Flushing system, closestool and flushing method

By introducing a switching valve and a boosting device into the flushing system, the working state is automatically switched based on the water pressure difference, which solves the problem of poor flushing performance of smart toilets under low water pressure, reduces manufacturing and maintenance costs, and improves the flushing effect. and quiet performance.

CN118745761AActive Publication Date: 2024-10-08QUANZHOU KEMU INTELLIGENT KITCHEN & TOILET

Patent Information

Application Number
CN202410991388.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-10-08
Estimated Expiration
2044-07-23

AI Technical Summary

Technical Problem

The manufacturing and maintenance costs of existing smart toilets with their own water pump flushing systems are high, and their flushing performance is affected under low water pressure conditions.

Method used

A flushing system is designed that includes a first water supply waterway and a second water supply waterway. The second water supply waterway is equipped with a boosting device, and switches the working state based on changes in water pressure difference through a switching valve, avoiding the use of solenoid valves and motors, and reducing production. and maintenance costs.

Benefits of technology

It realizes automatic switching of the working state of the flushing system under different water pressure conditions, meets the water demand for spraying and brushing water, reduces production and maintenance costs, and at the same time improves the flushing effect and silent performance when the water pressure is low.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745761A_ABST
    Figure CN118745761A_ABST
Patent Text Reader

Abstract

The flushing system comprises a switching valve, the switching valve is provided with a floating valve element, and the floating valve element is arranged to control opening and closing of a first water outlet and a second water outlet based on the pressure difference change of water inlet pressure of a first water inlet and a second water inlet of the switching valve so as to switch the working state of the flushing system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to toilet technology, and more particularly to a flushing system, a toilet and a flushing method. Background Art

[0002] At present, smart toilets with built-in water pump flushing systems are increasingly favored by consumers due to their stable flushing performance. In terms of flushing performance, they can not only meet the flushing requirements under high water pressure conditions of the tap water pipeline, but also are not affected by pipeline water pressure fluctuations when the tap water pipeline is under low pressure. Under normal working conditions, it is a relatively ideal flushing method.

[0003] However, this type of flushing system also has some disadvantages, the most prominent of which is the high manufacturing and maintenance costs. Summary of the invention

[0004] The present application provides a flushing system, a toilet and a flushing method, which can reduce manufacturing and maintenance costs.

[0005] The present application provides a flushing system, comprising:

[0006] a first water supply waterway and a second water supply waterway, wherein the second water supply waterway is provided with a pressure boosting device;

[0007] A control device, electrically connected to the boost device and configured to control the working state of the boost device;

[0008] A brush ring water channel and a first jet water channel, wherein the water outlet end of the brush ring water channel is configured to be connected to the brush ring interface of the toilet, and the water outlet end of the first jet water channel is configured to be connected to the siphon jet port of the toilet;

[0009] A switching valve, comprising a first water inlet and a second water inlet respectively connected to the water outlets of the first water supply waterway and the second water supply waterway, and a first water outlet and a second water outlet respectively connected to the water inlets of the brush circle waterway and the first jet waterway;

[0010] The switching valve is provided with a floating valve core, which is configured to control the opening and closing of the first water outlet and the second water outlet based on the change of the water pressure difference entering the first water inlet and the second water inlet to switch the working state of the flushing system.

[0011] In an exemplary embodiment, the switching valve comprises a valve body, a valve cavity provided in the valve body, and the first water inlet and the second water inlet, and the first water outlet and the second water outlet are all in communication with the valve cavity;

[0012] The floating valve core is arranged in the valve cavity, and the floating valve core includes a first working position in which the second water inlet is connected to the first water outlet and the second water inlet and the second water outlet are blocked, and a second working position in which the second water inlet is connected to the second water outlet and the first water inlet is connected to the first water outlet;

[0013] The floating valve core is configured to be movable in the valve chamber to switch between the first working position and the second working position based on a change in a pressure difference of water entering the first water inlet and the second water inlet.

[0014] In an exemplary embodiment, when the water pressure at the second inlet of the switching valve is greater than the water pressure at the first inlet, the switching valve switches to the first working position; when the water pressure at the second inlet is equal to or less than the water pressure at the first water supply line, the switching valve switches to the second working position.

[0015] In an exemplary embodiment, the control device is configured to control a duty cycle of the boosting device to control a water pressure difference between the second water inlet and the first water inlet;

[0016] When the control device controls the duty cycle of the boosting device to be the first duty cycle, the water pressure of the second water supply waterway is greater than the water pressure of the first water supply waterway, so that the water pressure of the second inlet is greater than the water pressure of the first inlet;

[0017] When the control device controls the duty cycle of the boosting device to a second duty cycle that is smaller than the first duty cycle, the water pressure of the second water supply waterway is equal to or smaller than the water pressure of the first water supply waterway, so that the water pressure of the second inlet is equal to or smaller than the water pressure of the first water supply waterway.

[0018] In an exemplary embodiment, the opening directions of the first water inlet and the second water inlet of the switching valve are arranged opposite to each other, and the first water outlet and the second water outlet are arranged in the direction from the first water inlet to the second water inlet;

[0019] The floating valve core has a partition portion that divides the valve cavity to form a first chamber and a second chamber, and a stopper portion that can block the second water outlet, the first chamber is communicated with the first water inlet, and the second chamber is communicated with the second water inlet;

[0020] When the floating valve core is in the first working position, the second water inlet is connected to the first outlet via the second chamber, and the stopper blocks the second outlet;

[0021] When the floating valve core is in the second working position, the second water inlet is communicated with the second outlet via the second chamber, and the first water inlet is communicated with the first outlet via the first chamber.

[0022] In an exemplary embodiment, a cross-sectional area of ​​the first water outlet is smaller than a cross-sectional area of ​​the second water outlet.

[0023] In an exemplary embodiment, the flushing system further comprises a reset element providing a force for the floating valve core to move toward the second water inlet, wherein one end of the reset element abuts against the floating valve core and the other end abuts against the inner wall of the valve cavity.

[0024] In an exemplary embodiment, when the water pressure of the first water supply waterway is lower than a predetermined value, the flushing system includes the following states:

[0025] First working state: the control device controls the second water supply channel to supply water and the booster device to operate, and performs the first brush circle cleaning;

[0026] Second working state: after the first brush circle cleaning, the control device controls both the first water supply channel and the second water supply channel to supply water and controls the booster device to operate, so as to perform brush circle and spray cleaning together;

[0027] The third working state: after the brushing and spraying are performed together, the control device controls the second water supply channel to supply water and controls the booster device to operate, and performs brushing and spraying again;

[0028] In the first working state and the third working state, the switching valve switches to the first working position; in the second working state, the switching valve switches to the second working position.

[0029] In an exemplary embodiment, when the water pressure of the first water supply waterway is higher than or equal to a predetermined value, the flushing system includes the following multiple working states:

[0030] Fourth working state: the control device controls the first water supply channel to supply water and the booster device is closed, and the first brush circle cleaning is performed;

[0031] Fifth working state: after the first brush circle cleaning, the control device controls both the first water supply channel and the second water supply channel to supply water and controls the booster device to operate, so as to perform brush circle and spray cleaning together;

[0032] The sixth working state: after the brush circle and the spray are cleaned together, the control device controls the first water supply channel to supply water and controls the booster device to be closed, and performs brush circle cleaning again;

[0033] In the fourth working state to the sixth working state, the switching valve is switched to the second working position.

[0034] In an exemplary embodiment, the flushing system further includes a second jetting waterway, and a control valve provided in the first water supply waterway and used to control the on-off of the first water supply waterway; the control valve divides the first water supply waterway into a first water supply branch connected to a first water inlet connected to a water inlet end of the second jetting waterway and a second water supply branch connected to a water inlet end of the switching valve;

[0035] When the power is off, the flushing system includes the following multiple working states: in the seventh working state, the control device controls the second water supply branch to supply water to perform the first brush circle cleaning;

[0036] In the eighth working state, after the first brush circle cleaning, the control device controls the first water supply branch to supply water for spray cleaning;

[0037] In the ninth working state, after the spray washing, the control device controls the second water supply branch to supply water to perform another brushing and cleaning;

[0038] In the seventh working state and the ninth working state, the switching valve is switched to the second working position.

[0039] An embodiment of the present application also provides a toilet, comprising a toilet body having a brush ring interface and a siphon jet port, and a flushing system as described in any of the above embodiments.

[0040] In an exemplary embodiment, the toilet further comprises a water tank, the water inlet end of the first water supply circuit of the flushing system is configured to be connected to a municipal water source, and the water inlet end of the second water supply circuit of the flushing system is connected to the water tank.

[0041] The embodiment of the present application further provides a flushing method of the flushing system as described in any of the above embodiments, comprising: when it is detected that the water pressure of the first water supply waterway is lower than a predetermined value, performing a second operation, and at least one of the first operation and the third operation:

[0042] First operation: control the water supply of the second water supply waterway and control the operation of the booster device, adjust the water pressure of the second water supply waterway to be greater than that of the first water supply waterway, switch the switching valve to the first working position, and perform the first brush circle cleaning;

[0043] Second operation: after the first brush circle cleaning, the first water supply channel and the second water supply channel are controlled to supply water and the booster device is controlled to operate, the water pressure of the second water supply channel is adjusted to be less than or equal to the water pressure of the first water supply channel, the switching valve is switched to the second working position, and brush circle and spray cleaning are performed together;

[0044] The third operation: after performing brush circle and spray cleaning together, control the water supply of the second water supply waterway and control the operation of the booster device, adjust the water pressure of the second water supply waterway to be greater than that of the first water supply waterway, and switch the switching valve to the first working position to perform brush circle cleaning again.

[0045] In an exemplary embodiment, the method includes when the water pressure of the first water supply waterway is higher than or equal to a predetermined value,

[0046] Control the first water supply channel to supply water and control the booster device to close, and switch the switching valve to the second working position to perform the first brush ring cleaning;

[0047] After the first brush circle cleaning, the second water supply waterway is controlled to supply water and the booster device is controlled to operate, the first water supply waterway is controlled to supply water, the water pressure of the second water supply waterway is adjusted to be equal to or less than the water pressure of the first water supply waterway, the switching valve is switched to the second working position, and brush circle and spray cleaning are performed together;

[0048] When the brush ring and the jet are cleaned together, the first water supply channel is controlled to supply water and the booster device is controlled to be closed, the switching valve is switched to the second working position, and the brush ring is cleaned again.

[0049] Compared with the related art, the flushing system of the embodiment of the present application is provided with a switching valve. The switching valve can switch between different water circuits to switch the working state of the flushing system based on the pressure difference change of the water inlet pressure of the first water inlet and the second water inlet of the switching valve. It avoids the use of solenoid valves and motors, does not require additional power supply, has a simple structure, and reduces production and maintenance costs while meeting the water needs of the toilet's spray water and brush ring water.

[0050] Other features and advantages of the present application will be described in the following description, and partly become apparent from the description, or be understood by implementing the present application. Other advantages of the present application can be realized and obtained by the schemes described in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] The accompanying drawings are used to provide an understanding of the technical solution of the present application and constitute a part of the specification. Together with the embodiments of the present application, they are used to explain the technical solution of the present application and do not constitute a limitation on the technical solution of the present application.

[0052] Figure 1 A partial three-dimensional exploded view of a toilet according to an embodiment of the present application;

[0053] Figure 2 A piping connection diagram of a flushing system and a water tank according to an embodiment of the present application;

[0054] Figure 3A three-dimensional exploded view of a switching valve according to an embodiment of the present application;

[0055] Figure 4 This is an internal cross-sectional view of a switching valve according to an embodiment of the present application;

[0056] Figure 5 A view of a first working position of a switching valve according to an embodiment of the present application;

[0057] Figure 6 A second working position view of the switching valve according to an embodiment of the present application;

[0058] Figure 7 A view of a first working position of a switching valve installed with a reset element according to an embodiment of the present application;

[0059] Figure 8 A view of a second working position of the switching valve of the embodiment of the present application with the reset element installed;

[0060] Fig. 9 This is a control flow chart of the flushing method of the flushing system according to an embodiment of the present application.

[0061] Figure numerals: toilet 100; toilet body-1; water tank-2; flushing system-3; basin-11; first water supply waterway-31; second water supply waterway-32; brush ring waterway-33; first jet waterway-34; and switching valve-35; booster device-36; second jet waterway-37; control valve-38; first water supply branch-311; second water supply branch-312; valve body-35a; valve chamber-350; first water inlet-351; second water inlet-3 52; first water outlet-353; second water outlet-354; floating valve core-355; valve chamber-350; partition-3551; stopper-3552; first chamber-3501; second chamber-3502; reset element-T; first mounting portion-3553; second mounting portion-3554; first valve body-351a; second valve body-352a; brush ring nozzle-41 and siphon injector-42; first interface-421 and second interface-422. DETAILED DESCRIPTION

[0062] like Figure 1-Figure 8 As shown, the embodiment of the present application provides a toilet 100, including a toilet body 1, a water tank 2, and a flushing system 3. The toilet 100 can be used as a jet siphon type smart toilet, which can be a floor-standing type or a wall-mounted type. This embodiment is described in detail with a floor-standing toilet 100.

[0063] like Figure 1As shown, the toilet body 1 includes a basin body 11 and a drainage channel (not shown) connected to the basin body 11, and the drainage channel is used to connect to the sewer system. The basin body 11 includes a water seal area (not shown) connected to the drainage channel, and the water seal area is used to store a water column of a certain height to resist the change of air pressure difference in the drainage channel and prevent the gas in the drainage channel from entering the room.

[0064] The toilet body 1 is provided with a brush ring interface (not shown) and a siphon jet (not shown) connected to the basin body 11. The brush ring interface 1 is provided at the upper part of the basin body 11, and the siphon jet is provided at the lower part of the basin body 11, located at the water seal area. The water tank 2 in this embodiment is designed to be separated from the toilet body 1. In other embodiments, the water tank 2 can also be integrated into the toilet body 1, which is not limited here.

[0065] like Figure 2 As shown, the flushing system 3 of the embodiment of the present application includes a first water supply waterway 31 and a second water supply waterway 32 , a brush circle waterway 33 and a first spray waterway 34 , and a switching valve 35 .

[0066] The water inlet end of the first water supply circuit 31 of the embodiment of the present application is configured to be connected to the municipal water source (tap water pipe), the water inlet end of the second water supply circuit 32 is configured to be connected to the water tank 2, and the second water supply circuit 32 is provided with a booster device 36, thereby realizing two water supply modes of tap water supply and increased water supply from the water tank 2 to provide a variety of flushing modes.

[0067] In this embodiment, the booster device 36 uses a water pump, but of course, an air pump can also be used, which is not limited here. The flushing system 3 also includes a control device electrically connected to the booster device 36, which can control the opening and closing of the booster device 36.

[0068] The water outlet of the brush ring water path 33 is configured to be connected to the brush ring interface of the toilet body 1, and provides brush ring flushing water for the toilet body 1. The water outlet of the first jet water path 34 is configured to be connected to the siphon jet port of the toilet body 1, and provides a jetting water flow to generate a siphon effect for sewage discharge. The switching valve 35 is connected to the water outlets of the first water supply water path 31 and the second water supply water path 32, and the water inlets of the brush ring water path 33 and the first jet water path 34, respectively.

[0069] like Figure 3-Figure 8As shown, the switching valve 35 of the embodiment of the present application includes a valve body 35a, a valve cavity 350 provided in the valve body 35a, a first water inlet 351 connected to the outlet end of the first water supply waterway 31 and a second water inlet 352 connected to the outlet end of the second water supply waterway 32, and a first water outlet 353 connected to the water inlet end of the brush circle waterway 33 and a second water outlet 354 connected to the water inlet end of the first jetting waterway 34. The switching valve is provided with a floating valve core 355, which is configured to control the opening and closing of the first water outlet 353 and the second water outlet 354 based on the pressure difference change of the inlet water pressure entering the first water inlet 351 and the second water inlet 352 to switch the working state of the flushing system 3.

[0070] The floating valve core 355 is disposed in the valve cavity 350. The floating valve core 355 includes a first working position (brush ring open, spray closed) in which the second water inlet 352 and the first water outlet 353 are connected and the second water inlet 352 and the second water outlet 354 are blocked (refer to FIG. Figure 5 ), and a second working position (brush circle open, spray open) in which the second water inlet 352 and the second water outlet 354 are connected and the first water inlet 351 and the first water outlet 353 are connected (refer to Figure 6 The floating valve core 355 is configured to move in the valve cavity 350 to switch between the first working position and the second working position based on the change of the water pressure difference entering the first water inlet 351 and the second water inlet 352 to realize the working state of the flushing system 35 .

[0071] When the water pressure of the second water inlet 352 is greater than that of the first water inlet 351, the floating valve core 355 switches to the first working position (brush circle on, spray off) under the action of the water flow of the second water inlet 351; when the water pressure of the second water inlet 352 is less than or equal to the water pressure of the first water inlet 351, the floating valve core 355 switches to the second working position (brush circle on, spray on) under the joint action of the water flow of the first water inlet 351 and the second water inlet 352.

[0072] In an exemplary embodiment, the control device is configured to control the duty cycle of the boost device 36 to control the water pressure difference between the second water inlet 352 and the first water inlet 351;

[0073] When the control device controls the duty cycle of the boosting device 36 to be the first duty cycle, the water pressure of the second water supply waterway 32 is greater than the water pressure of the first water supply waterway 31, so that the water pressure of the second water inlet 352 is greater than the water pressure of the first water inlet 351;

[0074] When the control device controls the duty cycle of the boosting device to a second duty cycle that is smaller than the first duty cycle, the water pressure of the second water supply circuit 32 is equal to or smaller than the water pressure of the first water supply circuit 31, so that the water inlet pressure of the second water inlet 352 is smaller than or equal to the water inlet pressure of the first water inlet 351.

[0075] like Figure 4 As shown, the opening directions of the first water inlet 351 and the second water inlet 352 of the switching valve 35 are arranged opposite to each other, so that the water flow directions of the first water inlet 351 and the second water inlet 352 are opposite to each other, so that the floating valve core 355 can be pushed to reciprocate in the opposite directions under the change of pressure difference. The first water outlet 353 and the second water outlet 354 are arranged in the direction from the first water inlet 351 to the second water inlet 352, and the second water outlet 354 is closer to the second water inlet 352 than the first water outlet 353.

[0076] like Figure 4-Figure 6 As shown, the floating valve core 355 has a partition 3551 that divides the valve cavity 350 and forms a first chamber 3501 communicating with the first water inlet 351 and a second chamber 3502 communicating with the second water inlet 352, and a stopper 3552 that can block the second water outlet 352. When the floating valve core 355 is in the first working position, the second water inlet 351 is communicated with the first outlet 251 through the second chamber 3502, and the stopper blocks the second outlet 354; when the floating valve core 355 is in the second working position, the second water inlet 352 is communicated with the second outlet 354 through the second chamber 3502, the first water inlet 351 is communicated with the first outlet 353 through the first chamber 3501, and the first chamber 3501 and the second chamber 3502 are not communicated with each other. The design of the floating valve core 355 can ensure that the first water outlet 353 and the second water outlet 354 have a certain water flow rate when water is discharged at the same time.

[0077] The floating valve core 355 of the embodiment of the present application is an inner shell arranged in the valve cavity 350, and a water flow channel is provided inside the inner shell. The top of the shell serves as a partition 3551, the shell body serves as a stopper 3552, and an orifice 3550 is provided to switch the communication relationship between the first water outlet 353 and the second water outlet 354.

[0078] The cross-sectional area of ​​the first water outlet 353 of the switching valve 35 is smaller than the cross-sectional area of ​​the second water outlet 354, so that the water flow rate of the first water outlet 353 is smaller than the water flow rate of the second water outlet 354, meeting the requirements of different water flow rates of different waterways and expanding its adaptability. In particular, it meets the different requirements of the brush circle waterway 33 and the jet waterway 34 for water flow rates during the flushing process of the toilet 100.

[0079] The switching valve 36 of the embodiment of the present application can switch between different water circuits based on the change in water inlet pressure of the first water inlet 351 and the second water inlet 352 to achieve the purpose of switching the working state of the flushing system, avoid the use of solenoid valves and motors, do not require additional power supply, have a simple structure, and reduce production and maintenance costs while meeting the water needs of the toilet 1 for spraying water and brush ring water.

[0080] like Figure 3 , Figure 7-Figure 8 As shown, the switching valve 35 also includes a reset element T that provides a force for the floating valve core 355 to move toward the second water inlet 352. One end of the reset element T abuts against the floating valve core 355, and the other end abuts against the inner wall of the valve cavity 350. The floating valve core 355 is provided with a first mounting portion 3553, and the inner wall of the valve cavity 350 is provided with a second mounting portion 3554. The two ends of the reset element 60 are respectively installed on the first mounting portion 3553 and the second mounting portion 3554 to prevent the reset element 60 from being displaced during the compression process and ensure its normal use. In this embodiment, the reset element 60 adopts a reset spring.

[0081] like Figure 3 As shown, the valve body 35a includes a first valve body 351a and a second valve body 352a detachably assembled with the first valve body 351a. The valve chamber 350 is formed by assembling the first valve body 351a and the second valve body 352a, so that it is convenient to install and replace the floating valve core 355 and the reset element T, etc.

[0082] The flushing system 3 of the embodiment of the present application can provide multiple flushing modes according to the water pressure of the first water supply waterway 31. In one flushing mode: when it is detected that the water pressure of the first water supply waterway 31 is lower than a predetermined value, the flushing system 3 includes a second working state, and at least one of the first working state and the third working state:

[0083] In the first working state, the control device controls the second water supply channel 32 to supply water and controls the booster device 36 to operate, and performs the first brush ring cleaning. Since the tap water pressure is low and the brush ring cleaning ability is low, the use of pressurized water provided by the second water supply channel 32 for brush ring flushing can achieve a higher brush ring flushing effect. In this state, the switching valve 35 is switched to the first working position (brush ring open, spray closed), connecting the second water supply channel 32 with the brush ring water channel 33, and disconnecting the second water supply channel 32 from the first spray water channel 31.

[0084] In the second working state, after the first brush ring cleaning, the control device controls the first water supply waterway 31 and the second water supply waterway 32 to supply water and controls the booster device 36 to operate, and the system performs brush ring and jet cleaning together. During the jet cleaning process, the brush ring water covers the jet water flow, which can reduce the noise of the jet water hitting the toilet wall and achieve a silent flushing effect. In this state, the switching valve 35 is switched to the second working position (brush ring open, jet open), connecting the first water supply waterway 31 with the brush ring waterway 33, and connecting the second water supply waterway 32 with the first jet waterway 34.

[0085] In the third working state, after the brush ring and the jet are cleaned together, and when the pressure of the second water supply waterway 32 is greater than that of the first water supply waterway 31, the control device controls the water supply of the second water supply waterway 32 and controls the operation of the booster device 36, and the brush ring is cleaned again by the booster water to improve the cleaning effect of the brush ring. In this state, the switching valve 35 is switched to the first working position (brush ring on, jet off), the second water supply waterway 32 and the brush ring waterway 33 are connected, and the second water supply waterway 32 and the first jet waterway 34 are disconnected.

[0086] The flushing system 3 of the embodiment of the present application can start the second water supply channel 31 for pressurized cleaning when the water pressure in the first water supply channel 31 is low. At the same time, when the pressurized water is sprayed, the first water supply channel 31 continues to provide brush circle water to reduce the noise generated by the spraying water, thereby achieving a silent flushing effect.

[0087] In another flushing mode: when the water pressure of the first water supply channel 31 is higher than or equal to a predetermined value, the flushing system includes the following multiple working states:

[0088] In the fourth working state, the control device controls the booster device 36 to be closed and the first water supply channel 31 to supply water, and the first brush circle cleaning is performed. In this state, the switching valve 35 switches to the second working position (brush circle open, spray open), connects the first water supply channel 31 with the brush circle water channel 33, and stops the second water supply channel 32 from supplying water to the spray water channel 34.

[0089] In the fifth working state, after the first brush circle cleaning, the control device controls the first water supply channel 31 and the second water supply channel 32 to supply water and the booster device 36 to operate, and the brush circle and spray cleaning are performed. In this state, the switching valve 35 switches to the second working position (brush circle open, spray open), connects the first water supply channel 31 with the brush circle water channel 33, and connects the second water supply channel 32 with the spray water channel 34.

[0090] In the sixth working state, after the brush circle and the jet are cleaned together, the control device controls the booster device 36 to close, the second water supply channel 32 stops supplying water, and the first water supply channel 31 supplies water, and the brush circle cleaning is performed again. In this state, the switching valve 35 switches to the second working position (brush circle open, jet open), the first water supply channel 31 is connected with the brush circle water channel 33, and the second water supply channel 32 stops supplying water to the jet water channel 33.

[0091] The flushing system 3 of the embodiment of the present application can switch the flushing mode according to the water pressure of the first water supply waterway 31, so that flushing is more intelligent. Specifically, a detection element (not shown in the figure) can be set to detect the water pressure of the first water supply waterway 31, and the detection element can be connected through the control device to switch the flushing mode according to the detection result.

[0092] The flushing system 3 controls the water pressure of the second water supply waterway 32 by controlling the duty cycle of the booster device 36 through the control device, and the specific control is as follows:

[0093] In the first working state, the control device controls the duty cycle of the boosting device 36 to be the first duty cycle, so as to adjust the water pressure of the second water supply waterway 32 to be greater than the water pressure of the first water supply waterway 31, and the floating valve core 355 is switched to the first working position (brush ring open, spray closed) under the action of the water flow of the second water inlet 352;

[0094] In the second working state, the control device controls the duty cycle of the boosting device 36 to be a second duty cycle that is smaller than the first duty cycle, so as to adjust the water pressure of the second water supply waterway 32 to be equal to or smaller than the water pressure of the first water supply waterway 31, and the floating valve core 355 is switched to the second working position (brush circle open, spray open) under the joint action of the water flow of the first water inlet 31 and the second water inlet 32;

[0095] In the third working state, the control device controls the duty cycle of the boosting device 36 to be a third duty cycle greater than the second duty cycle, and adjusts the water pressure of the second water supply waterway 32 to be greater than the water pressure of the first water supply waterway 31 again, and the floating valve core 36 switches to the first working position again under the action of the water flow of the second water inlet 32. The third duty cycle can be the same as or different from the first duty cycle, which is not limited here;

[0096] In the fourth working state, the control device controls the duty cycle of the boosting device 36 to be the fourth duty cycle, so as to adjust the water pressure of the second water supply waterway 32 to be equal to or less than the water pressure of the first water supply waterway 31, and the floating valve core 355 is switched to the second working position (brush circle open, spray open) under the joint action of the water flow of the first water inlet 351 and the second water inlet 352. The fourth duty cycle can be the same as the first duty cycle, or different.

[0097] like Figure 2 The flushing system 35 also includes a second jetting waterway 37, and a control valve 38 provided in the first water supply waterway 31 and used to control the on-off of the first water supply waterway. The control valve 38 divides the first water supply waterway 31 into a first water supply branch 311 connected to the water inlet end of the second jetting waterway 37 and a second water supply branch 312 connected to the first water inlet 351 of the switching valve 35. The control device is electrically connected to the control valve 38.

[0098] The booster device 36 is configured to be connected to a municipal power supply. When the municipal power supply is unable to supply power, the flushing system 3 has a non-electric flushing mode. The flushing system 3 includes the following working states:

[0099] In the seventh working state, the control device controls the control valve 38 to open the second water supply branch 312 to supply water to the switching valve 35 for the first brush circle cleaning; in this working state, the switching valve 35 is switched to the second working position (brush circle open, spray open) to connect the second water supply waterway 31 with the brush circle waterway 33.

[0100] In the eighth working state, after the first brush circle cleaning, the control device controls the control valve 38 to open the first water supply branch 311 to supply water to the second spray water channel 37 for siphon spray cleaning;

[0101] In the ninth working state, after the siphon spraying, the control device controls the control valve 38 to open the second water supply branch 312 to supply water to the switching valve 35 for another brushing circle cleaning. In this working state, the switching valve 35 is switched to the second working position (brush circle open, spray open) to connect the first water supply waterway 31 with the brush circle waterway 33.

[0102] like Figure 2 As shown, the flushing system 35 further includes a brush ring nozzle 41 and a siphon jet 42. The brush ring nozzle 41 is provided at the water outlet of the brush ring waterway 31 and is configured to be installed in cooperation with the brush ring interface of the toilet 1. The siphon jet 42 is configured to be installed in cooperation with the siphon jet port of the toilet 1 and is provided with a first interface 421 and a second interface 422 connected to the water outlet of the first jet waterway 34 and the water outlet of the second spray waterway 37, respectively.

[0103] When the flushing system 3 of the embodiment of the present application is working, the water pressure of the first water supply waterway 31 is detected by the pressure detection device (not shown) to determine the flushing mode. When the tap water pressure is insufficient, the booster device 36 is adjusted by the control device to operate at a certain duty cycle, so that the water pressure of the second water supply waterway 32 is greater than the water pressure of the first water supply waterway 31, and the water flows into the switching valve 35 through the second water inlet 352. Since the water pressure of the second water inlet 352 is greater than the water pressure of the first water inlet 351, the floating valve core 355 of the switching valve 35 is switched to the first working position (brush ring open, spray off) under the action of the water flow entering the second water inlet 352, and the water flow pressurized by the booster device 36 enters the brush ring waterway 33 through the second water inlet 352, the valve chamber 350, and the first water outlet 353, and the toilet 1 is flushed with the brush ring for the first time.

[0104] After the first brush circle flushing is completed, the control valve 38 opens the first water supply waterway 31 and reduces the duty cycle of the boosting device 36 at the same time, and the tap water enters the valve chamber 350 from the first water inlet 351, pushing the floating valve core 355 to switch to the second working position (brush circle open, spray open), and the tap water enters the brush circle waterway 33 from the first water inlet 351; after a period of time, the boosting device 36 starts to operate with a certain duty cycle, and the boosted water flow enters the valve chamber 350 from the second water inlet 352, and enters the spray waterway 34 from the second water outlet 352. At this time, the brush circle waterway 33 and the spray waterway 34 are supplied with water at the same time, and the air friction sound formed by the spray water flow is covered by the brush circle water, thereby reducing the spray noise.

[0105] After the brush ring and jet flushing are completed, the control valve 38 closes the first water supply circuit 31, the booster device 36 operates at a low duty cycle, water flows into the valve chamber 350 from the second water inlet 352, and pushes the floating valve core 355 to switch to the first working position (brush ring open, jet closed), and water flows into the brush ring water circuit 33 from the first water outlet 351.

[0106] When it is detected that the water pressure of the first water supply circuit 31 is equal to or higher than the predetermined value, the flushing system 35 adopts the second flushing mode for flushing: the control valve 38 opens the first water supply circuit 31, and tap water enters. At this time, the water flows into the switching valve 35 from the first water inlet 351, pushing the floating valve core 355 to switch to the second working position (brush circle on, spray off), and the tap water enters the brush circle water circuit 33 through the first water outlet 351 to perform the first brush circle cleaning.

[0107] After the first flushing of the brush circle is completed, the control valve 38 keeps the first water supply waterway 31 open, the booster device 36 starts to operate, and the booster water enters the valve chamber 350 from the second water inlet 352 and enters the jet waterway 34 from the second water outlet 352. By adjusting the duty cycle of the booster device 36 to keep tap water supplying the brush circle waterway 33, the brush circle water covers the air friction sound formed by the jet water flow, thereby reducing noise.

[0108] After the brush circle and siphon spray washing are completed, the booster device 36 stops running, and the control valve 38 opens the tap water to enter the switching valve 35 to supply water to the brush circle waterway 33.

[0109] The detection unit of the flushing system of this embodiment can be integrated on the housing of the control valve 38, or integrated on the control panel of the toilet body 1, etc., and can detect the water pressure of the first water supply circuit 31 and the second water supply circuit 32. The detection unit is set to control the water pressure at the input end of the valve 38 and send it to the control device. When the control device determines that the water pressure at the input end of the control valve 38 is less than the working water pressure, for example, when detecting that the tap water pressure is too low, the control device can use the control of the boosting device 36 to adopt the first flushing mode (silent zero water pressure flushing mode). When the control device determines that the tap water pressure is too low and not less than the working water pressure, the control device controls the control valve 38 to flush in the second flushing mode (normal silent flushing mode).

[0110] The flushing system of this embodiment can intelligently select a flushing mode according to the user's actual water pressure environment to meet different flushing needs and improve the intelligence of the product.

[0111] It should be noted that the "first time" and "again" described in the embodiments of the present application only indicate different flushing sequences, and do not limit the number of flushing in each state. For example, in the first state, brush circle cleaning can be performed once or multiple times.

[0112] like Fig. 9 As shown, the embodiment of the present application also provides a flushing method applied to the flushing system 3 as described in any of the above embodiments, the method comprising:

[0113] S1. When it is detected that the water pressure of the first water supply channel 31 is lower than a predetermined value, execute S12, and at least one of S11 and S13:

[0114] S11, control the water supply of the second water supply channel 32 and operate the booster device 36, adjust the water pressure of the second water supply channel 32 to be greater than that of the first water supply channel 31, and switch the switching valve 35 to the first working position (brush circle on, spray off), and perform the first brush circle cleaning;

[0115] S12, after the first brush circle cleaning, control the second water supply waterway 32 to supply water and operate the booster device 36, control the first water supply waterway 31 to supply water, adjust the water pressure of the second water supply waterway 32 to be less than or equal to the water pressure of the first water supply waterway 31, and switch the switching valve 35 to the second working position (brush circle on, spray on), and perform brush circle and spray cleaning together;

[0116] S13, when brushing and spraying are performed together, the water supply of the second water supply channel 32 is controlled and the booster device 36 is operated, the water pressure of the second water supply channel 31 is adjusted to be greater than that of the first water supply channel 31, and the switching valve 35 is switched to the first working position (brushing is on, spraying is off), and brushing is performed again.

[0117] The flushing method of the flushing system 3 further includes: S2, when it is detected that the water pressure of the first water supply channel 31 is higher than or equal to a predetermined value, performing the following operations:

[0118] S21, control the first water supply channel 31 to supply water and close the booster device 36, switch the switching valve 36 to the second working position (brush ring open, spray open), and perform the first brush ring cleaning;

[0119] S22, control the water supply of the second water supply channel 32 and operate the booster device 36, control the water supply of the first water supply channel 31, adjust the water pressure of the second water supply channel 32 to be less than or equal to the water pressure of the first water supply channel 31, and switch the switching valve 36 to the second working position (brush circle on, spray on), and perform brush circle and spray cleaning together;

[0120] S23, control the water supply of the first water supply channel 31 and close the booster device 36, switch the switching valve 31 to the second working position (brush circle on, spray on), and perform brush circle cleaning again.

[0121] The flushing system 3 of this embodiment can intelligently select a flushing mode according to the user's actual water pressure environment to meet different flushing needs and improve the intelligence of the product.

[0122] The present application describes multiple embodiments, but the description is exemplary rather than restrictive, and it is obvious to those skilled in the art that there may be more embodiments and implementations within the scope of the embodiments described in the present application. Although many possible feature combinations are shown in the drawings and discussed in the specific embodiments, many other combinations of the disclosed features are also possible. Unless specifically limited, any feature or element of any embodiment may be used in combination with any other feature or element in any other embodiment, or may replace any other feature or element in any other embodiment.

[0123] The present application includes and contemplates combinations of features and elements known to those of ordinary skill in the art. The embodiments, features and elements disclosed in the present application may also be combined with any conventional features or elements to form a unique invention scheme defined by the claims. Any features or elements of any embodiment may also be combined with features or elements from other invention schemes to form another unique invention scheme defined by the claims. Therefore, it should be understood that any feature shown and / or discussed in the present application may be implemented individually or in any appropriate combination. Therefore, except for the limitations made according to the attached claims and their equivalents, the embodiments are not subject to other restrictions. In addition, various modifications and changes may be made within the scope of protection of the attached claims.

[0124] In addition, when describing representative embodiments, the specification may have presented the method and / or process as a specific sequence of steps. However, to the extent that the method or process does not rely on the specific order of the steps described herein, the method or process should not be limited to the steps of the specific order described. As will be understood by those of ordinary skill in the art, other sequences of steps are also possible. Therefore, the specific sequence of the steps set forth in the specification should not be interpreted as a limitation to the claims. In addition, the claims for the method and / or process should not be limited to the steps of performing them in the order written, and those skilled in the art can easily understand that these sequences can be changed and still remain within the spirit and scope of the embodiments of the present application.

[0125] It will be appreciated by those skilled in the art that all or some of the steps, systems, and functional modules / units in the methods disclosed above may be implemented as software, firmware, hardware, and appropriate combinations thereof. In hardware implementations, the division between the functional modules / units mentioned in the above description does not necessarily correspond to the division of physical components; for example, a physical component may have multiple functions, or a function or step may be performed by several physical components in cooperation. Some or all components may be implemented as software executed by a processor, such as a digital signal processor or a microprocessor, or implemented as hardware, or implemented as an integrated circuit, such as an application-specific integrated circuit. Such software may be distributed on a computer-readable medium, which may include a computer storage medium (or non-transitory medium) and a communication medium (or temporary medium). As known to those skilled in the art, the term computer storage medium includes volatile and non-volatile, removable and non-removable media implemented in any method or technology for storing information (such as computer-readable instructions, data structures, program modules, or other data). Computer storage media include, but are not limited to, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, digital versatile disks (DVD) or other optical disk storage, magnetic cassettes, magnetic tapes, magnetic disk storage or other magnetic storage devices, or any other medium that can be used to store the desired information and can be accessed by a computer. In addition, it is well known to those of ordinary skill in the art that communication media typically contain computer-readable instructions, data structures, program modules, or other data in a modulated data signal such as a carrier wave or other transport mechanism, and may include any information delivery media.

[0126] In the description of the present application, it should be noted that the terms "upper", "lower", "one side", "the other side", "one end", "the other end", "side", "relative", "four corners", "periphery", "mouth structure" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the structure referred to has a specific orientation, is constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0127] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, the terms "connection", "direct connection", "indirect connection", "fixed connection", "installation", and "assembly" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; the terms "installation", "connection", and "fixed connection" can be a direct connection, or an indirect connection through an intermediate medium, or the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0128] Although the implementation methods disclosed in this application are as above, the contents described are only implementation methods adopted to facilitate understanding of this application, and are not intended to limit this application. Any technician in the field to which this application belongs can make any modifications and changes in the form and details of implementation without departing from the spirit and scope disclosed in this application, but the scope of patent protection of this application shall still be defined by the attached claims.

Claims

1. A flushing system, It is characterized in that include: a first water supply waterway and a second water supply waterway, wherein the second water supply waterway is provided with a pressure boosting device; A control device, electrically connected to the boost device and configured to control the working state of the boost device; A brush ring water channel and a first jet water channel, wherein the water outlet end of the brush ring water channel is configured to be connected to the brush ring interface of the toilet, and the water outlet end of the first jet water channel is configured to be connected to the siphon jet port of the toilet; A switching valve, comprising a first water inlet and a second water inlet respectively connected to the water outlets of the first water supply waterway and the second water supply waterway, and a first water outlet and a second water outlet respectively connected to the water inlets of the brush circle waterway and the first jet waterway; The switching valve is provided with a floating valve core, which is configured to control the opening and closing of the first water outlet and the second water outlet based on the change of the water pressure difference entering the first water inlet and the second water inlet to switch the working state of the flushing system.

2. The flushing system according to claim 1, It is characterized in that The switching valve comprises a valve body, which is arranged in a valve cavity of the valve body, and the first water inlet and the second water inlet, and the first water outlet and the second water outlet are all connected to the valve cavity; The floating valve core is arranged in the valve cavity, and the floating valve core includes a first working position in which the second water inlet is connected to the first water outlet and the second water inlet and the second water outlet are blocked, and a second working position in which the second water inlet is connected to the second water outlet and the first water inlet is connected to the first water outlet; The floating valve core is configured to be movable in the valve chamber to switch between the first working position and the second working position based on a change in a pressure difference of water entering the first water inlet and the second water inlet.

3. The flushing system according to claim 2, It is characterized in that When the water pressure at the second inlet of the switching valve is greater than the water pressure at the first inlet, the switching valve switches to the first working position; when the water pressure at the second inlet is equal to or less than the water pressure at the first water supply waterway, the switching valve switches to the second working position.

4. The flushing system according to claim 3, It is characterized in that The control device is configured to control the duty cycle of the boosting device to control the water pressure difference between the second water inlet and the first water inlet; When the control device controls the duty cycle of the boosting device to be the first duty cycle, the water pressure of the second water supply waterway is greater than the water pressure of the first water supply waterway, so that the water pressure of the second inlet is greater than the water pressure of the first inlet; When the control device controls the duty cycle of the boosting device to a second duty cycle that is smaller than the first duty cycle, the water pressure of the second water supply waterway is equal to or smaller than the water pressure of the first water supply waterway, so that the water pressure of the second inlet is equal to or smaller than the water pressure of the first water supply waterway.

5. The flushing system according to claim 2, It is characterized in that The opening directions of the first water inlet and the second water inlet of the switching valve are arranged opposite to each other, and the first water outlet and the second water outlet are arranged in the direction from the first water inlet to the second water inlet; The floating valve core has a partition portion that divides the valve cavity to form a first chamber and a second chamber, and a stopper portion that can block the second water outlet, the first chamber is communicated with the first water inlet, and the second chamber is communicated with the second water inlet; When the floating valve core is in the first working position, the second water inlet is connected to the first outlet via the second chamber, and the stopper blocks the second outlet; When the floating valve core is in the second working position, the second water inlet is communicated with the second outlet via the second chamber, and the first water inlet is communicated with the first outlet via the first chamber.

6. The flushing system according to claim 2, It is characterized in that A cross-sectional area of ​​the first water outlet is smaller than a cross-sectional area of ​​the second water outlet.

7. The flushing system according to claim 2, It is characterized in that It also includes a reset element that provides a force for the floating valve core to move toward the second water inlet, one end of the reset element abuts against the floating valve core, and the other end abuts against the inner wall of the valve cavity.

8. A flushing system according to any one of claims 1 to 7, It is characterized in that When the water pressure of the first water supply channel is lower than a predetermined value, the flushing system includes the following states: First working state: the control device controls the second water supply channel to supply water and the booster device to operate, and performs the first brush circle cleaning; Second working state: after the first brush circle cleaning, the control device controls both the first water supply channel and the second water supply channel to supply water and controls the booster device to operate, so as to perform brush circle and spray cleaning together; The third working state: after the brushing and spraying are performed together, the control device controls the second water supply channel to supply water and controls the booster device to operate, and performs brushing and spraying again; In the first working state and the third working state, the switching valve switches to the first working position; in the second working state, the switching valve switches to the second working position.

9. The flushing system according to any one of claims 1 to 7, It is characterized in that When the water pressure of the first water supply channel is higher than or equal to a predetermined value, the flushing system includes the following multiple working states: Fourth working state: the control device controls the first water supply channel to supply water and the booster device is closed, and the first brush circle cleaning is performed; Fifth working state: after the first brush circle cleaning, the control device controls both the first water supply channel and the second water supply channel to supply water and controls the booster device to operate, so as to perform brush circle and spray cleaning together; The sixth working state: after the brush circle and the spray are cleaned together, the control device controls the first water supply channel to supply water and controls the booster device to be closed, and performs brush circle cleaning again; In the fourth working state to the sixth working state, the switching valve is switched to the second working position.

10. The flushing system according to any one of claims 1 to 7, It is characterized in that It also includes a second jet waterway, and a control valve provided in the first water supply waterway and used to control the on-off of the first water supply waterway; the control valve divides the first water supply waterway into a first water supply branch connected to a first water inlet connected to a water inlet end of the second jet waterway and a second water supply branch connected to a water inlet end of the switching valve; When the power is off, the flushing system includes the following multiple working states: in the seventh working state, the control device controls the second water supply branch to supply water to perform the first brush circle cleaning; In the eighth working state, after the first brush circle cleaning, the control device controls the first water supply branch to supply water for spray cleaning; In the ninth working state, after the spray washing, the control device controls the second water supply branch to supply water to perform a second brushing and cleaning; In the seventh working state and the ninth working state, the switching valve is switched to the second working position.

11. A toilet, It is characterized in that The invention comprises a toilet body having a brush ring interface and a siphon jet port, and a flushing system as claimed in any one of claims 1 to 10.

12. The toilet according to claim 11, It is characterized in that It also includes a water tank. The water inlet end of the first water supply waterway of the flushing system is configured to be connected to a municipal water source, and the water inlet end of the second water supply waterway of the flushing system is connected to the water tank.

13. A flushing method applied to a flushing system as claimed in any one of claims 1 to 10, include: When it is detected that the water pressure of the first water supply waterway is lower than a predetermined value, the second operation and at least one of the first operation and the third operation are performed: First operation: control the water supply of the second water supply waterway and control the operation of the booster device, adjust the water pressure of the second water supply waterway to be greater than that of the first water supply waterway, switch the switching valve to the first working position, and perform the first brush circle cleaning; Second operation: after the first brush circle cleaning, the first water supply channel and the second water supply channel are controlled to supply water and the booster device is controlled to operate, the water pressure of the second water supply channel is adjusted to be less than or equal to the water pressure of the first water supply channel, the switching valve is switched to the second working position, and brush circle and spray cleaning are performed together; The third operation: after performing brush circle and spray cleaning together, control the water supply of the second water supply waterway and control the operation of the booster device, adjust the water pressure of the second water supply waterway to be greater than that of the first water supply waterway, and switch the switching valve to the first working position to perform brush circle cleaning again.

14. The flushing method according to claim 13, It is characterized in that The method comprises: when the water pressure of the first water supply waterway is higher than or equal to a predetermined value, Control the first water supply channel to supply water and control the booster device to close, and switch the switching valve to the second working position to perform the first brush ring cleaning; After the first brush circle cleaning, the second water supply waterway is controlled to supply water and the booster device is controlled to operate, the first water supply waterway is controlled to supply water, the water pressure of the second water supply waterway is adjusted to be equal to or less than the water pressure of the first water supply waterway, the switching valve is switched to the second working position, and brush circle and spray cleaning are performed together; When the brush ring and the jet are cleaned together, the first water supply channel is controlled to supply water and the booster device is controlled to be closed, the switching valve is switched to the second working position, and the brush ring is cleaned again.

Citation Information

Patent Citations

  • Automatic reset switching valve and shower device comprising automatic reset switching valve

    CN111442114A

  • Closestool flushing system

    CN115710952A

  • Poor reversing valve core of non -pressure

    CN205978616U

  • Water purifier

    CN215924551U

  • Drain valve device, washing water tank device, and water closet

    JP2023110606A

Cited By

  • Water tank assembly, flushing system and closestool

    CN119145504A

  • A tank assembly, a flushing system and a toilet

    CN119145504B