Inner sleeve layered grouting construction method and trolley

Through the layered grouting construction method of the inner casing, the problems of low grouting efficiency and poor fluidity of the slurry during the half-height grouting and fixation process are solved. The grout is evenly filled, preventing the inner casing from tilting and quality problems, and improving the construction efficiency. and installation quality.

CN118757162AActive Publication Date: 2024-10-11CCFEB CIVIL ENG
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202410866843.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-01
Publication Date
2024-10-11
Estimated Expiration
2044-07-01

AI Technical Summary

Technical Problem

During the half-height grouting and fixation process of the inner casing, the grouting efficiency is low and the fluidity of the slurry is poor, which may cause the inner casing to tilt, float, and move laterally during the grouting process, causing axis deviation and sealing rubber ring extrusion. and other quality issues, affecting the construction progress.

Method used

The inner casing layered grouting construction method is used to predict and fill the grout in layers to shorten the grouting distance. The sealing plate and grouting system are used to control the grout flow to ensure uniform grout filling, reduce buoyancy imbalance, and improve grouting quality.

Benefits of technology

It effectively reduces the liquid level difference and pressure difference of the inner casing during the grouting process, prevents tilting, floating and lateral movement, improves the installation quality, reduces the secondary grouting steps, shortens the grouting time, and improves construction efficiency. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118757162A_ABST
    Figure CN118757162A_ABST
Patent Text Reader

Abstract

Slurry needing to be filled is layered in the height direction according to the number of the inner sleeves installed at the current shift, the layering number of the slurry is consistent with the installation number of the inner sleeves, one-layer grouting is conducted after each section of inner sleeve is installed and fixed, grouting is divided into multiple layers in the height direction and the first direction, and the grouting efficiency is improved. Each layer is small in filling grout amount and short in length and is more convenient to control, and due to the fact that single-layer grouting is small in grout amount and short in length, the liquid level difference generated by poor grout flowability, uncontrollability of grout flowing and other factors influencing grout flowing in the grouting process can be effectively reduced, and the grouting quality is improved. And the probability of inclination of the inner sleeve due to unbalanced buoyancy is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground pipeline construction, and in particular to an inner casing layered grouting construction method and a trolley. Background Art

[0002] The construction of municipal pipelines inevitably requires crossing roads, mountains or existing structures. In order to ensure the safe and effective operation of the planned pipelines and the safety of existing structures, a protective cover is generally installed in the project, and then an inner casing is inserted into the protective cover.

[0003] At present, the inner casing is mostly fixed by grouting. When grouting is used to fix the inner casing traditionally, full-height grouting is often used, and the inner casing is completely wrapped with concrete slurry. However, the full-height grouting requires a large amount of slurry, and due to the shrinkage of the slurry during solidification, secondary grouting is required later. At the same time, it is not convenient for pipeline maintenance. Therefore, half-height grouting is currently being promoted. Half-height grouting only needs to fill the slurry to the half-height state of the inner casing, and the inner casing is fixed with a fixing device, which can reduce the amount of slurry used by half, and can greatly reduce the project cost. At the same time, since the half-height grouting will expose the upper part of the inner casing, it will be more convenient in later maintenance.

[0004] At present, when the inner casing is fixed with semi-height grouting, it is generally installed after a certain length of the inner casing, and then the grouting is uniformly carried out from the outside of the inner casing, and then the slurry is waited for to solidify, and then the subsequent inner casing is installed, and it is repeated. Each time, the area that needs grouting has a large span in the axial direction of the inner casing. In order to increase the grouting efficiency, it is necessary to inject the slurry from the middle of the entire grouting area during grouting so that the slurry flows to both ends. At this time, it is necessary to use multiple high-power grouting pumps to cooperate with grouting pipes to transport the slurry. When the grouting pipe is long, different grouting pipes will produce different bending shapes, resulting in different resistances to the slurry in the grouting pipe. At the same time, since the slurry delivery speeds between different grouting pumps cannot be completely consistent, it will eventually lead to differences in the grouting speeds on the left and right sides of the inner casing, and due to the flow of the slurry The performance is poor, and the flow of slurry cannot be controlled artificially. In addition, a pad will be installed at the bottom of the inner casing, and the slurry on the left and right sides of the inner casing can only be connected to each other through the gap between the pads. The axial length of the overall grouting area is too long, and there are too many parameters affecting the flow of slurry during the grouting process, which will lead to height differences in the slurry on both sides of the inner casing and in the axial direction during the grouting process. The height difference of the slurry on the left and right sides of the inner casing will apply different buoyancy and lateral pressure to the inner casing. The liquid level difference in the axial direction of the inner casing will cause different buoyancy at both ends of the inner casing, making the pressure on the surface of the inner casing during the grouting process extremely complicated, which may cause the inner casing to float up or move horizontally, thereby causing the axis of the inner casing to shift, the adjacent inner casing sockets to form an angle, the sealing rubber ring to extrude and other quality problems, which seriously affect the construction progress.

[0005] Based on this, the present invention designs an inner casing layered grouting construction method and a trolley to solve the above problems. Summary of the invention

[0006] To achieve the above object, the present invention provides the following technical solution: a layered grouting construction method for an inner casing, comprising:

[0007] Step 1: predict the number of inner casings installed in the current shift and divide the slurry to be filled into layers in the vertical direction, with the number of layers being the same as the number of inner casings installed;

[0008] Step 2: transport the inner sleeve to the installation position, and fix the inner sleeve to the installation position in the protective sleeve through the installation assembly;

[0009] Step 3: Install a sealing plate on one end of the outer surface of the inner casing near the inner casing socket, the sealing plate is used to close the gap between the outer wall of the inner casing and the inner cavity wall of the protective sleeve, and then start grouting into the gap between the inner casing and the protective sleeve, so that the slurry on the side of the inner casing reaches the height of the first layer of layered grouting;

[0010] Step 4: Install a new section of inner casing into the protective sleeve through step 2 and dock it with the socket of the previous section of inner casing. After installing a sealing plate at the socket of the new section of inner casing, remove the sealing plate at the socket of the previous section of inner casing, and simultaneously inject grout into the outer side of the new section of inner casing to increase the overall slurry height by one layer.

[0011] Step 5, repeat step 4, so that the slurry on the sides of all inner sleeves reaches the preset height when all inner sleeves are installed.

[0012] As a further solution of the present invention, in step 1, the layers are layered at equal heights.

[0013] As a further solution of the present invention, the inner casing is provided with grouting holes penetrating the inner and outer walls thereof, so that slurry can be transported from the inner casing to the outside.

[0014] As a further solution of the present invention, in step four, when grouting the outside of the new section of the inner casing, the grouting is stopped after the slurry on the outside of the new section of the inner casing is flush with the slurry on the outside of the previous section of the inner casing. Next, the grouting position is changed, and grouting is started from the side of the previous section of the inner casing to allow the slurry to gather on the side of the previous section of the inner casing to fill the gap caused by the shrinkage of the previous layer of slurry due to solidification.

[0015] As a further solution of the present invention, in step 2, after the inner sleeve is fixed, a liquid level measuring sticker is fixedly installed on the outer wall of the inner sleeve and the inner wall of the protective sleeve. The installation height of the liquid level measuring sticker is the same as the final liquid level height, and the surface of the liquid level measuring sticker is made of reflective material.

[0016] As a further solution of the present invention, the sealing plate includes a template 21 and a support member installed on the first surface of the template 21, and the shape of the template 21 matches the shape of the gap between the inner sleeve and the protective sleeve; the support member includes a support foot for obliquely supporting the template and a support rib close to the template.

[0017] As a further solution of the present invention, the template is composed of a first part and a second part of the same shape to facilitate disassembly of the template.

[0018] An inner casing layered grouting construction trolley is used to transport the inner casing in a protective sleeve, adjust the inner casing and output slurry, including a trolley body, an adjustment mechanism located on the trolley body and a grouting system located on the trolley body, the trolley body is used to place the inner casing and move the inner casing in the protective sleeve; the adjustment mechanism is used to adjust the inner casing located on the trolley body when the inner casing is docked; the grouting system is used to transport the slurry between the inner casing and the protective sleeve after the inner casing is transported

[0019] As a further solution of the present invention, the grouting system includes a stirring device, a grouting pump and a grouting pipe. The stirring device is connected to the input end of the grouting pump through a pipeline for conveying slurry to the grouting pump. The grouting pipe is fixed to the output end of the grouting pump and is used to connect the grouting pump with the grouting port opened in the inner casing.

[0020] As a further solution of the present invention, the adjustment mechanism includes a retractable cross bar and retractable vertical bars fixedly arranged at both ends of the cross bar, and one of the two vertical bars is fixed on the vehicle body.

[0021] The present invention has the following beneficial effects:

[0022] The method divides the area to be grouted into multiple layers in the first direction and the height direction, shortens the distance of each grouting in the first direction and the height direction, and reduces the amount of slurry for each grouting, which can effectively reduce the liquid level difference of the slurry in the first direction and the left and right sides of the inner casing, reduce the difference in pressure on different parts of the inner casing during the grouting process, shorten the time the inner casing is subjected to unbalanced pressure, prevent the inner casing from tilting, floating and moving sideways, effectively ensure the installation quality of the inner casing, make full use of the time for installing the inner casing, and allow the slurry to better fill the gap between the pads below the inner casing. The subsequent step of secondary grouting due to liquid level drop is eliminated. At the same time, after installing a new section of inner casing and removing the sealing plate used to block the slurry, the slurry has a certain height and thus has a certain gravitational potential energy, which allows the slurry to be filled to the side of the new section of inner casing more quickly, further accelerating the filling speed of the slurry, and further shortening the time required for the slurry to fill the side of the inner casing to the same height, thereby once again shortening the time that the inner casing is subjected to unbalanced buoyancy, effectively improving the grouting quality, and preventing quality problems such as axial deviation of the inner casing, angle formation between adjacent casing sockets, and extrusion of sealing rubber rings.

[0023] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0025] Figure 1 This is a flow chart of the inner casing layered grouting construction method.

[0026] Figure 2 This is a schematic diagram of the inner casing fixing structure.

[0027] Figure 3 It is a structural schematic diagram of the trolley in the present invention.

[0028] Figure 4 It is a structural schematic diagram of the sealing plate in the present invention.

[0029] Figure 5 It is a schematic diagram of the inner casing docking in the present invention.

[0030] Figure 6 It is a schematic diagram of inner casing grouting in the present invention.

[0031] Legend:

[0032] 11. Clamp; 12. Adjustable support; 21. Formwork; 22. Support foot; 23 Support rib; 3. Vehicle body; 41. Mixing device; 42. Grouting pump; 43. Grouting pipe; 51. Cross bar; 52. Vertical bar. DETAILED DESCRIPTION

[0033] The embodiments of the present invention are described in detail below with reference to the accompanying drawings. However, the present invention can be implemented in many different ways as defined and covered below.

[0034] See also Figure 1-6 The present invention provides an inner casing layered grouting construction method, the construction method comprising:

[0035] Step 1: Predict the number of inner casing installations in the current shift and divide the slurry that needs to be filled into layers in the vertical direction. The number of layers is the same as the number of inner casing installations, and the height of each layer is equal. There will be errors in the slurry height during the actual grouting process. Therefore, the height of each grouting layer is only a reference value and needs to be adjusted in real time according to the actual situation to ensure that the height of the final slurry filling layer is within the allowable error.

[0036] Step 2: transport the inner sleeve to the installation position, and fix the inner sleeve to the installation position in the protective sleeve through the installation assembly;

[0037] Step 3: Install a sealing plate on one end of the outer surface of the inner casing near the inner casing socket, the sealing plate is used to close the gap between the outer wall of the inner casing and the inner cavity wall of the protective sleeve, and then start grouting into the gap between the inner casing and the protective sleeve, so that the slurry on the side of the inner casing reaches the first layer height;

[0038] Step 4: Install a new section of inner casing into the protective sleeve through step 2 and dock it with the socket of the previous section of inner casing. After installing a sealing plate at the socket of the new section of inner casing, remove the sealing plate at the socket of the previous section of inner casing, and simultaneously inject grout into the outer side of the new section of inner casing to increase the overall slurry height by one layer.

[0039] Step 5, repeat step 4, so that the slurry on the sides of all inner sleeves reaches the preset height when all inner sleeves are installed.

[0040] According to the number of inner casings installed in the current shift, the slurry to be filled is layered in the height direction. The number of slurry layers is consistent with the number of inner casings installed. After each section of the inner casing is installed and fixed, a layer of grouting is performed. The grouting is divided into multiple layers in the height direction and the first direction. Each layer is filled with a small amount of slurry and a short length, which is easier to control. Since the single-layer grouting has a small amount of slurry and a short length, it can effectively reduce the liquid level difference caused by poor slurry fluidity, uncontrollable slurry flow and other factors affecting slurry flow during the grouting process, and reduce the probability of the inner casing tilting due to unbalanced buoyancy;

[0041] Specifically, the first direction is the axial direction of the protective sleeve.

[0042] Figure 2 An example of a mounting assembly is shown. In this example, the mounting assembly includes a clamp 11 and an adjustable support 12 fixedly installed on the top of the protective sleeve. The adjustable support 12 consists of a fixed portion fixed to the inner wall of the protective sleeve and a movable portion threadedly installed on the fixed portion. The adjustable support 12 is installed on the top of the inner cavity wall of the protective sleeve. The movable portion is rotated to increase the distance between the movable portion and the fixed portion so that the movable portion abuts against the top of the inner sleeve to fix the inner sleeve. The clamp 11 is then wrapped around the outside of the inner sleeve. The two ends of the clamp 11 are respectively fixed to the inner wall of the protective sleeve to fix the inner sleeve in the protective sleeve.

[0043] When installing the inner casing, the time for transporting and installing the inner casing can be fully utilized. After each layer of grouting is completed, it is necessary to wait for the subsequent inner casing to be installed. During this waiting process, the slurry can be completely filled into the gap between the pads under the inner casing. Each section of the inner casing can be completely filled to ensure the quality of the slurry filling, and the slurry on the left and right sides of the inner casing is connected to form a whole, so that the slurry reaches a balanced state on both sides of the inner casing, eliminating the subsequent secondary grouting step. In the subsequent grouting process after the inner casing is installed, the slurry of the previous layer can be supplemented;

[0044] Since the slurry will self-flow and level on the outside of the installed inner casing, when installing a new section of the inner casing, because the slurry already has a certain height, the slurry can be filled to the outside of the new section of the inner casing more quickly under the action of gravity, and at the same time, the new slurry is added to both sides of the new section of the inner casing. In the first direction, the slurry on the side of the new section of the inner casing can quickly reach the same height as the slurry on the side of the installed inner casing, shortening the slurry flow time, shortening the time of unbalanced buoyancy of the inner casing, and reducing the movement of the inner casing. The probability of movement is small, and because the liquid levels on the left and right sides of the previously installed inner casing are the same, when the new section of the inner casing is installed and the sealing plate of the previous section of the inner casing is removed, the slurry on both sides of the previous section of the inner casing can only flow in one direction with the same pressure, then the slurry on both sides of the previous section of the inner casing will maintain a similar speed and flow to both sides of the new section of the inner casing, so that the liquid level difference of the slurry on both sides of the new section of the inner casing during the grouting process is smaller, preventing the new section of the inner casing from generating a large buoyancy and lateral pressure imbalance in the left and right directions;

[0045] By dividing the area to be grouted into multiple layers in the first direction and the height direction, shortening the distance of each grouting in the first direction and the height direction, and reducing the amount of slurry for each grouting, since each grouting area is short in the first direction and the grouting height is low, the liquid level difference of the slurry in the first direction and the left and right sides of the inner casing can be effectively reduced, and there will be no large liquid level difference in the first direction and the left and right sides, reducing the difference in pressure on different parts of the inner casing during the grouting process, and at the same time, the slurry can be filled faster, shortening the time the inner casing is subjected to unbalanced pressure, preventing the inner casing from tilting, floating and moving horizontally, and effectively ensuring the installation quality of the inner casing. During the grouting process, since the installation of each section of the inner casing takes a certain amount of time, the traditional grouting method causes the time gap when installing the inner casing to be Waste, while during the installation of the inner casing by the present method, since there is already a certain amount of slurry on the outside of the installed inner casing, the slurry can be better filled into the gap between the pads below the inner casing, eliminating the subsequent step of secondary grouting due to the drop in liquid level. At the same time, when a new section of the inner casing is installed and the sealing plate used to block the slurry is removed, since the slurry has a certain height, the slurry will have a certain gravitational potential energy, which allows the slurry to be filled into the side of the new section of the inner casing faster, further accelerating the filling speed of the slurry, and further shortening the time required for the slurry to fill the side of the inner casing to the same height, thereby once again shortening the time that the inner casing is subjected to unbalanced buoyancy, effectively improving the grouting quality, and preventing quality problems such as inner casing axis deviation, adjacent casing socket angle formation, and sealing rubber ring extrusion.

[0046] Specifically, the surface of the inner casing is provided with grouting holes penetrating the inner and outer walls thereof. During grouting, grouting can be injected from the inner casing to the outside of the inner casing, so that the grouting position is adjustable.

[0047] Specifically, after the new section of the inner casing is fixed and the sealing plate of the previous section of the inner casing is removed, grouting is started from the top of the new section of the inner casing first to speed up the slurry on the side of the new section of the inner casing to reach the same height as the slurry on the side of the previous section of the inner casing, while allowing the new slurry with stronger fluidity to fill to the bottom of the inner casing, making the filling denser. After the slurry on the side of the new section of the inner casing reaches the same height as the slurry on the previous section of the inner casing, the grouting position is changed, and grouting is started from the top of the previous section of the inner casing. Because the slurry in the previous section of the inner casing will solidify in advance, injecting slurry from the side of the previous section of the inner casing can reduce the formation of cold joints between the new and old slurries in the previous section.

[0048] Figure 4An example of a sealing plate is shown. In this example, the sealing plate includes a template 21 and a support member. The shape of the template 21 is the same as the shape of the gap between the inner sleeve and the protective sleeve. After the inner sleeve is fixedly installed, it is installed on the side of the inner sleeve near the socket to seal the gap between the inner sleeve and the protective sleeve to prevent slurry leakage during grouting. The support member is installed on the first side of the template 21. The first side of the template 21 is the side of the template 21 facing away from the grouting area. The support member includes a supporting foot 22 and a supporting rib 23. One end of the supporting foot 22 abuts against the first side of the template 21, and the other end abuts against the inner cavity wall of the protective sleeve to support the template 21. Several supporting feet 22 are installed on the first side of the template 21. The support rib 23 is fixedly installed on the first side of the template 21 to improve the overall bending resistance of the template 21 and ensure the safe use of the template 21.

[0049] Specifically, the template 21 is composed of a detachable first part and a second part, the first part and the second part have the same shape, and the gap between the inner sleeve and the protective sleeve is divided into two left and right parts from the middle, which is convenient for subsequent removal of the template 21.

[0050] Specifically, after the inner sleeve is fixed, a liquid level measuring sticker is fixedly installed on the outer wall of the inner sleeve and the inner wall of the protective sleeve. The installation height of the liquid level measuring sticker is the same as the final liquid level height, and the surface of the liquid level measuring sticker is made of reflective material. When the last layer of slurry is filled, the liquid level measuring sticker can be used to determine whether the slurry has reached the preset height.

[0051] A construction trolley for layered grouting of inner casing is used for transporting inner casing in a protective casing, adjusting the inner casing and outputting slurry. The trolley comprises a vehicle body 3, an adjusting mechanism located on the vehicle body 3 and a grouting system located on the vehicle body 3. The vehicle body 3 is used for placing the inner casing and moving the inner casing in the protective casing; the adjusting mechanism is used for adjusting the inner casing located on the vehicle body 3 when the inner casing is docked; the grouting system is used for transporting slurry between the inner casing and the protective casing after the inner casing is transported.

[0052] Specifically, Figure 3As shown, the grouting system includes a stirring device 41, a grouting pump 42 and a grouting pipe 43. The stirring device 41 is connected to the input end of the grouting pump 42 through a pipeline for conveying slurry to the grouting pump 42. The grouting pipe 43 is fixed to the output end of the grouting pump 42, and is used to connect the grouting pump 42 with the grouting port opened in the inner casing. During grouting, it is necessary to respectively connect the grouting ports on the left and right sides of the inner casing through two grouting pipes 43, and grout to the left and right sides of the inner casing at the same time to prevent the slurry on the left and right sides of the inner casing from forming a liquid level difference, and to prevent different sizes of lateral pressures from being formed on both sides of the inner casing. Short-distance grouting is achieved through the grouting system of the trolley to reduce the length of the slurry moving in the grouting pipe 43, reduce the influence of the length of the grouting pipe 43 on the grouting speed on the left and right sides of the inner casing, reduce the grouting speed difference on the left and right sides of the inner casing during grouting, and reduce the liquid level difference formed on the left and right sides of the inner casing during grouting.

[0053] Specifically, Figure 5-6 As shown, the adjustment mechanism includes a retractable cross bar 51 and retractable vertical bars 52 fixedly arranged at both ends of the cross bar 51, one of the two vertical bars 52 is fixed on the vehicle body 3, and after the inner sleeve is transported to its place through the vehicle body 3, the cross bar 51 is unfolded to move the vertical bar 52 which is not connected to the vehicle body 3 laterally through the inner cavity of the inner sleeve to be installed to the inner cavity of the previous section of the inner sleeve, and the vertical bar 52 is unfolded to abut against the inner cavity of the previous section of the inner sleeve, at this time, the cross bar 51 passes through the inner sleeve to be installed, and then the two vertical bars 52 are unfolded at the same time to make the cross bar 51 rise, and the inner sleeve is lifted from the inner cavity of the inner sleeve to be installed by the cross bar 51 to achieve height adjustment of the inner sleeve, and then the vehicle body 3 approaches the installed sleeve, and at the same time the cross bar 51 begins to retract at the same speed, so that the inner sleeve on the cross bar 51 approaches the inner sleeve of the previous section and finally completes the docking.

[0054] By installing the adjustment mechanism and the grouting system on the vehicle body 3, the transportation, installation and grouting of the inner casing are integrated. Each time the inner casing is transported to the designated position in the protective cover by the vehicle body 3, the inner casing can be docked through the adjustment mechanism, and grouting can be performed on both sides of the inner casing through the grouting system, thereby saving construction time and accelerating the construction progress.

[0055] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A layered grouting construction method for an inner casing, characterized in that: include: Step 1: predict the number of inner casings to be installed in the current shift, and divide the slurry to be filled into layers in the vertical direction, with the number of layers being the same as the number of inner casings to be installed; Step 2: transport the inner sleeve to the installation position, and fix the inner sleeve to the installation position in the protective sleeve through the installation assembly; Step 3: Install a sealing plate on one end of the outer surface of the inner casing near the inner casing socket, the sealing plate is used to close the gap between the outer wall of the inner casing and the inner cavity wall of the protective sleeve, and then start grouting into the gap between the inner casing and the protective sleeve, so that the slurry on the side of the inner casing reaches the height of the first layer of layered grouting; Step 4: Install a new section of inner casing into the protective sleeve through step 2 and dock it with the socket of the previous section of inner casing. After installing a sealing plate at the socket of the new section of inner casing, remove the sealing plate at the socket of the previous section of inner casing, and simultaneously inject grout into the outer side of the new section of inner casing to increase the overall slurry height by one layer. Step 5, repeat step 4, so that the slurry on the sides of all inner sleeves reaches the preset height when all inner sleeves are installed.

2. The inner casing layered grouting construction method according to claim 1 is characterized in that: In step 1, the layers are layered at equal heights.

3. The inner casing layered grouting construction method according to claim 1 is characterized in that: The inner casing surface is provided with grouting holes penetrating the inner and outer wall surfaces thereof, so that slurry can be transported from the inner casing to the outside.

4. The inner casing layered grouting construction method according to claim 1 is characterized in that: In step 4, when grouting the outside of the new section of the inner casing, stop after the slurry on the outside of the new section of the inner casing is flush with the slurry on the outside of the previous section of the inner casing. Next, change the grouting position and start grouting from the side of the previous section of the inner casing.

5. The inner casing layered grouting construction method according to claim 1 is characterized in that: In step 2, after the inner sleeve is fixed, a liquid level measuring sticker is fixedly installed on the outer wall of the inner sleeve and the inner wall of the protective sleeve. The installation height of the liquid level measuring sticker is the same as the final liquid level height, and the surface of the liquid level measuring sticker is made of reflective material.

6. The inner casing layered grouting construction method according to claim 1 is characterized in that: The sealing plate comprises a template (21) and a support member installed on a first surface of the template (21), and the shape of the template (21) matches the shape of the gap between the inner sleeve and the protective sleeve; The support member comprises a support foot (22) for obliquely supporting the template (21) and a support rib (23) closely attached to the template (21).

7. The inner casing layered grouting construction method according to claim 6 is characterized in that: The template (21) is composed of a first part and a second part of the same shape, so as to facilitate the disassembly of the template (21).

8. The inner casing layered grouting construction trolley according to claim 1 is used to transport the inner casing in the protective cover, adjust the inner casing and output slurry, characterized in that: It comprises a vehicle body (3), an adjustment mechanism located on the vehicle body (3) and a grouting system located on the vehicle body (3). The vehicle body (3) is used to place the inner sleeve and move the inner sleeve in the protective sleeve; The adjustment mechanism is used to adjust the inner sleeve located on the vehicle body (3) when the inner sleeve is docked; The grouting system is used to convey slurry between the inner casing and the protective sleeve after the inner casing is conveyed.

9. The inner casing layered grouting construction trolley according to claim 8, characterized in that: The grouting system comprises a stirring device (41), a grouting pump (42) and a grouting pipe (43); the stirring device (41) is connected to the input end of the grouting pump (42) through a pipeline for conveying slurry to the grouting pump (42); the grouting pipe (43) is fixed to the output end of the grouting pump (42) and is used to connect the grouting pump (42) with the grouting port opened in the inner casing.

10. The inner casing layered grouting construction trolley according to claim 8, characterized in that: The adjustment mechanism comprises a telescopic crossbar (51) and telescopic vertical bars (52) fixedly arranged at both ends of the crossbar (51), and one of the two vertical bars (52) is fixed on the vehicle body (3).

Citation Information

Patent Citations

  • Grouting protection method for submarine pipeline scouring disaster and grouting equipment used for grouting protection method

    CN109610462A

  • Construction method for penetrating continuously-wound glass reinforced plastic pipe into large-diameter concrete pipe

    CN112780832A

  • Construction method for steel pipe built in reinforced concrete sleeve

    CN112878460A

  • Steel pipe pile layered grouting device and grouting method

    CN116497828A

  • Tunnel three-step mechanical construction method for partitioned grouting reinforcement

    CN116838375A