Method and device for controlling GIS equipment partial discharge on-line monitoring data transmission
By dividing the communication network into multiple groups in the GIS equipment partial discharge online monitoring system, the automatic switching of the signal collection unit in the event of network failure is realized, which solves the problem of data transmission interruption caused by the communication network failure of the signal collection unit and improves the monitoring data real-time performance and system efficiency.
Patent Information
- Application Number
- CN202411048783.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-08-01
AI Technical Summary
In the GIS equipment partial discharge online monitoring system, the communication network failure of the signal acquisition unit caused the back-end diagnosis platform to be unable to obtain real-time partial discharge signals, affecting the real-time and accuracy of defect analysis.
By dividing multiple communication networks into multiple communication network groups, the signal acquisition unit automatically switches to the second communication network group to transmit partial discharge monitoring data when the first communication network group is unavailable, and switches back when the first communication network group is available. The first communication network group ensures the continuity and efficiency of data transmission.
It improves the continuity and real-time nature of partial discharge online monitoring data transmission of GIS equipment, avoids data interruption, enhances the transmission rate, frequency and integrity of data sets, and improves system efficiency.
Smart Images

Figure CN118762497A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of partial discharge monitoring, and in particular to a method and device for controlling online partial discharge monitoring data transmission of GIS equipment. Background Art
[0002] Gas Insulated Switchgear (GIS) uses SF6 gas as insulation and arc extinguishing medium, and encapsulates circuit breakers, disconnectors, grounding switches, transformers, bushings, lightning arresters, busbars and other components in a closed grounded metal shell. Due to the good arc extinguishing performance of SF6, GIS equipment has the advantages of compact structure, small footprint, easy installation, simple operation and maintenance, and long maintenance cycle, and is widely used in 110~1000kV substations.
[0003] GIS partial discharge monitoring is mainly achieved through live monitoring and online monitoring. Since partial discharge is highly random, it is very likely to be missed during live monitoring, so online partial discharge monitoring is crucial to the safe and stable operation of GIS equipment.
[0004] The GIS partial discharge online monitoring system includes front-end sensors, signal acquisition units and back-end diagnostic platforms. The front-end sensors receive partial discharge signals and transmit them to the signal acquisition unit, which then sends them to the back-end diagnostic platform through the communication network to conduct partial discharge defect analysis. However, the communication network of the signal acquisition unit may fail, which will cause the back-end diagnostic platform to be unable to obtain real-time partial discharge signals, affecting the real-time and accuracy of partial discharge defect analysis. Summary of the invention
[0005] In view of this, the present application proposes a method, device, electronic device and storage medium for controlling online monitoring data transmission of partial discharge of GIS equipment.
[0006] Based on the above purpose, the present application provides a method for controlling online monitoring data transmission of partial discharge of GIS equipment, comprising:
[0007] Dividing the plurality of communication networks into a plurality of communication network groups, the plurality of communication network groups comprising a first communication network group and a second communication network group, the first communication network group and the second communication network group comprising at least one communication network among the plurality of communication networks;
[0008] The signal acquisition unit receives the online monitoring data of partial discharge of GIS equipment collected by the sensor;
[0009] When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state where data cannot be transmitted, the signal acquisition unit controls the online monitoring data of partial discharge of the GIS equipment to be transmitted through the second communication network group of the signal acquisition unit;
[0010] When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state capable of transmitting data, the signal acquisition unit controls the online monitoring data of partial discharge of the GIS equipment to be transmitted through the first communication network group of the signal acquisition unit.
[0011] In some embodiments, controlling the GIS equipment partial discharge online monitoring data to be transmitted through the first communication network group of the signal acquisition unit includes:
[0012] Controlling the online monitoring data of partial discharge of the GIS equipment to be transmitted through the first communication network group of the signal acquisition unit in a first mode;
[0013] The controlling the online monitoring data of partial discharge of the GIS equipment to be transmitted through the second communication network group of the signal acquisition unit comprises:
[0014] The online monitoring data of partial discharge of the GIS equipment is controlled to be transmitted through the second communication network group of the signal acquisition unit in a second mode.
[0015] In some embodiments, the method for controlling the data transmission of partial discharge monitoring of GIS equipment,
[0016] Including: the first mode corresponds to a first mode priority, the second mode corresponds to a second mode priority, and the mode priority is
[0017]
[0018] Where n is the number of patterns, m is the number of pattern components, and X i is the weight corresponding to the components of the i-th mode, Y i is the numerical value corresponding to the i-th mode component, where the mode component includes at least one of rate, frequency, sampling rate and number of data sets.
[0019] In some embodiments, the method for controlling the data transmission of local online discharge monitoring of GIS equipment includes: the first mode priority is greater than the second mode priority, and the first mode priority is The second mode priority is
[0020]
[0021] In some embodiments, the method for controlling the transmission of online partial discharge monitoring data of GIS equipment further includes:
[0022] The multiple communication network groups include a third communication network group, the third communication network group includes at least one communication network among the multiple communication networks; the third communication network group corresponds to a third mode priority, the third mode priority is greater than the second mode priority, and the third mode priority is less than the first mode priority;
[0023] When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state where data cannot be transmitted, the signal acquisition unit controls the online monitoring data of partial discharge of the GIS equipment to be transmitted through the third communication network group of the signal acquisition unit;
[0024] When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state capable of transmitting data, the signal acquisition unit controls the online monitoring data of partial discharge of the GIS equipment to be transmitted through the first communication network group of the signal acquisition unit.
[0025] Based on the same concept, the present application also provides a device for controlling online monitoring data transmission of partial discharge of GIS equipment, including:
[0026] A communication network group creation module: used for dividing the multiple communication networks into multiple communication network groups, the multiple communication network groups include a first communication network group and a second communication network group, the first communication network group and the second communication network group include at least one communication network among the multiple communication networks;
[0027] A data receiving module is used to receive online monitoring data of partial discharge of GIS equipment collected by sensors;
[0028] The first control module: when determining that the first communication network group of the signal acquisition unit is in a state where data cannot be transmitted, controlling the online monitoring data of partial discharge of the GIS equipment to be transmitted through the second communication network group of the signal acquisition unit;
[0029] The second control module: when it is determined that the first communication network group of the signal acquisition unit is in a state capable of transmitting data, controls the online monitoring data of partial discharge of the GIS equipment to be transmitted through the first communication network group of the signal acquisition unit.
[0030] Based on the same concept, the present application also provides an electronic device, including: one or more processors; a storage device for storing one or more programs. When the one or more programs are executed by the one or more processors, the one or more processors implement the method for controlling the online monitoring data transmission of partial discharge of GIS equipment as described in any of the above items.
[0031] Based on the same concept, the present application also provides a storage medium containing computer executable instructions, which, when executed by a computer processor, are used to execute the method for controlling online monitoring data transmission of partial discharge of GIS equipment as described in any of the above items. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings of the embodiments will be briefly introduced below. Obviously, the drawings in the following description only relate to some embodiments of the present invention, but are not intended to limit the present invention.
[0033] Figure 1 It is a flow chart of a method for controlling local online discharge monitoring data transmission of GIS equipment provided in an embodiment of the present application;
[0034] Figure 2 It is another flow chart of the method for controlling online monitoring data transmission of partial discharge of GIS equipment provided by an embodiment of the present application;
[0035] Figure 3 It is another flow chart of the method for controlling online monitoring data transmission of partial discharge of GIS equipment provided in an embodiment of the present application;
[0036] Figure 4 This is a schematic diagram of the structure of the data transmission device for controlling partial discharge of GIS equipment provided in the embodiment of the present application.
[0037] Figure 5 is a schematic diagram of the structure of an electronic device provided according to an embodiment of the present application;
[0038] Figure 6 It is a schematic diagram of a storage medium provided according to an embodiment of the present application. DETAILED DESCRIPTION
[0039] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] Unless otherwise defined, the technical or scientific terms used herein shall have the usual meanings understood by persons with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the patent application specification and claims of the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. The words "include" or "comprises" and similar words mean that the technical features appearing before the word include the technical features listed after the word and their equivalents, but do not exclude other technical features.
[0041] The GIS partial discharge online monitoring system includes a front-end sensor, a signal acquisition unit, and a back-end diagnostic platform. The front-end sensor receives the partial discharge signal and transmits it to the signal acquisition unit, which sends it to the back-end diagnostic platform through the communication network to carry out partial discharge defect analysis. The communication network of the signal acquisition unit may fail, which will cause the back-end diagnostic platform to be unable to obtain real-time partial discharge signals, affecting the real-time and accuracy of partial discharge defect analysis. Therefore, in order to improve the reliability of data transmission of online monitoring of partial discharge of GIS equipment, a method for controlling the data transmission of online monitoring of partial discharge of GIS equipment is needed.
[0042] At least one embodiment of the present application provides a method for controlling the transmission of online monitoring data of partial discharge of GIS equipment, and the control method includes: a signal acquisition unit receives partial discharge monitoring data of GIS equipment collected by a sensor; when the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state where data cannot be transmitted, the partial discharge monitoring data of the GIS equipment is controlled to be transmitted through the second communication network group of the signal acquisition unit; when the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state where data can be transmitted, the partial discharge monitoring data of the GIS equipment is controlled to be transmitted through the first communication network group of the signal acquisition unit. In the method for controlling the transmission of partial discharge monitoring data of GIS equipment provided in an embodiment of the present application, the signal acquisition unit supports the first communication network group and the second communication network group at the same time. When the first communication network group is in a state where data cannot be transmitted, it automatically switches to transmission through the second communication network group, thereby avoiding interruption of the online data transmission of partial discharge monitoring of GIS equipment and improving the continuity of the online data transmission of partial discharge monitoring of GIS equipment; when the first communication network group is in a state where data can be transmitted, it automatically switches to transmission through the first communication network group, which can improve the rate, frequency, sampling rate and data set range of the online data transmission of partial discharge monitoring of GIS equipment, thereby improving the real-time and integrity of the data transmission of partial discharge monitoring of GIS equipment and improving the efficiency of the online monitoring system of partial discharge of GIS equipment.
[0043] At least one embodiment of the present application further provides a device for controlling the transmission of online monitoring data of partial discharge of GIS equipment, including a data receiving module for receiving online monitoring data of partial discharge of GIS equipment collected by a sensor; a first control module for controlling the transmission of the online monitoring data of partial discharge of GIS equipment through the second communication network group of the signal acquisition unit when determining that the first communication network group of the signal acquisition unit is in a state where data cannot be transmitted; and a second control module for controlling the transmission of the online monitoring data of partial discharge of GIS equipment through the first communication network group of the signal acquisition unit when determining that the first communication network group of the signal acquisition unit is in a state where data can be transmitted. In the method for controlling the online monitoring data transmission of partial discharge of GIS equipment provided in the embodiment of the present application, the signal acquisition unit supports the first communication network group and the second communication network group at the same time. When the first communication network group is in a state where data cannot be transmitted, it automatically switches to transmission through the second communication network group, thereby avoiding interruption of the online monitoring data transmission of partial discharge of GIS equipment and improving the continuity of the online monitoring data transmission of partial discharge of GIS equipment; when the first communication network group is in a state where data can be transmitted, it automatically switches to transmission through the first communication network group, thereby improving the rate, frequency, sampling rate and one or more of the data sets of the online monitoring data transmission of partial discharge of GIS equipment, thereby improving the real-time and integrity of the online monitoring data transmission of partial discharge of GIS equipment and improving the efficiency of the partial discharge monitoring system of GIS equipment.
[0044] At least one embodiment of the present disclosure further provides an electronic device, which includes: one or more processors and a storage device; the storage device is used to store one or more programs, and when the one or more programs are executed by the one or more processors, the one or more processors implement any one of the methods for controlling the transmission of partial discharge monitoring data of GIS equipment provided by the embodiments of the present disclosure.
[0045] At least one embodiment of the present disclosure further provides a storage medium comprising computer executable instructions, which, when executed by a computer processor, are used to execute any one of the methods for controlling partial discharge monitoring data transmission of GIS equipment provided in the embodiments of the present disclosure.
[0046] Figure 1 FIG. 1 is a flow chart of a method for controlling online monitoring of partial discharge of GIS equipment according to an embodiment of the present application. Figure 1 As shown, the method includes:
[0047] Step 102: Divide the multiple communication networks into multiple communication network groups, the multiple communication network groups include a first communication network group and a second communication network group, the first communication network group and the second communication network group include at least one communication network among the multiple communication networks;
[0048] The communication network includes wired transmission networks such as optical fiber and coaxial cable, long-distance wireless communication networks such as 4G and 5G, and short-distance wireless communication networks such as WIFI and BLUETOOTH; the network communication group can be the same type of communication network or different types of networks; for example, the first communication network group includes optical fiber and coaxial cable, and the second communication network group includes 4G and 5G; or the first communication network group includes optical fiber and WIFI, and the second communication network group includes 4G and 5G. Different communication network groups can back up each other to improve the stability and continuity of data transmission by the signal acquisition unit. The members of different communication network groups are at least partially different, such as the first communication network group includes optical fiber and 5G, and the second communication network group includes optical fiber and LORA. The members of different communication network groups can be completely different, such as the first communication network group includes optical fiber and coaxial cable, and the second communication network group includes 4G and 5G.
[0049] Step 104: The signal acquisition unit receives the GIS equipment partial discharge online monitoring data collected by the sensor;
[0050] The signal acquisition unit can collect one or more online monitoring data of partial discharge of GIS equipment, such as one or more of the partial discharge monitoring data of GIS equipment such as high-frequency current, ultrasonic wave, infrared temperature, ground current and load current; in addition, the signal acquisition unit can collect the monitoring data of one or more partial discharge monitoring sensors of GIS equipment, such as the monitoring data of multiple ultrasonic sensors.
[0051] Step 106: When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state where data cannot be transmitted, the signal acquisition unit controls the GIS equipment partial discharge online monitoring data to be transmitted through the second communication network group of the signal acquisition unit;
[0052] The communication networks in the first communication network group and the second communication network group can be the same type of communication networks. For example, the first communication network group includes wired transmission networks such as optical fiber and coaxial cable; the second communication network group includes long-distance wireless communication networks such as 4G and 5G. The first communication network group has a large bandwidth and a small delay, but the laying of the lines may be damaged. The second communication network has a small bandwidth and is not easily damaged because there are no laid lines. The signal acquisition unit can detect whether the transmission network meets the requirements for transmitting data by sending Ping messages; in addition, the signal acquisition unit can also determine whether the transmission network meets the requirements for transmitting data by sending part of the test data and accepting the response returned by the back-end diagnostic platform.
[0053] The communication networks in the first communication network group and the second communication network group can be different types of communication networks, such as the first communication network group includes optical fiber and WIFI network; the second communication network group includes 5G. The optical fiber network has a large bandwidth and low latency, but the laying of the line may be damaged. The WIFI network can only transmit over a short distance and needs to be combined with optical fiber to achieve long-distance transmission. The second communication network has a long transmission distance and a relatively small bandwidth, but it is not easily damaged because there is no laying of the line.
[0054] Step 108: When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state capable of transmitting data, the signal acquisition unit controls the GIS equipment partial discharge online monitoring data to be transmitted through the first communication network group of the signal acquisition unit.
[0055] The signal acquisition unit supports both the first communication network group and the second communication network group. When the first communication network group is normal, the first communication network group is used preferentially. When the first communication network group fails, it automatically switches to the second communication network group for data transmission, thereby ensuring the continuity of the online monitoring data transmission of partial discharge of GIS equipment, improving the real-time and integrity of the online monitoring data transmission of partial discharge of GIS equipment, and improving the efficiency of the online monitoring system of partial discharge of GIS equipment.
[0056] Figure 2 FIG. 1 is another flow chart of the method for controlling online monitoring of partial discharge of GIS equipment provided by the embodiment of the present application. Figure 2 As shown, the method includes:
[0057] Step 202: The signal acquisition unit receives the GIS equipment partial discharge online monitoring data collected by the sensor;
[0058] Step 204: When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state where data cannot be transmitted, the signal acquisition unit controls the GIS equipment partial discharge online monitoring data to be transmitted through the first communication network group of the signal acquisition unit in a first mode;
[0059] The first mode corresponds to a first mode priority, the second mode corresponds to a second mode priority, and the mode priorities are:
[0060]
[0061] Where n is the number of patterns, m is the number of pattern components, and X ij is the weight corresponding to the jth component of the ith mode, Y ij is the value corresponding to the jth component of the ith mode, where the components of the mode include at least one of rate, frequency, sampling rate and number of data sets.
[0062] The first mode priority is
[0063] Step 206: When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state capable of transmitting data, the signal acquisition unit controls the GIS equipment partial discharge online monitoring data to be transmitted through the second communication network group of the signal acquisition unit in a second mode;
[0064] The second mode priority is
[0065] The first mode priority is greater than the second mode priority.
[0066] The components of the second mode may be the same as those of the first mode, or may be a superset of the components of the first mode. For example, the components of the first mode include rate and frequency; the components of the second mode include speed, frequency, and sampling rate. Since the components of the first mode do not include the sampling rate, that is, there is no restriction on the sampling rate in the first mode, the full amount of online monitoring data of partial discharge of GIS equipment can be transmitted through the first communication network group.
[0067] Figure 3 FIG. 1 is another flow chart of a method for controlling partial discharge monitoring data transmission of GIS equipment provided in an embodiment of the present application. Figure 3 As shown, the method includes:
[0068] Step 302: The signal acquisition unit receives the GIS equipment partial discharge online monitoring data collected by the sensor;
[0069] Step 304: the multiple communication network groups include a third communication network group, the third communication network group includes at least one communication network among the multiple communication networks; the third communication network group corresponds to a third mode priority, the third mode priority is greater than the second mode priority, and the third mode priority is less than the first mode priority;
[0070] Furthermore, the signal acquisition unit controls the online monitoring data of partial discharge of the GIS equipment to be transmitted through the third communication network group of the signal acquisition unit in a third mode. The components of the third mode include at least one of rate, frequency, sampling rate and number of data sets. For example, the first communication network group includes self-built wired transmission networks such as optical fiber and coaxial cable, the second communication network group includes long-distance wireless communication networks built by operators such as 4G and 5G, and the third communication network group includes self-built wireless communication networks such as LORA. Since the first communication network group and the third communication network group are self-built networks and there is no usage fee, when the first communication network group fails and cannot transmit data, the third communication network group is used first. The members of the first communication network group, the second communication network group and the third communication network group are different.
[0071] Step 306: When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state where data cannot be transmitted, the signal acquisition unit controls the GIS equipment partial discharge online monitoring data to be transmitted through the third communication network group of the signal acquisition unit;
[0072] Step 308: When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state capable of transmitting data, the signal acquisition unit controls the transmission of the partial discharge online monitoring data of the GIS equipment through the first communication network group of the signal acquisition unit.
[0073] The signal acquisition unit supports the third communication network group, which further improves the reliability of signal transmission and ensures that the online monitoring data of partial discharge of GIS equipment is sent in time.
[0074] Figure 4 A device 400 for controlling online monitoring data transmission of partial discharge of GIS equipment is shown, comprising:
[0075] The communication network group creation module 410 is used to divide the plurality of communication networks into a plurality of communication network groups, wherein the plurality of communication network groups include a first communication network group and a second communication network group, wherein the first communication network group and the second communication network group include at least one communication network among the plurality of communication networks.
[0076] The data receiving module 420 is used to receive the GIS equipment partial discharge online monitoring data collected by the sensor;
[0077] The first control module 430: when determining that the first communication network group of the signal acquisition unit is in a state where data cannot be transmitted, controlling the GIS equipment partial discharge online monitoring data to be transmitted through the second communication network group of the signal acquisition unit;
[0078] The second control module 440 controls the transmission of the partial discharge online monitoring data of the GIS equipment through the first communication network group of the signal acquisition unit when determining that the first communication network group of the signal acquisition unit is in a state capable of transmitting data.
[0079] The device system provided in the embodiment of the present disclosure can achieve the same working process and technical effect as the embodiment of the method for controlling the data transmission of partial discharge monitoring of GIS equipment, which will not be repeated here, and please refer to the previous description.
[0080] At least one embodiment of the present disclosure further provides an electronic device 500, referring to Figure 5 The electronic device 500 includes: one or more processors 510 and a storage device 520; the storage device 520 is used to store one or more programs. When the one or more programs are executed by one or more processors, the one or more processors implement any one of the methods for controlling the transmission of partial discharge monitoring data of GIS equipment provided in the embodiments of the present disclosure.
[0081] At least one embodiment of the present application further provides a storage medium comprising computer executable instructions, which, when executed by a computer processor, are used to execute any one of the methods for controlling partial discharge monitoring data transmission of GIS equipment provided in the embodiments of the present disclosure.
[0082] At least one embodiment of the present disclosure also provides a computer executable instruction storage medium which may be a non-transitory computer readable storage medium. For example, Figure 6 A schematic diagram of a non-transitory computer-readable storage medium provided for at least one embodiment of the present disclosure.
[0083] For example, Figure 6 As shown, computer-readable instructions 601 are non-temporarily stored on a computer-readable storage medium 600. For example, when the computer-readable instructions 601 are executed by a processor, one or more steps in the method for controlling data transmission for partial discharge monitoring of GIS equipment described above can be executed.
[0084] For example, the storage medium 600 may be applied to the electronic device 500. For example, the storage medium 600 may include the memory 520 in the electronic device 500.
[0085] The above description is only a preferred embodiment of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present disclosure is not limited to the technical solutions formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the above disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in the present disclosure (but not limited to) by each other to form a technical solution.
[0086] There are a few points to note:
[0087] (1) The drawings of the embodiments of the present disclosure only relate to the structures related to the embodiments of the present disclosure, and other structures may refer to the general design.
[0088] (2) In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.
[0089] The above description is merely an exemplary embodiment of the present invention and is not intended to limit the protection scope of the present invention. The protection scope of the present invention is determined by the appended claims.
Claims
1. A method for controlling online monitoring data transmission of partial discharge of GIS equipment, applied to a signal acquisition unit, wherein the signal acquisition unit supports multiple communication networks, include: Dividing the plurality of communication networks into a plurality of communication network groups, the plurality of communication network groups comprising a first communication network group and a second communication network group, the first communication network group and the second communication network group comprising at least one communication network among the plurality of communication networks; The signal acquisition unit receives the online monitoring data of partial discharge of GIS equipment collected by the sensor; When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state where data cannot be transmitted, the GIS equipment partial discharge online monitoring data is controlled to be transmitted through the second communication network group of the signal acquisition unit; When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state capable of transmitting data, the signal acquisition unit controls the online monitoring data of partial discharge of the GIS equipment to be transmitted through the first communication network group of the signal acquisition unit.
2. The method for controlling the online monitoring data transmission of partial discharge of GIS equipment according to claim 1, wherein the online monitoring data of partial discharge of GIS equipment is controlled to be transmitted through the first communication network group of the signal acquisition unit, include: Controlling the online monitoring data of partial discharge of the GIS equipment to be transmitted through the first communication network group of the signal acquisition unit in a first mode; The controlling the online monitoring data of partial discharge of the GIS equipment to be transmitted through the second communication network group of the signal acquisition unit comprises: The online monitoring data of partial discharge of the GIS equipment is controlled to be transmitted through the second communication network group of the signal acquisition unit in a second mode.
3. The method for controlling the transmission of local online discharge monitoring data of GIS equipment according to claim 2, include: The first mode corresponds to a first mode priority, the second mode corresponds to a second mode priority, and the mode priorities are: Where n is the number of patterns, m is the number of pattern components, and X ij is the weight corresponding to the jth component of the ith mode, Y ij is the value corresponding to the jth component of the ith mode, where the components of the mode include at least one of rate, frequency, sampling rate and number of data sets.
4. The method for controlling the transmission of local online discharge monitoring data of GIS equipment according to claim 3, include: The first mode priority is greater than the second mode priority. The second mode priority is 5. The method for controlling online monitoring data transmission of partial discharge of GIS equipment according to claim 3, further comprising: include: The plurality of communication network groups include a third communication network group, the third communication network group including at least one communication network of the plurality of communication networks; The third communication network group corresponds to a third mode priority, the third mode priority is greater than the second mode priority, and the third mode priority is less than the first mode priority; When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state where data cannot be transmitted, the signal acquisition unit controls the online monitoring data of partial discharge of the GIS equipment to be transmitted through the third communication network group of the signal acquisition unit; When the signal acquisition unit determines that the first communication network group of the signal acquisition unit is in a state capable of transmitting data, the signal acquisition unit controls the online monitoring data of partial discharge of the GIS equipment to be transmitted through the first communication network group of the signal acquisition unit.
6. According to the method for controlling the transmission of local online discharge monitoring data of GIS equipment according to claim 1, members of the first communication network group and the second communication network group are different.
7. A device for controlling online monitoring data transmission of partial discharge of GIS equipment, include: A communication network group creation module: used for dividing the multiple communication networks into multiple communication network groups, the multiple communication network groups include a first communication network group and a second communication network group, the first communication network group and the second communication network group include at least one communication network among the multiple communication networks; A data receiving module is used to receive online monitoring data of partial discharge of GIS equipment collected by sensors; The first control module: when determining that the first communication network group of the signal acquisition unit is in a state where data cannot be transmitted, controlling the online monitoring data of partial discharge of the GIS equipment to be transmitted through the second communication network group of the signal acquisition unit; The second control module: when it is determined that the first communication network group of the signal acquisition unit is in a state capable of transmitting data, controls the online monitoring data of partial discharge of the GIS equipment to be transmitted through the first communication network group of the signal acquisition unit.
8. A device for controlling online monitoring data transmission of partial discharge of GIS equipment, wherein the first control module further include: Controlling the online monitoring data of partial discharge of the GIS equipment to be transmitted through the first communication network group of the signal acquisition unit in a first mode, wherein the first mode corresponds to a first mode priority; The second control module also includes: controlling the online monitoring data of partial discharge of the GIS equipment to be transmitted through the second communication network group of the signal acquisition unit in a second mode, the second mode corresponds to a second mode priority, and the first mode priority is greater than the second mode priority.
9. An electronic device, include: one or more processors; a storage device for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors implement the method for controlling partial discharge monitoring data transmission of GIS equipment as described in any one of claims 1-6.
10. A storage medium comprising computer executable instructions, wherein the computer executable instructions, when executed by a computer processor, are used to execute the method for controlling partial discharge monitoring data transmission of GIS equipment as described in any one of claims 1 to 6.
Citation Information
Patent Citations
Multimode communication method for state monitoring of power transmission line
CN105915454A
Method and device for determining network channel
CN113825170A
Optical network unit determination method, apparatus and device, and readable storage medium
CN115865184A
Energy storage power station communication networking method, device and equipment and storage medium
CN116170383A
GIS ultrahigh frequency partial discharge monitoring system and method
CN117907766A