatically recognized and integrated into the communication system without manual configuration.

[0121] c. Module identification and configuration management:

[0122] The system includes module identification and configuration management mechanisms. These mechanisms, such as using unique identifiers (e.g., MAC addresses, module IDs, serial numbers) and self-describing capabilities (e.g., spreadsheets and configuration files), enable the main controller or other management modules to automatically identify the type, function, and performance parameters of newly added modules. This allows the main controller to dynamically adjust system configurations, allocate resources, and update control strategies when modules are inserted into the system, ensuring that the new modules can quickly integrate and function effectively.

[0123] d. Hot plug support:

[0124] Modular hardware designs typically support hot swapping, which allows modules to be added, removed, or replaced while the system is running without downtime. This requires circuit structures with features such as transient voltage surge protection, arc suppression, and power management to ensure that module insertion and removal do not disrupt or damage the system.

[0125] e. Redundancy and load balancing:

[0126] For critical modules, the system may employ a redundant design, with each active module having a corresponding backup module. If the active module fails, the system automatically switches to the backup module using pre-defined switching logic. Furthermore, for scalable modular systems, load balancing may be implemented, dynamically allocating tasks to each module via a master controller or dedicated management module to ensure efficient utilization of system resources and optimized performance.

[0127] At the same time, the software redundancy architecture and adaptive control algorithm are explained:

[0128] Software redundancy architecture:

[0129] The system software is divided into multiple key modules, each responsible for a specific function. Each module is equipped with a backup module to ensure that if a module fails, the backup module can quickly take over the task and ensure the continuity of system functions.

[0130] Furthermore, hardware reliability has been enhanced to address the extreme environments this invention addresses: all hardware components have been specially treated to withstand these conditions. For example, high and low temperature resistant materials, waterproof and dustproof design, and corrosion-resistant coatings are used to ensure stable operation under these conditions.

[0131] In summary, the present invention provides a method for constructing a device status prediction model, its application, and an energy storage system, which obtains environmental parameters and operating performance data of the device in extreme environments to analyze and construct a mathematical model for device status prediction. The model can predict the device status based on the input environmental parameters, so that the staff can predict the working status of the threshold device in advance based on future environmental parameters, thereby making more timely and effective responses.

[0132] The integrated hardware and software dual redundancy design significantly enhances the system's safety and reliability, ensuring that even in the event of a main circuit communication interruption or power failure, the system can quickly switch to the backup circuit to maintain uninterrupted operation.

[0133] With the optimization and upgrade of intelligent adaptive regulation and refined control strategies, the system can dynamically adjust according to different environmental conditions, always maintain optimal performance, effectively suppress the possibility of failure, and also extend the overall service life of the equipment.

[0134] Specifically, this invention significantly improves the stability and reliability of energy storage control systems in extreme environments through the integrated application of hardware redundancy, software redundancy, and adaptive strategies (environmental awareness and dynamic adjustment). This approach is crucial for ensuring the safe and stable operation of energy storage systems in these extreme environments and provides new insights and directions for technological development in related fields.

[0135] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent transformations made using the contents of the present invention's description and drawings, or directly or indirectly applied in related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A method for constructing a device state prediction model, characterized in that: Includes steps: S1. Obtain historical data of system operation, wherein the historical data includes environmental parameters and performance data; S2, establishing a mapping relationship between environmental parameters and performance data in historical data; S3. Analyze the quantitative relationship between the environmental parameters and the performance data in the historical data by statistical methods, and establish a mathematical model based on the analysis structure to obtain an equipment status prediction model.

2. The method for constructing a device state prediction model according to claim 1, characterized in that: Step S1 also includes the steps of: S11. Preprocess the historical data, remove abnormal data, retain trend information of environmental parameters, and supplement missing data.

3. The method for constructing a device status prediction model according to claim 1, characterized in that: Step S1 also includes the steps of: For each piece of historical data, the same environmental parameters collected in different ways are fused, and a continuous environmental field distribution map is generated based on the historical data.

4. The method for constructing a device status prediction model according to claim 1, characterized in that: The environmental parameters include geographical parameters and meteorological parameters; Step S1 also includes the steps of: The basic statistics of meteorological parameters are calculated, and the periodicity, trend and seasonal characteristics in the meteorological parameters are identified. In combination with the geographic parameters, the environmental parameters are mapped into a spatial feature map.

5. The method for constructing a device state prediction model according to claim 1, characterized in that: Also includes the steps: S4. Use a cross-validation method to verify the generalization ability of the device state prediction model, and adjust the parameters of the device state prediction model.

6. An application of a device state prediction model, characterized in that: Includes steps: S1. Obtain environmental parameters at a future time, input them into the equipment status prediction model, and obtain equipment performance prediction data; The device state prediction model is constructed by using a method for constructing a device state prediction model according to any one of claims 1 to 5 above; S2. Adjusting the operating parameters of the equipment according to the performance prediction data.

7. The application of the equipment status prediction model according to claim 6, characterized in that: The performance prediction data includes the operating efficiency or safety risk of the equipment; Step S2 comprises the steps of: S21. Determine whether the operating efficiency of the device is reduced to reach a preset efficiency threshold, or whether the safety risk is increased to reach a preset risk threshold. If so, adjust the cooling strategy and energy management strategy of the device.

8. An energy storage system, comprising a controller, the controller comprising a processor, a memory, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps in the application of the device state prediction model described in claim 6 or 7 are implemented.

9. An energy storage system according to claim 8, characterized in that: There are two controllers, namely a main controller and a standby controller; The main controller and the standby controller also implement the following steps: S1. The main controller sends a heartbeat signal to the standby controller regularly; S2. The standby controller verifies the heartbeat signal and determines whether the main controller is faulty. If so, the standby controller is stepped up to operate.

Citation Information

Patent Citations

  • Compact integrated redundancy controller and control method thereof

    CN101271332A

  • Equipment state prediction method and device, storage medium and electronic device

    CN109784574A

  • Construction method and device of equipment operation condition prediction model and storage medium

    CN117076984A

  • Cloud computing-based highway electromechanical equipment operation and maintenance decision processing method and system

    CN117592975A

  • Intelligent equipment monitoring and maintenance system

    CN118134458A