A tube-type coal slime drying machine

By adopting a multi-point intake structure and feed-lifting system in the tube-type coal slime dryer, more efficient hot-dry air utilization and coal slime drying are achieved, and the problem of low hot-dry air utilization in the existing technology is solved. , improves the drying efficiency of coal slime.

CN118776295BActive Publication Date: 2024-12-06SHANDONG CHAOYANG MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411199819.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-06
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

During the drying process of existing tube-type coal slime dryers, the effective utilization rate of hot dry air is low, resulting in low drying efficiency of coal slime.

Method used

The design adopts a multi-point intake structure and feed lifting system, and transfers materials from the middle of the dryer body through coal sludge, and uses the hot dry air in the dryer body to increase the area of ​​coal sludge spreading to improve drying efficiency.

Benefits of technology

The utilization rate of hot dry air and the drying efficiency of coal slime are improved, and the moisture removal effect of coal slime is more significant.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118776295B_ABST
    Figure CN118776295B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of coal slime dryers, and proposes a tube-type coal slime dryer, wherein a multi-point air intake method is adopted in the dryer body to ensure the dryness and abundance of hot dry air, and at the same time, the coal slime is transferred and moved from the middle of the dryer body to realize the drying operation of the coal slime, so that the hot dry air in the dryer body can be better utilized, and the coal slime is spread over a larger area, so that the moisture of the coal slime can be better removed, the drying efficiency is higher, and it is more practical. The dryer body comprises a dryer body, a feed pipe is installed at one end of the dryer body, a feed hopper is installed on the feed pipe, a main frame and a lifting system, the dryer body comprises an outer wall tube and an inner wall tube fixedly connected to each other, the outer wall tube and the inner wall tube are fixedly connected to each other, and a plurality of air distribution holes are opened on the inner wall tube, and air permeable protective plugs are arranged in the plurality of air distribution holes, and the left and right ends of the outer wall tube are rotatably connected with a distribution end cover and a discharge end cover respectively.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal slime dryers, and in particular to a tube-in-tube type coal slime dryer. Background Art

[0002] As we all know, coal slime refers to a semi-solid substance formed by coal powder containing water. It is a product in the coal production process. Coal slime drying is an important link in the coal processing process. It aims to remove excess water in the coal slime through physical or chemical means to make it reach a certain degree of dryness for subsequent transportation, storage and utilization. In order to facilitate the drying operation of coal slime, we propose a tube-type coal slime dryer.

[0003] After searching, the Chinese patent publication number CN219415491U discloses a tubular dryer, which is roughly described as comprising a mounting bracket, two mounting collars are fixedly connected to the top of the mounting bracket, the two mounting collars are rotatably sleeved with a dryer body, an electric heater is fixedly connected to the surface of the dryer body, a mounting gear ring is fixedly sleeved on the outer wall of the dryer body, and an adjusting component for adjusting the mounting gear ring for rotation is connected to the top of the mounting bracket. When in use, the auxiliary worm gear, auxiliary filter screen, movable block, movable motor and movable worm can be matched by the movable component, so as to blow and dry the material inside the discharge shell through the auxiliary branch pipe. At the same time, we also retrieved the Chinese patent publication number CN212431711U A tubular dryer has been developed, which can be roughly described as including a base, a tubular dryer body, a bracket and a rotating wheel. Two rotating rings are symmetrically fixed on the two sides of the surface of the tubular dryer body, which are different from the two ends. The rotating rings are connected to the rotating wheel through a rotating shaft. The rotating wheel is connected to the bracket through a rotating shaft. Four brackets are fixed on the upper surface of the base in a rectangular array. Support plates are fixed on both sides of the front and rear ends of the base. Hydraulic cylinders are fixed on the upper surfaces of the four supporting plates. A hydraulic rod is movably installed at the bottom of the hydraulic cylinder, and the hydraulic rod passes through the supporting plate. A roller is fixed at the bottom of the hydraulic rod. When it is in use, the material enters the tubular dryer body through the feed port. After the rotating wheel rotates, the rotating ring is driven to rotate, thereby driving the tubular dryer body to rotate and dry the material. After drying, the material is discharged from the discharge port. When the tubular dryer body needs to be moved, the hydraulic cylinder drives the hydraulic rod to move downward. The power provided by the hydraulic rod lifts the base, and the roller contacts the ground. The roller can roll on the ground, and the base no longer contacts the ground, so that the tubular dryer body can move on the ground.

[0004] Although the above-mentioned prior art solution can be used for drying materials such as coal slime, during the drying operation of the material inside the dryer body, the material is turned over and dried by the rotation of the dryer body itself. Due to the effect of gravity, the material will only be at the lower inside of the dryer body during the rotation of the dryer body. Therefore, the effective utilization rate of the hot dry air flowing in the dryer body needs to be further improved. Summary of the invention

[0005] Technical Problems to be Solved In view of the deficiencies in the prior art, the present invention provides a tubular coal slime dryer, which adopts a multi-point air intake method in the dryer body to ensure the dryness and abundance of hot dry air, and at the same time adopts a method of transferring the coal slime from the middle of the dryer body to achieve the drying operation of the coal slime, which can better utilize the hot dry air in the dryer body, and the coal slime is spread over a larger area, which can better remove the moisture of the coal slime, and has higher drying efficiency and is more practical.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a tubular coal slime dryer, comprising a dryer body, a feed pipe is installed at one end of the dryer body, a feed hopper is installed on the feed pipe, and also comprises a main frame lifting system, the dryer body comprises an outer wall tube and an inner wall tube fixedly connected to each other, the outer wall tube and the inner wall tube are fixedly connected to each other, and a plurality of air distribution holes are opened on the inner wall tube, and a plurality of air distribution holes are all provided with air permeable protective plugs, the left and right ends of the outer wall tube are rotatably connected with a distribution end cover and a discharge end cover respectively, the distribution end cover and the discharge end cover are both rotatably connected to the inner wall tube, the distribution end cover and the discharge end cover are both fixedly connected in the main frame, the distribution end cover and the discharge end cover are respectively provided with distribution holes and a discharge port, the feed pipe is fixedly connected to the right end of the distribution end cover, the distribution end cover and the discharge end cover are both connected with an air supply pipe, and the distribution end cover and the discharge end cover are both provided with a first through hole and a second through hole , the material lifting system includes a first rack and a second rack, the left and right ends of the first rack respectively pass through the two first through holes, the left and right ends of the second rack respectively pass through the two second through holes, the first rack and the second rack are rotatably connected with a plurality of first material lifting box racks and a plurality of second material lifting box racks, the plurality of first material lifting box racks and the plurality of second material lifting box racks are alternately arranged at intervals, and the plurality of first material lifting box racks and the plurality of second material lifting box racks are both provided with wave rising steps from right to left, the left ends of the plurality of first material lifting box racks and the left ends of the plurality of second material lifting box racks are both provided with shrinking sections, and the plurality of shrinking sections are both provided with material transfer ports, the first rack is equipped with a first synchronous drive assembly, the first synchronous drive assembly is used for synchronously driving the plurality of first material lifting box racks, the second rack is equipped with a second synchronous drive assembly, the second synchronous drive assembly is used for synchronously driving the plurality of second material lifting box racks, and a coordinated material leveling assembly is installed in the material distributing hole.

[0007] Preferably, the first synchronous drive assembly and the second synchronous drive assembly respectively include a first electric drive rod and a second electric drive rod, the first electric drive rod and the second electric drive rod are respectively installed at the left end of the first frame and the left end of the second frame, and the first synchronous frame and the second synchronous frame are respectively installed on the driving shaft of the first electric drive rod and the driving shaft of the second electric drive rod, the first synchronous frame and the second synchronous frame are respectively slidably connected in the first frame and the second frame, the first synchronous frame is fixedly connected to a plurality of first racks, the plurality of first racks are meshed with a first gear, the plurality of first gears are fixedly connected to the first drive shaft, the plurality of first drive shafts are respectively fixedly connected to a plurality of first material lifting box frames, and the plurality of first drive shafts are rotatably connected to the first frame, the second synchronous frame is fixedly connected to a plurality of second racks, the plurality of second racks are meshed with a second gear, the plurality of second gears are fixedly connected to the second drive shaft, the plurality of second drive shafts are respectively fixedly connected to a plurality of second material lifting box frames, and the plurality of second drive shafts are rotatably connected to the second frame.

[0008] The first synchronous frame and the second synchronous frame are both provided with notch grooves, and pressure sensors are installed in the two notch grooves. The driving rod of the first electric driving rod and the driving rod of the second electric driving rod are both fixedly connected to square frames, and the two square frames are respectively slidably matched with the two notch grooves. Force transmission structures are installed in the two square frames, and force transmission plates are installed on the two force transmission structures. The two force transmission plates are respectively in contact with the pressure-bearing surfaces of the two pressure sensors.

[0009] Preferably, the two force transmission structures each include a first wedge block, a second wedge block and an elastic spring, the two first wedge blocks are respectively fixedly connected in the two square frames, the two second wedge blocks are respectively fixedly connected in the two square frames, the two elastic springs are respectively fixedly connected to the two force transmission plates, the two elastic springs are respectively fixedly connected to a transmission block, the two transmission blocks are respectively provided with a first slope surface and a second slope surface, the two first slope surfaces are respectively matched with the two first wedge blocks, the two second slope surfaces are respectively matched with the two second wedge blocks, and the two transmission blocks are respectively connected in the two notch grooves.

[0010] A moving frame is slidably connected in the two notched grooves, and the two moving frames are fixedly connected with a return spring. The two return springs are fixedly connected to the two transmission blocks respectively. The first wedge block and the second wedge block are both provided with a middle notch, and the two middle notches provide sufficient operating space for the left and right movement of the return spring.

[0011] Preferably, the collaborative material leveling assembly includes a rotating pipe rack and a swinging pipe rack, the rotating pipe rack is rotatably connected in the material distributing hole, the swinging pipe rack is rotatably connected to the rotating pipe rack, and the swinging pipe rack is connected to a hose, the hose is connected to the feed pipe, a linkage mechanism is installed on the swinging pipe rack, the linkage mechanism is installed on the material distributing end cover, a sliding bracket is provided on the rotating pipe rack, and the sliding bracket matches the rightmost first material lifting box rack among the multiple first material lifting box racks.

[0012] Preferably, the linkage mechanism includes a driving frame and a span rod, the driving frame is fixedly connected to the cloth end cover, two strip holes are provided on the driving frame, and the front and rear top ends of the driving frame are provided with wavy surfaces, the two wavy surfaces cooperate with each other, the front and rear ends of the span rod are fixedly connected with end balls, the two end balls are respectively matched with the two wavy surfaces, the span rod is fixedly connected with a connecting spring, the connecting spring is fixedly connected with a connecting block, and the connecting block is slidably connected to the swing pipe rack.

[0013] Preferably, a plurality of arc-shaped inner support bars are fixedly connected inside the outer wall tube, the plurality of arc-shaped inner support bars are all fixedly connected to the inner wall tube, and the plurality of arc-shaped inner support bars are respectively staggered relative to the plurality of air distribution holes.

[0014] Preferably, two support frames are fixedly connected inside the main frame, and the first bar frame and the second bar frame are both fixedly connected to the two support frames.

[0015] Preferably, an outer tooth ring is fixedly connected to the outer wall tube, the outer tooth ring is meshed with a driving gear, a servo motor is installed on the main frame, the driving gear is installed on the output shaft of the servo motor, and a plurality of segmented twisted slats are fixedly connected inside the inner wall tube.

[0016] Compared with the prior art, the present invention provides a tube-type coal slime drying machine, which has the following beneficial effects:

[0017] 1. In the present invention, a basic structure of multi-point air intake is formed through the design of the dryer body, and a multi-point air intake method is adopted to ensure the dryness and abundance of hot dry air.

[0018] 2. In the present invention, through the design of the lifting system, the coal slime is transferred from the middle of the dryer body to achieve the drying operation of the coal slime, which can better utilize the hot dry air in the dryer body, and the coal slime is spread over a larger area, which can better remove the moisture of the coal slime and has a higher drying efficiency.

[0019] 3. In the present invention, by coordinating the design of the material leveling assembly and coordinating the reciprocating rotation of the first material raising box frame and the second material raising box frame, the coal slime material is evenly distributed in the first material raising box frame on the far right, which is more practical. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of a partially cutaway three-dimensional structure of the present invention;

[0021] Figure 2 For the present invention Figure 1 A schematic diagram of the local enlarged structure at point A in the middle;

[0022] Figure 3 It is a schematic diagram of the overall three-dimensional structure of the present invention;

[0023] Figure 4 It is a partially cutaway three-dimensional structural schematic diagram of the cooperation of the first rack, the second rack and the first material lifting box rack of the present invention;

[0024] Figure 5 It is a partially cutaway three-dimensional structural schematic diagram of the cooperation of the first rack, the first synchronous rack and the first rack etc. of the present invention;

[0025] Figure 6 It is a schematic diagram of the three-dimensional structure of the present invention as a whole when viewed from above;

[0026] Figure 7 It is a schematic diagram of the three-dimensional structure of the square frame, the second wedge-shaped block and the elastic spring of the present invention;

[0027] Figure 8 It is a schematic diagram of the exploded three-dimensional structure of the square frame, the second wedge-shaped block and the elastic spring of the present invention;

[0028] Fig. 9 It is a schematic diagram of the exploded three-dimensional structure of the square frame, elastic spring and return spring of the present invention;

[0029] Fig.10 It is a partially cutaway three-dimensional structural schematic diagram of the coordination of the material distribution end cover, the rotating tube rack and the swinging tube rack of the present invention;

[0030] Fig.11 It is a schematic diagram of the three-dimensional structure of the discharge end cover of the present invention;

[0031] Fig.12 It is a schematic diagram of the three-dimensional structure of the inner wall tube and the segmented twisted strips of the present invention.

[0032] In the figure: 1. feed pipe; 2. feed hopper; 3. main frame; 4. outer wall pipe; 5. inner wall pipe; 6. air distribution hole; 7. cloth end cover; 8. discharge end cover; 9. cloth hole; 10. discharge port; 11. air supply pipe; 12. first rack; 13. second rack; 14. first material lifting box rack; 15. second material lifting box rack; 16. wave rising step; 17. necking section; 18. material transfer port; 19. first electric drive rod; 20. second electric drive rod; 21. first synchronous rack; 22. second synchronous rack; 23. first rack; 24. first gear; 25. first drive shaft; 26. second rack; 27. second gear; 28. second drive Axis; 29, notched groove; 30, pressure sensor; 31, square frame; 32, force transmission plate; 33, first wedge block; 34, second wedge block; 35, elastic spring; 36, transmission block; 37, first slope; 38, second slope; 39, reset spring; 40, middle notch; 41, rotating pipe rack; 42, swinging pipe rack; 43, hose; 44, sliding bracket; 45, drive rack; 46, span rod; 47, strip hole; 48, wavy surface; 49, end ball; 50, connecting spring; 51, connecting block; 52, arc-shaped inner support strip; 53, support frame; 54, outer gear ring; 55, driving gear; 56, servo motor; 57, segmented twisted slats. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] See also Figure 1-Figure 12A tubular coal slime dryer includes a dryer body, a feed pipe 1 is installed at one end of the dryer body, a feed hopper 2 is installed on the feed pipe 1, a main frame 3 and a lifting system, the dryer body includes an outer wall tube 4 and an inner wall tube 5 fixedly connected to each other, the outer wall tube 4 and the inner wall tube 5 are fixedly connected to each other, a plurality of arc-shaped inner support bars 52 are fixedly connected in the outer wall tube 4, the plurality of arc-shaped inner support bars 52 are fixedly connected to the inner wall tube 5, the plurality of arc-shaped inner support bars 52 are respectively staggered relative to a plurality of air distribution holes 6, a plurality of air distribution holes 6 are opened on the inner wall tube 5, and a plurality of air distribution holes 6 are each provided with a breathable protective plug, Through the design of the dryer body, a basic structure of multi-point air intake is formed, and a multi-point air intake method is adopted to ensure the dryness and abundance of hot dry air. The left and right ends of the outer wall tube 4 are rotatably connected with a cloth end cover 7 and a discharge end cover 8, respectively. The cloth end cover 7 and the discharge end cover 8 are both rotatably connected to the inner wall tube 5. The cloth end cover 7 and the discharge end cover 8 are both fixedly connected to the main frame 3. The cloth end cover 7 and the discharge end cover 8 are respectively provided with a cloth hole 9 and a discharge port 10. The feed pipe 1 is fixedly connected to the right end of the cloth end cover 7. The cloth end cover 7 and the discharge end cover 8 are both connected with an air supply pipe 11. The cloth end cover 7 and the discharge end cover 8 are A first through hole and a second through hole are opened, and the material lifting system includes a first frame 12 and a second frame 13. The left and right ends of the first frame 12 pass through the two first through holes respectively, and the left and right ends of the second frame 13 pass through the two second through holes respectively. A plurality of first material lifting box frames 14 and a plurality of second material lifting box frames 15 are rotatably connected between the first frame 12 and the second frame 13. The plurality of first material lifting box frames 14 and the plurality of second material lifting box frames 15 are alternately arranged at intervals. Wave rising steps 16 are arranged from right to left in the plurality of first material lifting box frames 14. The left end and the left ends of multiple second material lifting box racks 15 are both provided with a necking section 17, and the multiple necking sections 17 are all provided with a material transfer port 18. Through the design of the lifting system, the coal slime is transferred from the middle of the dryer body to achieve the drying operation of the coal slime, which can better utilize the hot dry air in the dryer body, and the coal slime is spread over a larger area, which can better remove the moisture of the coal slime and has higher drying efficiency. Two support frames 53 are fixedly connected in the main frame 3, and the first frame 12 and the second frame 13 are both fixedly connected to the two support frames 53, thereby improving the structural support strength of the first frame 12 and the second frame 13.

[0035] It should be further explained that the first frame 12 is equipped with a first synchronous drive assembly, and the first synchronous drive assembly is used for synchronously driving multiple first material lifting box frames 14. The second frame 13 is equipped with a second synchronous drive assembly, and the second synchronous drive assembly is used for synchronously driving multiple second material lifting box frames 15. The first synchronous drive assembly and the second synchronous drive assembly respectively include a first electric drive rod 19 and a second electric drive rod 20, and the first electric drive rod 19 and the second electric drive rod 20 are respectively installed on the left end of the first frame 12 and the left end of the second frame 13, and the first synchronous frame 21 and the second synchronous frame 22 are respectively installed on the drive shaft of the first electric drive rod 19 and the drive shaft of the second electric drive rod 20. The first synchronous frame 21 and the second synchronous frame 22 are respectively installed. The first synchronous frame 21 is slidably connected to the first rack 12 and the second rack 13. A plurality of first racks 23 are fixedly connected to the first synchronous frame 21. The plurality of first racks 23 are meshed with first gears 24. The plurality of first gears 24 are fixedly connected to first drive shafts 25. The plurality of first drive shafts 25 are respectively fixedly connected to the plurality of first material lifting box frames 14. The plurality of first drive shafts 25 are rotatably connected to the first rack 12. A plurality of second racks 26 are fixedly connected to the second synchronous frame 22. The plurality of second racks 26 are meshed with second gears 27. The plurality of second gears 27 are fixedly connected to second drive shafts 28. The plurality of second drive shafts 28 are respectively fixedly connected to the plurality of second material lifting box frames 15. The plurality of second drive shafts 28 are rotatably connected to the second rack 13. The first synchronous frame The first electric drive rod 19 and the second synchronous frame 22 are both provided with a notch groove 29, and pressure sensors 30 are installed in the two notch grooves 29. The driving rods of the first electric drive rod 19 and the second electric drive rod 20 are both fixedly connected with square frames 31. The two square frames 31 are respectively slidably matched with the two notch grooves 29. Force transmission structures are installed in the two square frames 31. Force transmission plates 32 are installed on the two force transmission structures. The two force transmission plates 32 are respectively in contact with the pressure-bearing surfaces of the two pressure sensors 30, which is convenient for detecting the driving force provided by the first electric drive rod 19 and the second electric drive rod 20, thereby improving the operation safety. The two force transmission structures include a first wedge block 33, a second wedge block 34 and an elastic spring 35. The two first wedge blocks 33 are respectively fixedly connected to the second electric drive rod 20. In the two square frames 31, the two second wedge blocks 34 are fixedly connected in the two square frames 31 respectively, the two elastic springs 35 are fixedly connected to the two force transmission plates 32 respectively, the two elastic springs 35 are fixedly connected with the transmission blocks 36, the two transmission blocks 36 are provided with the first slope surface 37 and the second slope surface 38, the two first slope surfaces 37 are matched with the two first wedge blocks 33 respectively, the two second slope surfaces 38 are matched with the two second wedge blocks 34 respectively, the two transmission blocks 36 are respectively connected in the two notch grooves 29, the two notch grooves 29 are slidably connected with the moving frames, the two moving frames are fixedly connected with the return springs 39, the two return springs 39 are fixedly connected with the two transmission blocks 36 respectively, the first wedge block 33 and the second wedge block 34 are provided with a middle notch 40,The two middle notches 40 provide sufficient operating space for the left and right movement of the return spring 39. Through a single pressure sensor 30, the dual detection of the pushing force and pulling force of the first electric drive rod 19 and the dual detection of the pushing force and pulling force of the second electric drive rod 20 can be realized.

[0036] It should be further explained that a coordinated material-scraping assembly is installed in the material-distributing hole 9, and the coordinated material-scraping assembly includes a rotating pipe rack 41 and a swinging pipe rack 42. The rotating pipe rack 41 is rotatably connected in the material-distributing hole 9, the swinging pipe rack 42 is rotatably connected to the rotating pipe rack 41, and the swinging pipe rack 42 is connected to a hose 43, and the hose 43 is connected to the feed pipe 1. A linkage mechanism is installed on the swinging pipe rack 42, and the linkage mechanism is installed on the material-distributing end cover 7. A sliding bracket 44 is provided on the rotating pipe rack 41, and the sliding bracket 44 matches the rightmost first material-distributing box rack 14 among multiple first material-distributing box racks 14. The linkage mechanism includes a driving frame 45 and a span rod 46. The driving frame 45 is fixedly connected to the material-distributing end cover 7. Two strip holes 47 are provided on the driving frame 45, and the front and rear top ends of the driving frame 45 are both provided with wavy surfaces 48, and the two wavy surfaces 48 cooperate with each other. The front and rear ends of the span rod 46 are both fixedly connected with end balls 49. The two end balls 49 are matched with the two wavy surfaces 48 respectively, the span rod 46 is fixedly connected with a connecting spring 50, the connecting spring 50 is fixedly connected with a connecting block 51, and the connecting block 51 is slidably connected with the swing pipe rack 42. Through the design of the coordinated material leveling component, the reciprocating rotation of the first material lifting box rack 14 and the second material lifting box rack 15 is matched, so that the coal slime material is evenly distributed in the first material lifting box rack 14 on the far right, which is more practical. An outer gear ring 54 is fixedly connected to the outer wall tube 4, and the outer gear ring 54 is meshed with a driving gear 55. A servo motor 56 is installed on the main frame 3, and the driving gear 55 is installed on the output shaft of the servo motor 56. A plurality of segmented twisted slats 57 are fixedly connected to the inner wall tube 5, so that the inner wall tube 5 can rotate and run, enriching the air distribution direction of the air distribution hole 6, and also facilitating the drying of the coal slime dropped between the first material lifting box rack 14 and the second material lifting box rack 15 and assisting in conveying it to the discharge port 10.

[0037] The pressure sensor 30, servo motor 56, first electric drive rod 19 and second electric drive rod 20 in this embodiment are all conventional equipment purchased on the market and known to those skilled in the art. They need to be selected or customized according to actual needs. In the present invention, we only use them and do not improve their structure and function. For those skilled in the art, their setting method, installation method and electrical connection method only need to be debugged according to the requirements of the instruction manual and will not be described in detail here.

[0038] In summary, the working process of the shell-and-tube coal slime dryer is as follows: when in use, first install the shell-and-tube coal slime dryer at the desired location, and connect the pressure sensor 30, the servo motor 56, the first electric drive rod 19 and the second electric drive rod 20 to the power-on control circuit according to their respective instructions, then electrically connect the pressure sensor 30 to the corresponding central control machine, and connect the control circuits of the first electric drive rod 19 and the second electric drive rod 20 to the central control machine, blow hot dry air into the air supply pipe 11 and the feed pipe 1, and the hot dry air entering the cloth end cover 7 and the discharge end cover 8 from the air supply pipe 11 will be guided through the space between the inner wall tube 5 and the outer wall tube 4 and enter the air distribution hole 6, and pass through the air distribution hole 6 and the swing pipe rack 42 to enter the inner wall tube 5, and then The power supply of the pressure sensor 30, the servo motor 56, the first electric drive rod 19 and the second electric drive rod 20 is started. The servo motor 56 works by the relative meshing action between the driving gear 55 and the outer gear ring 54 to realize the rotation operation of the dryer body. Since the air distribution hole 6 moves synchronously with the rotation movement of the inner wall tube 5, the hot dry air output by the air distribution hole 6 will enter the inner wall tube 5 from all directions. The first electric drive rod 19 realizes the reciprocating rotation and swinging of the multiple first material lifting box frames 14 through the transmission cooperation of the first synchronous frame 21, the first rack 23 and the first gear 24. The second electric drive rod 20 realizes the reciprocating rotation and swinging of the multiple second material lifting box frames 15 through the transmission cooperation of the second synchronous frame 22, the second rack 26 and the second gear 27. As shown in the attached figure Figure 1 The first electric drive rod 19 and the second electric drive rod 20 shown in the figure operate in coordination to control the relative posture between the adjacent first material lifting box racks 14 and the second material lifting box racks 15 among the plurality of first material lifting box racks 14 and the plurality of second material lifting box racks 15, so that the adjacent first material lifting box racks 14 and the second material lifting box racks 15 are always located at a position where the left end of the first material lifting box rack 14 is higher than the right end of the second material lifting box rack 15, and the coal sludge is fed into the feed hopper 2, and the coal sludge is guided into the hose 43 through the feed hopper 2 and the feed pipe 1 in sequence, and is discharged into the swing pipe rack 42 through the hose 43 and arranged into the first material lifting box rack 14 on the far right.

[0039] Furthermore, during the synchronous and coordinated operation of the plurality of first material raising box racks 14 and the plurality of second material raising box racks 15, since the first material raising box racks 14 and the second material raising box racks 15 will be alternately tilted to the left and to the right reciprocatingly, the coal slime in the first material raising box racks 14 and the second material raising box racks 15 will be conveyed alternately between the first material raising box racks 14 and the second material raising box racks 15 through the transfer port 18 as the first material raising box racks 14 and the second material raising box racks 15 reciprocate and alternately tilt to the left and to the right, and the tilt angles of the first material raising box racks 14 and the second material raising box racks 15 can be controlled by controlling the driving displacement amplitudes of the first electric driving rod 19 and the second electric driving rod 20 for the first synchronous frame 21 and the second synchronous frame 22 respectively. When the tilt postures of the first material raising box racks 14 and the second material raising box racks 15 prevent the coal slime therein from crossing the wave shape therein When the step 16 is raised, the coal slime will be accompanied by the reciprocating alternating left and right inclinations of the first material raising box frame 14 and the second material raising box frame 15, forming a repeated alternating flow and laying, thereby improving the contact effect between the coal slime and the hot dry air. Therefore, the first electric drive rod 19 and the second electric drive rod 20 are set by the central control machine to have a large stroke after several small strokes. The small stroke realizes the repeated flow and laying of coal powder in the first material raising box frame 14 and the second material raising box frame 15, and the large stroke realizes the alternating transportation of coal powder in the first material raising box frame 14 and the second material raising box frame 15, so as to improve the drying effect of the coal slime and ensure that the coal slime is fully dried when passing through the leftmost second material raising box frame 15. In actual operation, the number of small strokes between the two adjacent large strokes of the first electric drive rod 19 and the second electric drive rod 20 can be selected in a targeted manner according to the water content of the coal slime, so as to increase the drying effect of the coal slime. Figure 1The state shown is an initial state. When the right end of the first material lifting box frame 14 on the far right rotates and rises, it will first contact the sliding bracket 44, and under the driving action of the sliding bracket 44 and the rotating pipe rack 41, the rotating pipe rack 41 will be synchronously raised along with the rotation and raising of the first material lifting box frame 14 on the far right. The swinging pipe rack 42 will be driven to rise during the rising process of the rotating pipe rack 41. The rising of the swinging pipe rack 42 will drive the span rod 46 to rise synchronously. Due to the relative action of the two end balls 49 on the span rod 46 and the two wavy surfaces 48 respectively, the span rod 46 can be realized to form a front-to-back relative movement during the rising process, and then the swinging pipe rack 42 will swing back and forth relative to the first material lifting box frame 14 on the far right, so as to achieve uniform distribution of coal slime. When the inclined postures of the first material lifting box frame 14 and the second material lifting box frame 15 make the inner When the coal slime is able to cross the wave rising step 16 therein, the coal slime in the first lifting box frame 14 and the second lifting box frame 15 will pass through the transfer port 18 and enter the second lifting box frame 15 adjacent to the left and the second lifting box frame 15 adjacent to the left. Moreover, since the coal slime flows between the adjacent first lifting box frame 14 and the second lifting box frame 15, since there is no contact between the first lifting box frame 14 and the second lifting box frame 15, the coal slime is in a temporary free fall state in this state. In this state, the contact area between the coal slime and the hot dry air is greatly increased, and the removal efficiency of the moisture in the coal slime is greatly improved. The coal slime is transported between the adjacent first lifting box frame 14 and the second lifting box frame 15, and finally passes through the first first lifting box frame 14 on the far left and is guided to fall near the discharge port 10 under the action of the coal slime's own gravity, and is discharged through the discharge port 10.

[0040] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A tube-type coal slime dryer, comprising a dryer body, a feed pipe (1) being installed at one end of the dryer body, a feed hopper (2) being installed on the feed pipe (1), characterized in that: The dryer also comprises a main frame (3) and a lifting system, wherein the dryer body comprises an outer wall tube (4) and an inner wall tube (5) which are fixedly connected to each other, wherein the outer wall tube (4) and the inner wall tube (5) are fixedly connected to each other, and the inner wall tube (5) is provided with a plurality of air distribution holes (6), wherein each of the plurality of air distribution holes (6) is provided with a breathable protective plug, and the left and right ends of the outer wall tube (4) are respectively rotatably connected to a distribution end cover (7) and a discharge end cover (8), wherein the distribution end cover (7) and the discharge end cover (8) are both rotatably connected to the inner wall tube (5), and the distribution end cover (7) and the discharge end cover (8) are fixedly connected in the main frame (3), the cloth end cover (7) and the discharge end cover (8) are respectively provided with a cloth hole (9) and a discharge port (10), the feed pipe (1) is fixedly connected to the right end of the cloth end cover (7), the cloth end cover (7) and the discharge end cover (8) are both connected with an air supply pipe (11), the cloth end cover (7) and the discharge end cover (8) are both provided with a first through hole and a second through hole, the lifting system comprises a first frame (12) and a second frame (13), the first frame (12 ) pass through two of the first through holes at the left and right ends respectively, and the second frame (13) passes through two of the second through holes at the left and right ends respectively. A plurality of first material lifting box frames (14) and a plurality of second material lifting box frames (15) are rotatably connected between the first frame (12) and the second frame (13). The plurality of first material lifting box frames (14) and the plurality of second material lifting box frames (15) are alternately arranged at intervals. Wave rising steps (16) are arranged from right to left in the plurality of first material lifting box frames (14) and the plurality of second material lifting box frames (15). The left end of a material lifting box frame (14) and the left ends of a plurality of second material lifting box frames (15) are both provided with a necking section (17), and the plurality of necking sections (17) are both provided with a material transfer port (18). The first frame (12) is provided with a first synchronous drive component, and the first synchronous drive component is used for synchronously driving the plurality of first material lifting box frames (14). The second frame (13) is provided with a second synchronous drive component, and the second synchronous drive component is used for synchronously driving the plurality of second material lifting box frames (15). A coordinated material leveling component is provided in the material distribution hole (9).

2. A tube-type coal slime drying machine according to claim 1, characterized in that: The first synchronous drive assembly and the second synchronous drive assembly respectively comprise a first electric drive rod (19) and a second electric drive rod (20), the first electric drive rod (19) and the second electric drive rod (20) being respectively mounted on the left end of the first bar frame (12) and the left end of the second bar frame (13), and a first synchronous frame (21) and a second synchronous frame (22) being respectively mounted on the drive shaft of the first electric drive rod (19) and the drive shaft of the second electric drive rod (20), the first synchronous frame (21) and the second synchronous frame (22) being respectively slidably connected in the first bar frame (12) and the second bar frame (13), and a plurality of first racks (23) being fixedly connected to the first synchronous frame (21), the plurality of first racks The racks (23) are all meshed with a first gear (24), and the plurality of first gears (24) are all fixedly connected to a first drive shaft (25). The plurality of first drive shafts (25) are respectively fixedly connected to the plurality of first material lifting box frames (14). The plurality of first drive shafts (25) are all rotationally connected to the first rack (12). The second synchronous frame (22) is fixedly connected with a plurality of second racks (26). The plurality of second racks (26) are all meshed with a second gear (27). The plurality of second gears (27) are all fixedly connected to a second drive shaft (28). The plurality of second drive shafts (28) are respectively fixedly connected to the plurality of second material lifting box frames (15). The plurality of second drive shafts (28) are all rotationally connected to the second rack (13).

3. A tube-type coal slime drying machine according to claim 2, characterized in that: The first synchronous frame (21) and the second synchronous frame (22) are both provided with a notch groove (29), and pressure sensors (30) are installed in the two notch grooves (29). The driving rod of the first electric driving rod (19) and the driving rod of the second electric driving rod (20) are both fixedly connected to a square frame (31), and the two square frames (31) are respectively slidably matched with the two notch grooves (29). Force transmission structures are installed in the two square frames (31), and force transmission plates (32) are installed on the two force transmission structures. The two force transmission plates (32) are respectively in contact with the pressure-bearing surfaces of the two pressure sensors (30).

4. A tube-type coal slime drying machine according to claim 3, characterized in that: The two force transmission structures each comprise a first wedge block (33), a second wedge block (34) and an elastic spring (35); the two first wedge blocks (33) are respectively fixedly connected in the two square frames (31); the two second wedge blocks (34) are respectively fixedly connected in the two square frames (31); the two elastic springs (35) are respectively fixedly connected to the two force transmission plates (32); the two elastic springs (35) are both fixedly connected to a transmission block (36); the two transmission blocks (36) are each provided with a first slope surface (37) and a second slope surface (38); the two first slope surfaces (37) are respectively matched with the two first wedge blocks (33); the two second slope surfaces (38) are respectively matched with the two second wedge blocks (34); and the two transmission blocks (36) are respectively connected in the two notch grooves (29).

5. The tube-type coal slime drying machine according to claim 4, characterized in that: A moving frame is slidably connected in the two notched grooves (29), and the two moving frames are fixedly connected to a return spring (39). The two return springs (39) are respectively fixedly connected to the two transmission blocks (36). The first wedge block (33) and the second wedge block (34) are both provided with a middle notch (40), and the two middle notches (40) provide sufficient operating space for the return spring (39) to move left and right.

6. The tube-type coal slime drying machine according to claim 5, characterized in that: The coordinated material leveling assembly comprises a rotating pipe rack (41) and a swinging pipe rack (42), wherein the rotating pipe rack (41) is rotatably connected in the material distributing hole (9), the swinging pipe rack (42) is rotatably connected to the rotating pipe rack (41), and the swinging pipe rack (42) is connected to a hose (43), and the hose (43) is connected to the feed pipe (1), a linkage mechanism is installed on the swinging pipe rack (42), and the linkage mechanism is installed on the material distributing end cover (7), and a sliding bracket (44) is provided on the rotating pipe rack (41), and the sliding bracket (44) matches the rightmost first material raising box rack (14) among the plurality of first material raising box racks (14).

7. The tube-type coal slime drying machine according to claim 6, characterized in that: The linkage mechanism comprises a driving frame (45) and a span rod (46). The driving frame (45) is fixedly connected to the cloth end cover (7). Two strip holes (47) are provided on the driving frame (45). The front and rear top ends of the driving frame (45) are both provided with wavy surfaces (48). The two wavy surfaces (48) cooperate with each other. The front and rear ends of the span rod (46) are both fixedly connected with end balls (49). The two end balls (49) respectively match the two wavy surfaces (48). The span rod (46) is fixedly connected with a connecting spring (50). The connecting spring (50) is fixedly connected with a connecting block (51). The connecting block (51) is slidably connected to the swing pipe frame (42).

8. The tube-type coal slime drying machine according to claim 7, characterized in that: A plurality of arc-shaped inner support bars (52) are fixedly connected inside the outer wall tube (4), the plurality of arc-shaped inner support bars (52) are all fixedly connected to the inner wall tube (5), and the plurality of arc-shaped inner support bars (52) are respectively arranged in a staggered manner relative to the plurality of air distribution holes (6).

9. The tube-type coal slime drying machine according to claim 8, characterized in that: Two support frames (53) are fixedly connected inside the main frame (3), and the first bar frame (12) and the second bar frame (13) are both fixedly connected to the two support frames (53).

10. The tube-type coal slime drying machine according to claim 9, characterized in that: An outer toothed ring (54) is fixedly connected to the outer wall tube (4), a driving gear (55) is meshed with the outer toothed ring (54), a servo motor (56) is mounted on the main frame (3), the driving gear (55) is mounted on the output shaft of the servo motor (56), and a plurality of segmented twisted slats (57) are fixedly connected to the inner wall tube (5).