A big data-based embankment and bank protection safety early warning method and system

Through a big data-based method, using compressive and impact testers to detect embankment guard samples, combined with data collection, and calculate early warning index, the problem of untimely and inaccurate early warning of embankment guard safety in the existing technology is solved, and a more comprehensive and scientific safety monitoring.

CN118736805BActive Publication Date: 2024-11-12GUANGDONG HEHAI ENG CONSULTATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411235476.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-12
Estimated Expiration
2044-09-04

AI Technical Summary

Technical Problem

The safety warning of existing embankment guards relies on manual patrols and fixed-point monitoring. There are problems such as incomplete information collection, low monitoring frequency, few data references, and prone to abnormal data, which is difficult to truly reflect the safety status of the entire embankment guards.

Method used

Using a big data-based method, the compression and impact values ​​of the embankment guard samples are obtained through the compression tester and impact tester. Combined with the data acquisition unit to detect the water area parameters, calculate the water pressure threshold and flow velocity threshold, and build a plane coordinate system , filter out abnormal data, calculate the warning index and convert it into warning signals, and realize systematic safety warning.

Benefits of technology

It improves the timeliness and accuracy of safety warnings on the embankment guards, ensures that the safety warning center can timely understand the safety conditions of the embankment guards, reduces information blind spots, and enhances the diversity and scientificity of data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118736805B_ABST
    Figure CN118736805B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of safety early warning systems, and is a big data-based embankment and revetment safety early warning method and system, comprising: obtaining #imgabs0# groups of embankment and revetment samples, obtaining preliminary detection samples and compression values ​​using a compression tester and the embankment and revetment samples, detecting the preliminary detection samples using an impact tester to obtain impact values, respectively summarizing the compression values ​​and impact values ​​to obtain #imgabs1# compression values ​​and #imgabs2# impact values, calculating water pressure thresholds using #imgabs3# compression values, calculating flow velocity thresholds using #imgabs4# impact values, obtaining #imgabs5# initial data groups using a data acquisition unit, obtaining early warning data group sets using #imgabs6# initial data groups and water pressure thresholds, calculating early warning indexes using the early warning data group sets, water pressure thresholds and flow velocity thresholds, converting the early warning indexes into early warning signals using early warning prompt units, and sending the early warning signals to an initiator of safety early warning instructions; the present invention can improve the timeliness and accuracy of safety early warnings for embankments and revetments.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of safety warning systems, and in particular to a big data-based embankment and revetment safety warning method, system, electronic equipment and computer-readable storage medium. Background Art

[0002] Bank protection projects refer to measures taken to strengthen existing bank slopes in estuaries, rivers, lakes and coastal areas to prevent the invasion and scouring of waves and water flow, and the collapse of bank slopes caused by soil pressure and groundwater seepage pressure. Bank protection is an important building in the construction of a river basin flood control system, which plays a key role in preventing bank breaches and overtopping and protecting the lives and property of residents along the coast.

[0003] At present, the safety warning of embankments and revetments mainly relies on manual inspections and fixed-point monitoring. Manual inspections are usually carried out by professionals who regularly inspect the embankments and revetments, record and report the hidden dangers they find. Fixed-point monitoring is to set up monitoring instruments at a certain location of the embankment and use the monitoring instruments to monitor the safety of the embankment section in real time.

[0004] Although the above methods can achieve safety early warning of embankments and revetments, the manual inspection method has problems such as incomplete information collection, low monitoring frequency, and slow collection speed. The reference data obtained by fixed-point monitoring is small and abnormal data is prone to occur. Therefore, it is difficult to truly reflect the safety status of the entire embankment and revetment. Summary of the invention

[0005] The present invention provides a big data-based levee and revetment safety early warning method and a computer-readable storage medium, the main purpose of which is to improve the timeliness and accuracy of the levee and revetment safety early warning.

[0006] To achieve the above-mentioned purpose, the present invention provides a big data-based embankment and revetment safety early warning method, comprising:

[0007] Receive a safety warning instruction, and confirm a safety warning environment based on the safety warning instruction, wherein the safety warning environment includes: a target water area, a sample detection unit, a data collection unit, and a warning prompt unit, wherein the sample detection unit includes a pressure tester and an impact tester;

[0008] Get Samples of bank protection The following operations are performed on each group of dike and revetment samples in the dike and revetment sample group:

[0009] Use a compression tester and embankment and revetment samples to obtain preliminary test samples and compression values, and use an impact tester to test preliminary test samples to obtain impact values;

[0010] Summarize the compression value and impact value respectively to obtain The compressive strength and Impact resistance value, using The water pressure threshold is calculated using the compression resistance value. The flow rate threshold is calculated based on the impact resistance value;

[0011] Optionally, the target water area is detected by using a data acquisition unit to obtain An initial data set, including:

[0012] Start the data collection unit, wherein the data collection unit includes A test unit, wherein the test unit includes: a pressure sensor and a propeller flow meter;

[0013] Based on the Test units, target waters and preset position sequence acquisition initial data set, where the position sequence includes There are monitoring positions, and the monitoring positions correspond to the test units one by one, and the initial data set consists of water pressure values ​​and flow rate values.

[0014] The utilization The initial data set and water pressure threshold are used to obtain the early warning data set, including:

[0015] Use the water pressure threshold to obtain the rejection range;

[0016] right Each of the initial data groups performs the following operations:

[0017] If the water pressure value corresponding to the initial data group meets the exclusion range, the initial data group is identified as an abnormal data group, and the abnormal data groups are summarized to obtain p abnormal data groups, where p is an integer greater than or equal to 0;

[0018] The following operations are performed on all the abnormal data groups in the p abnormal data groups:

[0019] Leverage pre-built update relationships, exception data sets, and The updated data group is calculated from the initial data group, and the abnormal data group is updated using the updated data group to obtain a target data set, wherein the target data set is composed of an initial data set and an updated data set;

[0020] based on The mean water pressure, standard deviation of water pressure, mean flow velocity and standard deviation of flow velocity are obtained for each target data group, and a plane coordinate system is constructed with the mean water pressure and mean flow velocity as the origin of coordinates, wherein the horizontal coordinate of the plane coordinate system is the water pressure value and the vertical coordinate is the flow velocity value;

[0021] Will Mapping a target data set to the plane coordinate system to obtain a mapping coordinate system;

[0022] The target ellipse is constructed in the mapping coordinate system using the standard deviation of water pressure and the standard deviation of flow velocity;

[0023] Based on the target ellipse and the mapping coordinate system The target data set is used to obtain the warning data set.

[0024] Optionally, the using the early warning prompt unit to convert the early warning index into an early warning signal includes:

[0025] Comparing the warning index with a preset first warning threshold and a preset second warning threshold;

[0026] If the warning index is less than the first warning threshold, the pre-built advanced warning signal is outputted using the warning prompt unit;

[0027] If the warning index is greater than or equal to the first warning threshold, and the warning index is less than the second warning threshold, the pre-constructed primary warning signal is outputted using the warning prompt unit;

[0028] If the warning index is greater than or equal to the second warning threshold, the warning prompt unit is used to output a pre-constructed safety signal, wherein the warning signal is composed of: an advanced warning signal, a primary warning signal and a safety signal.

[0029] To achieve the above purpose, the present invention also provides a big data-based embankment and bank protection safety early warning system, comprising:

[0030] The warning environment confirmation module is used to receive the safety warning instruction and confirm the safety warning environment based on the safety warning instruction, wherein the safety warning environment includes: target waters, sample detection unit, data collection unit and warning prompt unit, wherein the sample detection unit includes a compression tester and an impact tester;

[0031] Sample threshold calculation module, used to obtain Samples of bank protection The following operations are performed on each group of embankment and revetment samples in the group of embankment and revetment samples: a compression tester and embankment and revetment samples are used to obtain preliminary test samples and compression values; an impact tester is used to test the preliminary test samples to obtain impact values; the compression values ​​and impact values ​​are respectively summarized to obtain The compressive strength and Impact resistance value, using The water pressure threshold is calculated using the compression resistance value. The flow rate threshold is calculated based on the impact resistance value;

[0032] The water area data acquisition module is used to detect the target water area using the data acquisition unit to obtain initial data set; using An initial data set and a water pressure threshold are used to obtain a warning data set;

[0033] The warning signal sending module is used to calculate the warning index using the warning data set, water pressure threshold and flow rate threshold, and convert the warning index into a warning signal using the warning prompt unit; the warning signal is sent to the initiator of the safety warning instruction to complete the safety warning of the embankment and revetment.

[0034] In order to solve the above problem, the present invention further provides an electronic device, the electronic device comprising:

[0035] A memory storing at least one instruction;

[0036] and a processor, executing instructions stored in the memory to implement the above-mentioned big data-based embankment and revetment safety early warning method.

[0037] In order to solve the above problems, the present invention also provides a computer-readable storage medium, in which at least one instruction is stored. The at least one instruction is executed by a processor in an electronic device to implement the above-mentioned big data-based embankment and revetment safety warning method.

[0038] The present invention is to solve the problem described in the background technology. The present invention receives a safety warning instruction and confirms a safety warning environment based on the safety warning instruction, wherein the safety warning environment includes: a target water area, a sample detection unit, a data acquisition unit and a warning prompt unit, wherein the sample detection unit includes a pressure tester and an impact tester. It can be seen that the present invention provides a systematic working environment for each unit by constructing a complete safety warning environment, thereby ensuring the comprehensiveness and systematicness of data collection, and then obtaining Samples of bank protection The following operations are performed on each group of embankment and revetment samples in the group of embankment and revetment samples: a compression tester and embankment and revetment samples are used to obtain preliminary test samples and compression values; an impact tester is used to test the preliminary test samples to obtain impact values; the compression values ​​and impact values ​​are respectively summarized to obtain The compressive strength and Impact resistance value, using The water pressure threshold is calculated using the compression resistance value. It can be seen that the embodiment of the present invention increases the diversity of data by testing multiple groups of embankment and revetment samples, and uses statistical methods to calculate the water pressure threshold and the flow velocity threshold, thereby improving the scientificity and accuracy of the calculation results; the target water area is detected by using a data acquisition unit to obtain It can be seen that the embodiment of the present invention reduces information blind spots and improves the comprehensiveness of monitoring by collecting data at multiple monitoring locations in the target water area; Initial data set and water pressure threshold to obtain early warning data set. It can be seen that the embodiment of the present invention is to Each data group in the initial data group is compared with the abnormal range set by the water pressure threshold, and the abnormal data group is screened out, the influence of special circumstances is eliminated, and multiple abnormal data groups are repaired to obtain multiple target data groups, and finally multiple target data groups are screened to obtain the warning data group, so that the warning data group is more in line with the actual situation; the warning index is calculated using the warning data group set, the water pressure threshold and the flow rate threshold, and the warning index is converted into a warning signal using the warning prompt unit. It can be seen that the embodiment of the present invention improves the scientific nature of the warning by calculating the warning index and quantifying the warning degree, and the converted warning signal can more intuitively show the warning degree of the embankment revetment, which is convenient for timely response and processing; the warning signal is sent to the initiator of the safety warning instruction to complete the safety warning of the embankment revetment, and the warning signal obtained by real-time calculation and conversion is transmitted to the initiator of the safety warning instruction to ensure that the safety warning center can timely understand the safety situation of the embankment revetment, and improve the timeliness of the safety warning of the embankment revetment. Therefore, the present invention can improve the timeliness and accuracy of the safety warning of the embankment revetment. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 A schematic diagram of a process flow of a big data-based embankment and bank protection safety early warning method provided in one embodiment of the present invention;

[0040] Figure 2 for Figure 1 A detailed implementation flow chart of one of the steps in the process;

[0041] Figure 3 for Figure 1 A detailed implementation flow diagram of another step in FIG.

[0042] Figure 4 A functional module diagram of a levee and bank protection safety early warning system based on big data provided by an embodiment of the present invention;

[0043] Figure 5 A schematic diagram of the structure of an electronic device for implementing the big data-based embankment and revetment safety early warning method provided in one embodiment of the present invention.

[0044] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0045] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0046] The embodiment of the present application provides a dike and revetment safety early warning method based on big data. The execution subject of the dike and revetment safety early warning method based on big data includes but is not limited to at least one of the electronic devices such as a server and a terminal that can be configured to execute the method provided by the embodiment of the present application. In other words, the dike and revetment safety early warning method based on big data can be executed by software or hardware installed on a terminal device or a server device, and the software can be a blockchain platform. The server includes but is not limited to: a single server, a server cluster, a cloud server or a cloud server cluster, etc.

[0047] Reference Figure 1 FIG. 1 is a flow chart of a big data-based embankment and bank protection safety early warning method according to an embodiment of the present invention. In this embodiment, the big data-based embankment and bank protection safety early warning method includes:

[0048] S1. Receive a safety warning instruction, and confirm a safety warning environment based on the safety warning instruction, wherein the safety warning environment includes: a target water area, a sample detection unit, a data acquisition unit, and a warning prompt unit, wherein the sample detection unit includes a pressure tester and an impact tester.

[0049] Furthermore, in the embodiment of the present invention, the environment used to monitor the safety of embankments and revetments is a safety warning environment. And the safety warning environment includes: a target water area, a sample detection unit, a data acquisition unit and an early warning prompt unit, wherein the embankment and revetment are a protective engineering facility to prevent lateral erosion of rivers and disasters caused by local scouring of the river. The embodiment of the present invention is suitable for embankments and revetments with uniform materials and stable structures, including but not limited to: uniform earth embankments with stone masonry facings, embankments with masonry structures or steel-concrete retaining walls, mixed embankments reinforced with piles or pile foundations, and various ecological embankments.

[0050] It is understandable that when dangerous conditions occur in embankments and revetments, rivers often burst their banks. Therefore, it is necessary to monitor the embankments and revetments so that they can be inspected, replaced and reinforced in a timely and accurate manner, thereby achieving safety early warnings for the embankments and revetments.

[0051] It should be explained that the safety warning instruction is generally initiated by the safety officer of the safety warning center. For example, Xiao Zhang is a safety officer of the Poyang Lake Safety Warning Center. Now Xiao Zhang needs to monitor the safety of a certain embankment and revetment around Poyang Lake, so Xiao Zhang initiates the safety warning instruction.

[0052] Importantly, the target water area refers to the water area within the scope of important embankment and revetment protection that will have an impact on the safety of the embankment and revetment protection. For example, a certain level of river passes through a large urban area with a length of about 10km. The water area of ​​10km in the urban area is the target water area. By monitoring the parameters of the target water area, the impact that the target water area may have on the embankment and revetment protection can be inferred. The main function of the sample detection unit is to detect and collect the compression resistance and impact resistance of subsequent embankment and revetment protection samples. The data acquisition unit is used to collect the parameters of the target water area. The early warning prompt unit is a unit that outputs different early warning signals according to different early warning indexes. For the specific application of the compression tester and the impact tester, please refer to the subsequent embodiments.

[0053] In detail, the receiving of the security warning instruction and confirming the security warning environment based on the security warning instruction includes:

[0054] After receiving the safety warning instruction, the sample detection unit, the data collection unit and the warning prompt unit are self-tested;

[0055] When the self-test passes, the parameters of the pressure tester and the impact tester are set respectively until the parameters are set successfully, and a safety warning environment including the target water area, the pressure tester, the impact tester, the data acquisition unit, the data analysis unit and the warning prompt unit is obtained, wherein the data acquisition unit is placed in the target water area.

[0056] It should be explained that the parameters for setting the compression tester and the impact tester include the test time, the number of tests, etc.

[0057] S2. Acquisition Samples of bank protection Each group of embankment and revetment samples in the group of embankment and revetment samples performs the following operations: using a compression tester and embankment and revetment samples to obtain preliminary test samples and compression values, using an impact tester to test the preliminary test samples to obtain impact values, and summarizing the compression values ​​and impact values ​​to obtain The compressive strength and An impact resistance value.

[0058] It should be explained that the embodiments of the present invention The similarities among the groups of embankment and revetment samples are that they are all taken from the embankment and revetment and are cubes of equal size; the differences are that each group of embankment and revetment samples is taken from different positions of the embankment and revetment.

[0059] In detail, the method of obtaining preliminary test samples and compression values ​​using a compression tester and embankment and revetment samples includes:

[0060] Start the compression tester, which includes a pressure testing machine, an optical ruler, an electronic balance and a resistance meter;

[0061] After the startup is completed, the embankment protection samples are measured respectively by using an optical ruler, an electronic balance and a resistance meter to obtain the sample side length, sample mass and sample resistance;

[0062] Obtain a pressure gradient set, import the pressure gradient set into a pressure testing machine, and use the pressure testing machine with the pressure gradient set imported to apply pressure to the embankment and revetment sample until the embankment and revetment sample is deformed. Stop applying pressure to obtain a preliminary test sample, record the value of the pressure applied by the pressure testing machine at this time, and obtain the pressure value.

[0063] The compressive strength is calculated using the sample side length, sample mass, sample resistance and pressure value. The calculation formula is as follows:

[0064] ;

[0065] in, is the compressive strength value, is the sample side length, is the sample quality, is the sample resistance, is the pressure value, is the preset density reference value, is the preset resistance reference value.

[0066] It is understandable that the compression tester is a comprehensive testing instrument including a pressure testing machine, an optical ruler, an electronic balance and a resistance meter. The pressure testing machine is a device that can apply pressure to the embankment and revetment sample according to the set pressure value. The optical ruler is a device that uses photoelectric conversion technology to measure the side length of the embankment and revetment sample and outputs a signal corresponding to the side length. The electronic balance is a device used to weigh the mass of the embankment and revetment sample. The resistance meter is a device that is connected to the embankment and revetment sample through two wires and measures its resistance. The sample side length, sample mass and sample resistance refer to the side length, mass and resistance of the embankment and revetment sample respectively.

[0067] It should be explained that the pressure gradient set is a set consisting of multiple time values ​​and their corresponding multiple pressure values, and the pressure value is linearly related to the time value.

[0068] For example, That is, a set of pressure gradient sets, which indicates that the pressure value at the beginning is , and every 1 second, the pressure value output by the pressure testing machine increases .

[0069] It is understood that the deformation of the embankment and revetment sample refers to a certain change in the shape of the embankment and revetment sample. Usually, a shortening or increase of 5% in the length of one side is considered as a deformation. The preliminary test sample refers to the embankment and revetment sample after the pressure tester applies pressure and deforms it.

[0070] For example, when the pressure testing machine applies pressure to the bank protection sample, Xiao Zhao uses an optical ruler to measure the side length of the bank protection sample in real time until the length of one side increases or decreases by 5%. It is considered that the bank protection sample has deformed, and the pressure is stopped. At this time, the pressure applied by the pressure testing machine is , then the pressure value is .

[0071] It should be understood that the density reference value and the resistance reference value are calculated by the breakwater and revetment design specifications, and the density reference value and the resistance reference value represent the density and resistance of the embankment revetment under qualified conditions, respectively. The technology of calculating the density reference value and the resistance reference value using the breakwater and revetment design specifications is an existing technology and will not be repeated. The magnitude of the compressive strength value reflects the ability of the embankment revetment sample to resist water pressure, and the ability of the embankment revetment sample to resist water pressure is determined to a certain extent by the density and humidity of the embankment revetment sample. In general, the greater the density and the lower the humidity of the embankment revetment sample, the stronger its ability to resist water pressure. The humidity is determined by the sample resistance of the embankment revetment sample. The smaller the sample resistance, the stronger the conductivity, the more water molecules inside the embankment revetment sample, and the greater its humidity. Therefore, the above process of calculating the compressive strength value utilizes the sample resistance and the density of the embankment revetment sample to make the calculated compressive strength value more in line with the actual situation.

[0072] For further information, see Figure 2 As shown, the use of an impact tester to test a preliminary test sample to obtain an impact value includes:

[0073] S21, starting the impact tester, wherein the impact tester includes a controllable water pump, a flow rate measuring instrument, a laser scanner, an image analyzer, a flat-mouth vise and a workbench, wherein the controllable water pump is composed of a high-pressure water pump and a water pump controller, and different water pressure values ​​are introduced into the controllable water pump, and the controllable water pump will generate water flows with different water pressures;

[0074] S22, after the start-up of the impact tester is completed, the preliminary test sample is fixed to the workbench by using the flat-mouth vise to obtain a fixed test sample;

[0075] S23, obtaining a water pressure sequence, wherein the water pressure sequence includes a plurality of water pressure values ​​and a plurality of time periods, and the water pressure values ​​correspond to the time periods one by one, after the water pressure sequence is introduced into a controllable water pump, the controllable water pump after the water pressure sequence is introduced is used to perform a spraying operation on a fixed test sample to obtain a spraying test sample, wherein the angle of the spraying water flow is preset, the tth test image is obtained by using a laser scanner and the spraying test sample, and the t+1th test image is confirmed based on the tth test image, wherein the scanning frequency of the laser scanner is preset, and the volume change rate is obtained by using an image analyzer, the tth test image and the t+1th test image;

[0076] S24, comparing the volume change rate with a preset change rate threshold;

[0077] S25. If the volume change rate is less than the change rate threshold, the t+1th detection image is taken as the tth detection image, and the process returns to the step of confirming the t+1th detection image based on the tth detection image, until the volume change rate is greater than or equal to the change rate threshold, and then the anti-impact value is obtained by using a flow meter and a controllable water pump in the time period corresponding to the t+1th detection image.

[0078] It is understandable that the impact tester is a comprehensive testing instrument including a controllable water pump, a flow rate meter, a laser scanner, an image analyzer, a flat-mouth vise and a workbench. The flow rate meter is an instrument for measuring the flow rate of water generated by a controllable water pump. Optionally, a JD-LS5 flow rate monitor is used as a flow rate meter. A laser scanner is an instrument that uses laser scanning technology, which can scan the spray test sample, obtain three-dimensional point cloud data, and generate a test image through calculation. An image analyzer is a computer with built-in image analysis software, which can calculate the volume change rate through the difference between the t-th test image and the t+1-th test image. A flat-mouth vise is a general machine tool accessory, used in conjunction with a workbench, to fix, clamp and position the preliminary test sample during the processing process.

[0079] It should be explained that the water pressure sequence is a sequence in which multiple water pressure values ​​correspond to multiple time periods one by one and are sorted in order from small to large according to the water pressure values. For example, (20bar-5s, 25bar-10s...120bar-105s) is a set of water pressure sequences. A fixed test sample refers to a preliminary test sample fixed to a workbench. A jet test sample is obtained by jetting a fixed test sample through a controllable water pump. In an embodiment of the present invention, a jet operation refers to an operation of flushing a fixed test sample with a water flow generated by a controllable water pump. The preset angle of the jet water flow refers to the angle between the water flow and the surface of the fixed test sample, which is usually 0 degrees, and the specific angle is determined by the direction of the water flow near the ecological embankment revetment in reality. Optionally, the scanning frequency is once every five seconds. The t-th test image and the t+1-th test image refer to images obtained by scanning the laser scanner at the t-th and t+1-th times according to the scanning frequency, and the initial value of t is 1. The volume change rate refers to the average volume lost per second by the jet test sample under the flushing of the controllable water pump water flow. For example, when the time is 5 seconds and the time is 10 seconds, and the scanning frequency is once every five seconds, the volume change value of the injection test sample is 5 cubic centimeters, then its volume change rate is 1 cubic centimeter per second. The change rate threshold is usually the average volume loss of the injection test sample per second, and the volume average reaches 2% of the total volume of the fixed test sample. In actual preset, the specific change rate threshold is determined by the material of the injection test sample.

[0080] Exemplarily, in order to test the preliminary test sample, Xiao Wang uses a flat-mouth vise to fix the preliminary test sample to the workbench to obtain a fixed test sample, sets the water pressure sequence to (20bar-5s, 25bar-10s...120bar-105s), and uses a controllable water pump to spray the fixed test sample to obtain a sprayed test sample, and during the spraying process, uses a water pump controller to set the water pressure value of the water flow sprayed by the high-pressure water pump every 5 seconds, that is, from 0 to 5 seconds, the water pressure of the water flow sprayed by the high-pressure water pump is set to 20 bars, and from 5 to 10 seconds, the water pressure of the water flow sprayed by the high-pressure water pump is set to 25 bars,..., and then during the spraying process, uses a laser scanner to scan the sprayed test sample every 5 seconds, and obtains the test sample at the 5th second. The first detection image is taken, and the second detection image is obtained at the 10th second. The first detection image and the second detection image are imported into the image analysis software programmed with Python, and the volume change rate of the injection detection sample is calculated. After comparing the volume change rate with the change rate threshold, it is found that the volume change rate is less than the change rate threshold. Then, a laser scanner is used to scan at the 15th second to obtain the third detection image. The second detection image and the third detection image are used to calculate a new volume change rate, and then the new volume change rate is compared with the change rate threshold. When the volume change rate is greater than the change rate threshold, the JD-LS5 flow rate monitor is used to measure the flow rate value of the controllable water pump jet water flow at 10-15 seconds. The flow rate value is the anti-impact value.

[0081] It should be understood that programming image analysis software using Python is a prior art and will not be described in detail here.

[0082] S3, respectively sum up the compression value and impact value, and obtain The compressive strength and Impact resistance value, using The water pressure threshold is calculated using the compression resistance value. The flow rate threshold is calculated based on the anti-shock value.

[0083] In detail, the use The water pressure threshold is calculated using the compression resistance value. The flow rate threshold is calculated based on the impact resistance value, including:

[0084] The calculation formula for the water pressure threshold is as follows:

[0085] ;

[0086] in, is the water pressure threshold, for The first The compressive strength value is ,and and is an integer.

[0087] The calculation formula for the flow rate threshold is as follows:

[0088] ;

[0089] in, is the flow rate threshold, is the pre-acquired water density in the target water area, is the density of pure water, for The impact resistance value An impact resistance value.

[0090] It should be explained that the flow velocity threshold refers to the flow velocity value of the water flow that will cause damage to the ecological embankment and revetment bank. The water pressure threshold refers to the water pressure value that will cause damage to the ecological embankment and revetment bank.

[0091] It should be understood that the above calculation formula makes the calculated flow rate threshold more consistent with the situation of the target water area by substituting the density of water in the target water area and the density of pure water used for injection into the calculation.

[0092] Exemplarily, the embankment and revetment are sampled in the form of cutting to obtain embankment and revetment samples, and a series of tests are performed on the embankment and revetment samples to obtain impact resistance values ​​and pressure resistance values, which are then converted into flow velocity thresholds and water pressure thresholds. The flow velocity thresholds and water pressure thresholds are used to characterize the ability of the embankment and revetment to resist water pressure and water flow.

[0093] S4, using the data acquisition unit to detect the target water area, obtain An initial data set.

[0094] In detail, the target water area is detected by using a data acquisition unit to obtain An initial data set, including:

[0095] Start the data collection unit, wherein the data collection unit includes A test unit, wherein the test unit includes: a pressure sensor and a propeller flow meter;

[0096] Based on the Test units, target waters and preset position sequence acquisition initial data set, where the position sequence includes There are monitoring positions, and the monitoring positions correspond to the test units one by one. The initial data set consists of water pressure values ​​and flow rate values, wherein: The initial data set is as follows:

[0097] ;

[0098] in, and They respectively represent the water pressure value and flow rate value corresponding to the first monitoring position in the position sequence, and They represent the water pressure and flow rate values ​​corresponding to the second monitoring position in the position sequence, respectively. and Respectively represent the first The water pressure and flow rate values ​​corresponding to each monitoring position.

[0099] It should be explained that a pressure sensor is a device that can measure pressure and convert it into an electrical signal. A propeller current meter is a flow velocity measuring instrument used to measure the flow velocity of water in a target water area at a monitoring location.

[0100] For example, the midpoint of the ecological dam revetment is taken as the origin, and the ecological dam revetment is linear, and the direction of water flow is taken as the positive direction of the longitudinal axis to establish a plane coordinate system. Then the position sequence can be (10, 0), (10, 10), (10, 20) ... (10, 200), that is, the first monitoring position is the position corresponding to the coordinate (10, 0), the second monitoring position is the position corresponding to the coordinate (10, 10), and so on. If the water pressure measured at the first monitoring position is 200N and the measured flow velocity is 10m / s, then is 200, is 10, and so on.

[0101] S5. Utilization An initial data set and water pressure threshold are used to obtain a warning data set.

[0102] In detail, the use The initial data set and water pressure threshold are used to obtain the early warning data set, including:

[0103] The rejection range is obtained using the water pressure threshold, wherein the rejection range is as follows:

[0104] ;

[0105] right Each of the initial data groups performs the following operations:

[0106] If the water pressure value corresponding to the initial data group meets the exclusion range, the initial data group is identified as an abnormal data group, and the abnormal data groups are summarized to obtain p abnormal data groups, where p is an integer greater than or equal to 0;

[0107] The following operations are performed on all the abnormal data groups in the p abnormal data groups:

[0108] Leverage pre-built update relationships, exception data sets, and The updated data group is calculated from the initial data group, and the abnormal data group is updated using the updated data group to obtain a target data set, wherein the target data set is composed of an initial data set and an updated data set;

[0109] based on The mean water pressure, standard deviation of water pressure, mean flow velocity and standard deviation of flow velocity are obtained for each target data group, and a plane coordinate system is constructed with the mean water pressure and mean flow velocity as the origin of coordinates, wherein the horizontal coordinate of the plane coordinate system is the water pressure value and the vertical coordinate is the flow velocity value;

[0110] Will Mapping a target data set to the plane coordinate system to obtain a mapping coordinate system;

[0111] The target ellipse is constructed in the mapping coordinate system using the standard deviation of water pressure and the standard deviation of flow velocity, where the semi-major axis length and semi-minor axis length of the target ellipse are:

[0112] ;

[0113] in, represents the semi-major axis length, represents the semi-minor axis length, represents the standard deviation of water pressure, represents the standard deviation of flow rate;

[0114] Based on the target ellipse and the mapping coordinate system The target data set is used to obtain the warning data set.

[0115] It should be explained that the abnormal data group is the data group whose water pressure value meets the exclusion range, which means that the data contained in the data group does not conform to the actual situation. The average water pressure and flow rate mean In the target data set The mean of the water pressure values ​​and The mean of the flow rate values, the standard deviation of water pressure and the standard deviation of flow rate refer to In the target data set The standard deviation of the water pressure values ​​and Optionally, the identification of the initial data group as an abnormal data group means that when the water pressure value corresponding to the initial data group meets the exclusion range, the initial data group is named as an abnormal data group. Other technologies can achieve the same effect, which will not be described here.

[0116] It is understandable that The target data set is mapped to the plane coordinate system, and obtaining the mapping coordinate system means Each target data set in the target data sets is placed on the plane coordinate system as a coordinate point on the plane coordinate system.

[0117] For example, if The first, second and third target data groups are (200, 20) (220, 25) (240, 18) respectively, where 200, 220 and 240 represent water pressure values, and 20, 25 and 18 represent flow velocity values. Their coordinate points in the mapping coordinate system are (200, 20) (220, 25) (240, 18) and so on.

[0118] It should be explained that the target ellipse is an ellipse constructed in the mapping coordinate system with the origin as the center of the ellipse according to the semi-major axis length and the semi-minor axis length. If the semi-major axis length of the ellipse is , then the major axis of the ellipse is located on the horizontal axis of the plane coordinate system. If the semi-major axis of the ellipse is , then the major axis of the ellipse is located on the longitudinal axis of the plane coordinate system.

[0119] It is understandable that based on the target ellipse and the mapped coordinate system The method of obtaining a warning data set from a target data set refers to: extracting all points wrapped by the target ellipse in the mapping coordinate system, converting these points into their corresponding target data sets, and aggregating these target data sets to obtain a warning data set.

[0120] For example, when is equal to 300, When it is equal to 100, the semi-major axis length of the target ellipse is 600 and the semi-minor axis length is 200, so the major axis of the target ellipse is located on the horizontal axis of the plane coordinate system, and the equation of the target ellipse is:

[0121] ;

[0122] Place the target ellipse in the mapping coordinate system and find that the points enclosed by the target ellipse are (200, 20) (220, 25) (240, 18). That is, the target data set corresponding to these points is (200, 20) (220, 25) (240, 18), so the warning data set is:

[0123] ;

[0124] Furthermore, the update relation is as follows:

[0125] ;

[0126] in, and Respectively represent the water pressure value and flow rate value in the abnormal data group, and they are located in the position sequence At each monitoring location, and , and , and Respectively expressed in The first position in the sequence corresponding to the initial data group At each monitoring location, At each monitoring location, The water pressure and flow rate values ​​at each monitoring location.

[0127] For example, if there is an abnormal data set at the fifth monitoring position, the updated data set is calculated using the initial data sets at the sixth, seventh and eighth detection positions and the abnormal data set at the fifth monitoring position. Assuming that the initial data sets at the sixth, seventh and eighth detection positions are (180, 15) (200, 20) (220, 25), and the abnormal data set at the fifth monitoring position is (20000, 20), the updated relationship is calculated to obtain is 200, we get Replace the abnormal data group , the updated data group is obtained as (200, 20), and then the abnormal data group at the fifth monitoring position is replaced by the updated data group to obtain the target data group.

[0128] S6. Calculate a warning index using the warning data set, the water pressure threshold and the flow rate threshold, and convert the warning index into a warning signal using a warning prompt unit.

[0129] In detail, the calculation of the warning index using the warning data set, the water pressure threshold and the flow rate threshold includes:

[0130] ;

[0131] in, is the early warning index, and Respectively represent the first The water pressure and flow rate values ​​in the early warning data group, Represents the total number of warning data groups in the warning data group set, where ,and and is an integer.

[0132] It should be explained that the size of the warning index reflects the urgency of the warning. The smaller the warning index, the higher the urgency of the warning.

[0133] Further, see Figure 3 As shown, the big data-based embankment and bank protection safety early warning method is characterized in that the early warning prompt unit is used to convert the early warning index into an early warning signal, including:

[0134] S61, comparing the warning index with a preset first warning threshold and a preset second warning threshold;

[0135] S62: if the warning index is less than the first warning threshold, outputting a pre-built advanced warning signal using the warning prompt unit;

[0136] S63: if the warning index is greater than or equal to the first warning threshold, and the warning index is less than the second warning threshold, outputting a pre-constructed primary warning signal using the warning prompt unit;

[0137] S64. If the warning index is greater than or equal to the second warning threshold, the warning prompt unit is used to output a pre-constructed safety signal, wherein the warning signal is composed of: an advanced warning signal, a primary warning signal and a safety signal.

[0138] It should be explained that the first warning threshold and the second warning threshold are usually 0.3 and 0.8, and are both related to the material of the embankment and the size and depth of the target water area.

[0139] S7, sending the warning signal to the initiator of the safety warning instruction to complete the safety warning of the embankment and revetment.

[0140] Exemplarily, when the early warning prompt unit sends a high-level early warning signal to a security early warning center of a dike and revetment protection area around Poyang Lake, the high-level early warning signal containing text information is parsed to obtain the text information, wherein the text information is: the dike and revetment protection area is in a high-level early warning state.

[0141] The present invention is to solve the problem described in the background technology. The present invention receives a safety warning instruction and confirms a safety warning environment based on the safety warning instruction, wherein the safety warning environment includes: a target water area, a sample detection unit, a data acquisition unit and a warning prompt unit, wherein the sample detection unit includes a pressure tester and an impact tester. It can be seen that the present invention provides a systematic working environment for each unit by constructing a complete safety warning environment, thereby ensuring the comprehensiveness and systematicness of data collection, and then obtaining Samples of bank protection The following operations are performed on each group of embankment and revetment samples in the group of embankment and revetment samples: a compression tester and embankment and revetment samples are used to obtain preliminary test samples and compression values; an impact tester is used to test the preliminary test samples to obtain impact values; the compression values ​​and impact values ​​are respectively summarized to obtain The compressive strength and Impact resistance value, using The water pressure threshold is calculated using the compression resistance value. It can be seen that the embodiment of the present invention increases the diversity of data by testing multiple groups of embankment and revetment samples, and uses statistical methods to calculate the water pressure threshold and the flow velocity threshold, thereby improving the scientificity and accuracy of the calculation results; the target water area is detected by using a data acquisition unit to obtain It can be seen that the embodiment of the present invention reduces information blind spots and improves the comprehensiveness of monitoring by collecting data at multiple monitoring locations in the target water area; Initial data set and water pressure threshold to obtain early warning data set. It can be seen that the embodiment of the present invention is to Each data group in the initial data group is compared with the abnormal range set by the water pressure threshold, and the abnormal data group is screened out, the influence of special circumstances is eliminated, and multiple abnormal data groups are repaired to obtain multiple target data groups, and finally multiple target data groups are screened to obtain the warning data group, so that the warning data group is more in line with the actual situation; the warning index is calculated using the warning data group set, the water pressure threshold and the flow rate threshold, and the warning index is converted into a warning signal using the warning prompt unit. It can be seen that the embodiment of the present invention improves the scientific nature of the warning by calculating the warning index and quantifying the warning degree, and the converted warning signal can more intuitively show the warning degree of the embankment revetment, which is convenient for timely response and processing; the warning signal is sent to the initiator of the safety warning instruction to complete the safety warning of the embankment revetment, and the warning signal obtained by real-time calculation and conversion is transmitted to the initiator of the safety warning instruction to ensure that the safety warning center can timely understand the safety situation of the embankment revetment, and improve the timeliness of the safety warning of the embankment revetment. Therefore, the present invention can improve the timeliness and accuracy of the safety warning of the embankment revetment.

[0142] like Figure 4 As shown, it is a functional module diagram of a levee and bank protection safety early warning system based on big data provided by one embodiment of the present invention.

[0143] The big data-based levee and bank safety warning system 100 of the present invention can be installed in an electronic device. According to the functions to be implemented, the big data-based levee and bank safety warning system 100 can include a warning environment confirmation module 101, a sample threshold calculation module 102, a water area data acquisition module 103 and a warning signal sending module 104. The module of the present invention can also be called a unit, which refers to a series of computer program segments that can be executed by an electronic device processor and can complete fixed functions, which are stored in the memory of the electronic device.

[0144] The warning environment confirmation module 101 is used to receive a safety warning instruction and confirm a safety warning environment based on the safety warning instruction, wherein the safety warning environment includes: a target water area, a sample detection unit, a data acquisition unit and a warning prompt unit, wherein the sample detection unit includes a compression tester and an impact tester;

[0145] The sample threshold calculation module 102 is used to obtain Samples of bank protection The following operations are performed on each group of embankment and revetment samples in the group of embankment and revetment samples: a compression tester and embankment and revetment samples are used to obtain preliminary test samples and compression values; an impact tester is used to test the preliminary test samples to obtain impact values; the compression values ​​and impact values ​​are respectively summarized to obtain The compressive strength and Impact resistance value, using The water pressure threshold is calculated using the compression resistance value. The flow rate threshold is calculated based on the impact resistance value;

[0146] The water area data acquisition module 103 is used to detect the target water area using a data acquisition unit to obtain initial data set; using An initial data set and a water pressure threshold are used to obtain a warning data set;

[0147] The warning signal sending module 104 is used to calculate the warning index using the warning data set, water pressure threshold and flow rate threshold, and convert the warning index into a warning signal using the warning prompt unit; the warning signal is sent to the initiator of the safety warning instruction to complete the safety warning of the embankment and revetment.

[0148] In detail, each module in the big data-based embankment and bank safety early warning system 100 in the embodiment of the present invention is used in the same manner as described above. Figure 1 The technical means are the same as the big data-based embankment and revetment safety early warning method described in , and can produce the same technical effects, so they will not be repeated here.

[0149] like Figure 5 1 is a schematic diagram of the structure of an electronic device for implementing a big data-based embankment and bank safety early warning method provided by an embodiment of the present invention.

[0150] The electronic device 1 may include a processor 10, a memory 11 and a bus 12, and may also include a computer program stored in the memory 11 and executable on the processor 10, such as a big data-based embankment and bank safety early warning method program.

[0151] The memory 11 includes at least one type of readable storage medium, including flash memory, mobile hard disk, multimedia card, card-type memory (such as SD or DX memory, etc.), magnetic memory, disk, optical disk, etc. In some embodiments, the memory 11 may be an internal storage unit of the electronic device 1, such as a mobile hard disk of the electronic device 1. In other embodiments, the memory 11 may also be an external storage device of the electronic device 1, such as a plug-in mobile hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (SecureDigital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device 1. Further, the memory 11 also includes an internal storage unit of the electronic device 1 and an external storage device. The memory 11 can not only be used to store application software and various types of data installed in the electronic device 1, such as the code of the embankment and bank safety early warning method program based on big data, but also be used to temporarily store data that has been output or is to be output.

[0152] The processor 10 may be composed of an integrated circuit in some embodiments, for example, a single packaged integrated circuit, or a plurality of packaged integrated circuits with the same or different functions, including one or more central processing units (CPUs), microprocessors, digital processing chips, graphics processors, and combinations of various control chips, etc. The processor 10 is the control core (Control Unit) of the electronic device, and uses various interfaces and lines to connect various components of the entire electronic device, and executes or executes programs or modules (such as a big data-based embankment and bank safety early warning method program, etc.) stored in the memory 11, and calls data stored in the memory 11 to execute various functions of the electronic device 1 and process data.

[0153] The bus 12 may be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus, etc. The bus 12 may be divided into an address bus, a data bus, a control bus, etc. The bus 12 is configured to realize connection and communication between the memory 11 and at least one processor 10, etc.

[0154] Figure 5 Only an electronic device with components is shown, and those skilled in the art will understand that Figure 5The structure shown does not constitute a limitation on the electronic device 1, and may include fewer or more components than shown in the figure, or combine certain components, or arrange the components differently.

[0155] For example, although not shown, the electronic device 1 may also include a power source (such as a battery) for supplying power to various components. Preferably, the power source may be logically connected to the at least one processor 10 through a power management device, so that the power management device can realize functions such as charging management, discharging management, and power consumption management. The power source may also include one or more DC or AC power sources, recharging devices, power failure detection circuits, power converters or inverters, power status indicators, and other arbitrary components. The electronic device 1 may also include a variety of sensors, Bluetooth modules, Wi-Fi modules, etc., which will not be repeated here.

[0156] Furthermore, the electronic device 1 may also include a network interface. Optionally, the network interface may include a wired interface and / or a wireless interface (such as a WI-FI interface, a Bluetooth interface, etc.), which is generally used to establish a communication connection between the electronic device 1 and other electronic devices.

[0157] Optionally, the electronic device 1 may further include a user interface, which may be a display, an input unit (such as a keyboard), or a standard wired interface or a wireless interface. Optionally, in some embodiments, the display may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, and an OLED (Organic Light-Emitting Diode) touch device. The display may also be appropriately referred to as a display screen or a display unit, which is used to display information processed in the electronic device 1 and to display a visual user interface.

[0158] It should be understood that the embodiment is for illustration only and the scope of the patent application is not limited to this structure.

[0159] The big data-based embankment and bank protection safety early warning method program stored in the memory 11 of the electronic device 1 is a combination of multiple instructions. When running in the processor 10, it can achieve:

[0160] Receive a safety warning instruction, and confirm a safety warning environment based on the safety warning instruction, wherein the safety warning environment includes: a target water area, a sample detection unit, a data collection unit, and a warning prompt unit, wherein the sample detection unit includes a pressure tester and an impact tester;

[0161] Get Samples of bank protection The following operations are performed on each group of dike and revetment samples in the dike and revetment sample group:

[0162] Use a compression tester and embankment and revetment samples to obtain preliminary test samples and compression values, and use an impact tester to test preliminary test samples to obtain impact values;

[0163] Summarize the compression value and impact value respectively to obtain The compressive strength and Impact resistance value, using The water pressure threshold is calculated using the compression resistance value. The flow rate threshold is calculated based on the impact resistance value;

[0164] The target water area is detected by using a data acquisition unit to obtain An initial data set;

[0165] use An initial data set and a water pressure threshold are used to obtain a warning data set;

[0166] The warning index is calculated by using the warning data set, the water pressure threshold and the flow rate threshold, and the warning index is converted into a warning signal by using the warning prompt unit;

[0167] The warning signal is sent to the initiator of the safety warning instruction to complete the safety warning of the embankment and revetment.

[0168] Specifically, the specific implementation method of the processor 10 for the above instructions can refer to Figures 1 to 5 The description of the relevant steps in the corresponding embodiments will not be repeated here.

[0169] Furthermore, if the module / unit integrated in the electronic device 1 is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. The computer-readable storage medium can be volatile or non-volatile. For example, the computer-readable medium can include: any entity or device capable of carrying the computer program code, a recording medium, a USB flash drive, a mobile hard disk, a magnetic disk, an optical disk, a computer memory, and a read-only memory (ROM).

[0170] The present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor of an electronic device, the computer program can implement:

[0171] Receive a safety warning instruction, and confirm a safety warning environment based on the safety warning instruction, wherein the safety warning environment includes: a target water area, a sample detection unit, a data collection unit, and a warning prompt unit, wherein the sample detection unit includes a pressure tester and an impact tester;

[0172] Get Samples of bank protection The following operations are performed on each group of dike and revetment samples in the dike and revetment sample group:

[0173] Use a compression tester and embankment and revetment samples to obtain preliminary test samples and compression values, and use an impact tester to test preliminary test samples to obtain impact values;

[0174] Summarize the compression value and impact value respectively to obtain The compressive strength and Impact resistance value, using The water pressure threshold is calculated using the compression resistance value. The flow rate threshold is calculated based on the impact resistance value;

[0175] The target water area is detected by using a data acquisition unit to obtain An initial data set;

[0176] use An initial data set and a water pressure threshold are used to obtain a warning data set;

[0177] The warning index is calculated by using the warning data set, the water pressure threshold and the flow rate threshold, and the warning index is converted into a warning signal by using the warning prompt unit;

[0178] The warning signal is sent to the initiator of the safety warning instruction to complete the safety warning of the embankment and revetment.

[0179] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. A big data-based embankment and bank safety early warning method, characterized in that: The method comprises: Receive a safety warning instruction, and confirm a safety warning environment based on the safety warning instruction, wherein the safety warning environment includes: a target water area, a sample detection unit, a data collection unit, and a warning prompt unit, wherein the sample detection unit includes a pressure tester and an impact tester; Get Samples of bank protection The following operations are performed on each group of dike and revetment samples in the dike and revetment sample group: Use a compression tester and embankment and revetment samples to obtain preliminary test samples and compression values, and use an impact tester to test preliminary test samples to obtain impact values; Summarize the compression value and impact value respectively to obtain The compressive strength and Impact resistance value, using The water pressure threshold is calculated using the compression resistance value. The flow rate threshold is calculated based on the impact resistance value; The target water area is detected by using a data acquisition unit to obtain An initial data set; use An initial data set and a water pressure threshold are used to obtain a warning data set; The warning index is calculated by using the warning data set, the water pressure threshold and the flow rate threshold, and the warning index is converted into a warning signal by using the warning prompt unit; The warning signal is sent to the initiator of the safety warning instruction to complete the safety warning of the dike and revetment bank, wherein the use of the compression tester and the dike and revetment bank sample to obtain the preliminary test sample and the compression value includes: Start the compression tester, which includes a pressure testing machine, an optical ruler, an electronic balance and a resistance meter; After the startup is completed, the embankment protection samples are measured respectively by using an optical ruler, an electronic balance and a resistance meter to obtain the sample side length, sample mass and sample resistance; Obtain a pressure gradient set, import the pressure gradient set into a pressure testing machine, apply pressure to the embankment and revetment sample using the pressure testing machine after the pressure gradient set is imported, until the embankment and revetment sample is deformed, stop applying pressure, obtain a preliminary test sample, record the value of the pressure applied by the pressure testing machine at this time, and obtain a pressure value; The compressive strength is calculated using the sample side length, sample mass, sample resistance and pressure value. The calculation formula is as follows: ; in, is the compressive strength value, is the sample side length, is the sample quality, is the sample resistance, is the pressure value, is the preset density reference value, is the preset resistance reference value; The method of using an impact tester to test a preliminary test sample to obtain an impact value includes: Start the impact tester, wherein the impact tester includes a controllable water pump, a flow rate measuring instrument, a laser scanner, an image analyzer, a flat-mouth vise and a workbench, wherein the controllable water pump is composed of a high-pressure water pump and a water pump controller, and different water pressure values ​​are introduced into the controllable water pump, and the controllable water pump will generate water flows with different water pressures; After the impact tester is started, the preliminary test sample is fixed to the workbench by using the flat-mouth vise to obtain a fixed test sample; Acquire a water pressure sequence, wherein the water pressure sequence includes a plurality of water pressure values ​​and a plurality of time periods, and the water pressure values ​​correspond to the time periods one by one, and after the water pressure sequence is introduced into a controllable water pump, use the controllable water pump after the water pressure sequence is introduced to perform a spraying operation on a fixed test sample to obtain a spraying test sample, wherein the angle of the spraying water flow is preset, and use a laser scanner and the spraying test sample to obtain a t-th test image, and confirm a t+1-th test image based on the t-th test image, wherein the scanning frequency of the laser scanner is preset, and use an image analyzer, the t-th test image, and the t+1-th test image to obtain a volume change rate; comparing the volume change rate with a preset change rate threshold; If the volume change rate is less than the change rate threshold, the t+1th detection image is taken as the tth detection image, and the process returns to the step of confirming the t+1th detection image based on the tth detection image, until the volume change rate is greater than or equal to the change rate threshold, and then the anti-impact value is obtained using a flow meter and a controllable water pump in the time period corresponding to the t+1th detection image.

2. The big data-based embankment and bank protection safety early warning method according to claim 1 is characterized in that: The target water area is detected by using a data acquisition unit to obtain An initial data set, including: Start the data collection unit, wherein the data collection unit includes A test unit, wherein the test unit includes: a pressure sensor and a propeller flow meter; Based on the Test units, target waters and preset position sequence acquisition initial data set, where the position sequence includes There are monitoring positions, and the monitoring positions correspond to the test units one by one, and the initial data set consists of water pressure values ​​and flow rate values.

3. The big data-based embankment and bank protection safety early warning method according to claim 2 is characterized in that: The utilization The initial data set and water pressure threshold are used to obtain the early warning data set, including: Use the water pressure threshold to obtain the rejection range; right Each of the initial data groups performs the following operations: If the water pressure value corresponding to the initial data group meets the exclusion range, the initial data group is identified as an abnormal data group, and the abnormal data groups are aggregated to obtain p abnormal data groups, where p is an integer greater than or equal to 0.

4. The big data-based embankment and bank protection safety early warning method according to claim 3 is characterized in that: The following operations are performed on all the abnormal data groups in the p abnormal data groups: Leverage pre-built update relationships, exception data sets, and The updated data group is calculated from the initial data group, and the abnormal data group is updated using the updated data group to obtain a target data set, wherein the target data set is composed of an initial data set and an updated data set; based on The mean water pressure, standard deviation of water pressure, mean flow velocity and standard deviation of flow velocity are obtained for each target data group, and a plane coordinate system is constructed with the mean water pressure and mean flow velocity as the origin of coordinates, wherein the horizontal coordinate of the plane coordinate system is the water pressure value and the vertical coordinate is the flow velocity value; Will Mapping a target data set to the plane coordinate system to obtain a mapping coordinate system; The target ellipse is constructed in the mapping coordinate system using the standard deviation of water pressure and the standard deviation of flow velocity; Based on the target ellipse and the mapping coordinate system The target data set is used to obtain the warning data set.

5. The big data-based embankment and bank protection safety early warning method according to claim 4 is characterized in that: The method of converting the warning index into a warning signal by using the warning prompt unit includes: Comparing the warning index with a preset first warning threshold and a preset second warning threshold; If the warning index is less than the first warning threshold, the pre-built advanced warning signal is outputted using the warning prompt unit; If the warning index is greater than or equal to the first warning threshold, and the warning index is less than the second warning threshold, the pre-constructed primary warning signal is outputted using the warning prompt unit; If the warning index is greater than or equal to the second warning threshold, the warning prompt unit is used to output a pre-constructed safety signal, wherein the warning signal is composed of: an advanced warning signal, a primary warning signal and a safety signal.

6. A big data-based embankment and bank safety early warning system, characterized in that: The system comprises: The warning environment confirmation module is used to receive the safety warning instruction and confirm the safety warning environment based on the safety warning instruction, wherein the safety warning environment includes: target waters, sample detection unit, data collection unit and warning prompt unit, wherein the sample detection unit includes a compression tester and an impact tester; Sample threshold calculation module, used to obtain Samples of bank protection Each group of embankment and revetment samples in the group embankment and revetment samples performs the following operations: using a compression tester and embankment and revetment samples to obtain preliminary test samples and compression values, Use an impact tester to test the preliminary test samples and obtain the impact value; Summarize the compression value and impact value respectively to obtain The compressive strength and Impact resistance value, using The water pressure threshold is calculated using the compression resistance value. The flow rate threshold is calculated based on the impact resistance value; The water area data acquisition module is used to detect the target water area using the data acquisition unit to obtain initial data set; using An initial data set and a water pressure threshold are used to obtain a warning data set; The warning signal sending module is used to calculate the warning index by using the warning data set, the water pressure threshold and the flow rate threshold, and convert the warning index into a warning signal by using the warning prompt unit; The warning signal is sent to the initiator of the safety warning instruction to complete the safety warning of the dike and revetment bank, wherein the use of the compression tester and the dike and revetment bank sample to obtain the preliminary test sample and the compression value includes: Start the compression tester, which includes a pressure testing machine, an optical ruler, an electronic balance and a resistance meter; After the startup is completed, the embankment protection samples are measured respectively by using an optical ruler, an electronic balance and a resistance meter to obtain the sample side length, sample mass and sample resistance; Obtain a pressure gradient set, import the pressure gradient set into a pressure testing machine, apply pressure to the embankment and revetment sample using the pressure testing machine after the pressure gradient set is imported, until the embankment and revetment sample is deformed, stop applying pressure, obtain a preliminary test sample, record the value of the pressure applied by the pressure testing machine at this time, and obtain a pressure value; The compressive strength is calculated using the sample side length, sample mass, sample resistance and pressure value. The calculation formula is as follows: ; in, is the compressive strength value, is the sample side length, is the sample quality, is the sample resistance, is the pressure value, is the preset density reference value, is the preset resistance reference value; The method of using an impact tester to test a preliminary test sample to obtain an impact value includes: Start the impact tester, wherein the impact tester includes a controllable water pump, a flow rate measuring instrument, a laser scanner, an image analyzer, a flat-mouth vise and a workbench, wherein the controllable water pump is composed of a high-pressure water pump and a water pump controller, and different water pressure values ​​are introduced into the controllable water pump, and the controllable water pump will generate water flows with different water pressures; After the impact tester is started, the preliminary test sample is fixed to the workbench by using the flat-mouth vise to obtain a fixed test sample; Acquire a water pressure sequence, wherein the water pressure sequence includes a plurality of water pressure values ​​and a plurality of time periods, and the water pressure values ​​correspond to the time periods one by one, and after the water pressure sequence is introduced into a controllable water pump, use the controllable water pump after the water pressure sequence is introduced to perform a spraying operation on a fixed test sample to obtain a spraying test sample, wherein the angle of the spraying water flow is preset, and use a laser scanner and the spraying test sample to obtain a t-th test image, and confirm a t+1-th test image based on the t-th test image, wherein the scanning frequency of the laser scanner is preset, and use an image analyzer, the t-th test image, and the t+1-th test image to obtain a volume change rate; comparing the volume change rate with a preset change rate threshold; If the volume change rate is less than the change rate threshold, the t+1th detection image is taken as the tth detection image, and the process returns to the step of confirming the t+1th detection image based on the tth detection image, until the volume change rate is greater than or equal to the change rate threshold, and then the anti-impact value is obtained using a flow meter and a controllable water pump in the time period corresponding to the t+1th detection image.