Analysis Method of Transformer Substation Transfer Capacity
Through multi-dimensional data analysis and grid topological evaluation, the transferable supply path is screened out, which solves the problem of the impact of a single factor in the substation transfer capacity analysis in the existing technology, improves the stability and intensity of transfer, and ensures the normal operation of the power grid.
Patent Information
- Application Number
- CN202411288795.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-09-14
AI Technical Summary
The influencing factors considered in the analysis of substation transfer capacity of the prior art are relatively single, resulting in a reduction in the transfer supply force and affecting the stable operation of the power grid.
By collecting electrical information of the substation, selecting the initial supply path, analyzing the power grid topology, screening the transferable supply path, evaluating the transferable supply efficiency factor, matching the reference load volume, calculating the load deviation volume, and feedback the transferable supply capacity of the substation. Improve the availability and stability of the transfer path.
Multi-dimensional data analysis has been realized, the reliability and flexibility of the substation's transfer path has been improved, the stability and intensity of the transfer are improved, and the normal operation of the power grid has been ensured.
Smart Images

Figure CN118826012B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power transfer in transformer substations, and in particular to a method for analyzing power transfer capacity of transformer substations. Background Art
[0002] At present, due to the increase in demand for electricity, power failures are becoming more and more frequent. Therefore, in order to ensure the stability and reliability of the power grid, it is necessary to perform corresponding power transfer operations. When analyzing the transfer capacity of substations, if the failure of substations or the fluctuation of power demand cannot be assessed in time, the transfer response speed will be delayed, and power transfer to substations cannot be implemented quickly and effectively, resulting in weak flexibility of the power grid and inability to maintain the normal operation of the power system.
[0003] For example, the invention patent with announcement number CN110137939B is a method for transferring load when the substation is completely shut down, which includes the following steps: S1, after the fault occurs, process each feeder of the power-off substation, identify whether the feeder path is a single path or multiple paths, and determine the contact relationship between the main transformers; S2, collect the initialization calculation parameters, and use the genetic algorithm to solve the optimal primary transfer scheme; S3, verify whether the substation after the transfer meets the main transformer constraint conditions. If there is a substation that does not meet the main transformer constraint, it is necessary to consider secondary transfer; S4, determine the maximum transferable load of the "weak link" and its overload capacity. If the former is small, it is necessary to modify the load rate of those "weak links" after the secondary transfer, and then solve the mathematical model of the primary transfer; S5, according to the optimal solution, find the fault recovery rate of each fault line. It can effectively improve the load transfer success rate and reduce the load recovery time, thereby reducing the load loss caused by the power outage of the substation.
[0004] For example, the invention patent with announcement number CN110148934B is a load transfer method for distribution network that takes secondary transfer into consideration. It uses genetic algorithm to solve the secondary transfer process. The secondary transfer takes the maximum transferable load as the objective function. Under the condition of fully considering the line constraints and the main transformer constraints, the transfer path of the power outage load is optimized. When the capacity of the target substation is insufficient, the power supply recovery amount is increased through secondary transfer. This scheme can effectively improve the load transfer success rate while reducing the load recovery time, thereby reducing the load loss caused by power outages in the substation.
[0005] Combining the above technical solutions, it is found that the current substation power transfer technical solutions consider a relatively single dimension that affects the transfer capacity. At the same time, genetic algorithms are used for data processing in most cases. However, genetic algorithms are existing algorithms and cannot guarantee that the results obtained are within the ideal range. Therefore, they will affect the transfer capacity of the substation and reduce the transfer strength of the substation, thereby reducing the stable operation of the power grid. Summary of the invention
[0006] In view of the deficiencies in the prior art, the present invention provides a method for analyzing the transfer capacity of a substation, which can effectively solve the problems involved in the above-mentioned background technology.
[0007] To achieve the above purpose, the present invention is implemented through the following technical solutions: a method for analyzing the transfer capacity of a substation, comprising: collecting electrical information of the substation, selecting each initial transfer path, obtaining and analyzing the grid topology information corresponding to each initial transfer path, thereby screening out each transfer path; evaluating the transfer status of each transfer path, obtaining the transfer transmission efficiency factor of each transfer path, and matching the reference load corresponding to the transfer area of each transfer path; obtaining the average of the actual load corresponding to the transfer area of each transfer path, performing difference processing with the reference load, obtaining the load deviation corresponding to the transfer area of each transfer path, and comparing it with the load deviation definition, thereby feeding back the transfer capacity of the substation.
[0008] As a further method, the specific analysis process of selecting each initial transfer path is as follows:
[0009] By collecting electrical information of the substation, the capacity fluctuation ratio of the substation on each historical collection day is evaluated, and the information is sorted in ascending order. The historical collection day corresponding to the capacity fluctuation ratio ranked first is selected and recorded as the transfer collection day. Thus, the transfer paths of the substation on the transfer collection day are counted and recorded as the initial transfer paths.
[0010] As a further method, the screening of the transferable supply paths includes the following specific screening process:
[0011] By analyzing the grid topology information corresponding to each initial transfer path, the grid structure influence of each initial transfer path is obtained, and compared with the grid structure influence threshold set in the transfer database. If the grid structure influence of an initial transfer path is less than or equal to the grid structure influence threshold, the initial transfer path is recorded as a transferable path. In this way, the initial transfer paths corresponding to the grid structure influence less than or equal to the grid structure influence threshold are screened out and recorded as transferable paths.
[0012] As a further method, the transfer transmission benefit factor of each transferable supply path is specifically analyzed as follows:
[0013] By evaluating the transfer status of each transferable supply path, the transfer information of each transferable supply path is collected, wherein the transfer information includes the maximum voltage value of the power supply bus on each transfer day, the number of power supply lines, the rated power supply capacity of each power supply line, and the power transmission capacity of each power supply line on each transfer day; the maximum output power corresponding to each power supply line of each transferable supply path is obtained, and the transfer information of each transferable supply path is comprehensively processed to obtain the transfer transmission efficiency factor of each transferable supply path.
[0014] As a further method, the reference load corresponding to the transfer area of each transferable path is matched, and the specific matching process is:
[0015] The regional reference load corresponding to each preset transfer transmission efficiency factor interval is extracted from the transfer database, and the regional reference load of each transferable supply path is matched according to the transfer transmission efficiency factor of each transferable supply path, which is recorded as the reference load corresponding to the transfer area of each transferable supply path.
[0016] As a further method, the feedback of the transferable power supply capacity of the substation is specifically conducted as follows:
[0017] The load deviation corresponding to the transfer area of each transferable path is obtained by performing difference processing between the average actual load corresponding to the transfer area of each transferable path and the reference load; the load deviation corresponding to the transfer area of each transferable path is compared with the load deviation limit preset in the transfer database; if the load deviation corresponding to the transfer area of a certain transferable path is equal to or lower than the load deviation limit, then the transfer operation of the substation can be normally performed on this transferable path, thereby screening out the transferable paths with load deviation equal to or lower than the load deviation limit, and finally feeding back the transfer capacity of the substation.
[0018] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects:
[0019] (1) The present invention provides a method for analyzing the transfer capacity of a substation. First, the electrical information of the substation is collected, and each initial transfer path can be selected. The grid topology information corresponding to each initial transfer path is analyzed, and each transfer path is screened out to improve the availability of the transfer path of the substation. The transfer status of each transfer path is evaluated. Through the analysis of multi-dimensional data, the reference load corresponding to the transfer area of each transfer path matched can be made more accurate. By performing difference processing with the average value of the actual load corresponding to the transfer area of each transfer path, the transfer capacity of the substation is finally fed back, thereby improving the transfer stability and transfer flexibility of the substation.
[0020] (2) The present invention selects each initial transfer path by collecting electrical information of the substation, and obtains and analyzes the grid topology information corresponding to each initial transfer path. Since the data analysis method is diversified, the reliability of each selected transferable path is higher, which can provide a more accurate data basis for the subsequent matching of the reference load corresponding to the transfer area of each transferable path.
[0021] (3) The present invention evaluates the transfer status of each transferable supply path to obtain the transfer transmission efficiency factor of each transferable supply path, matches the reference load corresponding to the transfer area of each transferable supply path, and performs difference processing with the average of the actual load corresponding to the transfer area of each transferable supply path. The transfer response of the substation can be obtained in real time and accurately, and by feeding back the transfer capacity of the substation, the power transfer of the substation can be quickly and effectively implemented, and finally the transfer strength of the substation is improved to maintain the normal operation of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.
[0023] Figure 1 It is a schematic diagram of the method flow of the present invention. DETAILED DESCRIPTION
[0024] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0025] Reference Figure 1 As shown, the present invention provides a method for analyzing the transferable power supply capacity of a substation, including: collecting electrical information of the substation, selecting each initial transfer supply path, obtaining and analyzing the power grid topology information corresponding to each initial transfer supply path, thereby screening out each transferable power supply path.
[0026] Specifically, the electrical information of the substation includes the average seasonal load and the rated capacity of the transformer. The average seasonal load can be obtained by reading the electric meter of the substation, obtaining the total load of a quarter and dividing it by the number of days corresponding to the quarter to obtain the average seasonal load; the rated capacity of the transformer is usually clearly marked on the technical specification of the transformer.
[0027] Furthermore, the capacity fluctuation ratio of the substation on each historical collection day is evaluated, and the specific evaluation process is as follows:
[0028] The first quarter cycle corresponding to the seasonal average load of the substation is obtained, wherein the first quarter cycle refers to the quarterly duration corresponding to the previous quarter for analyzing the transfer capacity of the substation; each historical collection day is divided, and the total load corresponding to the substation on each historical collection day is extracted. The extraction method can be through the substation's electric meter, to obtain the load of the substation on each day, and perform difference processing with the seasonal average load to obtain the load change of the substation on each historical collection day, thereby matching it with the maximum transformer fluctuation capacity corresponding to each load change interval preset in the transfer database, and obtaining the maximum transformer fluctuation capacity of the substation on each historical collection day.
[0029] It should be explained that the maximum capacity fluctuation of the transformer of the above substation on each historical collection day, the specific matching process is as follows:
[0030] In this example, the load change interval is divided into three intervals, namely, the first load change interval, the corresponding value range is (0, 200 MW), and the matching maximum fluctuation capacity of the first transformer is 200 MW; the second load change interval, the corresponding value range is [200 MW, 500 MW], and the matching maximum fluctuation capacity of the second transformer is 500 MW; the remaining values are all the third load change interval, and the matching maximum fluctuation capacity of the third transformer is 550 MW; if the load change is 500 MW, it belongs to the second load change interval, and the matching is the maximum fluctuation capacity of the second transformer, which is 500 MW.
[0031] The maximum transformer capacity fluctuation of the substation on each historical collection day is ratioed to the rated capacity of the transformer to obtain the capacity fluctuation ratio of the substation on each historical collection day.
[0032] It should be explained that the substation in this example is a large power plant, such as a main substation or a step-up substation. In this example, the rated capacity of the transformer is set to 500 MW.
[0033] In this example, the load change is 500 MW, which matches the maximum fluctuation capacity of the second transformer, which is 500 MW. When the ratio is processed with the rated capacity of the transformer, the obtained capacity fluctuation ratio is 1, indicating that the capacity fluctuation of the substation is strong, which is not conducive to the power transfer of the substation. Load output adjustment is required to provide a more stable power transfer capacity.
[0034] Specifically, the specific analysis process of selecting each initial transfer path is as follows:
[0035] By collecting electrical information of the substation, the capacity fluctuation ratio of the substation on each historical collection day is evaluated, and the information is sorted in ascending order. The historical collection day corresponding to the capacity fluctuation ratio ranking first is screened out and recorded as the transfer collection day. Thus, the transfer paths of the substation on the transfer collection day are counted and recorded as initial transfer paths. The statistical method can be through the transfer platform of the substation, from which the transfer path of the substation on the transfer collection day is extracted, thereby obtaining each initial transfer path.
[0036] Furthermore, the specific screening process of screening out the transferable supply paths is as follows:
[0037] By analyzing the grid topology information corresponding to each initial transfer path, the grid structure influence of each initial transfer path is obtained, and compared with the grid structure influence threshold set in the transfer database. If the grid structure influence of an initial transfer path is less than or equal to the grid structure influence threshold, the initial transfer path is recorded as a transferable path. In this way, the initial transfer paths corresponding to the grid structure influence less than or equal to the grid structure influence threshold are screened out and recorded as transferable paths.
[0038] Specifically, the grid topology information corresponding to each initial transfer path includes the number of grid transfer nodes of each initial transfer path, the number of redundant lines of each initial transfer path, and the number of electrical equipment corresponding to each redundant line of each initial transfer path.
[0039] It needs to be explained that the methods of obtaining the above-mentioned number of power grid transfer nodes, number of redundant lines, and number of electrical equipment are all derived from the power grid planning and design documents. This power grid planning and design document includes a power grid planning map, cable route map, equipment configuration map, etc., which describes in detail the connection layout, transfer path and redundant line design of the substation, from which the number of power grid transfer nodes, number of redundant lines, and number of electrical equipment can be extracted.
[0040] Furthermore, the specific analysis process of the influence of the grid structure of each initial transfer path is as follows:
[0041] Locate and count the distances between the location points of each power grid transfer node on each initial transfer path and the central location point of the substation, and obtain the location of the substation and each power grid transfer node through the geographic information platform; confirm the precise latitude and longitude coordinate information of the substation and each power grid transfer node; import the coordinate information into the geographic information system; use the spatial analysis function of the geographic information system to treat the substation and each power grid transfer node as point objects, and use the distance measurement tools in the geographic information system, such as the distance between two points, to calculate the straight-line distance between each power grid transfer node and the central location point of the substation.
[0042] The transfer distance of each node of each initial transfer path is recorded, and the power grid topology information corresponding to each initial transfer path is analyzed to obtain the power grid structure influence of each initial transfer path. The specific analysis formula is:
[0043]
[0044] In the formula, is the influence of the grid structure on the ath initial transfer path. In this embodiment, the transfer process of the substation will be affected by factors such as transfer distance, transfer line, and transfer equipment. That is, the longer the transfer distance, the more transfer lines will appear in the transfer process, but in a few cases, there will be spare lines, and the corresponding redundant lines will become fewer, which is not conducive to the transfer of the substation. At the same time, due to the small number of redundant lines, the number of electrical equipment within the redundant line range will be small, and the transfer strength of the substation cannot be improved, which is not conducive to the stable operation of the overall power grid. Therefore, by comprehensively analyzing the impact of the above factors on the transfer, the factors that reduce the transfer strength can be quickly and accurately obtained, so as to take corresponding measures to improve the transfer capacity analysis of the substation.
[0045] The transfer distance of the jth node of the ath initial transfer path refers to the straight-line distance between the substation location and each node.
[0046] The influencing factor corresponding to the unit value of the transfer distance preset in the transfer database can be obtained by fitting the relationship between the historical transfer capacity of the power supply line and the transfer distance, and the fitting curve corresponding to the transfer distance is brought into the fitting curve according to the real-time transfer capacity of the power supply line, thereby obtaining the influencing factor corresponding to the unit value of the transfer distance in this example. At the same time, the value range in this example is (0, 1).
[0047] The number of redundant lines for the ath initial transfer path refers to the lines used to provide additional power supply paths.
[0048] The number of redundant lines preset in the transfer database refers to the minimum number of redundant lines in this example.
[0049] The number of electrical equipment corresponding to the bth redundant line of the ath initial transfer path refers to the number of electrical equipment corresponding to each redundant line.
[0050] The correction factor corresponding to the redundant line preset in the transfer database can be obtained by fitting the relationship between the historical number of redundant lines, the historical number of electrical equipment and the redundant lines, and the fitting curve corresponding to the redundant line can be substituted into the fitting curve corresponding to the redundant line according to the real-time number of redundant lines and the number of electrical equipment, thereby obtaining the correction factor corresponding to the redundant line in this example, and the value range in this example is (0, 1).
[0051] j is the number of each node, , m is the total number of nodes, b is the number of each redundant line, , y is the number of redundant lines, a is the number of each initial transfer path, , u is the total number of initial transfer paths.
[0052] In a specific embodiment, the present invention selects each initial transfer path by collecting electrical information of the substation, and obtains and analyzes the power grid topology information corresponding to each initial transfer path. Since the data analysis method is diversified, the reliability of each screened transferable supply path is higher, and a more accurate data basis can be provided for the subsequent matching of the reference load corresponding to the transfer area of each transferable supply path.
[0053] The transfer status of each transferable supply path is evaluated to obtain the transfer transmission efficiency factor of each transferable supply path, and the reference load corresponding to the transfer area of each transferable supply path is matched.
[0054] Specifically, the transfer transmission benefit factor of each transferable supply path is analyzed in the following process:
[0055] By evaluating the transfer status of each transferable supply path, the transfer information of each transferable supply path is collected, where the transfer information includes the maximum voltage value of the power supply bus on each transfer day, the number of power supply lines, the rated power supply capacity of each power supply line, and the power transmission capacity of each power supply line on each transfer day.
[0056] It needs to be explained that the above-mentioned transfer days refer to the corresponding days in the transfer process of the substation, which can be extracted through the transfer monitoring system of the substation; the maximum voltage value is obtained by the voltage sensor; the number of power supply lines and the rated power supply capacity can be obtained through the transfer monitoring system of the substation; the power supply transmission capacity can be obtained through the transfer monitoring system of the substation.
[0057] The maximum output power corresponding to each power supply line of each transferable supply path is obtained by a power sensor, and the transfer information of each transferable supply path is comprehensively processed to obtain the transfer transmission efficiency factor of each transferable supply path.
[0058] In this embodiment, the transfer efficiency factor of each transferable path is specifically processed as follows:
[0059] The power supply rated capacity of each power supply line of each transferable supply path and the power supply transmission capacity of each power supply line of each transferable supply path on each transfer day are processed by difference, so as to obtain the transferable capacity of each power supply line of each transferable supply path on each transfer day.
[0060] The transferable capacity of each power supply line of each transferable supply path on each transfer day is matched with the reference output power corresponding to each transferable capacity interval set in the transfer database to obtain the reference output power corresponding to each power supply line of each transferable supply path on each transfer day.
[0061] It should be explained that the matching process of the above reference output power is as follows:
[0062] In this example, the transferable capacity interval is divided into two intervals, namely, the first transferable capacity interval, the corresponding value range is (200 MW, 400 MW), and the matching first reference output power is 300 MW; the remaining value belongs to the second transferable capacity interval, and the matching second reference output power is 500 MW; therefore, if the transferable capacity is 500 MW, it belongs to the second transferable capacity interval and matches the second reference output power, which is 500 MW.
[0063] The maximum voltage value of the power supply busbar of each transferable supply path on each transfer day and the maximum output power corresponding to each power supply line of each transferable supply path are combined to obtain the transfer transmission efficiency factor of each transferable supply path. The specific formula is:
[0064]
[0065] In the formula, is the transfer transmission efficiency factor of the nth transferable supply path. In this embodiment, by analyzing the transmission capacity of the power supply line of the substation, the transferable capacity of the substation during transfer can be obtained through the rated capacity. Since the power supply line will be affected by the external environment during the transfer process, the specific situation of the external environmental interference is obtained by obtaining the output power of the power supply line of the substation during the transfer. At the same time, the greater the output power, the more transferable capacity is. Therefore, the adapted output power of the power supply line of the substation during the transfer is obtained through matching the transferable capacity. The actual output power is combined to further understand the transfer strength of the substation. Combining the above-mentioned influencing factors, the transmission situation of the substation during the transfer process can be clearly known, so that corresponding measures can be taken to improve its transfer capacity.
[0066] It is the maximum voltage value of the power supply bus of the nth transferable path on the dth transfer day, indicating the maximum output voltage of the power supply bus during daily transfer.
[0067] It is the bus-limited voltage value preset in the transfer database, indicating the maximum output voltage of the power supply bus.
[0068] The correction factor corresponding to the bus voltage preset in the transfer database can be obtained by fitting the relationship between the historical load changes of the power supply bus and the bus voltage, and then bringing the fitting curve corresponding to the bus voltage into the fitting curve according to the real-time load changes, thereby obtaining the correction factor corresponding to the bus voltage in this example. At the same time, the value range in this example is (0, 1).
[0069] It is the maximum output power corresponding to the g-th power supply line of the n-th transferable path, indicating the maximum output power of the power supply line during transfer.
[0070] It is the reference output power corresponding to the g-th power supply line of the n-th transferable path on the d-th transfer day, which represents the reference output power matched by the transferable capacity.
[0071] The correction factor corresponding to the output power preset in the transfer database can be obtained by fitting the relationship between the historical output efficiency of the protection equipment in the power supply line, the historical regional temperature and the output power, and the fitting curve corresponding to the output power is fitted. The real-time output efficiency and regional temperature are brought into the fitting curve corresponding to the output power to obtain the correction factor corresponding to the output power in this example. At the same time, the value range in this example is (0, 1).
[0072] n is the number of each transferable path, , c is the number of transfer paths, d is the number of each transfer day, , h is the total number of transfer days, g is the number of each power supply line, , q is the number of power supply lines.
[0073] Furthermore, the reference load corresponding to the transfer area of each transferable path is matched, and the specific matching process is as follows:
[0074] The regional reference load corresponding to each preset transfer transmission efficiency factor interval is extracted from the transfer database, and the regional reference load of each transferable supply path is matched according to the transfer transmission efficiency factor of each transferable supply path, which is recorded as the reference load corresponding to the transfer area of each transferable supply path.
[0075] It should be explained that the reference load corresponding to the transfer area of each transferable path is matched as follows:
[0076] In this example, the above-mentioned transfer transmission efficiency factor interval is divided into two intervals, namely, the first transfer transmission efficiency factor interval, the value range is (0, 0.5), and the matching first area reference load is 150 MW; the second transfer transmission efficiency factor interval, the value range is [0.5, 1], and the matching second area reference load is 250 MW; if the transfer transmission efficiency factor calculation result is 0.6, it belongs to the second transfer transmission efficiency factor interval, and the matching area reference load is 250 MW.
[0077] The average actual load corresponding to the transfer area of each transferable supply path is obtained, and the difference is processed with the reference load to obtain the load deviation corresponding to the transfer area of each transferable supply path, and compared with the load deviation limit, thereby feeding back the transfer capacity of the substation.
[0078] In a specific embodiment, the present invention evaluates the transfer status of each transferable supply path, obtains the transfer transmission efficiency factor of each transferable supply path, matches the reference load corresponding to the transfer area of each transferable supply path, and performs difference processing with the average of the actual load corresponding to the transfer area of each transferable supply path. The transfer response of the substation can be obtained in real time and accurately, and by feeding back the transfer capacity of the substation, the power transfer of the substation can be implemented quickly and effectively, and finally the transfer strength of the substation is improved to maintain the normal operation of the power grid.
[0079] Specifically, the feedback of the transferable power supply capacity of the substation is as follows:
[0080] The load deviation corresponding to the transfer area of each transferable supply path is obtained by performing difference processing between the average actual load amount corresponding to the transfer area of each transferable supply path and the reference load amount.
[0081] The load deviation corresponding to the transfer area of each transferable supply path is compared with the load deviation limit preset in the transfer database. If the load deviation corresponding to the transfer area of a certain transferable supply path is equal to or lower than the load deviation limit, then the transferable supply path can perform the transfer operation of the substation normally. In this way, the transferable supply paths with load deviation equal to or lower than the load deviation limit are screened out, and finally the transfer capacity of the substation is fed back.
[0082] In this embodiment, the above feedback substation's transferable power supply capacity is specifically fed back in the following process:
[0083] By comparing the load deviation corresponding to the transfer area of each transferable path with the load deviation limit preset in the transfer database, if the load deviation corresponding to the transfer area of a certain transferable path is equal to or lower than the load deviation limit, it means that the transferable path can meet the transfer standard set in the transfer monitoring system of the substation during the transfer process, that is, the transferable path can normally perform the transfer operation of the substation; by screening out the transferable paths corresponding to the load deviation equal to or lower than the load deviation limit, they are recorded as the transfer-compliant paths; that is, there are 10 transferable paths, and if there are 5 transfer-compliant paths, it means that the transfer strength of the substation is 50%, and if there are 9 transfer-compliant paths, the transfer strength of the substation is 90%; therefore, the transfer monitoring system of the substation can obtain the transfer capacity of the substation through the transfer strength of the substation, that is, the feedback of the transfer capacity of the substation is completed.
[0084] In a specific embodiment, the present invention provides a method for analyzing the transfer capacity of a substation. First, the electrical information of the substation is collected, and each initial transfer path can be selected. The grid topology information corresponding to each initial transfer path is analyzed, and each transferable path is screened out to improve the availability of the transfer path of the substation. The transfer status of each transferable path is evaluated. Through the analysis of multi-dimensional data, the reference load corresponding to the transfer area of each matched transferable path can be made more accurate. By performing difference processing with the average of the actual load corresponding to the transfer area of each transferable path, the transfer capacity of the substation is finally fed back, thereby improving the transfer stability and transfer flexibility of the substation.
[0085] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the present invention, they should all fall within the protection scope of the present invention.
Claims
1. A method for analyzing the transfer capacity of a substation, characterized in that: include: Collect electrical information of the substation, select each initial transfer path, obtain and analyze the grid topology information corresponding to each initial transfer path, and thus select each transferable path; Evaluate the transfer status of each transferable supply path, obtain the transfer transmission efficiency factor of each transferable supply path, and match the reference load corresponding to the transfer area of each transferable supply path; Obtain the average actual load corresponding to the transfer area of each transferable path, perform difference processing with the reference load, obtain the load deviation corresponding to the transfer area of each transferable path, and compare it with the load deviation limit, thereby feeding back the transfer capacity of the substation; The specific screening process of screening out the transferable supply paths is as follows: By analyzing the grid topology information corresponding to each initial transfer path, the grid structure influence of each initial transfer path is obtained, and compared with the grid structure influence threshold set in the transfer database. If the grid structure influence of an initial transfer path is less than or equal to the grid structure influence threshold, the initial transfer path is recorded as a transferable path, thereby screening out the initial transfer paths corresponding to the grid structure influence less than or equal to the grid structure influence threshold, and recording them as transferable paths; The specific analysis process of the influence of the grid structure of each initial transfer path is as follows: The distance between the location point of each power grid transfer node of each initial transfer path and the central location point of the substation is located and counted, which is recorded as the transfer distance of each node of each initial transfer path. The power grid topology information corresponding to each initial transfer path is analyzed to obtain the power grid structure influence of each initial transfer path. The specific analysis formula is: In the formula, is the grid structure influence of the a-th initial transfer path, is the transfer distance of the jth node of the ath initial transfer path, is the impact factor corresponding to the transfer distance unit value preset in the transfer database, is the number of redundant lines of the a-th initial transfer path, Define the number of redundant lines preset in the transfer database, is the number of electrical equipment corresponding to the bth redundant line of the ath initial transfer path, is the correction factor corresponding to the redundant line preset in the transfer database, j is the number of each node, , m is the total number of nodes, b is the number of each redundant line, , y is the number of redundant lines, a is the number of each initial transfer path, , u is the total number of initial transfer paths; The specific analysis process of the transfer and transmission benefit factor of each transferable supply path is as follows: By evaluating the transfer status of each transferable supply path, the transfer information of each transferable supply path is collected, wherein the transfer information includes the maximum voltage value of the power supply bus on each transfer day, the number of power supply lines, the rated power supply capacity of each power supply line, and the power transmission capacity of each power supply line on each transfer day; The maximum output power corresponding to each power supply line of each transferable supply path is obtained, and the transfer information of each transferable supply path is comprehensively processed to obtain the transfer transmission efficiency factor of each transferable supply path.
2. The method for analyzing the transfer capacity of a substation according to claim 1, characterized in that: The specific analysis process of selecting each initial transfer path is as follows: By collecting electrical information of the substation, the capacity fluctuation ratio of the substation on each historical collection day is evaluated, and the information is sorted in ascending order. The historical collection day corresponding to the capacity fluctuation ratio ranked first is selected and recorded as the transfer collection day. Thus, the transfer paths of the substation on the transfer collection day are counted and recorded as the initial transfer paths.
3. The method for analyzing the transfer capacity of a substation according to claim 2, characterized in that: The electrical information of the substation specifically includes the seasonal average load and the rated capacity of the transformer.
4. The method for analyzing the transfer capacity of a substation according to claim 2, characterized in that: The capacity fluctuation ratio of the substation on each historical collection day is evaluated, and the specific evaluation process is as follows: The first quarter cycle corresponding to the seasonal average load of the substation is obtained, and each historical collection day is divided. The total load corresponding to the substation on each historical collection day is extracted, and the difference is processed with the seasonal average load to obtain the load change of the substation on each historical collection day. This is matched with the maximum transformer fluctuation capacity corresponding to each load change interval preset in the transfer database to obtain the maximum transformer fluctuation capacity of the substation on each historical collection day; The maximum transformer capacity fluctuation of the substation on each historical collection day is ratioed to the rated capacity of the transformer to obtain the capacity fluctuation ratio of the substation on each historical collection day.
5. The method for analyzing the transfer capacity of a substation according to claim 1, characterized in that: The grid topology information corresponding to each initial transfer path specifically includes the number of grid transfer nodes of each initial transfer path, the number of redundant lines of each initial transfer path, and the number of electrical equipment corresponding to each redundant line of each initial transfer path.
6. The method for analyzing the transfer capacity of a substation according to claim 1, characterized in that: The reference load corresponding to the transfer area of each transferable path is matched, and the specific matching process is as follows: The regional reference load corresponding to each preset transfer transmission efficiency factor interval is extracted from the transfer database, and the regional reference load of each transferable supply path is matched according to the transfer transmission efficiency factor of each transferable supply path, which is recorded as the reference load corresponding to the transfer area of each transferable supply path.
7. The method for analyzing the transfer capacity of a substation according to claim 1, characterized in that: The feedback substation's transferable capacity is specifically fed back in the following process: The load deviation corresponding to the transfer area of each transferable supply path is obtained by performing difference processing on the average of the actual load corresponding to the transfer area of each transferable supply path and the reference load; The load deviation corresponding to the transfer area of each transferable supply path is compared with the load deviation limit preset in the transfer database. If the load deviation corresponding to the transfer area of a certain transferable supply path is equal to or lower than the load deviation limit, then the transferable supply path can perform the transfer operation of the substation normally. In this way, the transferable supply paths with load deviation equal to or lower than the load deviation limit are screened out, and finally the transfer capacity of the substation is fed back.