Drilling and planting all-in-one machine suitable for composite pile and construction method
By designing an integrated drilling and planting machine suitable for composite piles, the mobile mechanism and linear drive mechanism are used to achieve the centering of the core pile and the outer pile body, which solves the problems of complex structure and low construction efficiency of the existing equipment, improves construction efficiency and quality, and reduces equipment weight and floor space.
Patent Information
- Application Number
- CN202410990896.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-10-08
AI Technical Summary
The existing composite pile construction equipment has a complex structure, low construction efficiency, and cannot guarantee the neutrality of the core pile and the outer pile body, affecting the construction quality and efficiency.
An all-in-one drilling and planting machine suitable for combined piles is designed, including a moving mechanism, a tower, a core pile implanting mechanism and a hollow power head. It realizes single-person operation through a linear drive mechanism and a controller to ensure that the core pile is in contact with the outer pile body. neutrality, and improve construction efficiency through multi-directional movement mechanism.
It simplifies construction operations, improves construction efficiency and quality, reduces the equipment footprint, reduces equipment counterweight requirements, expands the scope of application of the construction site, and saves construction time.
Smart Images

Figure CN118745733A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of combined piles, and in particular to a drilling and planting integrated machine and a construction method suitable for combined piles. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] Composite piles are composed of two or more pile types such as core piles and cement soil piles or cement mortar piles wrapped around the core piles. The core piles are mainly precast concrete piles, steel piles, etc. According to the characteristics of foundation piles, composite piles are suitable for soft soil layers and strongly weathered rock layers.
[0004] The inventors have found that the existing construction of combined piles is carried out in stages by corresponding construction equipment, resulting in more equipment on the construction site and a larger occupied area. After the outer pile body is constructed, the corresponding equipment is moved to carry out the core pile construction, resulting in low construction efficiency.
[0005] There are also integrated equipment, but the existing integrated equipment has a complex structure. After drilling a hole with a drill on one side, the entire frame is rotated to implant the core pile. The overall equipment cannot guarantee the centering of the core pile and the outer pile body. After the construction of the outer pile body is completed, multiple alignments are required before the core pile can be implanted, which makes the operation complicated and requires the cooperation of multiple people. Sometimes, the accuracy of the alignment cannot be guaranteed even with the cooperation of multiple people, thus affecting the construction quality and efficiency.
[0006] Currently, composite pile technology is booming, but a large number of engineering projects cannot be carried out on a large scale due to the limitations of composite pile construction equipment, which seriously restricts the promotion and progress of this technology. Summary of the invention
[0007] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a drilling and planting machine suitable for combined piles, which can simplify operation, optimize personnel, improve construction efficiency and ensure construction quality.
[0008] In order to achieve the above object, the present invention is implemented through the following technical solutions:
[0009] A drilling and planting machine suitable for combined piles comprises a moving mechanism, the moving mechanism supports a working platform, the working platform supports a tower, a core pile planting mechanism is arranged on one side of the tower, a notch is arranged on the working platform below the core pile planting mechanism, a hollow power head is arranged on the other side of the tower, a drilling tool passes through the hollow power head and the hollow power head can release the drilling tool, the core pile planting mechanism can clamp and release the core pile, a linear drive mechanism is arranged on the tower, the hollow power head and the core pile planting mechanism are connected with the corresponding linear drive mechanism to drive the hollow power head and the core pile planting mechanism to move vertically relative to the tower respectively;
[0010] The hollow power head drives the drill tool to drill holes and / or construct piles. The moving mechanism can drive the supporting platform to move a set distance along the Y direction so that the core pile implanting mechanism is placed above the completed pile body. The central axes of the core pile implanting mechanism and the hollow power head are located in the same plane, which is parallel to the Y direction. The core pile implanting mechanism of the supporting platform implants the core pile into the completed pile body to form a combined pile.
[0011] In the above-mentioned integrated drilling and planting machine suitable for combined piles, the distance between the core pile planting mechanism and the hollow power head is L, and the moving mechanism can drive the support platform to move the set distance L. The movement of the support platform is controlled by the moving mechanism to ensure that after the pile body construction is completed, the core pile planting mechanism moves to the top of the corresponding pile body, and the central axis of the core pile planting mechanism is coaxially arranged with the pile body after the core pile is grabbed;
[0012] The core pile implanting mechanism and the plane where the central axis of the hollow power head is located are arranged perpendicular to the tower.
[0013] The drilling and planting integrated machine suitable for combined piles as described above, wherein the moving mechanism is a multi-directional moving mechanism;
[0014] The moving mechanism is a walking moving mechanism, which includes a Y-direction moving unit and an X-direction moving unit. The Y-direction moving unit drives the support platform to move in the Y direction, and the X-direction moving unit drives the support platform to move in the X direction to sequentially construct multiple combined piles.
[0015] As described above, a drilling and planting machine suitable for combined piles is provided with a vertical slide rail along the height direction of the tower frame, the vertical slide rail is provided on the side of the tower frame, the hollow power head and the core pile planting mechanism are connected with a slider provided at the vertical slide rail, and the setting of the vertical slide rail guides the movement of the hollow power head and the core pile planting mechanism to ensure that the central axis of the two remains unchanged during the movement.
[0016] In the above-mentioned integrated drilling and planting machine suitable for combined piles, the moving mechanism and the linear driving mechanism are respectively connected to the controller separately, and the moving mechanism and the linear driving mechanism are controlled by the controller, so that unified control can be performed to ensure that each mechanism moves in sequence, and only one staff member is required to control it, without the need for multiple staff members;
[0017] A limit switch is arranged in the middle section of the tower to limit the hollow power head. The limit switch is connected to a controller. The limit switch limits the lower limit of movement of the hollow power head to ensure the service life of the hollow power head.
[0018] The drilling and planting machine suitable for combined piles as described above, wherein the drilling tool is a rotary jet drilling tool or a spiral blade drilling tool. When the drilling tool is a rotary jet drilling tool, the pile body formed is a cement soil pile, and when the drilling tool is a spiral blade drilling tool, the pile body formed is a cement mortar pile or a plain concrete pile;
[0019] The core pile implanting mechanism is a hydraulic hammer, a diesel hammer or a vibration hammer;
[0020] In the integrated drilling and planting machine suitable for combined piles as described above, a side of the tower frame close to the hollow power head is flush with a side of the platform, thereby ensuring that the bottom of the hollow power head is hollow, which is beneficial to the construction of the drilling tool.
[0021] In the above-mentioned integrated drilling and planting machine suitable for combined piles, a clamping assembly is provided in the hollow power head to clamp the drilling tool, and the clamping assembly includes a clamping part, which is connected to a driving power source, and the driving power source drives the clamping part to open or close;
[0022] The core pile implanting mechanism is provided with a clamping assembly to clamp the core pile or the pile driver, and the clamping assembly is coaxially arranged with the central axis of the core pile implanting mechanism to ensure that after the core pile implanting mechanism moves a set distance, the central axis of the core pile implanting mechanism, the clamping assembly and the core pile is coaxially arranged with the central axis of the pile body.
[0023] In a second aspect, the present invention provides a method for drilling and planting a combined pile, using the drilling and planting machine suitable for the combined pile, including the following contents:
[0024] The drill tool is inserted into the hollow part of the hollow power head. When the drill tool is a rotary jet drill tool, the drill tool sprays cement slurry while drilling holes to construct cement soil piles.
[0025] When the hollow power head moves along the tower to the bottom of the tower, the hollow power head releases the jet grouting drill, and driven by the corresponding linear drive mechanism, the hollow power head moves along the tower to the upper side of the tower, and the hollow power head clamps the jet grouting drill again, and drives the jet grouting drill to continue working downward, and repeats this process many times until the cement soil pile reaches the designed effective pile length;
[0026] The rotary jet drilling tool is driven upward by the hollow power head, and the hollow power head and the rotary jet drilling tool are combined multiple times until the rotary jet drilling tool is lifted out of the ground;
[0027] The moving mechanism drives the working platform to move a set distance in the direction of the cement soil pile, so that the core pile implanting mechanism is placed above the cement soil pile that has been completed;
[0028] The core pile implantation mechanism clamps the core pile and moves along the tower under the drive of the corresponding linear drive mechanism to implant the core pile into the cement soil pile. The core pile implantation mechanism moves upward and clamps the pile driver, and the core pile implantation mechanism drives the pile driver to move downward until the core pile is sent to the predetermined elevation and the pile implantation stops.
[0029] In a third aspect, the present invention also provides a method for integrated construction of a combined pile by drilling and planting, which also includes the following contents:
[0030] The drill tool is inserted into the hollow of the hollow power head. When the drill tool is a spiral blade drill tool, the spiral blade drill tool drills holes to construct cement mortar piles or plain concrete piles.
[0031] When the hollow power head moves along the tower to the bottom of the tower, the hollow power head releases the spiral blade drill, and driven by the corresponding linear drive mechanism, the hollow power head moves along the tower to the upper side of the tower, and the hollow power head clamps the spiral blade drill again, and drives the spiral blade drill to continue working downward, which is repeated many times until the hole is formed to the designed depth;
[0032] Cement mortar or concrete is pumped into the hole through the hollow part of the spiral blade drill. At the same time, the spiral blade drill is driven upward through the hollow power head. The hollow power head and the spiral blade drill are combined several times until the spiral blade drill is lifted out of the ground.
[0033] The moving mechanism drives the working platform to move a set distance in the direction of the cement soil pile, so that the core pile implanting mechanism is placed above the completed cement mortar pile or plain concrete pile;
[0034] The core pile implantation mechanism clamps the core pile and moves along the tower under the drive of the corresponding linear drive mechanism to implant the core pile into the cement soil pile. The core pile implantation mechanism moves upward and clamps the pile driver, and the core pile implantation mechanism drives the pile driver to move downward until the core pile is sent to the predetermined elevation and the pile implantation stops.
[0035] The beneficial effects of the present invention are as follows:
[0036] 1) In the present invention, the mobile mechanism supports the working platform, and the working platform is provided with a tower frame, which is used to support the core pile implanting mechanism and the hollow power head. The drill tool can be arranged through the hollow power head, and the drill tool is driven by the hollow power head to drill holes or directly construct the pile body. After the drilling construction is completed, the pile body is also formed by grouting. The mobile mechanism drives the supporting platform to move a set distance, so that the core pile implanting mechanism is placed above the pile body, and the core pile is implanted by the core pile implanting mechanism to complete the construction of the combined pile. No secondary positioning is required, the constructed combined pile has high concentricity, and the implantation is more convenient and the pile planting efficiency is high, which reduces the waiting time caused by multiple positioning, ensures the implantation success rate, and makes the pile body quality more reliable.
[0037] 2) In the present invention, the core pile implantation mechanism and the hollow power head are integrated on both sides of the tower, the structural footprint is effectively controlled, and the controller realizes the control of the moving mechanism and the linear drive mechanism, without the need for multiple workers to cooperate with each other, making the operation simple; and the process of drilling holes first to form the pile body and then implanting the core pile is adopted. There is no overlap between the various processes, and multiple devices can work in parallel, which greatly improves the construction efficiency. Compared with the traditional construction method of combined piles, it can save more than half of the time.
[0038] 3) The overall structure of the present invention is simpler, and the working platform is supported by a mobile mechanism, so that the entire equipment has a low center of gravity, light weight, safety, affordability, simple operation, and effective cost control. Compared with the static pressure piling method, the equipment has low weight requirements and a wider range of site applications.
[0039] 4) In the present invention, the distance between the core pile implanting mechanism and the hollow power head is L, so that a single pile only needs to be moved once to complete the construction. The moving mechanism can drive the support platform to move the set distance L, so the concentricity is more guaranteed and the quality is more reliable. The movement of the support platform is controlled by the moving mechanism to ensure that after the pile body construction is completed, the core pile implanting mechanism moves to the top of the corresponding pile body, and the central axis of the core pile implanting mechanism is coaxially arranged with the pile body after grabbing the core pile.
[0040] 5) In the present invention, the height of the tower is lowered by the hollow power head, and the length of the drill rod is greater than the height of the tower, so that deep pile construction can be achieved without connecting rods; the drill tool is detachable relative to the hollow power head and can be replaced. The replacement of the drill tool can achieve the construction of cement soil piles, cement mortar piles, plain concrete piles, etc., further expanding the application scope of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0042] Figure 1 It is a top view of a drilling and planting machine suitable for combined piles according to one or more embodiments of the present invention.
[0043] Figure 2 It is a schematic diagram of a rotary jet drilling tool in a drilling and planting machine suitable for combined piles according to one or more embodiments of the present invention.
[0044] Figure 3 It is a schematic diagram of a spiral blade drilling tool in a drilling and planting machine suitable for combined piles according to one or more embodiments of the present invention.
[0045] Figure 4It is a schematic diagram of a tower-supported hollow power head and a core pile implanting mechanism in a drilling and implanting machine suitable for combined piles according to one or more embodiments of the present invention.
[0046] Figure 5 It is a schematic diagram of a conventional power head supporting a drilling tool in the prior art.
[0047] Figure 6 It is a schematic diagram of a core pile implanting mechanism in a drilling and implanting machine suitable for a combination pile moving a set distance L according to one or more embodiments of the present invention.
[0048] Figure 7 It is a flow chart of constructing a composite pile consisting of a cement soil pile and a core pile in a drilling and planting integrated construction method of a composite pile according to one or more embodiments of the present invention.
[0049] Figure 8 It is a flow chart of constructing a combined pile consisting of a cement mortar pile or a plain concrete pile and a core pile in a drilling and planting integrated construction method of a combined pile according to one or more embodiments of the present invention.
[0050] In the figure: the distances or sizes between parts are exaggerated to show the positions of various parts, and the schematic diagram is for reference only.
[0051] Among them: 1. Hollow power head, 2. Jet-jet drilling tools, 3. Spiral blade drilling tools, 4. Tower, 5. Hydraulic (diesel) hammer or vibratory hammer, 6. Working platform, 7. Y-axis moving unit, 8. Y-axis cylinder, 9. X-axis moving unit, 10. X-axis cylinder, 11. Traditional power head. DETAILED DESCRIPTION
[0052] It should be noted that the following detailed descriptions are illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0053] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present invention. As used herein, unless otherwise explicitly stated in the present invention, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "include" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof;
[0054] As introduced in the background technology, the construction equipment of the combination pile in the prior art has the problem of poor centering. In order to solve the above technical problem, the present invention proposes a drilling and planting machine suitable for the combination pile.
[0055] Embodiment 1
[0056] In a typical embodiment of the present invention, reference is made to Figure 1 As shown, a drilling and planting machine suitable for combined piles includes a moving mechanism, the moving mechanism supports a working platform 6, the working platform 6 supports a tower 4, a core pile planting mechanism is arranged on one side of the tower 4, a notch is arranged on the working platform below the core pile planting mechanism, a hollow power head 1 is arranged on the other side of the tower 4, a drilling tool passes through the hollow power head and the hollow power head can release the drilling tool, the core pile planting mechanism can clamp and release the core pile, a linear drive mechanism is arranged on the tower, and the hollow power head and the core pile planting mechanism are connected to the corresponding linear drive mechanism to drive the hollow power head and the core pile planting mechanism to move in the vertical direction relative to the tower respectively;
[0057] The hollow power head 1 drives the drill tool to drill holes and / or construct piles. The moving mechanism can drive the supporting platform to move a set distance along the Y direction so that the core pile implanting mechanism is placed above the completed pile body. The central axes of the core pile implanting mechanism and the hollow power head are located in the same plane, which is parallel to the Y direction. The core pile implanting mechanism of the supporting platform implants the core pile into the completed pile body to form a combined pile.
[0058] It can be understood that the plane where the central axis of the core pile implanting mechanism and the hollow power head are located is perpendicular to the tower, the distance between the core pile implanting mechanism and the hollow power head is L, the moving mechanism can drive the support platform to move the set distance L, and the movement of the support platform is controlled by the moving mechanism to ensure that after the pile body construction is completed, the core pile implanting mechanism moves to the top of the corresponding pile body, and the central axis of the core pile implanting mechanism is coaxially arranged with the pile body after the core pile is grabbed;
[0059] Specifically, the drilling tool is a rotary jet drilling tool 2 or a spiral blade drilling tool 3.
[0060] refer to Figure 2 As shown, the hollow power head is used together with the rotary jet drilling tool 2 and the spiral blade drilling tool 3. When the hollow power head 1 is combined with the rotary jet drilling tool 2, cement soil piles can be constructed; the rotary jet drilling tool 2 has a high-pressure jet mixing function and can be used to construct cement soil piles;
[0061] refer to Figure 3 As shown, when the hollow power head 1 is combined with the spiral blade drilling tool 3, cement mortar piles and plain concrete piles can be constructed; the spiral blade drilling tool 3 forms a hole when drilling and sinking, and pumps cement mortar or concrete into the hole through the hollow tube of the drilling tool when lifting, and lifts while pumping until the construction of the cement mortar pile or plain concrete pile is completed.
[0062] It should be noted that the hollow power head 1 and the drilling tool combination can greatly reduce the height of the equipment tower 4 compared with the traditional power head 11, which not only lowers the center of gravity of the equipment, improves safety, but also reduces the cost and weight of the equipment.
[0063] Specifically, a clamping assembly is arranged in the hollow power head to clamp the drilling tool, and the clamping assembly includes a clamping part, which is connected to a driving power source, and the driving power source drives the clamping part to open or close; the hollow power head selects the hollow power head commonly used on the market, or the power head of a compaction-type deep drilling CFG pile driver disclosed in Chinese patent application CN218991484U, in which a corresponding clamping assembly is arranged.
[0064] In this embodiment, the moving mechanism is a multi-directional moving mechanism; the moving mechanism is an existing walking type moving mechanism, and the moving mechanism includes a Y-direction moving unit 7 and an X-direction moving unit 9, the Y-direction moving unit drives the support platform to move in the Y direction, the Y-direction moving unit 7 is provided with a Y-direction oil cylinder 8 to drive the support platform to move in the Y direction, the X-direction moving unit 9 drives the support platform to move in the X direction to carry out the sequential construction of multiple combined piles, and the X-direction moving unit is provided with an X-direction oil cylinder 10 to drive the support platform to move in the X direction;
[0065] It is easy to understand that the core pile implantation mechanism is a hydraulic hammer or a diesel hammer or a vibratory hammer, which is more efficient and economical. The hydraulic (diesel) hammer or vibratory hammer 5 is used for the core pile implantation construction. The hydraulic (diesel) hammer or vibratory hammer 5 and the hollow power head 1 are staggered at a circumferential angle of 180 degrees. In the vertical direction, the hydraulic (diesel) hammer or vibratory hammer 5 is arranged parallel to the hollow power head 1. In the horizontal direction, the two always maintain a fixed distance L, and the line connecting the horizontal projection center points of the hydraulic (diesel) hammer or vibratory hammer 5 and the hollow power head 1 is parallel to the travel direction of the Y-direction moving unit.
[0066] It can be understood that the hydraulic (diesel) hammer or vibratory hammer 5 is a hydraulic hammer or a diesel hammer or a vibratory hammer, which are all prior arts. The hydraulic (diesel) hammer or vibratory hammer 5 is provided with a clamping assembly to clamp the core pile or the pile driver. The clamping assembly is an existing clamping assembly, and the pile driver is also an existing pile driver, which is used to send the core pile inserted into the pile body to a set depth. The clamping assembly is coaxially arranged with the central axis of the core pile implanting mechanism to ensure that after the core pile implanting mechanism moves a set distance, the central axis of the core pile implanting mechanism, the clamping assembly and the core pile is coaxially arranged with the central axis of the pile body.
[0067] It is easy to understand that the support platform 6 is used to install the controller, which is a PLC controller or other types of controllers; the support platform is vertically connected to the tower, the width of the support platform is greater than the width of the tower (greater than the distance between the core pile implantation mechanism and the hollow power head), and the support platform is provided with hollow parts on both sides of the core pile implantation mechanism.
[0068] In addition, the tower is constructed of angle steel, the transverse cross-section of the tower can be rectangular, and the side of the tower close to the hollow power head is flush with the side of the platform, thereby ensuring that the bottom of the hollow power head is hollow, which is conducive to the construction of the drilling tool;
[0069] It is easy to understand that a limit switch is set in the middle section of the tower to limit the hollow power head. The limit switch is connected to the controller. The limit switch limits the lower limit of the movement of the hollow power head to ensure the service life of the hollow power head.
[0070] Embodiment 2
[0071] This embodiment provides a method for drilling and planting a combined pile, using a drilling and planting machine suitable for combined piles as described in the first embodiment, referring to Figure 7 As shown, including the following:
[0072] The hollow power head 1 is combined with the jet grouting drill 2 to position and lay out the pile foundation. The jet grouting drill 2 is centered through the moving mechanism, the equipment is leveled, the jet grouting drill is controlled to drill and sink, and cement slurry is sprayed at the same time to construct cement soil piles.
[0073] When the hollow power head 1 slides downward along the tower 4 to the lower side of the tower, the clamping assembly of the hollow power head 1 and the rotary jet drilling tool 2 is released, the hollow power head 1 slides upward to the upper part of the tower 4, the clamping assembly is contracted, the hollow power head 1 and the rotary jet drilling tool 2 are reassembled together, the hollow power head 1 slides downward along the tower 4 until the cement soil pile reaches the designed effective pile length, and then the hollow power head 1 slides upward to the upper part of the tower 4, the clamping assembly of the hollow power head 1 and the rotary jet drilling tool 2 is released, the hollow power head 1 slides downward to the lower part of the tower 4, the clamping assembly clamps the rotary jet drilling tool, the hollow power head 1 and the rotary jet drilling tool 2 are reassembled together, the hollow power head 1 slides upward along the tower 4 until the rotary jet drilling tool is lifted out of the ground, and the cement soil pile construction is completed;
[0074] After the cement soil pile construction is completed, the cement soil pile is advanced along the vertical step 7 for a distance L. At this time, the horizontal projection center point of the hydraulic (diesel) hammer or vibratory hammer 5 is concentric with the cement soil pile, the core pile is lifted, the core pile is sent into the clamping assembly of the hydraulic (diesel) hammer or vibratory hammer 5, the core pile is clamped, the hydraulic (diesel) hammer or vibratory hammer 5 is started to concentrically implant the core pile, and after the core pile is implanted below the ground, the clamping assembly is released, the hydraulic (diesel) hammer or vibratory hammer 5 is slid upward along the tower 4, and the sliding is stopped after reaching the upper part of the tower 4, the pile driver is lifted, the pile driver is sent into the clamping device of the hydraulic (diesel) hammer or vibratory hammer 5, the pile driver is clamped, the hydraulic (diesel) hammer or vibratory hammer 5 is started to continue to implant downward, until the core pile is sent to the predetermined elevation, the pile planting is stopped, the hydraulic (diesel) hammer or vibratory hammer 5 is slid upward along the tower 4, and the sliding is stopped after reaching the upper part of the tower 4;
[0075] After the construction of the combined pile is completed, repeat the above steps to carry out the construction of the next pile;
[0076] Embodiment 2
[0077] This embodiment provides a method for drilling and planting a combined pile, using a drilling and planting machine suitable for combined piles as described in the first embodiment, referring to Figure 8 As shown, including the following:
[0078] The hollow power head 1 is combined with the spiral blade drilling tool 3, the pile foundation is positioned and laid out, the spiral blade drilling tool is centered through the moving mechanism, the equipment is leveled, and the spiral blade drilling tool is started to drill and sink into a hole;
[0079] When the hollow power head 1 slides down along the tower 4 to the bottom of the tower, the clamping assembly of the hollow power head 1 and the spiral blade drilling tool 3 is released, the hollow power head 1 slides upward to the upper part of the tower 4, the clamping assembly is contracted, the hollow power head 1 and the spiral blade drilling tool 3 are recombined together, the hollow power head 1 slides downward along the tower 4 until the hole reaches the designed depth, and then cement mortar or concrete is pumped into the hole through the hollow tube of the spiral blade drilling tool 3, and the hollow power head 1 is slowly lifted to the upper part of the tower 4 at the same time, the clamping assembly of the hollow power head 1 and the spiral blade drilling tool 3 is released, the hollow power head 1 slides downward to the lower part of the tower 4, the clamping assembly works, the hollow power head 1 and the spiral blade drilling tool 3 are recombined together, the hollow power head 1 slides upward along the tower 4 until the spiral blade drilling tool is lifted out of the ground, and the construction of cement mortar piles or concrete piles is completed;
[0080] After the construction of cement mortar pile or concrete pile is completed, the cement mortar pile or concrete pile is advanced along the Y direction by a distance L. At this time, the horizontal projection center point of the hydraulic (diesel) hammer or vibratory hammer 5 is concentric with the cement mortar pile or concrete pile, the core pile is lifted, the core pile is sent into the clamping assembly of the hydraulic (diesel) hammer or vibratory hammer 5, the core pile is clamped, the hydraulic (diesel) hammer or vibratory hammer 5 is started to concentrically implant the core pile, after the core pile is implanted below the ground, the clamping assembly is released, the hydraulic (diesel) hammer or vibratory hammer 5 is slid upward along the tower 4, and the sliding is stopped after reaching the upper part of the tower 4, the pile driver is lifted, the pile driver is sent into the clamping assembly of the hydraulic (diesel) hammer or vibratory hammer 5, the pile driver is clamped, the hydraulic (diesel) hammer or vibratory hammer 5 is started to continue to implant downward, until the core pile is sent to the predetermined elevation, the pile planting is stopped, the hydraulic (diesel) hammer or vibratory hammer 5 is slid upward along the tower 4, and the sliding is stopped after reaching the upper part of the tower 4;
[0081] After the construction of the combined pile is completed, repeat the above steps to proceed to the construction of the next pile.
[0082] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A drilling and planting machine suitable for combined piles, It is characterized in that It includes a moving mechanism, the moving mechanism supports a working platform, the working platform supports a tower, a core pile implanting mechanism is arranged on one side of the tower, a notch is arranged on the working platform below the core pile implanting mechanism, a hollow power head is arranged on the other side of the tower, a drilling tool passes through the hollow power head and the hollow power head can release the drilling tool, the core pile implanting mechanism can clamp and release the core pile, a linear drive mechanism is arranged on the tower, the hollow power head and the core pile implanting mechanism are connected with the corresponding linear drive mechanism to drive the hollow power head and the core pile implanting mechanism to move in the vertical direction relative to the tower respectively; The hollow power head drives the drill tool to drill holes and / or construct piles. The moving mechanism can drive the supporting platform to move a set distance along the Y direction so that the core pile implanting mechanism is placed above the completed pile body. The central axes of the core pile implanting mechanism and the hollow power head are located in the same plane, which is parallel to the Y direction. The core pile implanting mechanism of the supporting platform implants the core pile into the completed pile body to form a combined pile.
2. A drilling and planting machine suitable for combined piles according to claim 1, It is characterized in that The distance between the core pile implantation mechanism and the hollow power head is L, and the moving mechanism can drive the support platform to move a set distance L; The core pile implanting mechanism and the plane where the central axis of the hollow power head is located are arranged perpendicular to the tower.
3. The drilling and planting machine suitable for combined piles according to claim 1, It is characterized in that The moving mechanism is a multi-directional moving mechanism; The moving mechanism is a walking moving mechanism, which includes a Y-direction moving unit and an X-direction moving unit. The Y-direction moving unit drives the support platform to move in the Y direction, and the X-direction moving unit drives the support platform to move in the X direction to sequentially construct multiple combined piles.
4. The drilling and planting machine suitable for combined piles according to claim 1, It is characterized in that A vertical slide rail is arranged along the height direction of the tower frame, and the vertical slide rail is arranged on the side of the tower frame. The hollow power head and the core pile implantation mechanism are connected with a slider arranged at the vertical slide rail.
5. The drilling and planting machine suitable for combined piles according to claim 1, It is characterized in that The moving mechanism and the linear driving mechanism are separately connected to the controller; A limit switch is arranged in the middle section of the tower to limit the hollow power head, and the limit switch is connected to a controller.
6. The drilling and planting machine suitable for combined piles according to claim 1, It is characterized in that The drilling tool is a rotary jet drilling tool or a spiral blade drilling tool. When the drilling tool is a rotary jet drilling tool, the pile body formed is a cement soil pile. When the drilling tool is a spiral blade drilling tool, the pile body formed is a cement mortar pile or a plain concrete pile. The core pile implanting mechanism is a hydraulic hammer, a diesel hammer or a vibration hammer.
7. The drilling and planting machine suitable for combined piles according to claim 1, It is characterized in that A side surface of the tower frame close to the hollow power head is flush with a side surface of the platform.
8. The drilling and planting machine suitable for combined piles according to claim 1, It is characterized in that A clamping assembly is provided in the hollow power head to clamp the drilling tool, and the clamping assembly includes a clamping part, and the clamping part is connected to the driving power source; The core pile implanting mechanism is provided with a clamping assembly to clamp the core pile or pile driver.
9. A drilling and planting integrated construction method for combined piles. It is characterized in that The drilling and planting integrated machine for combined piles according to claim 1 comprises the following contents: The drill tool is inserted into the hollow part of the hollow power head. When the drill tool is a rotary jet drill tool, the drill tool sprays cement slurry while drilling holes to construct cement soil piles. When the hollow power head moves along the tower to the bottom of the tower, the hollow power head releases the jet grouting drill, and driven by the corresponding linear drive mechanism, the hollow power head moves along the tower to the upper side of the tower, and the hollow power head clamps the jet grouting drill again, and drives the jet grouting drill to continue working downward, and repeats this process many times until the cement soil pile reaches the designed effective pile length; The rotary jet drilling tool is driven upward by the hollow power head, and the hollow power head and the rotary jet drilling tool are combined multiple times until the rotary jet drilling tool is lifted out of the ground; The moving mechanism drives the working platform to move a set distance in the direction of the cement soil pile, so that the core pile implanting mechanism is placed above the cement soil pile that has been completed; The core pile implantation mechanism clamps the core pile and moves along the tower under the drive of the corresponding linear drive mechanism to implant the core pile into the cement soil pile. The core pile implantation mechanism moves upward and clamps the pile driver, and the core pile implantation mechanism drives the pile driver to move downward until the core pile is sent to the predetermined elevation and the pile implantation stops.
10. According to the drilling and planting integrated construction method of combined piles as described in claim 1, It is characterized in that Also includes the following: The drill tool is inserted into the hollow of the hollow power head. When the drill tool is a spiral blade drill tool, the spiral blade drill tool drills holes to construct cement mortar piles or plain concrete piles. When the hollow power head moves along the tower to the bottom of the tower, the hollow power head releases the spiral blade drill, and driven by the corresponding linear drive mechanism, the hollow power head moves along the tower to the upper side of the tower, and the hollow power head clamps the spiral blade drill again, and drives the spiral blade drill to continue working downward, which is repeated many times until the hole is formed to the designed depth; Cement mortar or concrete is pumped into the hole through the hollow part of the spiral blade drill. At the same time, the spiral blade drill is driven upward through the hollow power head. The hollow power head and the spiral blade drill are combined several times until the spiral blade drill is lifted out of the ground. The moving mechanism drives the working platform to move a set distance in the direction of the cement soil pile, so that the core pile implanting mechanism is placed above the completed cement mortar pile or plain concrete pile; The core pile implantation mechanism clamps the core pile and moves along the tower under the drive of the corresponding linear drive mechanism to implant the core pile into the cement soil pile. The core pile implantation mechanism moves upward and clamps the pile driver, and the core pile implantation mechanism drives the pile driver to move downward until the core pile is sent to the predetermined elevation and the pile implantation stops.