Closed drilling drainage and deslagging device and method based on liquid level real-time monitoring

By combining intelligent gas monitoring and liquid level monitoring technology in a closed drilling drainage and slag removal device, real-time monitoring and automated response to high gas outburst coal seams are achieved, solving the problems of gas blowhole accidents and low drainage efficiency, and improving Improve the safety and efficiency of mine production safety.

CN118745872APending Publication Date: 2024-10-08JIANGSU DUOAN TECHNOLOGY CO LTD
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202410931635.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-08

AI Technical Summary

Technical Problem

The existing blowout prevention device lacks real-time gas status monitoring and automated response mechanisms during the drilling process of high-gas outburst coal seams, resulting in an increased risk of gas blowout accidents, low extraction efficiency and the inability to achieve intelligent dynamic adjustment, affecting mine safety production.

Method used

A closed drilling drainage and slag removal device based on real-time liquid level monitoring is adopted, including an intelligent gas monitoring and early warning extraction system and an intelligent liquid level monitoring and drainage system. Gas concentration, pressure and temperature are monitored in real time through high-precision sensors and deep learning models. Automatically adjust extraction parameters and drainage strategies to achieve rapid response and intelligent control.

Benefits of technology

It effectively reduces the risk of gas blowhole accidents, improves gas drainage efficiency and safety, ensures stable control of underground liquid level and cinder volume, and improves mine safety production levels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118745872A_ABST
    Figure CN118745872A_ABST
Patent Text Reader

Abstract

The invention discloses a closed drilling water and slag discharging device and method based on liquid level real-time monitoring. An automatic slag removing system is used for automatically collecting and discharging coal slag generated in the drilling process. The intelligent gas monitoring and early warning extraction system is used for monitoring the gas concentration, pressure and temperature in the box body in the drilling process in real time and conveying gas in the blowout prevention body into the extracted gas storage device to be collected. The intelligent liquid level monitoring and drainage system is used for monitoring the liquid level height and change condition in the box body and the coal cinder stacking height and change condition; the intelligent control center is used for receiving data in the underground drilling process in real time, adjusting opening and closing of the gas extraction valve and the power of the gas extraction pump, and meanwhile adjusting opening and closing of the slag discharging valve and the conveying speed of the automatic coal slag conveying mechanism according to the coal slag stacking height and the change condition. And opening and closing of the drainage valve and the water pumping power of the water pump are adjusted according to the liquid level height and the change condition, so that closed gas extraction, deslagging and water drainage are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a closed drilling water discharge and slag removal device and method based on real-time liquid level monitoring, which is suitable for preventing and controlling large-scale gas blowout accidents during drilling holes for gas extraction in high-gas and protruding coal seams, and belongs to the technical field of mine gas disaster prevention and control. Background Art

[0002] Since 70% of mines in my country are high-gas or protruding mines, the occurrence of gas disasters seriously affects the safe production of coal mines. Gas extraction is a fundamental technology to solve gas disasters in mines. However, as the depth of coal seam mining increases, the gas pressure of the coal seam increases and the coal quality becomes soft. Therefore, during the drilling process in the coal seam, under the action of high gas pressure, gas and coal powder are quickly and massively sprayed from the drill hole into the mining space, causing gas over-limit accidents. In severe cases, the sprayed coal powder can also cause harm to workers.

[0003] In response to the drilling blowout accident in high-gas coal seams, the current blowout prevention device has the following problems: 1. There is a lack of real-time monitoring of the gas state (gas concentration, pressure and temperature) during the drilling process. In addition, there is a lack of effective early warning and rapid response mechanism for gas over-limit on site, which makes it difficult to issue an alarm in time at the early stage of gas blowout, resulting in an increased risk of gas accumulation, explosion and blowout accidents; 2. Traditional blowout prevention devices usually rely on manual operation and lack an automated rapid response mechanism. In an emergency, such as when a gas blowout occurs, the delay in manual operation may cause a large amount of gas to flow into the mining face, increasing safety risks; 3. When extracting the over-limit gas during the drilling process, fixed parameters are often used for extraction, and there is a lack of the ability to intelligently and dynamically adjust the extraction parameters based on real-time monitoring data. This results in the inability to achieve the optimal extraction effect under different gas conditions; 4. The blowout prevention device cannot regularly drain and slag, which will significantly affect the continuity and efficiency of gas extraction and blowout prevention device work, limiting the improvement of mine safety production level.

[0004] The above-mentioned problems not only affect the efficiency and effect of gas extraction, but also increase the risk of mine safety production; therefore, how to provide a new device and method that can effectively solve the above-mentioned problems is the research and development direction of the present invention. Summary of the invention

[0005] In view of the problems existing in the above-mentioned prior art, the present invention provides a closed drilling water drainage and slag removal device and method based on real-time liquid level monitoring, which can effectively solve the above-mentioned technical problems.

[0006] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a closed drilling and drainage and slag removal device based on real-time liquid level monitoring, including a blowout prevention body, an automatic slag removal system, an intelligent control center, an intelligent gas monitoring and early warning extraction system, and an intelligent liquid level monitoring and drainage system;

[0007] The blowout prevention body is fixed on the bracket, and includes a tee, a slag discharge funnel and a box body; the tee pipe is a hollow pipe with openings at both ends and a slag discharge port on its side, one end of the tee pipe is pushed into the coal seam, and the other end and the slag discharge port are outside the drill hole, and the slag discharge port is sealed and connected to the box body inlet through a flexible sealing hose; an inlet valve is installed at the inlet of the box body for controlling the opening and closing of the box body inlet; the slag discharge funnel is installed at the lower part of the box body, and the upper port of the slag discharge funnel is connected to the inside of the box body for collecting coal slag generated by drilling; the upper part of the box body is provided with a box body air outlet, and the lower part is provided with a water discharge port;

[0008] The automatic slag removal system is used to automatically collect and discharge the coal slag generated during the drilling process. The automatic slag removal system includes a slag discharge valve, a coal slag automatic conveying mechanism and a coal slag collection area. The slag discharge valve is installed at the lower port of the slag discharge funnel and is used to control the opening and closing of the lower port of the slag discharge funnel; the coal slag automatic conveying mechanism is located below the lower port of the slag discharge funnel and is used to receive the coal slag discharged by the slag discharge funnel and convey it to the coal slag collection area;

[0009] The intelligent gas monitoring and early warning extraction system includes a gas multi-parameter monitoring unit and a gas extraction actuator. The gas multi-parameter monitoring unit is installed in a box body and is used to monitor the gas concentration, pressure and temperature inside the box body in real time during the drilling process; the gas extraction actuator includes a gas extraction valve, a gas extraction pump and an extracted gas storage device; the gas extraction valve is installed at the air outlet of the box body and is used to control the opening and closing of the air outlet of the box body; the inlet of the gas extraction pump is connected to the air outlet of the box body through a pipeline, and the outlet of the gas extraction pump is connected to the extracted gas storage device through a pipeline, so as to transport the gas in the box body to the extracted gas storage device for collection;

[0010] The intelligent liquid level monitoring and drainage system includes a plurality of high-precision liquid level monitoring units and an automatic drainage mechanism; the plurality of high-precision liquid level monitoring units are installed on the inner wall of the box body and are respectively located at different heights, and are used to monitor the liquid level height and changes in the box body, and the coal slag accumulation height and changes; the automatic drainage mechanism includes a drainage valve, a water pump and a drainage collection device, the inlet of the water pump is connected to the drainage port through a pipeline, and the outlet of the water pump is connected to the drainage collection device through a pipeline, and is used to pump the water in the box body into the drainage collection device; the drainage valve is installed at the drainage port, and is used to control the on-off of the drainage port and the water pump;

[0011] The intelligent control center is connected to the gas multi-parameter monitoring unit through a data transmission line, which is used to receive the gas concentration, pressure and temperature change data in the underground drilling process in real time, and adjust the opening and closing of the gas extraction valve and the power of the gas extraction pump after analysis and processing. At the same time, the intelligent control center analyzes and processes the data feedback from each high-precision liquid level monitoring unit on their respective positions, and adjusts the opening and closing of the slag discharge valve and the transportation speed of the automatic slag conveying mechanism according to the coal slag accumulation height and changes, and adjusts the opening and closing of the drainage valve and the pumping power of the water pump according to the liquid level height and changes to meet the gas extraction and slag removal and drainage needs.

[0012] Furthermore, the gas multi-parameter monitoring unit includes an air pressure sensor, a methane gas concentration sensor and a temperature sensor; wherein the air pressure sensor is used to monitor the pressure of methane gas in the blowout preventer body in real time; the methane gas concentration sensor is used to monitor the concentration of methane gas in the blowout preventer body in real time; and the temperature sensor is used to monitor the temperature in the blowout preventer body in real time.

[0013] Furthermore, the high-precision liquid level monitoring unit includes a radar sensor, an image sensor and a liquid pressure sensor. Each sensor is arranged horizontally at its height position and is used to collect real-time coal slag distance data, image data and liquid pressure at the location, so as to reflect the liquid level height and changes, coal slag accumulation height and changes at the current location.

[0014] Furthermore, a filter is installed at the air outlet of the box, and a large-pore filter element, a medium-pore filter element and a small-pore filter element are arranged inside the filter, which is used to allow the gas extracted from the box to be filtered through the large-pore filter element, the medium-pore filter element and the small-pore filter element in sequence before entering the extracted gas storage device.

[0015] Furthermore, the intelligent control center has an audible and visual alarm function. When it detects that the gas concentration, temperature and pressure exceed the preset warning threshold, it automatically triggers the audible and visual alarm to promptly notify the underground workers to take risk avoidance measures.

[0016] Furthermore, the automatic coal slag conveying mechanism is a belt conveyor.

[0017] The working method of the closed drilling and drainage device based on real-time liquid level monitoring comprises the following specific steps:

[0018] Step 1: Install the tee pipe and assemble the anti-blowout hole drilling device: According to the design plan of pre-draining gas holes in high-gas and protruding coal seams, first use a drilling rig to push one end of the tee pipe into the coal seam according to the angle and direction of the gas pre-draining drilling hole design. The other end of the tee pipe and the slag discharge port are outside the borehole. Complete the assembly of the closed drilling and drainage slag discharge device next to the area to be drilled;

[0019] Step 2: Start the intelligent gas monitoring, early warning and extraction system and the intelligent liquid level monitoring and drainage system: After the three-way pipe and the drilling blowout prevention device are installed in place, start the intelligent gas monitoring, early warning and extraction system. The gas multi-parameter monitoring unit monitors the gas concentration, pressure and temperature data of the underground drilling area in real time, and feeds back to the intelligent control center; at the same time, start the intelligent liquid level monitoring and drainage system. The high-precision liquid level monitoring units at different heights use their own radar sensors, image sensors and liquid pressure sensors to collect the coal slag distance data, image data and liquid pressure data at the location in real time and feed them back to the intelligent control center. After analysis and processing, the intelligent control center obtains the liquid level height and changes inside the box, and the coal slag accumulation height and changes;

[0020] Step 3: Drilling for pre-gas extraction: Start the drilling rig and adjust the angle and direction of the drill rod so that the drill rod passes through both ends of the tee pipe and drills into the coal seam. During the drilling process, the intelligent gas monitoring and early warning extraction system will continuously monitor the gas concentration, pressure and temperature. At the same time, the intelligent liquid level monitoring and drainage and slag removal system will monitor the liquid level inside the box and the height and changes of coal slag accumulation.

[0021] Step 4: Intelligent drainage and slag discharge process: The drill cuttings, coal slag and dust generated during the normal drilling process of the gas pre-extraction drilling are discharged through the slag discharge port of the three-way pipe, and then enter the box through the box inlet of the blowout prevention body; the intelligent control center receives the monitoring data of the liquid level changes and coal slag accumulation at different heights in the box, and obtains real-time monitoring of the liquid level / coal slag changes at different heights inside the box during the downhole drilling process after analysis. When the monitored coal slag accumulation data / liquid level data exceeds the preset coal slag accumulation upper limit threshold / liquid level upper limit threshold, the intelligent control center intelligently matches the best slag discharge / drainage strategy and parameters through the deep learning model, and generates trigger instructions based on the best slag discharge / drainage strategy and parameters and sends them to the automatic slag discharge mechanism and automatic The drainage mechanism performs slag and water discharge, and provides real-time feedback of the liquid level / coal slag conditions at different heights inside the box through a high-precision liquid level monitoring unit. The intelligent control center further adjusts the drainage / slag discharge strategy based on the feedback monitoring data until the feedback coal slag accumulation data / liquid level data drops to the preset coal slag accumulation lower limit threshold / liquid level lower limit threshold, and then generates a trigger instruction to be sent to the automatic slag discharge mechanism and the automatic drainage mechanism to automatically turn off the slag discharge and water discharge modes. During the entire drilling process, the intelligent control center always judges the liquid level and coal slag height and changes inside the box in real time, thereby dynamically adjusting the working status and working parameters of the automatic slag discharge mechanism and automatic drainage to keep the liquid level and coal slag volume in each area inside the box within the preset safety range during the drilling process.

[0022] Step 5. Intelligent gas early warning and extraction: The intelligent control center compares the preset gas concentration safety threshold, temperature threshold, gas pressure safety threshold and real-time monitoring data, and conducts a comprehensive assessment of the gas status, so as to identify potential gas accumulation, gas explosion and blowout phenomenon in advance, and realize real-time analysis of gas temperature and pressure status during underground drilling. According to whether the monitoring data exceeds the safety threshold, it intelligently identifies and judges abnormal changes in gas concentration inside the borehole, potential blowout phenomenon and gas explosion hazards; when the real-time monitored gas concentration, temperature and pressure exceed their respective safety thresholds, the intelligent control center automatically triggers the sound and light alarm, and promptly notifies the underground workers to take risk avoidance measures; at the same time, the intelligent control center opens the gas extraction according to the gas monitoring results and the preset control logic. The gas extraction valve is opened, and the drainage valve and slag discharge valve connected to the automatic drainage mechanism and the automatic slag removal mechanism are closed at the same time; at the same time, the real-time monitoring data is matched with the data stored in the intelligent control center to obtain the current gas overlimit degree, and the gas extraction pump is adjusted to start gas extraction with the corresponding power. A large amount of ejected gas is filtered through the filter and then collected in the extraction gas storage device, thereby reducing the gas concentration generated by the spray hole and preventing gas accumulation; the gas multi-parameter monitoring unit provides real-time feedback on the gas extraction situation inside the blowout prevention body until the monitored gas concentration, pressure and temperature are all less than their respective safety thresholds. The intelligent control center automatically switches the gas extraction valve and drainage / slag discharge valve, so that the blowout prevention body can quickly switch from the gas extraction mode to the slag drainage mode, and continue normal underground drilling operations;

[0023] Step 6. Drill withdrawal: operate the drilling rig to withdraw the drill rod, and repeat the gas intelligent early warning and extraction and intelligent water drainage and slag removal processes in steps 4 and 5 during the drill withdrawal process. After the drill is withdrawn, the three-way pipe is taken out from the gas pre-extraction borehole, and the gas pre-extraction borehole is sealed and connected to the gas extraction branch pipeline to continue gas extraction, thereby completing the construction of the gas pre-extraction borehole to prevent blowout.

[0024] Furthermore, in step 2, the intelligent control center obtains the liquid level height and change condition inside the box body, the coal slag accumulation height and change condition, and the specific process is as follows:

[0025] The intelligent control center obtains the distance data and image data of coal slag at different height positions in real time. If the image data at a certain height position does not capture coal slag, and the distance data monitored by the radar sensor at this position is the width of the box, it means that there is no coal slag at this height position; if the image data at a certain height position captures coal slag, and the distance monitored by the radar sensor at this position is less than the width of the box, it means that there is coal slag at the current height position. The data collected by different high-precision liquid level monitoring units at the same collection time are all judged whether there is coal slag. Among them, the high-precision liquid level monitoring unit with coal slag and the highest position corresponds to the height of the coal slag in the box at the current collection time and stores it; then, by recording the coal slag height data in the box at different collection times, the change in coal slag height can be obtained;

[0026] The intelligent control center obtains the liquid pressure data at different heights in real time. If the monitoring data of the liquid pressure sensor at a certain height is zero, it means that there is no liquid at that height; if the monitoring data of the liquid pressure sensor at a certain height is not zero, it means that there is liquid at that height. According to this rule, the data collected by different high-precision liquid level monitoring units at the same collection time are judged to determine whether there is liquid. The high-precision liquid level monitoring unit with the highest position and the presence of liquid corresponds to the height of the liquid level in the box at the current collection time and is stored; then, by recording the liquid height data in the box at different collection times, the change in liquid level height can be obtained.

[0027] Furthermore, in step 4, the intelligent control center intelligently matches the best slag discharge / drainage strategy and parameters through the deep learning model, specifically:

[0028] The strategies and parameters of slag discharge / water drainage include: ① slag discharge strategy: only open the slag discharge valve and the coal slag automatic transportation mechanism, the drainage valve and the water pump are in the closed state, and the transportation speed of the coal slag automatic transportation mechanism is adjusted; ② Drainage strategy: only open the drainage valve and the water pump, the slag discharge valve and the coal slag automatic transportation mechanism are in the closed state, and the pumping flow of the water pump is adjusted; ③ Drainage and slag drainage strategy: open the slag discharge valve, the coal slag automatic transportation mechanism, the drainage valve and the water pump at the same time, and adjust the transportation speed of the coal slag automatic transportation mechanism and the pumping flow of the water pump;

[0029] A deep learning algorithm is used to obtain the slag discharge / drainage strategies and parameters corresponding to different coal slag heights and liquid level heights for training. A deep learning model is formed after training. Subsequently, the deep learning model is input according to the real-time monitored coal slag height and liquid level height. The deep learning model first determines one of the slag discharge strategy, drainage strategy and drainage and slag discharge strategy based on the real-time monitored coal slag height and liquid level height, and determines the specific parameters of the strategy accordingly.

[0030] Compared with the prior art, the present invention has the following advantages:

[0031] (1) The gas multi-parameter monitoring unit of the present invention adopts high-precision sensors, which can monitor the key parameters such as gas concentration, pressure and temperature of underground drilling in real time, ensuring the accuracy and timeliness of the monitoring data; the intelligent control center analyzes the monitoring data in real time, so as to intelligently identify and judge the abnormal changes in gas concentration inside the borehole, potential blowout phenomena and gas explosion hazards; when it is detected that there is a risk of explosion or blowout in the underground gas state, the system can quickly issue an audible and visual alarm, and start the gas extraction system by controlling the opening and closing of the solenoid valve, so as to reduce the gas concentration in the shortest time and effectively prevent the occurrence of gas accumulation and blowout accidents.

[0032] (2) The intelligent control center of the present invention can intelligently match the degree of gas overlimit according to real-time gas monitoring data and historical extraction results, and dynamically adjust gas extraction parameters such as extraction flow and pressure according to real-time feedback data of gas extraction status to achieve the best extraction effect. This intelligent matching technology not only improves the efficiency of gas extraction, but also reduces energy consumption, achieving efficient and energy-saving gas extraction.

[0033] (3) The intelligent liquid level monitoring system of the present invention arranges multiple high-precision liquid level monitoring units at different heights inside the box to monitor the radar distance information, image information and liquid level pressure information of different areas inside the box in real time at different heights. The intelligent control center can analyze the coal slag accumulation and liquid level characteristic changes in different height areas inside the box, accurately obtain the height and change of the liquid level and coal slag accumulation, and facilitate subsequent processing.

[0034] (4) The intelligent control center in the present invention uses a machine learning model to quickly determine the height and changes of coal slag accumulation and liquid level. When the liquid level / coal slag prediction result rises to the preset liquid level and preset upper limit threshold, the intelligent control center intelligently matches the best slag discharge / drainage strategy and parameters through the deep learning model, and drives the automatic slag discharge and drainage mechanism to perform efficient operations. The drainage / slag discharge strategy is further adjusted according to the feedback information until it drops to the preset lower limit threshold; during the entire drilling process, the intelligent control center always evaluates and predicts the liquid level and coal slag change trends in different areas inside the box in real time, thereby dynamically adjusting the working state and working parameters of the automatic slag discharge mechanism and automatic drainage to keep the liquid level and coal slag amount in each area inside the box during the drilling process always within the preset threshold range; this not only improves the operating efficiency, but also reduces the risk of manual operation, ensuring the stable control of the liquid level and coal slag amount inside the box during the drilling process.

[0035] (5) The closed drilling and slag removal device proposed in the present invention achieves effective isolation of gas by maintaining a certain safe liquid level of water inside the box: the core of the device lies in its unique liquid level control mechanism. Through the synergy of the high-precision liquid level monitoring unit and the intelligent control center, the device can monitor the water level inside the box in real time to ensure that the water level always remains within the preset safety range; a stable water seal is formed during the drilling operation, which restricts the gas above the water seal, thereby blocking the possibility of gas entering the tunnel through the slag discharge port. This isolation mechanism not only prevents the uncontrolled release of gas, but also reduces the risk of explosion caused by gas accumulation.

[0036] (6) The various components of the closed drilling, drainage and slag removal device of the present invention cooperate with each other. The intelligent gas monitoring, early warning and extraction system works in coordination with the intelligent control center to achieve a rapid response to the gas blowhole situation and ensure the timeliness and effectiveness of gas extraction. The intelligent liquid level monitoring and drainage system works in coordination with the intelligent control center to ensure the stability of the liquid level and coal slag amount inside the box, avoiding safety risks caused by excessive liquid level or coal slag accumulation. The intelligent gas monitoring, early warning and extraction system works in coordination with the intelligent liquid level monitoring and drainage system to always limit the gas to above the liquid level inside the box, providing a stable environment for gas extraction and ensuring extraction efficiency and safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0038] Figure 2 It is a work flow chart of the intelligent gas monitoring, early warning and extraction system of the present invention;

[0039] Figure 3 It is a work flow chart of the intelligent liquid level monitoring and water discharge and slag discharge system of the present invention;

[0040] Figure 4 It is a structural schematic diagram of a gas multi-parameter monitoring unit in the present invention;

[0041] Figure 5 It is a structural schematic diagram of the high-precision liquid level monitoring unit in the present invention;

[0042] Figure 6 It is a schematic diagram of the structure of the filter in the present invention.

[0043] In the figure: 1-roof, 2-coal seam, 3-drill pipe, 4-tee pipe, 5-flange, 6-flexible sealing hose, 7-blowout prevention body, 7-1-box inlet, 7-2-box outlet, 8-slag discharge funnel, 9-slag discharge valve, 10-coal slag automatic conveying mechanism, 11-coal slag collection area, 12-intelligent control center, 13-gas multi-parameter monitoring unit, 13-1-temperature sensor, 13-2-air pressure sensor, 13-3-methane concentration sensor, 14-data Transmission line, 15-gas extraction valve, 16-gas extraction pipeline, 17-gas extraction pump, 18-extracted gas storage device, 19-inlet valve, 20-high-precision liquid level monitoring unit, 20-1-radar sensor, 20-2-image sensor, 20-3-liquid pressure sensor, 21-drainage valve, 22-water pump, 23-drainage collection device, 24-filter, 24-1-large-pore filter element, 24-2-medium-pore filter element, 24-3-small-pore filter element. DETAILED DESCRIPTION

[0044] The present invention will be further described below.

[0045] like Figure 1 As shown, a closed drilling and drainage and slag removal device based on real-time liquid level monitoring includes a blowout prevention body 7, an automatic slag removal system, an intelligent control center 12, an intelligent gas monitoring and early warning extraction system, and an intelligent liquid level monitoring and drainage system;

[0046] The blowout prevention body 7 is fixed on the bracket, and includes a tee pipe 4, a slag discharge funnel 8 and a box body; the tee pipe 4 is a hollow pipe with two ends open and a slag discharge port on its side, one end of the tee pipe 4 is pushed into the coal seam 2, and the other end and the slag discharge port are outside the borehole, and the slag discharge port is sealed and connected to the box body inlet through a flexible sealing hose 6; an inlet valve 19 is installed at the box body inlet 7-1, which is used to control the opening and closing of the box body inlet 7-1; the slag discharge funnel 8 is installed at the lower part of the box body, and the upper end of the slag discharge funnel 8 is connected to the inside of the box body, which is used to collect the coal slag generated by drilling; the box body is provided with a box body air outlet 7-2 at the upper part and a water discharge port at the lower part;

[0047] The automatic slag removal system is used to automatically collect and discharge the coal slag generated during the drilling process. The automatic slag removal system includes a slag discharge valve 9, a coal slag automatic conveying mechanism 10 and a coal slag collection area 11. The slag discharge valve 9 is installed at the lower port of the slag discharge funnel 8 and is used to control the opening and closing of the lower port of the slag discharge funnel 8; the coal slag automatic conveying mechanism 10 is located below the lower port of the slag discharge funnel 8 and is used to receive the coal slag discharged by the slag discharge funnel 8 and convey it to the coal slag collection area 11;

[0048] The intelligent gas monitoring, early warning and extraction system includes a gas multi-parameter monitoring unit 13 and a gas extraction actuator. The gas multi-parameter monitoring unit 13 is installed in a box body and is used to monitor the gas concentration, pressure and temperature inside the box body in real time during the drilling process; the gas extraction actuator includes a gas extraction valve 15, a gas extraction pump 17 and an extracted gas storage device 18; the gas extraction valve 15 is installed at the box body air outlet 7-2 and is used to control the opening and closing of the box body air outlet 7-2; the inlet of the gas extraction pump 17 is connected to the box body air outlet 7-2 through a pipeline, and the outlet of the gas extraction pump 17 is connected to the extracted gas storage device 18 through a pipeline, so as to transport the gas in the box body to the extracted gas storage device 18 for collection; Figure 4 As shown, the gas multi-parameter monitoring unit 13 includes an air pressure sensor 13-2, a methane gas concentration sensor 13-3 and a temperature sensor 13-1; wherein the air pressure sensor 13-2 is used to monitor the pressure of the methane gas in the blowout prevention body 7 in real time; the methane gas concentration sensor 13-3 is used to monitor the concentration of the methane gas in the blowout prevention body 7 in real time; and the temperature sensor 13-1 is used to monitor the temperature in the blowout prevention body 7 in real time.

[0049] The intelligent liquid level monitoring and drainage system includes a plurality of high-precision liquid level monitoring units 20 and an automatic drainage mechanism; the plurality of high-precision liquid level monitoring units 20 are installed on the inner wall of the box body and are respectively located at different heights, and are used to monitor the liquid level height and changes in the box body, and the coal slag accumulation height and changes; the automatic drainage mechanism includes a drainage valve 21, a water pump 22 and a drainage collection device 23, the inlet of the water pump 22 is connected to the drainage port through a pipeline, and the outlet of the water pump 22 is connected to the drainage collection device 23 through a pipeline, and is used to pump the water in the box body into the drainage collection device 23; the drainage valve 21 is installed at the drainage port, and is used to control the on-off of the drainage port and the water pump 22; Figure 5 As shown, the high-precision liquid level monitoring unit 20 includes a radar sensor 20-1, an image sensor 20-2 and a liquid pressure sensor 20-3. Each sensor is arranged horizontally at its height position and is used to collect the coal slag distance data, image data and liquid pressure at the location in real time to reflect the liquid level height and changes, coal slag accumulation height and changes at the current location.

[0050] The intelligent control center 12 is connected to the gas multi-parameter monitoring unit 13 through a data transmission line 14, which is used to receive the gas concentration, pressure and temperature change data in the underground drilling process in real time, and adjust the opening and closing of the gas extraction valve 15 and the power of the gas extraction pump 17 after analysis and processing. At the same time, the intelligent control center 12 analyzes and processes the data of the respective positions fed back by each high-precision liquid level monitoring unit 20, and adjusts the opening and closing of the slag discharge valve 9 and the transportation speed of the coal slag automatic conveying mechanism 10 according to the coal slag accumulation height and changes, and adjusts the opening and closing of the drainage valve 21 and the pumping power of the water pump according to the liquid level height and changes, so as to meet the gas extraction and slag removal and drainage needs; the intelligent control center 12 has an audible and visual alarm function. When the gas concentration, temperature and pressure are monitored to exceed the preset warning threshold, the audible and visual alarm is automatically triggered to promptly notify the underground workers to take risk avoidance measures;

[0051] As an improvement of the present invention, Figure 6 As shown, a filter 24 is installed at the air outlet 7-2 of the box, and a large-pore filter element 24-1, a medium-pore filter element 24-2 and a small-pore filter element 24-3 are arranged inside the filter 24, so that the gas extracted from the box is filtered by the large-pore filter element 24-1, the medium-pore filter element 24-2 and the small-pore filter element 24-3 in sequence and then enters the extracted gas storage device 18; the automatic coal slag conveying mechanism 10 is a belt conveyor.

[0052] The working method of the closed drilling and drainage device based on real-time liquid level monitoring comprises the following specific steps:

[0053] Step 1: Install the tee pipe and assemble the anti-blowout hole drilling device: According to the design scheme of pre-drilling gas holes for high-gas and protruding coal seams, first use a drilling rig to push one end of the tee pipe 4 into the coal seam 2 according to the angle and direction of the gas pre-drilling hole design. The other end of the tee pipe 4 and the slag discharge port are outside the borehole. Complete the assembly of the closed drilling and drainage slag discharge device next to the area to be drilled.

[0054] Step 2, start the intelligent gas monitoring, early warning and extraction system and the intelligent liquid level monitoring and drainage system: after the three-way pipe 4 and the drilling anti-blowout hole device are installed in place, start the intelligent gas monitoring, early warning and extraction system, and the gas multi-parameter monitoring unit 13 monitors the gas concentration, pressure and temperature data of the underground drilling area in real time, and feeds back to the intelligent control center 12; at the same time, start the intelligent liquid level monitoring and drainage system, and the high-precision liquid level monitoring units 20 at different heights collect the coal slag distance data, image data and liquid pressure data at the location in real time through their own radar sensors 20-1, image sensors 20-2 and liquid pressure sensors 20-3, and feed them back to the intelligent control center 12. After analysis and processing, the intelligent control center 12 obtains the liquid level height and change inside the box body, and the coal slag accumulation height and change. The specific process is as follows:

[0055] The intelligent control center 12 collects data every 1 minute to obtain the distance data and image data of coal slag at different height positions. If the image data at a certain height position does not capture coal slag, and the distance data monitored by the radar sensor 20-1 at this position is the width of the box, it means that there is no coal slag at this height position; if the image data at a certain height position captures coal slag, and the distance monitored by the radar sensor 20-1 at this position is less than the width of the box, it means that there is coal slag at the current height position. The data collected by different high-precision liquid level monitoring units 20 at the same collection time are all judged whether there is coal slag. Among them, the high-precision liquid level monitoring unit 20 with coal slag and the highest position corresponds to the height of the coal slag in the box at the current collection time and stores it; then, by recording the coal slag height data in the box at different collection times, the change in coal slag height can be obtained;

[0056] The intelligent control center 12 obtains the liquid pressure data at different height positions in real time. If the monitoring data of the liquid pressure sensor 20-3 at a certain height position is zero, it means that there is no liquid at this height position; if the monitoring data of the liquid pressure sensor 20-3 at a certain height position is not zero, it means that there is liquid at this height position. According to this rule, the data collected by different high-precision liquid level monitoring units 20 at the same collection time are all judged whether there is liquid. The high-precision liquid level monitoring unit 20 with the highest position where liquid exists has its corresponding position as the height of the liquid level in the box at the current collection time and is stored; then, by recording the liquid height data in the box at different collection times, the change in liquid level height can be obtained.

[0057] Step 3: Drilling for pre-gas extraction: Start the drilling rig and adjust the angle and direction of the drill rod so that the drill rod passes through both ends of the tee pipe 4 and drills into the coal seam 2; during the drilling process, the intelligent gas monitoring and early warning extraction system will continuously monitor the gas concentration, pressure and temperature, while the intelligent liquid level monitoring and drainage and slag removal system monitors the liquid level inside the box and the height and changes of coal slag accumulation;

[0058] Step 4: Intelligent drainage and slag removal process: Figure 3 As shown, the drilling cuttings, coal slag and dust generated during the normal drilling process of the gas pre-extraction drilling are discharged through the slag discharge port of the three-way pipe 4, and then enter the box through the box inlet of the blowout prevention body 7; the intelligent control center 12 receives the monitoring data of the liquid level changes and coal slag accumulation at different heights in the box, and obtains the real-time monitoring of the liquid level / coal slag changes at different heights inside the box during the downhole drilling process after analysis. When the monitored coal slag accumulation data / liquid level data exceeds the preset coal slag accumulation upper limit threshold / liquid level upper limit threshold (the upper limit threshold is 80% of the box height), the intelligent control center 12 intelligently matches the best slag discharge / water discharge strategy and parameters through the deep learning model, specifically:

[0059] The strategies and parameters of slag discharge / water discharge include: ① slag discharge strategy: only open the slag discharge valve 9 and the coal slag automatic transportation mechanism 10, the water discharge valve 21 and the water pump 22 are in the closed state, and the transportation speed of the coal slag automatic transportation mechanism 10 is adjusted; ② Water discharge strategy: only open the water discharge valve 21 and the water pump 22, the slag discharge valve 9 and the coal slag automatic transportation mechanism 10 are in the closed state, and the pumping flow of the water pump 22 is adjusted; ③ Water discharge and slag discharge strategy: open the slag discharge valve 9, the coal slag automatic transportation mechanism 10, the water discharge valve 21 and the water pump 22 at the same time, and adjust the transportation speed of the coal slag automatic transportation mechanism 10 and the pumping flow of the water pump 22;

[0060] A deep learning algorithm (such as random forest or neural network, support vector machine and neural network, etc.) is used to obtain the strategies and parameters of slag discharge / drainage corresponding to different coal slag heights and liquid level heights for training. After training, a deep learning model is formed. Subsequently, the deep learning model is input according to the real-time monitored coal slag height and liquid level height. The deep learning model first determines whether to adopt one of the slag discharge strategy, drainage strategy and drainage and slag discharge strategy according to the real-time monitored coal slag height and liquid level height, and determines the specific parameters of the strategy accordingly; a trigger instruction is generated according to the optimal slag discharge / drainage strategy and parameters and sent to the automatic slag discharge mechanism and the automatic drainage mechanism for slag discharge and drainage, and the liquid level at different heights inside the box is fed back in real time through the high-precision liquid level monitoring unit 20. The intelligent control center 12 further adjusts the drainage / slag discharge strategy according to the feedback monitoring data until the feedback coal slag accumulation data / liquid level data is reduced to the preset coal slag accumulation lower limit threshold / liquid level lower limit threshold (the lower limit threshold is 20% of the box height), and generates a trigger instruction to send to the automatic slag discharge mechanism and the automatic drainage mechanism to automatically close the slag discharge and drainage mode; during the entire drilling process, the intelligent control center 12 always judges the liquid level and coal slag height and changes inside the box in real time, so as to dynamically adjust the working state and working parameters of the automatic slag discharge mechanism and automatic drainage to keep the liquid level and coal slag volume in various areas inside the box during the drilling process always within the preset safety range, that is, between 20% and 80% of the box height;

[0061] Step 5: Intelligent gas warning and extraction: Figure 2As shown, the intelligent control center 12 compares the preset gas concentration safety threshold, temperature threshold, gas pressure safety threshold and real-time monitoring data, and conducts a comprehensive assessment of the gas status, so as to identify potential gas accumulation, gas explosion and blowout phenomenon in advance, and realize real-time analysis of the gas temperature and pressure status during underground drilling. According to whether the monitoring data exceeds the safety threshold, the abnormal changes in the gas concentration inside the borehole, potential blowout phenomenon and gas explosion hazards are intelligently identified and judged; when the real-time monitored gas concentration (safety threshold concentration is 1.0%), temperature (safety threshold: 60°C with coolant upper limit; 100°C without coolant upper limit) and pressure (safety threshold pressure is 1MPa) all exceed their respective safety thresholds, the intelligent control center 12 automatically triggers the sound and light alarm to promptly notify the underground workers to take risk avoidance measures; at the same time, the intelligent control center 12 According to the results and the preset control logic, the gas extraction valve 15 is opened, and the drainage valve 21 and the slag discharge valve 9 connected to the automatic drainage mechanism and the automatic slag removal mechanism are closed; at the same time, the real-time monitoring data is matched with the data stored in the intelligent control center 12 to obtain the current gas overlimit degree, and the gas extraction pump 17 is adjusted to start gas extraction with the corresponding power. A large amount of ejected gas is filtered by the filter and then collected in the extraction gas storage device 18, thereby reducing the gas concentration generated by the spray hole and preventing gas accumulation; the gas multi-parameter monitoring unit 13 provides real-time feedback on the gas extraction situation inside the blowout prevention body, until the monitored gas concentration, pressure and temperature are all less than their respective safety thresholds, the intelligent control center 12 automatically switches the gas extraction valve 15 and the drainage / slag discharge valve, so that the blowout prevention body 7 quickly switches from the gas extraction mode to the slag discharge mode, and continues the normal drilling operation underground;

[0062] Step 6, drill withdrawal: operate the drilling rig to withdraw the drill rod, and repeat the gas intelligent early warning and extraction and intelligent water drainage and slag removal processes of steps 4 and 5 during the drill withdrawal process. After the drill is withdrawn, the three-way pipe 4 is taken out from the gas pre-extraction borehole, and the gas pre-extraction borehole is sealed and connected to the gas extraction branch pipeline to continue gas extraction, thereby completing the construction of the gas pre-extraction borehole to prevent blowout.

[0063] As another improvement of the present invention, in step five, a deep learning algorithm (such as random forest or neural network, support vector machine and neural network, etc.) can also be used in advance to obtain gas extraction parameters corresponding to different gas concentrations, temperatures and pressure data for training. After training, a deep learning model is formed, and the monitoring data collected each time is input into the deep learning model. The deep learning model intelligently matches the degree of gas exceeding the limit and dynamically adjusts the underground gas extraction parameters to the optimal extraction parameters to ensure efficient gas extraction; wherein the real-time monitoring data dynamically adjusts the underground gas extraction parameters: ① Optimal extraction flow rate: calculated according to the gas outburst rate, for every 0.1% increase in gas concentration, the extraction flow rate increases by 30L / min, and the maximum does not exceed 300L / min; ② Optimal extraction pressure: matching the extraction flow rate and maintaining below 0.8MPa; ③ Optimal extraction time: dynamically adjusted according to the monitoring data.

[0064] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A closed drilling and drainage device based on real-time liquid level monitoring, characterized in that: It includes blowout prevention body, automatic slag removal system, intelligent control center, intelligent gas monitoring and early warning extraction system and intelligent liquid level monitoring and drainage system; The blowout prevention body is fixed on the bracket, and includes a tee, a slag discharge funnel and a box body; the tee pipe is a hollow pipe with openings at both ends and a slag discharge port on its side, one end of the tee pipe is pushed into the coal seam, and the other end and the slag discharge port are outside the drill hole, and the slag discharge port is sealed and connected to the box body inlet through a flexible sealing hose; an inlet valve is installed at the inlet of the box body for controlling the opening and closing of the box body inlet; the slag discharge funnel is installed at the lower part of the box body, and the upper port of the slag discharge funnel is connected to the inside of the box body for collecting coal slag generated by drilling; the upper part of the box body is provided with a box body air outlet, and the lower part is provided with a water discharge port; The automatic slag removal system is used to automatically collect and discharge the coal slag generated during the drilling process. The automatic slag removal system includes a slag discharge valve, a coal slag automatic conveying mechanism and a coal slag collection area. The slag discharge valve is installed at the lower port of the slag discharge funnel and is used to control the opening and closing of the lower port of the slag discharge funnel; the coal slag automatic conveying mechanism is located below the lower port of the slag discharge funnel and is used to receive the coal slag discharged by the slag discharge funnel and convey it to the coal slag collection area; The intelligent gas monitoring and early warning extraction system includes a gas multi-parameter monitoring unit and a gas extraction actuator. The gas multi-parameter monitoring unit is installed in a box body and is used to monitor the gas concentration, pressure and temperature inside the box body in real time during the drilling process; the gas extraction actuator includes a gas extraction valve, a gas extraction pump and an extracted gas storage device; the gas extraction valve is installed at the air outlet of the box body and is used to control the opening and closing of the air outlet of the box body; the inlet of the gas extraction pump is connected to the air outlet of the box body through a pipeline, and the outlet of the gas extraction pump is connected to the extracted gas storage device through a pipeline, so as to transport the gas in the box body to the extracted gas storage device for collection; The intelligent liquid level monitoring and drainage system includes a plurality of high-precision liquid level monitoring units and an automatic drainage mechanism; the plurality of high-precision liquid level monitoring units are installed on the inner wall of the box body and are respectively located at different heights, and are used to monitor the liquid level height and changes in the box body, and the coal slag accumulation height and changes; the automatic drainage mechanism includes a drainage valve, a water pump and a drainage collection device, the inlet of the water pump is connected to the drainage port through a pipeline, and the outlet of the water pump is connected to the drainage collection device through a pipeline, and is used to pump the water in the box body into the drainage collection device; the drainage valve is installed at the drainage port, and is used to control the on-off of the drainage port and the water pump; The intelligent control center is connected to the gas multi-parameter monitoring unit through a data transmission line, which is used to receive the gas concentration, pressure and temperature change data in the underground drilling process in real time, and adjust the opening and closing of the gas extraction valve and the power of the gas extraction pump after analysis and processing. At the same time, the intelligent control center analyzes and processes the data feedback from each high-precision liquid level monitoring unit on their respective positions, and adjusts the opening and closing of the slag discharge valve and the transportation speed of the automatic slag conveying mechanism according to the coal slag accumulation height and changes, and adjusts the opening and closing of the drainage valve and the pumping power of the water pump according to the liquid level height and changes to meet the gas extraction and slag removal and drainage needs.

2. According to claim 1, the closed drilling and drainage device based on real-time liquid level monitoring is characterized in that: The gas multi-parameter monitoring unit includes an air pressure sensor, a methane gas concentration sensor and a temperature sensor; wherein the air pressure sensor is used to monitor the pressure of methane gas in the blowout prevention body in real time; the methane gas concentration sensor is used to monitor the concentration of methane gas in the blowout prevention body in real time; and the temperature sensor is used to monitor the temperature in the blowout prevention body in real time.

3. The closed drilling and dewatering device based on real-time liquid level monitoring according to claim 1 is characterized in that: The high-precision liquid level monitoring unit includes a radar sensor, an image sensor and a liquid pressure sensor. Each sensor is arranged horizontally at its height position and is used to collect coal slag distance data, image data and liquid pressure at the location in real time to reflect the liquid level height and changes at the current location, and the coal slag accumulation height and changes.

4. The closed drilling and dewatering device based on real-time liquid level monitoring according to claim 1 is characterized in that: A filter is installed at the air outlet of the box, and a large-pore filter element, a medium-pore filter element and a small-pore filter element are arranged inside the filter, which is used to allow the gas extracted from the box to be filtered through the large-pore filter element, the medium-pore filter element and the small-pore filter element in sequence before entering the extracted gas storage device.

5. The closed drilling and drainage and slag removal device based on real-time liquid level monitoring according to claim 1 is characterized in that: The intelligent control center is equipped with sound and light alarm functions. When it detects that the gas concentration, temperature and pressure exceed the preset warning threshold, it automatically triggers the sound and light alarm to promptly notify the underground workers to take risk avoidance measures.

6. The closed drilling and drainage and slag removal device based on real-time liquid level monitoring according to claim 1 is characterized in that: The automatic coal slag conveying mechanism is a belt conveyor.

7. A working method of a closed drilling and dewatering device based on real-time liquid level monitoring according to any one of claims 1 to 6, characterized in that: The specific steps are: Step 1: Install the tee pipe and assemble the anti-blowout hole drilling device: According to the design plan of pre-draining gas holes in high-gas and protruding coal seams, first use a drilling rig to push one end of the tee pipe into the coal seam according to the angle and direction of the gas pre-draining drilling hole design. The other end of the tee pipe and the slag discharge port are outside the borehole. Complete the assembly of the closed drilling and drainage slag discharge device next to the area to be drilled; Step 2: Start the intelligent gas monitoring, early warning and extraction system and the intelligent liquid level monitoring and drainage system: After the three-way pipe and the drilling blowout prevention device are installed in place, start the intelligent gas monitoring, early warning and extraction system. The gas multi-parameter monitoring unit monitors the gas concentration, pressure and temperature data of the underground drilling area in real time, and feeds back to the intelligent control center; at the same time, start the intelligent liquid level monitoring and drainage system. The high-precision liquid level monitoring units at different heights use their own radar sensors, image sensors and liquid pressure sensors to collect the coal slag distance data, image data and liquid pressure data at the location in real time and feed them back to the intelligent control center. After analysis and processing, the intelligent control center obtains the liquid level height and changes inside the box, and the coal slag accumulation height and changes; Step 3: Drilling for pre-gas extraction: Start the drilling rig and adjust the angle and direction of the drill rod so that the drill rod passes through both ends of the tee pipe and drills into the coal seam. During the drilling process, the intelligent gas monitoring and early warning extraction system will continuously monitor the gas concentration, pressure and temperature. At the same time, the intelligent liquid level monitoring and drainage and slag removal system will monitor the liquid level inside the box and the height and changes of coal slag accumulation. Step 4: Intelligent drainage and slag discharge process: The drill cuttings, coal slag and dust generated during the normal drilling process of the gas pre-extraction drilling are discharged through the slag discharge port of the three-way pipe, and then enter the box through the box inlet of the blowout prevention body; the intelligent control center receives the monitoring data of the liquid level changes and coal slag accumulation at different heights in the box, and obtains real-time monitoring of the liquid level / coal slag changes at different heights inside the box during the downhole drilling process after analysis. When the monitored coal slag accumulation data / liquid level data exceeds the preset coal slag accumulation upper limit threshold / liquid level upper limit threshold, the intelligent control center intelligently matches the best slag discharge / drainage strategy and parameters through the deep learning model, and generates trigger instructions based on the best slag discharge / drainage strategy and parameters and sends them to the automatic slag discharge mechanism and automatic The drainage mechanism performs slag and water discharge, and provides real-time feedback of the liquid level / coal slag conditions at different heights inside the box through a high-precision liquid level monitoring unit. The intelligent control center further adjusts the drainage / slag discharge strategy based on the feedback monitoring data until the feedback coal slag accumulation data / liquid level data drops to the preset coal slag accumulation lower limit threshold / liquid level lower limit threshold, and then generates a trigger instruction to be sent to the automatic slag discharge mechanism and the automatic drainage mechanism to automatically turn off the slag discharge and water discharge modes. During the entire drilling process, the intelligent control center always judges the liquid level and coal slag height and changes inside the box in real time, thereby dynamically adjusting the working status and working parameters of the automatic slag discharge mechanism and automatic drainage to keep the liquid level and coal slag volume in each area inside the box within the preset safety range during the drilling process. Step 5. Intelligent gas early warning and extraction: The intelligent control center compares the preset gas concentration safety threshold, temperature threshold, gas pressure safety threshold and real-time monitoring data, and conducts a comprehensive assessment of the gas status, so as to identify potential gas accumulation, gas explosion and blowout phenomenon in advance, and realize real-time analysis of gas temperature and pressure status during underground drilling. According to whether the monitoring data exceeds the safety threshold, it intelligently identifies and judges abnormal changes in gas concentration inside the borehole, potential blowout phenomenon and gas explosion hazards; when the real-time monitored gas concentration, temperature and pressure exceed their respective safety thresholds, the intelligent control center automatically triggers the sound and light alarm, and promptly notifies the underground workers to take risk avoidance measures; at the same time, the intelligent control center opens the gas extraction according to the gas monitoring results and the preset control logic. The gas extraction valve is opened, and the drainage valve and slag discharge valve connected to the automatic drainage mechanism and the automatic slag removal mechanism are closed at the same time; at the same time, the real-time monitoring data is matched with the data stored in the intelligent control center to obtain the current gas overlimit degree, and the gas extraction pump is adjusted to start gas extraction with the corresponding power. A large amount of ejected gas is filtered through the filter and then collected in the extraction gas storage device, thereby reducing the gas concentration generated by the spray hole and preventing gas accumulation; the gas multi-parameter monitoring unit provides real-time feedback on the gas extraction situation inside the blowout prevention body until the monitored gas concentration, pressure and temperature are all less than their respective safety thresholds. The intelligent control center automatically switches the gas extraction valve and drainage / slag discharge valve, so that the blowout prevention body can quickly switch from the gas extraction mode to the slag drainage mode, and continue normal underground drilling operations; Step 6. Drill withdrawal: operate the drilling rig to withdraw the drill rod, and repeat the gas intelligent early warning and extraction and intelligent water drainage and slag removal processes in steps 4 and 5 during the drill withdrawal process. After the drill is withdrawn, the three-way pipe is taken out from the gas pre-extraction borehole, and the gas pre-extraction borehole is sealed and connected to the gas extraction branch pipeline to continue gas extraction, thereby completing the construction of the gas pre-extraction borehole to prevent blowout.

8. The working method according to claim 7, characterized in that: In step 2, the intelligent control center obtains the liquid level height and change situation inside the box body, the coal slag accumulation height and change situation, and the specific process is: The intelligent control center obtains the distance data and image data of coal slag at different height positions in real time. If the image data at a certain height position does not capture coal slag, and the distance data monitored by the radar sensor at this position is the width of the box, it means that there is no coal slag at this height position; if the image data at a certain height position captures coal slag, and the distance monitored by the radar sensor at this position is less than the width of the box, it means that there is coal slag at the current height position. The data collected by different high-precision liquid level monitoring units at the same collection time are all judged whether there is coal slag. Among them, the high-precision liquid level monitoring unit with coal slag and the highest position corresponds to the height of the coal slag in the box at the current collection time and stores it; then, by recording the coal slag height data in the box at different collection times, the change in coal slag height can be obtained; The intelligent control center obtains the liquid pressure data at different heights in real time. If the monitoring data of the liquid pressure sensor at a certain height is zero, it means that there is no liquid at that height; if the monitoring data of the liquid pressure sensor at a certain height is not zero, it means that there is liquid at that height. According to this rule, the data collected by different high-precision liquid level monitoring units at the same collection time are judged to determine whether there is liquid. The high-precision liquid level monitoring unit with the highest position and the presence of liquid corresponds to the height of the liquid level in the box at the current collection time and is stored; then, by recording the liquid height data in the box at different collection times, the change in liquid level height can be obtained.

9. The working method according to claim 7, characterized in that: In step 4, the intelligent control center intelligently matches the best slag discharge / drainage strategy and parameters through the deep learning model, specifically: The strategies and parameters for slag discharge / drainage include: ① Slag discharge strategy: only the slag discharge valve and the coal slag automatic transport mechanism are opened, the drainage valve and the water pump are closed, and the transportation speed of the coal slag automatic transport mechanism is adjusted; ② Drainage strategy: Only the drainage valve and the water pump are opened, the slag discharge valve and the coal slag automatic transportation mechanism are closed, and the water flow of the water pump is adjusted; ③ Drainage and slag discharge strategy: the slag discharge valve, the coal slag automatic transportation mechanism, the drainage valve and the water pump are opened at the same time, and the transportation speed of the coal slag automatic transportation mechanism and the water flow of the water pump are adjusted; A deep learning algorithm is used to obtain the slag discharge / drainage strategies and parameters corresponding to different coal slag heights and liquid level heights for training. A deep learning model is formed after training. Subsequently, the deep learning model is input according to the real-time monitored coal slag height and liquid level height. The deep learning model first determines one of the slag discharge strategy, drainage strategy and drainage and slag discharge strategy based on the real-time monitored coal slag height and liquid level height, and determines the specific parameters of the strategy accordingly.

Citation Information

Cited By

  • Dust removal and slag discharge system of underground coal mine drilling machine and control method

    CN119860158A

  • A coal mine underground drilling machine dust removal and slag discharge system and control method

    CN119860158B

  • Blowout preventer for coal mine drilling orifice

    CN121497259A

  • Coal seam stoping and slag transporting integrated simulation device and control method thereof

    CN121565054A