A cloud platform-based intelligent management system and method for energy consumption of electric energy equipment
Through the cloud-based intelligent management system for power equipment energy consumption, the distribution and fault historical data of air conditioning equipment are analyzed, and the pre-regulation model is established to realize automatic regulation and control when air conditioning equipment fails, solving the problem of automatic regulation after air conditioning equipment failure and improving the energy Consumption management efficiency and user comfort.
Patent Information
- Application Number
- CN202411253272.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-09-09
AI Technical Summary
The prior art cannot automatically control other equipment after air conditioning equipment failure to meet the equipment usage needs in the area, while reducing energy consumption, which can easily lead to temperature discomfort or increased equipment energy consumption.
Adopt a cloud-based intelligent power equipment energy consumption management system, through environmental data collection, data management, abnormal pre-regulation management and automatic equipment regulation modules, analyze the distribution data and fault historical data of air conditioning equipment, establish a pre-regulation model, and realize air conditioning equipment Automatic regulation in case of failure.
It improves the necessity and effect of automatic regulation in the event of air conditioning equipment failure, ensures the satisfaction of equipment usage requirements in the area, and reduces equipment energy consumption.
Smart Images

Figure CN118776038B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric energy equipment management, and in particular to an intelligent management system and method for energy consumption of electric energy equipment based on a cloud platform. Background Art
[0002] By automatically adjusting the operating parameters of air-conditioning equipment to efficiently manage and control air-conditioning equipment, the energy consumption of electrical equipment in the environment space can be effectively reduced, which helps to optimize energy utilization efficiency. Reducing the energy consumption of electrical equipment is an important part of modern intelligent buildings and energy-saving technologies.
[0003] However, air-conditioning equipment in the environmental space may malfunction from time to time. For a space area equipped with multiple air-conditioning equipment, if one of the air-conditioning equipment fails, the remaining air-conditioning equipment needs to be adaptively adjusted to reduce the impact of the air-conditioning equipment failure. However, in the prior art, when this situation generally occurs, most of the time, people in the space area go to the control panel area to manually adjust the air-conditioning equipment parameters because they feel uncomfortable with the environment. The prior art has not yet achieved the function of automatically adjusting the remaining non-faulty equipment to meet the equipment usage needs in the area after a faulty device occurs. Secondly, how to perform automatic regulation to reduce equipment energy consumption while meeting the equipment usage needs in the area is also a problem that needs to be considered. If the automatic regulation is improper, for example: when the temperature of the air-conditioning equipment is too low after regulation, it is easy for people in the area to feel uncomfortable with the environment or for the equipment energy consumption to increase unnecessarily.
[0004] Therefore, people need an intelligent energy consumption management system and method for electric energy equipment based on a cloud platform to solve the above problems. Summary of the invention
[0005] The purpose of the present invention is to provide a cloud platform-based intelligent energy consumption management system and method for electric energy equipment to solve the problems raised in the above-mentioned background technology.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: an intelligent management system for energy consumption of electric energy equipment based on a cloud platform, the system comprising: an environmental data acquisition module, a data management cloud platform, an abnormal pre-control management module, an electric energy equipment monitoring module and an equipment automatic control module;
[0007] The environmental data collection module collects the distribution data of the air-conditioning equipment in the space and the historical data of the remaining air-conditioning equipment being regulated when an air-conditioning equipment failure occurs in the space, and transmits all the collected data to the data management cloud platform;
[0008] Storing and managing all received data through the data management cloud platform;
[0009] The abnormal pre-control management module analyzes the spatial distribution concentration coefficients between the devices in the space where the air-conditioning equipment has previously experienced operating failures, screens and processes the historical data to be regulated based on the spatial distribution concentration coefficients, and establishes a pre-control model for the specified air-conditioning equipment based on the screened data;
[0010] The operation of the air conditioning equipment in the current space is monitored by the electric energy equipment monitoring module, and an alarm is issued when a failure of the air conditioning equipment operation is detected, and the environmental data in the current space is selectively transmitted to the equipment automatic control module;
[0011] The received environmental data in the current space is input into the pre-control model through the equipment automatic control module, and the designated air-conditioning equipment is automatically controlled according to the output data.
[0012] Furthermore, the environmental data collection module includes an equipment distribution data collection unit, a fault information collection unit and a control data collection unit;
[0013] Collecting the distribution location data of the air-conditioning equipment in the same space by the equipment distribution data collection unit, wherein the air-conditioning equipment refers to the central air-conditioning equipment;
[0014] The fault information collection unit collects the straight-line distance between the air-conditioning device closest to the faulty air-conditioning device and the faulty air-conditioning device when the air-conditioning device is in cooling mode in the past. The phenomenon of the air-conditioning device operating failure refers to the phenomenon that the air-conditioning device cannot perform cooling;
[0015] The control data collection unit collects data on the control of the air-conditioning device closest to the faulty air-conditioning device when the air-conditioning device is in cooling mode in the past when an air-conditioning device fails to operate in the same space. The control data includes temperature data of the air-conditioning device being controlled to reduce the temperature and time data of the air-conditioning device maintaining the corresponding temperature unchanged after being controlled to reduce different temperatures.
[0016] Furthermore, the abnormal pre-regulation management module includes a distribution concentration analysis unit, a historical regulation data analysis unit and a pre-regulation model establishment unit;
[0017] The distribution concentration analysis unit analyzes the spatial distribution concentration coefficient between the air-conditioning equipment closest to the faulty air-conditioning equipment and the faulty air-conditioning equipment when the air-conditioning equipment fails in the same space, and sets a reference value of the spatial distribution concentration coefficient according to the spatial distribution concentration coefficient;
[0018] The historical control data analysis unit selects historical control data when a spatial distribution concentration coefficient between the air-conditioning device closest to the faulty air-conditioning device and the faulty air-conditioning device exceeds a reference value of the spatial distribution concentration coefficient when an air-conditioning device operating fault condition in the same space occurs at different times in the past, and analyzes the optimal controlled temperature value of the air-conditioning device closest to the faulty air-conditioning device based on the selected historical control data;
[0019] The pre-control model establishment unit combines the optimal controlled temperature value and the distance parameter to generate data points, and after linear fitting of the data points, a pre-control model of the air-conditioning device closest to the faulty air-conditioning device is established. The air-conditioning device closest to the faulty air-conditioning device is the designated air-conditioning device.
[0020] Further, the electric energy equipment monitoring module includes an equipment operation monitoring unit, an equipment failure alarm unit and an alarm information transmission unit;
[0021] Perform real-time operation monitoring of all air-conditioning equipment in the current space through the equipment operation monitoring unit;
[0022] The equipment failure alarm unit sends out an alarm signal when any air-conditioning equipment operation failure is monitored;
[0023] After receiving the alarm signal, the alarm information transmission unit will determine whether the spatial distribution concentration coefficient between the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space and the faulty air-conditioning equipment exceeds the spatial distribution concentration coefficient benchmark value: if so, the straight-line distance information between the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space and the faulty air-conditioning equipment is transmitted to the equipment automatic control module; if the spatial distribution concentration coefficient does not exceed the benchmark value, it is chosen not to transmit the distance information, and the automatic control mechanism of the air-conditioning equipment is not triggered.
[0024] Furthermore, the equipment automatic control module includes a fault environment data input unit, a control parameter output unit and a control instruction execution unit;
[0025] The fault environment data input unit inputs the straight-line distance between the air-conditioning device closest to the faulty air-conditioning device in the current space and the faulty air-conditioning device into the pre-control model;
[0026] Outputting the automatic control temperature parameter of the air-conditioning device closest to the faulty air-conditioning device in the current space through the control parameter output unit, generating an automatic control instruction, and transmitting the automatic control instruction to the control instruction execution unit;
[0027] The control instruction execution unit executes the control instruction according to the automatic control temperature parameter, and automatically controls the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space.
[0028] A cloud platform-based intelligent management method for energy consumption of electric energy equipment includes the following steps:
[0029] S01: Collect the distribution data of air-conditioning equipment in the space and the historical data of the remaining air-conditioning equipment being regulated when an air-conditioning equipment failure occurs in the space;
[0030] S02: Analyze the spatial distribution concentration coefficients between the equipment in the space where the air-conditioning equipment has previously experienced operating failures, filter and process the historical data to be regulated, and establish a pre-regulation model for the specified air-conditioning equipment based on the filtered and processed data;
[0031] S03: monitor the operation of the air-conditioning equipment in the current space, and issue an alarm when a failure of the air-conditioning equipment is detected, and selectively transmit the environmental data in the current space;
[0032] S04: Input the received environmental data in the current space into the pre-control model, and automatically control the designated air-conditioning equipment according to the output data.
[0033] Further, in S01: the distribution location data of the air-conditioning equipment in the same space is collected, and it is collected that when an air-conditioning equipment fails to operate in the same space in the past, the air-conditioning equipment closest to the failed air-conditioning equipment is L={L1, L2, ...L i , ...L m}, where m represents the number of times an air-conditioning device has failed in the same space in the past. The data on the air-conditioning device being controlled when an air-conditioning device failed in the same space in the past is collected under the premise that the air-conditioning device is in cooling mode, including the temperature lowered by the air-conditioning device and the time the air-conditioning device maintains the corresponding temperature unchanged after being controlled to lower different temperatures.
[0034] Further, in S02: according to formula H i =1 / [(L i ) / ∑ m i=1 (L i )] Calculate the spatial distribution concentration coefficient H between the air conditioning equipment closest to the faulty air conditioning equipment and the faulty air conditioning equipment when an air conditioning equipment failure occurs in the same space for the i-th time in the past i , we get the spatial distribution concentration coefficient set between the air-conditioning equipment closest to the faulty air-conditioning equipment and the faulty air-conditioning equipment when an air-conditioning equipment failure occurs in the same space for the past m times: {H1, H2, ...H i , ...H m}, compare the spatial distribution concentration coefficients, arrange the m spatial distribution concentration coefficients in descending order and randomly divide them into n groups. The spatial distribution concentration coefficient of each item in the previous group is greater than that of the next group. The average value set of all spatial distribution concentration coefficients in each group of a random grouping result is W={W1, W2, ...W j , ...W n}, where j represents the jth group of a random grouping result. According to the formula T=[(∑ n j=1 (W j -∑ n j=1 (W j ) / n) 2 ) / n] 1 / 2 Select reference data for setting the benchmark value of spatial distribution concentration coefficient, T represents a random grouping result used for the reference value of setting the benchmark value of spatial distribution concentration coefficient, calculate the reference value of different grouping results used for setting the benchmark value of spatial distribution concentration coefficient, select the grouping result with the largest reference value as the reference data, obtain the spatial distribution concentration coefficient of the first group in the grouping result with the largest reference value, calculate the average value of the spatial distribution concentration coefficient in the first group, and obtain the calculated average value as Q, set Q as the benchmark value of spatial distribution concentration coefficient, and count that there are k times in the past m times when the spatial distribution concentration coefficient between the faulty air-conditioning equipment and the air-conditioning equipment closest to the faulty air-conditioning equipment exceeds Q, and obtain the set of straight-line distances of the corresponding k times of faulty air-conditioning equipment from the air-conditioning equipment closest to the faulty air-conditioning equipment as L ’ ={L1 ’ , L2 ’ , ...L e ’ , ...L k ’}, set L contains set L ’ , the set of temperature values of the air conditioner closest to the faulty air conditioner that is regulated to be lowered when the air conditioner fails for the eth time among the k times is selected as R={R1, R2, ...R a , ... R f}, f represents the number of times the air conditioner closest to the faulty air conditioner is regulated when the air conditioner fails for the eth time, a represents the ath time the air conditioner closest to the faulty air conditioner is regulated when the air conditioner fails for the eth time, and the time set of the temperature remaining unchanged after the temperature is regulated to lower the corresponding temperature value is t={t1, t2, ...t a ,...t f}, the longest time for the temperature to remain unchanged is obtained from the set t is t max, retrieve and compare the time that the temperature remains unchanged after the corresponding temperature value is lowered by the control, and obtain the time when the temperature remains unchanged for the longest time when the air-conditioning equipment fails for the eth time, and the temperature value of the air-conditioning equipment closest to the faulty air-conditioning equipment that is lowered by the control is r e , we get the set of temperature values r={r1, r2, ...r} when the temperature remains unchanged for the longest time when the air conditioner is closest to the faulty air conditioner for the kth time the air conditioner fails. e ,...r k}, the temperature value in the set r is used as the optimal controlled temperature value of the air conditioner closest to the faulty air conditioner when the corresponding fault occurs, and the data point {(L1 ’ , r1), (L2 ’ , r2), ... (L e ’ , r e ),...(L k ’ , r k )}, after performing straight line fitting on the data points, a pre-control model for the air-conditioning equipment closest to the faulty air-conditioning equipment is established: y=E1*x+E2, where E1 and E2 represent fitting coefficients, x represents the independent variable representing the distance in the pre-control model, and y represents the dependent variable representing the regulated temperature value in the pre-control model.
[0035] Furthermore, in S03: after receiving the alarm signal, the spatial distribution concentration coefficient between the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space and the faulty air-conditioning equipment is obtained as U, and U and Q are compared: if U>Q, choose to transmit the straight-line distance information between the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space and the faulty air-conditioning equipment; if U≤Q, choose not to transmit the distance information and do not trigger the automatic control mechanism of the air-conditioning equipment.
[0036] Further, in S04: if U>Q, the straight-line distance between the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space and the faulty air-conditioning equipment is collected as D, and D is input into the pre-control model: let x=D, and the automatic control temperature parameter of the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space is output as E1*D+E2, and the automatic control instruction is generated and executed: adjust the temperature of the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space to be reduced by E1*D+E2.
[0037] Compared with the prior art, the beneficial effects achieved by the present invention are:
[0038] The present invention uses big data technology to collect historical control data of remaining air-conditioning equipment and distribution data between failed equipment and non-faulty equipment when an air-conditioning equipment failure occurred in the same space in the past, and transmits the collected data to the data management cloud platform for storage management. By retrieving the distribution data between the equipment from the cloud platform for analysis and setting a reference value of the spatial distribution concentration coefficient, the purpose is to take into account that although in the same space, when the remaining equipment is far away from the failed equipment, even if the parameters of the remaining air-conditioning equipment are adjusted, the impact of the equipment failure cannot be well alleviated. Setting the reference value is conducive to screening out accurate reference data for establishing a pre-control model, and is also conducive to judging whether it is necessary to adjust the remaining air conditioning equipment when equipment failure occurs later. The automatic control of the regulating equipment improves the necessity of automatic control of the remaining air-conditioning equipment and the effect of the control. According to the screened historical control data analysis, when the distance from the air-conditioning equipment closest to the faulty air-conditioning equipment is different, the best controlled temperature value of the air-conditioning equipment closest to the faulty air-conditioning equipment is established, and a pre-control model is established. When the same fault situation occurs in the current space, it is analyzed whether it is necessary to trigger the automatic control mechanism of the equipment. If necessary, set appropriate automatic control temperature parameters, and automatically control the air-conditioning equipment closest to the faulty air-conditioning equipment according to the set parameters. Setting appropriate automatic control temperature parameters is beneficial to meeting the equipment usage needs in the area while reducing equipment energy consumption compared to randomly setting parameters. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0040] Figure 1 This is a structural composition diagram of an intelligent management system for energy consumption of electric energy equipment based on a cloud platform according to the present invention;
[0041] Figure 2 It is a flow chart of a cloud platform-based intelligent management method for energy consumption of electric energy equipment of the present invention. DETAILED DESCRIPTION
[0042] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0043] Combine the following Figure 1-Figure 2 The present invention is further described with reference to the accompanying drawings and specific embodiments.
[0044] Example 1: Figure 1As shown, this embodiment provides an intelligent management system for energy consumption of electric energy equipment based on a cloud platform, and the system includes: an environmental data acquisition module, a data management cloud platform, an abnormal pre-regulation management module, an electric energy equipment monitoring module and an equipment automatic regulation module; the output end of the environmental data acquisition module is connected to the input end of the data management cloud platform, the output end of the data management cloud platform is connected to the input end of the abnormal pre-regulation management module, and the output ends of the abnormal pre-regulation management module and the electric energy equipment monitoring module are connected to the input end of the equipment automatic regulation module; the distribution data of the air-conditioning equipment in the space and the historical data of the remaining air-conditioning equipment being regulated when the air-conditioning equipment fails in the space are collected by the environmental data acquisition module, and all the collected data are transmitted to the data management cloud platform; The data management cloud platform stores and manages all received data; analyzes the spatial distribution concentration coefficients between devices in the space where air-conditioning equipment failures have occurred in the past through the abnormal pre-control management module, screens and processes the historical data to be controlled based on the spatial distribution concentration coefficient, and establishes a pre-control model for the specified air-conditioning equipment based on the screened data; monitors the operation of the air-conditioning equipment in the current space through the electric energy equipment monitoring module, issues an alarm when an air-conditioning equipment failure is detected, and selectively transmits the environmental data in the current space to the equipment automatic control module; inputs the received environmental data in the current space into the pre-control model through the equipment automatic control module, and automatically controls the specified air-conditioning equipment based on the output data.
[0045] The environmental data collection module includes a device distribution data collection unit, a fault information collection unit and a control data collection unit; the output end of the device distribution data collection unit is connected to the input end of the data management cloud platform, the output end of the fault information collection unit is connected to the input end of the control data collection unit, and the output end of the control data collection unit is connected to the input end of the data management cloud platform; the distribution position data of the air-conditioning equipment in the same space is collected through the device distribution data collection unit, and the air-conditioning equipment refers to the central air-conditioning equipment; the fault information collection unit collects the straight-line distance between the air-conditioning equipment closest to the faulty air-conditioning equipment and the faulty air-conditioning equipment when the air-conditioning equipment is in the cooling mode and an air-conditioning equipment failure occurred in the same space in the past, and the phenomenon of air-conditioning equipment failure refers to the phenomenon that the air conditioner cannot perform cooling; the control data collection unit collects the data of the air-conditioning equipment closest to the faulty air-conditioning equipment when the air-conditioning equipment is in the cooling mode and an air-conditioning equipment failure occurred in the same space in the past, and the regulated data includes the temperature data of the air-conditioning equipment being regulated and the time data of the air-conditioning equipment maintaining the corresponding temperature unchanged after being regulated to reduce different temperatures.
[0046] The abnormal pre-control management module includes a distribution concentration analysis unit, a historical control data analysis unit and a pre-control model establishment unit; the input ends of the distribution concentration analysis unit and the historical control data analysis unit are connected to the output ends of the data management cloud platform, and the input end of the pre-control model establishment unit is connected to the output ends of the distribution concentration analysis unit and the historical control data analysis unit; the distribution concentration analysis unit analyzes the spatial distribution concentration coefficient between the air-conditioning equipment closest to the faulty air-conditioning equipment and the faulty air-conditioning equipment when an air-conditioning equipment operation failure occurs in the same space, and sets a reference value of the spatial distribution concentration coefficient according to the spatial distribution concentration coefficient; the historical control data analysis unit selects the historical control data when the spatial distribution concentration coefficient between the air-conditioning equipment closest to the faulty air-conditioning equipment and the faulty air-conditioning equipment exceeds the reference value of the spatial distribution concentration coefficient when an air-conditioning equipment operation failure occurs in the same space for different times in the past, and analyzes the best controlled temperature value of the air-conditioning equipment closest to the faulty air-conditioning equipment according to the selected historical control data; the pre-control model establishment unit combines the best controlled temperature value and the distance parameter to generate data points, and establishes a pre-control model of the air-conditioning equipment closest to the faulty air-conditioning equipment after linear fitting of the data points, and the air-conditioning equipment closest to the faulty air-conditioning equipment is the designated air-conditioning equipment.
[0047] The electric energy equipment monitoring module includes an equipment operation monitoring unit, an equipment fault alarm unit and an alarm information transmission unit; the output end of the equipment operation monitoring unit is connected to the input end of the equipment fault alarm unit, and the output end of the equipment fault alarm unit is connected to the input end of the alarm information transmission unit; the equipment operation monitoring unit is used to monitor the operation of all air-conditioning equipment in the current space in real time; the equipment fault alarm unit sends an alarm signal when any air-conditioning equipment operation failure is monitored; after receiving the alarm signal, the alarm information transmission unit determines whether the spatial distribution concentration coefficient between the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space and the faulty air-conditioning equipment exceeds the spatial distribution concentration coefficient benchmark value: if so, the straight-line distance information between the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space and the faulty air-conditioning equipment is transmitted to the equipment automatic control module; if the spatial distribution concentration coefficient does not exceed the benchmark value, it is chosen not to transmit the distance information and the automatic control mechanism of the air-conditioning equipment is not triggered.
[0048] The equipment automatic control module includes a fault environment data input unit, a control parameter output unit and a control instruction execution unit; the input end of the fault environment data input unit is connected to the output ends of the pre-control model establishment unit and the alarm information transmission unit, the output end of the fault environment data input unit is connected to the input end of the control parameter output unit, and the output end of the control parameter output unit is connected to the input end of the control instruction execution unit; the straight-line distance between the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space and the faulty air-conditioning equipment is input into the pre-control model through the fault environment data input unit; the automatic control temperature parameters of the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space are output through the control parameter output unit, an automatic control instruction is generated, and the automatic control instruction is transmitted to the control instruction execution unit; the control instruction execution unit executes the control instruction according to the automatic control temperature parameters, and automatically controls the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space.
[0049] Example 2: Figure 2 As shown, this embodiment provides a cloud platform-based intelligent management method for energy consumption of electric energy equipment, which is implemented based on the management system in the embodiment and specifically includes the following steps:
[0050] S01: Collect the distribution data of air-conditioning equipment in the space and the historical data of the remaining air-conditioning equipment being controlled when an air-conditioning equipment failure occurs in the space: Collect the distribution location data of the air-conditioning equipment in the same space, and collect the air-conditioning equipment in the same space. Under the premise that the air-conditioning equipment is in cooling mode, when an air-conditioning equipment failure occurs in the same space in the past, the air-conditioning equipment closest to the failed air-conditioning equipment has a straight-line distance set of L={L1, L2, ...L i , ...L m}, where m represents the number of times an air-conditioning device has failed in the same space in the past. The data of the air-conditioning device closest to the failed air-conditioning device being regulated when an air-conditioning device failed in the same space in the past is collected under the premise that the air-conditioning device is in cooling mode, including the temperature lowered by the air-conditioning device and the time the air-conditioning device maintains the corresponding temperature unchanged after being regulated to lower different temperatures;
[0051] S02: Analyze the spatial distribution concentration coefficients between the equipment in the space where the air-conditioning equipment has failed in the past, filter and process the historical data to be regulated, and establish a pre-regulation model for the specified air-conditioning equipment based on the filtered data: According to the formula H i =1 / [(L i ) / ∑ m i=1 (L i)] Calculate the spatial distribution concentration coefficient H between the air conditioning equipment closest to the faulty air conditioning equipment and the faulty air conditioning equipment when an air conditioning equipment failure occurs in the same space for the i-th time in the past i , we get the spatial distribution concentration coefficient set between the air-conditioning equipment closest to the faulty air-conditioning equipment and the faulty air-conditioning equipment when an air-conditioning equipment failure occurs in the same space for the past m times: {H1, H2, ...H i , ...H m}, compare the spatial distribution concentration coefficients, arrange the m spatial distribution concentration coefficients in descending order and randomly divide them into n groups. The spatial distribution concentration coefficient of each item in the previous group is greater than that of the next group. The average value set of all spatial distribution concentration coefficients in each group of a random grouping result is W={W1, W2, ...W j , ...W n}, where j represents the jth group of a random grouping result. According to the formula T=[(∑ n j=1 (W j -∑ n j=1 (W j ) / n) 2 ) / n] 1 / 2 Select reference data for setting the benchmark value of spatial distribution concentration coefficient, T represents a random grouping result used for the reference value of setting the benchmark value of spatial distribution concentration coefficient, calculate the reference values of different grouping results used for setting the benchmark value of spatial distribution concentration coefficient, select the grouping result with the largest reference value as the reference data, obtain the spatial distribution concentration coefficient in the first group among the grouping results with the largest reference value, calculate the average value of the spatial distribution concentration coefficient in the first group, and obtain the calculated average value as Q, and set Q as the benchmark value of spatial distribution concentration coefficient;
[0052] For example, when an air-conditioning device fails in the same space for 8 times in the past, the set of spatial distribution concentration coefficients between the air-conditioning device closest to the failed air-conditioning device and the failed air-conditioning device is {H1, H2, H3, H4, H5, H6, H7, H8}={25.6, 20.5, 13.7, 22.8, 8.2, 5.1, 4.9, 3.6}. The 8 spatial distribution concentration coefficients are arranged in order from large to small and randomly divided into 3 groups. The result of a random grouping is: the sets of spatial distribution concentration coefficients of the 3 groups are {25.6, 22.8}, {20.5, 13.7} and {8.2, 5.1, 4.9, 3.6}, the average value set of all spatial distribution concentration coefficients in each group of the corresponding grouping results is W={W1, W2, W3}={24.2, 17.1, 5.45}, the reference value of the corresponding grouping results used for setting the reference value of the spatial distribution concentration coefficient is 7.7, and the reference values of different grouping results used for setting the reference value of the spatial distribution concentration coefficient are calculated. The grouping results with the largest reference value are: the three groups of spatial distribution concentration coefficient sets are {25.6, 22.8, 20.5}, {13.7} and {8.2, 5.1, 4.9, 3.6} respectively, and Q≈23.0 is set as the reference value of the spatial distribution concentration coefficient;
[0053] It is counted that there are k times in the past m times when the air conditioner operation failure occurs. The spatial distribution concentration coefficient between the faulty air conditioner and the air conditioner closest to the faulty air conditioner exceeds Q. The linear distance set of the corresponding k faulty air conditioners and the air conditioner closest to the faulty air conditioner is obtained as L. ’ ={L1 ’ , L2 ’ , ...L e ’ , ...L k ’}, set L contains set L ’ , the set of temperature values of the air conditioner closest to the faulty air conditioner that is regulated to be lowered when the air conditioner fails for the eth time among the k times is selected as R={R1, R2, ...R a , ... R f}, f represents the number of times the air conditioner closest to the faulty air conditioner is regulated when the air conditioner fails for the eth time, a represents the ath time the air conditioner closest to the faulty air conditioner is regulated when the air conditioner fails for the eth time, the time the temperature remains unchanged after the corresponding temperature value is reduced is retrieved and compared, and the temperature value r is the lowered temperature value of the air conditioner closest to the faulty air conditioner when the temperature remains unchanged for the longest time when the air conditioner fails for the eth time. eFor example, the time set for the temperature to remain unchanged after the corresponding temperature value in the controlled reduction set R is retrieved is t={t1, t2, ...t a ,...t f}, the longest time for the temperature to remain unchanged is obtained from the set t is t max , then r e The maintenance time is t max The set of temperature values that are regulated to be reduced is obtained when the temperature remains unchanged for the longest time when the air-conditioning equipment fails to operate for k times. The set of temperature values that are regulated to be reduced when the air-conditioning equipment is closest to the failed air-conditioning equipment is r={r1, r2, ...r e ,...r k}, the temperature value in the set r is used as the optimal controlled temperature value of the air conditioner closest to the faulty air conditioner when the corresponding fault occurs, and the data point {(L1 ’ , r1), (L2 ’ , r2), ... (L e ’ , r e ),...(L k ’ , r k )}, after performing straight line fitting on the data points, establish the pre-regulation model of the air-conditioning equipment closest to the faulty air-conditioning equipment: y=E1*x+E2, where E1 and E2 represent fitting coefficients, * represents the multiplication sign, x represents the independent variable representing the distance in the pre-regulation model, and y represents the dependent variable representing the regulated temperature value in the pre-regulation model;
[0054] S03: Monitor the operation of the air-conditioning equipment in the current space, and when a fault is detected in the operation of the air-conditioning equipment, issue an alarm and selectively transmit the environmental data in the current space. After receiving the alarm signal, obtain the spatial distribution concentration coefficient U between the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space and the faulty air-conditioning equipment. The calculation method of U is the same as H. i The calculation method is the same as that of , comparing U and Q: if U>Q, choose to transmit the straight-line distance information between the air-conditioning device closest to the faulty air-conditioning device in the current space and the faulty air-conditioning device; if U≤Q, choose not to transmit the distance information and do not trigger the automatic control mechanism of the air-conditioning device;
[0055] S04: Input the received environmental data in the current space into the pre-control model, and perform automatic control processing on the designated air-conditioning equipment according to the output data: If U>Q, the straight-line distance between the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space and the faulty air-conditioning equipment is collected as D, and D is input into the pre-control model: Let x=D, and output the automatic control temperature parameter of the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space as E1*D+E2, generate and execute the automatic control instruction: adjust the temperature of the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space to reduce E1*D+E2.
[0056] Finally, it should be noted that the above description is only a preferred example of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An intelligent energy consumption management system for electric energy equipment based on cloud platform, Features: The system includes: an environmental data acquisition module, a data management cloud platform, an abnormal pre-control management module, an electric energy equipment monitoring module and an equipment automatic control module; The environmental data collection module collects the distribution data of the air-conditioning equipment in the space and the historical data of the remaining air-conditioning equipment being regulated when an air-conditioning equipment failure occurs in the space, and transmits all the collected data to the data management cloud platform; Storing and managing all received data through the data management cloud platform; The abnormal pre-control management module analyzes the spatial distribution concentration coefficients between the devices in the space where the air-conditioning equipment has previously experienced operating failures, screens and processes the historical data to be regulated based on the spatial distribution concentration coefficients, and establishes a pre-control model for the specified air-conditioning equipment based on the screened data; The operation of the air conditioning equipment in the current space is monitored by the electric energy equipment monitoring module, and an alarm is issued when a failure of the air conditioning equipment operation is detected, and the environmental data in the current space is selectively transmitted to the equipment automatic control module; The equipment automatic control module inputs the received environmental data in the current space into the pre-control model, and performs automatic control processing on the designated air-conditioning equipment according to the output data; Collect the distribution location data of the air-conditioning equipment in the same space. Under the premise that the air-conditioning equipment is in cooling mode, when an air-conditioning equipment fails in the same space, the straight-line distance set of the air-conditioning equipment closest to the failed air-conditioning equipment is L = {L 1 , L 2 , ...L i , ...L m }, where m represents the number of times an air-conditioning device has failed in the same space in the past. The data of the air-conditioning device closest to the failed air-conditioning device being regulated when an air-conditioning device failed in the same space in the past is collected under the premise that the air-conditioning device is in cooling mode, including the temperature lowered by the air-conditioning device and the time the air-conditioning device maintains the corresponding temperature unchanged after being regulated to lower different temperatures; According to the formula H i =1 / [(L i ) / ∑ m i=1 (L i )] Calculate the spatial distribution concentration coefficient H between the air conditioning equipment closest to the faulty air conditioning equipment and the faulty air conditioning equipment when an air conditioning equipment failure occurs in the same space for the i-th time in the past i , we get the spatial distribution concentration coefficient set between the air-conditioning equipment closest to the faulty air-conditioning equipment and the faulty air-conditioning equipment when an air-conditioning equipment failure occurs in the same space for the past m times: {H 1 , H 2 , ...H i , ...H m }, compare the spatial distribution concentration coefficients, arrange the m spatial distribution concentration coefficients in descending order and randomly divide them into n groups, and obtain the average value of all spatial distribution concentration coefficients in each group of a random grouping result as W = {W 1 , W 2 , ...W j , ...W n }, where j represents the jth group of a random grouping result, according to the formula T = [(∑ n j=1 (W j -∑ n j=1 (W j ) / n) 2 ) / n] 1 / 2 Select reference data for setting the benchmark value of spatial distribution concentration coefficient, T represents a random grouping result used for the reference value of setting the benchmark value of spatial distribution concentration coefficient, calculate the reference values of different grouping results used for setting the benchmark value of spatial distribution concentration coefficient, select the grouping result with the largest reference value as the reference data, obtain the spatial distribution concentration coefficient of the first group in the grouping result with the largest reference value, calculate the average value of the spatial distribution concentration coefficient in the first group, and obtain the calculated average value as Q, and set Q as the benchmark value of the spatial distribution concentration coefficient.
2. According to claim 1, a cloud platform-based intelligent management system for energy consumption of electric energy equipment, Features: The environmental data acquisition module includes an equipment distribution data acquisition unit, a fault information acquisition unit and a control data acquisition unit; Collecting the distribution location data of the air-conditioning equipment in the same space by the equipment distribution data collection unit; The fault information collection unit collects the straight-line distance between the air-conditioning device closest to the faulty air-conditioning device and the faulty air-conditioning device when an air-conditioning device previously failed to operate in the same space under the premise that the air-conditioning device is in cooling mode; The control data collection unit collects data on the control of the air-conditioning device closest to the faulty air-conditioning device when the air-conditioning device is in cooling mode in the past when an air-conditioning device fails to operate in the same space. The control data includes temperature data of the air-conditioning device being controlled to reduce the temperature and time data of the air-conditioning device maintaining the corresponding temperature unchanged after being controlled to reduce different temperatures.
3. According to claim 2, a cloud platform-based intelligent management system for energy consumption of electric energy equipment, Features: The abnormal pre-regulation management module includes a distribution concentration analysis unit, a historical regulation data analysis unit and a pre-regulation model establishment unit; The distribution concentration analysis unit analyzes the spatial distribution concentration coefficient between the air-conditioning equipment closest to the faulty air-conditioning equipment and the faulty air-conditioning equipment when the air-conditioning equipment fails in the same space, and sets a reference value of the spatial distribution concentration coefficient according to the spatial distribution concentration coefficient; The historical control data analysis unit selects historical control data when a spatial distribution concentration coefficient between the air-conditioning device closest to the faulty air-conditioning device and the faulty air-conditioning device exceeds a reference value of the spatial distribution concentration coefficient when an air-conditioning device operating fault condition in the same space occurs at different times in the past, and analyzes the optimal controlled temperature value of the air-conditioning device closest to the faulty air-conditioning device based on the selected historical control data; The optimal regulated temperature value and the distance parameter are combined to generate data points by the pre-regulation model building unit, and a pre-regulation model of the air-conditioning device closest to the faulty air-conditioning device is established after linear fitting of the data points.
4. According to claim 3, a cloud platform-based intelligent management system for energy consumption of electric energy equipment, Features: The electric energy equipment monitoring module includes an equipment operation monitoring unit, an equipment failure alarm unit and an alarm information transmission unit; Perform real-time operation monitoring of all air-conditioning equipment in the current space through the equipment operation monitoring unit; The equipment failure alarm unit sends out an alarm signal when any air-conditioning equipment operation failure is monitored; After receiving the alarm signal, the alarm information transmission unit determines whether the spatial distribution concentration coefficient between the air-conditioning device closest to the faulty air-conditioning device in the current space and the faulty air-conditioning device exceeds the reference value of the spatial distribution concentration coefficient: if so, transmits the straight-line distance information between the air-conditioning device closest to the faulty air-conditioning device in the current space and the faulty air-conditioning device to the device automatic control module; If the spatial distribution concentration coefficient does not exceed the benchmark value, the distance information is not transmitted and the automatic control mechanism of the air-conditioning equipment is not triggered.
5. According to claim 4, a cloud platform-based intelligent management system for energy consumption of electric energy equipment, Features: The equipment automatic control module includes a fault environment data input unit, a control parameter output unit and a control instruction execution unit; The fault environment data input unit inputs the straight-line distance between the air-conditioning device closest to the faulty air-conditioning device in the current space and the faulty air-conditioning device into the pre-control model; Outputting the automatic control temperature parameter of the air-conditioning device closest to the faulty air-conditioning device in the current space through the control parameter output unit, generating an automatic control instruction, and transmitting the automatic control instruction to the control instruction execution unit; The control instruction execution unit executes the control instruction according to the automatic control temperature parameter, and automatically controls the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space.
6. A cloud platform-based intelligent management method for energy consumption of electric energy equipment. Features: The following steps are involved: S01: Collect the distribution data of air-conditioning equipment in the space and the historical data of the remaining air-conditioning equipment being regulated when an air-conditioning equipment failure occurs in the space; S02: Analyze the spatial distribution concentration coefficients between the equipment in the space where the air-conditioning equipment has previously experienced operating failures, filter and process the historical data to be regulated, and establish a pre-regulation model for the specified air-conditioning equipment based on the filtered and processed data; S03: monitor the operation of the air-conditioning equipment in the current space, and issue an alarm when a failure of the air-conditioning equipment is detected, and selectively transmit the environmental data in the current space; S04: inputting the received environmental data in the current space into the pre-control model, and automatically controlling the designated air-conditioning equipment according to the output data; In S01: the distribution location data of the air conditioners in the same space is collected, and it is collected that when an air conditioner fails in the same space in the past, the air conditioner closest to the failed air conditioner has a straight-line distance set of L = {L 1 , L 2 , ...L i , ...L m }, where m represents the number of times an air-conditioning device has failed in the same space in the past. The data of the air-conditioning device closest to the failed air-conditioning device being regulated when an air-conditioning device failed in the same space in the past is collected under the premise that the air-conditioning device is in cooling mode, including the temperature lowered by the air-conditioning device and the time the air-conditioning device maintains the corresponding temperature unchanged after being regulated to lower different temperatures; In S02: According to formula H i =1 / [(L i ) / ∑ m i=1 (L i )] Calculate the spatial distribution concentration coefficient H between the air conditioning equipment closest to the faulty air conditioning equipment and the faulty air conditioning equipment when an air conditioning equipment failure occurs in the same space for the i-th time in the past i , we get the spatial distribution concentration coefficient set between the air-conditioning equipment closest to the faulty air-conditioning equipment and the faulty air-conditioning equipment when an air-conditioning equipment failure occurs in the same space for the past m times: {H 1 , H 2 , ...H i , ...H m }, compare the spatial distribution concentration coefficients, arrange the m spatial distribution concentration coefficients in descending order and randomly divide them into n groups, and obtain the average value of all spatial distribution concentration coefficients in each group of a random grouping result as W = {W 1 , W 2 , ...W j , ...W n }, where j represents the jth group of a random grouping result, according to the formula T = [(∑ n j=1 (W j -∑ n j=1 (W j ) / n) 2 ) / n] 1 / 2 Select reference data for setting the benchmark value of spatial distribution concentration coefficient, T represents a random grouping result used for the reference value of setting the benchmark value of spatial distribution concentration coefficient, calculate the reference values of different grouping results used for setting the benchmark value of spatial distribution concentration coefficient, select the grouping result with the largest reference value as the reference data, obtain the spatial distribution concentration coefficient of the first group in the grouping result with the largest reference value, calculate the average value of the spatial distribution concentration coefficient in the first group, and obtain the calculated average value as Q, and set Q as the benchmark value of the spatial distribution concentration coefficient.
7. According to claim 6, a cloud platform-based intelligent management method for energy consumption of electric energy equipment, Features: It is counted that there are k times in the past m times when the air conditioner operation failure occurs. The spatial distribution concentration coefficient between the faulty air conditioner and the air conditioner closest to the faulty air conditioner exceeds Q. The linear distance set of the corresponding k faulty air conditioners and the air conditioner closest to the faulty air conditioner is obtained as L. ’ ={L 1 ’ , L 2 ’ , ...L e ’ , ...L k ’ }, the set of temperature values of the air conditioner closest to the faulty air conditioner that is regulated to be lowered when the air conditioner fails for the eth time among the k times is selected as R = {R 1 , R 2 , ... R a , ... R f }, f represents the number of times the air conditioner closest to the faulty air conditioner is regulated when the air conditioner fails for the eth time, a represents the ath time the air conditioner closest to the faulty air conditioner is regulated when the air conditioner fails for the eth time, the time the temperature remains unchanged after the corresponding temperature value is reduced is retrieved and compared, and the temperature value r is the lowered temperature value of the air conditioner closest to the faulty air conditioner when the temperature remains unchanged for the longest time when the air conditioner fails for the eth time. e , the set of temperature values of the air conditioner closest to the faulty air conditioner that is regulated to be lowered when the temperature remains unchanged for the longest time when the air conditioner fails for k times is obtained as r = {r 1 , r 2 ,...r e ,...r k }, the temperature value in the set r is used as the optimal controlled temperature value of the air conditioner closest to the faulty air conditioner when the corresponding fault occurs, and the data point {(L 1 ’ , r 1 ), (L 2 ’ , r 2 ),...(L e ’ , r e ),...(L k ’ , r k )}, after performing straight line fitting on the data points, a pre-control model of the air-conditioning equipment closest to the faulty air-conditioning equipment is established: y=E1*x+E2, where E1 and E2 represent fitting coefficients.
8. According to claim 7, a cloud platform-based intelligent management method for energy consumption of electric energy equipment, Features: In S03: after receiving the alarm signal, the spatial distribution concentration coefficient between the air-conditioning device closest to the faulty air-conditioning device in the current space and the faulty air-conditioning device is obtained as U, and U and Q are compared: if U>Q, the straight-line distance information between the air-conditioning device closest to the faulty air-conditioning device in the current space and the faulty air-conditioning device is selected for transmission; If U≤Q, choose not to transmit distance information; In S04: If U>Q, the straight-line distance between the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space and the faulty air-conditioning equipment is collected as D, and D is input into the pre-control model: let x=D, and the automatic control temperature parameter of the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space is output as E1*D+E2, and the automatic control instruction is generated and executed: adjust the temperature of the air-conditioning equipment closest to the faulty air-conditioning equipment in the current space to reduce E1*D+E2.
