A method for solar heat and power resource allocation based on digital model

Through the solar energy combined heat and power supply resource allocation method based on digital models, the operating parameters of each module are optimized, and the blindness and waste of resource allocation in traditional systems are solved, and the solar energy utilization rate and resource efficiency are improved.

CN118735228BActive Publication Date: 2024-11-29SICHUAN SHUWANG TECH +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411225237.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-11-29
Estimated Expiration
2044-09-03

AI Technical Summary

Technical Problem

The traditional combined heat and power supply system is blind in the heating and power distribution process, resulting in waste of heat and electricity, reducing solar energy utilization and resource utilization efficiency.

Method used

Using the solar energy combined heat and power supply resource allocation method based on digital models, we can collect and analyze the historical operation data and weather forecast data of each module, establish a digital model and heating demand model, and allocate optoelectronic modules, photothermal modules, power storage modules and electric heat The operating parameters of the module to optimize resource utilization.

Benefits of technology

It significantly reduces the blindness of resource allocation, reduces system losses, improves the resource utilization rate of solar combined heat and power supply systems, and ensures that heating demands are retained while retaining more electricity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118735228B_ABST
    Figure CN118735228B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of intelligent resource allocation technology, and specifically to a solar heat and power cogeneration resource allocation method based on a digital model, which obtains the efficiency data and heating demand of each functional module under different weather conditions by establishing a digital model of each functional module and heating demand, so as to serve as a basis for allocating the heat and power cogeneration system. By adjusting the time intervals in which the photovoltaic module and the photothermal module are each exposed to light, the time interval and power in which the electric heating module heats the hot water in the hot water storage module, the time interval and charging power in which the photovoltaic module charges the electric energy into the power storage module, and the time interval and power supply power in which the power storage module supplies electric energy to the electric heating module, the redundant power of the system is maximized. It can actively guide the resource allocation plan in the process of solar heat and power cogeneration according to weather changes, significantly reduce the blindness of allocation, and help retain more electric energy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent resource allocation, and in particular to a solar heat and power cogeneration resource allocation method based on a digital model. Background Art

[0002] In the traditional cogeneration mode, heating and power supply are only optional functions, and there is obvious blindness in the allocation of heating and power supply. In actual use, blind allocation often causes a large amount of waste of heat and electricity, resulting in a large amount of loss of electricity and heat before electricity and heat are used, making the overall solar energy utilization rate low and natural resources seriously wasted.

[0003] In the cogeneration system, how to maintain the optimal working state of the cogeneration system under different weather conditions and maximize the utilization of resources is a difficult problem that needs to be solved urgently.

[0004] In view of this, this application is hereby filed. Summary of the invention

[0005] The purpose of the present invention is to provide a solar heat and power cogeneration resource allocation method based on a digital model, which can actively guide the resource allocation plan in the solar heat and power cogeneration process according to weather changes, significantly reduce the blindness of the allocation, and effectively reduce the internal loss of the system, which helps to retain more electricity while meeting the heating demand.

[0006] The embodiment of the present invention is achieved as follows:

[0007] A solar thermal power cogeneration resource allocation method based on a digital model, comprising:

[0008] Collect historical operating data of photovoltaic modules, solar thermal modules, power storage modules, electric heating modules and hot water storage modules in the solar thermal cogeneration system, wherein the historical operating data of photovoltaic modules include weather data and power generation efficiency data, the historical operating data of solar thermal modules include weather data and heating efficiency data, the historical operating data of power storage modules include weather data and charging and discharging efficiency data, the historical operating data of electric heating modules include weather data and heating efficiency data, and the historical operating data of hot water storage modules include weather data and insulation efficiency data.

[0009] Digital models of photovoltaic modules, solar thermal modules, electricity storage modules, electric thermal modules, and hot water storage modules are established respectively, and the training of their respective digital models is completed based on their respective historical operating data.

[0010] Collect historical data on heating demand, including weather data and heat demand data.

[0011] Establish a heating demand model and complete the training of the heating demand model based on historical data.

[0012] Obtain weather forecast data, input the weather forecast data into the digital model and the heating demand model, and obtain the future performance data of the photovoltaic module, solar thermal module, electric heating module, and hot water storage module, as well as the future heat demand data.

[0013] Deploy at least one of the following resources based on future heat demand data:

[0014] (1) The time interval during which the photovoltaic module and the solar thermal module receive light respectively.

[0015] (2) The time interval and power during which the electric heating module heats the hot water in the hot water storage module.

[0016] (3) The time interval and charging power during which the photovoltaic module charges the energy storage module.

[0017] (4) The time interval and power supply during which the energy storage module supplies electricity to the electric heating module.

[0018] Furthermore, when allocating resources based on future heat demand data, it includes:

[0019] The command transmission line is used to send deployment instructions to the photovoltaic module, the photothermal module, the power storage module, and the electric heating module.

[0020] Among them, the starting end of the instruction transmission line is the control end, the photovoltaic module, the photothermal module, the power storage module, and the electric heating module are arranged in series on the instruction transmission line, and the terminal end of the instruction transmission line is also the control end.

[0021] A deployment instruction data packet is constructed. The deployment instruction data packet has four command layers and one verification layer. The verification layer is the innermost layer, and the four command layers are covered layer by layer outside the verification layer.

[0022] The four command layers store the deployment instructions for the photovoltaic module, the solar thermal module, the power storage module, and the electric thermal module, respectively. In each command layer, the matching field of the object targeted by the corresponding deployment instruction is stored.

[0023] When the deployment instruction data packet is transmitted in the instruction transmission line, the functional module that receives the deployment instruction data packet reads the outermost layer data of the deployment instruction data packet. If the matching field in the outermost layer matches it, the deployment instruction in the outermost layer is extracted for execution, and the outermost layer is removed from the deployment instruction data packet at the same time. After removal, the deployment instruction data packet continues to be sent along the instruction transmission line.

[0024] Furthermore, in each command layer, the execution time of the corresponding deployment instruction is also stored. When extracting the deployment instruction in the outermost layer, the functional module also extracts the corresponding execution time, so as to execute the deployment instruction at the time point specified by the execution time.

[0025] Furthermore, when the deployment instruction data packet is transmitted along the instruction transmission line for one round and is sent back to the control end via the terminal end of the instruction transmission line, the control end verifies the outermost layer of the returned deployment instruction data packet.

[0026] If the outermost layer is a verification layer, it is determined that all deployment instructions have been successfully issued. If the outermost layer is any of the four command layers, it is determined that not all deployment instructions have been successfully issued. If the outermost layer cannot be recognized, it is determined that the deployment instruction data packet is damaged.

[0027] Furthermore, when the control end verifies the outermost layer of the returned dispatch instruction data packet, if the outermost layer is any one of the four command layers, the dispatch instruction data packet is further transmitted through the instruction transmission line for one cycle.

[0028] Furthermore, when the deployment instruction data packet is continuously transmitted through the instruction transmission line, a week number threshold is set, and a week number mark is set on the deployment instruction data packet, and the initial value of the week number mark is 1.

[0029] Each time the dispatch instruction data packet is continuously transmitted through the instruction transmission line, the value of the cycle number mark is increased by 1. When a dispatch instruction data packet needs to be continuously transmitted through the instruction transmission line, and the control end detects that the cycle number mark is equal to the cycle number threshold, the transmission of the dispatch instruction data packet is stopped, and a signal reception abnormality prompt is issued to the administrator.

[0030] The object of the signal reception abnormality prompt is the target object of the current outermost deployment instruction of the deployment instruction data packet.

[0031] Furthermore, after a certain deployment instruction data packet continues to be transmitted through the instruction transmission line, when the control end receives the returned deployment instruction data packet again, if its outermost layer is a verification layer, the value of the current week number mark of the deployment instruction data packet is used as the basis for evaluating the transmission reliability.

[0032] Furthermore, in the four command layers, the order of the objects targeted by the deployment instructions saved in the four command layers from the outside to the inside is the same as the setting order of the photovoltaic module, the solar thermal module, the power storage module and the electric thermal module on the instruction transmission line.

[0033] Furthermore, when the control end determines that all the deployment instructions have been successfully issued, the control end sends a confirmation data packet on the instruction transmission line in advance for a preparation time.

[0034] The confirmation data packet has four data segments and one verification segment which are arranged in series, and the verification segment is located at the end.

[0035] Each data segment is divided into a front end and a back end. The front end of the data segment stores a matching field, and the back end of the data segment stores a confirmation mark.

[0036] When a confirmation data packet is transmitted in the instruction transmission line, the functional module that receives the confirmation data packet reads the data at the front end of the confirmation data packet. If the matching field in the data segment at the front end matches it, the functional module removes the matching field, cuts and saves the confirmation mark in the current data segment, and at the same time continues to send the remaining confirmation data packets along the instruction transmission line.

[0037] Before executing the deployment instruction, if the function module obtains the corresponding confirmation mark, the deployment instruction is executed at the time point specified by the execution time. Otherwise, the execution step of the corresponding deployment instruction is canceled.

[0038] The beneficial effects of the technical solution of the embodiment of the present invention include:

[0039] During the application of the solar heat and power cogeneration resource allocation method based on the digital model provided by the embodiment of the present invention, it is taken into account that the conversion rates of solar energy by the photovoltaic module and the photothermal module are different under different weather conditions; the charging and discharging ratios of the electric energy of the power storage module are different under different weather conditions; the heating effect of the electric heating module on water is also different under different weather conditions; and the insulation effect of the hot water storage module on hot water is also different under different weather conditions, and the longer the hot water is stored in the hot water storage module, the greater the heat loss of the hot water.

[0040] Through the design of this scheme, only by combining weather forecast information, the resource allocation of each functional module of the solar heat and power cogeneration system in the future can be reasonably arranged. Combined with the allocation methods (1) to (4), the actual energy consumed before the hot water is directly supplied can be minimized. In other words, through allocation, the redundant power resources can be maximized. The redundant power can be used for other local power needs or for external supply.

[0041] The technical solution of this embodiment is very suitable for situations where the illumination area is limited or the layout area of ​​the solar panels is limited, and can help maximize the utilization rate of solar energy resources.

[0042] In general, the solar heat and power cogeneration resource allocation method based on the digital model provided in the embodiment of the present invention can actively guide the resource allocation plan in the solar heat and power cogeneration process according to weather changes, significantly reducing the blindness of the allocation, while effectively reducing the internal loss of the system, and helping to retain more electricity while meeting the heating demand. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0044] Figure 1 The schematic diagram of the layout of the instruction transmission line;

[0045] Figure 2 A schematic diagram of the composition of a deployment instruction data packet;

[0046] Figure 3 To confirm the schematic diagram of the data packet composition;

[0047] Figure 4 The figure is a schematic diagram of a function module obtaining a confirmation tag from a confirmation data packet. DETAILED DESCRIPTION

[0048] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0049] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0050] It should be understood that the "system", "device", "unit" and / or "module" used in the present invention are a method for distinguishing different components, elements, parts, portions or assemblies at different levels. However, if other words can achieve the same purpose, the words can be replaced by other expressions.

[0051] As shown in this specification and claims, unless the context clearly provides an example, the words "a", "an", "the", etc. do not refer to the singular, but also include the plural. Generally speaking, the terms "include" and "comprise" only indicate the inclusion of the steps and elements that have been clearly identified, and these steps and elements do not constitute an exclusive list. The method or device may also include other steps or elements.

[0052] The flowcharts used in this specification are used to illustrate the operations performed by the system according to the embodiments of this specification. It is understood that the operations of each step are not necessarily performed precisely in order. On the contrary, the steps can be processed in reverse order or simultaneously. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.

[0053] This embodiment provides a solar thermal power cogeneration resource allocation method based on a digital model, which includes the following steps:

[0054] S1. Collect historical operation data of functional modules (photovoltaic module, solar thermal module, power storage module, electric heating module, and hot water storage module) in the solar thermal power cogeneration system. The historical operation data of the photovoltaic module includes weather data and power generation efficiency data, the historical operation data of the solar thermal module includes weather data and heating efficiency data, the historical operation data of the power storage module includes weather data and charging and discharging efficiency data, the historical operation data of the electric heating module includes weather data and heating efficiency data, and the historical operation data of the hot water storage module includes weather data and insulation efficiency data.

[0055] S2. Establish digital models of photovoltaic modules, solar thermal modules, electricity storage modules, electric thermal modules, and hot water storage modules respectively, and complete the training of their respective digital models based on their respective historical operation data.

[0056] S3. Collect historical data on heating demand, including weather data and heat demand data.

[0057] S4. Establish a heating demand model and complete the training of the heating demand model based on historical data.

[0058] S5. Obtain weather forecast data, input the weather forecast data into the digital model and the heating demand model, and obtain future performance data of the photovoltaic module, the solar thermal module, the electric heating module, and the hot water storage module, as well as future heat demand data.

[0059] S6. Allocate at least one of the following resources based on future heat demand data:

[0060] (1) The time interval during which the photovoltaic module and the solar thermal module receive light respectively;

[0061] (2) The time interval and power of the electric heating module heating the hot water in the hot water storage module;

[0062] (3) The time interval and charging power during which the photovoltaic module charges the energy storage module;

[0063] (4) The time interval and power supply during which the energy storage module supplies electricity to the electric heating module.

[0064] It should be noted that the conversion rates of solar energy by photovoltaic modules and photothermal modules are different under different weather conditions; the charge and discharge ratios of electric energy by the power storage module are different under different weather conditions; the heating effect of water by the electric thermal module is also different under different weather conditions; and the insulation effect of hot water by the hot water storage module is also different under different weather conditions, and the longer the hot water is stored in the hot water storage module, the greater the heat loss of the hot water.

[0065] Through the above design, by simply combining weather forecast information, the resource allocation of each functional module of the solar heat and power cogeneration system in the future can be reasonably arranged. Combined with the above allocation methods (1) to (4), the actual energy consumed before hot water is directly supplied can be minimized. In other words, through allocation, the redundant power resources can be maximized. The redundant power can be used for other local power needs or for external supply.

[0066] The technical solution of this embodiment is very suitable for situations where the illumination area is limited or the layout area of ​​the solar panels is limited, and can help maximize the utilization rate of solar energy resources.

[0067] In general, the solar heat and power cogeneration resource allocation method based on the digital model provided in this embodiment can actively guide the resource allocation plan in the solar heat and power cogeneration process according to weather changes, significantly reducing the blindness of the allocation, while effectively reducing the internal loss of the system, and helping to retain more electricity while meeting the heating demand.

[0068] In this embodiment, when allocating resource content according to future heat demand data, it includes:

[0069] The command transmission line is used to send deployment instructions to the photovoltaic module, the photothermal module, the power storage module, and the electric heating module.

[0070] The starting end of the instruction transmission line is the control end, the photovoltaic module, the photothermal module, the power storage module, and the electric heating module are arranged in series on the instruction transmission line, and the terminal end of the instruction transmission line is also the control end. Figure 1 shown.

[0071] A deployment instruction data packet is constructed. The deployment instruction data packet has four command layers and one verification layer. The verification layer is the innermost layer, and the four command layers are covered layer by layer outside the verification layer.

[0072] The four command layers store the deployment instructions for photovoltaic modules, solar thermal modules, power storage modules, and electric thermal modules. In each command layer, the matching fields for the objects targeted by the corresponding deployment instructions are stored, such as Figure 2 shown.

[0073] When the deployment instruction data packet is transmitted in the instruction transmission line, the functional module that receives the deployment instruction data packet reads the outermost layer data of the deployment instruction data packet. If the matching field in the outermost layer matches it, the deployment instruction in the outermost layer is extracted for execution, and the outermost layer is removed from the deployment instruction data packet at the same time. After removal, the deployment instruction data packet continues to be sent along the instruction transmission line.

[0074] Through this design, all deployment instructions can be issued through a single line, which simplifies the transmission relationship, saves more ports, and reduces the probability of data transmission errors.

[0075] In addition, this method can also be used to continuously monitor the reliability of the instruction transmission line.

[0076] Specifically, in each command layer, the execution time of the corresponding deployment instruction is also stored. When extracting the deployment instruction in the outermost layer, the functional module also extracts the corresponding execution time, so as to execute the deployment instruction at the time point specified by the execution time.

[0077] Optionally, in the four command layers, the order of the objects targeted by the deployment instructions saved in the four command layers from the outside to the inside is the same as the setting order of the photovoltaic module, the solar thermal module, the power storage module and the electric thermal module on the instruction transmission line.

[0078] In particular, when the deployment instruction data packet is transmitted along the instruction transmission line for one round and is sent back to the control end via the terminal end of the instruction transmission line, the control end verifies the outermost layer of the returned deployment instruction data packet.

[0079] If the outermost layer is the verification layer, it is determined that all the deployment instructions have been successfully issued. This also shows that the instruction transmission line has good reliability, and each functional module can normally complete the reception of the deployment instructions. It also serves as feedback on the completion of the deployment instructions.

[0080] If the outermost layer is any one of the four command layers, it is determined that the deployment instructions have not been successfully issued. It also means that a functional module has not completed the reception of the deployment instructions normally. The node (functional module) that currently hinders the reception of the deployment instructions is the target of the current outermost deployment instructions, that is, the functional module to which the current outermost deployment instructions are sent is the functional module with the problem.

[0081] If the outermost layer cannot be identified, it is determined that the deployment instruction data packet is damaged, which means that the deployment instruction data packet is damaged during transmission and the reliability of the instruction transmission line is damaged. At this time, the outermost layer can be determined by determining the similarity between the outermost layer and the original 4 command layers and 1 verification layer to determine which original data layer the outermost layer corresponds to. The transmission interval before the functional module corresponding to the original data layer corresponding to the outermost layer is the priority inspection interval.

[0082] It should be noted that when the control end verifies the outermost layer of the returned dispatch instruction data packet, if the outermost layer is any one of the four command layers, the dispatch instruction data packet will continue to be transmitted through the instruction transmission line for one more cycle.

[0083] When the deployment instruction data packet is continuously transmitted through the instruction transmission line, a week number threshold is set, and a week number mark is set on the deployment instruction data packet, and the initial value of the week number mark is 1.

[0084] Each time the allocation instruction data packet is transmitted through the instruction transmission line, the value of the week number mark is increased by 1. When a certain allocation instruction data packet needs to be transmitted through the instruction transmission line, and the control end detects that the week number mark is equal to the week number threshold (the week number threshold can be flexibly set and adjusted according to actual conditions), the transmission of the allocation instruction data packet is stopped, and a signal reception abnormality prompt is sent to the administrator.

[0085] The object of the signal reception abnormality prompt is the target object of the current outermost deployment instruction of the deployment instruction data packet.

[0086] Through this design, the overall reliability of the system can be evaluated by continuing to transmit the dispatch instruction data packet through the instruction transmission line. If the dispatch instruction is transmitted after continued transmission, it means that the fault is not the most serious, and there may be a temporary stagnation in data reception. If the dispatch instruction cannot be transmitted after executing all the continued transmission processes, it means that the fault is more serious and cannot be completed after repeated issuance. In this way, maintenance personnel can have a priority reference standard when arranging maintenance work for different cogeneration systems.

[0087] That is to say, after a certain dispatching instruction data packet is transmitted through the instruction transmission line, when the control end receives the dispatching instruction data packet sent back again, if its outermost layer is the verification layer, then the value of the current week number mark of the dispatching instruction data packet can be used as the basis for evaluating the transmission reliability. The larger the value of the week number mark, the lower the reliability.

[0088] More specifically, when the control end verifies the outermost layer of the returned dispatch instruction data packet, if the outermost layer is any one of the four command layers, it is determined that the dispatch instruction has not been successfully issued, and the node (functional module) that currently hinders the reception of the dispatch instruction is the target of the current outermost dispatch instruction (assuming it is functional module 2). At this time, the dispatch instruction data packet is transmitted once more through the instruction transmission line, and the value of the cycle number mark increases by 1.

[0089] If the dispatching instruction is delivered after the transmission is continued, the value of the week number mark is 2 at this time, which can be used as the reliability basis of the functional module 2.

[0090] If after the transmission continues, the control end verifies the outermost layer of the returned dispatch instruction data packet, the outermost layer is still one of the four command layers, and the current outermost dispatch instruction is for function module 3. At this time, after recording the value "2" of the week number mark as the reliability basis of function module 2, the value of the week number mark is reset to "1", and the current dispatch instruction data packet is continuously transmitted through the instruction transmission line. In this way, the reliability of function module 3 can be evaluated.

[0091] Through such a design, the reliability evaluation of each functional module can be realized synchronously during the operation process. The larger the value of the week number mark, the lower the reliability. The reliability evaluation result can be used as a reference for the arrangement of each functional module on the instruction transmission line. Specifically: when arranging each functional module on the instruction transmission line, arrange them from large to small according to the value of the week number mark, that is, along the transmission direction of the instruction transmission line, each functional module is arranged in order from large to small according to the value of the week number mark. In other words, after the deployment instruction data packet is sent by the control end, it is first received by the functional module corresponding to the maximum value of the week number mark, and so on.

[0092] In this way, the deployment instruction data packet is first received by the functional module with the lowest reliability. If it is not successfully received, the remaining functional modules will not perform the instruction receiving operation, which can effectively reduce the data processing load of other functional modules. At the same time, even if the first functional module still fails to successfully complete the instruction reception after repeatedly sending the deployment instruction data packet, there is no need to send a command to cancel the relevant instructions to the remaining functional modules, and there is no need to shut down, which effectively reduces subsequent troubles. In addition, arranging the functional modules according to their reliability and placing the functional module with the lowest reliability in the first receiving position can effectively reduce the probability of "some functional modules have completed the instruction reception, while other functional modules have not completed the instruction reception", thereby reserving sufficient time for troubleshooting and avoiding the embarrassing situation that some functional modules have completed the instruction reception and need to complete the troubleshooting before the execution time of the relevant instructions.

[0093] Another point that needs to be explained is that based on the above arrangement of functional modules, that is, arranging the functional modules according to their reliability and placing the functional module with the lowest reliability in the first receiving position, when performing equipment maintenance, the arrangement order of the current functional modules as instruction transmission lines can be used as a reference, and the functional modules can be maintained according to the arrangement order, with the functional module with the lowest reliability being processed first. This achieves guidance on maintenance work.

[0094] Furthermore, when the control end determines that all the deployment instructions have been successfully issued, the control end sends a confirmation data packet on the instruction transmission line in advance for a preparation time.

[0095] The confirmation data packet has four data segments and one verification segment which are arranged in series, and the verification segment is located at the end.

[0096] Each data segment is divided into a front end and a back end. The front end of the data segment stores the matching fields, and the back end of the data segment stores the confirmation mark, such as Figure 3 shown.

[0097] When the confirmation data packet is transmitted in the instruction transmission line, the function module that receives the confirmation data packet reads the data at the front end of the confirmation data packet. If the matching field in the data segment at the front end matches it, the function module removes the matching field and cuts and saves the confirmation mark in the current data segment. Figure 4 As shown, at the same time, the remaining confirmation data packets continue to be sent along the instruction transmission line.

[0098] Before executing the deployment instruction, if the function module obtains the corresponding confirmation mark, the deployment instruction is executed at the time point specified by the execution time. Otherwise, the execution step of the corresponding deployment instruction is canceled.

[0099] With this design, if the functional module at the front end fails to successfully complete the acquisition of the confirmation mark, it will affect the normal acquisition of the confirmation mark by the subsequent functional modules. This will cause the front end of the confirmation data packet to not be the verification segment when it is retransmitted back to the control end. When this happens, the control end continuously sends the instruction "cancel the execution step of the corresponding deployment instruction" to each functional module through the instruction transmission line, and at the same time alarms the management personnel, who will determine whether it is necessary to temporarily shut down for investigation based on the actual situation. If emergency treatment is not performed, it is possible that some functional modules will execute the deployment instructions while other functional modules will not execute the deployment instructions, that is, there will be a situation where the work is not synchronized, which may cause system damage.

[0100] The above design is not only to complete the confirmation of the deployment instructions, but also to continue to monitor the reliability of the instruction transmission line. Since the deployment instructions are issued in advance and executed by the functional module at the specified execution time, the deployment instructions are issued in advance, and the execution steps are later. If the instruction transmission line fails during the period between the issuance and execution of the deployment instructions, it is very likely that the subsequent deployment work cannot be carried out, and in serious cases, it is very likely to cause damage to the cogeneration system. The confirmation step of the deployment instruction can just complete the re-evaluation of the reliability of the instruction transmission line during the period between the issuance and execution of the deployment instructions.

[0101] In summary, the solar heat and power cogeneration resource allocation method based on the digital model provided in the embodiment of the present invention can actively guide the resource allocation plan in the solar heat and power cogeneration process according to weather changes, significantly reducing the blindness of the allocation, while effectively reducing the internal loss of the system, and helping to retain more electricity while meeting the heating demand.

[0102] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A solar heat and power cogeneration resource allocation method based on a digital model, characterized in that: include: Collect historical operation data of photovoltaic modules, photothermal modules, power storage modules, electric heating modules, and hot water storage modules in a solar thermal power cogeneration system, wherein the historical operation data of the photovoltaic modules include weather data and power generation efficiency data, the historical operation data of the photothermal modules include weather data and heating efficiency data, the historical operation data of the power storage modules include weather data and charging and discharging efficiency data, the historical operation data of the electric heating modules include weather data and heating efficiency data, and the historical operation data of the hot water storage modules include weather data and thermal insulation efficiency data; Establishing digital models of the photovoltaic module, the photothermal module, the electricity storage module, the electric thermal module, and the hot water storage module respectively, and completing the training of the respective digital models based on the respective historical operation data; Collecting historical data of heating demand, wherein the historical data includes weather data and heat demand data; Establishing a heating demand model, and completing training of the heating demand model based on the historical data; Acquire weather forecast data, input the weather forecast data into the digital model and the heat demand model, and obtain future performance data of the photovoltaic module, the solar thermal module, the electric thermal module, and the hot water storage module, as well as future heat demand data; At least one of the following resource contents is allocated according to the future heat demand data: (1) The time interval during which the photovoltaic module and the photothermal module are exposed to light; (2) the time interval and power of the electric heating module heating the hot water in the hot water storage module; (3) the time interval and charging power during which the photovoltaic module charges the energy storage module; (4) The time interval and power supply during which the energy storage module supplies electrical energy to the electric heating module; Wherein, when allocating the resource content according to the future heat demand data, it includes: Sending a deployment instruction to the photovoltaic module, the photothermal module, the power storage module, and the electric heating module by using an instruction transmission line; The starting end of the instruction transmission line is the control end, the photovoltaic module, the photothermal module, the power storage module, and the electric heating module are arranged in series on the instruction transmission line, and the terminal end of the instruction transmission line is also the control end; Constructing a deployment instruction data packet, wherein the deployment instruction data packet has four command layers and one verification layer, wherein the verification layer is the innermost layer, and the four command layers are layered outside the verification layer; The four command layers respectively store the deployment instructions for the photovoltaic module, the photothermal module, the power storage module and the electric thermal module; in each of the command layers, a matching field for the object targeted by the corresponding deployment instruction is stored; When the deployment instruction data packet is transmitted in the instruction transmission line, the functional module receiving the deployment instruction data packet reads the outermost layer data of the deployment instruction data packet, and if the matching field in the outermost layer matches it, extracts the deployment instruction in the outermost layer for execution, and simultaneously removes the outermost layer from the deployment instruction data packet, and after removal, continues to send the deployment instruction data packet along the instruction transmission line for transmission; When the allocation instruction data packet is transmitted along the instruction transmission line for one round and is sent back to the control end via the terminal end of the instruction transmission line, the control end verifies the outermost layer of the returned allocation instruction data packet; if the outermost layer is any one of the four command layers, the allocation instruction data packet is further transmitted through the instruction transmission line for one round; When the allocation instruction data packet is continuously transmitted through the instruction transmission line, a week number threshold is set, and a week number mark is set on the allocation instruction data packet, and the initial value of the week number mark is 1; each time the allocation instruction data packet is continuously transmitted through the instruction transmission line, the value of the week number mark is increased by 1; when a certain allocation instruction data packet needs to be continuously transmitted through the instruction transmission line, and the control end detects that the week number mark is equal to the week number threshold, the transmission of the allocation instruction data packet is stopped, and a signal reception abnormality prompt is issued to the administrator; the prompt object of the signal reception abnormality is the target object of the current outermost allocation instruction of the allocation instruction data packet; After a certain deployment instruction data packet continues to be transmitted through the instruction transmission line, when the control end receives the deployment instruction data packet sent back again, if its outermost layer is the verification layer, the current value of the week number mark of the deployment instruction data packet is used as the basis for evaluating the transmission reliability.

2. The solar thermal power cogeneration resource allocation method based on digital model according to claim 1 is characterized in that: In each of the command layers, the execution time of the corresponding deployment instructions is also stored; when the functional module extracts the deployment instructions in the outermost layer, it also extracts the corresponding execution time, so as to execute the deployment instructions at the time point specified by the execution time.

3. The solar thermal power cogeneration resource allocation method based on digital model according to claim 2 is characterized in that: If the outermost layer is the verification layer, it is determined that all the deployment instructions have been successfully issued; if the outermost layer is any one of the four command layers, it is determined that not all the deployment instructions have been successfully issued; if the outermost layer cannot be recognized, it is determined that the deployment instruction data packet is damaged.

4. The solar thermal power cogeneration resource allocation method based on digital model according to claim 3 is characterized in that: In the four command layers, the order of the objects targeted by the deployment instructions saved in the four command layers from the outside to the inside is the same as the setting order of the photovoltaic module, the photothermal module, the power storage module and the electric thermal module on the instruction transmission line.

5. The solar thermal power cogeneration resource allocation method based on digital model according to claim 4 is characterized in that: When the control end determines that all the deployment instructions have been successfully issued, the control end sends a confirmation data packet on the instruction transmission line in advance for a preparation time; The confirmation data packet has four data segments and one verification segment arranged in series, and the verification segment is located at the tail end; Each of the data segments is divided into a front end and a back end, the front end of the data segment stores the matching field, and the back end of the data segment stores a confirmation mark; When the confirmation data packet is transmitted in the instruction transmission line, the function module that receives the confirmation data packet reads the front-end data of the confirmation data packet, and if the matching field in the data segment at the front-end matches it, the function module removes the matching field, cuts and saves the confirmation mark in the current data segment, and at the same time continues to send the remaining confirmation data packets along the instruction transmission line for transmission; Before executing the deployment instruction, if the functional module obtains the corresponding confirmation mark, the deployment instruction is executed at the time point specified by the execution time; otherwise, the execution step of the corresponding deployment instruction is canceled.

Citation Information

Patent Citations

  • Virtual power plant operation control system and control method

    CN113346558A

  • Regulation and control method, device and regulation and control equipment for electric heating comprehensive energy system

    CN116151551A

  • Comprehensive energy supply method and device based on cascade type multi-source heat pump

    CN118212092A

  • Solar co-generation management system based on digital twinborn technology

    CN118353101A