Lock catch steel pipe pile cofferdam for offshore inclined bare rock bearing platform construction and construction method of lock catch steel pipe pile cofferdam
By using locking steel pipe pile cofferdams in the construction of offshore bridges, the problems of low cofferdam reuse rate and difficulty in underwater bedrock excavation are solved. Dry construction is realized, materials are saved, the construction period is shortened, and the construction period is improved. Improved work efficiency.
Patent Information
- Application Number
- CN202411112992.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-10-18
AI Technical Summary
In the construction of offshore bridges, the cofferdam reuse rate of high pile caps is low, underwater bedrock excavation is difficult, the work efficiency is low, the construction period is long, and a large amount of back-sealing concrete is required, which increases the engineering volume.
The locking steel pipe pile cofferdam is used. Steel pipe piles are buried in the seabed through pilot holes, ring beams and internal supports are installed, sand is backfilled to level the seabed, and water is pumped to form a dry operating environment. The strength of the bedrock itself is used to stop water, and can Adjust the length of the steel pipe piles to adapt to the seabed surface to form an overall structure and reduce the use of underwater concrete.
It improves the construction efficiency, saves steel and back-sealing concrete, shortens the construction period, reduces the project volume and construction difficulty, and has great promotion value.
Smart Images

Figure CN118793079A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bridge construction, and in particular relates to a locking steel pipe pile cofferdam for offshore inclined bare rock foundation construction and a construction method thereof. Background Art
[0002] The high pile cap is a pile foundation cap, which is characterized by the bottom surface of the cap being above the foundation surface. This structural form is common in high pile docks. The high pile cap not only serves as a foundation, but also participates in the work of the entire building as a component due to its certain free height, becoming a major load-bearing component in the high pile cap. In some cases, in order to adapt to geological conditions or engineering requirements, the bottom of the high pile cap may be partially buried in the bedrock to improve the stability and bearing capacity of the structure. This design allows the cap to transmit the external force from the superstructure to the deeper foundation bearing layer through the piles and the cap, and is suitable for projects such as large-span bridges, docks and offshore oil platforms. Since the top of the cap is often near the water surface during bridge construction, most of the cofferdams used for cap construction are steel hanging box cofferdams, which have the problem of low reuse rate of cofferdams. At the same time, water stopping requires bottom concrete, which increases the amount of engineering work. The depth of the cofferdam buried in the bedrock is deeper than that of the cap bottom. The underwater bedrock excavation volume is large, the water is deeper, the excavation is difficult, the work efficiency is low, and the construction period is long. Summary of the invention
[0003] In view of this, the present invention aims to overcome the defects in the prior art and proposes a locking steel pipe pile cofferdam for offshore inclined bare rock foundation construction and a construction method thereof.
[0004] To achieve the above object, the technical solution created by the present invention is implemented as follows:
[0005] A locking steel pipe pile cofferdam for offshore inclined bare rock foundation construction comprises a cofferdam body formed by a plurality of locking steel pipe piles, and ring beams are respectively installed inside and outside the cofferdam body, and concrete is poured in the gaps around the locking steel pipe piles. At the same time, an internal support structure is arranged in the cofferdam body.
[0006] Furthermore, the inner support structure includes at least one transverse inner support and a plurality of oblique inner supports.
[0007] A method for constructing a locking steel pipe pile cofferdam for offshore inclined bare rock cap construction comprises the following steps:
[0008] S1. Use a rotary drill to dig a trench in the cofferdam design area on the supporting trestle;
[0009] S2. Insert and drive the locking steel pipe piles one by one to the designed elevation until the entire cofferdam is closed, and then pour concrete into the gaps around the locking steel pipe piles;
[0010] S3. After the concrete reaches the design strength, the steel casing in the inner support area is cut off to the design elevation when the water level is low, and the cofferdam ring beam and inner support structure are installed at the design elevation;
[0011] S4. Fill the cofferdam with sand to the designed elevation and control the water head difference between the inside and outside of the cofferdam during the sand filling process;
[0012] S5. After the sand filling is completed, water is pumped into the cofferdam to the designed elevation and the concrete cushion is poured;
[0013] S6. After the concrete cushion reaches the designed strength, cut and clean the steel casing and chisel out the pile head; then tie the first layer of cap steel bars and cast the first layer of cap;
[0014] S7. After the first-layer pedestal concrete pouring is completed and reaches the designed strength, remove the ring beam and internal support; tie the second-layer pedestal reinforcement and pour the second-layer pedestal.
[0015] Furthermore, the inner support structure includes at least one transverse inner support and a plurality of oblique inner supports.
[0016] Furthermore, the cofferdam ring beam includes an inner ring beam inside the cofferdam and an outer ring beam outside the cofferdam.
[0017] Furthermore, pads are provided above the concrete poured between the first cap and the locking steel pipe piles, and above the concrete poured between the second cap and the locking steel pipe piles.
[0018] Further, in step S4, medium and coarse sand are filled into the cofferdam, wherein the particle size of the coarse sand is in the range of 2-4.75 mm, and the particle size of the medium sand is in the range of 0.5-2 mm.
[0019] Compared with the prior art, the present invention has the following advantages:
[0020] The invention buries steel pipe piles in bedrock through holes, installs ring beams and internal supports, backfills sand to level the inclined seabed, and then pumps water to form a dry working environment to construct the foundation. The underwater excavation of bedrock is transformed into dry excavation of bedrock, and the strength and integrity of the bedrock itself are fully utilized to stop water instead of underwater concrete. The length of the steel pipe piles can be freely adjusted to adapt to the inclined seabed surface. The locking steel pipe pile cofferdam and the complete bedrock of the seabed are formed into a whole through underwater concrete. The steel pipe column can be reused, saving steel materials, saving the amount of bottom sealing concrete, and improving construction efficiency, thereby accelerating the construction period. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The drawings constituting part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:
[0022] Figure 1 This is a plan view of the locking steel pipe pile cofferdam in the invention;
[0023] Figure 2 This is a vertical layout diagram of the locking steel pipe pile cofferdam in the invention;
[0024] Figure 3 This is a side view of the locking steel pipe pile cofferdam in the invention;
[0025] Figure 4 The invention provides the following steps for the construction of the locking steel pipe pile cofferdam: Figure 1 Schematic diagram;
[0026] Figure 5 The invention provides the following steps for the construction of the locking steel pipe pile cofferdam: Figure 2 Schematic diagram;
[0027] Figure 6 The invention provides the following steps for the construction of the locking steel pipe pile cofferdam: Figure 3 Schematic diagram;
[0028] Figure 7 The invention provides the following steps for the construction of the locking steel pipe pile cofferdam: Figure 4 Schematic diagram;
[0029] Figure 8 The invention provides the following steps for the construction of the locking steel pipe pile cofferdam: Figure 5 Schematic diagram;
[0030] Fig. 9 The invention provides the following steps for the construction of the locking steel pipe pile cofferdam: Figure 6 Schematic diagram;
[0031] Fig.10 The invention provides the following steps for the construction of the locking steel pipe pile cofferdam: Figure 7 Schematic diagram. DETAILED DESCRIPTION
[0032] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.
[0033] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0034] In the description of the invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to specific circumstances.
[0035] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments.
[0036] A locking steel pipe pile cofferdam for offshore inclined bare rock cap construction, such as Figure 1 and Figure 3 As shown, it includes a cofferdam body formed by a plurality of locking steel pipe piles 1, and ring beams 3 are respectively installed inside and outside the cofferdam body, and concrete is poured in the gaps around the locking steel pipe piles. At the same time, an internal support structure 4 is provided in the cofferdam body. At least one of the internal support structures includes a transverse internal support and a plurality of oblique internal supports.
[0037] A method for constructing a cofferdam with locking steel pipe piles for offshore inclined bare rock cap construction, such as Figures 4 to 10 As shown, the following steps are included:
[0038] S1, lowering the steel casing 10 into the seabed foundation 12, and using a rotary drill 15 on the supporting trestle 14 to dig a trench 11 in the cofferdam design area;
[0039] S2. Insert and drive the locking steel pipe piles one by one to the designed elevation until the entire cofferdam is closed, and then pour concrete into the gaps around the locking steel pipe piles;
[0040] S3. After the concrete reaches the design strength, cut off the steel casing 10 in the inner support area to the design elevation when the water level is low, and install the cofferdam ring beam and inner support structure at the design elevation;
[0041] S4, fill the cofferdam with sand 13 to the designed elevation, and control the water head difference between the inside and outside of the cofferdam during the sand filling process, that is, in this step, pay attention to controlling the water level difference between the water level line 2 outside the cofferdam and the water level line 8 inside the cofferdam;
[0042] S5. After the sand filling is completed, water is pumped into the cofferdam to the designed elevation, and the concrete cushion layer 7 is poured;
[0043] S6. After the concrete cushion reaches the designed strength, the steel casing is cut off and cleaned, and the pile head is chiseled off; then the first layer of the cap steel bars are tied and the first layer of the cap 5 is poured;
[0044] S7. After the first-layer cap concrete pouring is completed and reaches the designed strength, remove the ring beam and internal support; tie the second-layer cap steel bars and pour the second-layer cap 6.
[0045] The inner support structure includes at least one transverse inner support and a plurality of oblique inner supports. In an optional embodiment, the oblique inner supports include a first oblique support body and a second oblique support body arranged in every two adjacent directions of the cofferdam body. In step S4, medium and coarse sand are filled into the cofferdam, wherein the particle size range of the coarse sand is 2-4.75 mm, and the particle size range of the medium sand is 0.5-2 mm.
[0046] The cofferdam ring beam comprises an inner ring beam inside the cofferdam and an outer ring beam outside the cofferdam. A pad 14 is provided above the concrete poured between the first cap and the locking steel pipe pile, and above the concrete poured between the second cap and the locking steel pipe pile.
[0047] The invention buries steel pipe piles in bedrock through holes, installs ring beams and internal supports, and levels the inclined seabed 9 by backfilling sand, and then pumps water to form a dry working environment to construct the foundation. The underwater excavation bedrock is turned into dry working excavation bedrock, and the strength and integrity of the bedrock itself are fully utilized to stop water, instead of using underwater concrete to stop water. The length of the steel pipe piles can be freely adjusted to adapt to the inclined seabed surface. By forming a whole with the locking steel pipe pile cofferdam and the complete bedrock of the seabed through underwater concrete, the steel pipe column can be reused, saving steel, saving the amount of bottom sealing concrete, and improving construction efficiency, thereby accelerating the construction period. Compared with the conventional steel hanging box cofferdam, the construction method created by the invention can save underwater concrete and avoid underwater excavation of bedrock, reduce the amount of engineering, reduce the difficulty of construction and speed up the construction period, save construction costs, have great promotion value, and good social benefits, and provide a reference for the construction of foundations under offshore inclined bare rock conditions.
[0048] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A locking steel pipe pile cofferdam for offshore inclined bare rock cap construction, characterized by: It includes a cofferdam body formed by a number of locking steel pipe piles, and ring beams are respectively installed inside and outside the cofferdam body, and concrete is poured in the gaps around the locking steel pipe piles. At the same time, an internal support structure is arranged in the cofferdam body.
2. The locking steel pipe pile cofferdam for offshore inclined bare rock cap construction according to claim 1 is characterized by: The inner support structure includes at least one transverse inner support and a plurality of oblique inner supports.
3. A construction method of the locking steel pipe pile cofferdam for offshore inclined bare rock cap construction according to claim 1, characterized in that: The steps include: S1. Use a rotary drill to dig a trench in the cofferdam design area on the supporting trestle; S2. Insert and drive the locking steel pipe piles one by one to the designed elevation until the entire cofferdam is closed, and then pour concrete into the gaps around the locking steel pipe piles; S3. After the concrete reaches the design strength, the steel casing in the inner support area is cut off to the design elevation when the water level is low, and the cofferdam ring beam and inner support structure are installed at the design elevation; S4. Fill the cofferdam with sand to the designed elevation and control the water head difference between the inside and outside of the cofferdam during the sand filling process; S5. After the sand filling is completed, water is pumped into the cofferdam to the designed elevation and the concrete cushion is poured; S6. After the concrete cushion reaches the designed strength, cut and clean the steel casing and chisel out the pile head; then tie the first layer of cap steel bars and cast the first layer of cap; S7. After the first-layer pedestal concrete pouring is completed and reaches the designed strength, remove the ring beam and internal support; tie the second-layer pedestal reinforcement and pour the second-layer pedestal.
4. The method for constructing a locking steel pipe pile cofferdam for offshore inclined bare rock cap construction according to claim 3 is characterized by: The inner support structure includes at least one transverse inner support and a plurality of oblique inner supports.
5. The method for constructing a locking steel pipe pile cofferdam for offshore inclined bare rock cap construction according to claim 3, characterized in that: The cofferdam ring beam comprises an inner ring beam inside the cofferdam and an outer ring beam outside the cofferdam.
6. The method for constructing a locking steel pipe pile cofferdam for offshore inclined bare rock cap construction according to claim 3, characterized in that: A pad is provided above the concrete poured between the first cap and the locking steel pipe pile, and above the concrete poured between the second cap and the locking steel pipe pile.
7. The method for constructing a locking steel pipe pile cofferdam for offshore inclined bare rock cap construction according to claim 3, characterized in that: In step S4, medium and coarse sand are filled into the cofferdam, wherein the particle size of the coarse sand is in the range of 2-4.75 mm, and the particle size of the medium sand is in the range of 0.5-2 mm.
Citation Information
Cited By
Inclined shallow covering layer batholith seabed steel cofferdam inner support conversion construction method
CN119615945A
Three-face type lock catch steel pipe pile cofferdam and construction method thereof
CN119981109A
Karst development area deepwater bare rock low pile cofferdam platform and construction method thereof
CN121024099A