Information integrated data penetration system

By designing an information-integrated data penetration system, the problem of information islands caused by different data formats in various departments of the enterprise has been solved, unified format conversion and synchronization of data has been achieved, and digital management efficiency and data accuracy have been improved.

CN118779304APending Publication Date: 2024-10-15NANTONG LEER ENVIRONMENTAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410770902.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-14
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

In the existing technology, the data composition of each department of the enterprise is different, resulting in different data storage formats, resulting in information islands, making it difficult to realize data sharing, and reducing the efficiency of enterprise digital management.

Method used

An information-integrated data penetration system is designed, which converts raw data from different departments into unified format business data through the data integration module, and realizes data synchronization and errors through the data synchronization module, anomaly detection module and central data platform. Correction to ensure smooth transfer and integration of data between different departments.

Benefits of technology

It improves the efficiency of enterprise digital management, ensures timely synchronization and accuracy of data, and reduces storage error rates.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118779304A_ABST
    Figure CN118779304A_ABST
Patent Text Reader

Abstract

The invention discloses an information-integrated data penetration system, relates to the technical field of data management, and solves the problems that data among departments is difficult to share in time due to different data compositions of the departments of an existing digital enterprise; and the efficiency of enterprise digital management is low. The data integration module is used for acquiring a plurality of original data of different formats in different departments in real time; converting the original data into business data in a unified format; the data synchronization module is used for generating a corresponding importance score according to the business data; generating a synchronization instruction corresponding to the business data according to the importance score; synchronously uploading the service data according to the synchronization instruction; the abnormity checking module is used for generating an alarm signal according to the business data and the original data; data retransmission or data retransmission is carried out according to the alarm signal; the problems of data transmission, integration and synchronization among different departments are solved, and the efficiency of enterprise digital management is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of data management technology, and relates to data management technology, and specifically is an information-integrated data penetration system. Background Art

[0002] In order to strengthen information construction and focus on promoting the deployment and implementation of various information systems, enterprises and companies will digitally manage the information of various departments of the enterprise. It integrates, consolidates and optimizes various business processes, information resources and data of the enterprise to achieve optimal resource allocation, improve work efficiency, reduce management costs, and enhance corporate competitiveness. Enterprises need to clarify digital transformation goals, master digital technologies, design and implement digital processes, and continuously optimize digital management to respond to market changes, shape brand image, and ensure data security.

[0003] However, the data structures of various departments in existing digital enterprises are different, resulting in different data storage formats. The independent storage of each data leads to the existence of information islands, which is not conducive to information sharing and exchange. It makes it difficult to share data between departments in a timely manner, which makes the efficiency of enterprise digital management low.

[0004] Therefore, an information-integrated data penetration system is needed. Summary of the invention

[0005] The present application aims to solve at least one of the technical problems existing in the prior art; to this end, the present application proposes an information-integrated data penetration system to solve the technical problem that the data structures of various departments of existing digital enterprises are different, resulting in difficulty in timely data sharing between departments; and the efficiency of enterprise digital management is low. The present application solves the above problem by unifying the format of the original data of different departments and uploading it to a central data platform to which all departments are connected.

[0006] To achieve the above-mentioned purpose, the first aspect of the present application provides an information-integrated data penetration system, including: a data integration module, a data synchronization module, an anomaly detection module, a central data platform and a data storage module;

[0007] Data integration module: used to obtain raw data in different formats from different departments in real time and store the raw data in the raw database; convert the raw data into business data in a unified format and store the business data in the unified database;

[0008] Data synchronization module: obtains a number of business data, inputs the business data into the importance assessment model to obtain the importance score of each business data; generates synchronization instructions corresponding to the business data according to the importance score; synchronizes and uploads the business data according to the synchronization instructions; the importance assessment model is obtained through artificial intelligence model training;

[0009] Abnormality detection module: obtains business data and its corresponding original data, generates alarm signals according to the business data and original data; retransmits or re-transfers data according to the alarm signals;

[0010] The data storage module includes an original database and a unified database; the original database is used to store original data; and the unified database is used to store business data in the data integration module.

[0011] This application obtains raw data from different departments and converts raw data in different formats into business data in a unified format; sorts the business data according to the importance of each business data, uploads the business data to the central data platform according to the sorting order, and simultaneously detects whether the data at each stage is correct, generates an alarm signal, and promptly corrects the erroneous data transmission; solves the problems of data transmission, integration, and synchronization between different departments, and improves the efficiency of enterprise digital management.

[0012] Preferably, the converting of the original data into business data in a unified format includes:

[0013] Acquire raw data; perform data cleaning on the raw data and data sources, wherein the data cleaning includes removing duplicates, processing missing values, and correcting outliers;

[0014] Use the parsing file corresponding to the original data to parse the cleaned original data to obtain the original content and data source;

[0015] Obtain a unified data format, and reorganize the original content and data sources according to the unified data format to obtain business data.

[0016] Preferably, the importance assessment model is obtained by training an artificial intelligence model, including:

[0017] Acquire a number of business data and a number of corresponding importance scores through a unified database; integrate the business data and the corresponding importance scores into a number of sets of training data and test data;

[0018] The artificial intelligence model is trained using training data; the trained artificial intelligence model is tested using test data, and finally an importance assessment model is obtained, which inputs business data and outputs an importance score corresponding to the business data; wherein the artificial intelligence model includes a BP neural network model or a RBF neural network model.

[0019] Preferably, the importance scores in the training data and the test data are obtained through an importance word library and a department importance score table, including:

[0020] Extract the data source from the business data, and query the source score corresponding to the data source in the department importance score table;

[0021] Extracting several record words from the original content in the business data; searching for the corresponding important words in the importance word library to obtain the word score of the important words; summing the word scores of several record data to obtain the content score of the corresponding business data;

[0022] Mark the source score as LP; mark the content score as NP;

[0023] The importance score ZP of the corresponding business data is calculated by the formula ZP = β1 × LP + β2 × NP; where β1 and β2 are proportional coefficients, which are set according to experience;

[0024] The importance word library includes a number of important words and their corresponding word scores.

[0025] Preferably, generating the synchronization instruction corresponding to the business data according to the importance score includes:

[0026] Determine whether the importance score is greater than the synchronization threshold; if yes, set the synchronization instruction of the business data to "1"; otherwise, set the synchronization instruction of the business data to "0".

[0027] Preferably, the synchronous uploading of the business data according to the synchronization instruction includes:

[0028] Get the business data with synchronization instruction "1", upload the business data to the immediate synchronization message queue, and sort them from large to small according to their corresponding importance scores; when there is business data in the immediate synchronization message queue, immediately synchronize and upload the corresponding business data to the central data platform in the corresponding order of the business data;

[0029] Acquire business data with a synchronization instruction of "0", upload the business data to a waiting synchronization message queue, and sort the business data from large to small according to their corresponding importance scores; the waiting synchronization message queue uploads the corresponding business data to the central data platform according to the idle window;

[0030] The message queue includes an immediate synchronization message queue and a waiting synchronization message queue.

[0031] This application evaluates the importance of business data to obtain the importance score of each business data, and synchronizes the business data according to the importance score, so that important data can be synchronized in time, and unimportant data is synchronized when idle, ensuring that key data is processed first and no transmission congestion occurs.

[0032] Preferably, the waiting synchronization message queue uploads the corresponding business data to the central data platform according to the idle window, comprising the following steps:

[0033] Step 1: Determine whether the current upload period is an idle window; if yes, jump to step 2; if no, proceed to step 1 when the next period arrives;

[0034] Step 2: Determine whether there is business data in the immediate synchronization message queue; if yes, jump to step 3; if not, wait for the data in the immediate synchronization message queue to be uploaded, and then jump to step 1;

[0035] Step 3: Synchronously upload the business data ranked first in the waiting synchronization message queue to the central data platform; after the upload is completed, jump to step 1.

[0036] Preferably, the idle window is obtained according to the business data of each upload period, including:

[0037] A number of business data and their corresponding recording times are obtained through a unified database; a number of upload time periods are obtained, and the total number of business data in each upload time period and the total number of business data with a synchronization instruction of "1" are counted according to the recording time; the total number one is marked as ZS1, and the total number two is marked as ZS2; the idle coefficient KY of the corresponding upload time period is calculated by the formula KY=α1×exp(-ZS1)+α2×exp(-ZS2); wherein α1 and α2 are proportional coefficients, which are set according to experience; the upload time period with an idle coefficient less than a coefficient threshold is marked as an idle window.

[0038] Preferably, generating the alarm signal according to the business data and the original data includes:

[0039] When the data center receives the uploaded business data, it obtains the corresponding original data, data source and its corresponding business data from the data integration module, and determines whether the original content and data source in the business data are consistent with the corresponding original content and data source in the original data;

[0040] Yes, obtain the business data in the central data platform, and when the original content and data source in the business data are inconsistent with the corresponding original content and data source in the original data, generate a transmission abnormality signal;

[0041] If not, a conversion abnormality signal is generated; the alarm signal includes a transmission abnormality signal and a conversion abnormality signal.

[0042] Preferably, retransmitting data or re-forwarding data according to the alarm signal includes:

[0043] Determine whether the alarm signal is a conversion abnormality signal;

[0044] If yes, then the corresponding original data is obtained from the original database, the original data is reconverted to obtain new business data, and the business data is input into the data synchronization module and retransmitted to the central data platform; at the same time, the business data is used to replace the corresponding business data in the unified database;

[0045] If not, the corresponding business data is obtained from the unified database, the business data is input into the data synchronization module, and retransmitted to the central data platform.

[0046] The present application compares the contents of business data at different stages with the corresponding original data to determine whether data transmission or conversion anomalies occur, and takes corresponding remedial measures, thereby reducing the error rate of stored data.

[0047] Compared with the prior art, the beneficial effects of this application are:

[0048] 1. This application obtains original data from different departments and converts the original data in different formats into business data in a unified format; sorts the business data according to the importance of each business data, and uploads the business data to the central data platform according to the sorting order, thereby solving the problems of data transmission, integration, and synchronization between different departments and improving the efficiency of enterprise digital management.

[0049] 2. This application evaluates the importance of business data to obtain the importance score of each business data, and synchronizes the business data according to the importance score, so that important data can be synchronized in time, and unimportant data is synchronized when idle, ensuring that key data is processed first and does not cause transmission congestion.

[0050] 3. This application compares the business data at different stages with the corresponding original data to determine whether there is any transmission or conversion anomaly in the data, and takes corresponding remedial measures, thereby reducing the error rate of stored data. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0052] Figure 1 This is a schematic diagram of the principle of this application;

[0053] Figure 2 Schematic diagram of the method steps in this application. DETAILED DESCRIPTION

[0054] The technical solution of the present application will be described clearly and completely below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0055] See also Figure 1-Figure 2 The first aspect of the present application provides an information-integrated data penetration system, including: a data integration module, a data synchronization module, an anomaly detection module, a central data platform and a data storage module; the data storage module includes an original database and a unified database; the original database is used to store original data; the unified database is used to store business data in the data integration module; the data integration module and the central data platform are connected to the management systems of various departments;

[0056] Data integration module: used to obtain raw data in several different formats from different departments in real time. The raw data includes original content and data source. The data source is the source department of the raw content. The original content includes personnel data, profit data, R&D data, etc. The original content of different departments is different; and the raw data is stored in the original database; the raw data is converted into business data in a unified format, and the business data is stored in the unified database; it can be understood that the business data in the unified database corresponds one to one with the raw data in the original database.

[0057] Data synchronization module: obtains a number of business data, inputs the business data into the importance assessment model to obtain the importance score of each business data; generates synchronization instructions corresponding to the business data according to the importance score; synchronizes and uploads the business data according to the synchronization instructions; the importance assessment model is obtained through artificial intelligence model training;

[0058] Abnormality detection module: obtains business data and its corresponding original data, generates an alarm signal based on the business data and the original data; retransmits or re-transfers data based on the alarm signal.

[0059] In this embodiment, the original data of different departments are obtained, and the original data of different formats are converted into business data of a unified format; the business data are sorted according to the importance of each business data, and the business data are uploaded to the central data platform according to the sorting order. At the same time, the data at each stage is monitored to see if they are correct, an alarm signal is generated, and the erroneous data is corrected in time; the problems of data transmission, integration, and synchronization between different departments are solved, and the efficiency of digital management of the enterprise is improved.

[0060] Convert raw data into business data in a unified format, including:

[0061] Acquire raw data; perform data cleaning on the raw data and data sources, wherein the data cleaning includes removing duplicates, processing missing values, and correcting outliers;

[0062] Use the parsing file corresponding to the original data to parse the cleaned raw data to obtain the original content and data source; for example, use Python's pandas library to read CSV files and convert them into DataFrame objects, use Python's json library to parse JSON files and convert them into Python dictionaries or lists, use XML parsing libraries to parse XML files, etc.

[0063] Obtain a unified data format, reorganize the original content and data sources according to the unified data format to obtain business data; the unified data format is set by internal enterprise personnel.

[0064] The importance assessment model is obtained through artificial intelligence model training, including:

[0065] Acquire a number of business data and a number of corresponding importance scores through a unified database; integrate the business data and the corresponding importance scores into a number of sets of training data and test data;

[0066] Use training data to train the artificial intelligence model; use test data to test the trained artificial intelligence model, specifically, use training data to train the artificial intelligence model; input the business data in the test data into the trained artificial intelligence model to obtain an importance score. When the importance score is within the threshold range of the importance score in the test data, the threshold range is set according to experience. For example, if the importance score recorded in the test data is 95 points; the threshold range is set to 5, then the output importance score of the artificial intelligence model after inputting the test data is between 95-5 and 95+5, which are all within the threshold range; the next set of test data is used for testing; otherwise, the relevant parameters of the artificial intelligence are adjusted according to experience, and the current set of test data is continued to be used for testing; until the output importance score meets the requirements; finally, an importance assessment model is obtained, whose input is business data and whose output is the importance score corresponding to the business data; wherein the artificial intelligence model includes a BP neural network model or an RBF neural network model.

[0067] The importance scores in the training data and test data are obtained through the importance vocabulary and department importance score table, including:

[0068] The department importance score table is set manually, which includes each department and its corresponding department score; extract the data source in the business data, and query the source score corresponding to the data source in the department importance score table; specifically, determine the department according to the data source, find the corresponding department score in the department importance score table according to the department, and use the department score as the source score corresponding to the data source;

[0069] Extracting several record words from the original content in the business data; searching for the corresponding important words in the importance word library to obtain the word score of the important words; summing the word scores of several record data to obtain the content score of the corresponding business data;

[0070] Mark the source score as LP; mark the content score as NP;

[0071] The importance score ZP of the corresponding business data is calculated by the formula ZP = β1 × LP + β2 × NP; where β1 and β2 are proportional coefficients, which are set according to experience;

[0072] The importance word library contains a number of important words and their corresponding word scores, and the word scores in the importance word library are set manually.

[0073] Generate synchronization instructions corresponding to business data based on importance scores, including:

[0074] Determine whether the importance score is greater than the synchronization threshold; if yes, set the synchronization instruction of the business data to "1"; otherwise, set the synchronization instruction of the business data to "0".

[0075] Upload business data synchronously according to the synchronization instructions, including:

[0076] Get the business data with synchronization instruction "1", upload the business data to the immediate synchronization message queue, and sort them from large to small according to their corresponding importance scores; when there is business data in the immediate synchronization message queue, immediately synchronize and upload the corresponding business data to the central data platform in the corresponding order of the business data;

[0077] Acquire business data with a synchronization instruction of "0", upload the business data to a waiting synchronization message queue, and sort the business data from large to small according to their corresponding importance scores; the waiting synchronization message queue uploads the corresponding business data to the central data platform according to the idle window;

[0078] The message queue includes an immediate synchronization message queue and a waiting synchronization message queue.

[0079] In this embodiment, the synchronization instruction of important business data is set to "1", indicating that the corresponding business data needs to be synchronized to the central data platform in a timely manner; the synchronization instruction of unimportant business data is set to "0", indicating that the corresponding business data can be synchronized to the central data platform when the data transmission is idle;

[0080] This embodiment evaluates the importance of business data to obtain importance scores for each business data, and synchronizes the business data according to the importance scores, so that important data can be synchronized in a timely manner, and unimportant data is synchronized when idle, ensuring that key data is processed first and does not cause transmission congestion.

[0081] Waiting for the synchronization message queue to upload the corresponding business data to the central data platform according to the idle window includes the following steps:

[0082] Step 1: Determine whether the current upload period is an idle window; the upload period is set according to experience, for example, 2 hours is one upload period, and there are 12 upload periods in a day; if yes, jump to step 2; if no, go to step 1 when the next period arrives;

[0083] Step 2: Determine whether there is business data in the immediate synchronization message queue; if yes, jump to step 3; if not, wait for the data in the immediate synchronization message queue to be uploaded, and then jump to step 1;

[0084] Step 3: Synchronously upload the business data ranked first in the waiting synchronization message queue to the central data platform; after the upload is completed, jump to step 1.

[0085] When the present embodiment transmits business data in the waiting synchronization message queue in the idle window, it is necessary to determine whether there is business data in the immediate synchronization message queue at this time. If so, the business data in the immediate synchronization message queue is transmitted first; if not, the business data in the waiting synchronization message queue is transmitted; at the same time, one business data is transmitted and it is checked once whether there is business data in the immediate synchronization message queue to prevent the important business data from not being synchronized in time when unimportant business data is synchronized.

[0086] The idle window is obtained based on the business data of each upload period, including:

[0087] A number of business data and their corresponding recording time are obtained through a unified database, where the recording time is the time when each business data is recorded, such as a certain year, month, day, hour, and minute; a number of upload time periods are obtained, and the total number of business data in each upload time period and the total number of business data with a synchronization instruction of "1" are counted according to the recording time; specifically, if the upload time period is from 9:00 to 11:00, the total number of business data with a certain hour and minute in all recording times between 9:00 and 11:00 is the total number one; wherein the total number of business data with a synchronization instruction of "1" is the total number two; the total number one is marked as ZS1, and the total number two is marked as ZS2; the idle coefficient KY of the corresponding upload time period is calculated by the formula KY=α1×exp(-ZS1)+α2×exp(-ZS2); the more business data or the more important business data in a certain upload time period, the more crowded this time period is, and the smaller the idle coefficient in the corresponding time period is; wherein α1 and α2 are proportional coefficients, which are set according to experience; the upload time period with an idle coefficient less than a coefficient threshold is marked as an idle window, and the coefficient threshold is set according to experience.

[0088] In this embodiment, the total amount of business data and the total amount of important business data in each time period are counted to determine the idleness of each upload time period, and the upload time period with an idle coefficient lower than the coefficient threshold is used as an idle window for synchronizing unimportant business data; to ensure the balance of synchronized data in each time period, and to avoid as much as possible the situation where important business data cannot be synchronized in time due to the synchronization of unimportant business data.

[0089] Generating the alarm signal according to the business data and the original data includes:

[0090] When the data center receives the uploaded business data, it obtains the corresponding original data, data source and its corresponding business data from the data integration module, and determines whether the original content and data source in the business data are consistent with the corresponding original content and data source in the original data;

[0091] Yes, obtain the business data in the central data platform, and when the original content and data source in the business data are inconsistent with the corresponding original content and data source in the original data, generate a transmission abnormality signal;

[0092] If not, a conversion abnormality signal is generated; the alarm signal includes a transmission abnormality signal and a conversion abnormality signal.

[0093] Retransmit or re-transmit data according to the alarm signal, including:

[0094] Determine whether the alarm signal is a conversion abnormality signal;

[0095] If yes, then the corresponding original data is obtained from the original database, the original data is reconverted to obtain new business data, and the business data is input into the data synchronization module and retransmitted to the central data platform; at the same time, the business data is used to replace the corresponding business data in the unified database;

[0096] If not, the corresponding business data is obtained from the unified database, the business data is input into the data synchronization module, and retransmitted to the central data platform.

[0097] This embodiment compares the content of business data at different stages with the corresponding original data to determine whether data transmission or conversion is abnormal, and takes corresponding remedial measures, thereby reducing the error rate of stored data.

[0098] Part of the data in the above formula is calculated by removing the dimension and taking its numerical value. The formula is a formula closest to the actual situation obtained by software simulation of a large amount of collected data; the preset parameters and preset thresholds in the formula are set by technical personnel in this field according to actual conditions or obtained through simulation of a large amount of data.

[0099] How this application works:

[0100] In this embodiment, the original data of different departments are obtained, and the original data of different formats are converted into business data of a unified format; the business data are sorted according to the importance of each business data, and the business data are uploaded to the central data platform according to the sorting order. At the same time, the data at each stage is monitored to see if they are correct, an alarm signal is generated, and the erroneous data is corrected in time; the problems of data transmission, integration, and synchronization between different departments are solved, and the efficiency of digital management of the enterprise is improved.

[0101] The above embodiments are only used to illustrate the technical method of the present application and are not intended to limit it. Although the present application has been described in detail with reference to the preferred embodiments, a person of ordinary skill in the art should understand that the technical method of the present application may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present application.

Claims

1. An information-integrated data penetration system, comprising: Data integration module, data synchronization module, anomaly detection module, central data platform and data storage module; characterized in that, Data integration module: used to obtain raw data in different formats from different departments in real time; convert raw data into business data in a unified format; Data synchronization module: obtains a number of business data, inputs the business data into the importance assessment model to obtain the importance score of each business data; generates synchronization instructions corresponding to the business data according to the importance score; synchronizes and uploads the business data according to the synchronization instructions; the importance assessment model is obtained through artificial intelligence model training; Abnormality detection module: obtains business data and its corresponding original data, generates alarm signals according to the business data and original data; retransmits or re-transfers data according to the alarm signals; The data storage module includes an original database and a unified database; the original database is used to store original data; and the unified database is used to store business data in the data integration module.

2. The information-integrated data penetration system according to claim 1, characterized in that: The converting of the original data into business data in a unified format includes: Acquire raw data; perform data cleaning on the raw data and data sources, wherein the data cleaning includes removing duplicates, processing missing values, and correcting outliers; Use the parsing file corresponding to the original data to parse the cleaned original data to obtain the original content and data source; Obtain a unified data format, and reorganize the original content and data sources according to the unified data format to obtain business data.

3. The information-integrated data penetration system according to claim 1 is characterized in that: The importance assessment model is obtained through artificial intelligence model training, including: Acquire a number of business data and a number of corresponding importance scores through a unified database; integrate the business data and the corresponding importance scores into a number of sets of training data and test data; The artificial intelligence model is trained using training data; the trained artificial intelligence model is tested using test data, and finally an importance assessment model is obtained, which inputs business data and outputs an importance score corresponding to the business data; wherein the artificial intelligence model includes a BP neural network model or a RBF neural network model.

4. The information-integrated data penetration system according to claim 3 is characterized in that: The importance scores in the training data and the test data are obtained through the importance word library and the department importance score table, including: Extract the data source from the business data, and query the source score corresponding to the data source in the department importance score table; Extracting several record words from the original content in the business data; searching for the corresponding important words in the importance word library to obtain the word score of the important words; summing the word scores of several record data to obtain the content score of the corresponding business data; Mark the source score as LP; mark the content score as NP; The importance score ZP of the corresponding business data is calculated by the formula ZP = β1 × LP + β2 × NP; where β1 and β2 are proportional coefficients; The importance word library includes a number of important words and their corresponding word scores.

5. The information-integrated data penetration system according to claim 1 is characterized in that: Generating the synchronization instruction corresponding to the business data according to the importance score includes: Determine whether the importance score is greater than the synchronization threshold; if yes, set the synchronization instruction of the business data to "1"; otherwise, set the synchronization instruction of the business data to "0".

6. The information-integrated data penetration system according to claim 5, characterized in that: The synchronous uploading of the business data according to the synchronization instruction includes: Get the business data with synchronization instruction "1", upload the business data to the immediate synchronization message queue, and sort them from large to small according to their corresponding importance scores; when there is business data in the immediate synchronization message queue, immediately synchronize and upload the corresponding business data to the central data platform in the corresponding order of the business data; Get the business data with synchronization instruction "0", upload the business data to the waiting synchronization message queue, and sort them from large to small according to their corresponding importance scores; the waiting synchronization message queue uploads the corresponding business data to the central data platform according to the idle window; The message queue includes an immediate synchronization message queue and a waiting synchronization message queue.

7. The information-integrated data penetration system according to claim 6, characterized in that: The waiting synchronization message queue uploads the corresponding business data to the central data platform according to the idle window, including the following steps: Step 1: Determine whether the current upload period is an idle window; if yes, jump to step 2; if no, proceed to step 1 when the next period arrives; Step 2: Determine whether there is business data in the immediate synchronization message queue; if yes, jump to step 3; if no, wait for the data in the immediate synchronization message queue to be uploaded, and then jump to step 1; Step 3: Synchronously upload the business data ranked first in the waiting synchronization message queue to the central data platform; after the upload is completed, jump to step 1.

8. The information-integrated data penetration system according to claim 7 is characterized in that: The idle window is obtained according to the business data of each upload period, including: A number of business data and their corresponding recording times are obtained through a unified database; a number of upload time periods are obtained, and the total number of business data in each upload time period and the total number of business data with a synchronization instruction of "1" are counted according to the recording time; the total number one is marked as ZS1, and the total number two is marked as ZS2; the idle coefficient KY of the corresponding upload time period is calculated by the formula KY=α1×exp(-ZS1)+α2×exp(-ZS2); wherein α1 and α2 are proportional coefficients; and the upload time period with an idle coefficient less than a coefficient threshold is marked as an idle window.

9. The information-integrated data penetration system according to claim 1, characterized in that: Generating the alarm signal according to the business data and the original data includes: When the data center receives the uploaded business data, it obtains the corresponding original data, data source and its corresponding business data from the data integration module, and determines whether the original content and data source in the business data are consistent with the corresponding original content and data source in the original data; Yes, obtain the business data in the central data platform, and when the original content and data source in the business data are inconsistent with the corresponding original content and data source in the original data, generate a transmission abnormality signal; If not, a conversion abnormality signal is generated; the alarm signal includes a transmission abnormality signal and a conversion abnormality signal.

10. The information-integrated data penetration system according to claim 9, characterized in that: The retransmitting data or re-forwarding data according to the alarm signal comprises: Determine whether the alarm signal is a conversion abnormality signal; If yes, then the corresponding original data is obtained from the original database, the original data is reconverted to obtain new business data, and the business data is input into the data synchronization module and retransmitted to the central data platform; at the same time, the business data is used to replace the corresponding business data in the unified database; If not, the corresponding business data is obtained from the unified database, the business data is input into the data synchronization module, and retransmitted to the central data platform.