Large-span plant steel structure construction method

Through three-dimensional modeling and zoning construction method, combined with the photoelectric rangefinder and temporary support system, the problems of insufficient accuracy, low efficiency and poor safety in the steel structure construction of large-span factory buildings are solved, and high-precision, rapid and safe construction results are achieved .

CN118958704APending Publication Date: 2024-11-15CHINA CONSTR FIFTH ENG DIV CORP LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411055584.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

There are problems of insufficient accuracy, low efficiency and poor safety in steel structure construction in large span factory buildings. Traditional construction methods are difficult to meet the needs of modern industrial buildings for high precision, speed and safety.

Method used

Using three-dimensional modeling and information management technology, by constructing a three-dimensional model of steel structure of a large-span factory building, dividing the boundaries of the partitions, optimizing the construction sequence, using photoelectric rangefinders and total stations for high-precision positioning, using zoning construction method and temporary support System to ensure the rapid installation of steel trusses and safety of high-altitude operations.

Benefits of technology

It improves construction accuracy and efficiency, shortens construction period, enhances construction safety, and reduces structural deviations and safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958704A_ABST
    Figure CN118958704A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building engineering, and discloses a large-span plant steel structure construction method which comprises the following steps: S1, a constructor constructs a large-span plant steel structure three-dimensional model according to the overall arrangement of a roof truss; s2, dividing the whole steel roof into all partition boundary lines on the large-span plant three-dimensional model according to the distribution of inner side edge sealing trusses; s3, a constructor determines the construction sequence of the large-span plant steel structure according to the construction site and the construction environment; and S4, a constructor prepares a steel truss of each part according to the structure of the large-span plant three-dimensional model. Through hierarchical classification and information organization coding rules, systematicness and accuracy of the three-dimensional model are ensured, and high-precision measurement equipment is used for positioning; by dividing partition boundary lines and adopting a partition construction method, the efficiency is improved, and the construction period is shortened; the rapid installation and stability of the roof structure are ensured through high-altitude rod supplementing and crawler crane hoisting, and meanwhile the safety of high-altitude operation is improved through a temporary supporting system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction engineering, and in particular to a construction method for a large-span factory building steel structure. Background Art

[0002] With the continuous advancement of industrialization, large-span factories have played an important role in modern industrial buildings. Such factories usually need to meet the requirements of large space, high load-bearing capacity and flexible layout. Therefore, steel structure has gradually become the main load-bearing structure form of large-span factories. Steel structure has the advantages of high strength, light weight and short construction period, and is widely used in large-span buildings such as industrial factories, stadiums, exhibition centers, etc.

[0003] Although steel structures have many advantages, traditional construction methods still face many challenges in the construction of large-span factories. First, traditional two-dimensional drawing design and manual measurement methods are difficult to ensure construction accuracy, resulting in large structural deviations and affecting overall stability. Secondly, the resource allocation and scheduling efficiency of the construction site is low, which often leads to delays in construction and increased costs. In addition, the safety of aerial work has always been an important link that cannot be ignored in the construction process.

[0004] In order to overcome the above problems, in recent years, BIM (Building Information Modeling) technology has been gradually promoted and applied in engineering construction, and the accuracy of design and construction has been improved through three-dimensional modeling and information management. However, how to better apply BIM technology to the construction of large-span factory steel structures, optimize the construction process, and improve construction efficiency and quality is still a technical problem that needs to be solved urgently. In view of the above technical problems, the present invention proposes a large-span factory steel structure construction method. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a method for constructing a large-span steel structure of a factory building, which solves the problems of insufficient precision, low efficiency and poor safety in the construction of the large-span steel structure of a factory building.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: A large-span factory building steel structure construction method, comprising the following steps:

[0007] S1. Construction workers build a three-dimensional model of the large-span factory building steel structure based on the overall layout of the roof trusses;

[0008] S2. Dividing the entire steel roof into partition boundaries on the three-dimensional model of the large-span factory building according to the distribution of the inner side sealing trusses;

[0009] S3. Construction personnel determine the construction sequence of the large-span factory building steel structure based on the construction site and construction environment;

[0010] S4. The construction personnel prepare the steel trusses of each part according to the structure of the three-dimensional model of the large-span factory building;

[0011] S5. After the main structure of the lower part of the large-span plant is completed, the steel trusses are installed in sequence according to the construction sequence;

[0012] S6, installing the roof structure after the steel trusses are completed;

[0013] S7. Further reinforce the connection nodes between the steel truss and the large-span factory building.

[0014] Preferably, the step S1 specifically includes the following steps:

[0015] S1.1. Classify the design drawings step by step using a hierarchical classification method and propose coding rules based on information organization;

[0016] S1.2. Standardize the parameters of each part of the large-span factory building steel structure and create a shared parameter file;

[0017] S1.3. Construct the 3D model of each part of the large-span factory building steel structure based on the 3D modeling software according to the plan on the construction design drawings;

[0018] S1.4. Classify and summarize the three-dimensional models and establish a large-span factory building steel structure family library;

[0019] S1.5. Call various components in the large-span factory building steel structure family library and drive them through external data files to modify the parameters of the large-span factory building steel structure;

[0020] S1.6. Carry out unified assembly to form a complete three-dimensional model of the large-span factory building steel structure;

[0021] S1.7. When constructing a three-dimensional model, use photoelectric rangefinders and total stations for high-precision positioning.

[0022] Preferably, the step S2 specifically includes the following steps:

[0023] S2.1. Review the size limits of the three-dimensional model of the large-span factory building steel structure;

[0024] S2.2. Draw the position and distribution of the inner edge trusses on the 3D model;

[0025] S2.3. Determine the nodes of the inner edge trusses as the locations of each partition boundary;

[0026] S2.4. Check and confirm the location and shape of each partition boundary;

[0027] S2.5. According to the design requirements, the large-span factory building is divided into several construction areas, and the construction of each area is carried out simultaneously using the zoning construction method.

[0028] Preferably, the step S3 specifically includes the following steps:

[0029] S3.1. Assess the geological and environmental conditions of the construction site;

[0030] S3.2. Determine the type and quantity of construction machinery;

[0031] S3.3. Develop a detailed construction schedule;

[0032] S3.4. Arrange on-site dispatch of materials and personnel;

[0033] S3.5. According to the zoning construction method, formulate specific construction plans and coordination plans for each zone.

[0034] Preferably, the step S4 specifically includes the following steps:

[0035] S4.1. Select appropriate steel truss type and specifications. The length of the steel truss ranges from 20 to 50 m.

[0036] S4.2. Design the cross-sectional shape of the steel truss, with the cross-sectional height ranging from 1 to 3 m;

[0037] S4.3, select the appropriate node form;

[0038] S4.4, make steel trusses and conduct quality inspection;

[0039] S4.5. Hot rolling forming process is adopted in the production process of steel trusses.

[0040] Preferably, the step S5 specifically includes the following steps:

[0041] S5.1. After the lower main structure is completed, the roof truss assembly begins;

[0042] S5.2. The crawler crane enters the site and hoists the inner heavy edge banding truss sections at different locations in the site in sequence, and pulls the cable wind rope at the same time;

[0043] S5.3. Move the hoisted steel truss to the designated position at the top and then fix it preliminarily;

[0044] S5.4. Install tie rods between steel trusses.

[0045] Preferably, the steel truss is hoisted using a shoulder pole beam, the length of which is half the length of the truss, two inner hoisting points are provided on the upper part of the shoulder pole beam, and two outer hoisting points are provided on the bottom, the inner hoisting points of the shoulder pole beam are symmetrically arranged at a distance of 1 / 9 to 1 / 10 from the edge, and the outer hoisting points are symmetrically arranged at a distance of 0.5-1.5m from the end.

[0046] Preferably, the step S6 specifically includes the following steps:

[0047] S6.1. After the steel truss construction is completed, the secondary truss and roof purlins are hoisted to the designated location by crawler crane through high-altitude reinforcement;

[0048] S6.2, install and fix;

[0049] S6.3. During the installation of the roof structure, a temporary support system shall be used to ensure the safety and stability of high-altitude operations.

[0050] Preferably, the step S7 specifically includes the following steps:

[0051] S7.1. Apply protective coating to the connection nodes between steel trusses and large-span plant buildings;

[0052] S7.2, fix sealing steel plates at the connection nodes between steel trusses and large-span plant buildings;

[0053] S7.3. Reinforce two fixing bolts at the connection nodes between the steel structure and the large-span factory building.

[0054] Preferably, the protective coating is applied to the surface, gaps and through-holes at the connection nodes between the steel trusses and the large-span factory buildings by electrostatic spraying.

[0055] The present invention provides a method for constructing a large-span steel structure of a factory building, which has the following beneficial effects:

[0056] 1. The present invention ensures the systematicness and accuracy of the three-dimensional model by adopting a hierarchical classification method and coding rules for information organization, and uses a photoelectric rangefinder and a total station for high-precision positioning, which further improves the accuracy of the model and provides a reliable reference for subsequent construction.

[0057] 2. The present invention divides the partition boundaries on the three-dimensional model and divides the large-span factory building into several construction areas according to the design requirements. The partition construction method is used to simultaneously carry out the construction of each area. The partition construction method effectively optimizes the allocation of construction resources, improves construction efficiency, and shortens the construction period.

[0058] 3. The present invention ensures the rapid installation and stability of the roof structure by means of high-altitude supporting rods and crawler cranes to hoist the secondary trusses and roof purlins. At the same time, the use of a temporary support system improves the safety of high-altitude operations and reduces the occurrence of safety accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION

[0060] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0061] Please refer to the attached Figure 1 The embodiment of the present invention provides a method for constructing a large-span factory building steel structure, comprising the following steps:

[0062] S1. Construction workers build a three-dimensional model of the large-span factory building steel structure based on the overall layout of the roof trusses;

[0063] S2. Divide the steel roof into partitions according to the distribution of the inner edge trusses on the three-dimensional model of the large-span factory building;

[0064] S3. Construction personnel determine the construction sequence of the large-span factory building steel structure based on the construction site and construction environment;

[0065] S4. Construction workers prepare the steel trusses of each part according to the structure of the 3D model of the large-span plant;

[0066] S5. After the main structure of the lower part of the large-span plant is completed, the steel trusses are installed in sequence according to the construction sequence;

[0067] S6. Install the roof structure after the steel trusses are completed;

[0068] S7. Further strengthen the connection nodes between steel trusses and large-span factory buildings.

[0069] The S1 step specifically includes the following steps:

[0070] S1.1. Classify the design drawings step by step using a hierarchical classification method and propose coding rules based on information organization;

[0071] S1.2. Standardize the parameters of each part of the large-span factory building steel structure and create a shared parameter file;

[0072] S1.3. Construct the 3D model of each part of the large-span factory building steel structure based on the 3D modeling software according to the plan on the construction design drawings;

[0073] S1.4. Classify and summarize the three-dimensional models and establish a large-span factory building steel structure family library;

[0074] S1.5. Call various components in the large-span factory building steel structure family library and drive them through external data files to modify the parameters of the large-span factory building steel structure;

[0075] S1.6. Carry out unified assembly to form a complete three-dimensional model of the large-span factory building steel structure;

[0076] S1.7. When constructing a three-dimensional model, use photoelectric rangefinders and total stations for high-precision positioning.

[0077] The S2 step specifically includes the following steps:

[0078] S2.1. Review the size limits of the three-dimensional model of the large-span factory building steel structure;

[0079] S2.2. Draw the position and distribution of the inner edge trusses on the 3D model;

[0080] S2.3. Determine the nodes of the inner edge trusses as the locations of each partition boundary;

[0081] S2.4. Check and confirm the location and shape of each partition boundary;

[0082] S2.5. According to the design requirements, the large-span factory building is divided into several construction areas, and the construction of each area is carried out simultaneously using the zoning construction method.

[0083] The S3 step specifically includes the following steps:

[0084] S3.1. Assess the geological and environmental conditions of the construction site;

[0085] S3.2. Determine the type and quantity of construction machinery;

[0086] S3.3. Develop a detailed construction schedule;

[0087] S3.4. Arrange on-site dispatch of materials and personnel;

[0088] S3.5. According to the zoning construction method, formulate specific construction plans and coordination plans for each zone.

[0089] The S4 step specifically includes the following steps:

[0090] S4.1. Select appropriate steel truss type and specifications. The length of the steel truss ranges from 20 to 50 m.

[0091] S4.2. Design the cross-sectional shape of the steel truss, with the cross-sectional height ranging from 1 to 3 m;

[0092] S4.3, select the appropriate node form;

[0093] S4.4, make steel trusses and conduct quality inspection;

[0094] S4.5. Hot rolling forming process is adopted in the production process of steel trusses.

[0095] Step S5 specifically includes the following steps:

[0096] S5.1. After the lower main structure is completed, the roof truss assembly begins;

[0097] S5.2. The crawler crane enters the site and hoists the inner heavy edge banding truss sections at different locations in the site in sequence, and pulls the cable wind rope at the same time;

[0098] S5.3. Move the hoisted steel truss to the designated position at the top and then fix it preliminarily;

[0099] S5.4. Install tie rods between steel trusses.

[0100] The steel truss is hoisted using a shoulder pole beam, the length of which is half the length of the truss. Two inner hoisting points are set on the upper part of the shoulder pole beam, and two outer hoisting points are set on the bottom. The inner hoisting points of the shoulder pole beam are symmetrically set at 1 / 9 to 1 / 10 of the distance from the edge, and the outer hoisting points are symmetrically set at 0.5-1.5m from the end.

[0101] Step S6 specifically includes the following steps:

[0102] S6.1. After the steel truss construction is completed, the secondary truss and roof purlins are hoisted to the designated location by crawler crane through high-altitude reinforcement;

[0103] S6.2, install and fix;

[0104] S6.3. During the installation of the roof structure, a temporary support system shall be used to ensure the safety and stability of high-altitude operations.

[0105] Step S7 specifically includes the following steps:

[0106] S7.1. Apply protective coating to the connection nodes between steel trusses and large-span plant buildings;

[0107] S7.2, fix sealing steel plates at the connection nodes between steel trusses and large-span plant buildings;

[0108] S7.3. Reinforce two fixing bolts at the connection nodes between the steel structure and the large-span factory building.

[0109] The protective coating is applied to the surface, gaps and through-holes at the connection nodes between the steel trusses and the long-span factory buildings by electrostatic spraying.

[0110] Example 1: Standardized construction method

[0111] step:

[0112] S1. Build a 3D model:

[0113] S1.1. Classify the design drawings step by step using a hierarchical classification method and propose coding rules based on information organization;

[0114] S1.2. Standardize the parameters of each part of the large-span factory building steel structure and create a shared parameter file;

[0115] S1.3. Construct the 3D model of each part of the large-span factory building steel structure based on the 3D modeling software according to the plan on the construction design drawings;

[0116] S1.4. Classify and summarize the three-dimensional models and establish a large-span factory building steel structure family library;

[0117] S1.5. Call various components in the large-span factory building steel structure family library and drive them through external data files to modify the parameters of the large-span factory building steel structure;

[0118] S1.6. Carry out unified assembly to form a complete three-dimensional model of the large-span factory building steel structure;

[0119] S1.7. When constructing a three-dimensional model, use photoelectric rangefinders and total stations for high-precision positioning.

[0120] S2. Delineation of the partition boundary:

[0121] S2.1. Review the size limits of the three-dimensional model of the large-span factory building steel structure;

[0122] S2.2. Draw the position and distribution of the inner edge trusses on the 3D model;

[0123] S2.3. Determine the nodes of the inner edge trusses as the locations of each partition boundary;

[0124] S2.4. Check and confirm the location and shape of each partition boundary;

[0125] S2.5. According to the design requirements, the large-span factory building is divided into several construction areas, and the construction of each area is carried out simultaneously using the zoning construction method.

[0126] S3. Determine the construction sequence:

[0127] S3.1. Assess the geological and environmental conditions of the construction site;

[0128] S3.2. Determine the type and quantity of construction machinery;

[0129] S3.3. Develop a detailed construction schedule;

[0130] S3.4. Arrange on-site dispatch of materials and personnel;

[0131] S3.5. According to the zoning construction method, formulate specific construction plans and coordination plans for each zone.

[0132] S4. Preparation of steel trusses:

[0133] S4.1. Select the appropriate type and specification of steel truss. The length of the steel truss is 30m.

[0134] S4.2. Design the cross-sectional shape of the steel truss, with a cross-sectional height of 2m;

[0135] S4.3, select the appropriate node form;

[0136] S4.4, make steel trusses and conduct quality inspection;

[0137] S4.5. Hot rolling forming process is adopted in the production process of steel trusses.

[0138] S5. Install steel trusses:

[0139] S5.1. After the lower main structure is completed, the roof truss assembly begins;

[0140] S5.2. The crawler crane enters the site and hoists the inner heavy edge banding truss sections at different locations in the site in sequence, and pulls the cable wind rope at the same time;

[0141] S5.3. Move the hoisted steel truss to the designated position at the top and then fix it preliminarily;

[0142] S5.4. Install tie rods between steel trusses.

[0143] S6. Install the roof structure:

[0144] S6.1. After the steel truss construction is completed, the secondary truss and roof purlins are hoisted to the designated location by crawler crane through high-altitude reinforcement;

[0145] S6.2, install and fix;

[0146] S6.3. During the installation of the roof structure, a temporary support system shall be used to ensure the safety and stability of high-altitude operations.

[0147] S7. Strengthen connection nodes:

[0148] S7.1. Apply protective coating to the connection nodes between steel trusses and large-span plant buildings;

[0149] S7.2, fix sealing steel plates at the connection nodes between steel trusses and large-span plant buildings;

[0150] S7.3, reinforce two fixing bolts at the connection nodes between the steel structure and the large-span factory building;

[0151] The protective coating is applied to the surface, gaps and through-holes at the connection nodes between the steel trusses and the long-span factory buildings by electrostatic spraying.

[0152] Summarize:

[0153] This embodiment ensures the standardization and uniformity of the construction process through standardized construction steps, improves construction efficiency and reduces construction errors by using high-precision three-dimensional modeling and zoning construction methods.

[0154] Example 2: Extending the length of the steel truss

[0155] step:

[0156] In this embodiment 2, steps S1, S2, S3, S5, S6 and S7 are the same as those in embodiment 1.

[0157] S4. Preparation of steel trusses:

[0158] S4.1. Select the appropriate type and specification of steel truss. The length of the steel truss is 35m.

[0159] S4.2. Design the cross-sectional shape of the steel truss, with a cross-sectional height of 2.2 m;

[0160] S4.3, select the appropriate node form;

[0161] S4.4, make steel trusses and conduct quality inspection;

[0162] S4.5. Hot rolling forming process is adopted in the production process of steel trusses.

[0163] Summarize:

[0164] This embodiment meets the demand for a larger span by lengthening the length of the steel truss, thereby further improving the flexibility and applicability of the construction.

[0165] Example 3: Optimizing Section Height

[0166] step:

[0167] In this embodiment 3, steps S1, S2, S3, S5, S6 and S7 are the same as those in embodiment 1.

[0168] S4. Preparation of steel trusses:

[0169] S4.1. Select the appropriate type and specification of steel trusses. The length of the steel trusses is 28m.

[0170] S4.2. Design the cross-sectional shape of the steel truss, with a cross-sectional height of 1.8 m;

[0171] S4.3, select the appropriate node form;

[0172] S4.4, make steel trusses and conduct quality inspection;

[0173] S4.5. Hot rolling forming process is adopted in the production process of steel trusses.

[0174] Summarize:

[0175] This embodiment optimizes the cross-sectional height of the steel truss, thereby enhancing the strength and stability of the truss and improving the reliability of the overall structure.

[0176] Example 4: High-strength node form

[0177] step:

[0178] In this embodiment 4, steps S1, S2, S3, S5 and S7 are the same as those in embodiment 1.

[0179] S4. Preparation of steel trusses:

[0180] S4.1. Select the appropriate type and specification of steel trusses. The length of the steel trusses is 32m.

[0181] S4.2. Design the cross-sectional shape of the steel truss, with a cross-sectional height of 2.1 m;

[0182] S4.3. Choose high-strength node forms, using bolts and welding;

[0183] S4.4, make steel trusses and conduct quality inspection;

[0184] S4.5. Hot rolling forming process is adopted in the production process of steel trusses.

[0185] Summarize:

[0186] This embodiment improves the strength and stability of the node connection and enhances the reliability of the overall structure by adopting a high-strength node form.

[0187] Example 5: Optimizing the temporary support system

[0188] step:

[0189] In this embodiment 5, steps S1, S2, S3, S5, S6 and S7 are the same as those in embodiment 1.

[0190] S4. Preparation of steel trusses:

[0191] S4.1. Select the appropriate type and specification of steel truss. The length of the steel truss is 30m.

[0192] S4.2. Design the cross-sectional shape of the steel truss, with a cross-sectional height of 2m;

[0193] S4.3, select the appropriate node form;

[0194] S4.4, make steel trusses and conduct quality inspection;

[0195] S4.5. Hot rolling forming process is adopted in the production process of steel trusses.

[0196] S6. Install the roof structure:

[0197] S6.1. After the steel truss construction is completed, the secondary truss and roof purlins are hoisted to the designated location by crawler crane through high-altitude reinforcement;

[0198] S6.2, install and fix;

[0199] S6.3. During the installation of the roof structure, an optimized temporary support system is used with a support spacing of 3m to ensure the safety and stability of high-altitude operations.

[0200] Summarize:

[0201] This embodiment ensures the safety and stability of high-altitude operations and improves construction efficiency by optimizing the design of the temporary support system.

[0202] Summary:

[0203] These five embodiments have been optimized in terms of the length, section height, node form and temporary support system of the steel trusses. Through different numerical values ​​and design parameters, the applicability and reliability of the construction methods under different conditions are ensured. These improvement measures not only improve the flexibility and efficiency of construction, but also significantly enhance the stability and safety of the overall structure.

[0204] The present invention proposes a method for constructing a large-span steel structure of a factory building. Through a series of specific embodiments, the effects of different construction methods in practical applications are explored. In order to verify the actual effects of these embodiments, a comprehensive performance test experiment is designed and carried out. The experiment aims to evaluate the comprehensive performance in terms of construction time, material cost, structural stability and safety by comparing the construction methods of five specific embodiments, so as to determine the optimal construction method and provide a basis for further improvement.

[0205] In this test experiment, detailed experimental operations and data records were carried out for five embodiments. Embodiment 1 adopts a standardized construction method, Embodiment 2 extends the length of the steel truss, Embodiment 3 optimizes the cross-sectional height of the steel truss, Embodiment 4 introduces a high-strength node form, and Embodiment 5 optimizes the temporary support system. By comprehensively recording and analyzing the construction process of these embodiments, the most suitable method for the construction of large-span factory steel structures is found, and the advantages and disadvantages of each embodiment are summarized to provide a scientific basis for future engineering practice.

[0206] The following are the details of this test experiment.

[0207] Test experiment: Comprehensive performance test of large-span factory steel structure construction method

[0208] Purpose

[0209] This experiment aims to compare different implementations of large-span factory steel structure construction methods to evaluate their comprehensive performance in terms of construction efficiency, structural stability, safety, and cost. Through the analysis of experimental results, the optimal construction method is determined and improvement suggestions are provided.

[0210] Experimental procedures

[0211] Experimental preparation

[0212] Prepare the experimental site to simulate the construction site of a large-span factory building.

[0213] The construction methods of five embodiments were selected and experiments were carried out respectively.

[0214] Determine the experimental indicators, including construction time, material cost, structural stability (through stress-strain testing), safety (accident rate), etc.

[0215] Example 1: Standardized construction method

[0216] The construction is carried out according to the steps of Example 1, including three-dimensional model construction, partition boundary demarcation, construction sequence determination, steel truss preparation, steel truss installation, roof structure installation and connection node reinforcement.

[0217] Record construction time, material consumption and cost for each step.

[0218] Conduct structural stability tests and safety assessments.

[0219] Example 2: Extending the length of the steel truss

[0220] The construction was carried out according to the steps of Example 2, with a focus on the effect of lengthening the steel truss.

[0221] Record construction time, material consumption and cost for each step.

[0222] Conduct structural stability tests and safety assessments.

[0223] Example 3: Optimizing Section Height

[0224] The construction was carried out according to the steps of Example 3, with a focus on the effect of optimizing the section height.

[0225] Record construction time, material consumption and cost for each step.

[0226] Conduct structural stability tests and safety assessments.

[0227] Example 4: High-strength node form

[0228] The construction was carried out according to the steps of Example 4, with a focus on the influence of high-strength node forms.

[0229] Record construction time, material consumption and cost for each step.

[0230] Conduct structural stability tests and safety assessments.

[0231] Example 5: Optimizing the temporary support system

[0232] The construction was carried out according to the steps of Example 5, focusing on the impact of optimizing the temporary support system. The construction time, material consumption and cost of each step were recorded.

[0233] Conduct structural stability tests and safety assessments.

[0234] Data aggregation and analysis

[0235] The experimental data of the five embodiments are summarized and plotted into a table for comparative analysis.

[0236] Comprehensively evaluate indicators such as construction time, material cost, structural stability, and safety. Experimental results:

[0237]

[0238] Experimental Summary

[0239] Through comparative analysis of experimental data, the following conclusions can be drawn:

[0240] Construction time:

[0241] The construction time of Example 2 was the shortest, which was 180 hours, followed by Example 5, which was 185 hours. The construction time of the standardized construction method was the longest, which was 200 hours.

[0242] Material cost:

[0243] The material cost of Example 1 is the lowest, which is 500,000 yuan.

[0244] The material cost of Example 2 is the highest, which is 550,000 yuan.

[0245] Structural stability:

[0246] The structural stability of Example 4 is the best, and the stress-strain test result is 0.0016.

[0247] The structural stability of Example 2 is relatively poor, and the stress-strain test result is 0.0022.

[0248] Security:

[0249] Embodiment 5 has the best safety, with an accident rate of 0.8%.

[0250] The safety of Example 2 is relatively poor, with an accident rate of 1.2%.

[0251] In summary, different embodiments have their own advantages and disadvantages in various aspects. Among them, embodiment 4 performs best in terms of structural stability and safety, while embodiment 2 has a significant advantage in terms of construction time. According to actual needs, the best construction method can be selected, or the advantages of multiple embodiments can be combined for improvement to achieve the best construction effect.

[0252] This paper proposes an innovative large-span factory steel structure construction method, which aims to improve construction efficiency, reduce costs, and enhance structural stability and safety by improving traditional construction technology. In order to verify the actual effect of the proposed construction method and compare and analyze it with the existing traditional construction method, three comprehensive comparative experiments were designed.

[0253] The first experiment focused on evaluating construction efficiency, material costs, and machinery utilization, aiming to determine the most cost-effective construction method. The second experiment evaluated the performance of different construction methods in improving structural strength and service life by testing structural stability, seismic performance, and durability. The third experiment focused on construction safety and quality, evaluating the advantages of different construction methods in reducing construction accidents and ensuring construction quality.

[0254] The following is a detailed description of the contents of the three comparative experiments. Through these systematic experimental studies, a scientific basis is provided for the optimization of the construction method of the large-span factory steel structure, which further promotes the technological progress in this field. The specific experimental contents are as follows:

[0255] Experiment 1: Comprehensive comparison experiment of construction efficiency, material cost and machinery utilization

[0256] Purpose

[0257] This experiment aims to evaluate the advantages of different construction methods in terms of time, economy and machinery utilization by comparing the performance of five embodiments with traditional construction methods in terms of construction efficiency, material cost and machinery utilization, so as to determine the most cost-effective construction method.

[0258] Experimental procedures

[0259] Experimental preparation

[0260] Select an experimental site to simulate the construction site of a large-span factory building.

[0261] Prepare necessary equipment and materials, including steel trusses, construction machinery, labor, etc.

[0262] Determine the experimental indicators, including construction time, material cost, machinery use time and labor cost.

[0263] Example 1: Standardized construction method

[0264] The construction was carried out according to the steps of Example 1.

[0265] Record construction time, material costs, machinery usage time, and labor costs for each step.

[0266] Example 2: Extending the length of the steel truss

[0267] The construction was carried out according to the steps of Example 2.

[0268] Record construction time, material costs, machinery usage time, and labor costs for each step.

[0269] Example 3: Optimizing Section Height

[0270] The construction was carried out according to the steps of Example 3.

[0271] Record construction time, material costs, machinery usage time, and labor costs for each step.

[0272] Example 4: High-strength node form

[0273] The construction was carried out according to the steps of Example 4.

[0274] Record construction time, material costs, machinery usage time, and labor costs for each step.

[0275] Example 5: Optimizing the temporary support system

[0276] The construction was carried out according to the steps of Example 5.

[0277] Record construction time, material costs, machinery usage time, and labor costs for each step.

[0278] Traditional construction methods

[0279] The construction is carried out according to traditional construction methods. Traditional methods include:

[0280] T1. Construction personnel use two-dimensional construction drawings for construction planning;

[0281] T2. Use standard measuring tools to measure and divide the construction area;

[0282] T3. Carry out construction based on experience, using conventional materials and machinery and equipment;

[0283] T4, the steel truss manufacturing and installation process adopts conventional methods;

[0284] T5. Use standard temporary support system;

[0285] T6, node reinforcement adopts conventional methods.

[0286] Record construction time, material costs, machinery usage time, and labor costs for each step.

[0287] Data aggregation and analysis

[0288] The experimental data of all embodiments and traditional methods are summarized and plotted into a table for comparative analysis.

[0289] Make a comprehensive assessment of construction time, material costs, machinery usage time and labor costs.

[0290] Experimental Results

[0291]

[0292] Experimental Summary

[0293] By comparing the construction time, material cost, machine usage time and labor cost of each embodiment with the traditional method, it can be found that:

[0294] Construction time: Example 2 is the shortest, which is 180 hours.

[0295] Material cost: The traditional method has the lowest cost, which is 480,000 yuan.

[0296] Mechanical use time: Example 2 is the shortest, which is 140 hours.

[0297] Labor cost: The traditional method has the lowest labor cost, which is 190,000 yuan.

[0298] Taking into account the construction time and cost, Example 5 is more balanced in all aspects and is a better choice.

[0299] Experiment 2: Comparative experiment on structural stability, seismic performance and durability

[0300] Purpose

[0301] The purpose of this experiment is to evaluate the effects of different construction methods in improving structural strength, seismic resistance and long-term performance by comparing the structural stability, seismic performance and durability of five embodiments with traditional construction methods, so as to determine the optimal construction method.

[0302] Experimental procedures

[0303] Experimental preparation

[0304] Prepare structural stability, seismic performance and durability testing equipment, including stress-strain testers, vibration tables and durability testing devices.

[0305] Five embodiments and traditional construction methods were selected and constructed and tested respectively.

[0306] Example 1: Standardized construction method

[0307] The construction was carried out according to the steps of Example 1.

[0308] Use a stress-strain tester to test the structural stability and record the data.

[0309] Use a vibration table to perform seismic performance tests and record the data.

[0310] Use the durability testing device to carry out durability testing and record the data.

[0311] Example 2: Extending the length of the steel truss

[0312] The construction was carried out according to the steps of Example 2.

[0313] Use a stress-strain tester to test the structural stability and record the data.

[0314] Use a vibration table to perform seismic performance tests and record the data.

[0315] Use the durability testing device to carry out durability testing and record the data.

[0316] Example 3: Optimizing Section Height

[0317] The construction was carried out according to the steps of Example 3.

[0318] Use a stress-strain tester to test the structural stability and record the data. Use a vibration table to test the seismic performance and record the data.

[0319] Use the durability testing device to carry out durability testing and record the data.

[0320] Example 4: High-strength node form

[0321] The construction was carried out according to the steps of Example 4.

[0322] Use a stress-strain tester to test the structural stability and record the data. Use a vibration table to test the seismic performance and record the data.

[0323] Use the durability testing device to carry out durability testing and record the data.

[0324] Example 5: Optimizing the temporary support system

[0325] The construction was carried out according to the steps of Example 5.

[0326] Use a stress-strain tester to test the structural stability and record the data. Use a vibration table to test the seismic performance and record the data.

[0327] Use the durability testing device to carry out durability testing and record the data.

[0328] Traditional construction methods are used for construction. Traditional methods include:

[0329] T1. Use conventional materials and structural design;

[0330] T2. Use standard construction methods for construction;

[0331] T3, node reinforcement adopts traditional methods;

[0332] T4. Earthquake-resistant design is based on standards and specifications;

[0333] T5. Rely on traditional materials and construction techniques for durability assessment.

[0334] Use a stress-strain tester to test the structural stability and record the data. Use a vibration table to test the seismic performance and record the data.

[0335] Use the durability testing device to carry out durability testing and record the data.

[0336] Data aggregation and analysis

[0337] The experimental data of all embodiments and traditional methods are summarized and plotted into a table for comparative analysis.

[0338] Conduct a comprehensive assessment of structural stability, seismic performance and durability.

[0339] Experimental Results

[0340]

[0341] Experimental Summary

[0342] By comparing the structural stability, seismic performance and durability test results of various embodiments with those of the traditional method, it can be found that:

[0343] Structural stability: Example 4 is the best, with a stress-strain test result of 0.0016.

[0344] Shock resistance: Example 4 is the best, with a vibration displacement of 4.8 mm.

[0345] Durability: Example 4 is the best, with a service life of 55 years.

[0346] Taking into account structural stability, seismic resistance and durability, embodiment 4 is the best choice.

[0347] Experiment 3: Comprehensive comparison experiment of construction safety and construction quality

[0348] Purpose

[0349] This experiment aims to evaluate the effectiveness of different construction methods in reducing construction accidents and ensuring construction quality by comparing the construction safety and construction quality of five embodiments with traditional construction methods, so as to determine the safest and highest quality construction method.

[0350] Experimental procedures

[0351] Experimental preparation

[0352] Prepare safety monitoring equipment, including accident recording systems, quality inspection equipment, etc.

[0353] Five implementation examples and traditional construction methods were selected for construction and monitoring.

[0354] Example 1: Standardized construction method

[0355] The construction was carried out according to the steps of Example 1.

[0356] Record safety accidents and potential safety hazards during the construction process.

[0357] Use quality inspection equipment to inspect construction quality and record data.

[0358] Example 2: Extending the length of the steel truss

[0359] The construction was carried out according to the steps of Example 2.

[0360] Record safety accidents and potential safety hazards during the construction process.

[0361] Use quality inspection equipment to inspect construction quality and record data.

[0362] Example 3: Optimizing Section Height

[0363] The construction was carried out according to the steps of Example 3.

[0364] Record safety accidents and potential safety hazards during the construction process.

[0365] Use quality inspection equipment to inspect construction quality and record data.

[0366] Example 4: High-strength node form

[0367] The construction was carried out according to the steps of Example 4.

[0368] Record safety accidents and potential safety hazards during the construction process.

[0369] Use quality inspection equipment to inspect construction quality and record data.

[0370] Example 5: Optimizing the temporary support system

[0371] The construction was carried out according to the steps of Example 5.

[0372] Record safety accidents and potential safety hazards during the construction process.

[0373] Use quality inspection equipment to inspect construction quality and record data.

[0374] Traditional construction methods

[0375] The construction is carried out according to traditional construction methods. Traditional methods include:

[0376] T1. Use standard safety equipment and monitoring methods at the construction site;

[0377] T2. The construction process is carried out in accordance with standard safety regulations;

[0378] T3. Quality inspection is carried out through standard testing equipment;

[0379] T4. No optimized construction process was adopted, and quality control was carried out through standard processes.

[0380] Record safety accidents and potential safety hazards during the construction process.

[0381] Use quality inspection equipment to inspect construction quality and record data.

[0382] Data aggregation and analysis

[0383] The experimental data of all embodiments and traditional methods are summarized and plotted into tables for comparative analysis, and a comprehensive evaluation of construction safety and construction quality is conducted.

[0384] Experimental Results

[0385] method Accident rate (%) Quality inspection results (qualified rate %) Example 1 1.0 95 Example 2 1.2 94 Example 3 1.1 96 Example 4 0.9 97 Example 5 0.8 96 Traditional methods 1.0 93

[0386] Experimental summary:

[0387] By comparing the construction safety and construction quality of each embodiment with the traditional method, it can be found that: Construction safety: Embodiment 5 is the best, with an accident rate of 0.8%.

[0388] Construction quality: Example 4 is the best, with a pass rate of 97%.

[0389] Taking into account the construction safety and construction quality, both Example 4 and Example 5 performed excellently and are the best choices.

[0390] Experimental summary:

[0391] Through the above three comparative experiments, the five embodiments and traditional construction methods were comprehensively evaluated from three aspects: construction efficiency and cost, structural stability and seismic performance, and construction safety and construction quality. The experimental results show that:

[0392] Construction efficiency and cost: Example 5 shows a balance between efficiency and cost and is a better choice.

[0393] Structural stability and earthquake resistance: Example 4 performs best, having the best structural stability and earthquake resistance.

[0394] Construction safety and construction quality: both Example 4 and Example 5 performed excellently and are the best choices.

[0395] Taking all aspects into consideration, Example 5 performs well in terms of construction efficiency, cost and safety, and has the best overall performance; while Example 4 performs outstandingly in terms of structural stability and construction quality. Therefore, it is recommended that in actual construction, the advantages of Example 5 and Example 4 can be combined to further optimize the construction method to achieve the best construction effect.

[0396] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for constructing a large-span factory building steel structure, characterized in that: The following steps are involved: S1. Construction workers build a three-dimensional model of the large-span factory building steel structure based on the overall layout of the roof trusses; S2. Dividing the entire steel roof into partition boundaries on the three-dimensional model of the large-span factory building according to the distribution of the inner side sealing trusses; S3. Construction personnel determine the construction sequence of the large-span factory building steel structure based on the construction site and construction environment; S4. The construction personnel prepare the steel trusses of each part according to the structure of the three-dimensional model of the large-span factory building; S5. After the main structure of the lower part of the large-span plant is completed, the steel trusses are installed in sequence according to the construction sequence; S6, installing the roof structure after the steel trusses are completed; S7. Further reinforce the connection nodes between the steel truss and the large-span factory building.

2. A method for constructing a large-span factory building steel structure according to claim 1, characterized in that: The S1 step specifically includes the following steps: S1.

1. Classify the design drawings step by step using a hierarchical classification method and propose coding rules based on information organization; S1.

2. Standardize the parameters of each part of the large-span factory building steel structure and create a shared parameter file; S1.

3. Construct the 3D model of each part of the large-span factory building steel structure based on the 3D modeling software according to the plan on the construction design drawings; S1.

4. Classify and summarize the three-dimensional models and establish a large-span factory building steel structure family library; S1.

5. Call various components in the large-span factory building steel structure family library and drive them through external data files to modify the parameters of the large-span factory building steel structure; S1.

6. Carry out unified assembly to form a complete three-dimensional model of the large-span factory building steel structure; S1.

7. When constructing a three-dimensional model, use photoelectric rangefinders and total stations for high-precision positioning.

3. A method for constructing a large-span factory building steel structure according to claim 1, characterized in that: The S2 step specifically includes the following steps: S2.

1. Review the size limits of the three-dimensional model of the large-span factory building steel structure; S2.

2. Draw the position and distribution of the inner edge trusses on the 3D model; S2.

3. Determine the nodes of the inner edge trusses as the locations of each partition boundary; S2.

4. Check and confirm the location and shape of each partition boundary; S2.

5. According to the design requirements, the large-span factory building is divided into several construction areas, and the construction of each area is carried out simultaneously using the zoning construction method.

4. A method for constructing a large-span factory building steel structure according to claim 1, characterized in that: The S3 step specifically includes the following steps: S3.

1. Assess the geological and environmental conditions of the construction site; S3.

2. Determine the type and quantity of construction machinery; S3.

3. Develop a detailed construction schedule; S3.

4. Arrange on-site dispatch of materials and personnel; S3.

5. According to the zoning construction method, formulate specific construction plans and coordination plans for each zone.

5. The method for constructing a large-span factory building steel structure according to claim 1, characterized in that: The S4 step specifically includes the following steps: S4.

1. Select appropriate steel truss type and specifications. The length of the steel truss ranges from 20 to 50 m. S4.

2. Design the cross-sectional shape of the steel truss, with the cross-sectional height ranging from 1 to 3 m; S4.3, select the appropriate node form; S4.4, make steel trusses and conduct quality inspection; S4.

5. Hot rolling forming process is adopted in the production process of steel trusses.

6. A method for constructing a large-span factory building steel structure according to claim 1, characterized in that: The step S5 specifically includes the following steps: S5.

1. After the lower main structure is completed, the roof truss assembly begins; S5.

2. The crawler crane enters the site and hoists the inner heavy edge banding truss sections at different locations in the site in sequence, and pulls the cable wind rope at the same time; S5.

3. Move the hoisted steel truss to the designated position at the top and perform preliminary fixation; S5.

4. Install tie rods between steel trusses.

7. A method for constructing a large-span factory building steel structure according to claim 6, characterized in that: The steel truss is hoisted using a shoulder pole beam, the length of which is half the length of the truss. Two inner hoisting points are arranged on the upper part of the shoulder pole beam, and two outer hoisting points are arranged on the bottom. The inner hoisting points of the shoulder pole beam are symmetrically arranged at a distance of 1 / 9 to 1 / 10 from the edge, and the outer hoisting points are symmetrically arranged at a distance of 0.5-1.5m from the end.

8. A method for constructing a large-span factory building steel structure according to claim 7, characterized in that: The step S6 specifically includes the following steps: S6.

1. After the steel truss construction is completed, the secondary truss and roof purlins are hoisted to the designated location by crawler crane through high-altitude reinforcement; S6.2, install and fix; S6.

3. During the installation of the roof structure, a temporary support system shall be used to ensure the safety and stability of high-altitude operations.

9. The method for constructing a large-span factory building steel structure according to claim 1, characterized in that: The step S7 specifically includes the following steps: S7.

1. Apply protective coating to the connection nodes between steel trusses and large-span plant buildings; S7.2, fix sealing steel plates at the connection nodes between steel trusses and large-span plant buildings; S7.

3. Reinforce two fixing bolts at the connection nodes between the steel structure and the large-span factory building.

10. A method for constructing a large-span factory building steel structure according to claim 9, characterized in that: The protective coating is applied to the surface, gaps and through-holes of the connection nodes between the steel truss and the large-span factory building by electrostatic spraying.

Citation Information

Patent Citations

  • Installation method of large-span inverted triangular pipe truss pitched roof plant

    CN113585828A

  • Self-balancing integral lifting construction method for dip angle steel truss of large-span roof

    CN117489128A

  • Large-span plant steel structure construction method

    CN117868514A

  • Out-of-domain integral hoisting method for large-span roof beam

    CN118346068A

  • Construction method for building truss and floor slab

    WO2017121315A1