Resource management method, device and equipment and computer readable medium

Through the collection and preprocessing of data by edge computing devices, the target large model is used to predict resource needs and implement resource collaboration strategies, which solves the problem of dynamic allocation and efficient utilization of resources in multi-tenant office spaces, achieves refined management and efficient utilization of resources, and improves overall utilization.

CN118735206APending Publication Date: 2024-10-01GREE ELECTRIC APPLIANCE INC OF ZHUHAI +1
View PDF 0 Cites 6 Cited by

Patent Information

Application Number
CN202410885167.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Existing multi-tenant office space management methods are difficult to achieve dynamic allocation and efficient utilization of resources, resulting in resource waste and low utilization.

Method used

Collect environmental status data and resource status data of multi-tenant office areas through edge computing devices, pre-process and input the target large model for prediction, execute resource collaboration strategies based on resource demand trends and tenant optimization goals, and dynamically allocate resources to ensure sufficient resources. and efficient utilization.

Benefits of technology

It achieves refined management and efficient utilization of multi-tenant office area resources, reduces resource idle time, increases resource utilization frequency, and reduces the data processing burden on the cloud.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735206A_ABST
    Figure CN118735206A_ABST
Patent Text Reader

Abstract

The invention relates to a resource management method, device and equipment and a computer readable medium. The method comprises the steps that preprocessing data sent by an edge computing device is received, and the edge computing device is used for collecting environment state data and resource state data of a multi-tenant office area and preprocessing the environment state data and the resource state data to obtain the preprocessing data; inputting the preprocessed data into a target large model, and predicting a resource demand trend of the multi-tenant office area by using the target large model; and executing a resource cooperation strategy to dynamically allocate resources of the multi-tenant office area based on the resource demand trend and a resource optimization target configured for each tenant in advance. According to the method, trend prediction is carried out on the resource use condition by applying a large model, fine management and allocation are carried out on the resources of the multi-tenant office area through the resource coordination strategy, and the technical problem that dynamic allocation and efficient utilization of the resources are difficult to realize is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of resource management technology, and in particular to a resource management method, apparatus, device and computer-readable medium. Background Art

[0002] With the rapid development of the modern business environment, multi-tenant office space has become more and more common as a new office model. The multi-tenant office space model allows multiple different organizations or individuals to share office resources in the same physical space, such as conference rooms, rest areas, printing equipment, network bandwidth, power supply, water supply, etc. However, due to the large number of tenants and the different needs and usage habits of each tenant, the existing multi-tenant office space management methods are difficult to achieve dynamic allocation and efficient utilization of resources when facing complex resource management issues.

[0003] There is currently no effective solution to the problem of difficulty in achieving dynamic allocation and efficient utilization of resources. Summary of the invention

[0004] The present application provides a resource management method, apparatus, device and computer-readable medium to solve the technical problem of difficulty in achieving dynamic allocation and efficient utilization of resources.

[0005] According to one aspect of an embodiment of the present application, the present application provides a resource management method, applied to a cloud server, comprising: receiving preprocessed data sent by an edge computing device, wherein the edge computing device is used to collect environmental status data and resource status data of a multi-tenant office area, and preprocessing the environmental status data and the resource status data to obtain the preprocessed data; inputting the preprocessed data into a target big model to use the target big model to predict the resource demand trend of the multi-tenant office area; executing a resource collaboration strategy to dynamically allocate resources to the multi-tenant office area based on the resource demand trend and the resource optimization goals pre-configured for each tenant.

[0006] Optionally, the execution resource coordination strategy includes: determining the priorities of multiple pending transactions based on a pre-established tenant demand profile and the resource demand trend, wherein the pending transactions are tenant behaviors that consume resources of the multi-tenant office area; determining the resource allocation order and resource consumption of each pending transaction according to the priority of each pending transaction and based on the resource optimization target corresponding to each tenant as a constraint; retrieving unused resources in the multi-tenant office area, and allocating resources to each pending transaction according to the resource allocation order and resource consumption.

[0007] Optionally, determining the priorities of multiple pending transactions based on the pre-established tenant demand profile and the resource demand trend includes: determining the time weight, scale weight, impact weight, resource demand weight, standardization weight and security weight of each pending transaction based on the tenant demand profile; calculating the weighted sum of at least one of the time weight, scale weight, impact weight, resource demand weight, standardization weight and security weight of each pending transaction to obtain a priority score for each pending transaction; sorting the pending transactions in descending order of the priority scores; determining the initial priority of each pending transaction according to the sorting order; and adjusting the initial priority of each pending transaction according to the resource demand trend to obtain a final priority of each pending transaction.

[0008] Optionally, determining the resource allocation order and resource consumption of each transaction to be executed based on the resource optimization target corresponding to each tenant as a constraint includes: determining the resource allocation order and resource consumption of each transaction to be executed with the goal of maximizing resource utilization, and the resource optimization target includes maximizing resource utilization; and / or, determining the resource allocation order and resource consumption of each transaction to be executed with the goal of minimizing energy consumption rate, and the resource optimization target includes minimizing energy consumption rate.

[0009] Optionally, after retrieving unused resources in the multi-tenant office area and allocating resources to each of the pending transactions according to the resource allocation order and resource consumption, the method further includes: obtaining execution data and resource usage data of each transaction as each of the pending transactions is executed; performing performance evaluation on each transaction based on the execution data to obtain a performance evaluation result, and determining comparison data between actual resource consumption and budgeted resource consumption based on the resource usage data; and optimizing the resource coordination strategy based on at least one of the performance evaluation result and the comparison data to improve resource utilization when the resource coordination strategy is executed next time.

[0010] Optionally, the method also includes pre-configuring the resource optimization target for each tenant in the following manner: collecting work attribute data, resource demand data and transaction demand data of each tenant, wherein the work attribute data is used to represent at least one of the tenant's work nature, staff size, office habits and rest system, the resource demand data is used to represent the tenant's demand for resources in the multi-tenant office area, and the transaction demand data is used to represent the tenant's demand for resource consumption; establishing the tenant demand profile for each tenant based on the work attribute data, the resource demand data and the transaction demand data; determining the matching degree of the tenant demand profile with the candidate optimization target, wherein the candidate optimization target includes maximizing resource utilization and minimizing energy consumption rate; configuring the candidate optimization target with the highest matching degree as the resource optimization target corresponding to the tenant.

[0011] Optionally, before inputting the preprocessed data into the target large model, the method also includes obtaining the target large model in the following manner: obtaining environmental status data and resource status data of a multi-tenant office area as training samples; inputting the training samples into an initial neural network model for deep learning, so that the initial neural network model aims to predict resource demand trends and learns the usage patterns and trends of resources in the multi-tenant office area based on the training samples; performing regression verification on the trained initial neural network model, and when the verification result meets the target condition, determining the initial neural network model as the target large model.

[0012] According to another aspect of an embodiment of the present application, the present application provides a resource management device, including: a receiving module, used to receive pre-processed data sent by an edge computing device, wherein the edge computing device is used to collect environmental status data and resource status data of a multi-tenant office area, and pre-process the environmental status data and the resource status data to obtain the pre-processed data; a prediction module, used to input the pre-processed data into a target big model, so as to use the target big model to predict the resource demand trend of the multi-tenant office area; an execution module, used to execute a resource coordination strategy, so as to dynamically allocate resources of the multi-tenant office area based on the resource demand trend and the resource optimization goals pre-configured for each tenant.

[0013] According to another aspect of an embodiment of the present application, the present application provides an electronic device, including a memory, a processor, a communication interface and a communication bus, wherein the memory stores a computer program that can be run on the processor, the memory and the processor communicate through the communication bus and the communication interface, and the steps of the above method are implemented when the processor executes the computer program.

[0014] According to another aspect of an embodiment of the present application, the present application also provides a computer-readable medium having a non-volatile program code executable by a processor, and the program code enables the processor to execute the above method.

[0015] The above technical solution provided by the embodiment of the present application has the following advantages compared with the related art:

[0016] The present application provides a resource management method, which is applied to a cloud server, including: receiving pre-processed data sent by an edge computing device, wherein the edge computing device is used to collect environmental status data and resource status data of a multi-tenant office area, and pre-processing the environmental status data and the resource status data to obtain the pre-processed data; inputting the pre-processed data into a target large model to use the target large model to predict the resource demand trend of the multi-tenant office area; executing a resource coordination strategy to dynamically allocate resources to the multi-tenant office area based on the resource demand trend and the resource optimization target pre-configured for each tenant. The present application uses a large model to predict the trend of resource usage, and uses a resource coordination strategy to finely manage and allocate resources in the multi-tenant office area, ensuring that all available resources in the multi-tenant office area are fully and efficiently used, reducing idle time, and improving resource utilization frequency, solving the technical problem of difficulty in realizing dynamic allocation and efficient utilization of resources, and also using edge computing devices for data collection and pre-processing, and cloud-based data analysis, thereby reducing the data processing burden on the cloud. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related technologies, the drawings required for use in the embodiments or the related technical descriptions are briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0019] Figure 1 A schematic diagram of a hardware environment for an optional resource management method provided according to an embodiment of the present application;

[0020] Figure 2 A schematic diagram of an optional resource management method flow chart provided according to an embodiment of the present application;

[0021] Figure 3 A block diagram of an optional resource management device provided according to an embodiment of the present application;

[0022] Figure 4 A schematic diagram of an optional electronic device structure provided in an embodiment of the present application. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0024] In the subsequent description, the suffixes such as "module", "component" or "unit" used to represent elements are only used to facilitate the description of the present application and have no specific meaning. Therefore, "module" and "component" can be used interchangeably.

[0025] In order to solve the problems mentioned in the background technology, according to one aspect of the embodiments of the present application, an embodiment of a resource management method is provided.

[0026] Optionally, in the embodiment of the present application, the resource management method can be applied to Figure 1 In the hardware environment shown in FIG. 1 , the edge computing device 101 and the cloud server 103 are formed. Figure 1 As shown, the cloud server 103 is connected to the edge computing device 101 through a network, and can be used to provide services for the edge computing device or the client installed on the edge computing device, and receive data sent by the edge computing device for in-depth data analysis. A database 105 can be set on the cloud server or independently of the cloud server to provide data storage services for the cloud server 103. The above network includes but is not limited to: a wide area network, a metropolitan area network or a local area network.

[0027] A resource management method in the embodiment of the present application can be executed by the cloud server 103, such as Figure 2 As shown, the method may include the following steps:

[0028] Step S202, receiving preprocessed data sent by an edge computing device, wherein the edge computing device is used to collect environmental status data and resource status data of a multi-tenant office area, and preprocess the environmental status data and the resource status data to obtain the preprocessed data;

[0029] Step S204, inputting the preprocessed data into the target large model, so as to predict the resource demand trend of the multi-tenant office area by using the target large model;

[0030] Step S206: executing a resource coordination strategy to dynamically allocate resources in the multi-tenant office area based on the resource demand trend and a resource optimization target pre-configured for each tenant.

[0031] In the embodiment of the present application, sensors and edge computing devices are deployed in the multi-tenant office area in advance to collect real-time data of the multi-tenant office area, including environmental status data, such as temperature, humidity, flow of people, etc., and resource status data, such as energy consumption, space usage, equipment usage, etc. The edge computing device is connected to the cloud server through a communication network. Before uploading the data to the cloud server, simple data cleaning and preprocessing are performed on the edge computing device, such as removing noise, outliers and duplicate data to improve data quality, and then necessary preprocessing operations are performed on the cleaned data, such as data compression, format conversion, data aggregation, etc., to reduce the burden of data transmission to the cloud. Simple real-time analysis can also be performed on the edge side, such as calculating statistical indicators such as average and standard deviation, to provide basic data support for in-depth analysis on the cloud. In addition, some sensitive data can be processed on the edge device, and there is no need to send sensitive data to the cloud, thereby reducing the risk of data transmission and improving data security.

[0032] In an embodiment of the present application, the system also pre-configures a suitable resource optimization goal for each tenant. If the tenant pursues resource utilization, the resource optimization goal is configured to maximize resource utilization. If the tenant pursues cost savings, the resource optimization goal is configured to minimize energy consumption rate, etc.

[0033] In an embodiment of the present application, the preprocessed data received by the cloud server is input into a pre-trained target large model for in-depth data analysis. The target large model identifies the patterns and trends of resource usage by analyzing historical data and current real-time data, and predicts resource demand in the future. Based on the prediction results of the target large model and the resource optimization goals of the tenant, the system dynamically adjusts the resource allocation plan. For example, the number of available conference rooms is automatically increased during the peak period of conference room reservations, or the operating parameters of air conditioning and lighting are automatically adjusted to reduce energy consumption during the peak period of energy consumption. The system ensures that all available resources are fully and efficiently used through refined management methods. At the same time, the system will also promote resource sharing among different tenants, improve overall resource utilization efficiency and reduce the proportion of idle resources.

[0034] This application uses a large model to predict resource usage trends, and uses resource collaboration strategies to finely manage and allocate resources in multi-tenant office areas, ensuring that all available resources in multi-tenant office areas are fully and efficiently used, reducing idle time, and increasing resource utilization frequency. It solves the technical problem of difficulty in achieving dynamic allocation and efficient utilization of resources, and also uses edge computing devices for data collection and preprocessing, and data analysis in the cloud, thereby reducing the data processing burden on the cloud.

[0035] In a preferred embodiment, the execution resource coordination strategy includes:

[0036] Step 1, determining the priorities of a plurality of pending transactions based on a pre-established tenant demand profile and the resource demand trend, wherein the pending transactions are tenant behaviors that consume resources of the multi-tenant office area;

[0037] Step 2: Determine the resource allocation order and resource consumption of each transaction to be executed according to the priority of each transaction to be executed and taking the resource optimization target corresponding to each tenant as a constraint;

[0038] Step 3: retrieve unused resources in the multi-tenant office area, and allocate resources to each of the to-be-executed transactions according to the resource allocation sequence and resource consumption.

[0039] In the embodiment of the present application, the tenant demand profile is a database or file containing information such as tenant historical behavior, resource usage habits, office-specific needs, etc. The tenant demand profile is used to help the system understand the unique needs and preferences of each tenant.

[0040] In the embodiment of the present application, a transaction refers to the behavior of the tenant's office that consumes resources. For example, in the scenario of holding a meeting in a conference room, a project launch meeting is a transaction, a project report meeting is a transaction, and a weekly meeting is a transaction. For another example, in the scenario of energy saving and power saving, the energy consumption of office computers is a transaction, the energy consumption of lamps is a transaction, and the energy consumption of the rest area is also a transaction.

[0041] In an embodiment of the present application, first, the system obtains the tenant demand file, and obtains the predicted resource demand trend through the target big model. The system combines the tenant demand file and the resource demand trend to determine the priority of each pending transaction. According to the priority of each pending transaction and the tenant's resource optimization goal, the system formulates a resource allocation strategy. The resource allocation strategy includes determining the resource allocation order of each transaction (i.e., which transactions to allocate resources to first, and which resources to allocate to a certain transaction first), resource consumption (i.e., how many resources should be allocated to each transaction), and possible resource scheduling schemes (such as allocating different amounts of resources in different time periods). According to the formulated resource allocation strategy, the system retrieves unused resources from the multi-tenant office area, and allocates resources to each pending transaction according to the allocation order and resource consumption.

[0042] In the embodiment of the present application, a personalized recommendation algorithm can also be introduced in the resource allocation process. Based on the tenant's historical usage records and current needs, the most suitable resource options (such as conference room location, equipment type, etc.) are recommended to the tenant. At the same time, considering the collaborative work needs between tenants, a resource combination that can promote teamwork is recommended.

[0043] In the embodiment of the present application, a resource utilization optimization model based on machine learning can also be constructed. The model learns and predicts how to adjust the resource allocation strategy to maximize resource utilization by analyzing the resource usage patterns and efficiency indicators in historical data. At the same time, the model can receive new data inputs in real time and update its prediction results to adapt to the dynamically changing environment.

[0044] In the embodiment of the present application, a cross-tenant resource sharing platform can also be established, allowing tenants to share and exchange resources under the premise of complying with certain rules and conditions. The platform can provide functions such as resource publishing, searching, matching, and trading to promote the effective use of resources and reduce waste. At the same time, the platform can introduce a credit evaluation mechanism to ensure the fairness and reliability of transactions.

[0045] In addition, considering the scalability of some resources (such as cloud computing resources, network bandwidth, etc.), an elastic resource expansion and contraction mechanism is designed. When a surge in resource demand is detected, resource expansion operations are automatically triggered to meet demand; when demand decreases, resource allocation is automatically reduced to reduce costs. This mechanism needs to be integrated with the cloud service provider's API interface to achieve automated operations.

[0046] Traditional static resource allocation methods are difficult to adapt to rapidly changing needs, and are prone to problems such as uneven resource allocation, low utilization or waste. This application introduces a resource collaboration strategy to manage resources more flexibly and intelligently, ensuring the reasonable allocation and efficient utilization of resources while meeting the personalized needs of tenants.

[0047] In a preferred embodiment, the determining the priorities of the plurality of pending transactions based on the pre-established tenant demand profile and the resource demand trend comprises:

[0048] Step 1, based on the tenant demand profile, determine the time weight, scale weight, impact weight, resource demand weight, standardization weight and security weight of each transaction to be executed;

[0049] Step 2, calculating the weighted sum of at least one of the time weight, scale weight, impact weight, resource demand weight, standardization weight and security weight of each of the pending tasks to obtain a priority score for each of the pending tasks;

[0050] Step 3, sorting the pending tasks in descending order of priority scores;

[0051] Step 4, determining the initial priority of each of the pending transactions according to the sorting order;

[0052] Step 5: adjusting the initial priority of each of the pending transactions according to the resource demand trend to obtain a final priority of each of the pending transactions.

[0053] In the embodiment of the present application, the time weight is an indicator of the urgency or time sensitivity of the pending affairs. For example, an upcoming meeting or urgent project task has a higher time weight. The scale weight is an indicator reflecting the size of the pending affairs. Large projects or activities may require more resources and attention, so they have a higher scale weight. The impact weight is an indicator to assess the impact of pending affairs on tenants or the entire office area. Affairs that have a significant impact on business operations will have a higher impact weight. The resource demand weight is an indicator to measure the amount of resources required for pending affairs. Affairs with large resource requirements may have a greater impact on the resource allocation of other affairs, so they have a higher resource demand weight. The normative weight is an indicator to assess whether the pending affairs comply with the rules and regulations or industry standards of the office area. Affairs that comply with the regulations help maintain the order and efficiency of the office area, so they may obtain a higher normative weight. The security weight is an indicator that considers the impact of pending affairs on the security of the office area. Affairs involving high-risk operations or requiring special security measures will have a higher security weight.

[0054] The above weights can be allocated with reference to the transaction demand situation of each tenant recorded in the tenant demand file, can be allocated based on expert experience, and can also be set according to actual needs.

[0055] In an embodiment of the present application, based on the tenant demand profile, the system determines the time weight, scale weight, impact weight, resource demand weight, normative weight and security weight for each pending transaction. The system calculates the weighted sum of at least one of the above weights for each pending transaction to obtain a comprehensive priority score, which reflects the importance and urgency of the pending transaction in multiple dimensions. According to the calculated priority score, the system sorts the pending transactions. The higher the score, the more important or urgent the transaction is considered. According to the sorting order, the system determines an initial priority for each pending transaction. Finally, the system adjusts the initial priority according to the resource demand trend. If the resource demand trend shows that a certain resource will become scarce in the future, the priority of the transaction involving the resource may be increased; on the contrary, if the resource demand decreases, the priority of the related transaction may be reduced accordingly. Adjusting the transaction priority in combination with the resource demand trend helps to ensure that resources are more reasonably and effectively allocated in the future.

[0056] Resource allocation in multi-tenant office areas requires comprehensive consideration of multiple factors, including the urgency, scale, impact, resource requirements, standardization and security of the transaction. This application can more comprehensively and accurately evaluate the importance and urgency of the transaction by determining multiple weights for each pending transaction and calculating the weighted sum. Furthermore, by sorting and adjusting priorities, it can ensure that resources can be allocated to each transaction in a reasonable order and proportion, thereby improving resource utilization efficiency and tenant satisfaction.

[0057] In a preferred embodiment, determining the resource allocation order and resource consumption of each transaction to be executed based on the resource optimization target corresponding to each tenant as a constraint includes:

[0058] Determining the resource allocation order and resource consumption of each of the to-be-executed transactions with the goal of maximizing resource utilization, wherein the resource optimization goal includes maximizing resource utilization; and / or,

[0059] The resource allocation order and resource consumption of each transaction to be executed are determined with the goal of minimizing the energy consumption rate, and the resource optimization goal includes minimizing the energy consumption rate.

[0060] In the embodiments of the present application, resource utilization refers to the degree to which resources (such as computing resources, storage space, electricity, etc.) are effectively utilized. High resource utilization means that resources are fully utilized without excessive idleness or waste. Energy consumption rate refers to the amount of energy consumed in the process of running pending transactions. Reducing energy consumption rate helps reduce operating costs and environmental impact.

[0061] In the embodiment of the present application, first, according to the needs of each tenant and the overall operation strategy, the resource optimization target is determined, and the resource optimization target includes maximizing resource utilization, minimizing energy consumption rate or a combination of the two. Each pending transaction is analyzed in detail, including the type, quantity, time window, etc. of resources required. When the goal is to maximize resource utilization, the system uses algorithms (such as greedy algorithms, genetic algorithms, etc.) to determine the optimal resource allocation order based on the resource requirements, time windows, and current resource availability of each pending transaction. The order is intended to ensure that resource utilization is maximized while meeting all transaction requirements. When the goal is to minimize energy consumption rate, similarly, the system considers energy consumption factors to determine the resource allocation order. After determining the resource allocation order, the system calculates the required resource consumption according to the specific needs of each transaction and the resource optimization target, including determining the type and quantity of resources that each transaction needs to consume in each time period. Finally, the system executes the pending transaction according to the determined resource allocation order and resource consumption.

[0062] In a multi-tenant office environment, resources are limited and demands are diverse. Reasonable resource allocation is crucial to improving overall operational efficiency, reducing costs and reducing environmental impact. By setting clear resource optimization goals (such as maximizing resource utilization, minimizing energy consumption, etc.), this application can formulate resource allocation plans more specifically to ensure that resources are used efficiently and reasonably.

[0063] In a preferred embodiment, after retrieving unused resources in the multi-tenant office area and allocating resources to each of the pending transactions according to the resource allocation order and resource consumption, the method further includes:

[0064] Step 1, when each of the pending transactions is being executed, the execution data and resource usage data of each transaction are obtained;

[0065] Step 2, performing performance evaluation on each transaction according to the execution data to obtain a performance evaluation result, and determining comparison data between actual resource consumption and budgeted resource consumption according to the resource usage data;

[0066] Step 3: Optimize the resource coordination strategy based on at least one of the performance evaluation result and the comparison data to improve resource utilization when the resource coordination strategy is executed next time.

[0067] In the embodiments of the present application, execution data refers to various data generated during the execution of the transaction to be executed, including but not limited to execution time, execution speed, processing volume, etc., which reflect the execution efficiency and performance of the transaction. Resource usage data refers to the type and quantity of resources actually used by the transaction during execution, such as CPU time, memory usage, network bandwidth, power consumption, and space usage time, etc. These data are used to evaluate the actual consumption of resources. The performance evaluation result is an evaluation of the execution effect of the transaction based on the execution data, which may include evaluations of execution efficiency, stability, response time, etc. The budgeted resource consumption is the resource consumption estimated before the transaction is executed based on the transaction requirements and resource allocation strategy.

[0068] In an embodiment of the present application, when each pending transaction is advanced for execution, the system obtains the execution data and resource usage data of the transaction in real time. Based on the acquired execution data, the system performs a performance evaluation on each transaction to obtain a performance evaluation result. At the same time, the system determines the comparison data between the actual resource consumption and the budgeted resource consumption based on the resource usage data. Based on at least one of the performance evaluation results and the comparison data, the system optimizes the current resource coordination strategy. The goal of the optimization is to improve resource utilization, reduce resource waste, and improve overall operational efficiency when the resource coordination strategy is executed next time. The optimized resource coordination strategy will be used to guide the resource allocation and use of subsequent pending transactions. At the same time, the system will continue to monitor and collect new transaction execution data and resource usage data for a new round of performance evaluation and strategy optimization.

[0069] The execution effect of the resource coordination strategy needs to be verified and optimized through actual data. By obtaining the execution data and resource usage data of the transaction, the system can comprehensively evaluate the performance and resource usage of the transaction. Performance evaluation and resource consumption comparison based on these data can help to discover deficiencies and room for improvement in the resource coordination strategy. By continuously optimizing the resource coordination strategy, the system can continuously improve resource utilization, reduce operating costs, and improve the overall operational efficiency of multi-tenant office areas.

[0070] In a preferred embodiment, the method further comprises pre-configuring the resource optimization target for each tenant in the following manner:

[0071] Step 1, collecting work attribute data, resource demand data and transaction demand data of each tenant, wherein the work attribute data is used to represent at least one of the tenant's work nature, staff size, office habits and rest system, the resource demand data is used to represent the tenant's demand for resources in the multi-tenant office area, and the transaction demand data is used to represent the tenant's demand for resource consumption;

[0072] Step 2, establishing the tenant demand profile for each tenant based on the work attribute data, the resource demand data and the transaction demand data;

[0073] Step 3, determining the matching degree between the tenant demand profile and the candidate optimization target, wherein the candidate optimization target includes maximizing resource utilization and minimizing energy consumption;

[0074] Step 4: configure the candidate optimization target with the highest matching degree as the resource optimization target corresponding to the tenant.

[0075] In the embodiment of the present application, work attribute data refers to data reflecting the tenant's work nature, staff size, office habits, and rest system. Resource demand data refers to the tenant's specific demand for multi-tenant office area resources (such as computing resources, storage space, electricity, lighting, network bandwidth, conference rooms, etc.). Transaction demand data refers to the tenant's demand for resource consumption behavior when performing specific transactions, including transaction type, execution time, required resource volume, etc., such as the conference room required for weekly meetings, usage time, etc. The tenant demand profile is established based on work attribute data, resource demand data, and transaction demand data, and is used to comprehensively record tenant needs and characteristics. Candidate optimization goals include but are not limited to maximizing resource utilization and minimizing energy consumption rate.

[0076] In an embodiment of the present application, first, the system needs to collect work attribute data, resource demand data, and transaction demand data for each tenant. Based on the collected data, the system establishes a tenant demand file for each tenant. The file records in detail information such as the tenant's job nature, staff size, office habits, rest system, resource requirements, and transaction requirements. Next, the system needs to determine the degree of match between the tenant's demand file and the candidate optimization target, which can be achieved by comparing the degree of fit between the tenant's needs and different optimization targets. Finally, based on the results of the matching analysis, the system configures the candidate optimization target with the highest matching degree as the resource optimization target corresponding to the tenant. In this way, each tenant will have a resource optimization target that meets its actual needs and characteristics.

[0077] Different tenants have different needs and characteristics, so personalized resource optimization goals need to be configured for them. By collecting and analyzing tenants' work attribute data, resource demand data, and transaction demand data, the system can fully understand the needs and characteristics of tenants and establish tenant demand profiles for them accordingly. Based on the matching analysis between tenant demand profiles and candidate optimization goals, the system can accurately configure resource optimization goals that meet their actual needs for each tenant, thereby improving the pertinence and effectiveness of resource allocation, and achieving efficient use of resources and effective cost control.

[0078] In a preferred embodiment, before inputting the preprocessed data into the target macro model, the method further comprises obtaining the target macro model in the following manner:

[0079] Step 1, obtaining environmental status data and resource status data of a multi-tenant office area as training samples;

[0080] Step 2: inputting the training samples into the initial neural network model for deep learning, so that the initial neural network model aims to predict resource demand trends and learns the usage patterns and trends of resources in the multi-tenant office area based on the training samples;

[0081] Step 3, performing regression verification on the trained initial neural network model, and when the verification result reaches the target condition, determining the initial neural network model as the target large model.

[0082] In the embodiment of the present application, environmental status data refers to data related to the environment in a multi-tenant office area, such as temperature, humidity, light intensity, noise level, and flow of people, etc. The environmental status data can reflect the physical state of the office environment. Resource status data refers to the usage of various resources in a multi-tenant office area, such as CPU usage, memory usage, network bandwidth, power consumption, and the usage of shared places, shared equipment, shared resources, etc. The usage can be divided into unused, to-be-used, and used. Unused resources are idle resources waiting to be allocated. To-be-used resources are resources that have been allocated, planned but not yet used. Used resources are resources that are in use or consumed. The initial neural network model refers to a neural network model used to learn and predict resource demand trends. Before training, the model is in an unlearned or initial state. Alternatively, a general large model can be used as the initial model to improve model accuracy and efficiency.

[0083] In the embodiment of the present application, first, the environmental status data and resource status data of the multi-tenant office area are collected as training samples. The training samples should cover different time periods, different tenant activities and different resource usage situations to ensure the diversity and representativeness of the training samples. The collected training samples are input into the initial neural network model for deep learning. During the training process, the model will learn the resource usage rules and trends of the multi-tenant office area to predict future resource requirements. The training goal is to enable the model to accurately predict resource demand trends and provide strong support for subsequent resource allocation and management. After the model training is completed, regression verification is required to evaluate the prediction performance of the model. During the verification process, a part of the known resource demand data is input into the model as a test set, and compared with the prediction results of the model for analysis. If the verification results meet the target conditions (such as indicators such as prediction accuracy and error rate meet the preset standards), the model training is considered to be successful and can be determined as the target large model. After regression verification and confirmation that the model performance meets the standards, the initial neural network model is determined as the target large model. The target large model will be used for subsequent data processing and decision support work to provide strong support for resource management and optimization of multi-tenant office areas.

[0084] In order to accurately predict resource demand trends and make reasonable resource allocation decisions, it is necessary to use advanced machine learning technology to build a model that can learn and adapt to complex environmental changes. This application collects environmental status data and resource status data of multi-tenant office areas as training samples, and uses these data to train and verify the initial neural network model, so as to obtain a target large model that can accurately predict resource demand trends. This model can provide strong support for subsequent resource management and optimization work, improve resource utilization efficiency and reduce operating costs.

[0085] The present application provides a resource management method, which is applied to a cloud server, including: receiving pre-processed data sent by an edge computing device, wherein the edge computing device is used to collect environmental status data and resource status data of a multi-tenant office area, and pre-processing the environmental status data and the resource status data to obtain the pre-processed data; inputting the pre-processed data into a target large model to use the target large model to predict the resource demand trend of the multi-tenant office area; executing a resource coordination strategy to dynamically allocate resources to the multi-tenant office area based on the resource demand trend and the resource optimization target pre-configured for each tenant. The present application uses a large model to predict the trend of resource usage, and uses a resource coordination strategy to finely manage and allocate resources in the multi-tenant office area, ensuring that all available resources in the multi-tenant office area are fully and efficiently used, reducing idle time, and improving resource utilization frequency, solving the technical problem of difficulty in realizing dynamic allocation and efficient utilization of resources, and also using edge computing devices for data collection and pre-processing, and cloud-based data analysis, thereby reducing the data processing burden on the cloud.

[0086] According to another aspect of the embodiment of the present application, Figure 3 As shown, a resource management device is provided, comprising:

[0087] A receiving module 301 is used to receive pre-processed data sent by an edge computing device, wherein the edge computing device is used to collect environmental status data and resource status data of a multi-tenant office area, and pre-process the environmental status data and the resource status data to obtain the pre-processed data;

[0088] A prediction module 303, used for inputting the pre-processed data into a target large model, so as to predict the resource demand trend of the multi-tenant office area by using the target large model;

[0089] The execution module 305 is used to execute the resource coordination strategy to dynamically allocate the resources of the multi-tenant office area based on the resource demand trend and the resource optimization target pre-configured for each tenant.

[0090] It should be noted that the receiving module 301 in this embodiment can be used to execute step S202 in the embodiment of the present application, the prediction module 303 in this embodiment can be used to execute step S204 in the embodiment of the present application, and the execution module 305 in this embodiment can be used to execute step S206 in the embodiment of the present application.

[0091] It should be noted that the examples and application scenarios implemented by the above modules and corresponding steps are the same, but are not limited to the contents disclosed in the above embodiments. It should be noted that the above modules as part of the device can be run in Figure 1 In the hardware environment shown, it can be implemented by software or by hardware.

[0092] Optionally, the execution module is specifically used to: determine the priorities of multiple pending transactions based on a pre-established tenant demand profile and the resource demand trend, wherein the pending transactions are tenant behaviors that consume resources of the multi-tenant office area; determine the resource allocation order and resource consumption of each pending transaction according to the priority of each pending transaction and with the resource optimization target corresponding to each tenant as a constraint; retrieve unused resources in the multi-tenant office area, and allocate resources to each pending transaction according to the resource allocation order and resource consumption.

[0093] Optionally, the execution module is also used to: determine the time weight, scale weight, impact weight, resource requirement weight, standardization weight and security weight of each of the pending transactions based on the tenant demand profile; calculate the weighted sum of at least one of the time weight, scale weight, impact weight, resource requirement weight, standardization weight and security weight of each of the pending transactions to obtain a priority score for each of the pending transactions; sort the pending transactions in order from large to small according to the priority scores; determine the initial priority of each of the pending transactions according to the sorting order; adjust the initial priority of each of the pending transactions according to the resource demand trend to obtain a final priority of each of the pending transactions.

[0094] Optionally, the execution module is also used to: determine the resource allocation order and resource consumption of each transaction to be executed with the goal of maximizing resource utilization, and the resource optimization goal includes maximizing resource utilization; and / or determine the resource allocation order and resource consumption of each transaction to be executed with the goal of minimizing energy consumption, and the resource optimization goal includes minimizing energy consumption.

[0095] Optionally, the execution module is also used to: obtain the execution data and resource usage data of each transaction when each of the pending transactions is executed; perform performance evaluation on each transaction based on the execution data to obtain a performance evaluation result, and determine comparison data between actual resource consumption and budgeted resource consumption based on the resource usage data; optimize the resource coordination strategy based on at least one of the performance evaluation result and the comparison data to improve resource utilization when the resource coordination strategy is executed next time.

[0096] Optionally, the resource management device also includes a configuration module, which is specifically used to: collect work attribute data, resource demand data and transaction demand data of each tenant, wherein the work attribute data is used to represent at least one of the tenant's work nature, staff size, office habits and rest system, the resource demand data is used to represent the tenant's demand for resources in the multi-tenant office area, and the transaction demand data is used to represent the tenant's demand for resource consumption; based on the work attribute data, the resource demand data and the transaction demand data, establish the tenant demand profile for each tenant; determine the matching degree of the tenant demand profile with the candidate optimization target, wherein the candidate optimization target includes maximizing resource utilization and minimizing energy consumption rate; configure the candidate optimization target with the highest matching degree as the resource optimization target corresponding to the tenant.

[0097] Optionally, the resource management device also includes a training module, which is specifically used to: obtain environmental status data and resource status data of a multi-tenant office area as training samples; input the training samples into an initial neural network model for deep learning, so that the initial neural network model aims to predict resource demand trends, and learns the usage patterns and trends of resources in the multi-tenant office area based on the training samples; perform regression verification on the trained initial neural network model, and when the verification result meets the target condition, determine the initial neural network model as the target large model.

[0098] According to another aspect of the embodiments of the present application, the present application provides an electronic device, such as Figure 4 As shown, it includes a memory 401, a processor 403, a communication interface 405 and a communication bus 407. The memory 401 stores a computer program that can be run on the processor 403. The memory 401 and the processor 403 communicate through the communication interface 405 and the communication bus 407. When the processor 403 executes the computer program, the steps of the above method are implemented.

[0099] The memory and processor in the above electronic device communicate via a communication bus and a communication interface. The communication bus may be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The communication bus may be divided into an address bus, a data bus, a control bus, etc.

[0100] The memory may include a random access memory (RAM) or a non-volatile memory, such as at least one disk memory. Optionally, the memory may also be at least one storage device located away from the aforementioned processor.

[0101] The above-mentioned processor can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components.

[0102] According to another aspect of the embodiments of the present application, a computer program product or a computer program is provided, the computer program product or the computer program includes computer instructions, and the computer instructions are stored in a computer-readable storage medium. The processor of the computer device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the computer device performs the steps of any of the above embodiments.

[0103] Optionally, in an embodiment of the present application, the computer-readable medium is configured to store program codes for the processor to perform the following steps:

[0104] Receiving preprocessed data sent by an edge computing device, wherein the edge computing device is used to collect environmental status data and resource status data of a multi-tenant office area, and preprocess the environmental status data and the resource status data to obtain the preprocessed data;

[0105] Inputting the preprocessed data into the target large model, so as to predict the resource demand trend of the multi-tenant office area by using the target large model;

[0106] A resource coordination strategy is executed to dynamically allocate resources of the multi-tenant office area based on the resource demand trend and a resource optimization goal pre-configured for each tenant.

[0107] Optionally, the specific examples in this embodiment may refer to the examples described in the above embodiments, and this embodiment will not be described in detail here.

[0108] When the embodiments of the present application are specifically implemented, reference may be made to the above-mentioned embodiments, which have corresponding technical effects.

[0109] It is understood that the embodiments described herein may be implemented in hardware, software, firmware, middleware, microcode, or a combination thereof. For hardware implementation, the processing unit may be implemented in one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), general purpose processors, controllers, microcontrollers, microprocessors, other electronic units for performing the functions described in the present application, or a combination thereof.

[0110] For software implementation, the technology described herein can be implemented by a unit that performs the functions described herein. The software code can be stored in a memory and executed by a processor. The memory can be implemented in the processor or outside the processor.

[0111] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0112] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0113] In the embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the modules is only a logical function division. There may be other division methods in actual implementation, such as multiple modules or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0114] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0115] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0116] If the function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on such an understanding, the technical solution of the embodiment of the present application is essentially or the part that contributes to the prior art or the part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium, including several instructions to make a computer device (which can be a personal computer, a server, or a network device, etc.) perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a ROM, a RAM, a magnetic disk or an optical disk. It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is any such actual relationship or order between these entities or operations. Moreover, the term "include", "include" or any other variant thereof is intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also includes other elements that are not explicitly listed, or also includes elements inherent to such a process, method, article or device. Without more constraints, an element defined by the phrase "comprising a..." does not exclude the existence of other identical elements in the process, method, article or apparatus comprising the element.

[0117] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

Claims

1. A resource management method, applied to a cloud server, It is characterized in that include: Receiving preprocessed data sent by an edge computing device, wherein the edge computing device is used to collect environmental status data and resource status data of a multi-tenant office area, and preprocess the environmental status data and the resource status data to obtain the preprocessed data; Inputting the preprocessed data into the target large model, so as to predict the resource demand trend of the multi-tenant office area by using the target large model; A resource coordination strategy is executed to dynamically allocate resources of the multi-tenant office area based on the resource demand trend and a resource optimization goal pre-configured for each tenant.

2. The method according to claim 1, It is characterized in that The execution resource coordination strategy includes: Determining priorities of a plurality of pending transactions based on a pre-established tenant demand profile and the resource demand trend, wherein the pending transactions are tenant behaviors that consume resources of the multi-tenant office area; According to the priority of each of the pending transactions and with the resource optimization target corresponding to each tenant as a constraint, determine the resource allocation order and resource consumption of each of the pending transactions; Unused resources in the multi-tenant office area are retrieved, and resources are allocated to each of the to-be-executed transactions according to the resource allocation sequence and resource consumption.

3. The method according to claim 2, It is characterized in that Determining the priorities of the plurality of pending transactions based on the pre-established tenant demand profile and the resource demand trend includes: Based on the tenant demand profile, determine the time weight, scale weight, impact weight, resource demand weight, standardization weight and security weight of each of the pending transactions; Calculating the weighted sum of at least one of the time weight, scale weight, impact weight, resource requirement weight, standardization weight, and security weight of each of the pending tasks to obtain a priority score for each of the pending tasks; Sorting the pending tasks in descending order of priority scores; Determining the initial priority of each of the pending transactions according to the sorting order; The initial priority of each of the pending transactions is adjusted according to the resource demand trend to obtain a final priority of each of the pending transactions.

4. The method according to claim 2, It is characterized in that The determining of the resource allocation order and resource consumption of each transaction to be executed based on the resource optimization target corresponding to each tenant as a constraint includes: Determining the resource allocation order and resource consumption of each of the to-be-executed transactions with the goal of maximizing resource utilization, wherein the resource optimization goal includes maximizing resource utilization; and / or, The resource allocation order and resource consumption of each transaction to be executed are determined with the goal of minimizing the energy consumption rate, and the resource optimization goal includes minimizing the energy consumption rate.

5. The method according to claim 2, It is characterized in that After retrieving unused resources in the multi-tenant office area and allocating resources to each of the to-be-executed transactions according to the resource allocation order and resource consumption, the method further includes: When each of the pending transactions is being executed, the execution data and resource usage data of each transaction are obtained; Performing performance evaluation on each transaction according to the execution data to obtain a performance evaluation result, and determining comparison data between actual resource consumption and budgeted resource consumption according to the resource usage data; The resource coordination strategy is optimized based on at least one of the performance evaluation result and the comparison data to improve resource utilization when the resource coordination strategy is executed next time.

6. The method according to claim 4, It is characterized in that The method further includes pre-configuring the resource optimization target for each tenant in the following manner: Collecting work attribute data, resource demand data, and transaction demand data of each tenant, wherein the work attribute data is used to indicate at least one of the tenant's work nature, staff size, office habits, and rest system; the resource demand data is used to indicate the tenant's demand for resources in the multi-tenant office area; and the transaction demand data is used to indicate the tenant's demand for resource consumption; Establishing the tenant demand profile for each tenant based on the work attribute data, the resource demand data and the transaction demand data; Determining the matching degree between the tenant demand profile and the candidate optimization target, wherein the candidate optimization target includes maximizing resource utilization and minimizing energy consumption; The candidate optimization target with the highest matching degree is configured as the resource optimization target corresponding to the tenant.

7. The method according to any one of claims 1 to 6, It is characterized in that Before inputting the preprocessed data into the target large model, the method further comprises obtaining the target large model in the following manner: Obtain environmental status data and resource status data of multi-tenant office areas as training samples; Inputting the training samples into an initial neural network model for deep learning, so that the initial neural network model aims to predict resource demand trends and learns the usage patterns and trends of resources in a multi-tenant office area based on the training samples; The trained initial neural network model is subjected to regression verification, and when the verification result reaches the target condition, the initial neural network model is determined as the target large model.

8. A resource management device, It is characterized in that include: A receiving module, configured to receive pre-processed data sent by an edge computing device, wherein the edge computing device is configured to collect environmental status data and resource status data of a multi-tenant office area, and pre-process the environmental status data and the resource status data to obtain the pre-processed data; A prediction module, used for inputting the preprocessed data into a target large model, so as to predict the resource demand trend of the multi-tenant office area by using the target large model; An execution module is used to execute a resource coordination strategy to dynamically allocate resources in the multi-tenant office area based on the resource demand trend and a resource optimization target pre-configured for each tenant.

9. An electronic device comprising a memory, a processor, a communication interface and a communication bus, wherein the memory stores a computer program that can be run on the processor, and the memory and the processor communicate through the communication bus and the communication interface. It is characterized in that When the processor executes the computer program, the resource management method described in any one of claims 1 to 7 is implemented.

10. A computer readable medium having a non-volatile program code executable by a processor, It is characterized in that The program code enables the processor to execute the resource management method according to any one of claims 1 to 7.

Citation Information

Cited By

  • Cross-network collaborative office management system and method based on big data

    CN119228321A

  • A cross-network collaborative office management system and method based on big data

    CN119228321B

  • Internet of Things equipment resource management method and device, equipment and storage medium

    CN119316377A

  • Multi-sensor fusion optimization system based on micro machine learning

    CN119515517A

  • Resource scheduling method and device for important science and technology infrastructure and medium

    CN119990703A