Method for predicting and optimizing operation strategy of two-stage refrigerating machine room

Through a two-stage refrigeration machine room operation strategy prediction and optimization method, discrete and continuous variables are separated, and naive search and optimization algorithms are used to optimize the energy consumption of the refrigeration machine room. This solves the problems of complex calculation and poor energy consumption optimization in the existing technology, and achieves more efficiency. energy management.

CN118735033APending Publication Date: 2024-10-01CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410715057.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing refrigeration machine room operation strategy methods, such as rule-based control strategies, reinforcement learning, model predictive control and parameter optimization, have problems such as high computational complexity, high experimental costs, high risk costs, or are not suitable for large public buildings, making it difficult to Effectively optimize the energy consumption of refrigeration equipment rooms in large public buildings.

Method used

A two-stage refrigeration machine room operation strategy prediction and optimization method is adopted. By acquiring and preprocessing machine room data, the equipment energy consumption model is established, discrete variables and continuous variables are separated, and naive search and optimization algorithms (such as genetic algorithms or improved differential evolution algorithms) are respectively used. To solve the optimization problem, the load prediction results of two time steps are introduced to reduce energy consumption.

Benefits of technology

It reduces the calculation difficulty, improves the calculation efficiency, reduces the cumulative energy consumption problems caused by load fluctuations, and significantly improves the energy efficiency ratio of the refrigeration machine room.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735033A_ABST
    Figure CN118735033A_ABST
Patent Text Reader

Abstract

The invention relates to the field of refrigerating machine room operation strategy optimization, and provides a two-stage refrigerating machine room operation strategy prediction optimization method in order to facilitate calculation of values of decision variables. Decision variables are divided into discrete variables and continuous variables, and the discrete variables adopt a naive search mechanism to obtain an optimal set value; the optimal set value of the continuous variable is obtained by adopting an optimization algorithm, the calculation difficulty is reduced, and the calculation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of refrigeration room operation strategy optimization, and in particular to a two-stage refrigeration room operation strategy prediction and optimization method. Background Art

[0002] Large public buildings have high operating energy consumption. Their refrigeration rooms can centrally produce chilled water and then transport it to various cooling areas at the end of the building. A good operation strategy can ensure efficient and economic operation of the refrigeration room while ensuring the end load demand. There are four main energy-saving optimization methods for refrigeration rooms: reinforcement learning, model predictive control, rule-based control strategy, and parameter optimization.

[0003] Rule-based control strategy (RBC) is a method that uses pre-set rules and logic to control system behavior. It can simplify the complexity of the actual system, but the load patterns of large public buildings are changeable and difficult to cover by rules, so it is not applicable. Reinforcement learning (RL) is a method of learning optimal behavior through trial and error and reward and punishment mechanisms. It has good simulation effects, but the experimental cost is high and the cycle is long. The risk cost is too high for large public buildings and is currently rarely used in practice. Model predictive control (MPC) is a method of formulating optimal control strategies based on model predictions of the future behavior of the system. It has high control accuracy but complex calculation process and is basically used in small residential buildings. Parameter optimization is a method of adjusting system parameters to achieve specific goals. It is more suitable for large public buildings, but the parameter optimization calculation process is complex and the calculation efficiency is not high. Summary of the invention

[0004] In order to facilitate the calculation of the values ​​of decision variables, the present application provides a two-stage refrigeration room operation strategy prediction and optimization method.

[0005] The technical solution adopted by the present invention to solve the above problems is:

[0006] The two-stage refrigeration room operation strategy prediction and optimization method includes:

[0007] Step 1: Obtain the data of the equipment room cooling season operation and pre-process it;

[0008] Step 2: Use the prediction model to predict the cooling load data required by the building and output the load prediction result at time t;

[0009] Step 3: Establish an equipment energy consumption model based on the mechanism model of each electromechanical equipment in the computer room;

[0010] Step 4: Establishing a refrigeration room operation strategy optimization problem model, including: constructing an objective function, selecting decision variables and establishing constraint conditions based on load forecast results and equipment operation conditions; the decision variables include discrete variables and continuous variables;

[0011] Step 5: Solve the refrigeration room operation strategy optimization problem model to obtain the optimal setting values ​​of the decision variables. The discrete variables use a naive search mechanism to obtain the optimal setting values, and the continuous variables use an optimization algorithm to obtain the optimal setting values.

[0012] Furthermore, in step 1, the preprocessing includes: performing linear interpolation processing on missing values; and detecting and deleting outliers based on the interquartile range.

[0013] Furthermore, in step 3, the electromechanical equipment includes a chiller, a variable frequency water pump and a cooling tower.

[0014] Furthermore, the step 3 includes: step 31, determining an energy consumption model:

[0015] The energy consumption model of the chiller is expressed as: Where P chiller is the energy consumption of the chiller, a1~a6 are the coefficients to be fitted, Δ=T cws -T chws , T cws is the cooling water supply temperature, T chws is the chilled water supply temperature, PLR is the ratio of the actual cooling load of the chiller to the rated cooling load, and CL0 is the rated cooling load;

[0016] The energy consumption model of variable frequency water pump is expressed as: P pump =b1+b2·W pump +b3·W pump 2 +b4·W pump 3 , where b1~b4 are the coefficients to be fitted, W pump is the speed ratio of the variable frequency water pump;

[0017] The cooling tower energy consumption model is expressed as: P ct =c1+c2·W ct +c3·W ct 2 +c4·W ct 3 , c1~c4 are the coefficients to be fitted, W ct is the speed ratio of the cooling tower fan;

[0018] Step 32: Use the operating data collected in step 1 to fit and obtain the values ​​of a1-a6, b1-b4, c1-c4.

[0019] Furthermore, the step 4 comprises:

[0020] Step 41: Construct objective function: Min{P chiller (t)+Ppump (t)+P ct (t)};P chiller (t) represents the power of the chiller at time t, P pump (t) represents the power of the variable frequency water pump at time t, P ct (t) represents the power of the cooling tower at time t;

[0021] Step 42: Select decision variables, where continuous variables include: chilled water supply temperature T chws , Cooling water supply temperature T cws , the ratio of the actual cooling load of the chiller to the rated cooling load PLR; discrete variables include: chilled water pump speed ratio W chw , Cooling water pump speed ratio W cw , Cooling tower fan speed ratio W ct And the number of N devices that are enabled for each device;

[0022] Step 43: Establish constraint conditions based on load forecast results and equipment operation conditions.

[0023] Furthermore, in step 5, the optimization algorithm is a genetic algorithm GA, a differential evolution algorithm DE or an improved differential evolution algorithm APDE.

[0024] Furthermore, the specific steps of the improved differential evolution algorithm APDE are as follows:

[0025] S1. Initialization: Initialize each solution X to a random number between a given minimum and maximum value, and uniformly distributed between 0 and 1, as shown in the following formula, where i is the number of the solution, j is the number of the dimension, and 0 represents the 0th generation;

[0026] X i,j,0 =Min j +rand i,j [0,1]·(Max j -Min j )

[0027] S2, mutation: adopt DE / current-to-pbest / 1 mutation strategy, as shown in the following formula:

[0028]

[0029] Where G is the current generation and F is the scaling factor. is the best individual of generation G, Select from the union of the current and eliminated sets, Random selection;

[0030] S3. Recombination: Using recombinant factor C rSpecify the update rule of the dimension variable as shown below:

[0031]

[0032] Where U i,j,G V represents the value of the new solution at position j after reorganization; i,j,G represents the value of the mutation vector at position j; X i,j,G represents the original solution, j rand represents rand(0,D);

[0033] S4, select: f(X i,G ) is the fitness function value of the corresponding solution, and the offspring is generated according to the following formula;

[0034]

[0035] S5. Parameter update: Decay the population according to the following equation:

[0036]

[0037] Among them, N min : minimum population value; N max : maximum value of the population; nfe: current number of calculations; maxnfe: maximum number of calculations; DI: population dispersion, DI last : the last population dispersion degree; RP: relative diversity; Current population mean;

[0038] Repeat steps S1-S5, stop searching when the maximum number of iterations is reached or the objective function value converges, and output the optimal solution to the corresponding problem.

[0039] Furthermore, the step 2 is specifically as follows: using the prediction model to predict the cooling load data required by the building, and outputting the load prediction results at time t and time t+1;

[0040] The step 4 constructs an objective function based on the load forecast results at time t and time t+1.

[0041] Furthermore, in step 2, the prediction model is a time series fusion prediction model TFT.

[0042] Compared with the prior art, the present invention has the following beneficial effects: the present invention divides the decision variables of the refrigeration room into discrete variables and continuous variables, and adopts different solution methods for different variables, thereby reducing the difficulty of calculation and improving the calculation efficiency. At the same time, the load prediction results of 2 time steps are introduced into the optimization objective function, thereby reducing the problem of cumulative energy consumption generated during load fluctuation. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 A roadmap for predicting and optimizing the operation strategy of a two-stage refrigeration room;

[0044] Figure 2 This is a schematic diagram of the process of simply searching for the optimal value of the variable frequency water pump;

[0045] Figure 3 Schematic diagram of the process of improving the differential evolution algorithm APDE;

[0046] Figure 4 This is a structural diagram of a refrigeration room in a large public building;

[0047] Figure 5 A roadmap of a two-stage refrigeration room operation strategy prediction and optimization method corresponding to the embodiment;

[0048] Figure 6 The total energy consumption change diagram before and after optimization of each optimization strategy;

[0049] Figure 7 The hourly EER curve of the refrigeration room under various optimization strategies;

[0050] Figure 8 To predict the changes in energy consumption of different devices under optimization. DETAILED DESCRIPTION

[0051] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0052] like Figure 1 As shown, the two-stage refrigeration room operation strategy prediction and optimization method includes:

[0053] Step 1: Use the refrigeration room monitoring system to obtain the room refrigeration season operation data. The collected data are shown in Table 1, where the meteorological data (env) includes dry bulb temperature (AT), wet bulb temperature (Twb), radiation intensity (SI), wind speed (WS), wind direction (WD) and absolute humidity (AH). After processing the missing values ​​and outliers of the data set, proceed to the next step.

[0054] Among them, linear interpolation is performed on missing values:

[0055]

[0056] Detect and remove outliers based on the interquartile range: The interquartile range (IQR) is defined as the difference between the first quartile Q1 and the third quartile Q3, which is used to measure data variability. Outliers are usually identified as observations that satisfy Q3+1.5·IQR<outlier<Q1-1.5·IQR.

[0057] Table 1 Operation parameters

[0058]

[0059]

[0060] Step 2: Use the prediction model to predict the cooling load data required by the building and output the load prediction result at time t.

[0061] Step 3: Establish the equipment energy consumption model based on the mechanism model of each electromechanical equipment in the computer room. The electromechanical equipment of large public buildings generally includes chillers, variable frequency water pumps (cooling water pumps and freezing water pumps) and cooling towers. The equipment energy consumption model is as follows:

[0062] The energy consumption model of the chiller is expressed as: Where P chiller is the energy consumption of the chiller, a1~a6 are the coefficients to be fitted, Δ=T cws -T chws , T cws is the cooling water supply temperature, T chws is the chilled water supply temperature, PLR is the partial load rate of the chiller, which is the ratio of the actual cooling load of the chiller to the rated cooling load, and CL0 is the rated cooling load;

[0063] According to the liquid kinetic energy theorem and the definition of power, the energy consumption of the pump P pump It can be expressed as: Where ρ is the density of water, g is the acceleration due to gravity, m / s 2 , L is the water flow rate in the corresponding water pump, m 3 / h, H is the head of the variable frequency water pump, m, η is the efficiency of the variable frequency water pump. As the speed changes, the performance parameters of the water pump follow the similarity law of the water pump: Where P is the operating power of the pump, kW; n is the speed, rpm; W pump is the pump speed ratio, L m , H m , P m 、n m It represents the corresponding variable value at the rated operating point m. Therefore, the energy consumption of the water pump and the water pump speed ratio present a cubic function relationship, as shown in the following formula:

[0064] P pump=b1+b2·W pump +b3·W pump 2 +b4·W pump 3

[0065] Where b1~b4 are the coefficients to be fitted.

[0066] The cooling tower energy consumption model is expressed as: P ct =c1+c2·W ct +c3·W ct 2 +c4·W ct 3 , c1~c4 are the coefficients to be fitted, W ct is the speed ratio of the cooling tower fan.

[0067] The operating data collected in step 1 is used to fit and obtain the values ​​of a1 to a6, b1 to b4, and c1 to c4.

[0068] Step 4: Establish a model for the optimization problem of the refrigeration room operation strategy, which mainly includes the objective function, decision variables and constraints, including:

[0069] Step 41: Construct objective function: Min{P chiller (t)+P pump (t)+P ct (t)};P chiller (t) represents the power of the chiller at time t, P pump (t) represents the power of the variable frequency water pump at time t, P ct (t) represents the power of the cooling tower at time t.

[0070] The objective function constructed based on one time step is prone to cumulative energy consumption during load fluctuations. In order to reduce cumulative energy consumption, when the prediction model is used in step 2 to predict the cooling load data required by the building, the load prediction results at time t and time t+1 can be output. When constructing the objective function, the load prediction results at time t and time t+1 are introduced into the objective function, expressed as: Min{P chiller (t, t+1)+P pump (t, t+1)+P ct (t, t+1)}, P chiller (t, t+1) represents the power of the chiller at time t and time t+1, P pump (t, t+1) represents the power of the variable frequency pump at time t and time t+1, P ct (t, t+1) represents the power of the cooling tower at time t and time t+1.

[0071] Step 42: Select decision variables. The decision variables are composed of controllable variables of each device, including continuous variables and discrete variables. Continuous variables include: Chilled water supply temperature T chws , Cooling water supply temperature T cws , the ratio of the actual cooling load of the chiller to the rated cooling load PLR; discrete variables include: chilled water pump speed ratio W chw , Cooling water pump speed ratio W cw , Cooling tower fan speed ratio W ct And the number of N devices that are enabled for each device;

[0072] Step 43: Establish constraint conditions based on the load forecast results and the equipment operation conditions. The constraint conditions are determined by the equipment parameters of different implementation instances and are solved using an exterior point penalty function.

[0073] The model in step 4 includes discrete variables and continuous variables. Directly optimizing the entire model will involve a large amount of optimization verification work, which is extremely complex. Therefore, this application designs a two-stage solution optimization algorithm.

[0074] First, for discrete variables, such as the chilled water pump speed ratio W chw , Cooling water pump speed ratio W cw , cooling tower fan frequency ratio W ct and the number of powered-on devices N, a naive search mechanism is constructed to traverse the devices and find the optimal value corresponding to the minimum energy consumption to simplify the optimization process.

[0075] Taking the variable frequency water pump as an example, the specific process of simple search is as follows Figure 2 As shown. First, calculate the chilled water and cooling water flow of the corresponding refrigeration room according to the building's required cooling load, then circulate i devices, calculate the corresponding speed ratio and corresponding equipment energy consumption, and finally determine the number and speed of variable frequency water pumps that minimize energy consumption. Use the same method to determine the optimal number of equipment turned on and fan speed ratio for the cooling tower.

[0076] For continuous variables (chilled water supply temperature T chws , Cooling water supply temperature T cws , PLR) is solved by an optimization algorithm, such as a genetic algorithm GA, a differential evolution algorithm DE or an improved differential evolution algorithm APDE.

[0077] In order to improve the accuracy of the solution, this application uses the improved differential evolution algorithm APDE for solution. The improved differential evolution algorithm APDE is based on the DE / current-to-pbest / 1 mutation strategy and uses the parameter files of successfully updated individuals to optimize F and C. r The value is set and the population size is decayed using an adaptive strategy. Figure 3 As shown, the specific steps are as follows:

[0078] S1. Initialization: Initialize each solution X to a random number between a given minimum and maximum value, and uniformly distributed between 0 and 1, as shown in the following formula, where i is the number of the solution, j is the number of the dimension, and 0 represents the 0th generation;

[0079] X i,j,0 =Min j +rand i,j [0,1]·(Max j -Min j )

[0080] S2, mutation: adopt DE / current-to-pbest / 1 mutation strategy, as shown in the following formula:

[0081]

[0082] Where G is the current generation and F is the scaling factor. is the best individual of generation G, Select from the union of the current and eliminated sets, Random selection;

[0083] S3. Recombination: Using recombinant factor C r Specify the update rule of the dimension variable as shown below:

[0084]

[0085] Where U i,j,G V represents the value of the new solution at position j after reorganization; i,j,G represents the value of the mutation vector at position j; X i,j,G represents the original solution. rand Represents rand(0,D), which is used to randomly change some positions to force the solution to change and avoid C r Too small;

[0086] S4, select: f(X i,G ) is the fitness function value of the corresponding solution, and the present invention is the objective function constructed in step 4, and the offspring is selected according to the following formula;

[0087]

[0088] S5. Parameter update: Decay the population according to the following equation:

[0089]

[0090] Among them, N min : minimum population value; N max: maximum value of the population; nfe: current number of calculations; maxnfe: maximum number of calculations; DI: population dispersion, DI last : the last population dispersion degree; RP: relative diversity; Current population mean;

[0091] Repeat steps S1-S5, and stop searching when the maximum number of iterations is reached or the objective function value converges, and then the optimal solution to the corresponding problem can be output.

[0092] This application divides the decision variables of the refrigeration room into discrete variables and continuous variables, and uses different solution methods for different variables, which reduces the difficulty of calculation and improves the calculation efficiency. The load forecast results of 2 time steps are introduced into the optimization objective function to reduce the cumulative energy consumption problem caused by load fluctuations.

[0093] Example

[0094] Take a large public building in a real project as an implementation case. The structure of the refrigeration room in this case is as follows: Figure 4 As shown. The detailed parameters of the equipment are as follows

[0095] Table 2 Equipment parameters

[0096]

[0097] The operation data of the refrigeration room was collected, totaling 6576 data. After analyzing the operation status of the refrigeration room, it was found that due to the current manual adjustment of some set values, the EER of the refrigeration room before optimization fluctuated in the range of 2.006-3.771, and the operation performance was unstable. The monthly average EER was 3.093, which was in urgent need of improvement. It was necessary to implement energy-saving optimization measures for the refrigeration room to improve the energy efficiency level of the room.

[0098] like Figure 5 As shown, the two-stage refrigeration room operation strategy prediction and optimization method includes:

[0099] S100: Data collection and preprocessing: using the refrigeration room monitoring system to obtain the room refrigeration season operation data and preprocessing it.

[0100] S200: Use the TFT prediction model to predict the cooling load data and output the load prediction results CL(t) and CL(t+1) at time t and time t+1. Different implementation cases can select higher-precision prediction models, such as LSTM, XGBoost and other models, depending on the situation.

[0101] S300: Establish the energy consumption model of the equipment according to the mechanism model of each electromechanical equipment (chiller, variable frequency water pump, cooling tower) in the computer room, and use the operation data collected in S100 to fit the parameters of the energy consumption model based on the least squares method. The results are shown in the following table:

[0102] Table 3 Fitting parameters

[0103]

[0104] S400: Optimization Problem Modeling:

[0105] Objective function: Min{P chiller (t, t+1)+P pump (t, t+1)+P ct (t, t+1)};

[0106] Decision variable: Chilled water supply temperature T chws , Cooling water supply temperature T cws , PLR; chilled water pump speed ratio W chw , Cooling water pump speed ratio W cw , Cooling tower fan speed ratio W ct And the number of devices N that are turned on.

[0107] Constraints: The cooling capacity of the refrigeration room does not exceed the rated cooling capacity Q of the chiller n (i) is actually to control the PLR ​​in the range of [0,1], as shown in the formula: Q chiller (i) = Q n (i) PLR(k)≤Q n (i).

[0108] T chws and T cws It is the key parameter of supervisory control. According to the operation characteristics: 5℃≤T chws ≤13℃,T chws ≤T chwr ; 22℃≤T cws ≤37℃,T wb +1≤T cws ≤T cwr .

[0109] For the variable frequency water pump speed ratio and cooling fan frequency, the unit is expressed in percentage and must meet the following conditions: 0≤W ct , W chw , W cw ≤1.

[0110] S500: According to the control strategy of the computer room, a naive search is used to obtain the optimal value for the chilled water pump speed ratio, cooling water pump speed ratio, cooling tower fan frequency ratio and the number of units turned on.

[0111] S600: Applying an optimization algorithm to solve the optimization problem.

[0112] S700: Output the best operation strategy.

[0113] The processing results of different optimization algorithms are shown in the following table:

[0114] Table 4 Comparison of results of different optimization algorithms

[0115]

[0116]

[0117] S800: Verify the performance of the computer room. Performance evaluation indicators: Energy saving rate (ER) and energy efficiency ratio (EER) of the computer room

[0118]

[0119] Where P ori is the energy consumption of the original strategy of the computer room, kW; P op is the energy consumption of the computer room generated by the optimization strategy, in kW; CL is the total cooling load generated by the computer room per unit time, in kWth; W is the total electrical energy consumed by the computer room per unit time, in kW.

[0120] A comparative experiment was conducted on four test days between static optimization (considering only one time step) and predictive optimization (based on two time steps), and the energy consumption values ​​were accumulated. The overall results are shown in the following table. It can be seen that predictive optimization achieved better prediction results.

[0121] Table 5 Comparison between static optimization and predictive optimization

[0122]

[0123] Visualize the optimization situation in the computer room, such as Figure 6 As shown in the figure, the energy consumption of each device in the computer room and the overall energy consumption of the computer room before and after the implementation of different optimization strategies are displayed. The results show that among the several optimization strategies, predictive optimization has the best effect. Figure 7 It is the hourly EER curve of the refrigeration room under various optimization strategies. It can be seen that after applying the prediction optimization method proposed in the present invention, the energy efficiency ratio of the room increases at each moment, is at the top, and has the best effect.

[0124] The energy consumption changes of different devices under prediction optimization are as follows Figure 8 As shown in the figure, it can be seen that the energy consumption of the chiller and the room are in a downward trend, and the energy consumption of the variable frequency water pump is significantly reduced after optimization. Although the energy consumption of the cooling tower increases, the overall energy efficiency of the refrigeration room is improved due to its low power consumption characteristics.

Claims

1. A two-stage refrigeration room operation strategy prediction and optimization method, characterized in that: include: Step 1: Obtain the data of the equipment room cooling season operation and pre-process it; Step 2: Use the prediction model to predict the cooling load data required by the building and output the load prediction result at time t; Step 3: Establish an equipment energy consumption model based on the mechanism model of each electromechanical equipment in the computer room; Step 4: Establishing a refrigeration room operation strategy optimization problem model, including: constructing an objective function, selecting decision variables and establishing constraint conditions based on load forecast results and equipment operation conditions; the decision variables include discrete variables and continuous variables; Step 5: Solve the refrigeration room operation strategy optimization problem model to obtain the optimal setting values ​​of the decision variables. The discrete variables use a naive search mechanism to obtain the optimal setting values, and the continuous variables use an optimization algorithm to obtain the optimal setting values.

2. The two-stage refrigeration room operation strategy prediction and optimization method according to claim 1 is characterized in that: In the step 1, the preprocessing includes: performing linear interpolation on missing values; and detecting and deleting outliers based on the interquartile range.

3. The two-stage refrigeration room operation strategy prediction and optimization method according to claim 1 is characterized in that: In step 3, the electromechanical equipment includes a chiller, a variable frequency water pump and a cooling tower.

4. The two-stage refrigeration room operation strategy prediction and optimization method according to claim 3 is characterized in that: The step 3 includes: step 31, determining an energy consumption model: The energy consumption model of the chiller is expressed as: Where P chiller is the energy consumption of the chiller, a1~a6 are the coefficients to be fitted, Δ=T cws -T chws , T cws is the cooling water supply temperature, T chws is the chilled water supply temperature, PLR is the ratio of the actual cooling load of the chiller to the rated cooling load, and CL0 is the rated cooling load; The energy consumption model of variable frequency water pump is expressed as: P pump =b1+b2·W pump +b3·W pump 2 +b4·W pump 3 , where b1~b4 are the coefficients to be fitted, W pump is the speed ratio of the variable frequency water pump; The cooling tower energy consumption model is expressed as: P ct =c1+c2·W ct +c3·W ct 2 +c4·W ct 3 , c1~c4 are the coefficients to be fitted, W ct is the speed ratio of the cooling tower fan; Step 32: Use the operating data collected in step 1 to fit and obtain the values ​​of a1-a6, b1-b4, c1-c4.

5. The two-stage refrigeration room operation strategy prediction and optimization method according to claim 4 is characterized in that: The step 4 comprises: Step 41: Construct objective function: Min{P chiller (t)+P pump (t)+P ct (t)};P chiller (t) represents the power of the chiller at time t, P pump (t) represents the power of the variable frequency water pump at time t, P ct (t) represents the power of the cooling tower at time t; Step 42: Select decision variables, where continuous variables include: chilled water supply temperature T chws , Cooling water supply temperature T cws , the ratio of the actual cooling load of the chiller to the rated cooling load PLR; discrete variables include: chilled water pump speed ratio W chw , Cooling water pump speed ratio W cw , Cooling tower fan speed ratio W ct And the number of N devices that are enabled for each device; Step 43: Establish constraint conditions based on load forecast results and equipment operation conditions.

6. The two-stage refrigeration room operation strategy prediction and optimization method according to claim 1 is characterized in that: In step 5, the optimization algorithm is a genetic algorithm GA, a differential evolution algorithm DE or an improved differential evolution algorithm APDE.

7. The two-stage refrigeration room operation strategy prediction and optimization method according to claim 6 is characterized in that: The specific steps of the improved differential evolution algorithm APDE are: S1. Initialization: Initialize each solution X to a random number between a given minimum and maximum value, and uniformly distributed between 0 and 1, as shown in the following formula, where i is the number of the solution, j is the number of the dimension, and 0 represents the 0th generation; X i,j,0 =My j +stripe i,j [0.1]·(Max j -My j ) S2, mutation: adopt DE / current-to-pbest / 1 mutation strategy, as shown in the following formula: Where G is the current generation and F is the scaling factor. is the best individual of generation G, Select from the union of the current and eliminated sets, Random selection; S3. Recombination: Using recombinant factor C r Specify the update rule of the dimension variable as shown below: Where U i,j,G V represents the value of the new solution at position j after reorganization; i,j,G represents the value of the mutation vector at position j; X i,j,G represents the original solution, j rand represents rand(0,D); S4, select: f(X i,G ) is the fitness function value of the corresponding solution, and the offspring is generated according to the following formula; S5. Parameter update: Decay the population according to the following equation: Among them, N min : minimum population value; N max : maximum value of the population; nfe: current number of calculations; maxnfe: maximum number of calculations; DI: population dispersion, DI last : the last population dispersion degree; RP: relative diversity; Current population mean; Repeat steps S1-S5, stop searching when the maximum number of iterations is reached or the objective function value converges, and output the optimal solution to the corresponding problem.

8. The two-stage refrigeration room operation strategy prediction and optimization method according to any one of claims 1 to 7, characterized in that: The step 2 specifically includes: using the prediction model to predict the cooling load data required by the building, and outputting the load prediction results at time t and time t+1; The step 4 constructs an objective function based on the load forecast results at time t and time t+1.

9. The two-stage refrigeration room operation strategy prediction and optimization method according to claim 8 is characterized in that: In the step 2, the prediction model is a time series fusion prediction model TFT.