Implementation method of underwater super-large rectangular pipe-jacking tunnel
By adopting the construction method of gradual jacking and splicing of double pipe jacking tunnels in the underwater environment, the complexity and risk problems of the construction of underwater ultra-large rectangular pipe jacking tunnels are solved, and safe and stable construction and short burial depth requirements are achieved. Reduced flooding and structural risks.
Patent Information
- Application Number
- CN202411097274.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-10-15
AI Technical Summary
In the construction of cross-river tunnels in urban areas, it is difficult to design and construct ultra-large rectangular pipe-jacking tunnels in an underwater environment. Existing equipment and technology cannot meet the construction requirements for 18m-level pipe-jacking tunnels, and there are huge risks.
The construction method of gradual jacking and splicing of double pipe jacking tunnels is adopted. By setting up pipe jacking tunnels arranged left and right in the left and right tunnels, the soil is jacked in at intervals and reinforced, and connecting beams and steel supports are set up to reduce gaps and carry out Secondary lining pouring ensures safe and stable construction.
The construction of a super-large rectangular pipe-jacking tunnel that is safe and stable in the underwater environment has been achieved, reducing water filling and structural risks, meeting the burial depth requirements for a short distance, and providing favorable conditions for access to ground roads.
Smart Images

Figure CN118774871A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of urban tunnels and underground spaces, and in particular relates to a method for realizing an underwater super-large rectangular jacking tunnel. Background Art
[0002] For example, when constructing a cross-river tunnel in a certain urban area, the tunnel needs to pass under a forest wetland with protected tree species in the country. The open-cut construction method cannot be used in this area, and the shield construction method cannot be used because of the large buried depth and the inability to meet the connection conditions. In view of the characteristics of the pipe curtain method with many underwater joints and high construction risks, the most reasonable construction method is the rectangular jacking method. However, since the tunnel section adopts a one-way single-hole four-lane, and in view of the complexity of the long-distance jacking posture control technology of super-large rectangular jacking in soft strata, there is no case of jacking tunnels of this level in the world to learn from. The construction process of a single-hole 18m-class jacking tunnel will face huge risks, and the existing equipment production technology and jacking construction technology cannot meet the requirements of 18m jacking. In view of this, how to realize the super-large rectangular jacking tunnel section in the underwater construction environment is the key and difficulty of the design work. Summary of the invention
[0003] The purpose of the present invention is to provide a method for realizing an underwater super-large rectangular jacking tunnel. Fewer gaps between the left-line tunnel and the right-line tunnel during construction reduce the risks of water flooding and structural safety, thereby ensuring the safety and stability of the tunnel construction environment.
[0004] The present invention adopts the following technical solution: a method for realizing an underwater super-large rectangular jacking tunnel, comprising the following steps:
[0005] Step 1: locate the left-line tunnel and the right-line tunnel within the tunnel outline, wherein the left-line tunnel is provided with a jacking tunnel 1 and a jacking tunnel 2 arranged on the left and right; the right-line tunnel is provided with a jacking tunnel 3 and a jacking tunnel 4 arranged on the left and right; perform jacking construction on the jacking tunnel 1, the jacking tunnel 2, the jacking tunnel 3 and the jacking tunnel 4 at intervals;
[0006] Step 2: Inject cement slurry to reinforce the bottom of each jacking tunnel;
[0007] Step 3: Reinforce the upper and lower soils of Tubular Tunnel 1 and Tubular Tunnel 2, Tubular Tunnel 3 and Tubular Tunnel 4;
[0008] Step 4: In each jacking tunnel, a connecting beam is arranged at the top and bottom of each jacking tunnel, and each connecting beam is consistent with the direction of the tunnel. In the same jacking tunnel, the positions of the top and bottom connecting beams correspond to each other; a plurality of vertical steel supports are arranged between the upper and lower connecting beams and at intervals along the longitudinal direction of the jacking tunnel;
[0009] Step 5: cutting the middle side wall between the top pipe tunnel 1 and the top pipe tunnel 2, and the middle side wall between the top pipe tunnel 3 and the top pipe tunnel 4; after the cutting is completed, the top pipe tunnel 1 and the top pipe tunnel 2 are connected to form a left-line tunnel; the top pipe tunnel 3 and the top pipe tunnel 4 are connected to form a right-line tunnel;
[0010] Step 6: Tie the first steel cage and the second steel cage around the left tunnel and the right tunnel respectively, and cast the second lining for the first steel cage and the second steel cage respectively, so as to form the inner contour of the tunnel section;
[0011] Step 7: Cut off the vertical steel supports.
[0012] Furthermore, the distance between the first pipe jacking tunnel and the second pipe jacking tunnel, and the distance between the third pipe jacking tunnel and the fourth pipe jacking tunnel are 10 to 30 cm.
[0013] Furthermore, the specific method can utilize the grouting pipes pre-buried at the top and bottom of the top pipe, and adopt the following method: if it is in a silt soil cement stratum, adopt the freezing method; if it is in a sand layer or silty clay layer, adopt cement grouting reinforcement.
[0014] Furthermore, in step one, the process of interval jacking construction is as follows: two jacking equipments are used to first jack jacking tunnel one and jacking tunnel three, and then jack jacking tunnel two and jacking tunnel four.
[0015] Furthermore, in step five, the middle side wall is cut using a skipping method.
[0016] Furthermore, the spans of the first pipe jacking tunnel, the second pipe jacking tunnel, the third pipe jacking tunnel and the fourth pipe jacking tunnel are the same.
[0017] The beneficial effects of the present invention are as follows: 1. Two jacking tunnels are gradually jacked up and then spliced together to form a tunnel. Under the condition of a very small spacing of 10 to 30 cm, a step-by-step jacking construction method is adopted, and then the soil between the jacking pipes is reinforced. After the soil reinforcement, the system is replaced. After the system is replaced, the tunnel lining is cast with formwork, and finally the system replacement steel support is cut off. The jacking equipment is used for construction. In the left and right tunnels, there are only two joints. The fewer gaps in the left and right tunnels during construction reduce the risks of flooding and structural safety, and ensure the safety and stability of the tunnel construction environment. 2. The jacking tunnel has a small minimum burial depth requirement, and the minimum burial depth only needs to meet the anti-floating requirement. Therefore, a 5m burial depth of the jacking tunnel can basically meet the requirement, which provides favorable conditions for the ramp to access the ground road at a relatively short distance. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 Schematic diagram of pipe jacking tunnels one, two, three and four;
[0019] Figure 2Schematic diagram of grouting foundation reinforcement using pre-buried grouting pipes under the jacking tunnel;
[0020] Figure 3 This is a schematic diagram of the construction between the pipe jacking tunnels;
[0021] Figure 4 This is a schematic diagram of the internal construction of the tunnel.
[0022] Among them: 1. Top tunnel one; 2. Top tunnel two; 3. Top tunnel three; 4. Top tunnel four; 5. Cement slurry foundation; 6. Grouting pipe; 7. Steel support; 8. Middle side wall; 9. Inner contour; 10. DETAILED DESCRIPTION
[0023] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0024] At present, 14m rectangular pipe jacking tunnels have been successfully built both at home and abroad. However, due to limitations in equipment development, attitude control, jacking force and other construction technologies, super-large rectangular pipe jacking tunnels of 18m and above have not yet been achieved.
[0025] The present invention discloses a method for realizing an underwater super-large rectangular jacking tunnel, comprising the following steps:
[0026] Step 1: construct water cofferdams at the starting and receiving ends of the jacking pipe, and then construct a working well to locate the left-line tunnel and the right-line tunnel within the tunnel contour, wherein the left-line tunnel is provided with jacking tunnel 1 and jacking tunnel 2 arranged on the left and right; the right-line tunnel is provided with jacking tunnel 3 and jacking tunnel 4 arranged on the left and right; the spacing between jacking tunnel 1 and jacking tunnel 2, as well as jacking tunnel 3 and jacking tunnel 4 is controlled at 10 to 30 cm to reduce the difficulty of reinforcing the water-rich soil layer during the system underpinning process. Figure 1 shown.
[0027] Prefabricate pipe segments, reserve soil reinforcement grouting pipes during the prefabrication of pipe segments for jacking sections; install jacks, jacking irons, guide rails and other equipment, install and debug pipe jacking machines; use interval jacking construction to jack four pipe jacking tunnels in batches, specifically using two pipe jacking equipment to jack pipe jacking tunnel 1 and pipe jacking tunnel 3 first, and then jack pipe jacking tunnel 2 and pipe jacking tunnel 4. During the jacking process, drag-reducing wall slurry materials are used around the pipe segments to reduce friction and reduce the impact on the surrounding soil.
[0028] Step 2: After the jacking of the first pipe tunnel 1, the second pipe tunnel 2, the third pipe tunnel 3 and the fourth pipe tunnel 4 is completed, the grouting pipe reserved in the pipe segment is used to inject cement slurry foundation 5 to reinforce the bottom of the tunnel. If the foundation is a muddy stratum, the all-round micro-disturbance high-pressure jet grouting process in the tunnel can be used. Figure 2 shown.
[0029] Step 3: Carry out preparatory work before system replacement, and reinforce the upper and lower soil between the top tunnel 1 and the top tunnel 2, and between the top tunnel 3 and the top tunnel 4. After reinforcement, an intermediate side wall 8 is formed between the top tunnel 1 and the top tunnel. The specific method can use the grouting pipe 6 pre-buried at the top and bottom of the top tunnel, and adopt different schemes according to the specific soil layer: if the cement grouting reinforcement effect of silt soil is poor, the freezing method can be used for reinforcement. The temperature attenuation radius of the freezing method is about 1.5m, and the impact on the ground vegetation is small; if it is in a sand layer or silty clay layer, cement grouting reinforcement can also be used to form a reinforcement area. After the reinforcement is completed, the soil reinforcement effect is verified through the observation hole.
[0030] Step 4: Replace the force system. In the first step, tie beams are installed at the top and bottom of each jacking tunnel. Each tie beam is consistent with the direction of the tunnel. In the same jacking tunnel, the positions of the top and bottom tie beams correspond. Multiple vertical steel supports 7 are installed between the upper and lower tie beams and along the longitudinal direction of the jacking tunnel. They provide vertical force support for the next step of dismantling the middle side wall 8. Figure 3 shown.
[0031] Step 5: After completing the construction of the connecting beams and steel supports in the top pipe tunnel, the second step of the force system replacement process is carried out, which is to cut the middle side wall 8 between the top pipe tunnel 1 and the top pipe tunnel 2, as well as the middle side wall 8 between the top pipe tunnel 3 and the top pipe tunnel 4. The skipping method is used in the process of cutting off each middle side wall 8, for example, cutting is performed at intervals of 10m in the longitudinal direction. After the cutting is completed, the top pipe tunnel 1 and the top pipe tunnel 2 are connected to form a left-line tunnel; the top pipe tunnel 3 and the top pipe tunnel 4 are connected to form a right-line tunnel. The left-line tunnel and the right-line tunnel adopt a construction method in which two jacking tunnels are gradually pushed forward and then spliced and merged into one tunnel, realizing the construction of an ultra-large rectangular jacking tunnel; and in the left-line tunnel, there are only two gaps, upper and lower, at the top and bottom between jacking tunnel 1 and jacking tunnel 2, that is, at the position of the original middle side wall 8; similarly, in the right-line tunnel, there are only two gaps, upper and lower, at the top and bottom between jacking tunnel 3 and jacking tunnel 4, that is, at the position of the original middle side wall 8. Fewer gaps in the left-line tunnel and the right-line tunnel during construction reduce the risks of water ingress and structural safety, ensuring the safety and stability of the tunnel construction environment.
[0032] Step 6: Carry out the third step of the force system replacement process. Waterproofing of underwater tunnels is a key and difficult point. In the longitudinal direction of the tunnel, the tunnel composed of top pipe segments has many joints, which brings great difficulties to tunnel waterproofing and anti-seepage under underwater working conditions. In order to improve the waterproof performance of the tunnel and reduce the joints of the tunnel segments during operation, the main structural self-waterproofing is adopted, and secondary lining waterproofing is applied. In the top pipe tunnel 1 and top pipe tunnel 2, the left side wall of the top pipe tunnel 1, the top and bottom walls of the top pipe tunnel 1 and the top pipe tunnel 2, and the right side wall of the top pipe tunnel 2 are tied with a first steel cage in a circumferential direction; in the top pipe tunnel 3 and top pipe tunnel 4, and attached to the left side wall of the top pipe tunnel 3, the top and bottom walls of the top pipe tunnel 3 and the top pipe tunnel 4, and the right side wall of the top pipe tunnel 4, the second steel cage is tied in a circumferential direction; the first steel cage and the second steel cage are cast for the second lining respectively, and each forms the inner contour 9 of the four-lane main line tunnel section. The first steel cage and the second steel cage have the same specifications.
[0033] Step 7: Carry out the fourth step of the force system replacement process. After the second lining is poured and cured, the vertical steel support 7 is cut off, and the ancillary facilities are installed and decorated inside the tunnel, such as Figure 4 shown.
[0034] The present invention discloses a method for realizing an underwater super-large rectangular jacking tunnel, which is applicable to jacking tunnels of 18m or above, and adopts a construction method in which two jacking tunnels are gradually jacked and then spliced and merged into one tunnel. In addition, there are only two gaps in the left-line tunnel and the right-line tunnel, which is less than the pipe curtain method. The fewer gaps in the left-line tunnel and the right-line tunnel during construction reduce the risks of water filling, structural safety, etc., and ensure the safety and stability of the tunnel construction environment.
Claims
1. A method for realizing an underwater super-large rectangular jacking tunnel, characterized in that: The steps include: Step 1: Locate a left-line tunnel and a right-line tunnel within the tunnel outline, wherein the left-line tunnel is provided with a top pipe tunnel 1 (1) and a top pipe tunnel 2 (2) arranged on the left and right; the right-line tunnel is provided with a top pipe tunnel 3 (3) and a top pipe tunnel 4 (4) arranged on the left and right; perform jacking construction on the top pipe tunnel 1 (1), the top pipe tunnel 2 (2), the top pipe tunnel 3 (3) and the top pipe tunnel 4 (4) at intervals; Step 2: Inject cement slurry foundation (5) to reinforce the bottom of each jacking tunnel; Step 3: reinforcing the upper and lower soil between the jacking tunnel 1 (1) and the jacking tunnel 2 (2), and between the jacking tunnel 3 (3) and the jacking tunnel 4 (4); Step 4: In each jacking tunnel, a connecting beam is arranged at the top and bottom of each jacking tunnel, and each connecting beam is consistent with the direction of the tunnel. In the same jacking tunnel, the positions of the connecting beams at the top and bottom correspond to each other; a plurality of vertical steel supports (7) are arranged between the upper and lower connecting beams and at intervals along the longitudinal direction of the jacking tunnel; Step 5: cutting the middle side wall (8) between the top pipe tunnel 1 (1) and the top pipe tunnel 2 (2), and the middle side wall (8) between the top pipe tunnel 3 (3) and the top pipe tunnel 4 (4); after the cutting is completed, the top pipe tunnel 1 (1) and the top pipe tunnel 2 (2) are connected to form a left-line tunnel; the top pipe tunnel 3 (3) and the top pipe tunnel 4 (4) are connected to form a right-line tunnel; Step 6: Tie the first steel cage and the second steel cage around the left tunnel and the right tunnel respectively, and cast the second lining for the first steel cage and the second steel cage respectively, so as to form the inner contour of the tunnel section (9); Step 7: Cut off the vertical steel support (7).
2. The method for realizing an underwater super-large rectangular jacking tunnel according to claim 1, characterized in that: in, The distance between the first pipe jacking tunnel (1) and the second pipe jacking tunnel (2), and the distance between the third pipe jacking tunnel (3) and the fourth pipe jacking tunnel (4) are 10 to 30 cm.
3. The method for realizing an underwater super-large rectangular jacking tunnel according to claim 2, characterized in that: The specific method can utilize the grouting pipes (6) pre-buried at the top and bottom of the top pipe, and adopt the following methods: if it is in the muddy soil cement stratum, adopt the freezing method; if it is in the sand layer or silty clay layer, adopt cement grouting reinforcement.
4. The method for realizing an underwater super-large rectangular jacking tunnel according to claim 3, characterized in that: In step 1, the process of interval jacking construction is as follows: two jacking equipments are used to first jack jacking tunnel 1 (1) and jacking tunnel 3 (3), and then jack jacking tunnel 2 (2) and jacking tunnel 4 (4).
5. The method for realizing an underwater super-large rectangular jacking tunnel according to claim 4, characterized in that: In step five, the middle side wall (8) is cut using a skipping method.
6. A method for realizing an underwater super-large rectangular jacking tunnel as claimed in claim 5, characterized in that: The spans of the jacking tunnel one (1), the jacking tunnel two (2), the jacking tunnel three (3) and the jacking tunnel four (4) are the same.