Enterprise cloud method, equipment and system

By combining Internet lines and operator private network lines, and using SD-WAN technology to dynamically schedule cloud lines, it solves the problems of high cost, long deployment time, and poor security in enterprise cloud migration, and achieves efficient and secure cloud services.

CN118740512APending Publication Date: 2024-10-01ASIAINFO TECH CHINA INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411064072.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

Among the existing enterprise cloud migration methods, the operator's private line cost is high, the deployment time is long and opaque, and the network quality is poor. The Internet cloud migration method has poor security and cannot effectively meet enterprises' needs for efficient and secure cloud services.

Method used

Use multiple cloud routes (such as Internet lines and operator private network lines) combined with software-defined wide area network (SD-WAN) technology to dynamically schedule multiple cloud routes according to the business needs of the enterprise to realize the connection between enterprise intranet equipment and cloud servers. communication to ensure flexible utilization and security of network resources.

Benefits of technology

By dynamically scheduling multiple cloud migration lines, it reduces the cost and deployment time for enterprises to migrate to the cloud, improves network quality and security, meets enterprises' diverse needs for cloud services, and improves cloud migration efficiency and reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118740512A_ABST
    Figure CN118740512A_ABST
Patent Text Reader

Abstract

The invention discloses an enterprise clouding method, equipment and system, aiming at the clouding demand of any enterprise and for a plurality of clouding lines available between enterprise intranet equipment and a cloud server, the enterprise can configure individual clouding line scheduling conditions required by the enterprise, and the enterprise can carry out clouding line scheduling according to scheduling indexes correspondingly indicated by the individual clouding line scheduling conditions. According to the method, the corresponding scheduling index data is automatically acquired according to the data of the enterprise intranet equipment, so that at least one current suitable cloud line is automatically scheduled from the plurality of cloud lines according to the scheduling index data and the cloud line scheduling condition, communication between the enterprise intranet equipment and the cloud server is realized, and the cloud demand of the enterprise is reliably met. Wherein, under the condition that a plurality of upper cloud lines need to be scheduled, the enterprise intranet equipment in the application simultaneously uses the plurality of upper cloud lines to connect the cloud server, network resources of different upper cloud lines are reasonably utilized, and different business upper cloud requirements supported by an enterprise are better met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of enterprise cloud technology, and in particular to an enterprise cloud method, device and system. Background Art

[0002] As ERP (Enterprise Resource Planning), CRM (Customer Relationship Management), corporate office, video communication and other applications gradually migrate to public cloud / private cloud, the amount of data transmission between enterprise branches and the cloud has increased dramatically. Currently, it is proposed to use a separate cloud dedicated line (such as Figure 1 The enterprise uses a dedicated line to the cloud as shown in the figure) or through the Internet (such as Figure 2 In the scenario shown in the figure, enterprises use the Internet to access the cloud to achieve the connection between the enterprise's business devices and the cloud server, meeting the enterprise's cloud service needs.

[0003] However, in Figure 1 In the enterprise cloud migration method shown in the figure, it is expensive to rent a cloud dedicated line from an operator, and it takes a long time to deploy basic equipment, which greatly reduces the efficiency of enterprise cloud migration. It is difficult to troubleshoot faults in the later stage, which affects the normal operation of enterprise business. In addition, since it belongs to the operator's private network, it is not transparent to the enterprise and lacks intelligence. Figure 2 Although the enterprise cloud migration method shown greatly reduces costs and deployment time, its poor network quality affects the quality of enterprise services. Moreover, since it exposes the enterprise business system to the Internet, it is easy to cause the leakage of the enterprise's core business data, resulting in poor cloud security.

[0004] It can be seen that a new method for enterprises to move to the cloud is urgently needed to overcome the above-mentioned technical defects. Summary of the invention

[0005] In view of the above problems, this application provides the following solutions:

[0006] The first aspect of the present application provides a method for an enterprise to migrate to the cloud, the method comprising:

[0007] In response to an enterprise's cloud migration request, obtaining a cloud migration line scheduling condition configured by the enterprise requesting cloud migration; different cloud migration line scheduling conditions indicate different scheduling indicators for multiple cloud migration lines, all of which are used to implement cloud migration line scheduling for communication between enterprise intranet devices and cloud servers;

[0008] Obtaining scheduling indicator data corresponding to the scheduling conditions of the cloud-based line;

[0009] Based on the scheduling indicator data and the cloud access line scheduling conditions, scheduling at least one of the cloud access lines to achieve communication between the enterprise intranet device and the cloud server;

[0010] Among them, if multiple cloud access lines are scheduled to connect the enterprise intranet equipment and the cloud server respectively.

[0011] In a possible implementation, in response to the enterprise's cloud migration request, obtaining the cloud migration line scheduling conditions configured by the enterprise requesting cloud migration includes:

[0012] In response to the enterprise's cloud migration request, output the cloud migration line scheduling configuration interface;

[0013] In response to a cloud-online input operation on the cloud-online scheduling configuration interface, determining a plurality of cloud-online circuits supported by an intranet device of the enterprise requesting cloud-online;

[0014] In response to the scheduling configuration operation on the multiple cloud migration lines, a cloud migration line scheduling condition for the enterprise requesting cloud migration is obtained.

[0015] In a possible implementation, in response to the scheduling configuration operation on the multiple cloud migration lines, obtaining the cloud migration line scheduling condition for the enterprise requesting cloud migration includes:

[0016] Displaying at least one scheduling indicator for the plurality of cloud-based lines on the cloud-based line scheduling configuration interface; the at least one scheduling indicator includes one or more combinations of a time scheduling indicator, a service scheduling indicator, a network performance scheduling indicator, and a custom scheduling indicator;

[0017] In response to the selection and configuration operation of the scheduling indicator, corresponding cloud-to-cloud line scheduling conditions for the multiple cloud-to-cloud lines are obtained using at least one configured scheduling indicator threshold or scheduling method.

[0018] In a possible implementation, the obtaining of scheduling indicator data corresponding to the scheduling condition of the cloud access line includes at least one of the following implementation methods:

[0019] If the cloud-access line scheduling condition indicates that there is a network performance scheduling indicator, obtaining network performance data of each monitored network device;

[0020] If the cloud-online scheduling condition indicates that there is a service scheduling indicator, obtain the service attribute of the enterprise's cloud-online service execution; the service attribute indicates the corresponding relationship between the service and different cloud-online services;

[0021] If the cloud access line scheduling condition indicates that there is a scheduling time indicator, the current execution time of the enterprise's cloud access business is obtained; the cloud access lines selected corresponding to different execution times are inconsistent.

[0022] In a possible implementation, scheduling at least one of the cloud access lines based on the scheduling indicator data and the cloud access line scheduling condition to achieve communication between the enterprise intranet device and the cloud server includes at least one of the following implementation methods:

[0023] Determine that the current execution time in the scheduling indicator data is within the scheduling time threshold of any of the cloud-access lines, and control the enterprise intranet device to connect to the cloud-access line to achieve communication between the enterprise intranet device and the cloud server;

[0024] Based on the service attributes in the scheduling indicator data, determine the cloud-online line corresponding to the corresponding service priority, control the enterprise intranet device to connect to the corresponding cloud-online line, so as to transmit service data corresponding to different priorities to the cloud server through different cloud-online lines; the higher the service priority, the better the network performance of the corresponding cloud-online line;

[0025] Based on the network performance data of any of the cloud-access lines in the scheduling indicator data, determining that the current load of the cloud-access line has reached its load scheduling threshold, controlling the enterprise intranet device to connect to other cloud-access lines to achieve communication between the enterprise intranet device and the cloud server; the current load of the other cloud-access lines has not reached their load scheduling threshold;

[0026] Based on the service attributes in the scheduling indicator data, according to the configured load sharing mode, control the enterprise intranet device to connect to the corresponding cloud line, and transmit the service data output by the enterprise intranet device to the cloud server through the corresponding cloud line;

[0027] Based on the network performance data of multiple cloud access lines in the scheduling indicator data, the main line and the backup line among the multiple cloud access lines are determined. If it is determined that the main line communication is abnormal, the enterprise intranet device is controlled to switch from the main line to the backup line to achieve communication between the enterprise intranet device and the cloud server.

[0028] In a possible implementation, scheduling at least one of the cloud access lines based on the scheduling indicator data and the cloud access line scheduling condition to achieve communication between the enterprise intranet device and the cloud server includes:

[0029] Based on the scheduling indicator data and the scheduling conditions of the cloud-access lines, a scheduling instruction for the multiple cloud-access lines is generated; the scheduling instruction indicates at least one of the cloud-access lines scheduled for communication between the enterprise intranet device and the cloud server and corresponding scheduling parameters;

[0030] Performing a rationality check on the scheduling instruction;

[0031] Execute the scheduling instructions that have been verified to be reasonable, control the enterprise intranet device to connect to at least one of the scheduled cloud routes, and realize communication between the enterprise intranet device and the cloud server.

[0032] In a possible implementation, the method further includes:

[0033] Outputting a scheduling monitoring interface, and displaying each of the scheduling indicator data on the scheduling monitoring interface;

[0034] or,

[0035] Outputting a scheduling analysis interface, displaying the scheduling analysis results and the scheduling optimization strategy on the scheduling analysis interface, so as to optimize the scheduling of at least one of the cloud access lines for communication between the enterprise intranet device and the cloud server by executing the scheduling optimization strategy;

[0036] The scheduling analysis result is determined based on the scheduling indicator data and the scheduling condition of the cloud line to generate the scheduling instruction;

[0037] The scheduling optimization strategy is determined based at least on the cloud line scheduling result and the scheduling analysis result. The cloud line scheduling result includes the newly acquired network performance data after executing the step of controlling at least one of the cloud lines scheduled for connection of the enterprise intranet device to realize communication between the enterprise intranet device and the cloud server.

[0038] The second aspect of the present application further provides an enterprise cloud device, the device comprising: at least one memory and at least one processor, wherein:

[0039] The processor is used to load and execute multiple computer instructions stored in the memory to implement the following steps:

[0040] In response to an enterprise's cloud migration request, obtaining a cloud migration line scheduling condition configured by the enterprise requesting cloud migration; different cloud migration line scheduling conditions indicate different scheduling indicators for multiple cloud migration lines, all of which are used to implement cloud migration line scheduling for communication between enterprise intranet devices and cloud servers;

[0041] Obtaining scheduling indicator data corresponding to the scheduling conditions of the cloud-based line;

[0042] Based on the scheduling indicator data and the cloud access line scheduling conditions, scheduling at least one of the cloud access lines to achieve communication between the enterprise intranet device and the cloud server;

[0043] Among them, if multiple cloud access lines are scheduled to connect the enterprise intranet equipment and the cloud server respectively.

[0044] A second aspect of the present application further provides an enterprise cloud migration system, the system comprising: the enterprise cloud migration device as described above, at least one enterprise intranet device, at least one cloud server and a plurality of cloud migration lines respectively connected to the enterprise cloud migration device;

[0045] Among them, each of the cloud access lines can connect the enterprise intranet device and the cloud server to achieve communication between the enterprise intranet device and the cloud server.

[0046] It can be seen that in the enterprise cloud-based method, device and system proposed in the application, facing the cloud-based needs of any enterprise, for the multiple cloud-based lines available between the enterprise intranet device and the cloud server, the enterprise can configure its own personalized cloud-based line scheduling conditions, and automatically obtain the corresponding scheduling indicator data according to the scheduling indicator indicated by the enterprise, so as to automatically schedule at least one cloud-based line that is currently suitable from multiple cloud-based lines according to the scheduling indicator data and the cloud-based line scheduling conditions, so as to realize the communication between the enterprise intranet device and the cloud server, and reliably meet the enterprise's cloud-based needs. Among them, in the case of needing to schedule multiple cloud-based lines, the enterprise intranet device in this application will use multiple cloud-based lines to connect to the cloud server at the same time, reasonably utilize the network resources of different cloud-based lines, and better meet the cloud-based needs of different businesses supported by the enterprise. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and the originals and elements are not necessarily drawn to scale.

[0048] Figure 1 A diagram of the cloud scenario where an enterprise uses a carrier dedicated line;

[0049] Figure 2 A schematic diagram of cloud computing scenarios for enterprises using the Internet;

[0050] Figure 3 A diagram of a cloud migration scenario where an enterprise uses both the operator's private network and the Internet;

[0051] Figure 4 A schematic diagram of the structure of an optional embodiment of the enterprise cloud migration system proposed in this application;

[0052] Figure 5a A schematic diagram of the system architecture of an optional application scenario of the enterprise cloud system proposed in this application;

[0053] Figure 5bA schematic diagram of the structure of an enterprise intranet device that supports switching connections of different cloud-to-cloud lines in the enterprise cloud-to-cloud system proposed in this application;

[0054] Figure 6 This is a flowchart of an optional embodiment 1 of the enterprise cloud migration method proposed in this application;

[0055] Figure 7 This is a flow chart of optional embodiment 2 of the enterprise cloud migration method proposed in this application;

[0056] Figure 8 This is a flowchart of the optional embodiment 3 of the enterprise cloud migration method proposed in this application;

[0057] Fig. 9 A schematic diagram of the structure of an enterprise cloud device proposed in an embodiment of the present application;

[0058] Fig.10 A schematic diagram of the enterprise cloud migration principle supported by the enterprise cloud migration device proposed in an embodiment of the present application. DETAILED DESCRIPTION

[0059] The embodiments of the present application are described below in conjunction with the drawings in the embodiments of the present application. The terms used in the implementation mode of the present application are only used to explain the specific embodiments of the present application and are not intended to limit the present application. The embodiments of the present application will be described below in conjunction with the drawings. It is known to those of ordinary skill in the art that with the development of technology and the emergence of new scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.

[0060] Moreover, the terms "first", "second" etc. in the full text description content and the accompanying drawings of the present application are used to distinguish similar objects, and need not be used to describe a specific order or sequential order. It should be understood that the terms used in this way can be interchangeable under appropriate circumstances, and this is only to describe the distinction mode adopted by the objects of the same attributes when describing in the embodiments of the present application. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, so that the process, method, system, product or equipment comprising a series of units need not be limited to those units, but may include other units that are not clearly listed or inherent to these processes, methods, products or equipment.

[0061] Combined with the background technology part Figure 1 and Figure 2 The two enterprise cloud migration methods are described in the figure, and a hybrid combination of the dedicated lines and the Internet used by the two enterprises to achieve the enterprise cloud migration method is proposed, such as Figure 3As shown in the figure, the network between the enterprise and the cloud is divided into two segments. The first segment is the Internet, which can use VPN (Virtual Private Network), and the second segment is the operator's dedicated network, which can use Software Defined Network (SDN). In this way, the enterprise can go to the cloud through the Internet VPN + SDN backbone network structure, solving the problem of Figure 2 The use of Internet VPN throughout the process leads to poor quality and security of public cloud access, and avoids Figure 1 The high cost of using dedicated lines throughout the process and the long delivery time are shown, and Figure 3 The cloud access method shown uses SDN technology, which can realize flexible scheduling of network resources, fully utilize network resources, provide different access links according to different SLA requirements, and ensure the quality of enterprise access to the public cloud.

[0062] visible, Figure 3 The enterprise cloud migration method shown is used to solve the network problem between the enterprise network egress and the operator's private network POP (pop-point-of-presence), but in essence it is still a private line to the cloud method, which only solves the problem of the last part of the enterprise cloud migration. Although the two existing technologies can utilize their respective technical advantages, their shortcomings have not been fundamentally solved.

[0063] In order to improve the problem of poor data security in enterprises using the Internet to access the cloud, and to prevent malicious users from forging IP message addresses, modifying message contents, replaying previous IP data packets, and intercepting them during transmission, which may cause data packet content leakage, a virtual IPSec (Internet Protocol Security) tunnel can be established between the egress gateway of the enterprise branch system and the egress gateway on the cloud. IPSec can encrypt interactive data accessing the cloud through the Internet, verify data integrity and data source, and prevent data replay, thus solving the data security problem at the application level. However, the network cannot be absolutely physically isolated, and there is still a risk of being monitored and messages being tampered with.

[0064] In order to further improve the above problems, this application proposes a new method for enterprise cloud migration, which integrates multiple cloud migration lines, such as the Internet lines (such as public lines) and operator private network lines (such as MPLS (Multi-Protocol Label Switching) private lines) described above, which correspond to the various enterprise cloud migration methods used by enterprises, and combines SD-WAN (Software Defined Wide Area Network) technology to solve the technical problems existing in the cloud migration lines used by different enterprise cloud migration methods, such as the high cost of private lines, long delivery time, difficult operation and maintenance, low degree of visualization, low service activation efficiency and poor data security described above; and because SD-WAN has good scalability, enterprises can keep up with the pace of IT innovation and better meet the internal transformation needs of the enterprise.

[0065] Reference Figure 4 , which is a system architecture diagram of an optional embodiment of the enterprise cloud system proposed in this application. The system may include an enterprise cloud device 410, and at least one enterprise intranet device 420, at least one cloud server 430 and multiple cloud lines 440 respectively connected to the enterprise cloud device 410. Each cloud line 440 can connect the enterprise intranet device 420 and the cloud server 430 to achieve communication between the enterprise intranet device 420 and the cloud server 430.

[0066] The enterprise cloud device 410 may include at least one memory and at least one processor, and the processor may load and execute computer instructions stored in the memory to implement the enterprise cloud method proposed in this application. Among them, the memory may include volatile memory (volatile memory), such as random access memory (random access memory, RAM), and may also include non-volatile memory (non-volatile memory), such as read-only memory (read-only memory, ROM), flash memory, mechanical hard disk (hard drive drive, HDD) or solid state drive (solid state drive, SSD) and other forms of storage media. The processor may include an SD-WAN controller, and may also include an SD-WAN coordinator / orchestrator as needed, and its function may be determined according to the SD-WAN system, and according to the SD-WAN network communication principle, control other devices in the enterprise cloud system to implement the enterprise cloud method proposed in this application. This application does not limit the types of memory and processor.

[0067] In one possible implementation, the enterprise cloud migration device 410 may also include a display for displaying various visualization interfaces during the execution of the enterprise cloud migration method, such as an output cloud migration line scheduling configuration interface, a scheduling monitoring interface, and at least one of a scheduling analysis interface. For the content of each visualization interface and its operation process, please refer to the description of the corresponding part of the enterprise cloud migration method embodiment below, which will not be described in detail in this embodiment.

[0068] It should be understood that the structure and deployment location of the enterprise cloud-based devices described above do not constitute a limitation on the enterprise cloud-based devices in the embodiments of the present application. In actual applications, the enterprise cloud-based devices may include more or fewer components than those described above, or a combination of certain components, such as communication elements, at least one input component, other output components, and various sensors, etc., which are not listed one by one in the present application.

[0069] The enterprise intranet device 420 can be a terminal device in the enterprise's internal network system, including network devices distributed in various enterprise branches, such as SD-WAN devices. The present application may refer to SD-WAN edge devices, that is, small customer terminal equipment (Customer Premises Equipment, CPE), that is, equipment used by the user end, which is an important device for receiving network signals and connecting to the network. It can be a modem, router, wireless network card and other terminal devices in different forms. The present application does not limit the product form of SD-WAN devices in different branches, which can be determined according to the situation.

[0070] Of course, for the business needs of different enterprise branches, the corresponding enterprise intranet devices may also include other business terminal devices, or network element devices (such as routers, switches, and firewalls) used to realize intranet communication between different enterprise intranet devices. The enterprise intranet devices corresponding to different enterprise branches may be completely different or partially different or the same. This application does not limit the product type of the enterprise intranet devices of each enterprise branch. And for different enterprise branches, an enterprise intranet (i.e., internal enterprise network) can be built based on SD-WAN technology to realize communication connection between enterprise intranet devices and meet the business service needs of enterprise intranet. This application does not elaborate on how to build an enterprise intranet based on SD-WAN technology. The composition of the enterprise intranet equipment includes but is not limited to the equipment types listed above, which can be flexibly configured according to the actual needs of the enterprise.

[0071] Multiple cloud lines 440 can be composed of different network systems, such as Internet lines supported by the Internet system, dedicated lines supported by different operators' private networks, i.e. operator private network lines, etc., which can be determined based on the network type supported by the enterprise's intranet equipment. This application does not limit the network type of each cloud line 440 and its network communication principle.

[0072] The cloud server 430 may be a service device that provides enterprise cloud services, and may be composed of one or more cloud servers, and different cloud servers may be interconnected through a network. The network may be a network corresponding to the cloud line 440, or the Internet may be uniformly used to realize communication connection between different cloud servers, and this application does not limit this.

[0073] Combined with the above analysis, at different stages when an enterprise requests to go to the cloud, and when the enterprise goes to the cloud to perform different types of business, the present application can select one or more required scheduling indicators based on factors such as the performance advantages of different cloud lines and the performance requirements of the cloud network for executing the business, and configure the corresponding cloud line scheduling conditions. Therefore, after obtaining the corresponding scheduling indicator data from the network devices monitored in each cloud line, one or more cloud lines can be quickly and reliably scheduled based on the currently obtained scheduling indicator data and the corresponding cloud line scheduling conditions to achieve communication between the enterprise intranet device 420 and the cloud server 430. It is no longer limited to a fixed cloud line, enriches the enterprise cloud method, and ensures that the selected cloud line can reliably and efficiently meet the enterprise's cloud needs, avoiding the inappropriate performance of the cloud lines used at different communication times, affecting the quality and performance of the enterprise cloud services.

[0074] For example, only two cloud-based lines, the Internet line and the operator's private network line, are used as examples for explanation. The integration implementation method for other cloud-based lines is similar. Figure 5a The following is an optional application scenario. In the early stage of an enterprise or when it fails to successfully rent a private network line from an operator, the enterprise can choose to go to the cloud through the Internet to meet the enterprise's needs for fast and convenient cloud migration. Later, the enterprise can still choose when to open a private line network at the supplier, continue to use the Internet, or use both networks at the same time (such as at least one of the actual situation (such as the enterprise's own business requirements and the network performance of different cloud migration lines). Figure 5a The two cloud access lines represented by the double-arrow dotted lines in the figure handle different types of services respectively, so as to better meet the communication needs between the enterprise's intranet devices and cloud servers, reduce the dedicated line bandwidth, expand the Internet bandwidth, and then reduce the enterprise's network usage costs.

[0075] Among them, the operator's private network line can use MPLS (Multi-Protocol Label Switching) dedicated line. Through this efficient and reliable network transmission technology, the address search time in each hop process can be shortened, the data transmission time in the network can be reduced, the network speed can be improved, and the network speed is stable and reliable. MPLS dedicated line can also provide different requirements such as bandwidth, delay, jitter, packet loss rate, etc., such as SLA (Service Level Agreement), and choose a dedicated line service suitable for itself to ensure the QoS (Quality of Service) of the enterprise cloud. Especially for enterprises with such features as efficient operation, frequent business activities, large data communication volume, high degree of dependence on the network, and many branches, some business traffic with high network quality requirements can be switched to the dedicated line; other business traffic can be allocated to the Internet line. In this way, this application can make flexible scheduling of these two ways of enterprise clouding based on actual business needs, make full use of their respective advantages, reasonably use network resources, and reliably and efficiently meet different business needs.

[0076] Based on this, in order to achieve Figure 5a In the enterprise cloud application scenario shown in the figure, the enterprise intranet device (i.e. SD-WAN device) connected to the enterprise internal network can be configured with at least three communication ports, such as Figure 5b The grayscale boxes numbered 1, 2, and 3 are respectively recorded as the first communication port (i.e., the intranet output port), the second communication port (i.e., the network access port), and the third communication port (i.e., the network access port). The first communication port is connected to the enterprise internal network and connects various enterprise branches. The second communication port can be connected to the operator's private network line. The third communication port can be connected to the Internet line. By controlling the connection between the first communication port and the second communication port (such as Figure 5b The networking state shown in ① in the figure) enables the enterprise intranet device to communicate with the cloud server through the operator's private network line, that is, the enterprise intranet realizes networking with the cloud through the operator's private network; by controlling the first communication port to connect to the third communication port (such as Figure 5b The networking status shown in ② in the figure above enables the enterprise intranet devices to communicate with the cloud server through the Internet line. That is, the enterprise intranet realizes networking with the cloud through the Internet, meeting the corresponding enterprise cloud needs.

[0077] In one possible implementation, the SD-WAN device can be configured with a line control circuit such as a multi-terminal selection switch to achieve the connection between the first communication port and one or two of the second communication port and the third communication port. The enterprise cloud device controls the state of the line control circuit, that is, to achieve the scheduling of at least one cloud line, and obtain different networking architectures to meet the business cloud needs of various branches of the enterprise. This application does not limit how to implement the switching control implementation method of different cloud lines, including but not limited to Figure 5b It should be understood that the cloud-up line includes more numbers, and can still refer to Figure 5b The switching control is performed in the manner shown, and its line control circuit structure and control process are not described in detail in the embodiment of the present application.

[0078] In addition, it needs to be explained that Figure 4 and Figure 5a The structure and deployment location of the enterprise cloud system described do not constitute a limitation on the enterprise cloud system in the embodiments of the present application. In actual applications, other devices such as databases, management devices or monitoring devices may also be included, which can be determined based on the actual enterprise cloud needs or management needs. This application does not give detailed examples one by one.

[0079] In combination with the enterprise cloud migration system and device embodiments described above, the enterprise cloud migration method proposed in the embodiments of the present application will be introduced in detail below.

[0080] Reference Figure 6 , is a flow chart of an optional embodiment 1 of the enterprise cloud migration method proposed in this application, which can be applied to enterprise cloud migration devices, such as Figure 6 As shown, the enterprise cloud migration method proposed in this embodiment may include but is not limited to the following steps:

[0081] Step S601, in response to the cloud migration request of the enterprise, obtaining the cloud migration line scheduling conditions configured by the cloud migration requesting enterprise; different cloud migration line scheduling conditions indicate different scheduling indicators for multiple cloud migration lines, all of which are used to implement cloud migration line scheduling for communication between the enterprise intranet device and the cloud server;

[0082] When any enterprise needs to interconnect its local intranet with the cloud to meet the communication service needs of its cloud-based business, enterprise personnel can use enterprise cloud-based devices to initiate enterprise cloud-based requests, such as logging into the system URL through a browser or using dedicated enterprise cloud-based software, etc., to enter the enterprise cloud-based system management platform, and complete the configuration of at least one cloud-based line scheduling condition based on the enterprise's actual cloud needs, so as to use the cloud-based line scheduling conditions to complete subsequent processing steps.

[0083] In one possible implementation method, after logging into the enterprise cloud system management platform, you can trigger the cloud request entrance in the enterprise cloud system management platform (such as a specified icon, function button or interface, etc., this application does not limit the display form of the cloud request entrance), enter the corresponding operation interface, and complete the configuration of the cloud line scheduling conditions. Usually, you can configure the corresponding cloud line scheduling conditions based on the different scheduling indicators of multiple cloud lines selected by the enterprise (which does not limit the usage method), which is used to realize the cloud line scheduling of communication between the enterprise intranet equipment and the cloud server. This application does not limit the configuration implementation method and content of the cloud line scheduling conditions.

[0084] In another possible implementation method, after the enterprise manager logs in to the enterprise cloud system management platform, he or she can also flexibly select at least one suitable cloud line scheduling condition from various candidate cloud line scheduling conditions, or adjust at least one candidate cloud line scheduling condition to obtain a cloud line scheduling condition suitable for the enterprise requesting cloud migration. The present application does not limit the implementation method of adjusting the candidate cloud line scheduling conditions.

[0085] Step S602, obtaining scheduling indicator data corresponding to the scheduling conditions of the cloud access line;

[0086] According to the method described above, the cloud line scheduling conditions configured by the enterprise are determined for different scheduling indicators. In order to accurately and reliably determine whether the current business and network conditions of the enterprise and each cloud line meet one or more configured cloud line scheduling conditions, in order to determine which one or more cloud lines to schedule for the enterprise, the scheduling indicator data corresponding to each configured cloud line scheduling condition can be obtained in real time or periodically (such as once every 10 seconds, etc., and the acquisition period / frequency can be customized by the enterprise or the default configuration value), that is, according to the scheduling indicators indicated by each configured cloud line scheduling condition, the corresponding scheduling indicator data is obtained.

[0087] It can be seen from this that for different types of scheduling indicators, the monitoring objects that generate corresponding scheduling indicator data may be different, such as each enterprise's intranet equipment, each network device involved in each cloud line, and the physical or virtual interface between different devices and other one or more monitoring objects. The types of scheduling indicator data generated by different types of monitoring objects may be different or the same, depending on the situation.

[0088] Step S603, based on the scheduling indicator data and the cloud line scheduling conditions, schedule at least one cloud line to realize communication between the enterprise intranet device and the cloud server; wherein, if multiple cloud lines are scheduled, they are respectively connected to the enterprise intranet device and the cloud server.

[0089] Combined with the above description of the cloud line scheduling conditions, it can be determined whether the various scheduling indicator data currently obtained meet the corresponding cloud line scheduling conditions. If there are satisfied cloud line scheduling conditions, at least one cloud line can be automatically scheduled according to the cloud line or scheduling method indicated by the corresponding cloud line scheduling conditions, so that the internal equipment of the enterprise is connected to the cloud server through at least one scheduled cloud line, which meets the enterprise's cloud needs while ensuring that the currently used cloud lines meet the business service needs of the enterprise at the current stage, such as efficiency, security, communication quality and cost.

[0090] Moreover, as the time when the enterprise goes to the cloud changes, most types of scheduling indicator data obtained will change accordingly. Based on the changed scheduling indicator data and the scheduling conditions of each cloud line configured by the enterprise, it can be determined whether it is necessary to schedule each cloud line used by the enterprise to go to the cloud, and how to schedule it, so as to meet the actual needs of the business and network conditions after the scheduling indicator data changes. This application does not limit the implementation method of how to implement the scheduling of at least one cloud line based on the scheduling indicator data and the cloud line scheduling conditions.

[0091] In summary, in the embodiments of the present application, facing the cloud migration needs of any enterprise, for the multiple cloud migration lines available between the enterprise intranet device and the cloud server, the enterprise can configure its own personalized cloud migration line scheduling conditions, and automatically obtain the corresponding scheduling indicator data according to the scheduling indicator indicated by the enterprise, so as to automatically schedule at least one cloud migration line currently suitable from multiple cloud migration lines according to the scheduling indicator data and the cloud migration line scheduling conditions, so as to realize the communication between the enterprise intranet device and the cloud server and reliably meet the enterprise's cloud migration needs. Among them, in the case of needing to schedule multiple cloud migration lines, relative to Figure 3 As shown in the enterprise cloud access method, the enterprise intranet equipment in this application will use multiple cloud access lines to connect to the cloud server at the same time, rationally utilize the network resources of different cloud access lines, and better meet the current business execution needs of the enterprise.

[0092] For example, if multiple cloud access lines include Internet lines and operator private network lines, in the early stage of the enterprise, when the enterprise has not successfully rented the operator private network line, the Internet cloud access method can be chosen to meet the enterprise's fast and convenient cloud access needs. Later, according to actual conditions, it can still choose to open a dedicated network at the supplier, or continue to use the Internet, or use the cloud access lines corresponding to the two networks to meet the actual communication needs between the enterprise's intranet equipment and the cloud server. This can be achieved by scheduling the enterprise's cloud access lines according to the method described in step S603. The implementation process of this embodiment will not be described in detail here.

[0093] In one possible implementation, when an enterprise executes a service with a high security level and high network quality requirements, it can dispatch the operator's private network line to carry the service, such as the enterprise's intranet equipment transmits the service data to the cloud server through the operator's private network line, reliably meeting the service needs; and for services with low security levels and low network quality requirements, it can dispatch the Internet line to carry, and the Internet line can also carry the enterprise's low priority or burst traffic services, so that the enterprise can reduce the dedicated line bandwidth, expand the Internet bandwidth, and then reduce the enterprise's network usage costs. In this way, when the enterprise executes different types of services on the cloud, according to the enterprise cloud method described above, the operator's private network line and the Internet line can be dispatched to carry the corresponding types of services respectively, and the advantages of different cloud lines can be used to meet the needs of the corresponding types of services respectively, solving the technical problem that the enterprise uses a fixed cloud line to communicate with the cloud server, which makes it unable to meet the different types of business needs of the enterprise.

[0094] Reference Figure 7 , is a flow chart of the optional embodiment 2 of the enterprise cloud migration method proposed in this application. This embodiment can describe an optional detailed implementation of the enterprise cloud migration method proposed above. This embodiment can provide convenient and efficient support for users (enterprises) to open services through the SD-WAN system, and provide users with a visual interface to configure their services and network parameters. Based on this, Figure 7 As shown, the enterprise cloud migration method proposed in this embodiment may include:

[0095] Step S701, in response to the enterprise's cloud migration request, output a cloud migration line scheduling configuration interface;

[0096] Step S702, in response to an input operation of a cloud migration line on the cloud migration line scheduling configuration interface, determining a plurality of cloud migration lines supported by an intranet device of the enterprise requesting cloud migration;

[0097] Step S703, in response to the scheduling configuration operation on the plurality of cloud migration lines, obtaining a cloud migration line scheduling condition for the enterprise requesting cloud migration;

[0098] In combination with the above description of the triggering implementation method of the enterprise cloud migration request, after logging into the enterprise cloud migration system login platform, the cloud migration line scheduling configuration operation can be triggered, and a visual cloud migration line scheduling configuration interface can be output to facilitate enterprise managers to independently configure the cloud migration line scheduling conditions based on the enterprise cloud migration on the cloud migration line scheduling configuration interface. This application does not restrict the layout format of the cloud migration line scheduling configuration interface and the implementation method of the cloud migration line scheduling condition configuration.

[0099] In a possible implementation, any enterprise requesting to go to the cloud can have the same network topology, that is, a system architecture consisting of multiple identical cloud lines, so that enterprise managers can configure the scheduling conditions for multiple cloud lines in the network topology when the enterprise goes to the cloud, that is, the cloud line scheduling conditions, based on the enterprise's own cloud needs. The same cloud line scheduling conditions can be configured for each branch of the enterprise, or different cloud line scheduling conditions can be configured for different branches, depending on the situation.

[0100] In another possible implementation, when there are a large number of candidate cloud-to-cloud lines, such as the Internet lines and private network lines of different operators described above, the enterprise can select multiple cloud-to-cloud lines that are suitable for itself, thereby forming a personalized network topology. Therefore, in the implementation process of step S702, multiple cloud-to-cloud lines supported by the enterprise's own intranet devices can be selected from the multiple candidate cloud-to-cloud lines displayed in the cloud-to-cloud line scheduling configuration interface (such as displayed through a corresponding drop-down menu, or directly displayed through a displayed window, etc.). If the enterprise intranet device is configured with a network access port corresponding to the candidate cloud-to-cloud line, it means that the enterprise intranet device supports the candidate cloud-to-cloud line and can be selected as a cloud-to-cloud line to be scheduled by the enterprise. Of course, the enterprise configuration personnel can also directly input multiple cloud-to-cloud lines supported by the enterprise intranet device in the cloud-to-cloud line scheduling configuration interface, etc. This application does not limit the cloud-to-cloud line input operation method in step S702.

[0101] After determining the network topology structure of the enterprise currently requesting to go to the cloud, the scheduling conditions of multiple cloud lines used to achieve communication between the enterprise's intranet and the cloud network (i.e., communication between each enterprise's intranet device and the cloud server) can be configured, which are recorded as cloud line scheduling conditions. This configuration operation can be implemented based on the enterprise's own business situation and the allocation method of network resources. This application does not limit the implementation method of step S703.

[0102] In some embodiments, step S703 may include but is not limited to: at least one scheduling indicator for multiple cloud-based lines may be displayed on the cloud-based line scheduling configuration interface, such as one or more combinations of time scheduling indicators, service scheduling indicators, network performance scheduling indicators, and other custom scheduling indicators, so that enterprise configuration personnel can select at least one suitable scheduling indicator from them and configure the corresponding scheduling indicator threshold. In response to the selection and configuration operation of the scheduling indicator, the enterprise cloud-based device can use the configured at least one scheduling indicator threshold to obtain the corresponding cloud-based line scheduling conditions for multiple cloud-based lines. Among them, the scheduling indicator threshold can be used to constitute the corresponding cloud-based line scheduling condition, as a critical value for triggering the scheduling of the cloud-based line indicated by the cloud-based line scheduling condition, that is, the corresponding type of scheduling indicator data reaches the scheduling indicator threshold, and the cloud-based line indicated by the cloud-based line scheduling condition can be scheduled to meet the corresponding cloud-based business needs.

[0103] For example, if the time scheduling index threshold is the time range value of 20:00-07:30, the corresponding cloud line scheduling condition can be: within the time scheduling threshold of 20:00-07:30, give priority to scheduling Internet lines to meet the cloud needs of enterprises; in other time periods, select other cloud lines or use other cloud line scheduling conditions to achieve autonomous and flexible scheduling of each cloud line. This application does not limit the value of the time scheduling index threshold, which can be determined by analyzing the changes in the business traffic of each cloud line over time, as well as the execution time and business attributes of each business supported by the enterprise.

[0104] If the business scheduling indicator threshold is the business priority threshold, it is used as the critical value of the business priority, and the corresponding cloud line scheduling condition can be: if the business priority is lower than the business scheduling indicator threshold, it means that the corresponding business executed by the enterprise has a lower priority, and the Internet line can be given priority to meet the cloud needs of this type of business; if the business priority is higher than the business scheduling indicator threshold, it means that the corresponding business executed by the enterprise has a higher priority, and the operator's private network line can be given priority to meet the cloud needs of this type of business.

[0105] If the network performance scheduling index threshold is a service flow threshold, it is used as a judgment of the traffic congestion level of the corresponding cloud-to-cloud line. The corresponding cloud-to-cloud line scheduling condition can be: if the service flow of a cloud-to-cloud line reaches the service flow threshold, it means that the cloud-to-cloud line is heavily loaded, and other cloud-to-cloud lines can be scheduled to carry the enterprise's cloud-to-cloud business, so as to achieve load sharing through multiple cloud-to-cloud lines, and avoid reducing the efficiency of cloud-to-cloud business due to service flow congestion. Among them, for cloud-to-cloud lines with different network performance, their corresponding service flow thresholds can be different. This application does not limit the load sharing implementation method, which can be determined according to the situation.

[0106] If other custom scheduling indicator thresholds are configured, the corresponding cloud line scheduling conditions may be: the corresponding scheduling indicator data reaches the custom scheduling indicator threshold, and the specified type of cloud line is scheduled according to the defined rules, etc. This application does not give detailed examples of the content of the cloud line scheduling conditions indicating different scheduling indicators. It includes but is not limited to the content of the cloud line scheduling conditions listed above, and can be flexibly configured or adjusted according to actual needs.

[0107] Step S704, obtaining the business attributes, current execution time, and network performance data of each monitored object of the business executed by the enterprise on the cloud;

[0108] It should be noted that the embodiment of the present application takes the scenario of configuring the cloud line scheduling conditions corresponding to the time scheduling indicators, service scheduling indicators, and network performance scheduling indicators as an example to obtain the corresponding scheduling indicator data acquisition method. When the scheduling indicator type indicated by the pre-configured cloud line scheduling conditions changes, the corresponding scheduling indicator data acquisition method is adjusted accordingly. The methods for obtaining the same type of scheduling indicator data are similar, and this application does not give detailed examples one by one.

[0109] In an embodiment of the present application, the business attributes of the services supported by each branch of the enterprise can indicate the priority of the service. The higher the priority of the service, the better the network performance of the corresponding scheduled cloud line. That is, the higher the execution priority of the service, the better the network performance of the cloud line required to be scheduled to transmit the service data. The network performance of the cloud line may include but is not limited to one or more network performance indicators such as business traffic, processor CPU performance, memory capacity, bandwidth utilization, etc.

[0110] Combined with the above description of the cloud line scheduling method, the service attributes may include the requirements of the corresponding business for the security, stability and network quality of the cloud line. This application does not limit the content of the service attributes that represent different requirements. The service priority can also be divided according to this requirement. For example, the higher the requirement, the higher the service priority, but it is not limited to this service priority division method. Of course, this application can also indicate the correspondence between the corresponding service and different cloud lines through service attributes, so that the corresponding relationship can be used later to schedule the cloud line for transmitting the corresponding business data. This application does not limit the representation of the corresponding relationship, such as tabular form, regular expression or other relational formula.

[0111] The current execution time of the business executed by the enterprise of this application can be the system time, which can be obtained by querying the system or network of the enterprise intranet equipment of the enterprise requesting to go to the cloud. Combined with the above description of the time scheduling index, the different execution times of various businesses supported by various enterprise branches correspond to the selected cloud lines inconsistently. The time scheduling index threshold can be used as the critical value of the execution time for scheduling different cloud lines. Based on this, the content of the cloud line scheduling conditions for scheduling multiple cloud lines is not described in detail.

[0112] In the embodiment of the present application, the monitored objects may include: various enterprise intranet devices (i.e., the above-mentioned SD-WAN devices), and network element devices connecting various enterprise intranet devices (such as the above-mentioned routers, switches, firewalls and other network devices). In addition to these two major types of network devices, physical or virtual interfaces of network devices may also be included as needed. The monitored objects may be determined based on the configured scheduling indicator type, including but not limited to the object types described in this embodiment.

[0113] Among them, the network performance data for SD-WAN equipment can be the current data of one or more indicators such as the CPU performance, memory capacity and bandwidth utilization of the corresponding equipment; the network performance data of the network element equipment can include the current data of one or more indicators such as the port status, packet loss rate and delay time of the corresponding equipment; the network performance data of the interface can be the current data of one or more indicators such as the inflow / outflow traffic and bandwidth utilization of the corresponding physical or virtual interface. This application does not limit the content of the network performance data of each detected object and its acquisition method. Optionally, the network performance data can be collected by the corresponding monitored object itself and actively reported to the monitoring component, or the monitoring component can periodically poll each monitored object to collect the corresponding network performance data.

[0114] It should be noted that in the actual application of this application, during the configuration of the cloud line scheduling conditions, if the selected scheduling indicator type or threshold is different, the corresponding configured cloud line scheduling conditions are different. After that, the scheduling indicator data that needs to be obtained in real time or periodically can change accordingly. This application can obtain the corresponding scheduling indicator data by determining the scheduling indicator type indicated by each configured cloud line scheduling condition. It is also possible to generate a corresponding scheduling indicator data acquisition instruction / event after determining the type of scheduling indicator to be obtained in the configuration stage to obtain the corresponding type of scheduling indicator data, etc. This application does not limit the triggering method of step S704.

[0115] Step S705: Generate scheduling instructions for multiple cloud-access lines based on the acquired service attributes, current execution time, and network performance data, as well as the corresponding configured cloud-access line scheduling conditions; the scheduling instructions indicate at least one cloud-access line scheduled for communication between the enterprise intranet device and the cloud server and the corresponding scheduling parameters;

[0116] According to the method described above, the current various scheduling indicator data can be obtained, and combined with the pre-configured scheduling conditions of the corresponding type of cloud lines, a comprehensive analysis can be made on when to schedule which one or more cloud lines to meet the cloud needs of the enterprise, and the corresponding scheduling instructions can be generated. The analysis process is implemented using a suitable algorithm, which can be a scheduling analysis algorithm that implements one or more aspects of business traffic prediction, load balancing, and resource optimization, such as a scheduling analysis model based on artificial intelligence algorithm training or a pre-configured / defined scheduling analysis algorithm, etc., to optimize the scheduling plan. This application does not limit the type of scheduling analysis algorithm and its analysis implementation method.

[0117] Step S706, performing a rationality check on the scheduling instruction;

[0118] Step S707, execute and verify the reasonable scheduling instructions, control the enterprise intranet device to connect to at least one cloud access line scheduled, and realize the communication between the enterprise intranet device and the cloud server.

[0119] In some embodiments, after generating a scheduling instruction according to the method described above, the scheduling instruction can be directly executed to schedule at least one cloud access line from the network topology structure to connect the enterprise intranet device, so that the enterprise intranet devices of various branches of the enterprise can communicate with the cloud server through the connected cloud access line, thereby meeting the enterprise's cloud needs.

[0120] In other embodiments, before executing the generated scheduling instruction, the scheduling instruction can also be checked for rationality, such as checking the scheduling parameters such as the scheduling frequency and scheduling time of each cloud-going line indicated by the scheduling instruction, so as to avoid mis-scheduling caused by abnormal conditions such as network jitter and delay, thereby affecting the cloud-going service demand. Based on this, this embodiment can determine whether the scheduling frequency of each cloud-going line indicated by the scheduling instruction exceeds the frequency threshold. If it exceeds, it means that the scheduling frequency of the cloud-going line is too high, and the cloud-going line can be scheduled to print, that is, the scheduling frequency of the cloud-going line can be reduced; for designated service data (such as data from the designated interface of the enterprise intranet device), delay processing can be performed, such as interface UP / DOWN (which can represent two relative states, such as the activation state / inactivation state of the switch, or different operation states or management states, etc., which can be determined according to the corresponding enterprise intranet device type) and other information, after two delays (which can be a pre-configured delay time, and this application does not limit the delay value and number of times), then execute the corresponding scheduling instruction.

[0121] After the rationality check described above but not limited to, it is determined that the scheduling instruction to be executed is reasonable, and the scheduling instruction that has been verified to be reasonable can be directly executed. For the scheduling instruction that has been verified to be unreasonable, corresponding correction operations can be performed on it, such as correcting the scheduling frequency or scheduling time indicated by the scheduling instruction, etc., and the corrected scheduling instruction is executed again to control the enterprise intranet device to connect to at least one scheduled cloud line at the indicated scheduling time to achieve communication between the enterprise intranet device and the cloud server, or control the enterprise intranet device to connect to at least one scheduled cloud line, and then trigger the enterprise intranet device to transmit business data to the cloud server through at least one connected cloud line at the indicated scheduling time to meet the cloud needs of the corresponding business.

[0122] Based on the above analysis, in the embodiment of the present application, a visual interface is provided for customers (enterprises requesting cloud migration) at the SD-WAN system level, so that customers can independently configure the network topology required for their own cloud migration, that is, select multiple cloud migration lines used by the enterprise to migrate to the cloud, and independently configure cloud migration line scheduling conditions that meet the enterprise's own conditions, so as to realize the scheduling of multiple cloud migration lines for communication between the enterprise's intranet devices and the cloud server, which is no longer limited to a fixed cloud migration line. In this way, the enterprise's cloud migration equipment can determine whether the business attributes of the enterprise's cloud migration business currently obtained, the current execution time, and the network performance data of each monitored object meet the corresponding cloud migration line scheduling conditions, and ensure that the scheduling instructions generated based on the conditional judgment results are more in line with the actual cloud needs of the enterprise's own business and the actual network conditions of multiple cloud migration lines, which is conducive to improving the reliability, efficiency, and security of the enterprise's cloud migration. Moreover, this embodiment will perform a rationality check on the generated scheduling instructions before executing the scheduling instructions, execute the verified reasonable scheduling instructions, and schedule at least one cloud line according to the corresponding parameters such as scheduling time and scheduling frequency to realize communication between the enterprise intranet equipment and the cloud server. It can reliably avoid erroneous scheduling caused by abnormal conditions such as network jitter and delay caused by unreasonable parameters, and further improve the reliability and accuracy of cloud line scheduling.

[0123] In addition, since the embodiment of the present application selects multiple cloud-to-cloud lines and integrates them together as multiple candidate cloud-to-cloud lines for communication between enterprise intranet devices and cloud servers, it provides customers with a one-stop solution, and provides convenient and efficient support for customers to open services through SD-WAN technology, thereby improving the efficiency of opening cloud-to-cloud services for enterprises. And since there are low-cost lines among the multiple candidate cloud-to-cloud lines, such as Internet lines, the service traffic can be distinguished by service attributes, so that it passes through different cloud-to-cloud lines, which not only meets the cloud-to-cloud needs of various services, but also reduces the bandwidth requirements of enterprise dedicated lines (i.e., operator dedicated network lines), saving the network usage costs of enterprises.

[0124] In some embodiments proposed in the present application, the scheduling implementation process of the cloud access line may also include but is not limited to at least one of the following implementation methods:

[0125] If it is determined that the current execution time in the scheduling indicator data (the execution time of the enterprise's cloud-based business execution, which can refer to the system time) is within the scheduling time threshold of any cloud-based line (i.e., the above-mentioned time scheduling indicator threshold), the enterprise intranet device is controlled to connect to the cloud-based line to achieve communication between the enterprise intranet device and the cloud server. It can be seen that for cloud-based lines with different performances, different scheduling time thresholds can be configured independently, or scheduling time thresholds that overlap in some time, or scheduling time thresholds that are configured the same for some cloud-based lines, etc. The enterprise configuration personnel can flexibly configure according to the actual situation. In this way, the enterprise intranet device can be controlled to connect to cloud-based line 1 within the ▽t1 time period to meet the cloud-based needs of executing business within this time period; and can be connected to cloud-based line 2 within the ▽t2 time period to meet the cloud-based needs of executing business within this time period. Based on this, the switching connection between the enterprise intranet device and different cloud-based lines is achieved, and the superior performance of different cloud-based lines is fully utilized to meet the cloud-based needs of the enterprise.

[0126] It should be noted that within the same time period, the enterprise intranet devices can be controlled to connect to one or more cloud lines as needed, so that the enterprise intranet devices can be connected to the cloud server through at least one cloud line to meet the cloud needs of the enterprise to execute business.

[0127] Combined with the above description of business attributes and business priorities, this application can determine the cloud-based lines corresponding to the corresponding business priorities based on the business attributes in the scheduling index data, and control the enterprise intranet equipment to connect to the corresponding cloud-based lines, so as to transmit the business data corresponding to different priorities to the cloud server through different cloud-based lines. Since the higher the priority of the business in this application, the better the network performance of the corresponding cloud-based lines, in one possible implementation, based on the business attributes of the business executed by the enterprise on the cloud, if it is determined that the business belongs to the first priority business, the enterprise intranet equipment can be controlled to connect to the operator's private network line; if it is determined that the business belongs to the second priority business, the enterprise intranet equipment can be controlled to connect to the Internet line. Since multiple cloud-based lines in this application are connected to the cloud server, the business data of services of different priorities can be transmitted through cloud-based lines that meet their own cloud-based needs, thereby reliably meeting the corresponding business cloud-based needs.

[0128] Combined with the above description of network performance indicators, the present application can also determine that the current load of any cloud-to-cloud line has reached its load scheduling threshold based on the network performance data of any cloud-to-cloud line in the scheduling indicator data, indicating that the business traffic carried by the cloud-to-cloud line is congested, and the enterprise intranet equipment can be controlled to connect to other cloud-to-cloud lines to achieve communication between the enterprise intranet equipment and the cloud server; the current load of the other cloud-to-cloud lines has not reached its load scheduling threshold, and can share the enterprise's cloud-to-cloud business, avoiding the adverse effects caused by the traffic congestion of being limited to a fixed cloud-to-cloud line, such as the adverse effects on the efficiency of business cloud-to-cloud. It can be seen that this embodiment can reliably and efficiently meet the enterprise's cloud-to-cloud needs by regularly and accurately obtaining the actual network status of each cloud-to-cloud line supported by the enterprise, and determining which one or more cloud-to-cloud lines are suitable for scheduling for the current enterprise cloud-to-cloud.

[0129] It should be noted that according to the various scheduling indicators indicated by the scheduling conditions of at least one cloud line configured by the enterprise, after obtaining the corresponding type of scheduling indicator data by adopting the timed polling method or the active reporting method, the corresponding cloud line scheduling method described above can be used to determine at least one cloud line to be scheduled that is suitable for the cloud business situation or network situation represented by the current scheduling indicator data. If the cloud lines to be scheduled are different according to different cloud line scheduling conditions, the scheduling analysis algorithm used for any aspect such as traffic prediction, load balancing and resource optimization can be used to comprehensively analyze the various scheduling indicator data currently obtained and the corresponding cloud line scheduling conditions to determine which one or more cloud lines are currently suitable for scheduling, as well as the corresponding scheduling time, etc. The present application does not impose any restrictions on the scheduling analysis implementation method, which can be determined according to the actual situation.

[0130] It can be seen that according to the scheduling method described above, a cloud-to-cloud line scheduling condition is pre-configured (as in the above example, it can indicate a scheduling indicator. In other embodiments, a cloud-to-cloud line scheduling condition can also indicate two or three or more scheduling indicators, and a complex condition composed of a combination of corresponding multiple scheduling indicator thresholds, etc.), and the corresponding type of scheduling indicator data is obtained. At least one cloud-to-cloud line can be directly scheduled to meet the cloud-to-cloud needs of the enterprise based on the cloud-to-cloud line scheduling condition and the corresponding scheduling indicator data. That is, it is determined whether the currently acquired scheduling indicator data meets the cloud-to-cloud line scheduling condition. If it does (such as the scheduling indicator data reaches the corresponding scheduling indicator threshold), the cloud-to-cloud line indicated by the cloud-to-cloud line scheduling condition can be scheduled to connect to the enterprise intranet device, so that the enterprise intranet device is connected to the cloud server through the cloud-to-cloud line.

[0131] If two corresponding cloud-to-cloud line scheduling conditions are configured in advance for two scheduling indicators (such as any two scheduling indicators listed above), that is, one cloud-to-cloud line scheduling condition is configured for each of the scheduling indicators, for the corresponding type of scheduling indicator data currently obtained, if they all meet the corresponding cloud-to-cloud line scheduling conditions, and the cloud-to-cloud lines indicated by the scheduling conditions of each cloud-to-cloud line are different, then in combination with the method described above, the different types of input scheduling indicator data and the corresponding cloud-to-cloud line scheduling conditions can be analyzed based on the scheduling analysis algorithm to determine whether it is currently suitable to schedule at least one cloud-to-cloud line connection for the enterprise's intranet equipment. Similarly, if more cloud-to-cloud line scheduling conditions are configured in advance for more types of scheduling indicators, this scheduling analysis method can also be used to reliably determine the scheduling strategy that is currently suitable for the enterprise's current business cloud-to-cloud needs and the current network conditions of each cloud-to-cloud line, thereby meeting the enterprise's cloud-to-cloud needs.

[0132] In other embodiments, for any of the optional examples above, no matter how many cloud access line scheduling conditions are pre-configured, after obtaining the corresponding type of scheduling indicator data, they can be used as scheduling optimization input information. Based on the pre-configured scheduling analysis algorithm, the scheduling optimization income information is comprehensively analyzed to determine at least one cloud access line suitable for scheduling to the enterprise intranet device under the current network state, control the enterprise intranet device to connect to the at least one cloud access line, and connect to the cloud server through the at least one cloud access line to realize the enterprise's cloud needs.

[0133] Among them, in the cloud access line scheduling analysis process, if the current enterprise intranet device is connected to at least one cloud access line, it can be determined whether it is necessary to schedule and optimize the currently connected cloud access lines according to the method described above; it can also be determined whether it is necessary to schedule the currently connected cloud access line based on the scheduling analysis algorithm by performing a rationality check on the scheduling instructions generated based on the scheduling analysis algorithm, such as checking any one or more scheduling parameters such as scheduling frequency and scheduling time, and determining whether it is necessary to schedule the currently connected cloud access line based on the check result, thereby determining at least one cloud access line that the enterprise intranet device is currently suitable for connecting to meet the cloud access needs of various business of the enterprise.

[0134] In some other embodiments proposed in the present application, in the configuration of the cloud line scheduling conditions involved in the present application, in addition to the implementation method of obtaining the corresponding cloud line scheduling conditions by using the configured various scheduling indicator thresholds as described above, the present application can also configure the corresponding scheduling method for the selected scheduling indicator, thereby obtaining the corresponding cloud line scheduling conditions. The scheduling method in the embodiment of the present application may include but is not limited to the load sharing method, such as a single main line or a main-backup line and other line scheduling methods, and the configuration process is similar to the configuration operation method described in the corresponding part of step S703. The corresponding scheduling method can also be selected or input on the cloud line scheduling configuration interface to obtain the cloud line scheduling conditions for each scheduling method.

[0135] Based on this, when the obtained scheduling indicator data contains business attributes, the enterprise intranet device can be controlled to connect to the corresponding cloud line according to the configured load sharing method, and the business data output by the enterprise intranet device can be transmitted to the cloud server through the corresponding cloud line. The load sharing method in the embodiment of the present application may include but is not limited to the flow-by-flow load sharing method and the packet-by-packet load sharing method.

[0136] In a possible implementation, if the load sharing mode indicated by the pre-configured cloud line scheduling conditions is a flow-by-flow load sharing mode, the business attributes of the business cloud execution service may include but are not limited to the five-element or three-element load sharing factors among the source (business message sending end) IP address, target (business message receiving end) IP address, port number, source MAC (Media Access Control) address, and destination MAC address of the business message, and thereby determine which one or more cloud lines are used to transmit the business data (such as business messages) of the corresponding cloud service, which can be configured in the cloud line scheduling conditions representing the flow-by-flow load sharing mode.

[0137] Exemplarily, based on the load sharing factors obtained as listed above, after controlling the connection between the enterprise intranet equipment and the scheduled cloud line, it can be ensured that the corresponding type of business data (such as business messages from the source IP address) is transmitted to the cloud server through the cloud line with the specified target IP address, that is, it is ensured that a certain type of business traffic can only be transmitted through the specified cloud line (such as the Internet line or the operator's private network line).

[0138] In another possible implementation, in order to realize the flow-by-flow load sharing method, a cloud line carrying the corresponding service can be set according to the service message type and / or service priority indicated by the obtained service attributes, so that the enterprise can configure a designated cloud line for special types of services or designated priority services, and obtain the cloud line scheduling conditions representing the configuration content. In this way, after obtaining the service attributes of the enterprise's cloud-based services, the corresponding cloud line can be scheduled and connected for the enterprise's intranet equipment according to the flow-by-flow load sharing method indicated by the cloud line scheduling conditions to meet the current service cloud needs.

[0139] In the case where the cloud access line scheduling condition indicates that the enterprise cloud access services are load-balanced packet by packet through different cloud access lines, that is, the above scheduling mode is a load-balanced packet by packet mode, the corresponding relationship between the execution order of the enterprise cloud access service messages and the multiple cloud access lines can be determined during the configuration of the cloud access line scheduling condition, such as determining that the first service message (i.e., service data packet) is transmitted through cloud access line 1, and the second service message is transmitted through cloud access line 2, and so on. After controlling the enterprise intranet device to connect to multiple cloud access lines at the same time, each service message output by the enterprise intranet device can be distributed packet by packet in sequence to different cloud access lines for transmission, thereby realizing load balancing scheduling of the enterprise cloud access services by multiple cloud access lines. In this case, the corresponding service attribute obtained can be the transmission order of the corresponding service message, without analyzing other contents such as the service message type and service priority, thereby improving the service message distribution efficiency. Compared with allocating all the enterprise cloud access service messages to a fixed cloud access line for transmission, the probability of service traffic congestion is reduced, and the service cloud access efficiency and reliability are improved.

[0140] In combination with the above analysis, based on the currently acquired network performance data, when it is determined that the current load of a certain cloud-to-cloud line has reached its load scheduling threshold, the business data of the cloud-to-cloud business originally carried by the cloud-to-cloud line is allocated to other cloud-to-cloud lines. In the process, the load sharing method described above can also be combined to achieve scheduling of at least one cloud-to-cloud line to solve the adverse effects caused by business traffic congestion. The implementation process is similar and will not be described in detail in this application.

[0141] In order to further improve the reliability of enterprise cloud access, the present application also proposes to configure at least one group of cloud access lines, one group of cloud access lines includes a main line and a backup line, so that in the event of a failure of the main line, the enterprise intranet equipment can be promptly controlled to switch to the corresponding backup line to continue to implement cloud services. Therefore, when the pre-configured cloud access line scheduling conditions indicate this type of line scheduling method, the main line and backup line in the multiple cloud access lines can be determined based on the network performance data of multiple cloud access lines in the currently acquired scheduling indicator data. If the main line communication is normal, the enterprise intranet equipment is controlled to connect to the main line to realize the communication between the enterprise intranet equipment and the cloud server; if it is determined that the main line communication is abnormal, the enterprise intranet equipment is controlled to switch from the main line to the backup line to continue to realize the communication between the enterprise intranet equipment and the cloud server. Since the switching time between different lines is extremely short, such as the switching time at the millisecond level, enterprise personnel usually do not perceive the switching of the cloud access line, which will not affect the currently executing cloud access business, thereby improving the reliability and efficiency of the business cloud access.

[0142] Based on the enterprise cloud migration methods described in the above embodiments, this application can use the SD-WAN system to provide customers with a visual interface to configure services and network parameters, and display the network status of customers in real time. Figure 8 The flowchart of the optional embodiment 3 of the method for migrating enterprises to the cloud proposed in the present application is shown. Combined with the description of the method for migrating enterprises to the cloud described in the above embodiments, the method for migrating enterprises to the cloud proposed in this embodiment may include:

[0143] Step S801, in response to the enterprise's cloud migration request, output a cloud migration line scheduling configuration interface;

[0144] Step S802, in response to an input operation on the cloud line scheduling configuration interface, obtaining a cloud line scheduling condition for the enterprise requesting cloud migration; different cloud line scheduling conditions indicate different scheduling indicators for multiple cloud lines, all of which are used to implement cloud line scheduling for communication between the enterprise intranet device and the cloud server;

[0145] Regarding the implementation method of step S802, reference may be made to the description of the corresponding parts of the above embodiments, such as the description of the corresponding parts of step S702 and step S703.

[0146] Step S803, obtaining scheduling indicator data corresponding to the scheduling conditions of the cloud access line;

[0147] Step S804, outputting a scheduling monitoring interface, and displaying various scheduling indicator data on the scheduling monitoring interface;

[0148] In order to facilitate customers to intuitively understand the business situation and network situation of the enterprise, the present application proposes to display the obtained various scheduling indicator data through a visual interface. Different types of scheduling indicator data can be visualized through one or more display methods such as tables, curves, bar charts or pie charts. This can be independently configured according to the data type and actual display needs. The configuration implementation process of the display method is similar to the configuration process of the cloud line scheduling conditions described above, and the embodiments of the present application will not be described in detail here.

[0149] Step S805: Analyze each scheduling indicator data and the corresponding cloud-access line scheduling conditions, generate scheduling instructions for multiple cloud-access lines based on the obtained scheduling analysis results, and output a scheduling analysis interface to display the scheduling analysis results;

[0150] Combined with the description of the corresponding part of the above embodiment, in order to improve the reliability and accuracy of scheduling, the various scheduling indicator data currently obtained and the corresponding combinations of scheduling conditions for each cloud line can be comprehensively analyzed based on the scheduling analysis algorithm to determine the appropriate scheduling mode, scheduling frequency, scheduling time and other scheduling parameters to generate a scheduling instruction representing the content, or generate a scheduling instruction that verifies reasonableness based on this. The comprehensive analysis process can be carried out according to the cloud line scheduling process described in the above embodiment, and the analysis process of the various scheduling indicator data currently obtained and the corresponding scheduling conditions for each cloud line can also include one or more aspects of combined analysis such as business traffic prediction, load balancing and resource optimization performed based on the analysis results. It can be implemented based on the selected scheduling analysis algorithm, and the implementation process is not described in detail in this application.

[0151] In the above-mentioned scheduling analysis process, the corresponding scheduling analysis results can be displayed through the output scheduling analysis interface, such as intuitively displaying the scheduling analysis results in the form of charts or reports, so as to facilitate customers to quickly and accurately understand the scheduling logic of the enterprise cloud system and evaluate whether the scheduling analysis results are appropriate. If appropriate, corresponding scheduling instructions can be generated in response to the confirmation operation of the scheduling analysis results, but it is not limited to this scheduling instruction generation method.

[0152] Step S806, executing the scheduling instruction, controlling the enterprise intranet device to connect to at least one scheduled cloud access line, and realizing communication between the enterprise intranet device and the cloud server;

[0153] Preferably, as described in the above embodiment, before executing the scheduling instruction, a rationality check may be performed on it. If the check is reasonable, the scheduling instruction is executed; if the check is unreasonable, the scheduling instruction may be corrected and then the corrected scheduling instruction is executed. This embodiment does not describe in detail how to schedule at least one cloud route based on the content of the scheduling instruction to meet the enterprise's cloud needs.

[0154] Step S807, determining a scheduling optimization strategy based on at least the currently obtained cloud-to-cloud line scheduling result and scheduling analysis result and displaying it on the scheduling analysis interface;

[0155] Step S808, in response to the determination operation of the scheduling optimization strategy displayed on the scheduling analysis interface, execute the scheduling optimization strategy to perform scheduling optimization on at least one cloud communication line between the enterprise intranet device and the cloud server.

[0156] In some embodiments proposed in the present application, as the time of enterprise cloud migration progresses, the various scheduling indicator data obtained and even the scheduling conditions of the cloud migration lines may change, and it is necessary to schedule the cloud migration lines multiple times. Each time, the method described in steps S801 to S806 can be used to implement the scheduling of multiple cloud migration lines for communication between the enterprise's internal devices and the cloud server.

[0157] Preferably, in order to further improve the scheduling accuracy, the present application may adopt a PDCA (Plan-Do-Check-Act) cycle management method. After completing the first cloud-based line scheduling according to the method described above, the result of this scheduling, i.e., the cloud-based line scheduling result, is recorded, such as the newly acquired network performance data, or the resource optimization result or load sharing condition obtained based on the change of the network performance data, so as to further analyze the scheduling result of this scheduling in combination with the scheduling analysis result of this scheduling result, and obtain the corresponding scheduling optimization strategy to optimize this scheduling instruction. In a possible implementation, the analysis result may be fed back to the scheduling analysis algorithm to optimize the scheduling analysis algorithm, such as optimizing network performance indicators, reliability, and fault tolerance, so as to continue to analyze the newly acquired scheduling indicator data and cloud-based line scheduling conditions based on the optimized scheduling analysis algorithm, generate new scheduling instructions, and complete the next scheduling of the cloud-based line, so as to meet the cloud-based needs of the business, reduce the cloud-based cost, and may also improve the cloud-based efficiency, security, and reliability as needed. The present application does not describe the scheduling optimization method in detail, which includes but is not limited to the optimization indicators described in this embodiment.

[0158] The above-mentioned scheduling optimization strategy can also be displayed through a visual interface, such as displaying the scheduling optimization strategy on the currently output scheduling analysis interface, or outputting a new optimization interface to display the scheduling optimization strategy, etc., so that the customer can evaluate the scheduling optimization strategy. If the scheduling optimization strategy is agreed, the confirmation optimization button is triggered, and the enterprise cloud device responds to the confirmation operation and can execute the scheduling optimization strategy. At least one cloud line currently used for communication between the enterprise intranet device and the cloud server can be scheduled and optimized, such as switching at least one cloud line to other cloud lines, or adding at least one cloud line, so that the enterprise intranet device can communicate with the cloud server through multiple cloud lines to meet the cloud needs of different businesses.

[0159] The above introduces the enterprise cloud migration method provided by the embodiment of the present application, and the device for executing the above-mentioned enterprise cloud migration method will be introduced below.

[0160] Reference Fig. 9 , is a schematic diagram of the structure of an enterprise cloud device proposed in an embodiment of the present application, and the enterprise cloud device can be implemented based on the SD-WAN network system, such as Fig. 9 As shown, the enterprise cloud device may include: an information configuration component 910, a data monitoring component 920, a scheduling analysis component 930 and a scheduling execution component 940 deployed on the control plane of the SD-WAN network system, and a data calculation component 950 and a scheduling response component 960 deployed on the forwarding plane of the SD-WAN network system, wherein:

[0161] The information configuration component 910 can be used to respond to the enterprise cloud migration request and obtain the cloud migration line scheduling conditions configured by the enterprise requesting cloud migration; different cloud migration line scheduling conditions indicate different scheduling indicators for multiple cloud migration lines, all of which are used to implement cloud migration line scheduling for communication between enterprise intranet devices and cloud servers;

[0162] In a possible implementation, the present application may be implemented using a visual interface UI. In this case, the information configuration component 910 may include:

[0163] A cloud-based line scheduling configuration output unit, used to respond to an enterprise cloud-based request and output a cloud-based line scheduling configuration interface;

[0164] A cloud-online determination unit, configured to determine, in response to a cloud-online input operation on the cloud-online scheduling configuration interface, a plurality of cloud-online circuits supported by an intranet device of the enterprise requesting cloud-online;

[0165] The cloud migration line scheduling condition obtaining unit is used to obtain the cloud migration line scheduling condition for the enterprise requesting cloud migration in response to the scheduling configuration operation of the multiple cloud migration lines.

[0166] Optionally, the cloud line scheduling condition obtaining unit may include:

[0167] A scheduling indicator display unit, configured to display at least one scheduling indicator for the plurality of cloud-based lines on the cloud-based line scheduling configuration interface; the at least one scheduling indicator comprises one or more combinations of a time scheduling indicator, a service scheduling indicator, a network performance scheduling indicator, and a custom scheduling indicator;

[0168] A scheduling condition configuration unit is used to obtain corresponding cloud-to-cloud line scheduling conditions for the multiple cloud-to-cloud lines by using at least one configured scheduling indicator threshold or scheduling method in response to the selection and configuration operation of the scheduling indicator.

[0169] The data monitoring component 920 can be used to obtain scheduling indicator data corresponding to the scheduling conditions of the cloud line.

[0170] In a possible implementation, in order to obtain different scheduling indicator data, the data monitoring component 920 may include at least one of the following acquisition units to obtain the corresponding scheduling indicator data of each monitoring object:

[0171] The network performance data acquisition unit is used to obtain the network performance data of each monitored network device if the cloud line scheduling condition indicates that there is a network performance scheduling indicator; it can be achieved through a timed polling method or an active reporting method.

[0172] A business data acquisition unit, configured to acquire business attributes of the business executed by the enterprise on the cloud if the cloud-online scheduling condition indicates that there is a business scheduling indicator; the business attributes indicate the corresponding relationship between the business and different cloud-online routes;

[0173] An execution time acquisition unit is used to obtain the current execution time of the enterprise's cloud-based business execution if the scheduling condition of the cloud-based line indicates that there is a scheduling time indicator; the cloud-based lines selected corresponding to different execution times are inconsistent.

[0174] For any scheduling indicator data monitored by the data monitoring component 920, the customer can perform a visual query through the visual interface UI, and the implementation process is not described in detail. Among them, the network performance data can be obtained by the data calculation component 950 and actively reported to the data monitoring component 920 of the control plane, or the data monitoring component 920 periodically polls the data calculation component 950 to obtain the network performance data to support visual query.

[0175] The scheduling analysis component 930, the scheduling execution component 940 and the scheduling response component 960 are used together to schedule at least one of the cloud lines based on the scheduling indicator data and the cloud line scheduling conditions to achieve communication between the enterprise intranet device and the cloud server.

[0176] In combination with the above description of the enterprise cloud migration method, the scheduling analysis component 930 can be used to generate scheduling instructions for the multiple cloud migration lines according to the scheduling indicator data and the cloud migration line scheduling conditions;

[0177] The scheduling execution component 940 can perform a rationality check on the scheduling instruction, and send the scheduling instruction that has been verified to be reasonable to the scheduling response component 960, which executes the scheduling instruction to control the enterprise intranet device to connect to at least one of the scheduled cloud lines, so as to realize the communication between the enterprise intranet device and the cloud server. Optionally, a standard Restful interface is defined by the control plane. After receiving the scheduling instruction from the control plane, the business traffic can be reasonably distributed among multiple lines by updating the routing, that is, the business traffic is transmitted through at least one of the scheduled cloud lines. The scheduling process can refer to the description of the corresponding part of the above method embodiment, such as load sharing method or primary and backup line scheduling method.

[0178] It can be seen that there may be a logical relationship between the above components, that is, the logical relationship represented by the enterprise cloud migration method provided by this application, combined with Fig.10 The processing steps represented by the serial numbers in the figure can first be set through the information configuration component 910 to set the threshold value of each scheduling indicator or the scheduling mode and other information to configure the scheduling conditions of the corresponding cloud-based lines. Combined with the scheduling indicator data obtained by the data monitoring component 920 (such as network performance data indicating the load status of each cloud-based line, etc.), a comprehensive analysis and calculation is performed in the scheduling analysis component 930, and the obtained scheduling analysis results are sent to the scheduling execution component 940. The scheduling execution component 940 determines whether the scheduling analysis results are reasonable (that is, the rationality of the scheduling instructions generated based on the scheduling analysis results is checked) according to its own algorithm, and whether the corresponding scheduling instructions need to be executed. If so, it is sent to the scheduling response component 960 of the forwarding plane. The forwarding plane executes the scheduling instructions. After meeting the cloud-based needs of the enterprise, the data calculation component 950 of the forwarding plane calculates new scheduling indicator data and feeds it back to the control plane for optimizing the scheduling analysis algorithm to reduce the cloud-based costs.

[0179] Also provided in an embodiment of the present application is a computer program product including computer-readable instructions. When the computer-readable instructions are executed on an electronic device, the electronic device implements any one of the enterprise cloud migration methods provided in the embodiments of the present application.

[0180] A computer-readable storage medium is also provided in an embodiment of the present application. The storage medium carries one or more computer programs. When the one or more computer programs are executed by an electronic device, the electronic device can implement any one of the enterprise cloud migration methods provided in the embodiment of the present application.

[0181] It should also be noted that the device embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed over multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the drawings of the device embodiments provided by the present application, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines.

[0182] Through the description of the above implementation mode, the technicians in the field can clearly understand that the present application can be implemented by means of software plus necessary general hardware, and of course, it can also be implemented by special hardware including special integrated circuits, special CPUs, special memories, special components, etc. In general, all functions completed by computer programs can be easily implemented by corresponding hardware, and the specific hardware structure used to implement the same function can also be various, such as analog circuits, digital circuits or special circuits. However, for the present application, software program implementation is a better implementation mode in more cases. Based on such an understanding, the technical solution of the present application is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a readable storage medium, such as a computer floppy disk, a U disk, a mobile hard disk, a ROM, a RAM, a disk or an optical disk, etc., including a number of instructions to enable a computer device (which can be a personal computer, a training device, or a network device, etc.) to execute the methods described in each embodiment of the present application.

[0183] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the above-mentioned process or function according to the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium, for example, the computer instructions can be transmitted from a website site, computer, training equipment or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line (DSL)) or wireless (e.g., infrared, wireless, microwave, etc.) mode to another website site, computer, training equipment or data center. The computer-readable storage medium can be any available medium that a computer can store or a data storage device such as a training equipment, a data center, etc. that contains one or more available media integrations. The available media may be magnetic media (eg, floppy disks, hard disks, magnetic tapes), optical media (eg, DVDs), or semiconductor media (eg, solid state disks (SSDs)).

Claims

1. A method for enterprise cloud migration, characterized in that: The method comprises: In response to an enterprise's cloud migration request, obtaining a cloud migration line scheduling condition configured by the enterprise requesting cloud migration; different cloud migration line scheduling conditions indicate different scheduling indicators for multiple cloud migration lines, all of which are used to implement cloud migration line scheduling for communication between enterprise intranet devices and cloud servers; Obtaining scheduling indicator data corresponding to the scheduling conditions of the cloud-based line; Based on the scheduling indicator data and the cloud access line scheduling conditions, scheduling at least one of the cloud access lines to achieve communication between the enterprise intranet device and the cloud server; Among them, if multiple cloud access lines are scheduled to connect the enterprise intranet equipment and the cloud server respectively.

2. The method according to claim 1, characterized in that The step of obtaining, in response to the enterprise's cloud migration request, a cloud migration line scheduling condition configured by the enterprise requesting cloud migration includes: In response to the enterprise's cloud migration request, output the cloud migration line scheduling configuration interface; In response to a cloud-online input operation on the cloud-online scheduling configuration interface, determining a plurality of cloud-online circuits supported by an intranet device of the enterprise requesting cloud-online; In response to the scheduling configuration operation on the multiple cloud migration lines, a cloud migration line scheduling condition for the enterprise requesting cloud migration is obtained.

3. The method according to claim 2, characterized in that The step of obtaining, in response to the scheduling configuration operation on the plurality of cloud migration lines, a cloud migration line scheduling condition for the enterprise requesting cloud migration includes: Displaying at least one scheduling indicator for the plurality of cloud-based lines on the cloud-based line scheduling configuration interface; the at least one scheduling indicator includes one or more combinations of a time scheduling indicator, a service scheduling indicator, a network performance scheduling indicator, and a custom scheduling indicator; In response to the selection and configuration operation of the scheduling indicator, corresponding cloud-to-cloud line scheduling conditions for the multiple cloud-to-cloud lines are obtained using at least one configured scheduling indicator threshold or scheduling method.

4. The method according to any one of claims 1 to 3, characterized in that: The obtaining of scheduling indicator data corresponding to the scheduling condition of the cloud access line includes at least one of the following implementation methods: If the cloud-access line scheduling condition indicates that there is a network performance scheduling indicator, obtaining network performance data of each monitored network device; If the cloud-online scheduling condition indicates that there is a service scheduling indicator, obtain the service attribute of the enterprise's cloud-online service execution; the service attribute indicates the corresponding relationship between the service and different cloud-online services; If the cloud-based line scheduling condition indicates that there is a scheduling time indicator, the current execution time of the enterprise's cloud-based business execution is obtained; The cloud routes selected corresponding to different execution times are inconsistent.

5. The method according to claim 4, characterized in that The step of scheduling at least one of the cloud access lines based on the scheduling indicator data and the cloud access line scheduling condition to achieve communication between the enterprise intranet device and the cloud server includes at least one of the following implementation methods: Determine that the current execution time in the scheduling indicator data is within the scheduling time threshold of any of the cloud-access lines, and control the enterprise intranet device to connect to the cloud-access line to achieve communication between the enterprise intranet device and the cloud server; Based on the service attributes in the scheduling indicator data, determine the cloud-online line corresponding to the corresponding service priority, control the enterprise intranet device to connect to the corresponding cloud-online line, so as to transmit service data corresponding to different priorities to the cloud server through different cloud-online lines; the higher the service priority, the better the network performance of the corresponding cloud-online line; Based on the network performance data of any of the cloud-access lines in the scheduling indicator data, determining that the current load of the cloud-access line has reached its load scheduling threshold, controlling the enterprise intranet device to connect to other cloud-access lines to achieve communication between the enterprise intranet device and the cloud server; the current load of the other cloud-access lines has not reached their load scheduling threshold; Based on the service attributes in the scheduling indicator data, according to the configured load sharing mode, control the enterprise intranet device to connect to the corresponding cloud line, and transmit the service data output by the enterprise intranet device to the cloud server through the corresponding cloud line; Based on the network performance data of multiple cloud access lines in the scheduling indicator data, the main line and the backup line among the multiple cloud access lines are determined. If it is determined that the main line communication is abnormal, the enterprise intranet device is controlled to switch from the main line to the backup line to achieve communication between the enterprise intranet device and the cloud server.

6. The method according to claim 4, characterized in that The step of scheduling at least one of the cloud access lines based on the scheduling indicator data and the cloud access line scheduling condition to achieve communication between the enterprise intranet device and the cloud server includes: Based on the scheduling indicator data and the scheduling conditions of the cloud-access lines, a scheduling instruction for the multiple cloud-access lines is generated; the scheduling instruction indicates at least one of the cloud-access lines scheduled for communication between the enterprise intranet device and the cloud server and corresponding scheduling parameters; Performing a rationality check on the scheduling instruction; Execute the scheduling instructions that have been verified to be reasonable, control the enterprise intranet device to connect to at least one of the scheduled cloud routes, and realize communication between the enterprise intranet device and the cloud server.

7. The method according to claim 6, characterized in that The method further comprises: Outputting a scheduling monitoring interface, and displaying each of the scheduling indicator data on the scheduling monitoring interface; or, Outputting a scheduling analysis interface, displaying the scheduling analysis results and the scheduling optimization strategy on the scheduling analysis interface, so as to optimize the scheduling of at least one of the cloud access lines for communication between the enterprise intranet device and the cloud server by executing the scheduling optimization strategy; The scheduling analysis result is determined based on the scheduling indicator data and the scheduling condition of the cloud line to generate the scheduling instruction; The scheduling optimization strategy is determined based at least on the cloud line scheduling result and the scheduling analysis result. The cloud line scheduling result includes the newly acquired network performance data after executing the step of controlling at least one of the cloud lines scheduled for connection of the enterprise intranet device to realize communication between the enterprise intranet device and the cloud server.

8. An enterprise cloud device, characterized in that: The device comprises: at least one memory and at least one processor, wherein: The processor is used to load and execute multiple computer instructions stored in the memory to implement the following steps: In response to an enterprise's cloud migration request, obtaining a cloud migration line scheduling condition configured by the enterprise requesting cloud migration; different cloud migration line scheduling conditions indicate different scheduling indicators for multiple cloud migration lines, all of which are used to implement cloud migration line scheduling for communication between enterprise intranet devices and cloud servers; Obtaining scheduling indicator data corresponding to the scheduling conditions of the cloud-based line; Based on the scheduling indicator data and the cloud access line scheduling conditions, scheduling at least one of the cloud access lines to achieve communication between the enterprise intranet device and the cloud server; Among them, if multiple cloud access lines are scheduled to connect the enterprise intranet equipment and the cloud server respectively.

9. The device according to claim 8, characterized in that The device also includes: A display, used to output at least one of a cloud line scheduling configuration interface, a scheduling monitoring interface, and a scheduling analysis interface; The cloud-online scheduling configuration interface displays at least one scheduling indicator for the multiple cloud-online lines, so that the processor responds to the selection and configuration operation of the scheduling indicator and obtains corresponding cloud-online scheduling conditions for the multiple cloud-online lines by using at least one configured scheduling indicator threshold or scheduling mode; The scheduling monitoring interface displays each of the scheduling indicator data; The scheduling analysis interface displays the scheduling analysis results and scheduling optimization strategies, so that the processor can perform scheduling optimization on at least one of the cloud communication lines between the enterprise intranet device and the cloud server in response to the scheduling optimization strategies.

10. An enterprise cloud system, characterized in that: The system comprises: the enterprise cloud device according to claim 8 or 9, connected to at least one enterprise intranet device, at least one cloud server and a plurality of cloud lines of the enterprise cloud device respectively; Among them, each of the cloud access lines can connect the enterprise intranet device and the cloud server to achieve communication between the enterprise intranet device and the cloud server.