Method and system for optimizing operation and maintenance cost of power grid project

By dividing power grid areas and optimizing the number of maintenance personnel based on historical data, the contradiction between power grid operation and maintenance costs and fault response speed is solved, achieving a balance between cost savings and power supply reliability.

CN118780779AInactive Publication Date: 2024-10-15CHUZHOU POWER SUPPLY CO OF STATE GRID ANHUI ELECTRIC POWER CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410999171.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In power grid operation and maintenance, too many maintenance personnel will increase operation and maintenance costs, but blindly reducing personnel may cause the power grid to be unable to respond quickly when sudden failures occur, affecting stability and power supply reliability.

Method used

By dividing the power grid area into high-risk and low-risk areas based on historical data, the optimization status of the maintenance site is determined, and the number of maintenance personnel is optimized based on operating status data and response data to ensure rapid response in the event of a sudden failure.

Benefits of technology

It realizes the optimization of power grid operation and maintenance costs, while ensuring the rapid response and power supply reliability of the power grid in the event of failure, reducing repair time and the impact on stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780779A_ABST
    Figure CN118780779A_ABST
Patent Text Reader

Abstract

The invention discloses a power grid project operation and maintenance cost optimization method and system, and particularly relates to the technical field of power grid cost optimizing.The method comprises the steps that a target power grid area is divided into a high-risk area and a low-risk area according to historical data, and when the target power grid area is the low-risk area, a first optimization state of a target maintenance site is determined; and when the target maintenance site is in the first optimizable state, determining a second optimization state of the target maintenance site, and when the second optimization state of the target maintenance site is in the second optimizable state, optimizing the number of maintenance personnel of the target maintenance site. Whether the number of the maintainers of the target maintenance site can be optimized or not can be judged by combining the target maintenance site and the target power grid region for many times, the operation and maintenance cost of the power grid is saved, the target maintenance site can be ensured to quickly respond when the power grid breaks down suddenly, the repair time is shortened, and the maintenance efficiency is improved. And the influence on the stability of a power grid and the power supply reliability of users is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid cost optimization, and in particular to a method and system for optimizing power grid project operation and maintenance costs. Background Art

[0002] Power grid engineering operation and maintenance refers to the daily operation, maintenance and repair of power grid facilities, including inspection, testing, maintenance and fault repair of transmission lines, substation equipment and distribution networks. Through scientific operation and maintenance, we can ensure the safe and reliable operation of the power system, improve the stability and efficiency of power supply, extend the service life of equipment, and ensure the normal power demand of power users;

[0003] In the operation and maintenance of power grid projects, in general, in order to better operate and maintain the power grid, maintenance stations will be set up in different power grid areas. At each maintenance station, a fixed number of power workers will be arranged to perform maintenance in the power grid area corresponding to the maintenance station to ensure the normal operation of the power grid. However, in actual power grid operation, if the risk of the power grid is low, too many maintenance personnel may increase the cost of power grid operation and maintenance, but if the maintenance personnel at the station are blindly reduced, the power grid may not be able to respond quickly to sudden failures, prolonging the repair time, thereby affecting the stability of the power grid and the reliability of power supply to users. Summary of the invention

[0004] The purpose of the present invention is to solve the problem that too many maintenance personnel may increase the cost of power grid operation and maintenance, but if the maintenance personnel at the site are reduced blindly, the power grid may not respond quickly to sudden failures, extending the repair time, thereby affecting the stability of the power grid and the power supply reliability of users. A method and system for optimizing the operation and maintenance cost of power grid projects is proposed.

[0005] In a first aspect of the present invention, a method for optimizing the operation and maintenance cost of a power grid project is first proposed, the method comprising:

[0006] The power grid area corresponding to the target maintenance site is recorded as the target power grid area, and the target power grid area is divided into a high-risk area and a low-risk area according to historical data;

[0007] When the target power grid area is a low-risk area, the important features of the target power grid area are obtained, and the important weight value of the target power grid area is determined according to the important features;

[0008] Compare the own importance weight value with the preset own importance weight value threshold, and determine the first optimization state of the target maintenance site according to the comparison result; the first optimization state includes a first optimizable state and a first non-optimizable state;

[0009] When the target maintenance site is in the first optimizable state, the operating status data of the target power grid area and the response status data of the target maintenance site are obtained, and the second optimization state of the target maintenance site is determined according to the operating status data of the target power grid area and the response status data of the target maintenance site; the second optimization state includes a second optimizable state and a second non-optimizable state;

[0010] When the second optimization state of the target maintenance site is the second optimizable state, the number of maintenance personnel of the target maintenance site is optimized.

[0011] Optionally, dividing the target power grid area into a high-risk area and a low-risk area according to historical data includes:

[0012] Extract the grid fault area involved in each fault in the target grid area from the historical data, and aggregate them based on time to obtain a fault area set;

[0013] Calculate the standard deviation of the fault area set and record the standard deviation as the fault area coefficient;

[0014] Extracting the fault frequency of the target power grid area from the historical data, and comparing the fault frequency of the target power grid area with a preset fault frequency threshold, and comparing the fault area coefficient with a preset fault area coefficient threshold;

[0015] If the fault frequency is less than the preset fault frequency threshold and the fault area coefficient is less than the preset fault area coefficient threshold, the target power grid area is divided into a high-risk area; if not, the target power grid area is divided into a low-risk area.

[0016] Optionally, obtaining the important features of the target power grid area, and determining the important weight value of the target power grid area according to the important features includes:

[0017] The important characteristics include the proportion of key users, the proportion of trunk lines and the proportion of environmental impact corresponding to the target power grid area; and the proportion of key users, the proportion of trunk lines and the proportion of environmental impact are each recorded as a criterion;

[0018] Construct a pairwise comparison judgment matrix for each criterion, and divide each element of the judgment matrix by the sum of its column to obtain a normalized matrix;

[0019] Calculate the average value of each row of the normalized matrix to obtain the weight vector of each criterion;

[0020] The consistency ratio of the judgment matrix is ​​calculated according to the weight vector of each criterion. When the consistency ratio is less than a preset consistency ratio threshold, the weight vector of each criterion is recorded as a final weight vector.

[0021] When the consistency ratio is not less than the preset consistency ratio threshold, the value of each element of the judgment matrix is ​​adjusted until the consistency ratio is less than the preset consistency ratio threshold, and the weight vector of each criterion corresponding to the output is the final weight vector;

[0022] The corresponding values ​​of the key user ratio, trunk line ratio and environmental impact ratio of the target power grid area are obtained, recorded as the criterion values, and the criterion values ​​are multiplied by the weight vector of the corresponding criterion to obtain the weight value of each criterion. The weight values ​​of each criterion are added together to obtain the important weight value of the target power grid area itself.

[0023] Optionally, comparing the own importance weight value with a preset own importance weight value threshold, and determining the first optimization state of the target maintenance site according to the comparison result includes:

[0024] If the self-importance weight value of the target power grid area is less than the preset self-importance weight value threshold, it means that the first optimization state of the corresponding target maintenance site is the first optimizable state;

[0025] If the self-importance weight value of the target power grid area is not less than the preset self-importance weight value threshold, it means that the first optimization state of the corresponding target maintenance site is the first non-optimizable state.

[0026] Optionally, determining the second optimization state of the target maintenance site according to the operation state data of the target power grid area and the response state data of the target maintenance site includes:

[0027] The operation status data of the target power grid area includes a power grid delivery operation time coefficient and a fault type similarity coefficient;

[0028] The response status data of the target maintenance site includes the average distance of the dispatchable sites and the coefficient of the number of vacancies;

[0029] The method for obtaining the power grid delivery operation time coefficient is:

[0030] Obtain the actual delivery operation time and the preset available time of the target power grid area, and divide the actual delivery operation time by the preset available time to obtain the power grid delivery operation time coefficient;

[0031] The method for obtaining the fault type similarity coefficient is:

[0032] Obtain the total fault types that appear in the historical records of the target power grid area as a historical fault type set;

[0033] Obtain the fault type corresponding to each fault in the target power grid area as the fault type set of the fault, and obtain several fault type sets;

[0034] Calculate the similarity between each fault type set and the historical fault type set to obtain a number of similarities, and group the similarities to obtain a similarity set, calculate the average value of the similarity set, and use the average value as the fault type similarity coefficient;

[0035] The second optimal state of the target maintenance site is determined according to the power grid delivery operation time coefficient, the fault type similarity coefficient, the average distance of the dispatchable sites and the vacant number of people coefficient.

[0036] Optionally, the method for obtaining the average distance of the schedulable sites is:

[0037] Obtain the total schedulable maintenance sites around the target maintenance site and record them as a schedulable site set;

[0038] Obtain the shortest drivable distance from each maintenance site in the schedulable site set to the target maintenance site, record it as the drivable distance of the site, and calculate the average drivable distance of all maintenance sites in the schedulable site set as the average distance of the schedulable sites;

[0039] The method for obtaining the vacancy coefficient is as follows:

[0040] Obtain the total number of maintenance personnel at the target maintenance site and the number of maintenance personnel who are not scheduled during each task scheduling, and calculate the average number of maintenance personnel who are not scheduled to obtain the average number of vacant personnel;

[0041] Divide the average number of vacant persons by the total number of maintenance personnel to obtain the vacant person coefficient.

[0042] Optionally, determining the second optimization state of the target maintenance site according to the power grid delivery operation time coefficient, the fault type similarity coefficient, the average distance of the dispatchable sites and the vacant number coefficient includes:

[0043] The power grid delivery operation time coefficient, fault type similarity coefficient, average distance of dispatchable stations and vacant personnel coefficient are defined as the input items of fuzzy rules and classified into different fuzzy sets respectively.

[0044] The final optimizability is defined as the output variable and divided into fuzzy sets;

[0045] Formulate fuzzy rules to describe the influence of different input variables on output variables;

[0046] Perform fuzzy reasoning based on fuzzy rules and output the final degree of optimization of the target maintenance site;

[0047] The final optimizability degree is compared with a preset threshold value, and if the final optimizability degree is not less than the preset threshold value, the second optimization state of the target maintenance site is determined as an optimizability state;

[0048] If the final optimizability is less than a preset threshold, the second optimization state of the target maintenance site is determined to be a non-optimizable state.

[0049] In a second aspect of the present invention, a system for optimizing the operation and maintenance cost of a power grid project is provided.

[0050] The system comprises:

[0051] Risk area division module: the power grid area corresponding to the target maintenance site is recorded as the target power grid area, and the target power grid area is divided into high-risk area and low-risk area according to historical data;

[0052] Self-important weight value module: when the target power grid area is a low-risk area, obtain the self-important features of the target power grid area, and determine the self-important weight value of the target power grid area based on the self-important features;

[0053] The first optimization state module: compares the own importance weight value with the preset own importance weight value threshold, and determines the first optimization state of the target maintenance site according to the comparison result; the first optimization state includes a first optimizable state and a first non-optimizable state;

[0054] Second optimization state module: when the target maintenance site is in the first optimizable state, obtain the operating state data of the target power grid area and the response state data of the target maintenance site, and determine the second optimization state of the target maintenance site according to the operating state data of the target power grid area and the response state data of the target maintenance site; the second optimization state includes a second optimizable state and a second non-optimizable state;

[0055] Optimization module: When the second optimization state of the target maintenance site is the second optimizable state, the number of maintenance personnel of the target maintenance site is optimized.

[0056] Beneficial effects of the present invention:

[0057] The present invention proposes a method and system for optimizing the operation and maintenance cost of a power grid project. The method divides a target power grid area into a high-risk area and a low-risk area according to historical data. When the target power grid area is a low-risk area, the first optimization state of the target maintenance site is determined. When the target maintenance site is in a first optimizable state, the second optimization state of the target maintenance site is determined. When the second optimization state of the target maintenance site is a second optimizable state, the number of maintenance personnel at the target maintenance site is optimized. In this way, the target maintenance site and the target power grid area can be combined multiple times to determine whether the number of maintenance personnel at the target maintenance site can be appropriately optimized. While saving the power grid operation and maintenance cost, it can also ensure that the target maintenance site can respond quickly to sudden power grid failures, reduce repair time, and reduce the impact on the stability of the power grid and the power supply reliability of users. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] The present invention will be further described below in conjunction with the accompanying drawings.

[0059] Figure 1 A flow chart of a method for optimizing the operation and maintenance cost of a power grid project provided by the present invention;

[0060] Figure 2 A framework diagram of a power grid engineering operation and maintenance cost optimization system provided by the present invention. DETAILED DESCRIPTION

[0061] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0062] Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without making any creative work shall fall within the scope of protection of the present invention.

[0063] The embodiment of the present invention provides a method for optimizing the operation and maintenance cost of a power grid project. Figure 1 , Figure 1 A flowchart of a method for optimizing the operation and maintenance cost of a power grid project provided by an embodiment of the present invention. The method comprises the following steps:

[0064] The power grid area corresponding to the target maintenance site is recorded as the target power grid area, and the target power grid area is divided into a high-risk area and a low-risk area according to historical data;

[0065] When the target power grid area is a low-risk area, the important features of the target power grid area are obtained, and the important weight value of the target power grid area is determined according to the important features;

[0066] Compare the own importance weight value with the preset own importance weight value threshold, and determine the first optimization state of the target maintenance site according to the comparison result; the first optimization state includes a first optimizable state and a first non-optimizable state;

[0067] When the target maintenance site is in the first optimizable state, the operating state data of the target power grid area and the response state data of the target maintenance site are obtained, and the second optimization state of the target maintenance site is determined according to the operating state data of the target power grid area and the response state data of the target maintenance site; the second optimization state includes a second optimizable state and a second non-optimizable state;

[0068] When the second optimization state of the target maintenance site is the second optimizable state, the number of maintenance personnel at the target maintenance site is optimized.

[0069] Based on a method for optimizing the operation and maintenance cost of a power grid project provided in an embodiment of the present invention, through the above-mentioned method, it is possible to combine the target maintenance site and the target power grid area multiple times to determine whether the number of maintenance personnel at the target maintenance site can be appropriately optimized, which can save the power grid operation and maintenance costs while ensuring that the target maintenance site can respond quickly in the event of a sudden power grid failure, thereby reducing the repair time and reducing the impact on the stability of the power grid and the power supply reliability of users.

[0070] In one embodiment, dividing the target power grid area into a high-risk area and a low-risk area according to historical data includes:

[0071] Extract the grid fault area involved in each fault in the target grid area from the historical data, and aggregate them based on time to obtain a fault area set;

[0072] Calculate the standard deviation of the fault area set and record the standard deviation as the fault area coefficient;

[0073] Extracting the fault frequency of the target power grid area from the historical data, and comparing the fault frequency of the target power grid area with a preset fault frequency threshold, and comparing the fault area coefficient with a preset fault area coefficient threshold;

[0074] If the fault frequency is less than the preset fault frequency threshold and the fault area coefficient is less than the preset fault area coefficient threshold, the target power grid area is divided into a high-risk area; if not, the target power grid area is divided into a low-risk area.

[0075] It should be noted that the preset fault frequency threshold and the preset fault area coefficient threshold are set by professionals according to actual conditions, and will not be described or limited in detail.

[0076] It should be noted that the division of high-risk areas includes the following: the fault frequency is not less than the preset fault frequency threshold but the fault area coefficient is less than the preset fault area coefficient threshold, the fault frequency is not less than the preset fault frequency threshold but the fault area coefficient is less than the preset fault area coefficient threshold, the fault frequency is not less than the preset fault frequency threshold and the fault area coefficient is not less than the preset fault area coefficient threshold;

[0077] It should be noted that the fault frequency reflects the frequency of problems occurring in the target power grid area within a certain period of time, which is an important indicator for measuring the health status of the target power grid area. A higher fault frequency usually means aging equipment, poor operating environment or poor management, while a lower fault frequency indicates stable equipment operation. The fault area coefficient reflects the scope and severity of the impact of each fault on the target power grid area. The volatility of the fault area can provide additional information about the severity of the fault. A larger fault area coefficient usually means that each fault has a larger impact range and may result in more serious power outages. The combination of these two indicators can more comprehensively assess the comprehensive risk of the power grid area. Combining the two helps to accurately assess the actual risk level of the power grid area. The high-risk area is: the fault frequency is high but the fault area is small, which may indicate that equipment problems are frequent but not serious; while the fault frequency is low but the fault area is large, which may indicate that the target power grid area is stable as a whole but serious faults occur occasionally. The high fault frequency and large fault area indicate that the target power grid area is unstable as a whole. Therefore, when the target power grid area is a high-risk area, in order to ensure that the power grid can be quickly repaired when a fault occurs, the number of maintenance personnel at the corresponding target maintenance site will not be considered to be reduced or optimized for the time being, and the number of maintenance personnel at the corresponding target maintenance site can even be appropriately increased according to the actual situation. Therefore, only when the fault frequency is low and the fault area is small, can the number of maintenance personnel at the corresponding target maintenance site be reduced or optimized.

[0078] In one implementation, the above method can more accurately determine the operating status of the target power grid area, so that the optimal status of the number of maintenance personnel at the subsequent target maintenance site can be determined more accurately.

[0079] In one embodiment, obtaining the important features of the target power grid area and determining the important weight value of the target power grid area according to the important features of the target power grid area includes:

[0080] Its important characteristics include the proportion of key users, trunk lines and environmental impact corresponding to the target power grid area; and the proportion of key users, trunk lines and environmental impact are each recorded as a criterion;

[0081] Construct a pairwise comparison judgment matrix for each criterion, and divide each element of the judgment matrix by the sum of its column to obtain a normalized matrix;

[0082] Calculate the average value of each row of the normalized matrix to obtain the weight vector of each criterion;

[0083] The consistency ratio of the judgment matrix is ​​calculated according to the weight vector of each criterion. When the consistency ratio is less than a preset consistency ratio threshold, the weight vector of each criterion is recorded as a final weight vector.

[0084] When the consistency ratio is not less than the preset consistency ratio threshold, the value of each element of the judgment matrix is ​​adjusted until the consistency ratio is less than the preset consistency ratio threshold, and the weight vector of each criterion corresponding to the output is the final weight vector;

[0085] The corresponding values ​​of the key user ratio, trunk line ratio and environmental impact ratio of the target power grid area are obtained, recorded as the criterion values, and the criterion values ​​are multiplied by the weight vector of the corresponding criterion to obtain the weight value of each criterion. The weight values ​​of each criterion are added together to obtain the important weight value of the target power grid area itself.

[0086] It should be noted that the preset consistency ratio threshold is set by professionals based on actual conditions, and no further details or limitations are given;

[0087] It should be noted that the proportion of key users refers to the proportion of some relatively key users among the users connected to the target power grid area, such as hospitals, factories, etc. These key users are highly dependent on power supply, and power outages will have a significant impact on their production and services. Therefore, in order to reduce the impact on the production and services of key users, it is necessary to determine the number of maintenance personnel at the corresponding target maintenance sites. The number of maintenance personnel at the target maintenance sites cannot be reduced arbitrarily to prevent the inability to respond quickly in the event of sudden power grid failures, thereby prolonging the repair time and affecting the stability of the power grid and the power supply reliability of users; the proportion of trunk lines refers to the proportion of trunk lines in all lines in the target power grid area. The trunk lines are the backbone of the power grid and play a key role in power transmission. Areas with a high proportion of trunk lines usually carry important power transmission tasks, and therefore require more attention and maintenance. Therefore, the number of maintenance personnel at the target maintenance site cannot be reduced arbitrarily; the environmental impact ratio refers to the proportion of the target power grid area affected by the external environment when a fault occurs. The calculation formula can be, Ds = sa / sd, where Ds is the environmental impact ratio, sa is the total number of times the cause of the target power grid area failure is affected by the external environment, and sd is the total number of failures in the target power grid area; areas with a high proportion of environmental impact indicate that the external environment has a greater impact on power grid failures. In this case, the target maintenance site requires more attention and maintenance to cope with possible environmental interference. Therefore, the number of maintenance personnel at the maintenance site cannot be reduced arbitrarily.

[0088] In addition, it should be noted that the determination of key users is determined by professional personnel and is not specifically limited; in addition, the values ​​corresponding to the proportion of key users, the proportion of trunk lines and the proportion of environmental impact, that is, the criterion values, can be obtained through the operation log of the target power grid area, or other methods, which are not specifically limited or elaborated;

[0089] It should be noted that the above-mentioned process of calculating the important weight value of the target power grid area itself is given as an example, for example:

[0090] 1. Record the proportion of key users, trunk lines and environmental impact as a criterion respectively, and construct a pairwise comparison judgment matrix for each criterion. A scale of 1-3 can be used to indicate relative importance, for example:

[0091] Key user ratio Main line ratio Environmental impact ratio Key user ratio 1 2 3 Main line ratio 1 / 2 1 2 Environmental impact ratio 1 / 3 1 / 2 1

[0092] Calculate the sum of each column in the judgment matrix:

[0093] The sum of the key user proportion columns: 1+1 / 2+1 / 3≈1.833;

[0094] The sum of the proportion of trunk lines and equipment is: 2+1+1 / 2=3.5;

[0095] The total of the environmental impact index column: 3+2+1=6.0;

[0096] Second: Divide each element of the judgment matrix by the sum of its column to obtain a normalized matrix:

[0097] Key user ratio Main line ratio Environmental impact ratio Key user ratio 0.545 0.571 0.500 Main line ratio 0.273 0.286 0.333 Environmental impact ratio 0.182 0.143 0.167

[0098] Calculate the average value of each row of the normalized matrix to obtain the weight vector for each criterion:

[0099] Key user proportion weight: (0.545+0.571+0.500) / 3=0.539;

[0100] Trunk line weight: (0.273+0.286+0.333) / 3=0.297;

[0101] Environmental impact index weight: (0.182+0.143+0.167) / 3=0.164;

[0102] The weight vector is: [0.539, 0.297, 0.164];

[0103] 3: Calculate the consistency ratio of the judgment matrix based on the weight vector of each criterion including:

[0104] 1. Multiply the judgment matrix by the weight vector as a new vector:

[0105]

[0106] 2. Calculate the ratio vector:

[0107] Divide each element in the new vector by the corresponding weight element:

[0108]

[0109] 3. Calculate the maximum eigenvalue λ max :

[0110]

[0111] 4. Calculate the consistency index (CI):

[0112]

[0113] For a 3x3 matrix:

[0114]

[0115] 5. Find the Random Consistency Index (RI)

[0116] For a 3x3 matrix, RI = 0.58;

[0117] 6. Calculate the consistency ratio (CR):

[0118]

[0119] 7. Judge consistency:

[0120] Results: The calculated CR = 0.006, which is less than 0.1, indicating that the consistency of the matrix is ​​good, and the weight vector of each criterion is recorded as the final weight vector.

[0121] 4: Calculate your own important weight value:

[0122] Step 1: Calculate the self-importance weight value of the target power grid area according to the weight of each criterion:

[0123] Assume that the corresponding values ​​of key user proportion, trunk line proportion and environmental impact proportion in the target power grid area are 0.75, 0.60 and 0.45 respectively;

[0124] Step 2: Use the weight values ​​for each criterion:

[0125] Key user proportion weight value: 0.75×0.539=0.40425;

[0126] Key user proportion weight value: 0.60×0.297=0.1782;

[0127] Key user proportion weight value: 0.45×0.164=0.0738;

[0128] Step 3: Calculate the important weight value of the target power grid area:

[0129] Its own importance weight value = 0.40425 + 0.1782 + 0.0738 = 0.65625.

[0130] It should be noted that in the above example, the threshold of the preset consistency ratio (CR) is usually set to 0.1 because this value reflects the consistency of each comparison in the judgment matrix. When CR is less than 0.1, it means that the consistency of the judgment matrix is ​​good, and the subjectivity and inconsistency of the data are within an acceptable range; when CR is not less than 0.1, it means that the consistency of the judgment matrix is ​​poor. At this time, by continuously adjusting the value of each element of the judgment matrix until the consistency ratio is less than the preset consistency ratio threshold, the weight vector of each criterion corresponding to the output is the final weight vector; in addition, for the 3x3 matrix, the random consistency index (RI) is set to 0.58, which is the average consistency index based on a large number of randomly generated judgment matrices. RI is used to calculate the consistency index (CI) to evaluate the consistency of the actual matrix. Comparing CI with the RI ratio (CR) can effectively identify inconsistent judgments, thereby ensuring the reliability and accuracy of the analysis results.

[0131] In one implementation method, multiple criteria (such as the proportion of key users, the proportion of trunk lines and the proportion of environmental impact) are considered simultaneously, and the influence of these criteria is integrated into a comprehensive score, so that the evaluation result is more comprehensive, covering all aspects of the importance of the target power grid area, and the obtained target power grid area's own importance weight value can more accurately reflect the importance of the target power grid area.

[0132] In one embodiment, comparing the own importance weight value with a preset own importance weight value threshold, and determining the first optimization state of the target maintenance site according to the comparison result includes:

[0133] If the self-importance weight value of the target power grid area is less than the preset self-importance weight value threshold, it means that the first optimization state of the corresponding target maintenance site is the first optimizable state;

[0134] If the self-importance weight value of the target power grid area is not less than the preset self-importance weight value threshold, it means that the first optimization state of the corresponding target maintenance site is the first non-optimizable state.

[0135] It should be noted that when the target maintenance site is in the first non-optimizable state, it means that the target power grid area is of high importance, and the existing maintenance personnel configuration should be maintained to ensure the stability and responsiveness of the power grid operation; when the target maintenance site is in the first optimizable state, it means that the target power grid area is of low importance, and it can be further evaluated whether the number of maintenance personnel can be optimized; in addition, the preset self-importance weight value threshold is set by professionals according to the actual situation and is not specifically limited.

[0136] In one implementation, through the above method, it is possible to determine whether the number of maintenance personnel at the corresponding target maintenance site can be optimized according to the importance of the actual target power grid area, so as to better meet the actual situation of the target power grid.

[0137] In one embodiment, determining the second optimization state of the target maintenance site according to the operation state data of the target power grid area and the response state data of the target maintenance site includes:

[0138] The operation status data of the target power grid area includes the power grid delivery operation time coefficient and the fault type similarity coefficient;

[0139] The response status data of the target maintenance site include the average distance of the dispatchable sites and the coefficient of vacant personnel;

[0140] The method for obtaining the power grid delivery operation time coefficient is as follows:

[0141] Obtain the actual delivery operation time and the preset available time of the target power grid area, and divide the actual delivery operation time by the preset available time to obtain the power grid delivery operation time coefficient;

[0142] The method for obtaining the fault type similarity coefficient is:

[0143] Obtain the total fault types that appear in the historical records of the target power grid area as a historical fault type set;

[0144] Obtain the fault type corresponding to each fault in the target power grid area as the fault type set of the fault, and obtain several fault type sets;

[0145] Calculate the similarity between each fault type set and the historical fault type set to obtain a number of similarities, and group the similarities to obtain a similarity set, calculate the average value of the similarity set, and use the average value as the fault type similarity coefficient;

[0146] The second optimal state of the target maintenance site is determined according to the power grid delivery operation time coefficient, the fault type similarity coefficient, the average distance of the dispatchable sites and the vacant number of people coefficient.

[0147] It should be noted that the actual delivery operation time of the target power grid area, the total fault types appearing in the historical records, and the fault types corresponding to each fault can be obtained according to the operation log of the target power grid area, or in other ways, which are not specifically limited;

[0148] It should be noted that the similarity between each fault type set and the historical fault type set can be calculated in the following manner:

[0149] For example, a certain fault type set K = {A, B, C} in the target power grid area, and the fault types L = {A, B, D, E} in the historical records, where A, B, C, D, E represent different fault types, then the similarity F between the fault type set and the historical fault type set can be calculated as follows:

[0150]

[0151] Of course, other similarity calculation methods may also be used, such as cosine similarity method, etc., which will not be specifically limited or elaborated.

[0152] In one implementation, the above method can more accurately calculate the power grid delivery operation time coefficient and the fault type similarity coefficient, and more accurately calculate the optimal state of the number of maintenance personnel at subsequent target maintenance sites.

[0153] It should be noted that when the grid operation time coefficient is smaller and the fault type similarity coefficient is larger, it means that the operation status of the target grid area is more stable, the maintenance work is relatively simple, and the demand for maintenance personnel may be lower, thus having the potential to further optimize and reduce the number of maintenance personnel.

[0154] In one embodiment, the method for obtaining the average distance of schedulable sites is:

[0155] Obtain the total schedulable maintenance sites around the target maintenance site and record them as a schedulable site set;

[0156] Obtain the shortest drivable distance from each maintenance site in the schedulable site set to the target maintenance site, record it as the drivable distance of the site, and calculate the average drivable distance of all maintenance sites in the schedulable site set as the average distance of the schedulable sites;

[0157] The method for obtaining the vacancy coefficient is as follows;

[0158] Obtain the total number of maintenance personnel at the target maintenance site and the number of maintenance personnel who are not scheduled during each task scheduling, and calculate the average number of maintenance personnel who are not scheduled to obtain the average number of vacant personnel;

[0159] Divide the average number of vacant persons by the total number of maintenance personnel to obtain the vacant person coefficient.

[0160] It should be noted that the total dispatchable maintenance sites around the target maintenance site and the corresponding shortest drivable distance to the target maintenance site, the total number of maintenance personnel at the target maintenance site and the number of maintenance personnel who are not dispatched during each task scheduling can all be monitored and obtained through the data module in the overall system of the power grid operation, or in other ways, which are not limited or elaborated on.

[0161] It should be noted that when the average distance between dispatchable sites is smaller and the vacant personnel coefficient is larger, the operating status of the target power grid area is more stable, the maintenance work is relatively simple, and the demand for maintenance personnel may be lower, thus having the potential to further optimize and reduce the number of maintenance personnel.

[0162] In one implementation, the above method can more accurately calculate the average distance of the dispatchable sites and the coefficient of vacant personnel, and more accurately calculate the optimization status of the maintenance personnel at the subsequent target maintenance sites.

[0163] In one embodiment, determining the second optimization state of the target maintenance site according to the power grid delivery operation time coefficient, the fault type similarity coefficient, the average distance of the dispatchable sites and the vacant number coefficient includes:

[0164] The power grid delivery operation time coefficient, fault type similarity coefficient, average distance of dispatchable stations and vacant personnel coefficient are defined as the input items of fuzzy rules and classified into different fuzzy sets respectively.

[0165] The final optimizability is defined as the output variable and divided into fuzzy sets;

[0166] Formulate fuzzy rules to describe the influence of different input variables on output variables;

[0167] Perform fuzzy reasoning based on fuzzy rules and output the final degree of optimization of the target maintenance site;

[0168] The final optimizability degree is compared with a preset threshold value. If the final optimizability degree is not less than the preset threshold value, the second optimization state of the target maintenance site is determined to be an optimizability state.

[0169] If the final optimizability is less than a preset threshold, the second optimization state of the target maintenance site is determined to be a non-optimizable state.

[0170] It should be noted that the preset threshold is set by professionals based on actual conditions and is not specifically limited.

[0171] It should be noted that when formulating fuzzy rules to describe the influence of different input variables on output variables, the rules can be:

[0172] If the grid delivery operation time coefficient is low and the fault type similarity coefficient is high and the average distance of dispatchable sites is short and the vacant population coefficient is high, the degree of optimization can be high.

[0173] If the grid delivery operation time coefficient is medium and the fault type similarity coefficient is medium and the average distance of dispatchable sites is medium and the vacancy population coefficient is medium, then the degree of optimization is medium.

[0174] If the grid delivery operation time coefficient is high and the fault type similarity coefficient is low and the average distance of dispatchable sites is long and the vacant population coefficient is low, the degree of optimization can be low.

[0175] In one implementation method, through the above method, the optimal state of the number of maintenance personnel at the target maintenance site can be scientifically evaluated based on the operating status of the target power grid area and the response status data of the maintenance site. This method fully considers multiple factors, avoids decision-making deviations that may be caused by a single indicator, and provides a more comprehensive and reliable optimization solution.

[0176] It should be noted that when the second optimization state of the target maintenance site is the second optimizable state, the number of maintenance personnel at the target maintenance site can be optimized, and the corresponding proportion of employees can be appropriately reduced according to the degree of optimizability, or the number of employees at the maintenance site can be optimized in other ways. In this way, while reducing the operation and maintenance costs of the power grid project, it can also ensure that the target maintenance site can respond quickly in the event of a sudden power grid failure, reduce repair time, and reduce the impact on the stability of the power grid and the power supply reliability of users.

[0177] Based on the same inventive concept, the embodiment of the present invention also provides a power grid engineering operation and maintenance cost optimization system. Figure 2 , Figure 2 A framework diagram of a power grid engineering operation and maintenance cost optimization system provided by an embodiment of the present invention includes:

[0178] Risk area division module: the power grid area corresponding to the target maintenance site is recorded as the target power grid area, and the target power grid area is divided into high-risk area and low-risk area according to historical data;

[0179] Self-important weight value module: when the target power grid area is a low-risk area, obtain the self-important features of the target power grid area, and determine the self-important weight value of the target power grid area based on the self-important features;

[0180] The first optimization state module: compares the own important weight value with the preset own important weight value threshold, and determines the first optimization state of the target maintenance site according to the comparison result; the first optimization state includes a first optimizable state and a first non-optimizable state;

[0181] Second optimization state module: when the target maintenance site is in the first optimizable state, the operation state data of the target power grid area and the response state data of the target maintenance site are obtained, and the second optimization state of the target maintenance site is determined according to the operation state data of the target power grid area and the response state data of the target maintenance site; the second optimization state includes a second optimizable state and a second non-optimizable state;

[0182] Optimization module: When the second optimization state of the target maintenance site is the second optimizable state, the number of maintenance personnel of the target maintenance site is optimized.

[0183] A power grid engineering operation and maintenance cost optimization system provided based on an embodiment of the present invention can multiple times combine the target maintenance site and the target power grid area to determine whether the number of maintenance personnel at the target maintenance site can be appropriately optimized, which can save the power grid operation and maintenance costs while ensuring that the target maintenance site can respond quickly in the event of a sudden power grid failure, thereby reducing repair time and reducing the impact on the stability of the power grid and the power supply reliability of users.

[0184] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A method for optimizing the operation and maintenance cost of a power grid project, characterized in that: The following steps are involved: The power grid area corresponding to the target maintenance site is recorded as the target power grid area, and the target power grid area is divided into a high-risk area and a low-risk area according to historical data; When the target power grid area is a low-risk area, the important features of the target power grid area are obtained, and the important weight value of the target power grid area is determined according to the important features; Compare the own importance weight value with the preset own importance weight value threshold, and determine the first optimization state of the target maintenance site according to the comparison result; the first optimization state includes a first optimizable state and a first non-optimizable state; When the target maintenance site is in the first optimizable state, the operating state data of the target power grid area and the response state data of the target maintenance site are obtained, and the second optimization state of the target maintenance site is determined according to the operating state data of the target power grid area and the response state data of the target maintenance site; The second optimization state includes a second optimizable state and a second non-optimizable state; When the second optimization state of the target maintenance site is the second optimizable state, the number of maintenance personnel of the target maintenance site is optimized.

2. A method for optimizing the operation and maintenance cost of a power grid project according to claim 1, characterized in that: The target grid area is divided into high-risk area and low-risk area based on historical data, including: Extract the grid fault area involved in each fault in the target grid area from the historical data, and aggregate them based on time to obtain a fault area set; Calculate the standard deviation of the fault area set and record the standard deviation as the fault area coefficient; Extracting the fault frequency of the target power grid area from the historical data, and comparing the fault frequency of the target power grid area with a preset fault frequency threshold, and comparing the fault area coefficient with a preset fault area coefficient threshold; If the fault frequency is less than the preset fault frequency threshold and the fault area coefficient is less than the preset fault area coefficient threshold, the target power grid area is divided into a high-risk area; if not, the target power grid area is divided into a low-risk area.

3. A method for optimizing the operation and maintenance cost of a power grid project according to claim 1, characterized in that: Obtaining the important features of the target power grid area and determining the important weight value of the target power grid area according to the important features include: The important characteristics include the proportion of key users, the proportion of trunk lines and the proportion of environmental impact corresponding to the target power grid area; and the proportion of key users, the proportion of trunk lines and the proportion of environmental impact are each recorded as a criterion; Construct a pairwise comparison judgment matrix for each criterion, and divide each element of the judgment matrix by the sum of its column to obtain a normalized matrix; Calculate the average value of each row of the normalized matrix to obtain the weight vector of each criterion; The consistency ratio of the judgment matrix is ​​calculated according to the weight vector of each criterion. When the consistency ratio is less than a preset consistency ratio threshold, the weight vector of each criterion is recorded as a final weight vector. When the consistency ratio is not less than the preset consistency ratio threshold, the value of each element of the judgment matrix is ​​adjusted until the consistency ratio is less than the preset consistency ratio threshold, and the weight vector of each criterion corresponding to the output is the final weight vector; The corresponding values ​​of the key user ratio, trunk line ratio and environmental impact ratio of the target power grid area are obtained, recorded as the criterion values, and the criterion values ​​are multiplied by the weight vector of the corresponding criterion to obtain the weight value of each criterion. The weight values ​​of each criterion are added together to obtain the important weight value of the target power grid area itself.

4. A method for optimizing the operation and maintenance cost of a power grid project according to claim 1, characterized in that: Comparing the own importance weight value with the preset own importance weight value threshold, and determining the first optimization state of the target maintenance site according to the comparison result includes: If the self-importance weight value of the target power grid area is less than the preset self-importance weight value threshold, it means that the first optimization state of the corresponding target maintenance site is the first optimizable state; If the self-importance weight value of the target power grid area is not less than the preset self-importance weight value threshold, it means that the first optimization state of the corresponding target maintenance site is the first non-optimizable state.

5. A method for optimizing the operation and maintenance cost of a power grid project according to claim 1, characterized in that: Determining the second optimized state of the target maintenance site according to the operating state data of the target power grid area and the response state data of the target maintenance site includes: The operation status data of the target power grid area includes a power grid delivery operation time coefficient and a fault type similarity coefficient; The response status data of the target maintenance site includes the average distance of the dispatchable sites and the coefficient of the number of vacancies; The method for obtaining the power grid delivery operation time coefficient is: Obtain the actual delivery operation time and the preset available time of the target power grid area, and divide the actual delivery operation time by the preset available time to obtain the power grid delivery operation time coefficient; The method for obtaining the fault type similarity coefficient is: Obtain the total fault types that appear in the historical records of the target power grid area as a historical fault type set; Obtain the fault type corresponding to each fault in the target power grid area as the fault type set of the fault, and obtain several fault type sets; Calculate the similarity between each fault type set and the historical fault type set to obtain a number of similarities, and group the similarities to obtain a similarity set, calculate the average value of the similarity set, and use the average value as the fault type similarity coefficient; The second optimal state of the target maintenance site is determined according to the power grid delivery operation time coefficient, the fault type similarity coefficient, the average distance of the dispatchable sites and the vacant number of people coefficient.

6. A method for optimizing the operation and maintenance cost of a power grid project according to claim 5, characterized in that: The method for obtaining the average distance of the schedulable sites is: Obtain the total schedulable maintenance sites around the target maintenance site and record them as a schedulable site set; Obtain the shortest drivable distance from each maintenance site in the schedulable site set to the target maintenance site, record it as the drivable distance of the site, and calculate the average drivable distance of all maintenance sites in the schedulable site set as the average distance of the schedulable sites; The method for obtaining the vacancy coefficient is as follows: Obtain the total number of maintenance personnel at the target maintenance site and the number of maintenance personnel who are not scheduled during each task scheduling, and calculate the average number of maintenance personnel who are not scheduled to obtain the average number of vacant personnel; Divide the average number of vacant persons by the total number of maintenance personnel to obtain the vacant person coefficient.

7. A method for optimizing the operation and maintenance cost of a power grid project according to claim 5, characterized in that: The second optimization state of the target maintenance site is determined according to the power grid delivery operation time coefficient, the fault type similarity coefficient, the average distance of the dispatchable sites and the vacant number coefficient, including: The power grid delivery operation time coefficient, fault type similarity coefficient, average distance of dispatchable stations and vacant personnel coefficient are defined as the input items of fuzzy rules and classified into different fuzzy sets respectively. The final optimizability is defined as the output variable and divided into fuzzy sets; Formulate fuzzy rules to describe the influence of different input variables on output variables; Perform fuzzy reasoning based on fuzzy rules and output the final degree of optimization of the target maintenance site; The final optimizability degree is compared with a preset threshold value, and if the final optimizability degree is not less than the preset threshold value, the second optimization state of the target maintenance site is determined as an optimizability state; If the final optimizability is less than a preset threshold, the second optimization state of the target maintenance site is determined to be a non-optimizable state.

8. A power grid engineering operation and maintenance cost optimization system, characterized in that: The system comprises: Risk area division module: the power grid area corresponding to the target maintenance site is recorded as the target power grid area, and the target power grid area is divided into high-risk area and low-risk area according to historical data; Self-important weight value module: when the target power grid area is a low-risk area, obtain the self-important features of the target power grid area, and determine the self-important weight value of the target power grid area based on the self-important features; The first optimization state module: compares the own importance weight value with the preset own importance weight value threshold, and determines the first optimization state of the target maintenance site according to the comparison result; the first optimization state includes a first optimizable state and a first non-optimizable state; Second optimization state module: when the target maintenance site is in the first optimizable state, obtain the operating state data of the target power grid area and the response state data of the target maintenance site, and determine the second optimization state of the target maintenance site according to the operating state data of the target power grid area and the response state data of the target maintenance site; the second optimization state includes a second optimizable state and a second non-optimizable state; Optimization module: When the second optimization state of the target maintenance site is the second optimizable state, the number of maintenance personnel of the target maintenance site is optimized.