A solderless edge mounted connector and its testing system
By designing a solderless edge-mount connector and its testing system, the problem of low connector stability was solved, accurate measurement of fault-free time was achieved, and the stability and efficiency of the connector in different environments were improved.
Patent Information
- Application Number
- CN202411265958.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-09-11
AI Technical Summary
In the existing technology, solderless edge-mounted connectors have low stability, and there is no effective measurement of the fault-free time from the start of use to the first occurrence of a quality problem.
Design a solderless edge-mount connector and its testing system, including a center conductor, insulation structure and fixing structure. Using a temperature regulator, contact resistance tester, life test bench and dust test bench, measure the connector's trouble-free time and data transmission rate under different environments to determine the most suitable temperature range and trouble-free time.
It improves the stability of connector use, reduces connector wear caused by temperature and dust adhesion by accurately measuring fault-free time, and ensures efficient operation of connectors in the preset environment.
Smart Images

Figure CN118795392B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of connection devices, and in particular to a solder-free edge-mounted connector and a test system thereof. Background Art
[0002] With the rapid development of electronic technology, the application of printed circuit boards (PCBs) is becoming more and more extensive, and the requirements for connectors are becoming higher and higher. Traditional welding methods have limitations in certain application scenarios, such as complex installation, high cost, and difficulty in replacement. Therefore, solderless edge-mounted connectors came into being to meet the needs of fast, convenient, and stable electrical connections.
[0003] Solderless edge-mount connectors usually include flange connectors, screws, bases, insulators, pins and other components. These components are precisely designed and manufactured to achieve the function of being directly mounted on the edge of the PCB without soldering. Its structural features include quick installation, easy replacement, good stability, etc., which enable the connector to perform well in a variety of application scenarios.
[0004] China application publication number: CN117728138A discloses a solderless connection mechanism between a coaxial connector and a planar microstrip, the solderless connection mechanism includes a coaxial connector, a metal shell, a low-loss dielectric pressing block and a planar microstrip board; the pin-type inner conductor of the coaxial connector extends from the cylindrical cavity of the metal shell and contacts the signal line of the planar microstrip board; the pin-type inner conductor and the signal line are crimped using a low-loss dielectric pressing block, thereby achieving a solderless connection. By designing the thickness and cavity of the low-loss dielectric pressing block, the change of the electromagnetic field from TEM wave to quasi-TEM wave at the transition between the coaxial connector and the planar microstrip line can be compensated, and the impedance discontinuity caused by the electric field change can be improved, so that it has excellent performance in a wide frequency band.
[0005] China application publication number: CN116565652A discloses a board-end solderless RF connector; including a housing, a first insulator, a second insulator and an inner conductor assembly, the housing is provided with a mounting hole penetrating the front and rear end surfaces thereof, the inner conductor assembly is in the mounting hole, the inner conductor assembly includes a head jack component and a tail pin component, the head jack component and the tail pin component are fixedly connected, the tail pin component extends out of the rear side of the mounting hole of the housing and contacts the external PCB board terminal, a first insulator is provided between the side wall of the head jack component and the mounting hole, and a second insulator is provided between the side wall of the tail pin component and the mounting hole. The board-end solderless RF connector enables the operating frequency to reach 40GHz, the voltage standing wave ratio is less than 1.3, is solder-free, easy to disassemble, and is applicable to RF coaxial connectors with various thickness PCB ports, which is of great significance to the development of future equipment and the development of the communications industry.
[0006] However, the above method has the following problems: there is no prior art for measuring the trouble-free time of the connector from the beginning of use to the first occurrence of quality problems, resulting in low stability of the connector during use. Summary of the invention
[0007] To this end, the present invention provides a solderless edge-mounted connector and a testing system thereof, so as to overcome the problem in the prior art that there is no method for measuring the trouble-free time of the connector from the beginning of use to the first occurrence of quality problems, resulting in low stability of the connector during use.
[0008] In one aspect, the present invention provides a solderless edge-mounted connector comprising a center conductor, an insulating structure, a fixing structure, and a plurality of connecting screws, wherein:
[0009] The central conductor is used for signal transmission;
[0010] The insulating structure is wrapped around the central conductor and is used to isolate the central conductor from the fixed structure;
[0011] The fixing structure is connected to the insulating structure and the central conductor through the plurality of connecting screws, and is used to provide support and protection for the connector.
[0012] In another aspect, the present invention provides a test system for a solderless edge-mount connector, comprising:
[0013] Temperature regulator, used to change the temperature inside the life test bench and dust test bench;
[0014] Contact resistance tester, used to detect whether the connector can pass current normally after the size changes due to temperature changes;
[0015] A life test bench, connected to the temperature regulator and the contact resistance tester, for testing the data transmission rate of the connector and the corresponding flawless time at the working temperature;
[0016] A dust test bench, connected to the temperature regulator, the contact resistance tester and the life test bench, is used to detect the data transmission rate of the connector when dust falls on the connector, and to determine the detection time by comparing the data transmission rate with the preset transmission rate;
[0017] A data processor is connected to the life test bench and the dust test bench, and is used to receive data from the life test bench and the dust test bench, compare the detection time with the flawless time, and re-determine the flawless time;
[0018] Wherein, the operating temperature is the temperature at which the connector works at a preset transmission rate;
[0019] The flawless time is the time period from the start of use of the connector to the first time that the data transmission rate is lower than the preset transmission rate.
[0020] Furthermore, the life test bench determines a test temperature range, and sets a temperature point according to the test temperature range, adjusts the temperature in the life test bench to reach the temperature point through the temperature regulator, installs the connector with the PCB board at each set temperature point, detects the current in the connector through the contact resistance tester, and detects the data transmission rate through the life test bench;
[0021] The temperature points are endpoints of a linear distribution within the test temperature range.
[0022] Furthermore, the contact resistance tester is preset with a standard current. At any temperature point, the actual current is measured after the connector and the PCB board are installed, and the actual current at the temperature point is compared with the standard current.
[0023] If the actual current at the temperature point is lower than the standard current, the connector and PCB board installation at the temperature point do not meet the preset standard, and the life test bench re-determines the test temperature range;
[0024] If the actual current at the temperature point is not lower than the standard current, the connector and PCB board installation at the temperature point meet the preset standard, and a data transmission rate test is performed;
[0025] The preset standard is that the data transmission rate of the connector is not less than the preset transmission rate.
[0026] Furthermore, the transmission detector detects the data transmission rate of the connector that reaches a preset standard in the contact resistance test, and there is a preset transmission rate in the transmission detector, and the data transmission rate is compared with the preset transmission rate.
[0027] If the data transmission rate is lower than the preset transmission rate, the connector and the PCB board installation at this temperature point do not meet the preset standard, and the life test bench re-determines the test temperature range;
[0028] If the data transmission rate is not less than the preset transmission rate, the connector and PCB board installation meet the preset standard at this temperature point, and the next temperature point test is performed.
[0029] Furthermore, after all the temperature points are tested, the life test bench processes the test data.
[0030] If all temperature points reach the preset standard, and the connector and PCB board installation reach the preset standard under the test temperature range, the connector is placed in the life test bench to determine the flawless time;
[0031] If any temperature point does not reach the preset standard, the connector and the PCB board do not reach the preset standard within the test temperature range, and the temperature regulator re-determines the test temperature range and performs a contact resistance test.
[0032] Furthermore, the temperature in the life test bench changes periodically within the test temperature range, and the life test bench records the time from the start of connection between the connector and the PCB board to the first time the transmission rate is lower than a preset value, and determines this time as the flawless time.
[0033] Furthermore, the dust test bench monitors the decrease in data transmission rate of the connector due to dust adhesion after operation. A dust collection chamber is provided at the bottom of the dust test bench, and a blower is provided in the dust collection chamber. The blower blows air into the dust test bench at a preset speed, and the air flow drives the dust into the dust test bench.
[0034] Furthermore, a preset transmission rate is determined in the dust test bench, and a timer is provided. The timer starts timing when the connector is connected to the PCB board, and the real-time transmission rate after the connector is connected to the PCB board is detected, and the real-time transmission rate is compared with the preset transmission rate.
[0035] If the real-time transmission rate is not lower than the preset transmission rate, the dust falling test bench continues to detect and the timer continues to count;
[0036] If the real-time transmission rate is lower than the preset transmission rate, the timer stops timing, and the duration from the start of timing to the stop of timing of the timer is determined as the detection duration.
[0037] Further, the data processor compares the detection duration with the flawless duration,
[0038] If the detection time does not exceed the flawless time, the detection time is determined as the new flawless time;
[0039] If the detection time exceeds the flawless time, the flawless time of the connector is determined.
[0040] Compared with the prior art, the beneficial effects of the present invention lie in that the applicable temperature range of the connector is detected and the flawless time is determined by using a life test bench, and the flawless time is re-determined by simulating the dust collection situation of the actual connector after use by using a dust collection laboratory, thereby determining the use environment of the connector and the trouble-free time in this environment, and improving the stability of the connector use, thereby overcoming the problem in the prior art that there is no method for measuring the trouble-free time of the connector from the beginning of use to the first occurrence of quality problems, resulting in low stability of the connector when used.
[0041] Furthermore, by using a contact resistance tester to detect the current conditions in the connector, the most suitable temperature range of the connector can be determined, thereby reducing the connector being unusable due to temperature problems during use and improving the efficiency of connector use, thereby further overcoming the problem in the prior art that there is no method for measuring the trouble-free time of the connector from the beginning of use to the first occurrence of quality problems, resulting in low stability of the connector during use.
[0042] Furthermore, the data transmission rate of the connector at this temperature is detected by a life test bench, and the temperature range that meets the transmission requirements is determined, thereby providing the most suitable parameters for the use of the connector, reducing the loss of the connector, and improving the efficiency of the connector. This further overcomes the problem in the prior art that there is no method for measuring the trouble-free time of the connector from the beginning of use to the first occurrence of a quality problem, resulting in low stability of the connector when it is used.
[0043] Furthermore, the dust adhesion conditions of the actual connector operation are simulated by a dust falling test bench to measure the trouble-free time, thereby improving the measurement accuracy of the trouble-free time, improving the stability of the connector use, allowing the connector to be arranged in advance and improving the use efficiency, thereby further overcoming the problem in the prior art that there is no method for measuring the trouble-free time of the connector from the beginning of use to the first occurrence of quality problems, resulting in low stability of the connector when used.
[0044] Furthermore, by constructing a structure of a solderless edge-mounted connector, the connector is made compact, reliable in performance, and easy to install, thereby further overcoming the problem in the prior art that there is no method for measuring the trouble-free time of the connector from the beginning of use to the first occurrence of a quality problem, resulting in low stability of the connector during use. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 It is a structural schematic diagram of the solderless edge connector testing system of the present invention;
[0046] Figure 2 This is a flow chart of a solderless edge connector testing system according to an embodiment of the present invention;
[0047] Figure 3 An exploded view of the solderless edge connector structure according to an embodiment of the present invention;
[0048] Figure 4 This is an assembly diagram of the solderless edge connector structure of an embodiment of the present invention;
[0049] Among them, the first center needle 1, the first insulator 2, the first main body 3, the flange 4, the first screw 5, the second center needle 6, the second insulator 7, the second screw 8, the second main body 9, the third main body 10, and the fourth main body 11. DETAILED DESCRIPTION
[0050] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0051] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0052] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is merely for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.
[0053] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0054] See also Figure 1 As shown, it is a structural schematic diagram of the solderless edge connector testing system of the present invention, comprising:
[0055] Temperature regulator, used to change the temperature inside the life test bench and dust test bench;
[0056] Contact resistance tester, used to detect whether the connector can pass current normally after the size changes due to temperature changes;
[0057] Life test bench, connected with temperature regulator and contact resistance tester, used to test the data transmission rate of the connector and the corresponding flawless time at working temperature;
[0058] A dust test bench, connected to a temperature regulator, a contact resistance tester and a life test bench, is used to detect the data transmission rate of the connector under dust conditions, and to determine the detection time by comparing the data transmission rate with the preset transmission rate;
[0059] A data processor is connected to the life test bench and the dust test bench, and is used to receive data from the life test bench and the dust test bench, compare the detection time with the flawless time, and re-determine the flawless time;
[0060] The operating temperature is the temperature at which the connector works at a preset transmission rate;
[0061] The idle time is the time period from the start of use of the connector to the first time the data transmission rate drops below the preset transmission rate.
[0062] During implementation, the life test bench determines the temperature range of the connector from -40°C to 40°C, and selects temperature points within the temperature range at intervals of 5°C. First, the temperature point of -40°C is measured. When the temperature regulator controls the life test bench to control the temperature at -40°C, the connector and the PCB board are placed on the test bench and a plug-in experiment is performed. The current of the connector and the PCB board is measured by a contact resistance tester. If the current exceeds the preset current, the connection between the connector and the PCB board is normal at -40°C. If it does not exceed the preset current, the temperature range is readjusted to -35°C to 40°C, and so on. Taking the detection of current reaching the standard at -40℃ as an example, the life test bench measures the data transmission rate of the connector. If the transmission rate is lower than the preset transmission rate, the temperature range is readjusted to -35℃ to 40℃. If it is not lower than the preset transmission rate, a temperature point test of 40℃ can be performed. In this way, temperature points are cross-selected from both ends of the temperature range for measurement until all temperature points in the temperature range are measured. The temperature section where the current and transmission rate of all two adjacent temperature points meet the standard is determined to be the temperature section where the connector can work normally, that is, the working temperature. This data is transmitted to the data processor.
[0063] After determining the working temperature, the service life test bench measures the time from the start of the connection between the connector and the PCB board to the first time the transmission rate is lower than the preset value, and determines this time as the flawless time. During the measurement, the temperature will change periodically from the lowest temperature to the highest temperature, and from the highest temperature to the lowest temperature within the working temperature range. The change cycle is determined by the temperature change rate in the actual working environment. This data is transmitted to the data processor.
[0064] The connector with flawless duration determined by the life test bench is sent to the dust test bench, the connector is connected to the PCB board, and the dust adhesion in the factory is simulated by the dust test bench. The dust is blown by the blower to make the type and content of dust in the dust test bench close to that in the factory. The data transmission rate is detected in real time, and the time when the transmission rate is lower than the preset rate for the first time is obtained by timing, which is the detection duration. This data is sent to the data processor. The flawless duration is re-determined by comparison through the data processor.
[0065] It can be understood that the dust types and contents in the dust test bench are obtained by measuring the actual dust types and contents in the factory on site, and by weighting them to obtain the average value after the connector is exposed to the air for a long time.
[0066] The applicable temperature range of the connector is tested on a life test bench and the flawless time is determined. The dust fall condition of the actual connector after use is simulated in a dust removal laboratory to re-determine the flawless time. The connector use environment and the trouble-free time in this environment are determined to improve the stability of connector use, thus overcoming the problem in the prior art that there is no method for measuring the trouble-free time of the connector from the beginning of use to the first occurrence of quality problems, resulting in low stability of the connector when used.
[0067] Please combine Figure 1 See also Figure 2 As shown, it is a flow chart of a solderless edge connector testing system according to an embodiment of the present invention, including:
[0068] Step S1: The life test bench determines the temperature range and temperature point, and the temperature regulator adjusts the temperature to the temperature point;
[0069] Step S2: the contact resistance tester tests the current. If the current meets the standard, the data transmission rate test is performed. If it does not meet the standard, the temperature range is re-determined and the contact resistance test is performed;
[0070] Step S3: The life test bench tests the data transmission rate. If the preset rate is reached, the next temperature point test is performed and steps S2-S3 are repeated until all temperature points are tested successfully. If the preset rate is not reached, the temperature range is re-determined and the contact resistance test is performed;
[0071] Step S4: After all temperature points have reached the preset standard, the life test bench tests the flawless time under the periodic change of this temperature range;
[0072] Step S5: The dust falling test bench simulates the dust adhesion condition to test the first time the transmission rate is lower than the preset rate.
[0073] Step S6: Determine the difference between the detection time and the idle time, and redetermine the idle time.
[0074] Specifically, the life test bench determines the test temperature range, sets the temperature points according to the test temperature range, adjusts the temperature in the life test bench to the temperature points through the temperature regulator, installs the connector with the PCB board at each set temperature point, and detects the current in the connector through the contact resistance tester, and detects the data transmission rate through the life test bench;
[0075] The temperature points are the endpoints of the linear distribution within the test temperature range.
[0076] Please refer to Table 1, which is a temperature range detection table of the solderless edge-mounted connector according to an embodiment of the present invention.
[0077] Table 1 Temperature range test table for solderless edge mount connectors
[0078]
[0079] Specifically, the contact resistance tester has a preset standard current. At any temperature point, the actual current is measured after the connector and PCB are installed. The actual current at that temperature point is compared with the standard current.
[0080] If the actual current at a temperature point is lower than the standard current, the connector and PCB installation at that temperature point do not meet the preset standard, and the life test bench re-determines the test temperature range;
[0081] If the actual current at the temperature point is not lower than the standard current, the connector and PCB board installation at the temperature point meet the preset standard, and the data transmission rate test is performed;
[0082] The preset standard is that the data transmission rate of the connector is not less than the preset transmission rate.
[0083] In practice, if there is a preset standard current of 10A in the contact resistance tester, and the current of the connector and the PCB board detected at the temperature point of 40°C is 8.6A, then at the temperature point of 40°C, the installation of the connector and the PCB board does not meet the preset standard, and the life test bench re-determines the temperature range of -40°C to 35°C and re-measures the current at 35°C.
[0084] If there is a preset standard current of 10A in the contact resistance tester, and the current detected between the connector and the PCB board is 10.7A at the temperature point of 35°C, then at the temperature point of 35°C, the installation of the connector and the PCB board meets the preset standard and the transmission rate is measured.
[0085] By using a contact resistance tester to detect the current in the connector, the most suitable temperature range of the connector can be determined, reducing the chances of the connector being unusable due to temperature problems during use and improving the efficiency of connector use. This further overcomes the problem in the prior art that there is no method for measuring the trouble-free time of the connector from the start of use to the first occurrence of a quality problem, resulting in low stability of the connector during use.
[0086] Specifically, after the life test bench receives the signal that the contact resistance test reaches the preset standard, it detects the data transmission rate of the connector. There is a preset transmission rate in the transmission detector, and compares the data transmission rate with the preset transmission rate.
[0087] If the data transmission rate is lower than the preset transmission rate, the connector and PCB board installation at this temperature point do not meet the preset standard, and the life test bench re-determines the test temperature range;
[0088] If the data transmission rate is not less than the preset transmission rate, the connector and PCB board installation meet the preset standard at this temperature point, and the next temperature point test is performed.
[0089] In practice, if the life test bench has a preset transmission rate of 1500km / s, and the data transmission rate between the connector and the PCB board is detected to be 1483km / s at a temperature point of 35°C, then at the temperature point of 35°C, the installation of the connector and the PCB board does not meet the preset standard, and the life test bench re-determines the temperature range of -40°C to 30°C. And re-measure the current and transmission rate at 30°C.
[0090] If the life test bench has a preset transmission rate of 1500km / s, and after testing at a temperature point of 30℃, the data transmission rate between the connector and the PCB board is detected to be 1516km / s, then at the temperature point of 30℃, the installation of the connector and the PCB board meets the preset standard. The next step is to test the current and data transmission rate at the temperature point of -35℃.
[0091] In this experiment, all data transmission rates are determined by rounding to integers.
[0092] Please refer to Table 2, which is a test table of flawless time of solderless edge mounted connector according to an embodiment of the present invention.
[0093] Table 2 Test table of flawless time of solderless edge mounted connector
[0094]
[0095] Specifically, after all temperature points are tested, the life test bench processes the test data.
[0096] If all temperature points meet the preset standards, and the connector and PCB board installation meet the preset standards within the test temperature range, the connector is placed in the life test bench to determine the flawless time;
[0097] If any temperature point does not reach the preset standard, the connector and the PCB board do not reach the preset standard within the test temperature range, and the temperature regulator re-determines the test temperature range and performs a contact resistance test.
[0098] In implementation, if the temperature range is determined to be -10℃ to 10℃, at this time, the temperature points of -10℃, -5℃, 0℃, 5℃, and 10℃ all reach the preset standards, then it is determined that under this temperature range, the installation of the connector and the PCB board reaches the preset mark, and a flawless time test can be performed.
[0099] If the temperature range is determined to be -10℃ to 10℃, at this time, the temperature points of -10℃, -5℃, 5℃, and 10℃ all meet the preset standards, but the temperature point of 0℃ does not meet the preset standard, then it is determined that within the temperature range of -10℃ to -5℃ and 5℃ to 10℃, the installation of the connector and the PCB board meets the preset markings, and a flawless time test can be performed.
[0100] Specifically, the temperature in the life test bench changes periodically within the test temperature range. The life test bench records the time from the start of connection between the connector and the PCB board to the first time the transmission rate is lower than the preset rate, and determines this time as the flawless time.
[0101] In implementation, if the temperature range is determined to be -20℃ to 40℃ after testing, in the life test bench, after adjusting the temperature to -20℃, increase the temperature at a rate of 3℃ per hour until it reaches 40℃, and then decrease to -20℃ at a rate of 3℃ per hour, and repeat this cycle. During this period, install the connector and PCB board and start testing the transmission rate. When the transmission rate is lower than the preset rate for the first time, stop and record the duration, which is the flawless time.
[0102] By testing the data transmission rate of the connector at this temperature through the life test bench, and determining the temperature range that meets the transmission requirements, the most suitable parameters for the use of the connector are provided, the loss of the connector is reduced, and the efficiency of the connector is improved, thereby further overcoming the problem in the prior art that there is no method for measuring the trouble-free time of the connector from the beginning of use to the first occurrence of quality problems, resulting in low stability of the connector during use.
[0103] Specifically, the dust test bench monitors the decrease in data transmission rate of the connector due to dust adhesion after operation. A dust collection chamber is provided at the bottom of the dust test bench, and a blower is provided in the dust collection chamber. The blower blows air into the dust test bench at a preset speed, and the air flow drives the dust into the dust test bench.
[0104] Specifically, a preset transmission rate is determined in the dust test bench, and a timer is set. The timer starts when the connector is connected to the PCB board, and the real-time transmission rate after the connector is connected to the PCB board is detected. The real-time transmission rate is compared with the preset transmission rate.
[0105] If the real-time transmission rate is not lower than the preset transmission rate, the dust test bench continues to detect and the timer continues to count;
[0106] If the real-time transmission rate is lower than the preset transmission rate, the timer stops timing, and the duration from the start of timing to the stop of timing of the timer is determined as the detection duration.
[0107] During implementation, if the preset transmission rate is 1500km / s, the dust falling test bench starts the dust falling simulation, and the determined temperature range is a periodic change of -20℃ to 40℃. When the detected transmission rate is 1633km / s, the dust falling test bench continues the experiment. When the detected transmission rate is 1499km / s, the dust falling test bench stops working, and the timer calculates the time from the start to the end, which is the detection time.
[0108] Specifically, the data processor compares the detection time with the flawless time.
[0109] If the detection time does not exceed the flawless time, the detection time will be determined as the new flawless time;
[0110] If the detection time exceeds the flawless time, the flawless time of the connector is determined.
[0111] In implementation, if the detection time is 5673h and the flawless time is 5432h, the flawless time of the connector is determined to be 5432h; if the detection time is 5379h and the flawless time is 5816h, the flawless time of the connector is determined to be 5379h.
[0112] All durations in this experiment are estimated using the rounding method.
[0113] The dust adhesion conditions of the actual connector operation are simulated on a dust falling test bench to measure the trouble-free time, thereby improving the measurement accuracy of the trouble-free time and improving the stability of the connector. The connector can be arranged in advance to improve the efficiency of use, thereby further overcoming the problem in the prior art that there is no method for measuring the trouble-free time of the connector from the beginning of use to the first occurrence of quality problems, resulting in low stability of the connector when it is used.
[0114] See also Figure 3 As shown, it is an exploded view of the solderless edge connector structure of an embodiment of the present invention, and according to Figure 3 See also Figure 4 As shown, it is an assembly diagram of the solder-free edge connector structure of an embodiment of the present invention, including a center conductor, an insulating structure, a fixing structure and a plurality of connecting screws, wherein:
[0115] Center conductor, used for signal transmission;
[0116] An insulating structure wrapped around the center conductor and used to isolate the center conductor from the fixed structure;
[0117] The fixing structure is connected to the insulating structure and the center conductor through a number of connecting screws to provide support and protection for the connector.
[0118] The center conductor includes a first center needle 1 and a second center needle 6, and the first center needle 1 and the second center needle 6 are contact-connected. The insulating structure includes a first insulator 2 and a second insulator 7. The first insulator 2 is wrapped around the side wall of the first center needle 1, and the second insulator 7 is wrapped around the side wall of the second center needle 6. The fixing structure includes a first main body 3, a flange 4, a second main body 9, a third main body 10, and a fourth main body 11. In addition, the connecting screws include a first screw 5 and a second screw 8. The first center needle 1 and the first insulator 2 are sleeved on the inner side of the first main body 3, the first main body 3 is sleeved on the inner wall of the flange 4, the flange 4 and the second main body 9 are connected by four first screws, the second center needle 6 and the second insulator 7 are sleeved on the inner wall of the second main body 9, and the second main body 9, the third main body 10 and the fourth main body 11 are connected by the second screw 8.
[0119] By constructing a structure of a solderless edge-mounted connector, the connector is made compact, reliable in performance, and easy to install, thereby further overcoming the problem in the prior art of having no method for measuring the trouble-free time of the connector from the beginning of use to the first occurrence of a quality problem, resulting in low stability of the connector during use.
[0120] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
[0121] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A test system for a solderless edge-mounted connector, characterized in that: include: Temperature regulator, used to change the temperature inside the life test bench and dust test bench; Contact resistance tester, used to detect whether the connector can pass current normally after the size changes due to temperature changes; A life test bench, connected to the temperature regulator and the contact resistance tester, for testing the data transmission rate of the connector and the corresponding flawless time at the working temperature; A dust test bench, connected to the temperature regulator, the contact resistance tester and the life test bench, is used to detect the data transmission rate of the connector under dust conditions, and to determine the detection time by comparing the data transmission rate with a preset transmission rate; A data processor is connected to the life test bench and the dust test bench, and is used to receive data from the life test bench and the dust test bench, compare the detection time with the flawless time, and re-determine the flawless time; Wherein, the operating temperature is the temperature at which the connector works at a preset transmission rate; The flawless time is the time period from the start of use of the connector to the first time the data transmission rate is lower than the preset transmission rate; The life test bench determines a test temperature range, sets a temperature point according to the test temperature range, adjusts the temperature in the life test bench to reach the temperature point through the temperature regulator, mounts the connector on the PCB board at each set temperature point, detects the current in the connector through the contact resistance tester, and detects the data transmission rate through the life test bench; The temperature points are endpoints of a linear distribution within the test temperature range; The dust test bench has a preset transmission rate, and a timer is provided. The timer starts timing when the connector is connected to the PCB board, and the real-time transmission rate after the connector is connected to the PCB board is detected, and the real-time transmission rate is compared with the preset transmission rate. If the real-time transmission rate is not lower than the preset transmission rate, the dust test bench continues to detect and the timer continues to count; If the real-time transmission rate is lower than the preset transmission rate, the timer stops timing, and the duration from the start of timing to the stop of timing of the timer is determined as the detection duration; The data processor compares the detection duration with the flawless duration, If the detection time does not exceed the flawless time, the detection time is determined as the new flawless time; If the detection time exceeds the flawless time, the original flawless time is determined to be the flawless time of the connector.
2. The test system for solderless edge-mounted connector according to claim 1, characterized in that: The contact resistance tester is preset with a standard current. At any temperature point, after the connector and the PCB board are installed, the actual current is measured, and the actual current at the temperature point is compared with the standard current. If the actual current at the temperature point is lower than the standard current, the connector and PCB board installation at the temperature point do not meet the preset standard, and the life test bench re-determines the test temperature range; If the actual current at the temperature point is not lower than the standard current, the connector and PCB board installation at the temperature point meet the preset standard, and a data transmission rate test is performed; Among them, the preset standard is that the data transmission rate of the connector is not less than the preset transmission rate.
3. The test system for solderless edge-mounted connector according to claim 2, characterized in that: After receiving the signal that the contact resistance test reaches the preset standard, the life test bench detects the data transmission rate of the connector. The transmission detector has a preset transmission rate, and compares the data transmission rate with the preset transmission rate. If the data transmission rate is lower than the preset transmission rate, the connector and the PCB board installation at this temperature point do not meet the preset standard, and the life test bench re-determines the test temperature range; If the data transmission rate is not less than the preset transmission rate, the connector and PCB board installation meet the preset standard at this temperature point, and the next temperature point test is performed.
4. The test system for solderless edge-mounted connector according to claim 3, characterized in that: After all temperature points are tested, the life test bench processes the test data. If all temperature points reach the preset standard, and the connector and PCB board installation reach the preset standard under the test temperature range, the connector is placed in the life test bench to determine the flawless time; If any temperature point does not reach the preset standard, the connector and the PCB board do not reach the preset standard within the test temperature range, and the temperature regulator re-determines the test temperature range and performs a contact resistance test.
5. The test system for solderless edge-mounted connector according to claim 4, characterized in that: The temperature in the life test bench changes periodically within the test temperature range. The life test bench records the time from the start of connection between the connector and the PCB board to the first time the transmission rate is lower than the preset rate, and determines this time as the flawless time.
6. The test system for solderless edge-mounted connector according to claim 5, characterized in that: The dust test bench monitors the situation where the data transmission rate of the connector decreases due to dust adhesion after operation. A dust collection chamber is provided at the bottom of the dust test bench, and a blower is provided in the dust collection chamber. The blower blows air into the dust test bench at a preset speed, and the air flow drives the dust into the dust test bench.
Citation Information
Patent Citations
Board end welding-free radio frequency connector
CN116565652A
Welding-free connecting mechanism for coaxial connector and planar microstrip
CN117728138A
Apparatus for automatic testing of electrical and electronic connectors
US5097213A
KR20220029352A