Low-voltage distribution network three-phase state estimation method considering measurement and control characteristics of three-phase three-wire inverter power supply

By constructing the low-voltage distribution network measurement equation and measurement and control characteristic equation of the smart meter, combined with the three-table method and the two-table method, the problem of convergence and accuracy of the three-phase three-wire inverter power supply state estimation in the low-voltage distribution network is solved, and high efficiency is achieved. status estimate.

CN118739251APending Publication Date: 2024-10-01CHONGQING UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410716236.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The existing technology fails to effectively consider the measurement characteristics and control characteristics of the three-phase three-wire inverter power supply in low-voltage distribution networks, resulting in poor convergence and accuracy of state estimation, especially in asymmetric low-voltage distribution networks. State estimation method for three-phase three-wire inverter power supply integrated into low-voltage distribution network.

Method used

Construct the low-voltage distribution network measurement equation and measurement and control characteristic equation based on smart meters, combine the three-table method and the two-table method, establish the measurement equation and control constraints considering the three-phase three-wire inverter power supply, and adopt the exponential weighted least squares estimation model. The three-phase state estimation model of low-voltage distribution network is solved through Lagrange multiplier and Newton-Raphson method.

Benefits of technology

The accuracy and convergence of the three-phase state estimation of the low-voltage distribution network are improved. By considering the symmetric control and zero-sequence current constraints of the inverter power supply, the redundancy of the measurement equation is enhanced, and efficient estimation of the actual operating conditions is achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118739251A_ABST
    Figure CN118739251A_ABST
Patent Text Reader

Abstract

The invention discloses a low-voltage distribution network three-phase state estimation method considering measurement and control characteristics of a three-phase three-wire inverter power supply. The method comprises the following steps: 1) constructing a low-voltage distribution network measurement equation based on an intelligent electric meter; 2) constructing a measurement and control characteristic equation based on a low-voltage distribution network measurement equation; 3) based on the measurement and control characteristic equation and the exponential weighted least square estimation model, constructing a low-voltage distribution network three-phase state estimation model considering the measurement and control characteristics of the three-phase three-wire inverter power supply; and 4) solving the three-phase state estimation model of the low-voltage distribution network to obtain a three-phase state estimation result of the low-voltage distribution network. Based on the Lagrange multiplier and the Newton method, efficient solving of the model is achieved, and the effect of accurately estimating the actual operation condition of the low-voltage distribution network is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of power system dispatching automation, and in particular to a low-voltage distribution network three-phase state estimation method taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply. Background Art

[0002] The historical measurement data of the low-voltage distribution network obtained by smart meters may contain abnormal data and missing data during the collection and transmission process due to human errors, damage to measuring instruments, electricity theft and other factors. The robust state estimation uses the redundant measurement data of the distribution system and adopts appropriate algorithms to estimate the operating status of the distribution system, reducing or even eliminating the impact of abnormal data on the state estimation. With the large-scale incorporation of wind and solar power into the low-voltage distribution network, it is necessary to study the state estimation method considering the incorporation of three-phase three-wire inverter power into the low-voltage distribution network.

[0003] Existing robust state estimation methods are mostly used in symmetrical transmission networks, while in asymmetrical low-voltage distribution networks, smart meters are installed on the low-voltage side of the distribution transformer and the user terminal. The measured data usually include the voltage amplitude, phase current amplitude, active power and reactive power of the three phases relative to the neutral point obtained by the three-meter method. Since there is no measurement data in the branch, the redundancy and convergence of the low-voltage distribution network state estimation are poor.

[0004] In terms of inverter power supply, the state estimation of three-phase three-wire inverter power supply connected to the grid currently only exists in the medium-voltage distribution network. There is no relevant research on the state estimation of three-phase three-wire inverter power supply connected to the low-voltage distribution network. Failure to consider its measurement characteristics and control characteristics will affect the convergence and accuracy of the low-voltage distribution network state estimation. In the medium-voltage distribution network, the total power of the three-phase three-wire inverter power supply is often selected as the quantity measurement, and the traditional weighted least squares method is used to estimate the state of the medium and low voltage distribution network. In terms of measurement characteristics, using total power as the quantity measurement reduces redundancy and increases the degree of freedom of the state quantity, which affects the accuracy of state estimation. In terms of control characteristics, the traditional method does not consider the zero-sequence current constraint and symmetrical control constraint of the three-phase three-wire inverter power supply, which affects the convergence and accuracy.

[0005] In summary, how to embed the three-phase three-wire inverter power supply into the three-phase four-wire low-voltage distribution network, consider its measurement characteristics and control characteristics, and combine the three-meter method and the two-meter method to establish appropriate measurement equations and equality constraints are urgent problems to be solved in the low-voltage distribution network robustness state estimation. Summary of the invention

[0006] The object of the present invention is to provide a method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply, comprising the following steps:

[0007] 1) Construct low-voltage distribution network measurement equation based on smart meters;

[0008] 2) Based on the low-voltage distribution network measurement equation, construct the measurement and control characteristic equation;

[0009] 3) Based on the measurement and control characteristic equation and the exponentially weighted least squares estimation model, a three-phase state estimation model of the low-voltage distribution network is constructed considering the measurement and control characteristics of the three-phase three-wire inverter power supply;

[0010] 4) Solve the three-phase state estimation model of the low-voltage distribution network and obtain the three-phase state estimation results of the low-voltage distribution network.

[0011] Further, the low-voltage distribution network measurement equation includes a distribution transformer low-voltage side and load measurement equation based on a three-meter method, and an inverter power supply measurement equation based on a two-meter method;

[0012] The distribution transformer low voltage side and load measurement equations include a three-phase active power measurement equation, a three-phase reactive power measurement equation, a three-phase voltage amplitude measurement equation, a three-phase current amplitude measurement equation, and a virtual measurement equation in which the sum of the three-phase current and the neutral line current vector is 0, with the neutral point of each end point as a reference;

[0013] The inverter power supply measurement equations include line-to-line active power measurement equations, line-to-line reactive power measurement equations, line-to-line voltage amplitude measurement equations, phase current measurement equations, virtual measurement equations with zero-sequence current being 0, and symmetrical current constraint equations.

[0014] Furthermore, in the distribution transformer low-voltage side and load measurement equations, the three-phase active power measurement equation and the three-phase reactive power measurement equation are respectively as follows:

[0015]

[0016] Where d is the phase number, d∈B p ,B p ={a,b,c}; n is the phase number; t is the phase number, and t∈B1,B1={a,b,c,n}; P i dn It indicates the active power of phase d on the low voltage side of the load or distribution transformer relative to the neutral point; It indicates the reactive power of phase d on the low voltage side of the load or distribution transformer relative to the neutral point; and express The real and imaginary parts of represents the endpoint admittance matrix of the d-phase and t-phase lines; e i d 、f i d express The real and imaginary parts of f i n express The real and imaginary parts of represents the voltage of phase d at load terminal j; represents the voltage of phase n at load terminal j; express The real and imaginary parts of It represents the voltage of phase t at the load terminal k; is a collection of endpoints;

[0017] The three-phase voltage amplitude measurement equation is as follows:

[0018]

[0019] In the formula, It represents the voltage amplitude of phase d relative to the neutral point at load terminal i.

[0020] The three-phase current amplitude measurement equation is as follows:

[0021]

[0022] In the formula, It represents the current amplitude of phase d at load terminal i.

[0023] Furthermore, in the inverter power supply measurement equation, the line-to-line active power measurement equation and the line-to-line reactive power measurement equation are respectively as follows:

[0024]

[0025] Where α is the phase number, α∈B0, B0={a,b}; Indicates the active power between phase α and phase c on the low-voltage side of the load or distribution transformer; It indicates the reactive power between phase α and phase c on the low voltage side of the load or distribution transformer; and express The real and imaginary parts of B represents the endpoint admittance matrix of the α-phase and t-phase lines; p ={a,b,c}; express The real and imaginary parts of It represents the voltage of phase t at the load terminal k; express The real and imaginary parts of express The real and imaginary parts of represents the voltage of phase α at the end point v; represents the voltage of phase α at terminal c; Represents a collection of endpoints;

[0026] The line voltage amplitude measurement equation is as follows:

[0027]

[0028] In the formula, It represents the voltage amplitude of phase α relative to phase c at the load end point v. The phase current measurement equation is as follows:

[0029]

[0030] In the formula, Represents the current amplitude of phase α at the load endpoint v; t is the phase number, and t∈B1, B1={a,b,c,n}.

[0031] Furthermore, the measurement and control characteristic equation includes the symmetrical control constraint of the three-phase three-wire inverter power supply, the asymmetrical zero-sequence current constraint, and the constraint that the sum of the three-phase current of the load and the neutral line current vector on the low-voltage side of the distribution transformer is 0.

[0032] Furthermore, the constraint that the sum of the three-phase current on the low-voltage side of the distribution transformer and the current vector of the load and the neutral line is 0 is as follows:

[0033]

[0034] Where δ is the phase number, and δ∈B1, B1={a,b,c,n}; and express The real and imaginary parts of Represents the endpoint admittance matrix of the δ-phase and t-phase lines; express The real and imaginary parts of Represents the voltage of phase line t at load end point k; t is the phase number, and t∈B1, B1={a,b,c,n}; is the set of endpoints connected to endpoint j and includes endpoint j;

[0035] The asymmetric zero-sequence current constraint is as follows:

[0036]

[0037] In the formula, Represents a set of endpoints; B0 = {a, b}; and express The real and imaginary parts of Represents the endpoint admittance matrix of the α-phase and t-phase lines;

[0038] Consider the symmetrical control constraints of the three-phase three-wire inverter power supply as follows:

[0039]

[0040] Where imag(·) and real(·) are functions that return the imaginary and real parts, respectively; I a ,I b ,I c are the three-phase current amplitudes of distributed power sources respectively.

[0041] Furthermore, the exponentially weighted least squares estimation model is as follows:

[0042]

[0043] Where J(x) represents the objective function value; x represents the state quantity, including the voltage amplitude and phase angle of the three-phase and neutral point at the endpoints; z represents the quantity measurement; h(x) represents the measurement function; W represents the weight matrix of the quantity measurement; c(x) represents the equality constraint equation.

[0044] Furthermore, the diagonal elements of the weight matrix W are recorded as Right now:

[0045]

[0046] In the formula, represents a fixed weight matrix; σ represents the Parzen window width

[0047] The standardized residual r of the measurement Ni As shown below:

[0048]

[0049] In the formula, r i Represents the measurement residual; R is the inverse matrix of the fixed weight matrix; (KR) ii In the above formula, the subscript ii represents the set of diagonal elements of the matrix KR in the brackets;

[0050] The residual sensitivity matrix K is shown below:

[0051] K=IH(H T WH) -1 H T W (13)

[0052] Where I is the unit matrix; H is the Jacques matrix corresponding to the quantity measurement.

[0053] Furthermore, the three-phase state estimation model of the low-voltage distribution network is solved by Lagrange multipliers and Newton-Raphson method.

[0054] Furthermore, the steps of solving the three-phase state estimation model of the low-voltage distribution network include:

[0055] 1) The Lagrange multiplier λ is introduced into the three-phase state estimation model of the low-voltage distribution network to form the unconstrained optimization objective of the augmented Lagrangian function L(x,λ), namely:

[0056]

[0057] In the formula, J(x) represents the objective function value; x represents the state quantity, including the voltage amplitude and phase angle of the three-phase and neutral point at the endpoints; z represents the quantity measurement; h(x) represents the measurement function; W represents the weight matrix of the quantity measurement; c(x) represents the equality constraint equation;

[0058] 2) The Newton-Raphson method is used to solve the unconstrained optimization objective, obtain the three-phase state estimation result of the low-voltage distribution network, and establish the correction equation;

[0059] The correction equation is as follows:

[0060]

[0061] In the formula, H represents h(x s ) corresponding to the Jacobian matrix; C represents c(x s ) corresponding to the Jacobian matrix; s represents the number of iterations; Δx s is the correction amount; s is the Lagrange multiplier of the sth iteration; h(x s ) represents the measurement function of the sth iteration; c(x s ) represents the equality constraint equation of the sth iteration;

[0062] 3) Determine the correction amount Δx s Satisfy max(|Δx s |)<ε and the number of iterations s satisfies s≤T max Is it true? If so, output the three-phase state estimation result of the low-voltage distribution network; if max(|Δx s |)≥ε and s≤T max , then set the number of iterations s = s + 1, and return to step 2); if max(|Δx s |)≥ε and s>T max , then the output is "non-convergence" result; T max is the maximum number of iterations, and ε is the correction threshold.

[0063] The technical effect of the present invention is unquestionable. The present invention proposes a three-phase state estimation method for a low-voltage distribution network that takes into account the measurement and control characteristics of a three-phase three-wire inverter power supply. In terms of measurement characteristics, this method establishes measurement equations for line power, line voltage and phase current of the inverter power supply based on a two-meter method. In terms of control characteristics, it establishes symmetrical control constraints and asymmetrical zero-sequence current constraints that take into account the three-phase three-wire inverter power supply.

[0064] Combining the above measurement and control characteristic equation and exponentially weighted least squares estimation, the present invention constructs a three-phase state estimation model for a low-voltage distribution network.

[0065] The present invention realizes efficient solution of the model based on Lagrange multipliers and Newton's method, and achieves the effect of accurately estimating the actual operation status of the low-voltage distribution network. BRIEF DESCRIPTION OF THE DRAWINGS

[0066] Figure 1 It is the equivalent model of low voltage distribution line;

[0067] Figure 2 It is an ungrounded inverter power supply structure;

[0068] Figure 3 It is a Y-connection load model;

[0069] Figure 4 Modify the system for IEEE13 nodes;

[0070] Figure 5 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION

[0071] The present invention is further described below in conjunction with the embodiments, but it should not be understood that the above subject matter of the present invention is limited to the following embodiments. Without departing from the above technical ideas of the present invention, various substitutions and changes are made according to the common technical knowledge and customary means in the art, which should all be included in the protection scope of the present invention.

[0072] Embodiment 1:

[0073] See also Figures 1 to 5 , including a three-phase state estimation method for a low-voltage distribution network considering the measurement and control characteristics of a three-phase three-wire inverter power supply, comprising the following steps:

[0074] 1) Construct low-voltage distribution network measurement equation based on smart meters;

[0075] 2) Based on the low-voltage distribution network measurement equation, construct the measurement and control characteristic equation;

[0076] 3) Based on the measurement and control characteristic equation and the exponentially weighted least squares estimation model, a three-phase state estimation model of the low-voltage distribution network is constructed considering the measurement and control characteristics of the three-phase three-wire inverter power supply;

[0077] 4) Solve the three-phase state estimation model of the low-voltage distribution network and obtain the three-phase state estimation results of the low-voltage distribution network.

[0078] The low-voltage distribution network measurement equations include the distribution transformer low-voltage side and load measurement equations based on the three-meter method, and the inverter power supply measurement equations based on the two-meter method;

[0079] The distribution transformer low voltage side and load measurement equations include a three-phase active power measurement equation, a three-phase reactive power measurement equation, a three-phase voltage amplitude measurement equation, a three-phase current amplitude measurement equation, and a virtual measurement equation in which the sum of the three-phase current and the neutral line current vector is 0, with the neutral point of each end point as a reference;

[0080] The inverter power supply measurement equations include line-to-line active power measurement equations, line-to-line reactive power measurement equations, line-to-line voltage amplitude measurement equations, phase current measurement equations, virtual measurement equations with zero-sequence current being 0, and symmetrical current constraint equations.

[0081] In the distribution transformer low-voltage side and load measurement equations, the three-phase active power measurement equation and the three-phase reactive power measurement equation are as follows:

[0082]

[0083] Where d is the phase number, d∈B p ,B p ={a,b,c}; n is the phase number; t is the phase number, and t∈B1,B1={a,b,c,n}; P i dn It indicates the active power of phase d on the low voltage side of the load or distribution transformer relative to the neutral point; It indicates the reactive power of phase d on the low voltage side of the load or distribution transformer relative to the neutral point; and express The real and imaginary parts of Represents the endpoint admittance matrix of the d-phase and t-phase lines; f i d express The real and imaginary parts of f i n express The real and imaginary parts of represents the voltage of phase d at load terminal j; represents the voltage of phase n at load terminal j; express The real and imaginary parts of It represents the voltage of phase t at the load terminal k; is a collection of endpoints;

[0084] The three-phase voltage amplitude measurement equation is as follows:

[0085]

[0086] In the formula, It represents the voltage amplitude of phase d relative to the neutral point at load terminal i.

[0087] The three-phase current amplitude measurement equation is as follows:

[0088]

[0089] In the formula, It represents the current amplitude of phase d at load terminal i.

[0090] In the inverter power supply measurement equation, the line-to-line active power measurement equation and the line-to-line reactive power measurement equation are as follows:

[0091]

[0092] Where α is the phase number, α∈B0, B0={a,b}; Indicates the active power between phase α and phase c on the low-voltage side of the load or distribution transformer; It indicates the reactive power between phase α and phase c on the low voltage side of the load or distribution transformer; and express The real and imaginary parts of B represents the endpoint admittance matrix of the α-phase and t-phase lines; p ={a,b,c}; express The real and imaginary parts of It represents the voltage of phase t at the load terminal k; express The real and imaginary parts of express The real and imaginary parts of represents the voltage of phase α at the end point v; represents the voltage of phase α at terminal c; Represents a collection of endpoints;

[0093] The line voltage amplitude measurement equation is as follows:

[0094]

[0095] In the formula, It represents the voltage amplitude of phase α relative to phase c at the load endpoint v.

[0096] The phase current measurement equation is as follows:

[0097]

[0098] In the formula, Represents the current amplitude of phase α at the load endpoint v; t is the phase number, and t∈B1, B1={a,b,c,n}.

[0099] The measurement and control characteristic equation includes the symmetrical control constraint of the three-phase three-wire inverter power supply, the asymmetrical zero-sequence current constraint, and the constraint that the sum of the three-phase current of the load and the neutral line current vector is 0 on the low-voltage side of the distribution transformer.

[0100] The constraint that the sum of the three-phase current on the low-voltage side of the distribution transformer and the current vector of the load and the neutral line is 0 is as follows:

[0101]

[0102] Where δ is the phase number, and δ∈B1, B1={a,b,c,n}; and express The real and imaginary parts of Represents the endpoint admittance matrix of the δ-phase and t-phase lines; express The real and imaginary parts of Represents the voltage of phase line t at load end point k; t is the phase number, and t∈B1, B1={a,b,c,n}; is the set of endpoints connected to endpoint j and includes endpoint j;

[0103] The asymmetric zero-sequence current constraint is as follows:

[0104]

[0105] In the formula, Represents a set of endpoints; B0 = {a, b}; and express The real and imaginary parts of Represents the endpoint admittance matrix of the α-phase and t-phase lines;

[0106] Consider the symmetrical control constraints of the three-phase three-wire inverter power supply as follows:

[0107]

[0108] Where imag(·) and real(·) are functions that return the imaginary and real parts, respectively; I a ,I b ,I c are the three-phase current amplitudes of distributed power sources respectively.

[0109] The exponentially weighted least squares estimation model is as follows:

[0110]

[0111] Where J(x) represents the objective function value; x represents the state quantity, including the voltage amplitude and phase angle of the three-phase and neutral point at the endpoints; z represents the quantity measurement; h(x) represents the measurement function; W represents the weight matrix of the quantity measurement; c(x) represents the equality constraint equation.

[0112] The diagonal elements of the weight matrix W are recorded as Right now:

[0113]

[0114] In the formula, represents a fixed weight matrix; σ represents the Parzen window width

[0115] The standardized residual r of the measurement Ni As shown below:

[0116]

[0117] In the formula, r i Represents the measurement residual; R is the inverse matrix of the fixed weight matrix; (KR) ii In the above formula, the subscript ii represents the set of diagonal elements of the matrix KR in the brackets;

[0118] The residual sensitivity matrix K is shown below:

[0119] K=IH(H T WH) -1 H T W (13)

[0120] Where I is the unit matrix; H is the Jacques matrix corresponding to the quantity measurement.

[0121] The three-phase state estimation model of low-voltage distribution network is solved by Lagrange multipliers and Newton-Raphson method.

[0122] The steps of solving the three-phase state estimation model of the low-voltage distribution network include:

[0123] s1) The Lagrange multiplier λ is introduced into the three-phase state estimation model of the low-voltage distribution network to form the unconstrained optimization objective of the augmented Lagrangian function L(x,λ), namely:

[0124]

[0125] In the formula, J(x) represents the objective function value; x represents the state quantity, including the voltage amplitude and phase angle of the three-phase and neutral point at the endpoints; z represents the quantity measurement; h(x) represents the measurement function; W represents the weight matrix of the quantity measurement; c(x) represents the equality constraint equation;

[0126] s2) Using the Newton-Raphson method to solve the unconstrained optimization objective, the three-phase state estimation result of the low-voltage distribution network is obtained, and the correction equation is established;

[0127] The correction equation is as follows:

[0128]

[0129] In the formula, H represents h(x s ) corresponding to the Jacobian matrix; C represents c(x s ) corresponding to the Jacobian matrix; s represents the number of iterations; Δx s is the correction amount; s is the Lagrange multiplier of the sth iteration; h(x s ) represents the measurement function of the sth iteration; c(x s ) represents the equality constraint equation of the sth iteration;

[0130] s3) Determine the correction amount Δx s Satisfy max(|Δx s |)<ε and the number of iterations s satisfies s≤T max Is it true? If so, output the three-phase state estimation result of the low-voltage distribution network; if max(|Δx s |)≥ε and s≤T max , then set the number of iterations s = s + 1, and return to step 2); if max(|Δx s |)≥ε and s>T max , then the output is "non-convergence" result; T max is the maximum number of iterations, and ε is the correction threshold.

[0131] Embodiment 2:

[0132] A three-phase state estimation method for a low-voltage distribution network considering the measurement and control characteristics of a three-phase three-wire inverter power supply includes the following steps:

[0133] 1) Construct low-voltage distribution network measurement equation based on smart meters;

[0134] 2) Based on the low-voltage distribution network measurement equation, construct the measurement and control characteristic equation;

[0135] 3) Based on the measurement and control characteristic equation and the exponentially weighted least squares estimation model, a three-phase state estimation model of the low-voltage distribution network is constructed considering the measurement and control characteristics of the three-phase three-wire inverter power supply;

[0136] 4) Solve the three-phase state estimation model of the low-voltage distribution network and obtain the three-phase state estimation results of the low-voltage distribution network.

[0137] Embodiment 3:

[0138] A method for estimating the three-phase state of a low-voltage distribution network considering the measurement and control characteristics of a three-phase three-wire inverter power supply, the technical content of which is the same as that of Example 2, and further, the low-voltage distribution network measurement equation includes a distribution transformer low-voltage side and load measurement equation based on a three-meter method, and an inverter power supply measurement equation based on a two-meter method;

[0139] The distribution transformer low voltage side and load measurement equations include a three-phase active power measurement equation, a three-phase reactive power measurement equation, a three-phase voltage amplitude measurement equation, a three-phase current amplitude measurement equation, and a virtual measurement equation in which the sum of the three-phase current and the neutral line current vector is 0, with the neutral point of each end point as a reference;

[0140] The inverter power supply measurement equations include line-to-line active power measurement equations, line-to-line reactive power measurement equations, line-to-line voltage amplitude measurement equations, phase current measurement equations, virtual measurement equations with zero-sequence current being 0, and symmetrical current constraint equations.

[0141] Embodiment 4:

[0142] A three-phase state estimation method for a low-voltage distribution network considering the measurement and control characteristics of a three-phase three-wire inverter power supply is provided. The technical content is the same as any one of Embodiments 2-3. Further, in the low-voltage side of the distribution transformer and the load measurement equation, the three-phase active power measurement equation and the three-phase reactive power measurement equation are respectively as follows:

[0143]

[0144] Where d is the phase number, d∈B p ,B p ={a,b,c}; n is the phase number; t is the phase number, and t∈B1,B1={a,b,c,n}; P i dn It indicates the active power of phase d on the low voltage side of the load or distribution transformer relative to the neutral point; It indicates the reactive power of phase d on the low voltage side of the load or distribution transformer relative to the neutral point; and express The real and imaginary parts of Represents the endpoint admittance matrix of the d-phase and t-phase lines; f i d express The real and imaginary parts of f i n express The real and imaginary parts of represents the voltage of phase d at load terminal j; represents the voltage of phase n at load terminal j; express The real and imaginary parts of It represents the voltage of phase t at the load terminal k; is a collection of endpoints;

[0145] The three-phase voltage amplitude measurement equation is as follows:

[0146]

[0147] In the formula, It represents the voltage amplitude of phase d relative to the neutral point at load terminal i.

[0148] The three-phase current amplitude measurement equation is as follows:

[0149]

[0150] In the formula, It represents the current amplitude of phase d at load terminal i.

[0151] Embodiment 5:

[0152] A low-voltage distribution network three-phase state estimation method considering the measurement and control characteristics of a three-phase three-wire inverter power supply is provided. The technical content is the same as any one of Embodiments 2-4. Further, in the inverter power supply measurement equation, the line-to-line active power measurement equation and the line-to-line reactive power measurement equation are respectively as follows:

[0153]

[0154] Where α is the phase number, α∈B0, B0={a,b}; Indicates the active power between phase α and phase c on the low-voltage side of the load or distribution transformer; It indicates the reactive power between phase α and phase c on the low voltage side of the load or distribution transformer; and express The real and imaginary parts of B represents the endpoint admittance matrix of the α-phase and t-phase lines; p ={a,b,c}; express The real and imaginary parts of It represents the voltage of phase t at the load terminal k; express The real and imaginary parts of express The real and imaginary parts of represents the voltage of phase α at the end point v; represents the voltage of phase α at terminal c; Represents a collection of endpoints;

[0155] The line voltage amplitude measurement equation is as follows:

[0156]

[0157] In the formula, It represents the voltage amplitude of phase α relative to phase c at the load end point v. The phase current measurement equation is as follows:

[0158]

[0159] In the formula, Represents the current amplitude of phase α at the load endpoint v; t is the phase number, and t∈B1, B1={a,b,c,n}.

[0160] Embodiment 6:

[0161] A method for estimating the three-phase state of a low-voltage distribution network considering the measurement and control characteristics of a three-phase three-wire inverter power supply is provided. The technical content is the same as any one of Embodiments 2-5. Further, the measurement and control characteristic equation includes a symmetrical control constraint of the three-phase three-wire inverter power supply, an asymmetrical zero-sequence current constraint, and a constraint that the sum of the three-phase current of the load and the neutral line current vector is 0.

[0162] Embodiment 7:

[0163] A method for estimating the three-phase state of a low-voltage distribution network considering the measurement and control characteristics of a three-phase three-wire inverter power supply is provided. The technical content is the same as any one of Embodiments 2-6. Furthermore, the constraint that the sum of the three-phase current of the load and the neutral line current vector on the low-voltage side of the distribution transformer is 0 is as follows:

[0164]

[0165] Where δ is the phase number, and δ∈B1, B1={a,b,c,n}; and express The real and imaginary parts of Represents the endpoint admittance matrix of the δ-phase and t-phase lines; express The real and imaginary parts of Represents the voltage of phase line t at load end point k; t is the phase number, and t∈B1, B1={a,b,c,n}; is the set of endpoints connected to endpoint j and includes endpoint j;

[0166] The asymmetric zero-sequence current constraint is as follows:

[0167]

[0168] In the formula, Represents a set of endpoints; B0 = {a, b}; and express The real and imaginary parts of Represents the endpoint admittance matrix of the α-phase and t-phase lines;

[0169] Consider the symmetrical control constraints of the three-phase three-wire inverter power supply as follows:

[0170]

[0171] Where imag(·) and real(·) are functions that return the imaginary and real parts, respectively; I a ,I b ,I c are the three-phase current amplitudes of distributed power sources respectively.

[0172] Embodiment 8:

[0173] A method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply is provided. The technical content is the same as any one of Embodiments 2-7. Further, the exponentially weighted least squares estimation model is as follows:

[0174]

[0175] Where J(x) represents the objective function value; x represents the state quantity, including the voltage amplitude and phase angle of the three-phase and neutral point at the endpoints; z represents the quantity measurement; h(x) represents the measurement function; W represents the weight matrix of the quantity measurement; c(x) represents the equality constraint equation.

[0176] Embodiment 9:

[0177] A method for estimating the three-phase state of a low-voltage distribution network considering the measurement and control characteristics of a three-phase three-wire inverter power supply is provided. The technical content is the same as any one of Embodiments 2-8. Further, the diagonal elements of the weight matrix W are recorded as Right now:

[0178]

[0179] In the formula, represents a fixed weight matrix; σ represents the Parzen window width

[0180] The standardized residual r of the measurement Ni As shown below:

[0181]

[0182] In the formula, r i Represents the measurement residual; R is the inverse matrix of the fixed weight matrix; (KR) ii The subscript ii of represents the set of diagonal elements of the matrix in brackets;

[0183] The residual sensitivity matrix K is shown below:

[0184] K=IH(H T WH) -1 H T W (13)

[0185] Where I is the unit matrix; H is the Jacques matrix corresponding to the quantity measurement.

[0186] Embodiment 10:

[0187] A three-phase state estimation method for a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply is provided. The technical content is the same as any one of Examples 2-9. Furthermore, the three-phase state estimation model of the low-voltage distribution network is solved by Lagrange multipliers and the Newton-Raphson method.

[0188] Embodiment 11:

[0189] A method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply is provided. The technical content is the same as any one of Embodiments 2-10. Further, the step of solving the three-phase state estimation model of the low-voltage distribution network includes:

[0190] 1) The Lagrange multiplier λ is introduced into the three-phase state estimation model of the low-voltage distribution network to form the unconstrained optimization objective of the augmented Lagrangian function L(x,λ), namely:

[0191]

[0192] In the formula, J(x) represents the objective function value; x represents the state quantity, including the voltage amplitude and phase angle of the three-phase and neutral point at the endpoints; z represents the quantity measurement; h(x) represents the measurement function; W represents the weight matrix of the quantity measurement; c(x) represents the equality constraint equation;

[0193] 2) The Newton-Raphson method is used to solve the unconstrained optimization objective, obtain the three-phase state estimation result of the low-voltage distribution network, and establish the correction equation;

[0194] The correction equation is as follows:

[0195]

[0196] In the formula, H represents h(x s ) corresponding to the Jacobian matrix; C represents c(x s ) corresponding to the Jacobian matrix; s represents the number of iterations; Δx s is the correction amount; s is the Lagrange multiplier of the sth iteration; h(x s ) represents the measurement function of the sth iteration; c(x s ) represents the equality constraint equation of the sth iteration;

[0197] 3) Determine the correction amount Δx s Satisfy max(|Δx s |)<ε and the number of iterations s satisfies s≤T max Is it true? If so, output the three-phase state estimation result of the low-voltage distribution network; if max(|Δx s |)≥ε and s≤T max , then set the number of iterations s = s + 1, and return to step 2); if max(|Δx s |)≥ε and s>T max , then the output is "non-convergence" result; T max is the maximum number of iterations, and ε is the correction threshold.

[0198] Embodiment 12:

[0199] A low-voltage distribution network three-phase state estimation method considering the measurement and control characteristics of a three-phase three-wire inverter power supply is provided, and the technical content is the same as any one of Embodiments 2-11. Further, the convergence accuracy ε is 10 -5 , Iteration number threshold T max Take 100.

[0200] Embodiment 13:

[0201] A method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply comprises the following steps:

[0202] 1) Based on the measurement characteristics of the two-meter method and the three-meter method, the low-voltage distribution network measurement equation based on smart meters is established, including the low-voltage side and load measurement equations of the distribution transformer based on the three-meter method and the inverter power supply measurement equation based on the two-meter method.

[0203] 2) Based on the control characteristics, the symmetrical control constraints of the three-phase three-wire inverter power supply, the asymmetrical zero-sequence current constraints, and the constraint that the sum of the three-phase current on the low-voltage side of the distribution transformer and the load and the neutral line current vector is 0 are established.

[0204] 3) Based on the measurement and control characteristic equation and exponentially weighted least squares estimation, a three-phase state estimation model of the low-voltage distribution network is constructed.

[0205] 4) Based on Lagrange multipliers and Newton's method, an efficient solution of the three-phase state estimation model of the low-voltage distribution network considering the measurement and control characteristics of the three-phase three-wire inverter power supply is achieved.

[0206] The distribution transformer low-voltage side and load measurement equations based on the three-meter method include three-phase active power (3 groups), three-phase reactive power (3 groups), three-phase voltage amplitude (3 groups) and three-phase current amplitude (3 groups) with the neutral point of each endpoint as a reference. At the same time, it is also necessary to satisfy the virtual measurement (2 groups) that the sum of the three-phase current and the neutral line current vector is 0 and make an equality constraint, that is, a total of 14 measurement equations.

[0207] The inverter power supply measurement equation based on the two-table method includes two sets of line-to-line active power (2 sets), two sets of line-to-line reactive power (2 sets), two sets of line-to-line voltage (2 sets) and two sets of phase current (2 sets), and also needs to satisfy the virtual measurement of zero-sequence current being 0 (2 sets) and make equation constraints. If the inverter power supply adopts a symmetrical current control method, it must also satisfy the symmetrical current constraint (4 sets), that is, a total of 14 sets of measurement equations.

[0208] The distribution transformer low voltage side and load measurement equations based on the three-meter method measurement characteristics include:

[0209] The three-phase power measurement equation is as follows:

[0210]

[0211] Where d is the phase number, d∈B p ,B p ={a,b,c}; n is the phase number; t is the phase number, and t∈B1,B1={a,b,c,n}; P i dn It indicates the active power of phase d on the low voltage side of the load or distribution transformer relative to the neutral point; It indicates the reactive power of phase d on the low voltage side of the load or distribution transformer relative to the neutral point; and express The real and imaginary parts of Represents the endpoint admittance matrix of the d-phase and t-phase lines; f i d and f i n express and The real and imaginary parts of represents the voltage of phase d at load terminal j; Represents the voltage of phase n at load terminal j.

[0212] The phase voltage amplitude measurement is as follows:

[0213]

[0214] In the formula, It represents the voltage amplitude of phase d relative to the neutral point at load terminal i.

[0215] The phase current amplitude measurement is as follows:

[0216]

[0217] In the formula, It represents the current amplitude of phase d at load terminal i.

[0218] The inverter power supply measurement equation based on the two-meter method measurement characteristics includes:

[0219] The line power measurement equation is as follows:

[0220]

[0221] Where α is the phase number, α∈B0, B0={a,b}; P i αc Indicates the active power between phase α and phase c on the low-voltage side of the load or distribution transformer; It indicates the reactive power between phase α and phase c on the low voltage side of the load or distribution transformer; and express The real and imaginary parts of Represents the endpoint admittance matrix of the α-phase and t-phase lines.

[0222] The line voltage amplitude measurement is as follows:

[0223]

[0224] In the formula, It represents the voltage amplitude of phase α relative to phase c at the load endpoint v.

[0225] The two sets of phase current amplitude measurements are as follows:

[0226]

[0227] In the formula, Represents the current amplitude of phase α at the load terminal v.

[0228] Constraints based on control characteristics include:

[0229] The virtual measurement of the sum of the three-phase current and the neutral line current vector at the low-voltage side of the distribution transformer and the load terminal is 0 is as follows:

[0230]

[0231] Where δ is the phase number, and δ∈B1, B1={a,b,c,n}; and express The real and imaginary parts of Represents the endpoint admittance matrix of the δ-phase and t-phase lines.

[0232] The virtual measurement of the inverter power supply zero-sequence current is 0 as follows:

[0233]

[0234] If the inverter power supply is symmetrical current control, the virtual measurement that needs to satisfy the three-phase current symmetry is as follows:

[0235]

[0236] Where imag(·) and real(·) are functions that return the imaginary and real parts, respectively; I a ,I b ,I c are the three-phase current amplitudes of distributed power sources respectively.

[0237] The exponentially weighted least squares estimation model is as follows:

[0238]

[0239] Where J(x) represents the objective function value; x represents the state quantity, which is the voltage amplitude and phase angle of the three-phase and neutral point at the endpoints; z represents the quantity measurement; h(x) represents the measurement function; W represents the weight matrix of the quantity measurement; c(x) represents the equality constraint equation.

[0240] The calculation formula for the diagonal elements of the weight matrix W is:

[0241]

[0242] In the formula, represents a fixed weight matrix, which is usually 1; σ represents the Parzen window width; r Ni The standardized residual of the quantity measurement is expressed as:

[0243]

[0244] In the formula, r i represents the measurement residual; K is the residual sensitivity matrix, and its specific formula is:

[0245] K=IH(H T WH) -1 H T W (13)

[0246] Where I is the unit matrix; H is the Jacques matrix corresponding to the quantity measurement.

[0247] For the three-phase state estimation model of low-voltage distribution network with inverter power supply, the Lagrange multiplier λ is introduced to deal with the equality constraint problem, and the unconstrained optimization problem of augmented Lagrangian function L(x,λ) is formed as follows:

[0248]

[0249] The Newton-Raphson method is used to solve the state estimation, and the correction equation is established as follows:

[0250]

[0251] Where H represents the Jacobian matrix corresponding to h(x); C represents the Jacobian matrix corresponding to c(x); and s represents the number of iterations.

[0252] Repeat the iteration until the iteration condition is met: correction value Δx s Satisfy max(|Δx s |)<ε and the number of iterations s satisfies s≤T max ; T max is the maximum number of iterations, and ε is the correction threshold.

[0253] Embodiment 14:

[0254] For the simulation verification of the low-voltage distribution network three-phase state estimation method considering the measurement and control characteristics of the three-phase three-wire inverter power supply described in any one of Examples 1-13, see Figure 4 , the content is as follows:

[0255] The IEEE13 node system is used for simulation analysis, and the wiring is as follows Figure 4 The construction process is as follows: 1) Terminal 1 is selected as the power terminal, with the neutral point as the zero potential reference point, terminals 5 and 7 as the contact terminals, terminal 8 as the distributed power terminal, and the remaining terminals as the load terminals; 2) There are 12 branches in total, and the model of each branch is set to 501, and the phase spacing is the same; 3) The load terminals are all connected in star shape.

[0256] Figure 4 In the figure, □ represents the three-phase active power, three-phase reactive power, three-phase voltage amplitude and three-phase current amplitude of the low-voltage side of the distribution transformer and the load terminal measured by the three-meter method; △ represents the virtual measurement of the sum of the three-phase and neutral point current vectors being 0 under the three-phase four-wire connection mode; ○ represents the zero-power injection virtual measurement of the contact terminal; ■ represents the two-meter method of measuring the two-line active power, two-line reactive power, two-line voltage amplitude and two-phase current amplitude of the inverter power supply; ▲ represents the virtual measurement of the symmetrical condition and zero-sequence current being 0 under the three-phase three-wire connection mode.

[0257] This embodiment uses the system estimation error S1 and the maximum estimation error S2 as evaluation indicators, which are as follows:

[0258]

[0259] Wherein, represents the estimated value of the d-phase state quantity; represents the flow value of the d-phase state quantity; and n represents the number of endpoints in the low-voltage distribution network.

[0260] First, the influence of the three-phase three-wire inverter power measurement characteristics on the state estimation accuracy is analyzed. Under the three-phase symmetric and asymmetric conditions on the low-voltage side of the distribution transformer, the following power measurement schemes are set respectively:

[0261] Solution A1: The power measurement of the inverter power supply is the total active power and reactive power. The power, voltage and current measurement data are superimposed with random measurement errors that obey the normal distribution. The standard deviations of the measurement errors are 0.01, 0.005, and 0.005 respectively.

[0262] Scheme A2: The power measurement of the inverter power supply is the two sets of line-to-line active and reactive power in this paper, and each measurement data is superimposed with the random error of Scheme A1.

[0263] State estimation is performed for scheme A1 and scheme A2 respectively. The system estimation error and maximum estimation error of voltage amplitude and phase angle are shown in Table 1.

[0264] Table 1. State variable estimation error under scheme A

[0265]

[0266]

[0267] As shown in Table 1, the systematic error and maximum error of the voltage amplitude and the systematic error and maximum error of the voltage phase angle under the line-to-line power measurement method are smaller than those under the total power measurement method. The reason for this is that when the line-to-line active and reactive power are used as the measurement quantity, the relationship between them and the state quantity is closer and the degree of freedom is smaller. On the other hand, the number of line-to-line power measurements is more than that of total power measurements, and the enhanced redundancy improves the accuracy of state estimation.

[0268] Then, the influence of the control characteristics of the three-phase three-wire inverter power supply on the state estimation accuracy is analyzed. In the actual state estimation in the low-voltage distribution network, the existing method believes that the injected power of the connection endpoint in the low-voltage distribution network state estimation is 0, which is a condition that must be met, and it is necessary to assign a large weight or perform an equality constraint. The present invention believes that in addition to the connection endpoint, it is also necessary to consider the equality constraint that the sum of the phase current of each endpoint and the neutral point current is 0. In addition, the inverter power supply added to the three-phase three-wire grid-connected mode of the present invention also needs to satisfy the equality constraint that the zero-sequence current of the inverter power supply is 0. When the inverter power supply is in a symmetrical control mode, it is also necessary to consider the equality constraints of symmetrical current or symmetrical voltage. In order to verify the effectiveness of the state estimation model proposed in the present invention, the following simulation scheme is set:

[0269] Solution B1: Only consider the zero injection power equation constraint of the contact endpoint and superimpose random errors on the quantity measurement;

[0270] Scheme B2: Considering the zero injection power equation constraint of the interconnection endpoints, the equation constraint that the sum of the phase current of each endpoint and the neutral point current is 0, the zero-sequence current and symmetrical control equation constraint of the inverter power supply, the measurement data error setting is the same as that of Scheme B1.

[0271] State estimation is performed under schemes B1 and B2, and the comparison between voltage estimates and power flow values ​​of some endpoints is shown in Table 2.

[0272] Table 2 Comparison of voltage estimates and power flow values ​​of some endpoints under Scheme B

[0273]

[0274]

[0275] As shown in Table 2, when Scheme B1 only considers the zero-injection virtual measurement of the interconnection terminals, there is a large deviation between the voltage amplitude estimation value and the power flow value. For example, the voltage amplitude estimation value of phase a of terminal 8 is 0.9735, while the actual power flow value is 0.9670, and the voltage amplitude estimation value of phase b of terminal 13 is 0.9634, while the actual power flow value is 0.9727. The estimation of the three-phase voltage phase angle of each terminal has a small deviation from the power flow value, such as the estimation of the voltage phase angle of phase c of terminal 1 is 2.0893, while the actual power flow value is 2.0944, and the estimation of the voltage phase angle of phase b of terminal 8 is -0.0242, while the actual power flow value is -0.0254. However, the estimation of the neutral point voltage phase angle of the terminal has a very large deviation from the power flow value. The estimation of the neutral point voltage phase angle of terminal 5 is 1.6386, while the actual power flow value is 2.3185, and the estimation of the neutral point voltage phase angle of terminal 13 is 1.8102, while the actual power flow value is 2.1024. It can be seen that if only the zero-injection virtual measurement of the interconnection endpoint is considered and other virtual measurements that must be objectively met in the low-voltage distribution network are ignored, the accuracy of the state estimation result will be greatly reduced. Scheme B2 comprehensively considers the equation constraints of the interconnection endpoints, the sum of the phase current and the neutral point current, the zero-sequence current of the three-phase three-wire inverter power supply, and the symmetry conditions in the low-voltage distribution network. The estimated voltage amplitude and phase angle are less deviated from the flow value. For example, the estimated voltage amplitude of phase c at terminal 8 is 0.9526, while the actual flow value is 0.9523. The estimated voltage phase angle of phase b at terminal 13 is -2.1142, and the actual flow value is -2.1176. It can be seen that the method of the present invention improves the accuracy of state estimation while increasing the redundancy of measurement, verifying its effectiveness.

[0276] Embodiment 15:

[0277] For the simulation verification of the low-voltage distribution network three-phase state estimation method considering the measurement and control characteristics of the three-phase three-wire inverter power supply described in any one of Examples 1-13, see Figure 4 , the content is as follows:

[0278] In order to verify the influence of the low-voltage distribution network robust state estimation model proposed in the present invention on abnormal data and missing data, the following simulation scheme is set:

[0279] Solution C1: There is no missing data or bad data in the system. Random errors are superimposed on the measured data, and the proposed method and conventional weighted least squares (WLS) are used for state estimation.

[0280] Scheme C2: There are missing data and abnormal data in the system, and the same random errors as scheme L1 are superimposed on the measured data. Assume that the a-phase voltage at the load 13 terminal is abnormal data (the voltage amplitude is 80% of the power flow value), and the a-phase active power at the load 4 terminal is missing data (recorded as 0), and use the proposed method and WLS method for state estimation respectively.

[0281] The simulation calculations were carried out under the conditions of Scheme C1 and Scheme C2. The system estimation error and system maximum error obtained by the low-voltage distribution network through the anti-difference state estimation are shown in Table 3. It can be seen that when there is no abnormal data and missing data in the low-voltage distribution network system, the amplitude system error obtained by the model proposed in this paper and the traditional WLS are both at the E-2 level, the phase angle system error is at the E-1 level, the maximum amplitude error is at the E-3 level, and the maximum phase angle error is at the E-2 level, but the estimation error of the model proposed in this paper is smaller. When there are a few abnormal data and missing data in the system, the amplitude system error obtained by the traditional WLS method increases to the E-1 level, the phase angle estimation is seriously inconsistent with the flow value, the phase angle system error is 1.7771, and the maximum amplitude and phase angle errors are also significantly increased. The reason for this situation is that the traditional WLS method cannot identify and eliminate abnormal data, which has the same weight as normal data, making the estimation results seriously deviate from reality. The maximum errors of amplitude and phase angle of the model proposed in this paper are still at levels E-3 and E-2, and the maximum errors of amplitude and phase angle are still at levels E-2 and E-1, which are not much different from those when there is no bad data. This shows that the method proposed in this paper can accurately estimate the actual operation of the low-voltage distribution network both in the absence of abnormal data and in the presence of abnormal data.

[0282] The reasons for the high accuracy of the present invention are: 1. an exponentially weighted least squares estimation model is adopted, and the weight of the corresponding quantity measurement is changed based on the residual in the state estimation iteration process, so as to reduce or even eliminate the influence of abnormal data and missing data on the state estimation result as much as possible; 2. the zero injection power of the connection terminal, the relationship between the phase current of each terminal and the neutral point current, the zero-sequence current and the symmetry condition of the inverter power supply that must be objectively met are used as virtual measurements and equation constraints, so as to increase the redundancy of the quantity measurement in the state estimation, make the state valuation degree of freedom smaller, and thus improve the accuracy of the estimation.

Claims

1. A three-phase state estimation method for a low-voltage distribution network considering the measurement and control characteristics of a three-phase three-wire inverter power supply, characterized in that: The following steps are involved: 1) Construct low-voltage distribution network measurement equation based on smart meters; 2) Based on the low-voltage distribution network measurement equation, construct the measurement and control characteristic equation; 3) Based on the measurement and control characteristic equation and the exponentially weighted least squares estimation model, a three-phase state estimation model of the low-voltage distribution network is constructed considering the measurement and control characteristics of the three-phase three-wire inverter power supply; 4) Solve the three-phase state estimation model of the low-voltage distribution network and obtain the three-phase state estimation results of the low-voltage distribution network.

2. The method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply according to claim 1 is characterized in that: The low-voltage distribution network measurement equations include the distribution transformer low-voltage side and load measurement equations based on the three-meter method, and the inverter power supply measurement equations based on the two-meter method; The distribution transformer low voltage side and load measurement equations include a three-phase active power measurement equation, a three-phase reactive power measurement equation, a three-phase voltage amplitude measurement equation, a three-phase current amplitude measurement equation, and a virtual measurement equation in which the sum of the three-phase current and the neutral line current vector is 0, with the neutral point of each end point as a reference; The inverter power supply measurement equations include line-to-line active power measurement equations, line-to-line reactive power measurement equations, line-to-line voltage amplitude measurement equations, phase current measurement equations, virtual measurement equations with zero-sequence current being 0, and symmetrical current constraint equations.

3. The method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply according to claim 1 is characterized in that: In the distribution transformer low-voltage side and load measurement equations, the three-phase active power measurement equation and the three-phase reactive power measurement equation are as follows: Where d is the phase number, d∈B p ,B p ={a,b,c}; n is the phase number; t is the phase number, and t∈B1,B1={a,b,c,n}; P i dn It indicates the active power of phase d on the low voltage side of the load or distribution transformer relative to the neutral point; It indicates the reactive power of phase d on the low voltage side of the load or distribution transformer relative to the neutral point; and express The real and imaginary parts of Represents the endpoint admittance matrix of the d-phase and t-phase lines; f i d express The real and imaginary parts of f i n express The real and imaginary parts of represents the voltage of phase d at load terminal j; represents the voltage of phase n at load terminal j; express The real and imaginary parts of It represents the voltage of phase t at the load terminal k; is a collection of endpoints; The three-phase voltage amplitude measurement equation is as follows: In the formula, It represents the voltage amplitude of phase d relative to the neutral point at load terminal i. The three-phase current amplitude measurement equation is as follows: In the formula, It represents the current amplitude of phase d at load terminal i.

4. The method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply according to claim 2 is characterized in that: In the inverter power supply measurement equation, the line-to-line active power measurement equation and the line-to-line reactive power measurement equation are as follows: Where α is the phase number, α∈B0, B0={a,b}; Indicates the active power between phase α and phase c on the low-voltage side of the load or distribution transformer; It indicates the reactive power between phase α and phase c on the low voltage side of the load or distribution transformer; and express The real and imaginary parts of B represents the endpoint admittance matrix of the α-phase and t-phase lines; p ={a,b,c}; express The real and imaginary parts of It represents the voltage of phase t at the load terminal k; express The real and imaginary parts of express The real and imaginary parts of represents the voltage of phase α at the end point v; represents the voltage of phase α at terminal c; Represents a collection of endpoints; The line voltage amplitude measurement equation is as follows: In the formula, It represents the voltage amplitude of phase α relative to phase c at the load end point v. The phase current measurement equation is as follows: In the formula, It represents the current amplitude of phase α at the load terminal v; t is the phase number, and t∈B1, B1={a,b,c,n}.

5. The method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply according to claim 1 is characterized in that: The measurement and control characteristic equation includes the symmetrical control constraints of the three-phase three-wire inverter power supply, the asymmetrical zero-sequence current constraints, and the constraint that the sum of the three-phase current of the load and the neutral line current vector on the low-voltage side of the distribution transformer is 0.

6. The method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply according to claim 5 is characterized in that: The constraint that the sum of the three-phase current on the low-voltage side of the distribution transformer and the current vector of the load and the neutral line is 0 is as follows: Where δ is the phase number, and δ∈B1, B1={a,b,c,n}; and express The real and imaginary parts of Represents the endpoint admittance matrix of the δ-phase and t-phase lines; express The real and imaginary parts of It represents the voltage of phase t at the load terminal k; t is the phase number, and t∈B1,B1={a,b,c,n}; is the set of endpoints connected to endpoint j and includes endpoint j; The asymmetric zero-sequence current constraint is as follows: In the formula, Represents a set of endpoints; B0 = {a, b}; and express The real and imaginary parts of Represents the endpoint admittance matrix of the α-phase and t-phase lines; Consider the symmetrical control constraints of the three-phase three-wire inverter power supply as follows: Where imag(·) and real(·) are functions that return the imaginary and real parts, respectively; I a ,I b ,I c are the three-phase current amplitudes of distributed power sources respectively.

7. The method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply according to claim 1 is characterized in that: The exponentially weighted least squares estimation model is as follows: Where J(x) represents the objective function value; x represents the state quantity, including the voltage amplitude and phase angle of the three-phase and neutral point at the endpoints; z represents the quantity measurement; h(x) represents the measurement function; W represents the weight matrix of the quantity measurement; c(x) represents the equality constraint equation.

8. The method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply according to claim 7 is characterized in that: The diagonal elements of the weight matrix W are recorded as Right now: In the formula, represents a fixed weight matrix; σ represents the Parzen window width The standardized residual r of the measurement Ni As shown below: In the formula, r i Represents the measurement residual; R is the inverse matrix of the fixed weight matrix; (KR) ii In the above formula, the subscript ii represents the set of diagonal elements of the matrix KR in the brackets; The residual sensitivity matrix K is shown below: K=I-H(H T WH) -1 H T W (13) Where I is the unit matrix; H is the Jacques matrix corresponding to the quantity measurement.

9. The method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply according to claim 1 is characterized in that: The three-phase state estimation model of low-voltage distribution network is solved by Lagrange multipliers and Newton-Raphson method.

10. The method for estimating the three-phase state of a low-voltage distribution network taking into account the measurement and control characteristics of a three-phase three-wire inverter power supply according to claim 9, characterized in that: The steps of solving the three-phase state estimation model of the low-voltage distribution network include: 1) The Lagrange multiplier λ is introduced into the three-phase state estimation model of the low-voltage distribution network to form the unconstrained optimization objective of the augmented Lagrangian function L(x,λ), namely: In the formula, J(x) represents the objective function value; x represents the state quantity, including the voltage amplitude and phase angle of the three-phase and neutral point at the endpoints; z represents the quantity measurement; h(x) represents the measurement function; W represents the weight matrix of the quantity measurement; c(x) represents the equality constraint equation; 2) The Newton-Raphson method is used to solve the unconstrained optimization objective, obtain the three-phase state estimation result of the low-voltage distribution network, and establish the correction equation; The correction equation is as follows: In the formula, H represents h(x s ) corresponding to the Jacobian matrix; C represents c(x s ) corresponding to the Jacobian matrix; s represents the number of iterations; Δx s is the correction amount; s is the Lagrange multiplier of the sth iteration; h(x s ) represents the measurement function of the sth iteration; c(x s ) represents the equality constraint equation of the sth iteration; 3) Determine the correction amount Δx s Satisfy max(|Δx s |)<ε and the number of iterations s satisfies s≤T max Is it true? If so, output the three-phase state estimation result of the low-voltage distribution network; if max(|Δx s |)≥ε and s≤T max , then set the number of iterations s = s + 1, and return to step 2); if max(|Δx s |)≥ε and s>T max , then the output is "non-convergence" result; T max is the maximum number of iterations, and ε is the correction threshold.

Citation Information

Cited By

  • Low-voltage transformer area power grid three-phase dynamic state estimation method based on data fusion technology

    CN119518760A