Distributed photovoltaic power generation anti-reflux device
By designing resistance cabinets and contactor groups in distributed photovoltaic power generation systems to adjust photovoltaic power generation, the problem of frequent inverter switching in traditional anti-backflow devices is solved, extending the life of the inverter and improving the power supply of photovoltaic power generation. efficiency.
Patent Information
- Application Number
- CN202411131360.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-17
- Publication Date
- 2024-10-01
AI Technical Summary
Traditional anti-backflow devices frequently trip the grid-connected switch of the photovoltaic power generation system or instantaneously adjust the inverter output when the main load circuit fluctuates, causing the inverter to switch on and off frequently, causing sudden changes in current, and reducing the service life of the inverter.
A distributed photovoltaic power generation anti-backflow device is designed, including grid power supply, main load circuit, AC combiner box, inverter, anti-backflow components and resistance cabinet, which is adjusted through multiple resistor strings and contactor groups in the resistance cabinet Photovoltaic power generation avoids frequent switching of the inverter and optimizes the power supply status of the photovoltaic power generation system when the load fluctuates.
It effectively avoids frequent switching on and off of the inverter, extends the service life of the inverter, and while ensuring that no reverse current power is generated, it also extends the duration of photovoltaic power supply to the load, increases the proportion of self-consumption of electricity, and allows The PV system remains in the grid state when the load power fluctuates in a wide range.
Smart Images

Figure CN118739435A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of photovoltaic power generation, and in particular to a distributed photovoltaic power generation backflow prevention device. Background Art
[0002] Traditional backflow prevention devices collect current data at the boundary between the power grid and the load. When there is a slight fluctuation in the main power load, the grid-connected switch of the photovoltaic power generation system is tripped or the inverter output is instantly adjusted using communication means, resulting in frequent switching of the inverter or combiner box branch. The current mutations generated during this period frequently impact the inverter, reducing the service life of the inverter. Summary of the invention
[0003] In view of the above technical problems, the present invention provides a distributed photovoltaic power generation backflow prevention device, which is used to solve the problem that when there is a slight fluctuation in the load main line, the photovoltaic power generation system grid-connected switch is tripped or the inverter output is instantaneously adjusted. During this period, the current mutation generated frequently impacts the inverter, thereby reducing the service life of the inverter.
[0004] In order to achieve the above object, the technical solution of the present invention is as follows: A distributed photovoltaic power generation backflow prevention device includes a power grid and a load main circuit, wherein the power grid is connected to the load main circuit through a power circuit breaker, one side of the load main circuit is connected to an AC combiner box through a first contactor, the AC combiner box is connected to an inverter, and the other side of the load main circuit is further branched into a load branch circuit, the load circuit breaker and a fourth current transformer are sequentially installed on the load branch circuit, and further includes a backflow prevention component, a first current transformer, a second contactor, a third current transformer and a compensation branch circuit; The first current transformer is installed between the grid power supply and the power circuit breaker; The second contactor is installed between the monitoring point A and the first contactor; The third current transformer is installed between the first contactor and the AC combiner box; The compensation branch is connected between the second contactor and the first contactor, and the compensation branch is sequentially connected with a switching circuit breaker, a second current transformer and a resistance cabinet; The first current collection terminal of the anti-backflow component is connected to the third current transformer; The group switching signals of the anti-backflow components are connected to the resistance cabinet; The third current collection terminal of the anti-backflow component is connected to the second current transformer; The on / off control signal of the anti-backflow component is connected to the second contactor; A fifth current transformer is installed between the monitoring point A and the second contactor, and the fourth current collection terminal of the anti-backflow component is connected to the fifth current transformer; The voltage collection input terminal of the anti-backflow component is connected to point D on the grid power supply; The second current collection terminal of the anti-backflow component is connected to the first current transformer; The voltage collection output terminal of the anti-backflow component is connected to point C on the load main circuit; The on / off control signal of the anti-backflow component is connected to the first contactor.
[0005] Furthermore, the resistor cabinet includes a main contactor group and a plurality of resistor strings, the main contactor group is respectively connected to the group switching signal of the anti-backflow component and the second current transformer, and the plurality of resistor strings are respectively connected to each branch contact of the main contactor group.
[0006] Compared with the prior art, the present invention has the following beneficial effects: First, it avoids frequent switching of the inverter or combiner box branches by traditional anti-backflow devices when the load fluctuates, reduces the impact of sudden current changes on the inverter, and extends the service life of the inverter; Second, while ensuring that no reverse power is generated, the photovoltaic power generation power supply time for the load is effectively extended, so that the load can use the photovoltaic system to power the load as much as possible, effectively reducing the power generation loss due to load fluctuations, and further increasing the proportion of self-generated electricity for self-use; Third, when the load power is allowed to fluctuate within a large range (within 95% of the maximum photovoltaic power generation power), the photovoltaic system always remains in the grid state; Fourthly, it provides great convenience for small inverters without communication power regulation function to access the power grid and ensure the maximum power generation efficiency when the surplus power is not connected to the grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0007] Figure 1 It is a connection relationship diagram of the present invention; Figure 2 It is the operation flow chart of the present invention; In the figure: 1. Grid power supply; 2. Load main circuit; 3. First contactor; 4. AC combiner box; 5. Inverter; 6. Load branch; 7. Load circuit breaker; 8. Fourth current transformer; 9. Anti-backflow component; 10. First current transformer; 11. Second contactor; 12. Third current transformer; 13. Compensation branch; 14. Power circuit breaker; 15. Switching circuit breaker; 16. Second current transformer; 17. Resistor cabinet; 18. Main contactor group; 19. Resistor string; 20. Fifth current transformer. DETAILED DESCRIPTION
[0008] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.
[0009] System like Figure 1 As shown, first close the compensation circuit breaker 15, connect the resistor cabinet 17 to the system, the second contactor 11 is in the disconnected state, close the first contactor 3, close the voltage acquisition circuit, that is, the voltage acquisition circuit (input) is connected to the voltage acquisition (output), use the grid voltage to precharge the inverter, and complete the grid voltage and photovoltaic voltage phase matching (completed by the inverter), close the first contactor of the main contactor group 18, use the first contactor of the main contactor group 18 as a test resistor, and test whether the photovoltaic power P2 is greater than or equal to 5% P2 MAX , if greater than 5%P2 MAX , and the grid power P1 (at this time, the grid power P1 = load power P7) ≥ P2 + set value 1 must be met. If the above conditions are not met, it means that the photovoltaic power generation power is small or the load power is small, and it is not suitable to start the grid connection. Then continue to judge after a short delay; if it is met, it means that both the power generation power and the load meet the requirements, then the first group of contactors of the main contactor group 18 will be cut off, and the next step of grid connection will be entered, and the second contactor 11 will be closed.
[0010] After being connected to the grid, the voltage acquisition output circuit needs to be disconnected, and the system output power P6 needs to be monitored at all times. At any time, when P6 is monitored to be less than 0, it indicates that the system is in an abnormal state, that is, the grid power is supplying power to the main contactor group 18. The second contactor needs to be immediately tripped, all contactors from groups 1 to N of the main contactor group need to be cut off, and the cycle needs to be re-entered. If P6 is less than 0 again after re-entering the cycle, it is determined that the contactor is stuck and the system alarm stops; if P6 ≥ 0, there is no action, and after a delay of 0.5s, monitoring continues, and the judgment of the grid power P1 at A continues.
[0011] Determine whether the grid power P1 at A is greater than the set value 1 (threshold value), that is, the minimum grid-connected current. If it is greater than the set value 1, it means there is no reverse power, and the load power demand at B is large. The photovoltaic power of the first contactor 3 plus the grid power at A is equal to the load power at B, that is, P2+P1=P7. At this time, all the contactors from the 1st to the Nth group of the main contactor group 18 are in the cut-off state, and the photovoltaic power of the first contactor 3 is equal to the output power of the second contactor 11, that is, P2=P6, and the photovoltaic system is in full power generation state.
[0012] After the grid connection, when it is determined that the grid power P1 at A is less than the set value 1 (threshold value), it means that reverse power is generated, and the load power demand at B is small. In addition to meeting the load power at B, the remaining power of the photovoltaic power of the first contactor 3 flows in reverse through the grid, making P1 less than the set value 1. Since P7=P2+P1=P6+P1, under the condition that the load power at B remains unchanged, reducing the photovoltaic power P2 of the first contactor 3 or reducing the output power P6 of the second contactor 11 can increase the grid power P1 until it is greater than the set value 1.
[0013] This solution increases the grid power P1 by reducing the output power P6 of the second contactor 11 .
[0014] Put the first contactor of the main contactor group 18 into operation. The rated power of the resistor carried by the first contactor is P R1 After the first group of contactors are put into operation, compensation power P3 is immediately generated in compensation branch 13, and P3=P R1 , the output power of the second contactor 11 is reduced from the original P6=P2 to P6=P2-P3, that is, P6=P2-P R1 At this time, it is determined again whether the power P1 of the power grid at A is greater than the set value 1 (threshold value). If it is greater than the set value 1 (threshold value), it means that the reverse power disappears and the system operation returns to normal.
[0015] After the system returns to normal, if the load power at B increases, the grid power P1 at A will also increase. To ensure that the system output power is at the maximum value when there is no reverse power, it is necessary to cut off this group of contactors when the grid power P1 at A increases to a certain value so that the output power is P6=P2-P R1 Restore to P6=P2; therefore, detect the power of the power grid P1 at A. When P1≥ the rated power P of the resistor of the first contactor of the main contactor group 18 R1 + When the setting value is 1, that is, P1≥P R1 +Set value 1, cut off the first group of contactors, (but after cutting off the first group of contactors of the main contactor 18, it is necessary to consider whether the photovoltaic power P2 may be reduced due to other reasons (such as sudden weather changes, etc.), so it is necessary to judge whether P2 ≥ 5% P2 MAX True or false, if P2<5%P2 MAX , it means that the photovoltaic power P2 output is reduced to the point where it cannot continue to generate electricity due to its own reasons, and the second contactor needs to be tripped, and all contactors from groups 1 to N of the main contactor group 18 are cut off. If P2 ≥ 5% P2 MAX , then continue to judge the size of the power grid P1 and execute downward. ); When P1<P R1 +When the setting value is 1, the first contactor of the main contactor group 18 is maintained in the engaged state, and the power grid power P1 at location A is continuously monitored.
[0016] After the first contactor of the main contactor group 18 is put into operation, if the grid power P1 at A is still less than the set value 1 (threshold value), it means that the reverse power still exists and the system output power P6 of the second contactor 11 still needs to be further reduced.
[0017] Then the second contactor of the main contactor group 18 is put into use. The rated power of the resistor carried by the second contactor is P R2 After the second group of contactors are put into operation, the compensation power P3 is generated by P3=P R1 Adjust to P3=P R1 +P R2 The output power of the second contactor 11 is changed from the original P6=P2-P3=P2-P R1 Reduced to P6=P2-P3=P2-P R1 -P R2 At this time, it is determined again whether the power P1 of the power grid at A is greater than the set value 1 (threshold value). If it is greater than the set value 1 (threshold value), it means that the reverse power disappears and the system operation returns to normal.
[0018] Similarly, if the load power at B increases, when the grid power at A P1 ≥ P R2 + When the setting value is 1, in order to ensure that the system output power is always at the maximum value when there is no reverse power, it is necessary to cut off the contactor of this group in time, and then determine the value of P1. If P1≥P R1 +Set value 1, then continue to cut off the first group of contactors.
[0019] After the second contactor of the main contactor group 18 is put into operation, if the grid power P1 at A is still less than the set value 1 (threshold value), it means that the reverse power still exists and the system output power P6 of the second contactor 11 still needs to be further reduced.
[0020] The third contactor, the fourth contactor, and the Nth contactor of the main contactor group 18 are put into operation in sequence. The rated power of the resistor of each contactor is P R3 , P R4 ,......,P RN-1 , P RN .
[0021] After the Nth contactor of the main contactor group 18 is put into operation, the compensation power generated is: P3=P R1 +P R2 +P R3 +P R4 +......+P RN-1 +P RN =95%P2 MAX At this time, the load power P7 at B drops to 5% of the photovoltaic power of the first contactor 3. If the grid power P1 at A is still less than the set value 1 (threshold value), the second contactor 11 is tripped, and all contactors from groups 1 to N of the main contactor group 18 are cut off. At this time, the grid power P1 at A is equal to the load power P7 at B, that is, P1=P7. The value of the grid power P1 at A is detected. When P1 recovers to be greater than the photovoltaic power P2 MAX 5%, that is, P1>5%P2 MAX +Set value 1, close the second contactor 11, restart the system and connect to the grid, and enter the cycle regulation.
[0022] Example: The total power of a distributed photovoltaic system is 500kW, and it consists of 5 100kW inverters 5. At a certain moment, the photovoltaic system is in the maximum power generation state, and the inverter 5 is running at full load. At this time, the load suddenly changes from 550kW to 390kW. If the traditional method is used to cut off the inverter 5, 2 inverters 5 need to be cut off to avoid reverse power. The remaining 3 inverters 5 work, with a total power of 300kW and a loss of 90kW.
[0023] If this technical solution is adopted, a resistor cabinet 17 with a power of 500kW*0.95=475kW is configured, and 19 groups of contactors are set. The resistance power of each group of contactors is 25kW, that is, P R1 =P R2 =P R3 =P RN =25kW. Set value 1 to 2kW. Inverter 5 is fully loaded, P2=500kW.
[0024] The load power P7 at B changes from 550kW to 390kW. The anti-backflow device monitors the grid power P1 at A, which changes from 550-500=50kW to 390-500=-110kW. P1=-110kW. The set value 1 is set to 2kW. P1<set value 1. Therefore, the first contactor of the main contactor group 18 is put into operation. The output power P6 of the second contactor 11 is reduced from 500kW to P6=P2-P3=P2-P R1 =500-25=475kW, at this time the power grid power at point A is P1=P7-P6=390-475=-85kW.
[0025] It is determined that the power P1 of the power grid at A is still less than the set value 1, and the second contactor of the main contactor group 18 is continued to be put into operation, and the compensation power P3=P R1 +P R2 =50, the output power of the second contactor 11 is P6=P2-P3=500-50=450kW, and the power of the power grid at point A is P1=P7-P6=390-450=-60kW.
[0026] It is determined that the power P1 of the power grid at A is still less than the set value 1, and the third contactor of the main contactor group 18 is continued to be put into operation, and the compensation power P3=P R1 +P R2 +P R3 =75, the output power of the second contactor 11 is P6=P2-P3=500-75=425kW, and the power of the power grid at point A is P1=P7-P6=390-425=-35kW.
[0027] It is determined that the power P1 of the power grid at A is still less than the set value 1, and the fourth contactor of the main contactor group 18 is still put into operation, and the compensation power P3=P R1 +P R2 +P R3 +P R4 =100, the output power of the second contactor 11 is P6=P2-P3=500-100=400kW, and the power of the power grid at point A is P1=P7-P6=390-400=-10kW.
[0028] It is determined that the power P1 of the power grid at A is still less than the set value 1, and the fifth contactor of the main contactor group 18 is continuously put into operation, and the compensation power P3=P R1 +P R2 +P R3 +P R4 +P R5 =125kW, the output power of the second contactor 11 P6=P2-P3=500-125=375kW, the power of the power grid at point A P1=P7-P6=390-375=15kW.
[0029] Determine that the power P1 of the power grid at A is greater than the set value 1, and continue to determine whether P1 and P R5 + setting value 1, P1=15kW, P R5 =25kW, setting value 1=2kW, P1<P R5 +Set value 1 to maintain the current state.
[0030] At this time, the output power of the entire system is P6=P2-P3=500-125=375kW, which is 75kW more than the traditional method of directly cutting off inverter 5.
[0031] If the next moment, the load power P7 at B increases from 390kW to 443kW, then the grid power P1 at A increases from P1=P7-P6=390-375=15kW to P1=P7-P6=443-375=68kW, P1≥P R5 + Setting value 1, cut off the contactor of main contactor group 18 (group 5), after cutting off the compensation power P3=P R1 +P R2 +P R3+P R4 =100kW, the output power of the second contactor 11 P6=P2-P3=500-100=400kW, the power of the power grid at A P1=P7-P6=443-400=43kW; Determine P1≥P R4 + set value 1, continue to cut off the main contactor group 18, the fourth contactor, after cutting off the compensation power P3 = P R1 +P R2 +P R3 =75kW, the output power of the second contactor 11 P6=P2-P3=500-75=425kW, the power of the power grid at A P1=P7-P6=443-425=18kW; P1≥set value 1, and P1<P R3 +Set value 1, maintain the current state, wait for the grid power P1 at A to change again, and then put the main contactor group 18 contactor group into operation or cut off. The resistor cabinet 17 shown in the figure is only a schematic diagram. In actual application, the resistors of the resistor cabinet 17 can be connected in series and parallel in multiple groups, each group is connected in series with a set of contactors, and there are N groups in total. The larger the N value, the more accurate the adjustment, but the response speed will be slower. The smaller the N value, the faster the response speed, but the adjustment accuracy will be correspondingly smaller, which can generally be about 10 to 30. In order to ensure that when the N value is large, the system still has a faster response time and shorten the countercurrent existence time as much as possible, the acceleration subroutine can be set in the program, that is, when it is detected that the main contactor group 18 has continuously put into use 3 groups of contactors, and P1 is still less than the set value 1, the acceleration subroutine is started, that is, 4 / N groups of contactors are directly put into use. If P1 is less than the set value 1, 2 / N groups of contactors are put into use. If P1 is less than the set value 1, all N groups of contactors are put into use until P1 ≥ the set value 1, and then enter the cycle, and use the main program to gradually cut off the contactors that are put into use, so that P1 is maintained at {P1|set value 1≤P1≤P RX +Set value 1, X is within 1, 2, 3...N}, so that the backflow can be eliminated after only 6 compensations at most.
[0032] Execution process such as Figure 2 As shown, ready to start (initial state: the first contactor 3 is in the disconnected state, the compensating circuit breaker 15 is in the disconnected state, and the second contactor 11 is in the disconnected state) (I) The anti-backflow component 9 is powered, the device is in normal working condition, the compensating circuit breaker 15 is closed, and the upper air switches of the main contactor group 18 are closed in turn to ensure that once the first contactor 3 is closed, all the contactors of the main contactor group 18 are energized. After the device self-checks normally, it issues a command to close the first contactor 3.
[0033] (II) Close the voltage collection circuit, that is, connect the voltage collection circuit (input) and the voltage collection (output), and the grid voltage is sent to the junction box 4 (inverter) via the pre-charging circuit of the anti-backflow component 9, pre-charge the inverter, and complete the phase matching of the photovoltaic voltage and the grid voltage (completed by the inverter), and then close the first group of contactors of the main contactor group 18.
[0034] (III) After closing the first contactor of the main contactor group 18, a current loop is formed to test the actual size of the photovoltaic power P2. When P2>5%P2 MAX And when P1≥P2+set value 1, it means that there is sufficient sunlight, the photovoltaic power reaches the output standard and the load power is appropriate, and then proceed to the next step; otherwise, delay for 0.5 seconds (adjustable) and judge again until the conditions are met and proceed to the next step.
[0035] (IV) Trip the test circuit, i.e. the first contactor of the main contactor group 18.
[0036] (V) Close the second contactor 11, and the system enters the grid-connected operation state; immediately disconnect the output of the voltage acquisition circuit. After the grid connection, the system output power P6 is monitored throughout the process. When the monitoring P6 is less than 0, it means that the system is in an abnormal state, and the grid power supply supplies power to the contactor group 18, which is not allowed. Immediately trip the second contactor and cut off all contactors from the 1st to Nth groups of the main contactor group. Re-enter the (II) cycle. If P6 is less than 0 again after re-entering the cycle, it is determined that the contactor is stuck and the system alarms and shuts down; if P6 ≥ 0, there is no action. After a delay of 0.5s, continue to monitor, and continue to execute (VI) to determine the size of the grid power P1 at A.
[0037] (VI) Determine the size of the grid power P1. When P1 ≥ the set value 1, it means that the load power at B is large. The photovoltaic power P2 plus the grid power P1 can meet the load power P7 at B. The photovoltaic power P2 is fully output through the second contactor 11, and the photovoltaic power P2 = the system output power P6; when P1 ≤ the set value 1, it means that the load power at B is small. The photovoltaic power P2 ≥ the load power P7 at B. The excess photovoltaic power may be sent to the grid through A to form reverse power, which is not allowed.
[0038] (VII) When a reverse power trend is detected (i.e., P1 < set value 1), the anti-backflow component 9 immediately enters the compensation state and controls the first contactor of the main contactor group 18 to be put into operation. After being put into operation, the compensation circuit breaker 15 immediately generates compensation power P3 = P R1 =U 2 / R1, system output power P6 = photovoltaic power P2 - compensation power P3, that is, the excess photovoltaic power is consumed by the compensation power P3 at the compensation circuit breaker 15.
[0039] (VIII) Continue to judge the size of the grid power P1. When P1 ≥ the set value 1, it means that after the compensating circuit breaker 15 generates the compensation power, the system output power P6 decreases, so that the system output power P6 is less than the load power P7 at point B, and the reverse power disappears.
[0040] However, with the load fluctuation, the load power P7 at B may increase in the next moment, and the demand for system output power P6 will increase. In this case, the first contactor of the main contactor group 18 must be cut off when the load power P7 at B increases to a certain value, so as to restore the system output power P6. Therefore, after judging P1≥set value 1, further judge P1≥P R1 + set value 1, if true, it means that the increment of load power P7 at load B reaches the compensation power P of the system at this time R1 , then cut off the first contactor of the main contactor group 18, and then judge whether the photovoltaic power P2 is reduced due to other reasons (such as sudden weather changes, etc.), that is, judge P2 ≥ 5% P2 MAX True or false, if P2<5%P2 MAX , it means that the photovoltaic power P2 output has been reduced to the point where it cannot continue to generate electricity due to its own reasons. It is necessary to trip the second contactor, cut off all contactors from group 1 to group N of the main contactor group, and then return to (II) to wait for the photovoltaic power P2 output to recover. If P2 ≥ 5% P2 MAX , then return to (VI) to continue to determine the size of the power grid P1 and execute downward; if P1 < set value 1 + P R1 , it means that the increment of load power P7 at load B cannot reach the compensation power P of the system at this time. R1 After the first contactor of the main contactor group 18 is cut off, reverse power will be generated, so return to (VIII) to continue to judge the size of P1 and execute downward.
[0041] When P1 in this step is less than the set value 1, it means that after the compensating circuit breaker 15 generates the compensation power, the system output power P6 does not decrease much, the system output power P6 is still greater than the load power P7 at point B, the reverse power has not disappeared, and the second contactor of the main contactor group 18 needs to be put into operation.
[0042] (IX) The anti-backflow component 9 is put into the second contactor of the main contactor group 18. After being put into operation, the compensating circuit breaker 15 generates a compensation power P3=P R1 +P R2 =U 2 / R1+U 2 / R2.
[0043] (X) After the second contactor of the main contactor group 18 is put into operation, the power of the power grid P1 is further judged. When P1 ≥ the set value 1, it means that after the compensation circuit breaker 15 generates compensation power, the system output power P6 decreases, making the system output power P6 < the load power P7 at B, and the reverse power disappears. However, with the fluctuation of the load, the load power P7 at B may increase in the next moment, and the demand for the system output power P6 increases. In this case, the second contactor of the main contactor group 18 must be cut off when the load power P7 at B increases to a certain value, so as to restore the system output power P6. Therefore, after judging that P1 ≥ the set value 1, further judgment is made as to whether P1 ≥ P R2 + set value 1, if true, it means that the increment of load power P7 at load B reaches the compensation power P of the system at this time R2 , then cut off the second contactor of the main contactor group 18, and then return to (VIII) to continue to judge the size of the power grid P1, and execute downward; if it is false, it means that the increment of the load power P7 at load B cannot reach the compensation power P of the system at this time R2 , after the second contactor of the main contactor group 18 is cut off, reverse power will be generated, so return to (X) to continue to judge the size of P1 and execute downward. When this step P1 < set value 1, it means that after the compensation circuit breaker 15 generates compensation power, the system output power P6 is not reduced to a large extent, and the system output power P6 is still greater than the load power P7 at B. The reverse power has not disappeared, and the third contactor of the main contactor group 18 needs to be put into operation.
[0044] (XI) The anti-backflow component 9 is put into the third contactor of the main contactor group 18. After being put into operation, the compensation circuit breaker 15 generates a compensation power P3=P R1 +P R2 +P R3 =U 2 / R1+U 2 / R2+U 2 / R3.
[0045] (XII) After the third contactor of the main contactor group 18 is put into operation, the power of the power grid P1 is further judged. When P1 ≥ the set value 1, it means that after the compensation circuit breaker 15 generates compensation power, the system output power P6 decreases, making the system output power P6 < the load power P7 at B, and the reverse power disappears. However, with the fluctuation of the load, the load power P7 at B may increase in the next moment, and the demand for the system output power P6 increases. In this case, the third contactor of the main contactor group 18 must be cut off when the load power P7 at B increases to a certain value, so as to restore the system output power P6. Therefore, after judging that P1 ≥ the set value 1, it is further judged that P1 ≥ P R3 + set value 1, if true, it means that the increment of load power P7 at load B reaches the compensation power P of the system at this time R3, then the third contactor of the main contactor group 18 is cut off, and then return to (X) to continue to judge the size of the power grid P1, and execute downward; if it is false, it means that the increment of the load power P7 at load B cannot reach the compensation power P of the system at this time R3 , after the third contactor of the main contactor group 18 is cut off, reverse power will be generated, so return to (XII) to continue to judge the size of P1 and execute downward. When this step P1 < set value 1, it means that after the compensation circuit breaker 15 generates compensation power, the system output power P6 is not reduced to a large extent, and the system output power P6 is still greater than the load power P7 at B. The reverse power has not disappeared, and the fourth contactor of the main contactor group 18 needs to be put into operation.
[0046] (XIII) By analogy, when the anti-backflow component 9 is put into the main contactor group 18 and the Nth group (the last group) of contactors is put into operation, the compensation circuit breaker 15 generates a compensation power P3=P R1 +P R2 +P R3 +......+P RN =U 2 / R1+U 2 / R2+U 2 / R3+......+U 2 / RN.
[0047] (XIV) After the Nth contactor of the main contactor group 18 is put into operation, the power of the power grid P1 is further judged. When P1 ≥ the set value 1, it means that after the compensation circuit breaker 15 generates compensation power, the system output power P6 decreases, making the system output power P6 < the load power P7 at B, and the reverse power disappears. However, with the fluctuation of the load, the load power P7 at B may increase in the next moment, and the demand for the system output power P6 increases. In this case, the Nth contactor of the main contactor group 18 must be cut off when the load power P7 at B increases to a certain value, so as to restore the system output power P6. Therefore, after judging that P1 ≥ the set value 1, it is further judged that P1 ≥ P RN + set value 1, if true, it means that the increment of load power P7 at load B reaches the compensation power P of the system at this time RN , then cut off the Nth contactor of the main contactor group 18, and then return to the step of putting the N-1 group of contactors into operation, judge the size of the power grid P1, and execute downward; if it is false, it means that the increment of the load power P7 at the load B cannot reach the compensation power P of the system at this time RN , after the Nth contactor of the main contactor group 18 is cut off, reverse power will be generated, so after returning to the step of putting the Nth contactor into operation, continue to judge the size of P1 and execute downward. When P1 in this step is less than the set value 1, it means that after all the compensation resistors are put into operation, the compensation power generated by the compensation circuit breaker 15 is still not enough to compensate for the reduction of the load power P7 at B, that is, the photovoltaic power P2 reaches the maximum value P2 MAX, the system output power P6 is reduced to the photovoltaic power P2 MAX 5%, the load power P7 reaches the minimum value, P7<5%P2 MAX + set value 1, at this time there is no need to continue to generate electricity, the anti-backflow component 9 then trips the second contactor 11, cuts off all contactors from group 1 to group N of the main contactor group 18, and the system is in an off-grid state. After off-grid, the grid power P1 = load power P7 at B. The size of the grid power P1 is determined. When P1 (i.e. load power P7) is greater than the photovoltaic power P2 MAX After 5% of P1, restart and connect to the grid (close the second contactor 11), that is, P1>5%P2 MAX + When the setting value is 1, the return (V) will close the second contactor 11, and then execute downward; P1≤5%P2 MAX +When the setting value is 1, it means that the load power P7 is still too small. After a delay of 0.5 seconds (adjustable), the judgment will continue until the conditions are met.
[0048] Such a cycle can achieve the output power of the anti-backflow device system by adjusting the resistance compensation power, preventing the generation of reverse power while maximizing the protection of photovoltaic power generation in the grid.
[0049] Note 1: When due to weather reasons or near dusk, assuming that the load remains unchanged (greater than 5% P2 MAX ), when the photovoltaic output decreases, the system will gradually cut off all contactors of the main contactor group 18 from the back to the front. After cutting off the first group of the main contactor group 18, it is necessary to determine whether the photovoltaic output has reached the minimum value. If it has reached the minimum value, that is, P2<5%P2 MAX When P2≥5%P2 MAX , continue to step (VI) and execute downward.
[0050] Note 2: The resistance values of the resistor string 19 R1, R2, R3...RN can be the same or different and can be adjusted according to load fluctuations; the minimum output of photovoltaic power P2 is P2 MIN It does not necessarily have to be greater than 5% P2 MAX , just need to be greater than the power P of resistor R1 R1 To ensure that the system is in the best working condition.
[0051] Note 3: To ensure that the system is automatically in standby mode at night, multiple timing modes can be used to control the system operation and standby.
[0052] Note 4: In order to ensure the adjustment accuracy and speed up the response time, it is also possible to set up sub-contactors 1 to n under each contactor group of contactors 1 to N. Use main contactor groups 1 to N for coarse adjustment to speed up the response time, and use sub-contactors 1 to n for fine adjustment to improve the adjustment accuracy. If the main contactor group N is 20 and the sub-contactor n is 5, the adjustment accuracy can reach 20×5=100 levels; the control signal of the n-group sub-contactor is controlled by serial communication, which can be achieved by adding a communication interface in the anti-backflow component 9, which will not be elaborated in this article.
[0053] Such a cycle can achieve the output power of the anti-backflow device system by adjusting the resistance compensation power, preventing the generation of reverse power while maximizing the protection of photovoltaic power generation in the grid.
[0054] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modification, replacement, or improvement made within the spirit and principle of the present invention to achieve output power adjustment of the photovoltaic system by increasing or decreasing resistance should be included in the protection scope of the present invention.
Claims
1. A distributed photovoltaic power generation backflow prevention device, comprising a power grid (1) and a load main circuit (2), wherein the power grid (1) is connected to the load main circuit (2) via a power circuit breaker (14), one side of the load main circuit (2) is connected to an AC combiner box (4) via a first contactor (3), the AC combiner box (4) is connected to an inverter (5), the other side of the load main circuit (2) is further branched into a load branch circuit (6), the load branch circuit (6) is sequentially installed with a load circuit breaker (7) and a fourth current transformer (8), characterized in that: It also includes a backflow prevention component (9), a first current transformer (10), a second contactor (11), a third current transformer (12), and a compensation branch (13); The first current transformer (10) is installed between the grid power supply (1) and the power circuit breaker (14); The second contactor (11) is installed between the monitoring point A and the first contactor (3); The third current transformer (12) is installed between the first contactor (3) and the AC combiner box (4); The compensation branch (13) is connected between the second contactor (11) and the first contactor (3), and the compensation branch (13) is sequentially connected to a switching circuit breaker (15), a second current transformer (16) and a resistor cabinet (17); The first current collection terminal of the anti-backflow component (9) is connected to the third current transformer (12); The group switching signal of the anti-backflow component (9) is connected to the resistance cabinet (17); The third current collection terminal of the anti-backflow component (9) is connected to the second current transformer (16); The on / off control signal of the backflow prevention component (9) is connected to the second contactor (11); A fifth current transformer (20) is installed between the monitoring point A and the second contactor (11), and the fourth current collection terminal of the anti-backflow component (9) is connected to the fifth current transformer (20); The voltage collection input terminal of the anti-backflow component (9) is connected to point D on the grid power supply (1); The second current collection terminal of the anti-backflow component (9) is connected to the first current transformer (10); The voltage collection output terminal of the anti-backflow component (9) is connected to point C on the load main circuit (2); The on / off control signal of the backflow prevention component (9) is connected to the first contactor (3).
2. A distributed photovoltaic power generation backflow prevention device according to claim 1, characterized in that: The resistor cabinet (17) comprises a main contactor group (18) and a plurality of resistor strings (19); the main contactor group (18) is respectively connected to the group switching signal of the anti-backflow component (9) and the second current transformer (16); and the plurality of resistor strings (19) are respectively connected to each branch contact of the main contactor group (18).
Citation Information
Cited By
Backflow prevention control method and system for user side energy storage device
CN119651707A