Movable quenching car dust removal system

By using a movable coke-quenching car dust removal system in coking production and using technologies such as inert gas and steering gear to remove dust on the coke, the problem of dust remaining in the coke quenching oven is solved, and the convenience and quenching of coking production are improved. Focal efficiency.

CN118755489APending Publication Date: 2024-10-11TAIYUAN SILIAN HEAVY IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411122489.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-10-11

AI Technical Summary

Technical Problem

During the coking production process, when the coke is transported to the coke quenching oven, the dust on the coke is retained in the coke quenching oven, resulting in a decrease in coke quenching efficiency and difficulty in cleaning, affecting production convenience.

Method used

A movable coke receiving and quenching car dust removal system is designed, including a car body, a coke receiving box, a blowing component, a dust removal component and a driving component. Dust is removed through the contact of inert gas and coke, and the steering gear and partition structure are optimized. The dust removal effect achieves dust pretreatment and avoids dust retention in the coke quenching oven.

Benefits of technology

It effectively removes the dust attached to the coke, avoids the retention of dust in the coke quenching oven, improves the convenience of coking production, reduces cleaning time, and improves the operating efficiency of the coke quenching oven.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118755489A_ABST
    Figure CN118755489A_ABST
Patent Text Reader

Abstract

The invention relates to a movable quenching car dust removal system, which relates to the technical field of coking equipment, and comprises a car body, a coke receiving box, an air blowing assembly, a dust removal assembly and a driving assembly, the coke receiving box is arranged on the vehicle body, and the coke receiving box is of a top opening structure; a box cover is hinged to a top opening of the coke receiving box; the gas blowing assembly is arranged on the vehicle body and is used for conveying inert gas into the coke receiving box; the dust removal assembly is arranged on the vehicle body and used for removing dust carried in inert gas. The driving assembly is arranged on the vehicle body and used for driving the box cover to rotate to be opened and closed. According to the invention, the convenience of coking production can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of coking equipment, and in particular to a movable coke receiving and quenching vehicle dust removal system. Background Art

[0002] During the coking production process, when the coal in the carbonization chamber is burned out, the operator uses a coke pusher to push the coke produced by the combustion in the carbonization chamber into the coke receiving car, and then the coke receiving car transports it to the coke quenching oven for quenching.

[0003] At present, the commonly used coke quenching methods are dry quenching and wet quenching. Dry quenching is a technology that uses low-temperature inert gas to exchange heat with coke in the coke quenching furnace to reduce the temperature of the coke. Although dry quenching is costly, it can improve the quality of coke and is therefore widely used.

[0004] During the above-mentioned coking production process, the coke receiving car transports the coke to the coke quenching oven for quenching. Since the coke carries a large amount of dust, during the quenching process, the dust flows in the coke quenching oven along with the inert gas and eventually stays inside the coke quenching oven, which eventually affects the quenching efficiency of the coke quenching oven. Cleaning the inside of the coke quenching oven is not only time-consuming and laborious, but also requires the coke quenching oven to stop working during cleaning, which brings inconvenience to the coking production. Summary of the invention

[0005] In order to improve the convenience of coking production, the present application provides a movable coke receiving and quenching vehicle dust removal system.

[0006] The present application provides a mobile coke quenching vehicle dust removal system, which adopts the following technical solution: A movable dust removal system for a coke receiving and quenching vehicle comprises a vehicle body, a coke receiving box, an air blowing assembly, a dust removal assembly and a driving assembly; the coke receiving box is arranged on the vehicle body, and is a top-opening structure; a box cover is hingedly provided at the top opening of the coke receiving box; the air blowing assembly is arranged on the vehicle body, and is used for conveying inert gas into the coke receiving box; the dust removal assembly is arranged on the vehicle body, and is used for removing dust carried in the inert gas; the driving assembly is arranged on the vehicle body, and is used for driving the box cover to rotate, open and close.

[0007] By adopting the above technical scheme, during the coking production process, when the coal in the carbonization chamber is completely burned, the operator drives the vehicle body to move to the side of the carbonization chamber, and then drives the box cover to open through the driving component, and uses the coke pushing equipment to push the coke into the coke receiving box, and then drives the box cover to close through the driving component, and then drives the vehicle body to move toward the coke quenching oven. During the movement, the blowing component is used to transport inert gas into the coke receiving box, and the inert gas contacts the coke, thereby carrying the dust attached to the coke to the dust removal component, and then the dust carried by the inert gas is removed by the dust removal component, and then the box cover is driven to open by the driving component to discharge the coke, and then it is transported to the coke quenching oven by the conveying equipment for the formal coke quenching process.

[0008] By utilizing the air blowing assembly and the dust removal assembly, the coke is pre-treated during the process of being transported to the coke quenching oven to remove the dust attached to the coke. This not only avoids the dust from being trapped inside the coke quenching oven and causing problems that are difficult to clean, but also utilizes the time for transporting the coke, does not increase the working hours, and thus improves the convenience of coking production.

[0009] Optionally, the air blowing assembly includes an air storage box, an air inlet pipe and an air outlet pipe; the air storage box is fixedly mounted on the vehicle body, and inert gas is preset inside the air storage box; the air inlet pipe and the air outlet pipe are both connected to the interior of the coke receiving box, and the connecting point between the air inlet pipe and the coke receiving box and the connecting point between the air outlet pipe and the coke receiving box are arranged opposite to each other; the air inlet pipe and the air outlet pipe are both connected to the interior of the air storage box; an air pump is installed on the air inlet pipe, and the air pump is used to transport the inert gas inside the air storage box to the coke receiving box.

[0010] By adopting the above technical solution, after the coke enters the coke receiving box, the air pump is started to transport the inert gas in the air outlet box to the coke receiving box through the air inlet pipe, and then flows back to the air storage box from the air outlet pipe, forming a gas circulation, thereby realizing the transportation of inert gas to the coke receiving box.

[0011] Optionally, the focus receiving box includes a bottom wall, a first side wall, a second side wall and two third side walls; the first side wall and the second side wall are arranged opposite to each other and are both fixedly connected to the bottom wall; the two third side walls are arranged opposite to each other and are both fixedly connected to the bottom wall; the first side wall and two adjacent third side walls are both fixedly connected; the second side wall and two adjacent third side walls are both fixedly connected; the first side wall, the second side wall, the two third side walls and the bottom wall together form the focus receiving box; the box cover is hinged to the first side wall; the connection points between the air inlet pipe and the air outlet pipe and the focus receiving box are respectively located on the two third side walls; a plurality of partitions are fixedly arranged in the focus receiving box, and the partitions, the first side wall and the second side wall are arranged in parallel; the focus receiving box is rotatably connected to the car body, and the direction of the rotation axis is perpendicular to the third side walls; a servo is fixedly arranged on the car body, and the servo is used to drive the focus receiving box to rotate.

[0012] By adopting the above technical scheme, the coke in the coke receiving box can be divided into several portions by using partitions, and then the coke receiving box is driven to rotate a certain angle by using a servo gear, so that there is a gap between every two portions of coke. Therefore, when the inert gas flows in the coke receiving box, it can flow through the gap between the two layers of coke. Compared with the traditional coke piled together, the inert gas can carry out more dust attached to the coke.

[0013] When the steering gear drives the coke receiving box to rotate, the dust between the coke blocks will be lifted up and scattered in the coke receiving box, so that the inert gas can also carry the dust between the coke blocks out. The steering gear can also be used to drive the coke receiving box to swing back and forth, thereby vibrating the coke inside the coke receiving box and lifting the dust inside the coke blocks to ensure the removal effect of the dust in the coke, thereby avoiding the dust from being trapped inside the coke quenching furnace, causing the problem of being difficult to clean, and improving the convenience of coking production.

[0014] When discharging the coke from the coke receiving box, the coke receiving box can be rotated by using a servo gear to discharge the coke, further improving the convenience of coking production.

[0015] Optionally, the angle formed by the partition and the bottom wall close to the second side wall is an acute angle; and the heights of a plurality of the partitions gradually increase in a direction close to the second side wall.

[0016] By adopting the above technical solution, the partition, the first side wall and the second side wall are all set to an inclined structure. After the coke in the carbonization chamber is pushed out, the coke is more likely to fall into the coke receiving box instead of being spilled outside, thereby avoiding the need to manually collect the coke spilled outside and re-put it into the coke receiving box. And because the partition, the first side wall and the second side wall are all set to an inclined structure, when the coke is discharged, it can be discharged downward cleanly by the gravity of the coke itself, and no coke will remain in the coke receiving box, and no manual cleaning is required, thereby improving the convenience of coking production.

[0017] Since the coke will move horizontally into the coke receiving box after being pushed out of the carbonization chamber, the height of several partitions is set to gradually increase in the direction close to the second side wall, so that the coke can fall more evenly into the chamber separated by the partitions, thereby making the coke more evenly divided into several portions, and there can be gaps between each portion to prevent the coke from accumulating in the chamber close to the second side wall. The chamber close to the second side wall is filled with coke, and there is no gap between the two layers, which affects the dust removal effect.

[0018] Optionally, the air outlet pipe includes a first pipe section and a second pipe section; the dust removal assembly includes a dust removal box, a water tank, an atomizing nozzle and a water outlet pipe; the dust removal box is fixedly arranged on the vehicle body; the two ends of the first pipe section are respectively connected to the interior of the focus receiving box and the interior of the dust removal box; one end of the second pipe section is connected to the interior of the dust removal box, and the other end is connected to the interior of the air storage tank; the water storage tank is fixedly arranged on the dust removal box, and water is preset in the water storage tank; the atomizing nozzle is located inside the dust removal box; the two ends of the water outlet pipe are respectively connected to the interior of the water storage tank and the interior of the atomizing nozzle, and a first water pump is installed on the water outlet pipe, and the first water pump is used to transport the water in the water storage tank to the atomizing nozzle for spraying.

[0019] By adopting the above technical solution, after the inert gas flows out of the coke receiving box, it flows into the dust removal box through the first pipe section, and then passes through the dust removal box into the second pipe section. When the inert gas flows in the dust removal box, the first water pump is in working state, and the first water pump transports the water in the water storage tank to the atomizing nozzle to spray it out and fall on the inert gas. The small water droplets wet the dust carried by the inert gas, and then settle to the bottom of the dust removal box, thereby achieving the removal of the dust carried by the inert gas.

[0020] Optionally, the air outlet pipe also includes a third pipe section; a heat recovery component is provided on the vehicle body, and the heat recovery component includes a cold water tank, a hot water tank, a heat exchange tank and a heat exchange pipe; the cold water tank and the hot water tank are both fixedly arranged on the vehicle body, and water is preset inside the cold water tank; the heat exchange box is fixedly arranged on the vehicle body; one end of the second pipe section away from the dust removal box is connected to the interior of the heat exchange box; one end of the third pipe section is connected to the interior of the heat exchange box, and the other end is connected to the interior of the air storage tank; the heat exchange pipe is penetrated into the heat exchange box, and both ends are respectively connected to the interior of the cold water tank and the interior of the hot water tank; a second water pump is installed on the heat exchange pipe, and the second water pump is used to transport the water in the cold water tank to the hot water tank.

[0021] By adopting the above technical solution, after the inert gas flows out of the dust removal box, it flows into the heat exchange box through the second pipe section, and then flows back to the gas storage box through the third pipe section. When the inert gas flows in the coke receiving box, it exchanges heat with the coke, and the heat on the coke is transferred to the inert gas, thereby reducing the temperature of the coke. When the inert gas flows in the heat exchange box, the second water pump is in working state, and the cold water in the cold water tank is transported to the hot water tank through the heat exchange pipe. When the cold water flows in the heat exchange pipe, it exchanges heat with the inert gas in the heat exchange box. The heat carried by the inert gas is transferred to the cold water in the heat exchange pipe, and the cold water is heated, thereby realizing the recovery of the heat carried by the inert gas.

[0022] Optionally, the driving assembly includes a hydraulic cylinder, a slider and a driving rod; the fixed end of the hydraulic cylinder is fixedly disposed on the first side wall; the slider is hinged to the top of the first side wall; the driving rod is passed through the slider and is slidably connected to the slider, and the two ends of the driving rod are respectively hinged to the movable end of the hydraulic cylinder and the box cover.

[0023] By adopting the above technical solution, the slider, the driving rod and the first side wall form a lever structure. When in use, the hydraulic cylinder is controlled to extend and retract, and the driving rod can be used to drive the box cover to rotate, open and close.

[0024] Optionally, the connection between the air inlet pipe and the focus receiving box is in a flared structure along the direction close to the interior of the focus receiving box; the connection between the first pipe section and the focus receiving box is in a flared structure along the direction close to the interior of the focus receiving box; the connection between the air inlet pipe and the focus receiving box and the connection between the first pipe section and the focus receiving box are both fixedly provided with a shield, and a plurality of air holes are opened on the shield.

[0025] By adopting the above technical solution, by setting the air inlet pipe and the first pipe section near one end of the coke receiving box into a flared structure, the inert gas can flow fully in the coke receiving box to cover all the coke, thereby improving the dust removal and heat recovery effects on the coke; the baffle cover can prevent the coke from clogging the air inlet pipe and the first pipe section, thereby ensuring the smooth circulation of the inert gas.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: By setting up an air blowing component and a dust removal component, the coke is pre-treated in the process of transporting the coke to the coke quenching oven to remove the dust attached to the coke, which not only avoids the dust from being trapped inside the coke quenching oven and causing the problem of being difficult to clean, but also utilizes the time for transporting the coke, does not cause an increase in working hours, and thus improves the convenience of coking production; By setting up partitions, the coke in the coke receiving box can be divided into several portions, and then the steering gear is used to drive the coke receiving box to rotate a certain angle, so that there is a gap between every two portions of coke. Therefore, when the inert gas flows in the coke receiving box, it can flow through the gap between the two layers of coke. Compared with the traditional coke piled together, the inert gas can carry out more dust attached to the coke; By setting a steering gear, when the steering gear drives the coke receiving box to rotate, the dust between the coke blocks will be lifted up and scattered in the coke receiving box, so that the inert gas can also carry the dust between the coke blocks out. The steering gear can also be used to drive the coke receiving box to swing back and forth, thereby vibrating the coke inside and lifting the dust inside the coke blocks to ensure the removal effect of the dust in the coke, thereby avoiding the dust from being trapped inside the coke quenching furnace, causing the problem of difficult cleaning, and improving the convenience of coking production; when discharging the coke from the coke receiving box, the steering gear can also be used to rotate the coke receiving box to discharge the coke, further improving the convenience of coking production; By setting the partition, the first side wall and the second side wall to be inclined structures, after the coke in the carbonization chamber is pushed out, the coke is more likely to fall into the coke receiving box instead of being spilled outside, thereby avoiding the need to manually collect the coke spilled outside and re-put it into the coke receiving box. And because the partition, the first side wall and the second side wall are all set to be inclined structures, when the coke is discharged, it can be discharged downwards cleanly by the gravity of the coke itself, and no coke will remain in the coke receiving box, and no manual cleaning is required, thereby improving the convenience of coking production. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application; Figure 2 It is a cross-sectional view of an embodiment of the present application for showing a blowing component; Figure 3 This is a cross-sectional view of an embodiment of the present application for showing a partition; Figure 4 yes Figure 1 A partial enlarged view of the middle A; Figure 5 yes Figure 2 A partial enlarged view of point B in the middle.

[0028] Description of reference numerals: 1. Vehicle body; 11. Servo; 2. coke receiving box; 21. box cover; 22. bottom wall; 23. first side wall; 24. second side wall; 25. third side wall; 26. partition; 27. shield; 271. air vent; 3. Blowing assembly; 31. Air storage box; 32. Air inlet pipe; 321. Air pump; 33. Air outlet pipe; 331. First pipe section; 332. Second pipe section; 333. Third pipe section; 4. Dust removal assembly; 41. Dust removal box; 42. Water storage tank; 43. Water outlet pipe; 431. First water pump; 44. Atomizing nozzle; 5. Driving assembly; 51. Hydraulic cylinder; 52. Sliding block; 53. Driving rod; 6. Heat recovery component; 61. Cold water tank; 62. Hot water tank; 63. Heat exchange tank; 64. Heat exchange pipe; 641. Second water pump. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1-5 This application is described in further detail.

[0030] The present application embodiment discloses a movable quenching vehicle dust removal system. Figure 1 The dust removal system of the movable coke receiving and quenching car includes a car body 1 and a coke receiving box 2.

[0031] Reference Figure 2 and Figure 3 , the focus receiving box 2 is arranged on the top of the vehicle body 1. The focus receiving box 2 includes a bottom wall 22, a first side wall 23, a second side wall 24 and two third side walls 25. The bottom wall 22 is arranged parallel to the bottom plate of the vehicle body 1. The first side wall 23 and the second side wall 24 are arranged parallel to each other and are fixedly arranged on both sides of the bottom wall 22 respectively. The two third side walls 25 are arranged opposite to each other and are fixedly arranged on both sides of the bottom wall 22 respectively, and the plane where the third side walls 25 are located is perpendicular to the plane where the first side walls 23 are located. The two ends of the first side wall 23 are fixedly connected to the two third side walls 25 respectively, and the two ends of the second side wall 24 are fixedly connected to the two third side walls 25 respectively. The first side wall 23, the second side wall 24, the two third side walls 25 and the bottom wall 22 together form a focus receiving box 2 with an open structure at the top.

[0032] Reference Figure 1 and Figure 3A box cover 21 is provided at the top opening of the coke receiving box 2 , and the box cover 21 is hinged to the top of the first side wall 23 .

[0033] Reference Figure 3 and Figure 4 , a driving assembly 5 is provided on the vehicle body 1, and the driving assembly 5 includes a hydraulic cylinder 51, a slider 52 and a driving rod 53. The fixed end of the hydraulic cylinder 51 is fixedly arranged on the first side wall 23. The slider 52 is located at the top of the first side wall 23, and is hinged to the first side wall 23 through a rotating shaft, and the hinge axis of the slider 52 and the first side wall 23 is parallel to the hinge axis of the box cover 21 and the first side wall 23. A sliding groove is provided on the slider 52. The driving rod 53 is inserted into the sliding groove and is slidably connected to the slider 52. The two ends of the driving rod 53 are respectively hinged to the fixed end of the hydraulic cylinder 51 and the box cover 21, and the hinge axes are parallel to the hinge axes of the box cover 21 and the first side wall 23.

[0034] The slider 52 , the driving rod 53 , and the first side wall 23 form a lever structure. When in use, the hydraulic cylinder 51 is controlled to extend and retract, and the driving rod 53 can be used to drive the box cover 21 to rotate, open, and close.

[0035] Reference Figure 2 The coke receiving box 2 is rotatably connected to the vehicle body 1 through two rotating shafts arranged on both sides of the coke receiving box 2, and the rotating axis is perpendicular to the plane where the third side wall 25 is located. A steering gear 11 is fixedly arranged on the vehicle body 1, and the output shaft of the steering gear 11 is coaxially fixedly connected to one of the rotating shafts.

[0036] When in use, the steering gear 11 can be operated to control the coke receiving box 2 to rotate. In order to avoid interference between the coke receiving box 2 and the bottom plate of the vehicle body 1, a chamfer is provided at the bottom of the coke receiving box 2, and a clearance groove is provided on the bottom plate of the vehicle body 1.

[0037] Reference Figure 3 , three partitions 26 are arranged in the coke receiving box 2, and the three partitions 26 are arranged parallel to the first side wall 23 and the second side wall 24. The bottom of the partition 26 is fixedly connected to the bottom wall 22, and the two sides of the partition 26 are fixedly connected to the two third side walls 25 respectively. The first side wall 23, the second side wall 24, the third side wall 25, the bottom wall 22 and the partition 26 are integrally formed by casting. The three partitions 26 divide the interior of the coke receiving box 2 into four chambers. The angle formed by the partition 26 and the bottom wall 22 near the second side wall 24 is an acute angle, the angle formed by the first side wall 23 and the bottom wall 22 near the second side wall 24 is also an equal acute angle, and the angle formed by the second side wall 24 and the bottom wall 22 near the first side wall 23 is a complementary obtuse angle. The heights of the three partitions 26 increase successively along the direction close to the second side wall 24, and are all less than the height of the second side wall 24.

[0038] Reference Figure 1 and Figure 2The vehicle body 1 is provided with an air blowing assembly 3, which includes an air storage box 31, an air inlet pipe 32 and an air outlet pipe 33. The air storage box 31 is fixedly arranged on the top of the vehicle body 1, and an inert gas is preset inside the air storage box 31. One end of the air inlet pipe 32 is passed through one of the third side walls 25 and communicated with the interior of the coke receiving box 2. One end of the air inlet pipe 32 passed through the third side wall 25 is in a flared structure in the direction close to the interior of the coke receiving box 2. The other end of the air inlet pipe 32 is communicated with the interior of the air storage box 31. An air pump 321 is fixedly installed on the air inlet pipe 32, and the air pump 321 is used to transport the inert gas inside the air storage box 31 to the coke receiving box 2.

[0039] The air outlet pipe 33 includes a first pipe section 331. One end of the first pipe section 331 is passed through the other third side wall 25 and is connected to the interior of the coke receiving box 2. The connection between the first pipe section 331 and the coke receiving box 2 is arranged opposite to the connection between the air inlet pipe 32 and the coke receiving box 2. One end of the first pipe section 331 passed through the third side wall 25 is in a flared structure in the direction close to the interior of the coke receiving box 2.

[0040] Reference Figure 2 and Figure 5 A shield 27 is fixedly provided at the connection point between the air inlet pipe 32 and the coke receiving box 2 and at the connection point between the first pipe section 331 and the coke receiving box 2. A plurality of air holes 271 are opened on the shield 27.

[0041] Reference Figure 1 and Figure 2 , the air outlet pipe 33 also includes a second pipe section 332. A dust removal assembly 4 is connected between the first pipe section 331 and the second pipe section 332. The dust removal assembly 4 includes a dust removal box 41, a water storage tank 42, an atomizing nozzle 44 and a water outlet pipe 43. The dust removal box 41 is fixedly arranged on the top of the vehicle body 1. The first pipe section 331 and the second pipe section 332 are arranged opposite to each other and are both connected to the inside of the dust removal box 41. The water storage tank 42 is fixedly arranged on the top of the dust removal box 41, and water is preset in the water storage tank 42. In some other embodiments, a water injection pipe can be connected to the top of the water storage tank 42 to replenish water into the water storage tank 42.

[0042] There are several atomizing nozzles 44, all of which are arranged inside the dust removal box 41. The atomizing nozzles 44 are located at the top of the first pipe section 331 and the second pipe section 332. One end of the water outlet pipe 43 is connected to the inside of the water storage tank 42, and the other end is provided with several branch pipes, and the branch pipes correspond to the atomizing nozzles 44 one by one, and the branch pipes are connected to the inside of the atomizing nozzles 44. The water outlet pipe 43 and the branch pipes are made of hard pipes. A first water pump 431 is fixedly installed on the water outlet pipe 43, and the first water pump 431 is used to transport the water in the water storage tank 42 to the atomizing nozzle 44 for spraying.

[0043] A drawer is slidably provided at the bottom of the dust removal box 41 for regularly discharging the internal contents of the dust removal box 41 .

[0044] The air outlet pipe 33 also includes a third pipe section 333. A heat recovery assembly 6 is connected between the second pipe section 332 and the third pipe section 333. The heat recovery assembly 6 includes a cold water tank 61, a hot water tank 62, a heat exchange box 63 and a heat exchange pipe 64. The cold water tank 61 and the hot water tank 62 are both fixedly arranged on the top of the vehicle body 1, and water is preset inside the cold water tank 61. The heat exchange box 63 is fixedly arranged on the top of the cold water tank 61 and the hot water tank 62. One end of the second pipe section 332 away from the dust removal box 41 is connected to the inside of the heat exchange box 63; one end of the third pipe section 333 is arranged opposite to the second pipe section 332 and is connected to the inside of the heat exchange box 63, and the other end of the third pipe section 333 is connected to the inside of the air storage box 31. The heat exchange pipe 64 is a corrugated structure and is located inside the heat exchange box 63. The two ends of the heat exchange pipe 64 pass through the two opposite side walls of the heat exchange box 63 respectively, and are connected to the inside of the cold water tank 61 and the inside of the hot water tank 62 respectively. A second water pump 641 is fixedly mounted on the heat exchange tube 64 . The second water pump 641 is located at one end of the heat exchange tube 64 close to the cold water tank 61 . The second water pump 641 is used to transport water in the cold water tank 61 to the hot water tank 62 .

[0045] In some other embodiments, a water pipe is connected to the cold water tank 61, and the operator can add water to the cold water tank 61 through the water pipe. A drain pipe is connected to the hot water tank 62, and the operator can drain the water in the hot water tank 62 through the drain pipe.

[0046] The air inlet pipe 32 , the first pipe section 331 , the second pipe section 332 and the third pipe section 333 are all made of soft pipes.

[0047] The implementation principle of a mobile quenching vehicle dust removal system in the present application embodiment is as follows: During the coking production process, when the coal in the carbonization chamber is completely burned, the operator drives the vehicle body 1 to move to the side of the carbonization chamber and makes the second side wall 24 close to the carbonization chamber, and then controls the hydraulic cylinder 51 to extend, and the movable end of the hydraulic cylinder 51 drives the driving rod 53 to move, so that the box cover 21 is rotated upward and opened. Then the operator uses the coke pushing equipment to push out the coke produced by the combustion in the carbonization chamber, and then makes a horizontal throwing motion to fall into the coke receiving box 2. The coke entering the coke receiving box 2 is divided into four parts by three partitions 26, and the amount of coke gradually decreases in the direction close to the first side wall 23. After all the coke falls into the coke receiving box 2, the operator controls the hydraulic cylinder 51 to shrink, so that the box cover 21 is rotated downward and closed.

[0048] Then the operator starts the steering gear 11, which drives the coke receiving box 2 to rotate a certain angle towards the first side wall 23, so that the partition 26, the first side wall 23 and the second side wall 24 are all inclined upward. At this time, the coke in the coke receiving box 2 falls on the partition 26 or the first side wall 23 under the action of its own gravity, thereby stratifying the coke in the coke receiving car, with gaps between every two layers of coke.

[0049] The operator starts the steering gear 11 and controls the air pump 321 to start at the same time. The air pump 321 allows the inert gas in the air storage box 31 to enter the coke receiving box 2 through the air inlet pipe 32 and the air hole 271 on the shield 27, and then passes through the coke receiving box 2 through the air hole 271 on another shield 27 to enter the first pipe section 331. The inert gas will exchange heat with the coke during the flow in the coke receiving box 2, thereby reducing the temperature of the coke. At the same time, the inert gas carries the dust attached to the coke and flows out to the first pipe section 331. It should be noted that in this application, the coke can only be reduced to a certain temperature, and the standard of the coke quenching process cannot be met, which is equivalent to a pretreatment of the coke quenching operation.

[0050] Since the coke in the coke receiving box 2 is layered, the inert gas can flow through the gap between the two layers of coke. Compared with the traditional coke piled together, the contact area between the inert gas and the coke is increased, so that the inert gas can contact more coke in the same time, and the heat exchange efficiency between the inert gas and the coke is improved, that is, the coke quenching efficiency is improved, and the inert gas can carry out more dust attached to the coke. When the steering gear 11 drives the coke receiving box 2 to rotate, the dust between the coke blocks will be lifted and scattered in the coke receiving box 2, so that the inert gas can also carry out the dust inside the coke blocks. If necessary, the steering gear 11 can be used to drive the coke receiving box 2 to swing back and forth, so as to vibrate the coke inside, which can not only lift the dust between the coke blocks, but also move the coke blocks, so as to avoid the inert gas only being able to exchange heat with the coke on the surface.

[0051] After the inert gas flows from the coke receiving box 2 into the first pipe section 331, it continues to flow into the dust removal box 41, passes through the dust removal box 41 and enters the second pipe section 332. In this process, the first water pump 431 is in operation. The first water pump 431 transports the water in the water storage tank 42 to the atomizing nozzle 44 through the water outlet pipe 43, and then sprays it from the atomizing nozzle 44. After being sprayed from the atomizing nozzle 44, the water mist falls on the inert gas, and the small water droplets wet the dust carried by the inert gas, and then settle to the bottom of the dust removal box 41, thereby removing the dust carried by the inert gas.

[0052] After the inert gas flows from the dust removal box 41 into the second pipe section 332, it continues to flow into the heat exchange box 63, and passes through the heat exchange box 63 into the third pipe section 333. During this process, the second water pump 641 is in working condition, and the cold water in the cold water tank 61 is transported to the hot water tank 62 through the heat exchange pipe 64. When the cold water flows in the heat exchange pipe 64, it will exchange heat with the inert gas in the heat exchange box 63. The heat carried by the inert gas is transferred to the cold water in the heat exchange pipe 64, and the cold water is heated, thereby realizing the recovery of the heat carried by the inert gas.

[0053] The inert gas flowing out of the heat exchange box 63 flows back to the gas outlet box through the third pipe section 333, forming a gas cycle until the temperature of the coke in the coke receiving box 2 is reduced to a preset value and the dust in the coke receiving box 2 is cleaned. Then the operator starts the steering gear 11, which drives the coke receiving box 2 to rotate a certain angle in the direction close to the second side wall 24, so that the partition 26, the first side wall 23 and the second side wall 24 are all tilted downward, and then the operator starts the hydraulic cylinder 51 to rotate the box cover 21 to open. Under the action of the gravity of the coke itself, the coke is discharged downward along the partition 26 or the second side wall 24, and then transported to the coke quenching furnace by the conveying equipment for the formal coke quenching process.

[0054] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A movable quenching car dust removal system, characterized in that: The invention comprises a vehicle body (1), a coke receiving box (2), an air blowing assembly (3), a dust removal assembly (4) and a driving assembly (5); the coke receiving box (2) is arranged on the vehicle body (1), and the coke receiving box (2) is a top-opening structure; a box cover (21) is hingedly provided at the top opening of the coke receiving box (2); the air blowing assembly (3) is arranged on the vehicle body (1), and the air blowing assembly (3) is used to transport inert gas into the coke receiving box (2); the dust removal assembly (4) is arranged on the vehicle body (1), and is used to remove dust carried in the inert gas; the driving assembly (5) is arranged on the vehicle body (1), and is used to drive the box cover (21) to rotate, open and close.

2. The movable quenching car dust removal system according to claim 1 is characterized in that: The air blowing assembly (3) comprises an air storage box (31), an air inlet pipe (32) and an air outlet pipe (33); the air storage box (31) is fixedly arranged on the vehicle body (1), and an inert gas is preset inside the air storage box (31); the air inlet pipe (32) and the air outlet pipe (33) are both connected to the inside of the coke receiving box (2), and the connecting point between the air inlet pipe (32) and the coke receiving box (2) and the connecting point between the air outlet pipe (33) and the coke receiving box (2) are arranged opposite to each other; the air inlet pipe (32) and the air outlet pipe (33) are both connected to the inside of the air storage box (31); an air pump (321) is installed on the air inlet pipe (32), and the air pump (321) is used to transport the inert gas inside the air storage box (31) to the coke receiving box (2).

3. The movable quenching car dust removal system according to claim 2 is characterized in that: The focus receiving box (2) comprises a bottom wall (22), a first side wall (23), a second side wall (24) and two third side walls (25); the first side wall (23) and the second side wall (24) are arranged opposite to each other and are both fixedly connected to the bottom wall (22); the two third side walls (25) are arranged opposite to each other and are both fixedly connected to the bottom wall (22); the first side wall (23) and two adjacent third side walls (25) are both fixedly connected; the second side wall (24) and two adjacent third side walls (25) are both fixedly connected; the first side wall (23), the second side wall (24), the two third side walls (25) and the bottom wall (22) are connected together The coke receiving box (2) is formed; the box cover (21) is hinged to the first side wall (23); the connecting points of the air inlet pipe (32) and the air outlet pipe (33) with the coke receiving box (2) are respectively located on the two third side walls (25); a plurality of partitions (26) are fixedly arranged in the coke receiving box (2), and the partitions (26), the first side wall (23) and the second side wall (24) are arranged in parallel; the coke receiving box (2) is rotatably connected to the vehicle body (1), and the direction of the rotation axis is perpendicular to the third side wall (25); a steering gear (11) is fixedly arranged on the vehicle body (1), and the steering gear (11) is used to drive the coke receiving box (2) to rotate.

4. The movable quenching car dust removal system according to claim 3 is characterized in that: The included angle formed by the partition (26) and the bottom wall (22) close to the second side wall (24) is an acute angle; and the heights of the plurality of partitions (26) gradually increase in a direction close to the second side wall (24).

5. The movable quenching car dust removal system according to claim 3 is characterized in that: The air outlet pipe (33) comprises a first pipe section (331) and a second pipe section (332); the dust removal assembly (4) comprises a dust removal box (41), a water storage tank (42), an atomizing nozzle (44) and a water outlet pipe (43); the dust removal box (41) is fixedly arranged on the vehicle body (1); two ends of the first pipe section (331) are respectively connected to the interior of the coke receiving box (2) and the interior of the dust removal box (41); one end of the second pipe section (332) is connected to the interior of the dust removal box (41), and the other end is connected to the air storage tank (31) is internally connected; the water storage tank (42) is fixedly arranged on the dust removal box (41), and water is preset in the water storage tank (42); the atomizing nozzle (44) is located inside the dust removal box (41); the two ends of the water outlet pipe (43) are respectively connected to the inside of the water storage tank (42) and the inside of the atomizing nozzle (44), and a first water pump (431) is installed on the water outlet pipe (43), and the first water pump (431) is used to transport the water in the water storage tank (42) to the atomizing nozzle (44) for spraying.

6. The movable quenching car dust removal system according to claim 5 is characterized in that: The air outlet pipe (33) further comprises a third pipe section (333); a heat recovery component (6) is arranged on the vehicle body (1), and the heat recovery component (6) comprises a cold water tank (61), a hot water tank (62), a heat exchange box (63) and a heat exchange pipe (64); the cold water tank (61) and the hot water tank (62) are both fixedly arranged on the vehicle body (1), and water is preset inside the cold water tank (61); the heat exchange box (63) is fixedly arranged on the vehicle body (1); the second pipe section (332) is away from the dust removal box (41) One end is in communication with the interior of the heat exchange box (63); one end of the third pipe section (333) is in communication with the interior of the heat exchange box (63), and the other end is in communication with the interior of the air storage box (31); the heat exchange pipe (64) is passed through the interior of the heat exchange box (63), and the two ends are respectively in communication with the interior of the cold water tank (61) and the interior of the hot water tank (62); a second water pump (641) is installed on the heat exchange pipe (64), and the second water pump (641) is used to transport water in the cold water tank (61) to the hot water tank (62).

7. The movable quenching car dust removal system according to claim 3 is characterized in that: The driving assembly (5) comprises a hydraulic cylinder (51), a slider (52) and a driving rod (53); the fixed end of the hydraulic cylinder (51) is fixedly arranged on the first side wall (23); the slider (52) is hinged to the top of the first side wall (23); the driving rod (53) is passed through the slider (52) and is slidably connected to the slider (52); and the two ends of the driving rod (53) are respectively hinged to the movable end of the hydraulic cylinder (51) and the box cover (21).

8. The movable quenching car dust removal system according to claim 5 is characterized in that: The connection point between the air inlet pipe (32) and the coke receiving box (2) is a flared structure along a direction close to the interior of the coke receiving box (2); the connection point between the first pipe section (331) and the coke receiving box (2) is a flared structure along a direction close to the interior of the coke receiving box (2); a shield (27) is fixedly provided at the connection point between the air inlet pipe (32) and the coke receiving box (2) and at the connection point between the first pipe section (331) and the coke receiving box (2), and a plurality of air holes (271) are provided on the shield (27).