Construction method for grouting peripheral circular seam of underwater implantable socketed pile
By setting up auxiliary devices in the engineering piles to prevent the influx of grouting materials, the circumferential joint grouting can be carried out immediately after the bottom sealing grouting, which solves the problems of grouting material waste and low work efficiency in offshore wind power jacket foundation construction, significantly saving materials and shortening construction time. .
Patent Information
- Application Number
- CN202411035840.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-10-11
AI Technical Summary
In the foundation construction of offshore wind power jackets, the increase in pressure during the grouting process of the circumferential joints of the engineering piles resulted in serious waste of grouting materials. Grouting of the outer circumferential joints of the piles could not be carried out immediately after the bottom sealing grouting, resulting in low work efficiency.
Auxiliary devices are set up in the engineering piles, including grout holes, isolation devices, baffles and traction ropes. The isolation devices and gland fillers are used to prevent the influx of grouting materials, so that the pile outer ring joint grouting can be carried out immediately after the bottom sealing grouting, reducing the Process rest time.
Effectively save grouting materials, shorten construction time, and improve work efficiency. On average, each pile saves 10m3 of grouting material, and the construction time is shortened from 36 hours to 24 hours.
Smart Images

Figure CN118756709A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a construction method for grouting the outer peripheral annular joint of an underwater implanted rock-embedded pile. Background Art
[0002] The offshore wind power conductor foundation has a three-leg or four-leg structure. When constructing the conductor foundation, the engineering piles are first planted on the seabed, and then the legs of the prefabricated conductor are inserted into the engineering piles. Then, cement-based high-strength slurry is injected into the annular space between the legs and the engineering piles. After the cement-based high-strength slurry solidifies, the conductor legs and the engineering piles are tightly combined into a whole.
[0003] When the engineering pile is an implanted rock-embedded pile, the construction method of the engineering pile is to first drive the steel casing into the seabed with a vibrating hammer, and the lower end of the steel casing penetrates the covering soil layer until the bedrock surface, and then put the drilling rig into the steel casing, drill the bedrock until the predetermined rock-embedded hole depth, and then insert the engineering pile into the steel casing until the bottom of the rock-embedded hole, and then inject high-strength grouting material into the annular gap between the engineering pile and the rock-embedded hole and the annular gap between the engineering pile and the steel casing, so that the engineering pile and the bedrock layer are connected into a solid whole to form a pile foundation.
[0004] After the engineering pile is inserted into the steel casing and the rock-embedded hole and temporarily supported and fixed, the grouting operation procedure needs to be carried out in three times. First, the bottom 1m of the engineering pile is grouted. The bottom grouting material needs to reach a certain setting strength. Generally, it takes more than 12 hours after the bottom grouting construction is completed to form an independent and non-interconnected space inside and outside the pile. Then start the pile backfill and the annular grouting outside the pile. The annular grouting outside the pile is generally carried out in two times. The slurry surface of the first annular grouting does not exceed the bottom elevation of the steel casing. After 18 hours, the engineering pile body has been fixed and is not bonded to the steel casing. At this time, the limit constraints of the engineering pile can be removed, and then the second annular grouting is carried out. Before the slurry of the second annular grouting is initially solidified, the steel casing is removed. After the above series of operations, the pile foundation is finally completed.
[0005] At present, in the process of annular grouting, no isolation device is set in the engineering pile. When the height of the annular grouting body outside the pile increases and the pressure continues to increase, a large amount of annular grouting material is squeezed into the pile, and the waste of grouting material is particularly serious. Therefore, it is necessary to wait for more than 12 hours after the bottom grouting for the slurry to initially set before the annular grouting construction outside the pile can be carried out, and the work efficiency is low. Summary of the invention
[0006] The purpose of the present invention is to overcome the defects of the prior art and provide a construction method for underwater engineering pile annular grouting, which can not only save grouting materials but also greatly improve the construction efficiency.
[0007] The object of the present invention is achieved by: a construction method for grouting the outer circumference of an underwater implantable rock-embedded pile, comprising the following steps:
[0008] Step 1: An auxiliary device is arranged in the engineering pile, and the auxiliary device includes a plurality of slurry inlet holes, a sealing device, a baffle and a traction rope; the plurality of slurry inlet holes are evenly distributed on the bottom wall of the engineering pile; the sealing device includes an annular pile bottom sealing plate and a sealing hole cover plate; the outer diameter of the pile bottom sealing plate is adapted to the inner diameter of the engineering pile, the pile bottom sealing plate is welded to the bottom inner wall of the engineering pile and is higher than the slurry inlet holes, and a pair of hinge seats are fixed on the top surface of the pile bottom sealing plate and at the edge of the inner hole; the outer diameter of the sealing hole cover plate is larger than the pile bottom The inner hole diameter of the sealing plate is fixed on one side of the top surface of the sealing cover plate, and a pair of hinge arms corresponding to a pair of hinge seats on the pile bottom sealing plate are fixed one by one, so that the sealing cover plate can hinge the pair of hinge arms on the pair of hinge seats of the pile bottom sealing plate one by one through two latches, and cover the inner hole of the pile bottom sealing plate, and an ear plate is fixed on the other side of the top surface of the sealing cover plate; the baffle is welded on the inner wall of the engineering pile and is above the isolation device and located on the opening path of the sealing cover plate; the traction rope is connected to the ear plate of the sealing cover plate;
[0009] Step 2: transport the engineering pile to the pile position above water and implant it into the rock-embedded hole formed by the steel casing and the drilling rig, and use a temporary fixing device on the top of the steel casing to limit the position of the engineering pile;
[0010] Step 3: Carry out the bottom sealing grouting construction. First, tighten the traction rope to lift the sealing cover plate of the isolation device, open the inner hole of the pile bottom sealing plate, and then inject the high-strength slurry from the grouting pipe located outside the engineering pile in the rock-embedded hole into the outer bottom of the pile, and enter the pile from the slurry inlet hole until the bottom sealing grouting layer is formed; during this process, the seawater in the engineering pile is discharged upward from the inner hole of the pile bottom sealing plate of the isolation device;
[0011] Step 4: After the bottom grouting construction is completed, the first annular grouting construction outside the pile is immediately carried out, including the following steps:
[0012] In the first step, the tension of the traction rope is first released to allow the sealing cover plate to fall down and cover the inner hole of the pile bottom sealing plate, and then the gland filler is filled into the pile, and the sealing cover plate is pressed with the gland filler. While the gland filler is filled, the first annular grouting construction outside the pile is carried out, and the height of the first annular grouting material is controlled not to be higher than the height of the gland filler;
[0013] Process 2: After the gland filling material and the first annular grouting material have reached a certain height, the grouting pipe outside the engineering pile is lifted to the same height, and the buried depth of the grouting pipe in the slurry is ensured to be no less than 0.5m. The gland filling material inside the pile and the first annular grouting outside the pile are continued until the top elevation of the first annular grouting material does not exceed the bottom elevation of the steel casing but is close to the bottom elevation of the steel casing, and the first annular grouting outside the pile is completed;
[0014] Step 5. Starting from the time when the first annular grouting construction outside the pile is started, 18 hours later, first remove the temporary fixing device, release the limit constraint on the engineering pile, and then carry out the second annular grouting construction outside the pile, and at the same time carry out backfill construction inside the pile until the top surface of the second annular grouting material is level with the seabed surface, and the second annular grouting construction outside the pile is completed; before the second annular grouting material begins to set, remove the steel casing.
[0015] The above-mentioned construction method for grouting the outer peripheral annular seam of an underwater implantable rock-embedded pile, wherein a reinforcing ring coaxial with the inner hole and having the same inner diameter as the inner hole is provided on the bottom surface of the pile bottom sealing plate; and an annular reinforcing rib with an outer diameter adapted to the inner hole diameter of the pile bottom sealing plate is provided on the bottom surface of the sealing cover plate.
[0016] In the above-mentioned construction method of grouting the outer circumferential seam of underwater implantable rock-embedded piles, the gland filler is made of solid materials such as coarse sand, crushed stone or drilling slag.
[0017] The construction method of underwater engineering pile annular grouting of the present invention has the following characteristics:
[0018] (1) Saving materials: By installing a sealing device at the bottom of the pile and filling a gland filler above the sealing device, it is possible to prevent the annular grouting material outside the pile from flowing into the pile too much due to excessive pressure during the pouring process, exceeding the height requirement of the designed bottom sealing grouting layer, thereby effectively saving grouting materials.
[0019] (2) Reducing process downtime: After the isolation device is used, the construction of the gland packing can be carried out immediately after the bottom grouting construction is completed, and the grouting construction of the pile outer ring joint can be carried out immediately, reducing the process downtime by 12 hours and greatly improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1a It is a structural schematic diagram of an auxiliary device used in the construction method of underwater engineering pile annular joint grouting of the present invention;
[0021] Figure 1b is a top view of the isolation device used in the construction method of the present invention;
[0022] Figure 2 is a state diagram when performing step 2 of the construction method of the present invention;
[0023] Figure 3 is a state diagram when performing step three of the construction method of the present invention;
[0024] Figure 4 It is a state diagram when performing process 1 of step 4 of the construction method of the present invention;
[0025] Figure 5 It is a state diagram when performing process 2 of step 4 of the construction method of the present invention;
[0026] Figure 6 1 is a state diagram when performing step 5 of the measurement method of the present invention. DETAILED DESCRIPTION
[0027] The present invention will be further described below in conjunction with the accompanying drawings.
[0028] Please refer to Figures 1 to Figure 6 The construction method of the underwater implantable rock-embedded pile outer peripheral annular seam grouting of the present invention comprises the following steps:
[0029] Step 1: In the engineering pile 1 manufacturing factory, an auxiliary device is installed in the engineering pile 1, and the auxiliary device includes four slurry inlet holes 10, a sealing device 2, a baffle 3 and a traction rope 4; wherein,
[0030] Four grouting holes 10 are evenly distributed on the bottom wall of the engineering pile 1 and are 150 mm away from the bottom surface of the engineering pile 1;
[0031] The sealing device 2 includes an annular pile bottom sealing plate 21 and a sealing cover plate 22; wherein, the outer diameter of the pile bottom sealing plate 21 is adapted to the inner diameter of the engineering pile 1, the pile bottom sealing plate 21 is welded to the bottom inner wall of the engineering pile 1 and is higher than the grouting hole 10, and the height of the pile bottom sealing plate 21 is the same as the height of the bottom sealing grouting 60, which is 1m; a pair of hinge seats 211 are fixed on the top surface of the pile bottom sealing plate 21 and on the edge of the inner hole, and a reinforcing ring 210 coaxial with the inner hole and having the same inner diameter as the inner hole is provided on the bottom surface of the pile bottom sealing plate 21; the outer diameter of the sealing cover plate 22 is larger than that of the pile bottom sealing plate 21, an annular reinforcing rib 220 with an outer diameter matching the inner hole diameter of the pile bottom sealing plate 21 is provided on the bottom surface of the sealing cover plate 22, a pair of hinge arms 221 corresponding to a pair of hinge seats 211 on the pile bottom sealing plate 21 are fixed on one side of the top surface of the sealing cover plate 22, so that the sealing cover plate 22 can hinge the pair of hinge arms 221 on the pair of hinge seats 211 of the pile bottom sealing plate 21 one by one through two latches, and cover the inner hole of the pile bottom sealing plate 21, and an ear plate 23 is fixed on the other side of the top surface of the sealing cover plate 22;
[0032] The baffle plate 3 is welded on the inner wall of the engineering pile 1 and is above the sealing device 2 and located on the opening path of the sealing cover plate 22;
[0033] The traction rope 4 is connected to the ear plate 23 of the sealing cover plate 22;
[0034] Step 2: transport the engineering pile 1 to the pile position above water and implant it into the rock-embedded hole 50 formed by the steel casing 5 and the drilling rig, and use a temporary fixing device (not shown) on the top of the steel casing 5 to limit the engineering pile 1;
[0035] Step three, perform bottom sealing grouting construction, first tighten the traction rope 4 to lift the sealing cover plate 22 of the isolation device 2, open the inner hole of the pile bottom sealing plate 21, and then inject high-strength slurry from the rock-embedded hole 50 and the grouting pipe 6 located outside the engineering pile 1 into the bottom outside the engineering pile 1, and the high-strength slurry then enters the engineering pile 1 from the four slurry inlet holes 10 upwards until a bottom sealing grouting layer 60 is formed. In this process, the seawater in the engineering pile 1 is discharged upward from the inner hole of the pile bottom sealing plate 21 of the isolation device 2;
[0036] Step 4: After the bottom grouting construction is completed, the first annular grouting construction outside the pile is immediately carried out, including the following steps:
[0037] In the first step, the tension of the traction rope 4 is first released, so that the sealing cover plate 22 falls down to cover the inner hole of the pile bottom sealing plate 21, and then the gland filler 20 is filled into the engineering pile 1, and the sealing cover plate 22 is pressed by the gland filler 20. The gland filler 20 adopts solid materials, such as coarse sand, gravel or drilling slag; while filling the gland filler 20, the first annular grouting construction outside the pile is carried out, and the height of the first annular grouting material 61 is controlled not to be higher than the height of the gland filler 20:
[0038] Step 2: After the gland filler 20 and the first annular grouting material 61 are at a height of 3m, the grouting pipe 6 outside the engineering pile 1 is lifted upward to the same height, and it is ensured that the buried depth of the grouting pipe 6 in the slurry is not less than 0.5m, and the gland filler 20 in the pile and the first annular grouting outside the pile are continued, until the top elevation of the first annular grouting material 61 does not exceed the bottom elevation of the steel casing 5 but is close to the bottom elevation of the steel casing 5, and the first annular grouting outside the pile is completed. In this process, since the isolation device 2 and the gland filler 20 are set in the engineering pile 1, the subsequent grouting material after the grouting pipe 6 is lifted will not cause disturbance to the bottom grouting layer 60 due to excessive liquid pressure;
[0039] Step 5, starting from the time when the first annular grouting construction outside the pile is started, 18 hours later, the strength of the bottom sealing grouting layer 60 and the first annular grouting material 61 gradually increases, the engineering pile 1 has been fixed and is not bonded to the steel casing 5, first remove the temporary fixing device, release the limit constraint on the engineering pile 1, and then carry out the second annular grouting construction outside the pile, and at the same time carry out 200 backfill construction inside the pile until the top surface of the second annular grouting material 62 is level with the seabed surface, completing the second annular grouting construction outside the pile; before the second annular grouting material 62 initially sets, remove the steel casing 5 to form a pile foundation.
[0040] The construction method of the underwater implantable rock-embedded pile outer peripheral annular seam grouting of the present invention has the following characteristics:
[0041] (1) Saving materials: By setting a sealing device 2 1 m below the pile bottom and filling a gland filler 20 above the sealing device 2, it is possible to prevent the annular grouting material outside the pile from being over-pressurized during the pouring process, causing excessive influx into the pile and exceeding the height requirement of the designed bottom sealing grouting layer 60 of 1 m, thereby effectively saving grouting materials.
[0042] (2) Reducing process downtime: Before the isolation device is used, the bottom grouting is carried out first, and it is necessary to wait for more than 12 hours before the annular grouting outside the pile can be carried out. After the isolation device is used, the pressure cap filler is filled in immediately after the bottom grouting construction is completed, and the annular grouting construction outside the pile can be carried out immediately, reducing the process downtime by 12 hours and greatly improving the construction efficiency.
[0043] With traditional technology, it takes 36 hours to grout a pile, and the average volume of grouting material used is 55m 3 After adopting the construction method of the present invention, the grouting operation only takes 24 hours, the operation efficiency is greatly improved, and the average grouting material volume is 45m 3 About 10m3 of grouting material can be saved for each pile.
[0044] The above embodiments are only used to illustrate the present invention, rather than to limit the present invention. Those skilled in the relevant technical field may make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions should also belong to the scope of the present invention and should be defined by the claims.
Claims
1. A construction method for grouting the outer circumference of an underwater embedded rock-embedded pile, characterized in that: The construction method comprises the following steps: Step 1: An auxiliary device is arranged in the engineering pile, and the auxiliary device includes a plurality of slurry inlet holes, a sealing device, a baffle and a traction rope; the plurality of slurry inlet holes are evenly distributed on the bottom wall of the engineering pile; the sealing device includes an annular pile bottom sealing plate and a sealing hole cover plate; the outer diameter of the pile bottom sealing plate is adapted to the inner diameter of the engineering pile, the pile bottom sealing plate is welded to the bottom inner wall of the engineering pile and is higher than the slurry inlet holes, and a pair of hinge seats are fixed on the top surface of the pile bottom sealing plate and at the edge of the inner hole; the outer diameter of the sealing hole cover plate is larger than the pile bottom The inner hole diameter of the sealing plate is fixed on one side of the top surface of the sealing cover plate, and a pair of hinge arms corresponding to a pair of hinge seats on the pile bottom sealing plate are fixed one by one, so that the sealing cover plate can hinge the pair of hinge arms on the pair of hinge seats of the pile bottom sealing plate one by one through two latches, and cover the inner hole of the pile bottom sealing plate, and an ear plate is fixed on the other side of the top surface of the sealing cover plate; the baffle is welded on the inner wall of the engineering pile and is above the isolation device and located on the opening path of the sealing cover plate; the traction rope is connected to the ear plate of the sealing cover plate; Step 2: transport the engineering pile to the pile position above water and implant it into the rock-embedded hole formed by the steel casing and the drilling rig, and use a temporary fixing device on the top of the steel casing to limit the engineering pile; Step 3: Carry out the bottom sealing grouting construction. First, tighten the traction rope to lift the sealing cover plate of the isolation device, open the inner hole of the pile bottom sealing plate, and then inject the high-strength slurry from the grouting pipe located outside the engineering pile in the rock-embedded hole into the outer bottom of the pile, and enter the pile from the slurry inlet hole until the bottom sealing grouting layer is formed; during this process, the seawater in the engineering pile is discharged upward from the inner hole of the pile bottom sealing plate of the isolation device; Step 4: After the bottom grouting construction is completed, the first annular grouting construction outside the pile is immediately carried out, including the following steps: In the first step, the tension of the traction rope is first released to allow the sealing cover plate to fall down and cover the inner hole of the pile bottom sealing plate, and then the gland filler is filled into the pile, and the sealing cover plate is pressed with the gland filler. While the gland filler is filled, the first annular grouting construction outside the pile is carried out, and the height of the first annular grouting material is controlled not to be higher than the height of the gland filler; Process 2: After the gland filling material and the first annular grouting material have reached a certain height, the grouting pipe outside the engineering pile is lifted to the same height, and the buried depth of the grouting pipe in the slurry is ensured to be no less than 0.5m. The gland filling material inside the pile and the first annular grouting outside the pile are continued until the top elevation of the first annular grouting material does not exceed the bottom elevation of the steel casing but is close to the bottom elevation of the steel casing, and the first annular grouting outside the pile is completed; Step 5. Starting from the time when the first annular grouting construction outside the pile is started, 18 hours later, first remove the temporary fixing device, release the limit constraint on the engineering pile, and then carry out the second annular grouting construction outside the pile, and at the same time carry out backfill construction inside the pile until the top surface of the second annular grouting material is level with the seabed surface, and the second annular grouting construction outside the pile is completed; before the second annular grouting material begins to set, remove the steel casing.
2. The construction method of grouting the outer periphery of an underwater implantable rock-embedded pile according to claim 1 is characterized in that: A reinforcing ring coaxial with the inner hole and having the same inner diameter as the inner hole is provided on the bottom surface of the pile bottom sealing plate; an annular reinforcing rib with an outer diameter matching the inner hole diameter of the pile bottom sealing plate is provided on the bottom surface of the sealing cover plate.
3. The construction method of grouting the outer circumference of an underwater implantable rock-embedded pile according to claim 1, characterized in that: The gland filler is made of solid materials, such as coarse sand, crushed stone or drilling slag.