Gas-water coordinated peak regulation operation optimization method and system
Through the gas-water coordinated peak shaving operation optimization method, combined with the water abandonment and gas and power operating cost models, the gas and power operation is optimized, which solves the high cost and resource waste problems of multi-energy coordinated peak shaving technology under the influence of the natural environment, and realizes the development of clean energy. Efficient utilization and economics and stability of power systems.
Patent Information
- Application Number
- CN202310342346.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-01
AI Technical Summary
Existing multi-energy coordinated peak shaving technology leads to high operating costs, waste of resources, and easily endangers the safe and stable operation of the power system in areas affected by natural environment and climatic conditions. It also hinders the development of thermal power and affects the configuration of peak shaving power sources.
Using the gas-water coordinated peak-shaving operation optimization method, by constructing a water abandonment calculation model and a gas and power operating cost model, combined with a coupling optimization model, the water abandonment and gas and power operating costs are optimized, and the gas power generation is quickly started and stopped, and has low carbon characteristics to reduce water abandonment. Opportunity losses and gas and electricity operating costs to achieve optimal economic distribution of loads.
It reduces the loss of water abandonment opportunities in the system and the operating costs of gas and electricity, increases the consumption rate of clean energy such as hydropower, reduces the output fluctuation during peak regulation, reduces the risk of power system instability, and promotes the efficient use of clean energy.
Smart Images

Figure CN118739319A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of clean energy multi-energy complementary coordinated peak regulation, and specifically relates to a gas-water coordinated peak regulation operation optimization method and system. Background Art
[0002] At present, most studies on multi-energy coordinated peak-shaving are to build a model with the minimum amount of abandoned hydroelectric power, and use thermal power, wind power, photovoltaic power or energy storage equipment to coordinate hydroelectric peak-shaving, and thermal power often serves as the system peak-shaving power source. However, the cost of energy storage equipment is too high and is affected by the natural environment and climatic conditions. The randomness and volatility of wind power and photovoltaic power output are large, which can easily endanger the safe and stable operation of the power system; the development of thermal power is hindered under the background of "dual carbon", which is bound to affect the configuration of peak-shaving power sources, and the goal of minimizing the amount of abandoned hydroelectric power is often achieved by reducing the power generation of the overall peak-shaving power source, but it does not necessarily reduce the cost of power generation. Therefore, it is urgent to seek efficient, stable, and low-carbon peak-shaving power sources, increase the absorption rate of clean energy such as hydropower, and improve the economy of peak-shaving operation of the power system. Summary of the invention
[0003] In view of some regions (such as Sichuan and Chongqing), which are affected by natural environment and climate conditions, the existing multi-energy coordinated peak-shaving technology leads to high operating costs, waste of resources, and easy endangerment of safe and stable operation of the power system. The present invention provides a gas-water coordinated peak-shaving operation optimization method and system. The present invention utilizes the advantages of gas-fired power generation such as fast start and stop and low carbon, adopts gas-fired power coordination and hydropower peak-shaving operation, reduces the opportunity loss of water abandonment and the operating cost of gas-fired power, and optimizes the peak-shaving output.
[0004] The present invention is achieved through the following technical solutions:
[0005] A gas-water coordinated peak-shaving operation optimization method, the method comprising:
[0006] According to the planned output of hydropower stations and gas power stations in the power system and the system load demand, a water abandonment calculation model is constructed;
[0007] Conduct gas turbine load rate sensitivity analysis and build a system gas-electricity operation cost model;
[0008] The abandoned water calculation model and the system gas-power operation cost model are coupled to obtain a gas-water coordinated peak-shaving optimization model with the objective function of minimizing the sum of the opportunity loss of electricity caused by the abandoned water and the operation cost of the gas-powered power station, and with the abandoned water electricity, unit output and unit capacity as constraints;
[0009] Based on the gas-water coordinated peak-shaving optimization model, the gas-water opportunity loss cost and the gas-electricity operation cost are optimized.
[0010] The present invention quantifies the loss of abandoned water as the opportunity loss of abandoned water electricity, utilizes the law that the kilowatt-hour of gas-steam combined cycle units changes with the load rate, takes into account the gas-fired power generation cost under different gas-fired power outputs, and comprehensively considers the constraints such as abandoned water electricity, unit output, and unit capacity. A gas-water coordinated peak-shaving operation analysis model is constructed, which can provide a reasonable peak-shaving power station output plan for the peak-shaving of the power system. It has the significant advantage of replacing thermal power and coordinating hydropower peak-shaving. The output volatility of the peak-shaving process is low, which minimizes the risk of instability in the power system, and can further promote the efficient use of clean energy in the power system.
[0011] As a preferred embodiment, the abandoned water volume calculation model constructed by the present invention is:
[0012]
[0013] Where W ab is the total abandoned hydropower of the system on a typical day, MWh, Ph i,t is the planned output of hydropower station i at time t, MW; Pg j,t is the planned output of gas power plant j at time t, MW; Pl t is the system load at time t, MW; Δt is the duration of each time period; T is the total number of time periods; I is the total number of hydropower stations; J is the total number of gas power stations.
[0014] As a preferred embodiment, the system gas-electricity operation cost model constructed by the present invention is:
[0015]
[0016] In the formula, C j,g,t Pg is the electricity cost of gas power station j at time t, RMB / kWh; j,t is the output of gas power station j at time t, MW; is the rated installed capacity of gas power station j, MW; b j is the intercept, yuan / kWh; -a j is the slope, yuan / kWh.
[0017] As a preferred embodiment, the constraints of the optimization model of the present invention include:
[0018] System maximum water abandonment constraint: The amount of water abandoned during coordinated gas-water peak regulation cannot exceed the maximum water abandonment limit under the planned hydropower output;
[0019] System power constraint: The sum of the planned output of the hydropower station and the planned output of the gas power station should be greater than or equal to the system load;
[0020] Hydropower station output constraints: The output of a hydropower station needs to be within its upper and lower limits;
[0021] Gas power station output constraints: The output of a gas power station needs to be within its upper and lower limits;
[0022] Capacity balance constraint: The installed capacity of hydropower stations and gas power stations is equal to the sum of their working capacity and reserve capacity respectively.
[0023] As a preferred embodiment, the objective function of the optimization model of the present invention is:
[0024]
[0025]
[0026] In the formula, C h is the on-grid electricity price for hydropower, RMB / kWh; Ph i,t is the planned output of hydropower station i at time t, MW; Pg j,t is the output of gas power station j at time t, MW; Pl t is the system load at time t, MW; is the rated installed capacity of gas power plant j, MW; Δt is the duration of each time period; T is the total number of time periods.
[0027] As a preferred embodiment, the present invention optimizes the gas-water opportunity loss cost and the gas-electricity operation cost, specifically including:
[0028] Obtain system load data, gas-fired power operation parameters, electricity price parameters, and upper and lower limits of hydropower and gas-fired power station output;
[0029] The parameters of the optimization model are obtained by fitting the gas-electricity cost curve;
[0030] If the sum of the planned output of the hydropower station and the minimum output of the gas power station is greater than or equal to the system load demand, water abandonment will occur, and the opportunity loss cost of water abandonment and the gas-fired power operation cost at that moment will be optimized; if the sum of the planned output of the hydropower station and the minimum output of the gas power station is less than the system load demand, no water abandonment will occur, and the system gas-fired power operation cost at that moment will be optimized.
[0031] In a second aspect, the present invention proposes a gas-water coordinated peak load operation optimization system, the system comprising:
[0032] The abandoned water volume calculation module builds an abandoned water volume calculation model based on the planned output of the hydropower station in the power system, the planned output of the gas power station and the system load demand;
[0033] Gas-fired power operation cost module, which conducts gas turbine load rate sensitivity analysis and builds a system gas-fired power operation cost model;
[0034] A coupling module couples the abandoned water volume calculation model with the system gas-power operation cost model to obtain a gas-water coordinated peak-shaving optimization model with the objective function of minimizing the sum of the opportunity loss of electricity caused by the abandoned water volume and the operation cost of the gas-powered power station and with the abandoned water volume, unit output and unit capacity as constraints;
[0035] The optimization module optimizes the gas-water opportunity loss cost and the gas-electricity operation cost based on the gas-water coordinated peak-shaving optimization model.
[0036] As a preferred embodiment, the optimization module of the present invention includes a parameter acquisition unit, a fitting calculation unit and a judgment unit;
[0037] Wherein, the parameter acquisition unit is used to obtain system load data, gas-power operation parameters, electricity price parameters, and upper and lower limits of hydropower and gas-power station output;
[0038] The fitting calculation unit obtains the parameters of the optimization model by fitting the gas-electricity kilowatt-hour cost curve;
[0039] When the sum of the planned output of the hydropower station and the minimum output of the gas power station is greater than or equal to the system load demand, the judgment unit optimizes the opportunity loss cost of water abandonment and the gas-fired power operation cost at that moment; when the sum of the planned output of the hydropower station and the minimum output of the gas power station is less than the system load demand, the judgment unit optimizes the system gas-fired power operation cost at that moment.
[0040] The present invention has the following advantages and beneficial effects:
[0041] 1. The present invention utilizes the characteristics of gas-fired power generation such as fast start and stop and low carbon, and comprehensively considers the opportunity loss of water abandonment and the operating cost of gas-fired power. Compared with the peak-shaving technology that only uses the minimum amount of water abandonment, it can reduce the opportunity loss of water abandonment and the operating cost of gas-fired power, achieve the optimal economic distribution of loads, and enable hydropower to better track load peak and valley fluctuations, optimize peak-shaving output, and improve the absorption rate of clean energy such as hydropower.
[0042] 2. The present invention can provide a reasonable peak-shaving power station output plan for the peak-shaving of the power system, and has the significant advantage of replacing thermal power and coordinating hydropower peak-shaving. The output volatility during the peak-shaving process is low, which reduces the risk of power system instability to a minimum, and can further promote the efficient use of clean energy in the power system.
[0043] 3. The present invention alleviates the peak load regulation difficulties in areas affected by natural environment and climate conditions (such as Sichuan and Chongqing), can promote the efficient use of clean energy, improve the economic efficiency of peak load regulation of the power system, and provide technical support for improving the current energy development status in Sichuan and Chongqing. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0045] Figure 1 The figure is a schematic diagram of a method flow of an embodiment of the present invention.
[0046] Figure 2 This is a curve diagram showing the change in the cost per kilowatt-hour of a gas-steam combined cycle unit according to an embodiment of the present invention as a function of the gas turbine load rate.
[0047] Figure 3 The figure is a schematic diagram of the optimization process of an embodiment of the present invention.
[0048] Figure 4 4 is a system principle block diagram of an embodiment of the present invention.
[0049] Figure 5 Typical daily load information.
[0050] Figure 6 These are typical daily output data for gas power stations in Sichuan.
[0051] Figure 7 These are typical daily output data for hydropower stations in Sichuan.
[0052] Figure 8 It is the total output data of gas-water coordinated peak regulation on a typical day.
[0053] Fig. 9 This is the total output curve of each power station on a typical day.
[0054] Fig.10 This is a comparison chart of the total cost of system peak load operation under the two modes. DETAILED DESCRIPTION
[0055] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0056] Example 1
[0057] Most of the existing studies on multi-energy coordinated peak-shaving are to build a model with the minimum amount of abandoned hydropower, and use thermal power, wind power, photovoltaics or energy storage equipment to coordinate hydropower peak-shaving. Thermal power often serves as the system peak-shaving power source, with high operating costs, large carbon emissions, and is likely to endanger the safe and stable operation of the power system. At the same time, the development of thermal power is limited under the background of "dual carbon", which will inevitably affect the configuration of peak-shaving power sources. Therefore, the application of existing technologies based on thermal power peak-shaving is limited. Based on this, this embodiment proposes a gas-water coordinated peak-shaving operation optimization method. The method proposed in this embodiment adopts a gas-power coordinated hydropower peak-shaving operation mode to reduce the opportunity loss of abandoned water and the operating cost of gas-power, optimize the peak-shaving capacity, solve the peak-shaving dilemma of hydropower in Sichuan and Chongqing, promote the development of clean energy peak-shaving in the power system and the commissioning of gas-powered units, alleviate the dilemma of hydropower abandonment in Sichuan and Chongqing and promote the natural gas consumption rate.
[0058] Among them, the basic principles of gas-fired power coordination and hydropower peak load regulation are:
[0059] When hydropower and gas-fired power are coordinated, the purpose is to maximize the use of clean hydropower. When hydropower and gas-fired power are coordinated, in order to give priority to the use of clean hydropower, hydropower in the flood season is mostly in full production, and the remaining load is small. At this time, gas-fired power can be used for peak load regulation to supplement the remaining load. Due to the limitation of the minimum output of gas-fired power stations, after the hydropower station provides base load operation, the sum of the outputs of various gas-fired power stations may exceed the remaining load capacity, resulting in abandoned water. In the dry season, due to the reduction of hydropower output, a large gas-fired power peak load capacity is required to meet the system load demand, but the corresponding increase in gas-fired power operation costs, the gas-fired power operation costs can be reduced by reasonably arranging the output of each gas-fired power station.
[0060] Specific as Figure 1 As shown, the method proposed in this embodiment includes the following steps:
[0061] Step 1: Build a water abandonment calculation model based on the power system output and load demand.
[0062] Specifically, when the total installed capacity of gas power stations and hydropower stations is greater than the load demand, assuming that the planned output of hydropower station i at time t (load valley) is Ph i,t , then there are two situations. One is that the planned output of the hydropower station plus the minimum output of the gas power station is greater than the load demand. At this time, the planned output of the hydropower station must be reduced, resulting in abandoned water. The other situation is that the planned output of the hydropower station plus the minimum output of the gas power station is less than the load demand. By reasonably arranging the planned output of the hydropower station and the output of the gas power station, the sum of the two is equal to the load demand, and the abandoned water at this moment is 0. Based on this, according to the planned output of the hydropower station, the planned output of the gas power station and the system load demand, the abandoned water calculation model shown in the following formula (1) can be constructed:
[0063]
[0064] Where W ab is the total abandoned hydropower of the system on a typical day, MWh, Ph i,t is the planned output of hydropower station i at time t, MW; Pg j,t is the planned output of gas power plant j at time t, MW; Pl t is the system load at time t, MW; Δt is the duration of each period, which is 1h; T is the total number of periods; I is the total number of hydropower stations; J is the total number of gas power stations.
[0065] The objective function to minimize the amount of abandoned water is:
[0066]
[0067] If the goal is only to minimize the amount of abandoned water, it can meet the goal of reducing the amount of abandoned water during low-load periods, but it ignores the economic operation mode of the gas-fired power plant, which will inevitably increase the cost of gas-fired power peak regulation. If the optimal output of the gas-fired power plant is achieved, the goal of economic load distribution can be achieved.
[0068] Step 2: Analyze the sensitivity of gas turbine load rate and build a gas-fired power operation cost model.
[0069] Specifically, taking a 270MW 9F gas-steam combined cycle unit as an example, when the ambient temperature is 25°C, the unit price of natural gas is 2.5 yuan / Nm 3 Under the condition of annual utilization hours of 2500h, the curve of gas-electricity cost changing with the load rate of the unit is obtained, as shown in Figure 2 shown.
[0070] Depend on Figure 2 It can be seen that the average cost per kilowatt-hour of a combined cycle gas turbine increases as the load rate of the gas turbine decreases. This is because the lower the load rate of the gas turbine, the lower the efficiency of the combined cycle gas turbine, resulting in increased costs. Fitting the cost per kilowatt-hour curve, the cost per kilowatt-hour curve is roughly in the form of a linear function, and the following relationship is obtained:
[0071]
[0072] In the formula, C j,g,t Pg is the electricity cost of gas power station j at time t, RMB / kWh; j,t is the output of gas power station j at time t, MW; is the rated installed capacity of gas power station j, MW; b j is the intercept, yuan / kWh; -a j is the slope, yuan / kWh.
[0073] Step 3: Couple the abandoned water calculation model and the gas-fired power plant operation cost model to construct a gas-water coordinated peak-shaving optimization model with the objective function of minimizing the sum of the opportunity loss of electricity caused by the abandoned water and the operation cost of the gas-fired power plant.
[0074] Specifically, in order to ensure full utilization of hydropower resources, hydropower is often used to undertake base load operation and gas power to undertake peak load operation during the flood season. However, due to the limitation of gas power output, water abandonment may occur during the low load period. Since the peak load margin of hydropower is insufficient at this time, this amount of abandoned water has an opportunity loss. At the same time, excessive increase in gas power output during peak load periods will increase the gas power operation cost of the system. Therefore, it is necessary to comprehensively consider the opportunity damage caused by abandoned water and the economy of system peak load operation. Using the constructed gas kilowatt-hour cost function and abandoned water calculation model, an optimization model is constructed to minimize the sum of the opportunity loss of electricity caused by abandoned water and the operating cost of the gas power station. The objective function is shown in formula (4):
[0075]
[0076] In the formula, C h is the on-grid electricity price of hydropower, RMB / kWh; C j,g,t Pg is the electricity cost of gas power station j at time t, RMB / kWh; j,t is the output of gas power station j at time t, MW; J is the number of gas power stations; Δt is the duration of each time period, which is 1h; T is the total number of time periods.
[0077] Substituting equations (1) and (3) into the objective function, the final objective function is:
[0078]
[0079]
[0080] The constraints of gas-water coordinated peak load regulation include:
[0081] (1) Constraints on the maximum amount of water discarded by the system
[0082] In order to make full use of clean hydropower, the amount of water abandoned in the coordinated peak regulation of gas and water cannot exceed the maximum water abandonment limit under the planned hydropower output, as shown in the following formula (6):
[0083]
[0084] Where Ph i,t,min is the lower limit of the output of hydropower station i at time t, MW; Pl t is the system load value at time t, MW.
[0085] (2) System power constraints
[0086] The hydropower station estimates the power generation based on the water supply one day before the dispatch date. This is the planned output of the hydropower station. The actual output may not necessarily be in accordance with the planned output, and the actual output may be less than the planned output. In this embodiment, the sum of the planned output of gas power and hydropower satisfies the requirement of being greater than or equal to the system load. If it is equal to the load after optimization, there is no water abandonment. If it is greater than the load after optimization, water is abandoned by the hydropower station to meet the load balance. The planned output of hydropower minus the abandoned output is the actual output. Therefore:
[0087] The sum of the planned output of the system's hydropower stations and the planned output of the gas power stations should be greater than or equal to the system load, so as to ensure that when the actual output is less than the planned output, the load power balance can still be met, as shown in the following formula (7):
[0088]
[0089] (3) Hydropower station output constraints
[0090] The output of the hydropower station needs to be within its upper and lower limits, as shown in the following formula (8):
[0091] Ph i,t,min ≤Ph i,t ≤Ph i,t,max (8)
[0092] Where Ph i,t,min Ph i,t,max They are the lower and upper limits of the output of hydropower station i at time t, both in MW.
[0093] (4) Gas-fired power plant output constraints
[0094] The output of the gas power station needs to be within its upper and lower limits, as shown in the following formula (9):
[0095] Pg j,min ≤Pg j,t ≤Pg j,max (9)
[0096] Where Pg j,min , Pg j,max They are the lower and upper limits of the output of gas power station j, both in MW.
[0097] (5) Capacity balance constraints
[0098] The installed capacity of a hydropower station and a gas power station is equivalent to the sum of their working capacity and reserve capacity, respectively, as shown in the following formula (10):
[0099]
[0100] In the formula, Ehc i , Egc jare the installed capacity of hydropower station i and gas power station j, both in MW; Wh i , Wg j are the operating capacities of hydropower station i and gas power station j, both in MW; Rh i , Rg j They are the reserve capacities of hydropower station i and gas power station j, both in MW.
[0101] Step 4: Based on the gas-water coordinated peak-shaving optimization model, optimize the gas-water opportunity loss cost and gas-electricity operation cost.
[0102] Specifically, since the gas-water coordinated peak-shaving model of this embodiment involves peak-shaving strategies for different periods of time, the model to be solved is a typical MINLP model, so the mature commercial optimization software package LINGO programming can be used to solve the model, such as Figure 3 As shown, the specific steps include:
[0103] Step 41, obtaining system load data, gas-fired power operation parameters, electricity price parameters, and upper and lower limits of hydropower and gas-fired power station outputs;
[0104] Step 42, using the gas-electricity kilowatt-hour cost curve to fit the parameters of the optimization model;
[0105] Step 43, determine whether water abandonment occurs: if the sum of the planned output of the hydropower station and the minimum output of the gas power station is greater than or equal to the system load demand, water abandonment occurs. By using the optimization model and nonlinear programming theory, the type of the constructed model can be automatically identified by the LINGO solver. By identifying that the model belongs to the MINLP model, the built-in branch and bound algorithm is called to optimize the opportunity loss cost of water abandonment and the gas-fired power operation cost at that moment; if the sum of the planned output of the hydropower station and the minimum output of the gas power station is less than the system load demand, no water abandonment occurs. In the process of solving the problem using the LINGO compiler, the gas-fired power operation cost of the system at that moment is optimized based on the principle of slight increase rate of gas-fired power generation unit consumption.
[0106] This embodiment also proposes a gas-water coordinated peak load regulation operation system, such as Figure 4 As shown, the system includes:
[0107] The abandoned water volume calculation module builds an abandoned water volume calculation model based on the power system output and load requirements;
[0108] Gas-fired power operation cost module, which analyzes the sensitivity of gas turbine load rate and builds a gas-fired power operation cost model;
[0109] The coupling module couples the abandoned water volume calculation model with the gas-fired power generation operation cost model to obtain a gas-water coordinated peak-shaving optimization model with the goal of minimizing the sum of the opportunity loss of electricity caused by abandoned water volume and the gas-fired power generation operation cost;
[0110] The optimization module optimizes the gas-water opportunity loss cost and gas-electricity operation cost based on the gas-water coordinated peak-shaving optimization model.
[0111] In an optional implementation manner, the above-mentioned optimization module further includes:
[0112] Parameter acquisition unit, used to obtain system load data, gas-fired power operation parameters, electricity price parameters, and upper and lower limits of hydropower and gas-fired power station output;
[0113] The fitting calculation unit uses the gas-electricity cost curve to fit and obtain the parameters of the optimization model;
[0114] The judgment unit optimizes the opportunity loss cost of water abandonment and the gas-fired power operation cost at that moment by using the optimization model and nonlinear programming theory when the sum of the planned output of the hydropower station and the minimum output of the gas-fired power station is greater than or equal to the system load demand; and optimizes the system gas-fired power operation cost at that moment by using the optimization model and nonlinear programming theory when the sum of the planned output of the hydropower station and the minimum output of the gas-fired power station is less than the system load demand.
[0115] This embodiment also provides a computer device for executing the above method of this embodiment.
[0116] A computer device includes a processor, an internal memory, and a system bus; various device components including the internal memory and the processor are connected to the system bus. A processor is a piece of hardware used to execute computer program instructions through basic arithmetic and logical operations in a computer system. An internal memory is a physical device used to temporarily or permanently store computer programs or data (e.g., program status information). The system bus can be any of the following types of bus structures, including a memory bus or memory controller, a peripheral bus, and a local bus. The processor and the internal memory can communicate data through the system bus. The internal memory includes a read-only memory (ROM) or a flash memory (not shown in the figure), and a random access memory (RAM), which usually refers to the main memory loaded with the operating system and computer programs.
[0117] Computer devices generally include an external storage device. The external storage device can be selected from a variety of computer-readable media, which refers to any available media that can be accessed by the computer device, including both removable and fixed media. For example, computer-readable media include, but are not limited to, flash memory (micro SD card), CD-ROM, digital versatile disk (DVD) or other optical disk storage, magnetic tape cassettes, magnetic tapes, magnetic disk storage or other magnetic storage devices, or any other medium that can be used to store the desired information and can be accessed by the computer device.
[0118] Computer devices can be logically connected to one or more network terminals in a network environment. Network terminals can be personal computers, servers, routers, smart phones, tablets, or other public network nodes. Computer devices are connected to network terminals through network interfaces (local area network LAN interfaces). Local area network (LAN) refers to a network of computers interconnected within a limited area, such as a home, school, computer laboratory, or office building using network media. WiFi and twisted pair cabling Ethernet are the two most commonly used technologies for building LANs.
[0119] It should be noted that other computer systems including more or fewer subsystems than a computer device may also be suitable for the invention.
[0120] As described in detail above, the computer device applicable to the present embodiment can perform the specified operations of the gas-water coordinated peak-shaving operation method. The computer device performs these operations in the form of software instructions running in a computer-readable medium through a processor. These software instructions can be read into the memory from a storage device or from another device through a local area network interface. The software instructions stored in the memory enable the processor to execute the above-mentioned group member information processing method. In addition, the present invention can also be implemented by hardware circuits or hardware circuits combined with software instructions. Therefore, the implementation of this embodiment is not limited to any specific combination of hardware circuits and software.
[0121] Example 2
[0122] This embodiment simulates and verifies the operation method proposed in the above embodiment 1, and the specific process is as follows:
[0123] (1) Select the installed capacity information of major large-scale hydropower stations in Sichuan and gas-fired power plants that have been put into operation or are to be built. Take a typical day in the flood season as the operation cycle, with a unit time of 1 hour.
[0124] The information of the four major hydropower stations in the lower reaches of the Jinsha River, namely the Xiluodu, Xiangjiaba, Wudongde and Baihetan hydropower stations, and the Sichuan gas-fired power plant are used as the basic implementation information for coordinated peak-shaving operation. Since the only large-scale gas-fired power generation project currently in operation in Sichuan is the Dazhou gas-fired power generation project, it is difficult to meet the system peak-shaving needs if only a single gas-fired power plant is used. The installed capacity configuration information of the Sichuan hydro-gas power plant is shown in Table 1-2.
[0125] Table 1 Main parameters of gas power plant
[0126]
[0127]
[0128] Table 2 Main parameters of hydropower station
[0129] Hydropower Station Name Development Method Installed capacity (10,000 kW) Wudongde Dam Type 1020 Baihetan Dam Type 1600 Xiluodu Dam Type 1260 Xiangjiaba Dam Type 600
[0130] (2) According to the 9F gas-steam combined cycle unit power cost curve, we can calculate a j 、b j , substitute it into formula (3), and then substitute it into formula (5) as a parameter.
[0131] Four gas power stations j 、b j They are as follows respectively: a1=a2=0.275 (yuan / kWh), b1=b2=0.7475 (yuan / kWh); a3=a4=0.3 (yuan / kWh), b3=b4=0.76 (yuan / kWh).
[0132] (3) Based on the typical daily average output of Wudongde, Baihetan, Xiluodu and Xiangjiaba, it is used as the planned output of each hydropower station. Is it true? If it is true, it means that there is water abandonment, and the sum of the opportunity loss of water abandonment in formula (5) and the operating cost of the gas power plant is minimized as the optimization goal; if it is not true, it means that only the gas power operation cost needs to be optimized, and the load value, gas power plant, hydropower station output constraints, installed capacity and spare capacity constraints are used as constraints. Since the objective function is a nonlinear function, a nonlinear algorithm is used to achieve optimization calculation. Typical daily load information is as follows Figure 5 shown.
[0133] (4) By optimizing the peak load operation of the above power grid information, the output information of each gas power station and hydropower station on a typical day is obtained, such as Figure 6-Figure 7 shown.
[0134] As can be seen from the figure, the output of the gas power stations in Guangyuan and Ziyang is relatively high throughout the entire cycle. This is due to the peak-shaving depth of the gas-steam combined cycle gas turbine. The larger the installed capacity of the 9H unit, the higher the peak-shaving depth, and the corresponding output is higher than that of the gas power stations in Dazhou and Neijiang. At the same time, it can be seen that the output and load of each hydropower station basically present a dynamic tracking mode, making full use of hydropower resources.
[0135] (5) The total output curve of gas-water coordinated peak regulation on a typical day is as follows Figure 8 As shown in the figure. As it is in the flood season, hydropower is mainly used as base load output. After 11:00, hydropower is used as peak load output. However, due to the constraint of the output upper limit, the peak load output is insufficient, and gas-fired power takes on part of the peak load. This peak load regulation method first ensures the consumption of hydropower. At the same time, since the output of gas-fired power peak regulation is generally stable, the risk brought by the frequent start and stop of gas-fired power units is reduced.
[0136] (6) Analyzing the planned hydropower output and the actual gas-fired power output curves, the planned hydropower output plus the gas-fired power output at 1-3 o'clock is greater than the load, resulting in water abandonment (such as Fig. 9 As shown in the figure, the amount of abandoned water power is already the optimized amount of power, that is, when the total output is greater than or equal to the load demand, the gas-fired power is already the minimum output, and the part exceeding the load is the minimum amount of abandoned water at that moment. Through the full-cycle operation, it can be seen that after optimization, abandoned water is only generated at 1-3 o'clock. On the one hand, there is a lower limit for gas-fired power output, and on the other hand, hydropower arranges the output plan according to the load demand. When the load drops sharply at 1-3 o'clock, the hydropower correspondingly reduces the planned output. When the load rises sharply at 10-12 o'clock, the planned output of hydropower increases accordingly, but the system still has a part of residual load, and the peak-shaving capacity of the gas-fired power station can meet the residual load demand of the system. Therefore, the gas-fired power can supplement the output at this time to achieve the purpose of peak-shaving and reducing the amount of abandoned water.
[0137] (7) In order to further highlight the superiority of the operation method proposed in the above embodiment, two schemes are designed for comparison, namely, the typical day load distribution is optimized and analyzed according to the models of "minimum opportunity loss of water abandonment" and "minimum opportunity loss of water abandonment + total cost of gas-fired power operation". The minimum amount of water abandonment and the operating cost of gas-fired power units on a typical day under the two models are obtained. The results are shown in Table 3 below. The corresponding total system operating cost at each moment is as follows: Fig.10 shown.
[0138] Table 3 Cost comparison under two models (ten thousand yuan)
[0139]
[0140] Depend on Fig.10 It can be seen that the total cost of system peak regulation of the goal of "minimizing the opportunity loss of water abandonment + gas-fired power operation" is lower than that of "minimizing the opportunity loss of water abandonment" after 3 o'clock, indicating that the operation method proposed in this embodiment can better realize the economic distribution of the load of the gas-fired power station. As shown in Table 3, the second model is used for peak regulation, and the gas-fired power operation cost in a typical day is saved by 556,800 yuan. This is because the model of formula (5) is used for optimization to achieve the optimal load distribution of the four gas-fired power stations in Dazhou, Neijiang, Ziyang and Guangyuan. Generally speaking, it not only achieves the purpose of reducing the amount of water abandonment and the opportunity loss of water abandonment, but also reduces the cost of gas-fired power peak regulation, thereby improving the economy of system operation.
[0141] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for optimizing gas-water coordinated peak load operation. It is characterized in that The method includes: According to the planned output of hydropower stations and gas power stations in the power system and the system load demand, a water abandonment calculation model is constructed; Conduct gas turbine load rate sensitivity analysis and build a system gas-electricity operation cost model; The abandoned water calculation model and the system gas-power operation cost model are coupled to obtain a gas-water coordinated peak-shaving optimization model with the objective function of minimizing the sum of the opportunity loss of electricity caused by the abandoned water and the operation cost of the gas-powered power station, and with the abandoned water electricity, unit output and unit capacity as constraints; Based on the gas-water coordinated peak-shaving optimization model, the gas-water opportunity loss cost and the gas-electricity operation cost are optimized.
2. According to the gas-water coordinated peak load operation optimization method of claim 1, It is characterized in that The constructed model for calculating the amount of abandoned water is: Where W ab is the total abandoned hydropower of the system on a typical day, MWh, Ph i,t is the planned output of hydropower station i at time t, MW; Pg j,t is the planned output of gas power plant j at time t, MW; Pl t is the system load at time t, MW; Δt is the duration of each time period; T is the total number of time periods; I is the total number of hydropower stations; J is the total number of gas power stations.
3. According to claim 2, a method for optimizing gas-water coordinated peak load operation, It is characterized in that The gas-electricity operation cost model of the system is constructed as follows: In the formula, C j,g,t Pg is the electricity cost of gas power station j at time t, RMB / kWh; j,t is the output of gas power station j at time t, MW; is the rated installed capacity of gas power station j, MW; b j is the intercept, yuan / kWh; -a j is the slope, yuan / kWh.
4. According to claim 1, a method for optimizing gas-water coordinated peak load operation, It is characterized in that The constraints of the optimization model include: System maximum water abandonment constraint: The amount of water abandoned during coordinated gas-water peak regulation cannot exceed the maximum water abandonment limit under the planned hydropower output; System power constraint: The sum of the planned output of the hydropower station and the planned output of the gas power station should be greater than or equal to the system load; Hydropower station output constraints: The output of a hydropower station needs to be within its upper and lower limits; Gas power station output constraints: The output of a gas power station needs to be within its upper and lower limits; Capacity balance constraint: The installed capacity of hydropower stations and gas power stations is equal to the sum of their working capacity and reserve capacity respectively.
5. According to the gas-water coordinated peak load operation optimization method of claim 4, It is characterized in that The objective function of the optimization model is: In the formula, C h is the on-grid electricity price for hydropower, RMB / kWh; Ph i,t is the planned output of hydropower station i at time t, MW; Pg j,t is the output of gas power station j at time t, MW; Pl t is the system load at time t, MW; is the rated installed capacity of gas power plant j, MW; Δt is the duration of each time period; T is the total number of time periods.
6. A method for optimizing gas-water coordinated peak load operation according to any one of claims 1 to 5, It is characterized in that Optimize the gas and water opportunity loss costs and gas and electricity operation costs, including: Obtain system load data, gas-fired power operation parameters, electricity price parameters, and upper and lower limits of hydropower and gas-fired power station output; The parameters of the optimization model are obtained by fitting the gas-electricity cost curve; If the sum of the planned output of the hydropower station and the minimum output of the gas power station is greater than or equal to the system load demand, water abandonment will occur, and the opportunity loss cost of water abandonment and the gas-fired power operation cost at that moment will be optimized; if the sum of the planned output of the hydropower station and the minimum output of the gas power station is less than the system load demand, no water abandonment will occur, and the system gas-fired power operation cost at that moment will be optimized.
7. A gas-water coordinated peak load operation optimization system, It is characterized in that The system includes: The abandoned water volume calculation module builds an abandoned water volume calculation model based on the planned output of the hydropower station in the power system, the planned output of the gas power station and the system load demand; Gas-fired power operation cost module, which conducts gas turbine load rate sensitivity analysis and builds a system gas-fired power operation cost model; A coupling module couples the abandoned water volume calculation model with the system gas-power operation cost model to obtain a gas-water coordinated peak-shaving optimization model with the objective function of minimizing the sum of the opportunity loss of electricity caused by the abandoned water volume and the operation cost of the gas-powered power station and with the abandoned water volume, unit output and unit capacity as constraints; The optimization module optimizes the gas-water opportunity loss cost and the gas-electricity operation cost based on the gas-water coordinated peak-shaving optimization model.
8. According to claim 7, a gas-water coordinated peak load operation optimization system, It is characterized in that The optimization module includes a parameter acquisition unit, a fitting calculation unit and a judgment unit; Wherein, the parameter acquisition unit is used to obtain system load data, gas-power operation parameters, electricity price parameters, and upper and lower limits of hydropower and gas-power station output; The fitting calculation unit obtains the parameters of the optimization model by fitting the gas-electricity kilowatt-hour cost curve; When the sum of the planned output of the hydropower station and the minimum output of the gas power station is greater than or equal to the system load demand, the judgment unit optimizes the opportunity loss cost of water abandonment and the gas-fired power operation cost at that moment; when the sum of the planned output of the hydropower station and the minimum output of the gas power station is less than the system load demand, the judgment unit optimizes the system gas-fired power operation cost at that moment.