Tunnel shield tunneling machine state monitoring method and system based on multi-source data
By analyzing the initial and real-time multi-source data of the tunnel, the working status alarm index of the shield machine is calculated, and status assessment and optimization are carried out. This solves the problem in the existing technology that the increase in unit load and environmental complexity in monitoring and analysis affects the accuracy, and improves the accuracy of monitoring and analysis. This improves the accuracy and stability of condition monitoring of tunnel shield machines.
Patent Information
- Application Number
- CN202411280383.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-09-13
AI Technical Summary
The existing tunnel shield machine condition monitoring methods and systems based on multi-source data increase the unit system load during monitoring and analysis, and due to the complexity of the shield machine working environment, the accuracy of the analysis of the shield machine status is affected.
By analyzing the initial multi-source data of the tunnel, the initial environmental impact factors of the tunnel are obtained, and combined with the initial multi-source data of the shield machine, the initial status information of the shield machine is obtained; the environmental factors are collected in real time, the real-time multi-source data of the shield machine is analyzed, and the calculation Work status alarm index, perform status assessment and tuning, and reduce the occurrence of faults.
It improves the accuracy of status monitoring of the shield machine, reduces the possibility of shield machine failure, reduces the system load of the unit, and ensures the stable operation of the shield machine in complex environments.
Smart Images

Figure CN118794493A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of shield machine monitoring, and in particular to a tunnel shield machine status monitoring method and system based on multi-source data. Background Art
[0002] A tunnel boring machine (TBM) is a type of engineering machinery specifically designed for underground tunnel construction. It is commonly used for excavating underground tunnels, particularly in urban subway construction. The shield machine operates by using prefabricated reinforced concrete tunnel linings to support and stabilize the tunnel walls. A propulsion system propels the machine forward, enabling tunnel excavation and construction. Utilizing multiple sensors and data sources to monitor and analyze various parameters and status of the TBM in real time during operation is crucial to ensure its safe and efficient operation.
[0003] The existing tunnel shield machine status monitoring method and system based on multi-source data will increase the load of the unit system when monitoring and analyzing multi-source data. In addition, due to the complex environmental factors during the operation of the shield machine, the accuracy of the monitoring system's analysis of the shield machine status is affected. Therefore, it is necessary to provide a tunnel shield machine status monitoring method and system based on multi-source data to solve the above-mentioned problems. Summary of the Invention
[0004] In order to solve the above technical problems, a tunnel shield machine status monitoring method and system based on multi-source data are provided. This technical solution solves the problem that the existing tunnel shield machine status monitoring method and system based on multi-source data proposed in the above background technology will increase the load of the unit system when monitoring and analyzing multi-source data, and the environmental factors of the shield machine during operation are complex, which affects the accuracy of the monitoring system's analysis of the shield machine status.
[0005] In order to achieve the above objects, the technical solution adopted by the present invention is: A tunnel shield machine status monitoring method based on multi-source data, characterized by comprising: Conducting on-site surveys of newly constructed tunnels to collect initial multi-source data of the tunnel, wherein the initial multi-source data includes initial tunnel environment information and initial tunnel stratum information; Based on the analysis of the initial multi-source data of the tunnel, the initial environmental impact factors of the tunnel are obtained; Acquire initial multi-source data of the shield machine under the influence of initial tunnel environmental factors, wherein the initial multi-source data of the shield machine includes initial mechanical state information of the shield machine, initial electrical state information of the shield machine, and initial posture information of the shield machine; Acquire real-time instruction information of the shield machine and real-time tunnel environmental influencing factors, and obtain real-time multi-source data of the shield machine under the influence of the real-time tunnel environmental influencing factors; Based on the analysis of the initial multi-source data and the real-time multi-source data of the shield machine, the shield machine working status alarm index is obtained; The working status of the shield machine is evaluated based on the shield machine working status alarm index, and the status of the shield machine is optimized according to the shield machine working status evaluation results.
[0006] Preferably, the on-site survey of the newly built tunnel and the collection of initial multi-source data of the tunnel specifically include: Obtain the planned area for the new tunnel and monitor the surface conditions and climate conditions within the planned area to obtain initial surface information and initial climate information; Process the initial surface information and climate information to obtain the initial tunnel environment information; A pressure sensor is installed at the front end of the shield machine to monitor the soil indicators in front of the shield machine, and obtain the soil initial pressure parameters, soil initial moisture index, soil initial temperature index and soil initial hardness index; Displacement sensors and stress sensors are installed on the tunnel wall to monitor the deformation of the tunnel wall and the stress of the tunnel structure, and the initial displacement parameters of the tunnel wall and the initial stress index of the tunnel structure are obtained; Data processing is performed on the soil initial pressure parameters, soil initial moisture index, soil initial temperature index, soil initial hardness index, tunnel wall initial displacement parameters and tunnel structure initial stress index to obtain the initial stratum information of the tunnel; The initial tunnel environment information and the initial tunnel stratum information are integrated to obtain the initial multi-source data of the tunnel.
[0007] Preferably, the initial tunnel environment impact factors are obtained based on the analysis of the initial multi-source data of the tunnel, specifically including: Collecting historical multi-source data of the tunnel, processing the data in the historical multi-source data of the tunnel corresponding to the initial multi-source data of the tunnel, and obtaining historical environment information and historical stratigraphic information of the tunnel; Obtain historical fault information of shield machines and perform fault tree analysis on historical fault information of shield machines and historical multi-source data of tunnels to obtain frequent fault information and multi-source data of common tunnels in different tunnel projects; Conduct correlation analysis on historical fault information of shield machines and multi-source data of common tunnels to obtain tunnel multi-source impact feature data; Process the tunnel multi-source impact characteristic data and determine the shield machine mechanical performance impact index and shield machine electrical performance impact index based on the tunnel historical environmental information and tunnel historical stratum information; Analyze the data of the shield machine's mechanical performance impact index and the shield machine's electrical performance impact index to obtain the initial tunnel environmental impact factor; The calculation formula of the shield machine mechanical performance influence index is: Where, is the shield machine mechanical performance impact index, To adjust the scale factor of the formula, is the empirical coefficient of the influence of tunnel wall displacement parameters on the mechanical performance of the shield machine, is the empirical coefficient of the influence of tunnel structure stress index on the mechanical performance of shield machine, is the empirical coefficient of the influence of soil pressure parameters on the mechanical properties of the shield machine, is the empirical coefficient of the influence of soil hardness index on the mechanical performance of shield machine, is the empirical coefficient of the influence of soil temperature index on the mechanical performance of shield machine, is the empirical coefficient of the influence of soil moisture index on the mechanical properties of shield machine, For the Soil pressure parameters of the day, For the Soil hardness index of the day, For the Soil temperature index of the day, For the Soil moisture index for the day, For the Tunnel wall displacement parameters of the day, is the tunnel wall position parameter on the first day, and They are reference pressure, reference hardness, reference temperature and reference humidity respectively; The calculation formula of the shield machine electrical performance impact index is: Where, is the shield machine electrical performance impact index, To adjust the scale factor of the formula, and are weight coefficients, and They are soil pressure parameters, soil moisture index, soil temperature index, soil hardness index, tunnel wall position parameters and tunnel structure stress index of the newly built tunnel on the first day; The calculation formula of the initial environmental impact factor of the tunnel is: Where, is the initial environmental impact factor of the tunnel, is a quadratic function, and There is a positive correlation.
[0008] Preferably, the obtaining of initial multi-source data of the shield machine under the influence of the initial environmental influencing factors of the tunnel specifically includes: Use monitoring equipment to obtain shield machine foundation mechanical status information and shield machine foundation electrical status information; The shield machine foundation mechanical status information and shield machine foundation electrical status information are evaluated respectively to obtain the shield machine foundation mechanical status index and shield machine foundation electrical status index; The shield machine foundation mechanical state index is associated with the shield machine mechanical performance influence index to obtain the shield machine initial mechanical state index; The shield machine foundation electrical status index is associated with the shield machine electrical performance impact index to obtain the shield machine initial electrical status index; Establish a three-dimensional coordinate system with the shield machine as the center point and obtain the initial posture parameters of the shield machine; The initial mechanical state index, initial electrical state index and initial posture parameters of the shield machine are integrated and processed to obtain the initial multi-source data of the shield machine.
[0009] Preferably, the step of acquiring the real-time instruction information of the shield machine and the real-time tunnel environment influencing factors to obtain the real-time multi-source data of the shield machine under the influence of the real-time tunnel environment influencing factors specifically includes: Real-time collection of surface and climate information, and data processing to obtain real-time tunnel environment information; Real-time collection of soil real-time index information at the front end of the shield machine, real-time displacement parameters of the tunnel wall, and real-time structural stress index of the tunnel; Data processing is performed on the real-time soil index information, real-time tunnel wall displacement parameters and real-time tunnel structural stress index to obtain real-time tunnel stratum information; Integrate real-time tunnel environment information and real-time tunnel stratum information to obtain real-time multi-source tunnel data; Correlating tunnel real-time multi-source data with tunnel initial environmental impact factors to obtain tunnel real-time environmental impact factors; Based on real-time environmental impact factors, shield machine initial posture information, shield machine foundation mechanical status information and shield machine foundation electrical status information, real-time multi-source data of the tunnel boring machine is obtained.
[0010] Preferably, the shield machine working status alarm index is obtained based on analyzing the initial multi-source data and the real-time multi-source data of the shield machine, specifically including: Obtain the real-time mechanical status information and electrical status information of the shield machine from the real-time multi-source data of the shield machine; Obtaining a real-time mechanical state index of the shield machine and a real-time electrical state index of the shield machine from the real-time mechanical state information of the shield machine and the real-time electrical state information of the shield machine; The difference between the real-time mechanical status index of the shield machine and the basic mechanical status index of the shield machine is used as the shield machine mechanical failure alarm value; The difference between the real-time electrical status index of the shield machine and the basic electrical status index of the shield machine is used as the electrical fault alarm value of the shield machine; Based on the shield machine mechanical fault alarm value and the shield machine electrical fault alarm value, the shield machine working status alarm index is obtained.
[0011] Preferably, the step of evaluating the working state of the shield machine based on the shield machine working state alarm index and optimizing the state of the shield machine according to the evaluation result of the working state of the shield machine specifically includes: The difference between the square of the shield machine mechanical fault alarm value and the square of the shield machine electrical fault alarm value is used as the shield machine working status alarm index; Obtain the total value of the shield machine foundation mechanical status index and the shield machine foundation electrical status index, and use one quarter of the square of the total value as the shield machine working status alarm index threshold; Based on the shield machine working state alarm index threshold, the shield machine working state alarm index is evaluated to obtain shield machine working state evaluation information; The shield machine working status assessment information is used as the shield machine working status assessment result to optimize the shield machine status.
[0012] Furthermore, a tunnel boring machine condition monitoring system based on multi-source data is proposed, which is used to implement any of the above monitoring methods, including: a main control module, the main control module being configured to receive initial multi-source data of the tunnel, initial environment information of the tunnel, initial stratum information of the tunnel, initial multi-source data of the shield machine, initial mechanical state information of the shield machine, initial electrical state information of the shield machine, and initial posture information of the shield machine, analyze the initial multi-source data of the tunnel to obtain an initial environment influencing factor of the tunnel, obtain initial multi-source data of the shield machine under the influence of the initial environment influencing factor of the tunnel, obtain real-time instruction information of the shield machine and real-time environment influencing factor of the tunnel, obtain real-time multi-source data of the shield machine under the influence of the real-time environment influencing factor of the tunnel, analyze the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine to obtain an alarm index of a working state of the shield machine, and optimize the state of the shield machine according to an evaluation result of the working state of the shield machine; A monitoring module is used to conduct on-site surveys of newly built tunnels, collect initial multi-source data on the tunnels, monitor surface conditions and climate conditions within the planned area of the newly built tunnels, obtain initial surface information and initial climate information, install a pressure sensor at the front end of the shield machine to monitor soil indicators in front of the shield machine, obtain initial soil pressure parameters, initial soil moisture index, initial soil temperature index, and initial soil hardness index, install displacement sensors and stress sensors on the tunnel walls to monitor tunnel wall deformation and tunnel structure stress, obtain initial tunnel wall displacement parameters and initial tunnel structure stress index, and acquire real-time tunnel environment information and real-time tunnel stratum information; An evaluation module is used to evaluate the shield machine foundation mechanical state information and the shield machine foundation electrical state information respectively, obtain the shield machine foundation mechanical state index and the shield machine foundation electrical state index, and evaluate the shield machine working state according to the shield machine working state alarm index; A transmission module, which is used for data transmission between the main control module, the monitoring module, the evaluation module and the display module; The display module is used to display the monitoring results of the monitoring module, the processing results of the main control module, the evaluation results of the evaluation module and the optimization process of the shield machine status.
[0013] Preferably, the main control module includes: a data receiving unit, the data receiving unit being used to receive initial multi-source data of the tunnel, initial environment information of the tunnel, initial stratum information of the tunnel, initial multi-source data of the shield machine, initial mechanical state information of the shield machine, initial electrical state information of the shield machine, and initial posture information of the shield machine; a data processing unit configured to analyze initial multi-source data of the tunnel to obtain initial environmental impact factors of the tunnel, obtain initial multi-source data of the shield machine under the influence of the initial environmental impact factors of the tunnel, obtain real-time instruction information of the shield machine and the real-time environmental impact factors of the tunnel, obtain real-time multi-source data of the shield machine under the influence of the real-time environmental impact factors of the tunnel, analyze the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, and obtain an alarm index of the working status of the shield machine; The tuning unit is used to tune the state of the shield machine according to the working state evaluation result of the shield machine.
[0014] Preferably, the evaluation module includes: A data evaluation unit, wherein the information evaluation unit is used to evaluate the shield machine foundation mechanical state information and the shield machine foundation electrical state information respectively to obtain the shield machine foundation mechanical state index and the shield machine foundation electrical state index; The state evaluation unit is used to evaluate the working state of the shield machine according to the shield machine working state alarm index.
[0015] Compared with the prior art, the present invention has the following beneficial effects: This solution proposes a tunnel shield machine status monitoring method and system based on multi-source data. By analyzing the initial multi-source data of the tunnel, the initial environmental impact factor of the tunnel is obtained, and the initial multi-source data of the shield machine under the influence of the initial environmental impact factor of the tunnel, as well as the real-time multi-source data of the shield machine under the influence of the real-time environmental impact factor of the tunnel are obtained. Based on the analysis of the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, an alarm index of the shield machine working status is obtained. The working status of the shield machine is evaluated and predicted using the alarm index. The working status of the shield machine is timely adjusted, so that the monitoring system can obtain the working status of the shield machine in a timely manner according to the environment of the tunnel and the stratum information that the shield machine needs to excavate when monitoring the status of the tunnel shield machine, thereby reducing the possibility of failure of the shield machine. This proposal proposes a tunnel shield machine status monitoring method and system based on multi-source data. By acquiring historical fault information of the shield machine and performing fault tree analysis on the historical fault information of the shield machine and the historical multi-source data of the tunnel, frequent fault information and common tunnel multi-source data in different tunnel projects are obtained. Finally, based on the historical environment information and the historical formation information of the tunnel, the mechanical performance impact index and the electrical performance impact index of the shield machine are determined, thereby improving the accuracy of the monitoring system's analysis of the working status of the shield machine. At the same time, fault tree analysis is used to obtain frequent fault information. Analysis of the tunnel environment and formation data will result in the most frequent fault information of the shield machine, thereby reducing the load on the unit system. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a flow chart of a tunnel shield machine status monitoring method based on multi-source data proposed by the present invention; Figure 2 This is a flow chart for obtaining the initial environmental impact factors in the present invention; Figure 3 This is a flowchart for obtaining the shield machine working status alarm index in the present invention; Figure 4 This is a system framework diagram of a tunnel shield machine status monitoring system based on multi-source data proposed in the present invention. DETAILED DESCRIPTION
[0017] The following description is intended to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are merely examples, and those skilled in the art may conceive of other obvious variations.
[0018] Reference Figure 1 - Figure 4 As shown, a tunnel shield machine condition monitoring method based on multi-source data includes: Conduct on-site surveys of newly built tunnels and collect initial multi-source data, including initial tunnel environment information and initial tunnel stratum information. Based on the analysis of the initial multi-source data of the tunnel, the initial environmental impact factors of the tunnel are obtained; Obtaining initial multi-source data of the shield machine under the influence of initial tunnel environmental factors. The initial multi-source data of the shield machine includes initial mechanical state information, initial electrical state information, and initial posture information of the shield machine. Acquire real-time instruction information of the shield machine and real-time tunnel environmental influencing factors, and obtain real-time multi-source data of the shield machine under the influence of the real-time tunnel environmental influencing factors; Based on the analysis of the initial multi-source data and the real-time multi-source data of the shield machine, the shield machine working status alarm index is obtained; The working status of the shield machine is evaluated based on the shield machine working status alarm index, and the status of the shield machine is optimized according to the shield machine working status evaluation results.
[0019] Specifically, the initial multi-source data of the tunnel are the environmental information and stratigraphic information of the newly built tunnel before the shield machine starts excavating, including the initial environment information of the tunnel and the initial stratigraphic information of the tunnel. The initial environment information of the tunnel is used to describe the climate, hydrology and other environmental conditions before tunnel construction to ensure the accuracy of the safety measures during the shield machine excavation. The initial stratigraphic information of the tunnel is used to describe the thickness and strength of the soil and rock layers in the area where the tunnel is located to evaluate the impact of geological conditions on the excavation work of the shield machine. The initial environment impact factor of the tunnel is a comprehensive indicator of the impact of the climate and other environments inside and outside the newly built tunnel and the soil and rock inside the tunnel on the mechanical and electrical performance of the shield machine. The shield machine working status alarm index is a predictive indicator of possible failures of the shield machine during excavation.
[0020] Furthermore, a site survey of the newly built tunnel was conducted to collect initial multi-source data of the tunnel, including: Obtain the planned area for the new tunnel and monitor the surface conditions and climate conditions within the planned area to obtain initial surface information and initial climate information; Process the initial surface information and climate information to obtain the initial tunnel environment information; A pressure sensor is installed at the front end of the shield machine to monitor the soil indicators in front of the shield machine, and obtain the soil initial pressure parameters, soil initial moisture index, soil initial temperature index and soil initial hardness index; Displacement sensors and stress sensors are installed on the tunnel wall to monitor the deformation of the tunnel wall and the stress of the tunnel structure, and the initial displacement parameters of the tunnel wall and the initial stress index of the tunnel structure are obtained; Data processing is performed on the soil initial pressure parameters, soil initial moisture index, soil initial temperature index, soil initial hardness index, tunnel wall initial displacement parameters and tunnel structure initial stress index to obtain the initial stratum information of the tunnel; The initial tunnel environment information and the initial tunnel stratum information are integrated to obtain the initial multi-source data of the tunnel.
[0021] Specifically, the planning area for a new tunnel is an area within a certain range where the soil and other materials required for excavation by a shield machine are located. The planned area needs to take into account the influence of surrounding buildings, trees, etc. Therefore, the initial surface information that needs to be considered includes the surface topography, land use, building distribution, underground facility location, surface settlement and displacement, etc. The initial climate information needs to consider regional precipitation, temperature, humidity and other information, which is helpful to evaluate the changes in groundwater levels and their impact on construction. The temperature will affect the performance of the shield machine and construction materials, especially at extreme temperatures. Humidity affects the moisture content of the soil, which in turn affects the effectiveness of the excavation and support system.
[0022] Furthermore, based on the analysis of the initial multi-source data of the tunnel, the initial environmental impact factors of the tunnel are obtained, including: Collecting historical multi-source data of the tunnel, processing the data in the historical multi-source data of the tunnel corresponding to the initial multi-source data of the tunnel, and obtaining historical environment information and historical stratigraphic information of the tunnel; Obtain historical fault information of shield machines and perform fault tree analysis on historical fault information of shield machines and historical multi-source data of tunnels to obtain frequent fault information and multi-source data of common tunnels in different tunnel projects; Conduct correlation analysis on historical fault information of shield machines and multi-source data of common tunnels to obtain tunnel multi-source impact feature data; Process the tunnel multi-source impact characteristic data and determine the shield machine mechanical performance impact index and shield machine electrical performance impact index based on the tunnel historical environmental information and tunnel historical stratum information; Analyze the data of the shield machine's mechanical performance impact index and the shield machine's electrical performance impact index to obtain the initial tunnel environmental impact factor; Specifically, the shield machine mechanical performance impact index is a comprehensive indicator of the impact of the environment and strata in the area where the new tunnel is located on the shield machine's mechanical performance. The shield machine electrical performance impact index is a comprehensive indicator of the impact of the environment and strata in the area where the new tunnel is located on the shield machine's electrical performance. For example, extreme temperatures (too high or too low) may affect the viscosity of the shield machine's hydraulic oil, causing the hydraulic system to degrade in performance. High humidity environments may cause short circuits or corrosion in electrical equipment and control systems, affecting equipment reliability. Different types of soil (such as clay, sand, and pebbles) will have different effects on the shield machine's propulsion force, excavation speed, and cutterhead wear. Perform fault tree analysis on shield machine historical fault information and tunnel historical multi-source data. The specific steps to obtain frequent fault information include: S1: Collect historical data on failures of shield machines during tunnel excavation, including fault records of the shield machines and various data during the tunnel construction process, such as equipment logs, maintenance records, and environmental data; S2: Build a fault tree model to decompose the fault event into more basic events and identify potential fault causes; S3: Identify the frequency and pattern of various types of failures through statistical analysis; S4: Identify the main factors that lead to frequent failures, such as equipment design defects, operating errors, environmental conditions, etc. The steps of establishing the fault tree model in step S2 include: S21: Identify the main problem or top-level event of the fault tree, such as "shield machine failure"; S22: Identify the main cause of the top-level event, such as "power system failure" or "hydraulic system problem"; S23: Further decompose the main fault cause into secondary events. For example, "power system failure" may be decomposed into "engine overheating" or "fuel supply problem"; S24: Use logic gates (AND, OR) to connect these events and describe the relationship between them. For example, if "engine overheating" and "fuel supply problem" can both cause "power system failure", connect them with an OR gate; S25: Decompose secondary events into primary events, which are the most basic events that can be directly observed or recorded, such as "cooling system failure" or "fuel pump failure"; S26: Verify the accuracy and completeness of the fault tree model to ensure that all possible fault paths are covered and make corrections based on the actual data collected; Among them, the calculation formula of the shield machine mechanical performance influence index is: Where, is the shield machine mechanical performance impact index, To adjust the scale factor of the formula, is the empirical coefficient of the influence of tunnel wall displacement parameters on the mechanical performance of the shield machine, is the empirical coefficient of the influence of tunnel structure stress index on the mechanical performance of shield machine, is the empirical coefficient of the influence of soil pressure parameters on the mechanical properties of the shield machine, is the empirical coefficient of the influence of soil hardness index on the mechanical performance of shield machine, is the empirical coefficient of the influence of soil temperature index on the mechanical performance of shield machine, is the empirical coefficient of the influence of soil moisture index on the mechanical properties of shield machine, For the Soil pressure parameters of the day, For the Soil hardness index of the day, For the Soil temperature index of the day, For the Soil moisture index for the day, For the Tunnel wall displacement parameters of the day, is the tunnel wall position parameter on the first day, and They are reference pressure, reference hardness, reference temperature and reference humidity respectively; The calculation formula of the shield machine electrical performance impact index is: Where, is the shield machine electrical performance impact index, To adjust the scale factor of the formula, and are weight coefficients, and They are soil pressure parameters, soil moisture index, soil temperature index, soil hardness index, tunnel wall position parameters and tunnel structure stress index of the newly built tunnel on the first day; The calculation formula for the initial environmental impact factor of the tunnel is: Where, is the initial environmental impact factor of the tunnel, is a quadratic function, and There is a positive correlation.
[0023] It is understandable that the higher the values of the soil pressure parameters, soil moisture index, soil temperature index, etc. of the new tunnel that the shield machine needs to excavate, the greater the value of the shield machine mechanical performance impact index. Because some specific mechanical parts of the shield machine, such as the cutter head and other mechanical parts, will wear out over time as the excavation work progresses, it is necessary to consider the total value of the soil pressure parameters, soil hardness index, etc. every day during the excavation period. The electrical components of the shield machine are not prone to wear and tear over time, and some electrical properties of the electrical components of the shield machine will gradually return to normal after the shield machine stops working, or even The environment inside the tunnel may improve the electrical performance of the shield machine. Therefore, only the difference between the soil pressure parameters, soil moisture index, etc. of the shield machine every day during the excavation period and the shield machine on the first day of operation can be considered. The larger the absolute value of the difference, the greater the shield machine electrical performance impact index. However, the larger the absolute value of the difference between the tunnel wall position parameters and tunnel structure stress index of each day during the excavation period and the shield machine on the first day of operation, the smaller the shield machine electrical performance impact index. This is because the larger the absolute value of the difference between the tunnel wall position parameters and the tunnel structure stress index, the better its electrical performance will be and it will not be easily affected by these data.
[0024] Furthermore, the initial multi-source data of the shield machine under the influence of the initial environmental factors of the tunnel is obtained, including: Use monitoring equipment to obtain shield machine foundation mechanical status information and shield machine foundation electrical status information; The shield machine foundation mechanical status information and shield machine foundation electrical status information are evaluated respectively to obtain the shield machine foundation mechanical status index and shield machine foundation electrical status index; The shield machine foundation mechanical state index is associated with the shield machine mechanical performance influence index to obtain the shield machine initial mechanical state index; The shield machine foundation electrical status index is associated with the shield machine electrical performance impact index to obtain the shield machine initial electrical status index; Establish a three-dimensional coordinate system with the shield machine as the center point and obtain the initial posture parameters of the shield machine; The initial mechanical state index, initial electrical state index and initial posture parameters of the shield machine are integrated and processed to obtain the initial multi-source data of the shield machine.
[0025] Furthermore, the real-time instruction information of the shield machine and the real-time environment influencing factors of the tunnel are obtained, and the real-time multi-source data of the shield machine under the influence of the real-time environment influencing factors of the tunnel are obtained, specifically including: Real-time collection of surface and climate information, and data processing to obtain real-time tunnel environment information; Real-time collection of soil real-time index information at the front end of the shield machine, real-time displacement parameters of the tunnel wall, and real-time structural stress index of the tunnel; Data processing is performed on the real-time soil index information, real-time tunnel wall displacement parameters and real-time tunnel structural stress index to obtain real-time tunnel stratum information; Integrate real-time tunnel environment information and real-time tunnel stratum information to obtain real-time multi-source tunnel data; Correlating tunnel real-time multi-source data with tunnel initial environmental impact factors to obtain tunnel real-time environmental impact factors; Based on real-time environmental impact factors, shield machine initial posture information, shield machine foundation mechanical status information and shield machine foundation electrical status information, real-time multi-source data of the tunnel boring machine is obtained.
[0026] Specifically, the tunnel real-time environmental impact factor is obtained from the tunnel real-time multi-source data and the tunnel initial environmental impact factor through the calculation formula of the tunnel initial environmental impact factor.
[0027] Furthermore, based on the analysis of the initial multi-source data and the real-time multi-source data of the shield machine, the shield machine working status alarm index is obtained, including: Obtain the real-time mechanical status information and electrical status information of the shield machine from the real-time multi-source data of the shield machine; Obtaining a real-time mechanical state index of the shield machine and a real-time electrical state index of the shield machine from the real-time mechanical state information of the shield machine and the real-time electrical state information of the shield machine; The difference between the real-time mechanical status index of the shield machine and the basic mechanical status index of the shield machine is used as the shield machine mechanical failure alarm value; The difference between the real-time electrical status index of the shield machine and the basic electrical status index of the shield machine is used as the electrical fault alarm value of the shield machine; Based on the shield machine mechanical fault alarm value and the shield machine electrical fault alarm value, the shield machine working status alarm index is obtained.
[0028] Specifically, the shield machine basic mechanical condition index is a comprehensive indicator used to evaluate the operating status and health level of the shield machine. It reflects the overall operating condition of the shield machine by comprehensively considering the performance, wear, and operating efficiency of multiple mechanical components. For example, the degree of component wear measures the wear of key components such as the cutterhead, cutter, and screw conveyor, including the wear rate and current wear volume, as well as the shield machine's propulsion speed, cutting efficiency, and overall operating efficiency. The shield machine basic electrical condition index is used to evaluate the health and operating status of the shield machine's electrical system. It comprehensively considers the performance and status of each component of the electrical system to reflect the reliability and efficiency of the entire electrical system. For example, the electrical component health is used to evaluate the operating status and performance of electrical components such as motors, inverters, and controllers. The power supply stability monitors the stability and quality of the power supply, such as voltage fluctuations and power outages.
[0029] Furthermore, the shield machine's working status is evaluated based on the shield machine's working status alarm index, and the shield machine's status is optimized according to the shield machine's working status evaluation results, including: The difference between the square of the shield machine mechanical fault alarm value and the square of the shield machine electrical fault alarm value is used as the shield machine working status alarm index; Obtain the total value of the shield machine foundation mechanical status index and the shield machine foundation electrical status index, and use one quarter of the square of the total value as the shield machine working status alarm index threshold; Based on the shield machine working state alarm index threshold, the shield machine working state alarm index is evaluated to obtain shield machine working state evaluation information; The shield machine working status assessment information is used as the shield machine working status assessment result to optimize the shield machine status.
[0030] Specifically, the shield machine working status alarm index can be obtained by setting the unit time according to the excavation period when the tunnel shield machine is excavating. In order to ensure that the monitoring system analyzes the working status of the shield machine more accurately, the unit time can be set to one minute or shorter. Although this will increase the load on the unit operation system, when calculating the shield machine mechanical performance impact index, the shield machine electrical performance impact index and the tunnel real-time environmental impact factor, the number of times the monitoring module collects the tunnel initial multi-source data and the tunnel real-time will increase. However, in a day, the surface real-time information and the climate real-time information usually do not change so quickly, especially the surface real-time information is difficult to change during tunnel construction. The number of times the monitoring module collects the tunnel initial multi-source data and the tunnel real-time can be reduced, the load of the monitoring system can be reduced, and the efficiency of the monitoring system in analyzing the working status of the shield machine can be improved.
[0031] Furthermore, a tunnel boring machine condition monitoring system based on multi-source data is proposed, which is used to implement any of the above monitoring methods, including: A main control module is used to receive initial multi-source data of the tunnel, initial environment information of the tunnel, initial stratum information of the tunnel, initial multi-source data of the shield machine, initial mechanical state information of the shield machine, initial electrical state information of the shield machine, and initial posture information of the shield machine, analyze the initial multi-source data of the tunnel, obtain initial environment impact factors of the tunnel, obtain initial multi-source data of the shield machine under the influence of the initial environment impact factors of the tunnel, obtain real-time instruction information of the shield machine and real-time environment impact factors of the tunnel, obtain real-time multi-source data of the shield machine under the influence of the real-time environment impact factors of the tunnel, analyze the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, obtain an alarm index of the working state of the shield machine, and optimize the state of the shield machine according to the evaluation results of the working state of the shield machine; The monitoring module is used to conduct on-site surveys of newly built tunnels, collect initial multi-source data on the tunnels, monitor the surface conditions and climate conditions within the planned area of the newly built tunnels, obtain initial surface information and initial climate information, install a pressure sensor at the front end of the shield machine to monitor soil indicators in front of the shield machine, and obtain initial soil pressure parameters, initial soil moisture index, initial soil temperature index, and initial soil hardness index. Displacement sensors and stress sensors are installed on the tunnel walls to monitor the deformation of the tunnel walls and the stress of the tunnel structure, and obtain initial displacement parameters of the tunnel walls and initial stress index of the tunnel structure, thereby obtaining real-time tunnel environmental information and real-time tunnel stratum information. An evaluation module is used to evaluate the shield machine foundation mechanical status information and the shield machine foundation electrical status information respectively, obtain the shield machine foundation mechanical status index and the shield machine foundation electrical status index, and evaluate the shield machine working status according to the shield machine working status alarm index; Transmission module, which is used for data transmission between the main control module, monitoring module, evaluation module and display module; Display module, the display module is used to display the monitoring results of the monitoring module, the processing results of the main control module, the evaluation results of the evaluation module and the tuning process of the shield machine status.
[0032] Furthermore, the main control module includes: A data receiving unit is used to receive initial multi-source data of the tunnel, initial environment information of the tunnel, initial stratum information of the tunnel, initial multi-source data of the shield machine, initial mechanical state information of the shield machine, initial electrical state information of the shield machine, and initial posture information of the shield machine; A data processing unit is used to analyze initial multi-source data of the tunnel, obtain initial environmental impact factors of the tunnel, obtain initial multi-source data of the shield machine under the influence of the initial environmental impact factors of the tunnel, obtain real-time instruction information of the shield machine and the real-time environmental impact factors of the tunnel, obtain real-time multi-source data of the shield machine under the influence of the real-time environmental impact factors of the tunnel, analyze the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, and obtain an alarm index of the working status of the shield machine; The tuning unit is used to tune the status of the shield machine according to the evaluation results of the working status of the shield machine.
[0033] Furthermore, the assessment modules include: The data evaluation unit and the information evaluation unit are used to evaluate the shield machine foundation mechanical state information and the shield machine foundation electrical state information respectively to obtain the shield machine foundation mechanical state index and the shield machine foundation electrical state index; The status evaluation unit is used to evaluate the working status of the shield machine according to the shield machine working status alarm index.
[0034] Furthermore, the monitoring module includes: The first monitoring unit is used to conduct on-site surveys of the newly built tunnel, collect initial multi-source data of the tunnel, monitor the surface conditions and climate conditions within the planned area of the newly built tunnel, and obtain initial surface information and initial climate information; The second monitoring unit is used to set a pressure sensor at the front end of the shield machine to monitor the soil indicators in front of the shield machine, obtain the initial soil pressure parameters, initial soil moisture index, initial soil temperature index and initial soil hardness index, install displacement sensors and stress sensors on the tunnel wall to monitor the deformation of the tunnel wall and the stress of the tunnel structure, obtain the initial displacement parameters of the tunnel wall and the initial stress index of the tunnel structure, and obtain real-time tunnel environment information and real-time tunnel formation information.
[0035] In summary, the advantages of the present invention are: by analyzing the initial multi-source data of the tunnel, the initial environmental impact factor of the tunnel is obtained, and the initial multi-source data of the shield machine under the influence of the initial environmental impact factor of the tunnel is obtained, and by obtaining the real-time instruction information of the shield machine and the real-time environmental impact factor of the tunnel, the real-time multi-source data of the shield machine under the influence of the real-time environmental impact factor of the tunnel is obtained; based on the analysis of the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, the working status alarm index of the shield machine is obtained, the working status of the shield machine is evaluated by using the working status alarm index of the shield machine, the working status of the shield machine is predicted, and the status of the shield machine is timely adjusted, so that when the monitoring system is performing tunnel shield machine status monitoring, the working status of the shield machine can be obtained in time according to the environment of the tunnel and the stratum information that the shield machine needs to excavate, thereby reducing the possibility of failure of the shield machine; By obtaining historical fault information of the shield machine and performing fault tree analysis on the historical fault information of the shield machine and the historical multi-source data of the tunnel, frequent fault information and common tunnel multi-source data in different tunnel projects are obtained. Finally, based on the historical tunnel environment information and the historical tunnel formation information, the shield machine mechanical performance impact index and the shield machine electrical performance impact index are determined, thereby improving the accuracy of the monitoring system's analysis of the shield machine's working status. At the same time, fault tree analysis is used to obtain frequent fault information. Analysis of the tunnel environment and formation data will result in the most frequent fault information of the shield machine, thereby reducing the load on the unit system.
[0036] The above shows and describes the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions merely illustrate the principles of the present invention. Various changes and modifications may be made to the present invention without departing from the spirit and scope of the present invention. Such changes and modifications are intended to fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the appended claims and their equivalents.
Claims
1. A tunnel shield machine condition monitoring method based on multi-source data, It is characterized in that include: Conducting on-site survey of the newly built tunnel and collecting initial multi-source data of the tunnel, wherein the initial multi-source data of the tunnel includes initial environment information of the tunnel and initial stratum information of the tunnel; Based on the analysis of the initial multi-source data of the tunnel, the initial environmental impact factors of the tunnel are obtained; Acquire initial multi-source data of the shield machine under the influence of initial environmental influencing factors of the tunnel, wherein the initial multi-source data of the shield machine includes initial mechanical state information of the shield machine, initial electrical state information of the shield machine, and initial posture information of the shield machine; Acquire the real-time instruction information of the shield machine and the real-time environmental influencing factors of the tunnel, and obtain the real-time multi-source data of the shield machine under the influence of the real-time environmental influencing factors of the tunnel; Based on the analysis of the initial multi-source data and the real-time multi-source data of the shield machine, the shield machine working status alarm index is obtained; The working status of the shield machine is evaluated based on the shield machine working status alarm index, and the status of the shield machine is optimized according to the evaluation result of the shield machine working status.
2. According to claim 1, a tunnel shield machine status monitoring method based on multi-source data, It is characterized in that The on-site survey of the newly built tunnel and the collection of initial multi-source data of the tunnel specifically include: Acquire the planned area of the new tunnel, and monitor the surface conditions and climate conditions within the planned area of the new tunnel to obtain initial surface information and initial climate information; Process the initial surface information and initial climate information to obtain the initial tunnel environment information; A pressure sensor is set at the front end of the shield machine to monitor the soil index in front of the shield machine, and obtain the soil initial pressure parameter, soil initial moisture index, soil initial temperature index and soil initial hardness index; Displacement sensors and stress sensors are installed on the tunnel wall to monitor the deformation of the tunnel wall and the stress of the tunnel structure, and the initial displacement parameters of the tunnel wall and the initial stress index of the tunnel structure are obtained; Data processing is performed on soil initial pressure parameters, soil initial moisture index, soil initial temperature index, soil initial hardness index, tunnel wall initial displacement parameters and tunnel structure initial stress index to obtain tunnel initial stratum information; The initial environment information and initial stratum information of the tunnel are integrated to obtain the initial multi-source data of the tunnel.
3. A tunnel shield machine status monitoring method based on multi-source data according to claim 2, It is characterized in that The initial environment impact factors of the tunnel are obtained based on the analysis of the initial multi-source data of the tunnel, which specifically include: Collecting tunnel historical multi-source data, processing the data in the tunnel historical multi-source data corresponding to the tunnel initial multi-source data, and obtaining tunnel historical environmental information and tunnel historical stratigraphic information; Obtain historical fault information of shield machines, and perform fault tree analysis on historical fault information of shield machines and historical multi-source data of tunnels to obtain frequent fault information and multi-source data of common tunnels in different tunnel projects; Conduct correlation analysis on the historical fault information of the shield machine and the multi-source data of the common tunnel to obtain the multi-source impact characteristic data of the tunnel; Process the multi-source influence characteristic data of the tunnel, and determine the shield machine mechanical performance influence index and shield machine electrical performance influence index based on the tunnel historical environment information and tunnel historical stratum information; Conduct data analysis on the shield machine mechanical performance impact index and shield machine electrical performance impact index to obtain the initial environmental impact factor of the tunnel; The calculation formula of the shield machine mechanical performance influence index is: ; In the formula, is the shield machine mechanical performance influence index, To adjust the scale factor of the formula, is the empirical coefficient of the influence of tunnel wall displacement parameters on the mechanical properties of the shield machine, is the empirical coefficient of the influence of tunnel structure stress index on the mechanical properties of shield machine, is the empirical coefficient of the influence of soil pressure parameters on the mechanical properties of the shield machine, is the empirical coefficient of the influence of soil hardness index on the mechanical properties of shield machine, is the empirical coefficient of the influence of soil temperature index on the mechanical properties of shield machine, is the empirical coefficient of the influence of soil moisture index on the mechanical properties of shield machine, For the Soil pressure parameters of the day, For the Soil hardness index of the day, For the Soil temperature index for the day, For the Soil moisture index for the day, For the The tunnel wall displacement parameters of the day, is the tunnel wall position parameter on the first day, and They are reference pressure, reference hardness, reference temperature and reference humidity respectively; The calculation formula of the shield machine electrical performance influence index is: ; In the formula, is the shield machine electrical performance impact index, To adjust the scale factor of the formula, and are weight coefficients, and They are soil pressure parameters, soil moisture index, soil temperature index, soil hardness index, tunnel wall position parameters and tunnel structure stress index of the newly built tunnel on the first day; The calculation formula of the initial environmental impact factor of the tunnel is: ; In the formula, is the initial environmental impact factor of the tunnel, is a quadratic function, and There is a positive correlation.
4. A tunnel shield machine status monitoring method based on multi-source data according to claim 3, It is characterized in that The obtaining of the initial multi-source data of the shield machine under the influence of the initial environmental impact factors of the tunnel specifically includes: Use monitoring equipment to obtain the shield machine foundation mechanical status information and shield machine foundation electrical status information; The mechanical state information of the shield machine foundation and the electrical state information of the shield machine foundation are evaluated respectively to obtain the mechanical state index of the shield machine foundation and the electrical state index of the shield machine foundation; The shield machine foundation mechanical state index is associated with the shield machine mechanical performance influence index to obtain the shield machine initial mechanical state index; The shield machine foundation electrical status index is associated with the shield machine electrical performance impact index to obtain the shield machine initial electrical status index; Establish a three-dimensional coordinate system with the shield machine as the center point, and obtain the initial posture parameters of the shield machine; The initial mechanical state index, initial electrical state index and initial attitude parameters of the shield machine are integrated and data processed to obtain the initial multi-source data of the shield machine.
5. A tunnel shield machine status monitoring method based on multi-source data according to claim 4, It is characterized in that The real-time instruction information of the shield machine and the real-time environment influencing factors of the tunnel are obtained to obtain the real-time multi-source data of the shield machine under the influence of the real-time environment influencing factors of the tunnel, specifically including: Collect real-time surface information and climate information, and process the data to obtain real-time tunnel environment information; Real-time collection of soil real-time index information at the front end of the shield machine, real-time displacement parameters of the tunnel wall, and real-time structural stress index of the tunnel; The real-time soil index information, the real-time displacement parameters of the tunnel wall and the real-time structural stress index of the tunnel are processed to obtain the real-time stratum information of the tunnel; Integrate the real-time tunnel environment information and real-time tunnel stratum information to obtain real-time multi-source tunnel data; Correlate the tunnel real-time multi-source data and the tunnel initial environmental impact factor to obtain the tunnel real-time environmental impact factor; Based on the real-time environmental impact factors, the initial posture information of the shield machine, the mechanical status information of the shield machine foundation and the electrical status information of the shield machine foundation, the real-time multi-source data of the tunnel shield machine is obtained.
6. A tunnel shield machine status monitoring method based on multi-source data according to claim 5, It is characterized in that The shield machine working status alarm index is obtained based on the analysis of the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, which specifically includes: Obtain the real-time mechanical status information and electrical status information of the shield machine from the real-time multi-source data of the shield machine; Obtain the real-time mechanical state index of the shield machine and the real-time electrical state index of the shield machine in the real-time mechanical state information of the shield machine and the real-time electrical state information of the shield machine; The difference between the real-time mechanical status index of the shield machine and the basic mechanical status index of the shield machine is used as the mechanical fault alarm value of the shield machine; The difference between the real-time electrical status index of the shield machine and the basic electrical status index of the shield machine is used as the electrical fault alarm value of the shield machine; Based on the shield machine mechanical fault alarm value and the shield machine electrical fault alarm value, the shield machine working status alarm index is obtained.
7. A tunnel shield machine status monitoring method based on multi-source data according to claim 6, It is characterized in that The method of evaluating the working state of the shield machine based on the shield machine working state alarm index and optimizing the state of the shield machine according to the evaluation result of the working state of the shield machine specifically includes: The difference between the square of the shield machine mechanical fault alarm value and the square of the shield machine electrical fault alarm value is used as the shield machine working status alarm index; Obtain the total value of the shield machine foundation mechanical state index and the shield machine foundation electrical state index, and use one quarter of the square of the total value as the shield machine working state alarm index threshold; Based on the shield machine working state alarm index threshold, the shield machine working state alarm index is evaluated to obtain shield machine working state evaluation information; The shield machine working status assessment information is used as the shield machine working status assessment result to optimize the shield machine status.
8. A tunnel shield machine status monitoring system based on multi-source data, used to implement the monitoring method according to any one of claims 1 to 7, It is characterized in that include: A main control module, wherein the main control module is used to receive initial multi-source data of the tunnel, initial environment information of the tunnel, initial stratum information of the tunnel, initial multi-source data of the shield machine, initial mechanical state information of the shield machine, initial electrical state information of the shield machine, and initial posture information of the shield machine, analyze the initial multi-source data of the tunnel, obtain initial environment impact factors of the tunnel, obtain initial multi-source data of the shield machine under the influence of the initial environment impact factors of the tunnel, obtain real-time instruction information of the shield machine and real-time environment impact factors of the tunnel, obtain real-time multi-source data of the shield machine under the influence of the real-time environment impact factors of the tunnel, analyze the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, obtain an alarm index of the working state of the shield machine, and optimize the state of the shield machine according to the evaluation result of the working state of the shield machine; A monitoring module, wherein the monitoring module is used to conduct on-site surveys of newly built tunnels, collect initial multi-source data of the tunnels, monitor the surface conditions and climate conditions within the planned area of the newly built tunnels, obtain initial surface information and initial climate information, set a pressure sensor at the front end of the shield machine to monitor the soil index in front of the shield machine, obtain the initial soil pressure parameter, the initial soil moisture index, the initial soil temperature index and the initial soil hardness index, install a displacement sensor and a stress sensor on the tunnel wall to monitor the deformation of the tunnel wall and the stress of the tunnel structure, obtain the initial displacement parameter of the tunnel wall and the initial stress index of the tunnel structure, and obtain the real-time tunnel environment information and the real-time tunnel formation information; An evaluation module, wherein the evaluation module is used to evaluate the mechanical state information of the shield machine foundation and the electrical state information of the shield machine foundation, respectively, obtain the mechanical state index of the shield machine foundation and the electrical state index of the shield machine foundation, and evaluate the working state of the shield machine according to the working state alarm index of the shield machine; A transmission module, which is used for data transmission between the main control module, the monitoring module, the evaluation module and the display module; The display module is used to display the monitoring results of the monitoring module, the processing results of the main control module, the evaluation results of the evaluation module and the optimization process of the shield machine status.
9. A tunnel shield machine status monitoring system based on multi-source data according to claim 8, It is characterized in that The main control module comprises: A data receiving unit, the data receiving unit is used to receive initial multi-source data of the tunnel, initial environment information of the tunnel, initial stratum information of the tunnel, initial multi-source data of the shield machine, initial mechanical state information of the shield machine, initial electrical state information of the shield machine and initial posture information of the shield machine; A data processing unit, the data processing unit is used to analyze the initial multi-source data of the tunnel, obtain the initial environmental impact factor of the tunnel, obtain the initial multi-source data of the shield machine under the influence of the initial environmental impact factor of the tunnel, obtain the real-time instruction information of the shield machine and the real-time environmental impact factor of the tunnel, obtain the real-time multi-source data of the shield machine under the influence of the real-time environmental impact factor of the tunnel, analyze the initial multi-source data of the shield machine and the real-time multi-source data of the shield machine, and obtain the working status alarm index of the shield machine; The tuning unit is used to tune the state of the shield machine according to the working state evaluation result of the shield machine.
10. The tunnel shield machine status monitoring system based on multi-source data according to claim 8, It is characterized in that The evaluation module includes: A data evaluation unit, wherein the information evaluation unit is used to evaluate the mechanical state information of the shield machine foundation and the electrical state information of the shield machine foundation, respectively, to obtain a mechanical state index of the shield machine foundation and an electrical state index of the shield machine foundation; The state evaluation unit is used to evaluate the working state of the shield machine according to the shield machine working state alarm index.
Citation Information
Patent Citations
Automatic cruise shield advanced geological forecast system based on big data and working method
CN113090274A
Grouting construction whole process real-time monitoring and pre-control method and system based on digital twinning
CN117848422A
Apparatus and method for monitoring tunnel boring efficiency
SG166348A1
Cited By
Pipe jacking machine construction on-line monitoring system based on Internet of Things
CN118984330A
Shield tunneling machine tunnel excavation precision control method and device and computer storage medium
CN119538684A
Shield tunneling axis direction control system and control method based on multi-sensor fusion
CN121345554A
Subway tunnel construction intelligent optimization system and method based on BIM model
CN121685199A
